This corporate presentation by Srushti Management Consultancy provides an overview of the company. It has been providing architectural and design consultancy since 1991 and has completed over 225 projects. The presentation outlines the company's vision to be a leader in integrated design-build solutions in South India. It then describes Srushti's proposed solution of a centralized communication platform and new workflow process. The presentation concludes by introducing the experienced team and highlighting some of Srushti's completed project portfolios, including residential homes, offices, and hospitality projects.
Business Patterns presentation @ Oredev 2012allan kelly
This document summarizes Allan Kelly's presentation at Oredev in Malmo, Sweden in November 2012. Kelly discussed several business patterns for software developers, including keeping product variations simple to reduce costs, having account managers work in pairs to handle commercial and technical customer issues, and using patterns sequences to link patterns and their consequences. Kelly also promoted his book "Business Patterns for Software Developers" which describes 38 patterns for software businesses.
Obelisk is a global knowledge partner that provides architecture and construction support services. It was founded in 2008 and has offices in India and the US. Obelisk delivers cost-effective BIM support, CAD drafting, and other services to help architecture and engineering firms maximize efficiency and revenue. Its experienced team and competitive hourly rates provide significant cost savings compared to in-house resources.
ARCO Construction Company was founded in 1992 in St. Louis, Missouri and has since expanded to eight offices across the United States, specializing in commercial and industrial construction projects including manufacturing facilities, warehouses, and office buildings. ARCO prides itself on its design/build approach which provides clients with a single point of contact and saves on costs and schedule compared to traditional methods. The document highlights several past projects for clients across various industries to demonstrate ARCO's capabilities and experience.
Landmark Cyber Park is a new 15 lakh square foot commercial project in Gurgaon designed for the IT and retail industries. The open plan design incorporates natural light, landscaped gardens, and technology-supported infrastructure to cater to a 24/7 work culture. The project aims to set new standards for sustainable and efficient commercial buildings.
Haener interlocking concrete blocks provide the strength and stability of concrete block construction with significantly lower costs and faster construction times than traditional methods. The blocks interlock without needing mortar, allowing walls to be assembled 10 times faster than standard concrete blocks. Unskilled laborers can complete walls after the initial course is laid out by a master mason, significantly reducing labor costs. The blocks also provide better insulation, strength, moisture and mold resistance than wood frames at comparable or lower costs.
This document discusses innovation challenges and knowledge transfer in the digital era. It provides examples of both incremental and radical innovations, as well as disruptive innovations that break market rules. Key factors for innovation are identified as culture, governance, strategy, and process. Culture requires an innovative DNA and qualities like quickness, openness, teamwork, focus, and positivity. Governance involves defining roles for leadership, R&D, and other functions. Strategy requires strategic alignment with the company and flexibility to spin out non-aligned projects. Process involves defining a clear innovation funnel with multiple steps of validation and testing from ideas to implementation. Open innovation and listening to consumer trends and scenarios are also emphasized for driving innovation.
Nekuda DM is a full turnkey product design and development firm established in 1996. They specialize in transforming new technologies into category-leading product solutions. Nekuda takes a multidisciplinary approach involving designers, engineers, and researchers to balance observation, innovation, and implementation throughout the product development process. They have experience across various industries including consumer electronics, medical devices, and smart home products.
Business Patterns presentation @ Oredev 2012allan kelly
This document summarizes Allan Kelly's presentation at Oredev in Malmo, Sweden in November 2012. Kelly discussed several business patterns for software developers, including keeping product variations simple to reduce costs, having account managers work in pairs to handle commercial and technical customer issues, and using patterns sequences to link patterns and their consequences. Kelly also promoted his book "Business Patterns for Software Developers" which describes 38 patterns for software businesses.
Obelisk is a global knowledge partner that provides architecture and construction support services. It was founded in 2008 and has offices in India and the US. Obelisk delivers cost-effective BIM support, CAD drafting, and other services to help architecture and engineering firms maximize efficiency and revenue. Its experienced team and competitive hourly rates provide significant cost savings compared to in-house resources.
ARCO Construction Company was founded in 1992 in St. Louis, Missouri and has since expanded to eight offices across the United States, specializing in commercial and industrial construction projects including manufacturing facilities, warehouses, and office buildings. ARCO prides itself on its design/build approach which provides clients with a single point of contact and saves on costs and schedule compared to traditional methods. The document highlights several past projects for clients across various industries to demonstrate ARCO's capabilities and experience.
Landmark Cyber Park is a new 15 lakh square foot commercial project in Gurgaon designed for the IT and retail industries. The open plan design incorporates natural light, landscaped gardens, and technology-supported infrastructure to cater to a 24/7 work culture. The project aims to set new standards for sustainable and efficient commercial buildings.
Haener interlocking concrete blocks provide the strength and stability of concrete block construction with significantly lower costs and faster construction times than traditional methods. The blocks interlock without needing mortar, allowing walls to be assembled 10 times faster than standard concrete blocks. Unskilled laborers can complete walls after the initial course is laid out by a master mason, significantly reducing labor costs. The blocks also provide better insulation, strength, moisture and mold resistance than wood frames at comparable or lower costs.
This document discusses innovation challenges and knowledge transfer in the digital era. It provides examples of both incremental and radical innovations, as well as disruptive innovations that break market rules. Key factors for innovation are identified as culture, governance, strategy, and process. Culture requires an innovative DNA and qualities like quickness, openness, teamwork, focus, and positivity. Governance involves defining roles for leadership, R&D, and other functions. Strategy requires strategic alignment with the company and flexibility to spin out non-aligned projects. Process involves defining a clear innovation funnel with multiple steps of validation and testing from ideas to implementation. Open innovation and listening to consumer trends and scenarios are also emphasized for driving innovation.
Nekuda DM is a full turnkey product design and development firm established in 1996. They specialize in transforming new technologies into category-leading product solutions. Nekuda takes a multidisciplinary approach involving designers, engineers, and researchers to balance observation, innovation, and implementation throughout the product development process. They have experience across various industries including consumer electronics, medical devices, and smart home products.
Este documento analiza la sentencia del caso Diane Pretty del Tribunal Europeo de Derechos Humanos a la luz del Convenio Europeo de Derechos Humanos. Resume la creación y naturaleza del Tribunal Europeo de Derechos Humanos y examina los argumentos presentados por Diane Pretty y la decisión del Tribunal de rechazar su demanda.
Los adhesivos son productos derivados principalmente del petróleo utilizados para unir dos materiales sin alterar su constitución a través de la adherencia y la cohesión. Existen diferentes tipos de adhesivos sintéticos, de origen vegetal y animal que se clasifican según sus componentes. Las propiedades fundamentales de los adhesivos incluyen su consistencia, tiempo de curado, penetración y bloqueo de las superficies.
Este documento trata sobre la energía nuclear. Explica que la energía nuclear se libera como resultado de reacciones nucleares como la fisión y la fusión nuclear. Describe los orígenes históricos de la obtención de energía nuclear y sus usos importantes como la producción de electricidad. También menciona accidentes nucleares notables y conceptos básicos de física nuclear.
Project Management Quick Reference Guide For Microsoft Project 2007Toney Sisk
Before beginning a project, an organization must determine its priority and identify an executive sponsor. A project manager is then assigned to create a project plan in Microsoft Project 2007. The planning stage involves defining tasks, milestones, resources, and schedules. During execution, the project manager tracks progress by updating task status and comparing to the baseline plan. Upon completion, a final report is generated and the project is archived or saved as a template for future use.
The document outlines the daily salaries and total costs for staff on a 3-day film shoot, including a camera man at £411 per day, sound man at £170 per day, editor at £225 per day, and lighting man at £230 per day for a total staff cost of £3,108. It also lists the equipment hire costs for a camera at £95 per day, lighting at £36 per day, microphone at £23 per day, and clapperboard at £5 per day for a total equipment cost of £477 and overall total cost of £3,585, leaving £415 remaining from the £4,000 budget.
This document proposes a solution for targeted audio advertising. It notes that listeners want fewer ads but advertisers want measurable returns. The proposed solution, exaget, inserts tailored audio ads into each broadcast stream using their service platform. This improves listener satisfaction while increasing ad value and bringing in new advertisers and broadcasters. The opportunity is large as audio advertising spends $33 billion annually. Exaget needs 7000 active listeners to reach their 2013 revenue target of 700k euros with projected 20-25% annual growth. They have an experienced team and advisors with backgrounds in mobile and radio to develop and launch their targeted advertising platform.
User Experience - More Than Just a Pretty StickC4Media
Video and slides synchronized, mp3 and slide download available at http://bit.ly/YLazIT.
Lane Halley advises on building and organizing a User Experience process based on the Lean Startup cycle. Filmed at qconsf.com.
Lane Halley uses lean design & agile development methods to create Web & mobile products. Prior to joining Carbon Five, Lane worked as a UX coach and trainer (LUXr), an in-house design manager (Liquidnet), an agency designer (Cooper, Hot Studio), a director of User Experience (SenSage) and a video game producer (Mindscape/Electronic Arts).
Agile Architecture Agile Dev Practices 2013 KeynoteAdam Boczek
The document discusses the concept of "Agile Architecture" and whether it is an oxymoron. It explores Agile Architecture as an architectural process, flavor, or behavior. The author argues that Agile Architecture should mean "Architectural Intelligence" - the ability of a system to monitor, optimize, and heal itself through techniques like event sourcing and simplification. This would allow for operational intelligence, adaptive strategies, and automatic error removal.
[ROOM2FIT] offers a wide range of FF&E [Furniture, Fixtures and Equipment] services and products for Hospitality and residential interiors, managing all relations between buyers and suppliers.
From the idea to the implementation of the project, [ROOM2FIT] considers every detail, aiming to obtain a result that exceeds expectations and providing a successful project.
Aeronautic manufacturing industry is facing huge challenge : production ramp up, new launch, etc
Increase use of suppliers has complexified programs management and
Tieto Corporation provides customer experience integration solutions, servicing over 100 million European consumers daily. They have 600 specialists focused on CRM, customer service, and self-service. Tieto has experience working with clients in financial services, telecom, utility and other sectors to design, develop, and manage applications for contact centers, retail operations, and online customer interactions handling over 1 million contacts per month.
This document discusses construction project management and outlines the typical workflow process. It begins by introducing key players in construction projects and the importance of professionals to remove probability and guessing. It then outlines the main stages of a construction project workflow, including procurement planning, tendering, contract administration, construction period, and post-contract administration. The final product is emphasized to appreciate the full process that construction management entails from conceptual design to defects liability and occupancy.
This document discusses the role of product owners and techniques they can use. It emphasizes that product owners need authority, responsibility, knowledge, and availability to define the product vision and ensure the team delivers quality solutions that provide value to stakeholders. They are responsible for what is built, when, and getting sign-off from stakeholders. The document also presents several agile techniques product owners can use to define requirements and priorities, such as story mapping, personas, scenarios, and requirements dinosaurs.
User Experience - More Than Just a Pretty StickLane Goldstone
Presented at QconSF http://qconsf.com/sf2012/tracks/show_track.jsp?trackOID=678
What is user experience (UX)? Why does it matter? UX design is more than just making things look good. How do you create a compelling product that balances user and business needs, efficiently, using the resources you have?
This presentation provide a framework for thinking about the UX of your product and contains examples of my work as a product designer and UX coach for Agile and Lean Startup teams.
Decommissioning and Abandonment Summit 2013Dean Murphy
The document summarizes the 5th annual Decommissioning & Abandonment Summit to be held in Houston, TX in March 2013. It provides an overview of the event, including speakers from major oil companies, regulators, and independent operators who will discuss industry trends and innovations. The summit will gather over 800 senior executives from over 400 decommissioning organizations to network and learn about strategic planning, regulations, costs, technologies and environmental challenges. Attendees will represent oil and gas operators, service providers, contractors, and government agencies working on decommissioning in the Gulf of Mexico region.
HiPerDevGen is a tool that aims to accelerate analog layout design by automatically generating common analog structures like current mirrors and differential pairs based on user constraints. It recognizes these structures in schematics and allows rapid generation of layouts that closely resemble handcrafted designs while meeting design rules. This helps address the increasing bottleneck of analog layout design due to shorter development times and shrinking process nodes. Key features include generation of silicon-aware layouts, understanding of parasitic and matching requirements, and allowing designers to retain control over the layout process and design flow.
Grain Storage Silos and Handling Equipments Producer
Grain Storage Silos, Feed Silos and Equipments, Grain Conditioning, Grain Handling Equipments, Catwalks and Support Towers, Grain Cleaning Systems, Control Panels and Automation Systems
The document discusses designing high-performance office buildings of the future. It covers regulatory impacts on building design from laws aiming to reduce greenhouse gas emissions. It also covers topics like how different generations in the workforce prefer different work environments, how to target passive design and operations to reduce a building's energy footprint and carbon impact, and how green building certification can impact sales prices and occupant productivity/satisfaction. The overall goal is to provide an integrated, holistic design approach that capitalizes on changes in regulations, workforce demographics, and the business value of green building to create high-performing, sustainable office spaces.
Este documento analiza la sentencia del caso Diane Pretty del Tribunal Europeo de Derechos Humanos a la luz del Convenio Europeo de Derechos Humanos. Resume la creación y naturaleza del Tribunal Europeo de Derechos Humanos y examina los argumentos presentados por Diane Pretty y la decisión del Tribunal de rechazar su demanda.
Los adhesivos son productos derivados principalmente del petróleo utilizados para unir dos materiales sin alterar su constitución a través de la adherencia y la cohesión. Existen diferentes tipos de adhesivos sintéticos, de origen vegetal y animal que se clasifican según sus componentes. Las propiedades fundamentales de los adhesivos incluyen su consistencia, tiempo de curado, penetración y bloqueo de las superficies.
Este documento trata sobre la energía nuclear. Explica que la energía nuclear se libera como resultado de reacciones nucleares como la fisión y la fusión nuclear. Describe los orígenes históricos de la obtención de energía nuclear y sus usos importantes como la producción de electricidad. También menciona accidentes nucleares notables y conceptos básicos de física nuclear.
Project Management Quick Reference Guide For Microsoft Project 2007Toney Sisk
Before beginning a project, an organization must determine its priority and identify an executive sponsor. A project manager is then assigned to create a project plan in Microsoft Project 2007. The planning stage involves defining tasks, milestones, resources, and schedules. During execution, the project manager tracks progress by updating task status and comparing to the baseline plan. Upon completion, a final report is generated and the project is archived or saved as a template for future use.
The document outlines the daily salaries and total costs for staff on a 3-day film shoot, including a camera man at £411 per day, sound man at £170 per day, editor at £225 per day, and lighting man at £230 per day for a total staff cost of £3,108. It also lists the equipment hire costs for a camera at £95 per day, lighting at £36 per day, microphone at £23 per day, and clapperboard at £5 per day for a total equipment cost of £477 and overall total cost of £3,585, leaving £415 remaining from the £4,000 budget.
This document proposes a solution for targeted audio advertising. It notes that listeners want fewer ads but advertisers want measurable returns. The proposed solution, exaget, inserts tailored audio ads into each broadcast stream using their service platform. This improves listener satisfaction while increasing ad value and bringing in new advertisers and broadcasters. The opportunity is large as audio advertising spends $33 billion annually. Exaget needs 7000 active listeners to reach their 2013 revenue target of 700k euros with projected 20-25% annual growth. They have an experienced team and advisors with backgrounds in mobile and radio to develop and launch their targeted advertising platform.
User Experience - More Than Just a Pretty StickC4Media
Video and slides synchronized, mp3 and slide download available at http://bit.ly/YLazIT.
Lane Halley advises on building and organizing a User Experience process based on the Lean Startup cycle. Filmed at qconsf.com.
Lane Halley uses lean design & agile development methods to create Web & mobile products. Prior to joining Carbon Five, Lane worked as a UX coach and trainer (LUXr), an in-house design manager (Liquidnet), an agency designer (Cooper, Hot Studio), a director of User Experience (SenSage) and a video game producer (Mindscape/Electronic Arts).
Agile Architecture Agile Dev Practices 2013 KeynoteAdam Boczek
The document discusses the concept of "Agile Architecture" and whether it is an oxymoron. It explores Agile Architecture as an architectural process, flavor, or behavior. The author argues that Agile Architecture should mean "Architectural Intelligence" - the ability of a system to monitor, optimize, and heal itself through techniques like event sourcing and simplification. This would allow for operational intelligence, adaptive strategies, and automatic error removal.
[ROOM2FIT] offers a wide range of FF&E [Furniture, Fixtures and Equipment] services and products for Hospitality and residential interiors, managing all relations between buyers and suppliers.
From the idea to the implementation of the project, [ROOM2FIT] considers every detail, aiming to obtain a result that exceeds expectations and providing a successful project.
Aeronautic manufacturing industry is facing huge challenge : production ramp up, new launch, etc
Increase use of suppliers has complexified programs management and
Tieto Corporation provides customer experience integration solutions, servicing over 100 million European consumers daily. They have 600 specialists focused on CRM, customer service, and self-service. Tieto has experience working with clients in financial services, telecom, utility and other sectors to design, develop, and manage applications for contact centers, retail operations, and online customer interactions handling over 1 million contacts per month.
This document discusses construction project management and outlines the typical workflow process. It begins by introducing key players in construction projects and the importance of professionals to remove probability and guessing. It then outlines the main stages of a construction project workflow, including procurement planning, tendering, contract administration, construction period, and post-contract administration. The final product is emphasized to appreciate the full process that construction management entails from conceptual design to defects liability and occupancy.
This document discusses the role of product owners and techniques they can use. It emphasizes that product owners need authority, responsibility, knowledge, and availability to define the product vision and ensure the team delivers quality solutions that provide value to stakeholders. They are responsible for what is built, when, and getting sign-off from stakeholders. The document also presents several agile techniques product owners can use to define requirements and priorities, such as story mapping, personas, scenarios, and requirements dinosaurs.
User Experience - More Than Just a Pretty StickLane Goldstone
Presented at QconSF http://qconsf.com/sf2012/tracks/show_track.jsp?trackOID=678
What is user experience (UX)? Why does it matter? UX design is more than just making things look good. How do you create a compelling product that balances user and business needs, efficiently, using the resources you have?
This presentation provide a framework for thinking about the UX of your product and contains examples of my work as a product designer and UX coach for Agile and Lean Startup teams.
Decommissioning and Abandonment Summit 2013Dean Murphy
The document summarizes the 5th annual Decommissioning & Abandonment Summit to be held in Houston, TX in March 2013. It provides an overview of the event, including speakers from major oil companies, regulators, and independent operators who will discuss industry trends and innovations. The summit will gather over 800 senior executives from over 400 decommissioning organizations to network and learn about strategic planning, regulations, costs, technologies and environmental challenges. Attendees will represent oil and gas operators, service providers, contractors, and government agencies working on decommissioning in the Gulf of Mexico region.
HiPerDevGen is a tool that aims to accelerate analog layout design by automatically generating common analog structures like current mirrors and differential pairs based on user constraints. It recognizes these structures in schematics and allows rapid generation of layouts that closely resemble handcrafted designs while meeting design rules. This helps address the increasing bottleneck of analog layout design due to shorter development times and shrinking process nodes. Key features include generation of silicon-aware layouts, understanding of parasitic and matching requirements, and allowing designers to retain control over the layout process and design flow.
Grain Storage Silos and Handling Equipments Producer
Grain Storage Silos, Feed Silos and Equipments, Grain Conditioning, Grain Handling Equipments, Catwalks and Support Towers, Grain Cleaning Systems, Control Panels and Automation Systems
The document discusses designing high-performance office buildings of the future. It covers regulatory impacts on building design from laws aiming to reduce greenhouse gas emissions. It also covers topics like how different generations in the workforce prefer different work environments, how to target passive design and operations to reduce a building's energy footprint and carbon impact, and how green building certification can impact sales prices and occupant productivity/satisfaction. The overall goal is to provide an integrated, holistic design approach that capitalizes on changes in regulations, workforce demographics, and the business value of green building to create high-performing, sustainable office spaces.
The document discusses designing high-performance office buildings of the future. Regulatory impacts like carbon reduction laws will require more efficient building design and operation. Targeting passive design through building form, orientation, and operations can reduce a building's energy use the most cost-effectively. Up to 80% of a building's energy is consumed during use. Building green can also increase sales prices - Energy Star buildings in previous years had sale premiums ranging from around 6-10% higher than non-Energy Star buildings.
This document provides an overview of Dekoral Aluminum Facade Company, including:
- The company profile, noting it was established in 1989 and has completed projects in 14 countries, partnering with Schüco since 1996.
- Quality policy focuses on meeting high customer expectations and standards through quality production and continuous improvement.
- Organizational charts show the management committee and divisions for project management, production, administration, and more.
- Facilities include the Duzce factory for stocking, production and shipment, with detailed processes for quality control, stock areas, and production planning.
Octo Consulting Group Corporate Capabilities Briefing Slide Sharefnelowet
Octo Consulting Group is an IT consulting firm that has been in business for over 10 years. It has over $100 million in annual revenue and primarily serves government clients, retaining over 90% of its clients. Octo provides services such as enterprise architecture, performance-based acquisition, enterprise portfolio management, and critical program management to clients such as various government agencies and commercial companies.
The document summarizes an upcoming nuclear construction summit taking place from October 25-27 in Charlotte, North Carolina. The summit will bring together over 350 senior executives from the nuclear industry to discuss key topics such as regulatory updates, licensing challenges, lessons learned from major construction projects, and project management strategies. Speakers will provide insights from large nuclear projects underway in the US and overseas. A new addition for 2011 is a one-day financing workshop focused on strategies for ensuring project success. The summit aims to help attendees develop nuclear strategies that mitigate risk and reduce costs on their projects.
3. HISTORY:
R&D NEW AVATAR
OLD AVATAR
DESIGN BUILD SYSTEM DEVELOPMENT
FIELD GROWTH
DEVELOPMENT PHASES ARCHITECTURE AND DESIGN CONSULTANCY IDEA STAGE RESEARCH TEST
TIME LINE
1991 2001 2003 2006 2009 2010 2011
NUMBER OF PROJECTS
225 30 10 17 5 20
APPROX. AVG. REVENUE PER PROJECT 1.25 3.75 6.75 8.10 10.00 12.00
(IN LAKH RUPEES)
HANDS ON EXPERIENCE
2004 - CONTRACTING
2005 - P M C
2006 – REAL ESTATE
NRITYAGRAM PALAZZO AGUADA JAIN FARMS NSR FARM HOUSE METAHELIX LIFE SCIENCES (P) LTD., PRIVATE HOUSE, BANGALORE TI CAFÉ, B’LORE Dr. GUK HOUSE
3
Tuesday 21 December 2010
4. VISION & MISSION STATEMENT:
✤ VISION: We will be the first company in South India to provide an “Integrated Design-
Build” solution leveraging the full potential of Information Technology, for end use
clients and capture a significant portion of the market share in the Designer Buildings
segment in the next Five years and later support & train other Design-Build firms too.
✤ MISSION:
✤ We will provide customized, holistic, environment friendly solutions
✤ We will provide Cost effective, Quality Environments within a pre agreed time frame
✤ We will provide a trackable transparent work flow process and a unique
communication tool
✤ We will provide a collaborative professional platform
✤ We will re-kindle pride of work for the workforce in the construction industry
4
Tuesday 21 December 2010
5. • Multi layered nodal points
THE EFFECT
• Varied conflicting interests IN A SHIFTING CLIENT-VENDOR
• Varied level of exposure RELATION AT ALL NODAL POINTS
• Not very Client requirement driven
• Non sequential delivery approach
• No single communication platform Client
Production Vendor
Training !!! Non – existent in the
Residential & SME sector unit
?????? CLIENT
ARCHITECT
PROJECT MANAGEMENT CONSULTANT
CONTRACTOR
SUB CONTRACTOR
THE EFFECT ON THE
PMC COMPLETE PROJECT
Client
Material
Contractor 1. Confusion
2. Delays
3. Missed deadlines
PHE Consultant 4. Sub standard quality
Architect 5. No redress available
&
GENERAL
Structural Consultant Accounting DIS-SATISFACTION
HVAC Electrical Consultant
Consultant
Design
BOQ
Landscape Architect Labour
Estimates
Work Schedule
Product
Cash Flow Stretched Project t i m e l i n e ……………..
EXISTING SCENARIO
As in the market today
5
Tuesday 21 December 2010
6. SRUSHTI’S SOLUTION: Re-organized supply chain
Production unit Out sourced to
Banker
sub consultants on
Client site
Technical
Co-ordination Cell
(PRS OWNERS)
Design cell Purchase
Financial cell
Facility
Knowledge Engineering Engineering
(Training) & Monitoring
cell
(OUT SOURCED)
(OUT SOURCED)
6
Tuesday 21 December 2010
7. SRUSHTI’S SOLUTION: Centralized Communication Platform
CLIENT
TECHNOLOGY PLUGINS
ARCHICAD
GS CONSTRUCTOR
BANKER SRUSHTI’S P R S GS ESTIMATOR
PRESENTLY POWERED BY
GS CONTROL
BASECAMP
GS COST MANAGER
5D PRESENTER
SITE
OUTSOURCED
ACCOUNTS
(BPO)
7
Tuesday 21 December 2010
9. FEATURES & BENEFITS OF THE SERVICE:
Features Benefits
Single point of contact: The client is continuously in touch with only one entity, this is convenient,
reliable and customized.
Design stage integration Integrates all design decisions based on professional inputs hence providing
customized solutions
Decision making stage integration Helps to arrive at a project plan which is based on facts and is also based on
touch and feel experience
Planning Stage integration All Costs, BOQs, Schedules and labour bills are pre-planned hence surprises at
later stages are minimized or eliminated
Project execution stage integration Quality and efficiency are monitored on an hourly basis by the complete
professional team.
Trackable transparency The project is continuously monitored and client is kept properly informed &
this service is available online
Strategic Vendor partners This helps design solutions to be up to date and real time as the ambiguity of
vendor also brings in material specific knowledge
Post construction support The client gets a support of the team for upgrading and upkeep of the facility as
the complete documentation is available
9
Tuesday 21 December 2010
10. MOTIVATION & CAPABILITIES:
✤ MOTIVATION:
✤ Action: To capitalize on the unique experience of providing an Integrated Solution from Concept
design to handing over of the completed architectural projects
✤ Network: To create a unique Profit Centered BPO to help bring professionalism and quality
consciousness among Design and Construction professionals
✤ Train: To train the unskilled, semi skilled and professionally qualified Design & Construction
professionals to adopt Best practices in the world
✤ CAPABILITIES:
✤ A highly motivated professional team with a combined experience of over 75 years in all domains
of Architecture and Construction Industry.
✤ The system developed after a robust research of over Six years in the field of Integration of the
supply chain in the ‘Design-Build’ industry & support Scalability
✤ Growth ready business model capable of scaling up while upholding the values
10
Tuesday 21 December 2010
12. The team:
✤ Vivek Halbe: A professionally qualified Architect with
Nineteen Years of Field experience leading over 295
projects
✤ Ashwini Halbe: A professionally qualified Engineer with
Fourteen years of field Experience
✤ KN Ramdas: A professionally qualified Engineer with
Nineteen years of field experience especially in large
scale projects
✤ Keshavaprasad: A professionally qualified Architect with
Nineteen years of field experience leading over 300
projects
Tuesday 21 December 2010
13. STRENGTHS:
✤ EXPERIENCE:
✤ Team consisting of qualified professionals from Architecture, Civil & Engineering background
✤ The team has completed over 300 projects of which more than 20% are end-to-end solutions
✤ Professional training experience of over 10 years in reputed Technical institutions
✤ Reliable and Effective network of Design professionals available to provide customized solutions to
end use clients
✤ Special software being designed, developed & deployed for providing seamless integration
✤ CONFIDENCE:
✤ Projects coming in from word of mouth references of past clients
✤ Multinational Corporates from allied fields showing interest in working with Srushti
✤ Applications like Terrace Gardens & Designer Group Housing ready for scaleable deployment after
having gone through Successful Field Tests
13
Tuesday 21 December 2010
14. Complete Scale up plan: ANT
A - ACTION
N - NETWORK
T - TRAIN
14
Tuesday 21 December 2010
15. BUSINESS VERTICALS
A N T
DESIGN- BUILD BPO TRAINING
Presently scaling up Planned entry in 2012-13 Planned entry in 2013-14
much above Rs. 1500 Crore New Market New Market
MARKET SIZE
INDIVIDUAL RESIDENTIAL, Unskilled, Semi skilled,
Architects, Engineers,
COMMERCIAL, INDUSTRIAL, Qualified Design & Construction
OPPORTUNITY SPACE INSTITUTIONAL, HOSPITALITY Contractors
professionals
SOUTH KARNATAKA
LOCATION AND SURROUNDING SOUTH INDIA THIRD WORLD COUNTRIES
AREAS
ORGANIC TERRACE GARDENS &
ADDITIONAL BUSINESS DESIGNER GROUP HOUSING
15
Tuesday 21 December 2010
16. SAMPLE PROJECTS PORTFOLIO – DESIGNER HNI HOUSING
-
RESIDENCES AT BANGALORE
SEA FRONT RESIDENCE AT, SINQUERIM, GOA
16
Tuesday 21 December 2010
17. SAMPLE PROJECTS PORTFOLIO – OFFICE SPACES & LABS
- GREEN BUILDINGS
STABILIZED EARTHEN WALLS USED TO REDUCE
AIR CONDITIONING LOADS BY ALMOST 65%
OFFICE SPACE WITH LABORATORIES WITH ALLIED FACILITY FOR
M/S. METAHELIX LIFE SCIENCES (P) LTD, BOMMASANDRA,
BANGALORE
17
Tuesday 21 December 2010
18. SAMPLE PROJECTS PORTFOLIO – INDIVIDUAL HOUSING
1. RESIDENCE FOR MR. VISHWESHWAR HEGDE, MANYATA LAYOUT
2. RESIDENCE FOR DR. GU KULKARNI, JAKKUR
STYLE : MINIMAL
3. RESIDENCE FOR MR. V NAGESH, SHAHAKARNAGAR
18
Tuesday 21 December 2010
19. SAMPLE PROJECTS PORTFOLIO – HOSPITALITY & LEISURE
COTTON COUNTY CLUB, HUBLI
CAFÉ FOR M/S. TEXAS INSTRUMENTS,
M/S. GREENBERG RESORTS, KERALA
19
Tuesday 21 December 2010
20. Thank you
✤ Srushti Management Consultancy (P) Ltd.
305-27, Srushti Residency, 3rd cross, Jaladarshini Layout,
RMV Extension - II stage, Bangalore -560094
20
Tuesday 21 December 2010