SlideShare a Scribd company logo
1 of 44
Download to read offline
ArcGIS® Desktop 10 Functionality Matrix
ArcGIS Desktop 10 Functionality Matrix
Mapping ......................................................................................................................... 1
     Map Interaction...................................................................................................................... 1
          Map Navigation ................................................................................................................................ 1
          Queries............................................................................................................................................. 1
          Tables............................................................................................................................................... 1
          Graphs ............................................................................................................................................. 2
          Graph Types .................................................................................................................................... 2
          Routing Using ArcGIS Online or Network Datasets (StreetMap™ USA).......................................... 2
     Map Display ........................................................................................................................... 2
          General Mapping.............................................................................................................................. 2
          Tabular Data .................................................................................................................................... 3
          Vector Data Display ......................................................................................................................... 3
          Thematic Vector Data Classifications .............................................................................................. 3
          Symbology ....................................................................................................................................... 3
          Elevation Surface Display ................................................................................................................ 4
          Raster Data Display ......................................................................................................................... 4
          Raster Display: Gradual Color Ramp Data-Stretching Algorithms .................................................. 4
          Raster Display Statistics .................................................................................................................. 4
          Raster Display Resample Methods.................................................................................................. 4
          Raster Display Classification Methods............................................................................................. 4
          Raster Catalog Footprint Display ..................................................................................................... 5
          Raster Tools..................................................................................................................................... 5
          Time Animation and Temporal Data ................................................................................................ 5
     Page Layout and Printing..................................................................................................... 5
          Map Elements .................................................................................................................................. 5
          Export Formats................................................................................................................................. 5
          Print with the Following Print Drivers ............................................................................................... 5
     Publishing and Sharing Maps.............................................................................................. 6
          Creating High-Performance Dynamic Maps .................................................................................... 6
          Sharing Maps, Layers, and Data ..................................................................................................... 6
     Map Text................................................................................................................................. 6
          Labels............................................................................................................................................... 6
          Annotation ........................................................................................................................................ 6
          Annotation Editing ............................................................................................................................ 6
          Annotation and Dimensions Management ....................................................................................... 7
     Advanced Labeling ............................................................................................................... 7
          Advanced Label Placement Rule Set .............................................................................................. 7
     Advanced Cartography......................................................................................................... 8
          Cartographic Editing Tools............................................................................................................... 8
          Point Geometric Effects ................................................................................................................... 8
          Line Geometric Effects..................................................................................................................... 8
          Polygon Geometric Effects .............................................................................................................. 8
          Interactive Symbol Editing ............................................................................................................... 9
          Geoprocessing Graphic Quality ....................................................................................................... 9
          Geoprocessing Masking Tools......................................................................................................... 9
          Geoprocessing Representation Management ................................................................................. 9
          Geoprocessing Symbolization Refinement ...................................................................................... 9




J-9707                                                                        i                                                              February 8, 2011
Address Matching ............................................................................................................... 10
         Geocoding Tools ............................................................................................................................ 10
         ArcGIS Online Locators ................................................................................................................. 10
         Geoprocessing ............................................................................................................................... 10

Data Support and Interoperability.............................................................................. 10
    Raster Data Support ........................................................................................................... 10
         Direct Read of Raster Data ............................................................................................................ 10
         Direct Read and Write of Raster Data ........................................................................................... 11
         Geodatabase Raster Management................................................................................................ 12
    Document and Data Support.............................................................................................. 12
         Map and Symbology Files.............................................................................................................. 12
         Direct Read of Vector and Raster Data ......................................................................................... 12
         Direct Editing of Vector Data.......................................................................................................... 12
         Direct Read of Other Data ............................................................................................................. 13
         Coordinate Systems....................................................................................................................... 13
    CAD Support........................................................................................................................ 13
         CAD File Support ........................................................................................................................... 13
         Direct Read of CAD Data ............................................................................................................... 13
         Editing with CAD Data.................................................................................................................... 13
         Coordinate Systems....................................................................................................................... 13
         Geoprocessing—See Geoprocessing Conversion ........................................................................ 13

Application Framework............................................................................................... 14
    Application Customization................................................................................................. 14
         Application Look and Feel.............................................................................................................. 14
         Customization ................................................................................................................................ 14

Data Automation.......................................................................................................... 14
    Data Editing ......................................................................................................................... 14
         General Editing .............................................................................................................................. 14
         Snapping Types ............................................................................................................................. 14
         Snapping to Topology Elements .................................................................................................... 14
         Snapping Tolerance ....................................................................................................................... 15
         Geometry Construction Options..................................................................................................... 15
         Geometry Creation Tools ............................................................................................................... 15
         Feature Manipulation Tasks........................................................................................................... 15
         Feature Editing Tools ..................................................................................................................... 16
         Attribute Editing.............................................................................................................................. 16
         Multipart Features (Point, Line, and Polygon) ............................................................................... 16
         Map Navigation while Editing......................................................................................................... 16
         Vector Data Transformations ......................................................................................................... 16
         Generalization ................................................................................................................................ 16
         Coordinate Geometry..................................................................................................................... 17
         Parcel Editing ................................................................................................................................. 17
    Raster Editing and Vectorization....................................................................................... 17
         Vectorize All Raster Formats Supported in ArcGIS ....................................................................... 17
         ArcGIS Integration.......................................................................................................................... 17
         Raster Snapping Geometry ........................................................................................................... 17
         Raster Snapping Environment ....................................................................................................... 17
         Vectorization Tracing ..................................................................................................................... 17



J-9707                                                                     ii                                                            February 8, 2011
Automatic Vectorization ................................................................................................................. 18
         Vectorization Parameters............................................................................................................... 18
         Vectorization Preview..................................................................................................................... 18
         Raster Cell Selection...................................................................................................................... 18
         Raster Cleanup Environment......................................................................................................... 18
         Raster Cleanup Painting Tools ...................................................................................................... 18
         Support Tools................................................................................................................................. 18
    Mobile................................................................................................................................... 18
         GPS Support .................................................................................................................................. 18
         Tablet PC ....................................................................................................................................... 18
         ArcGIS Mobile Support .................................................................................................................. 19
    Multiuser Geodatabase Editing ......................................................................................... 19
         General Editing .............................................................................................................................. 19
         Administration Geoprocessing ....................................................................................................... 19
         Versioning Geoprocessing ............................................................................................................. 19
         Short Transaction Editing............................................................................................................... 19
    Multiuser Geodatabase Archiving ..................................................................................... 19
         Display and Query.......................................................................................................................... 19
         Manage .......................................................................................................................................... 19
    Distributed Geodatabases.................................................................................................. 20
         Manage Replicas ........................................................................................................................... 20
         Disconnected Editing Geoprocessing ............................................................................................ 20
         Distributed Geodatabases Geoprocessing .................................................................................... 20
    Spatial Referencing Image Data (Georeferencing) .......................................................... 20
         Tools............................................................................................................................................... 20
         Transformation Methods ................................................................................................................ 20
         Save Spatial Reference Information .............................................................................................. 20

Data Management and Validation .............................................................................. 21
    Data Management ............................................................................................................... 21
         General .......................................................................................................................................... 21
         Search for GIS Data By.................................................................................................................. 21
         Manage Coverage Data ................................................................................................................. 21
         Geodatabase Administration.......................................................................................................... 21
         Geodatabase XML File Import/Export............................................................................................ 21
    Attribute Validation ............................................................................................................. 21
         Subtypes Geoprocessing ............................................................................................................... 21
         Domains Geoprocessing................................................................................................................ 21
         Create and Edit Relationships for Features ................................................................................... 22
         Geodatabase Relationship Behavior ............................................................................................. 22
         Relationship Class Geoprocessing ................................................................................................ 22
    Topology .............................................................................................................................. 22
         Map Display ................................................................................................................................... 22
         Editing ............................................................................................................................................ 22
         Geodatabase Topology Rule Violation Fix Operations.................................................................. 23
         Geodatabase Topology Management............................................................................................ 23
         Geodatabase Topology Rules ....................................................................................................... 23
         Geoprocessing ............................................................................................................................... 24




J-9707                                                                       iii                                                            February 8, 2011
Networks .............................................................................................................................. 24
         Utility (Geometric) Network Analysis.............................................................................................. 24
         Data Management.......................................................................................................................... 24
         Geometric Network Connectivity Rules ......................................................................................... 24
         Geometric Network Editing ............................................................................................................ 24
    Linear Referencing (Routes) .............................................................................................. 25
         Display............................................................................................................................................ 25
         Editing ............................................................................................................................................ 25
         Geoprocessing ............................................................................................................................... 25
    Metadata............................................................................................................................... 25
         General .......................................................................................................................................... 25
         Managing Metadata Using a Variety of Styles ............................................................................... 25
         Geoprocessing ............................................................................................................................... 25

Data Manipulation and Analysis ................................................................................ 26
    Coverage Geoprocessing................................................................................................... 26
         Application Framework................................................................................................................... 26
         Analysis.......................................................................................................................................... 26
         Conversion ..................................................................................................................................... 26
         Aggregation.................................................................................................................................... 26
         Composite Features....................................................................................................................... 27
         Generalization ................................................................................................................................ 27
         Table Management ........................................................................................................................ 27
         Projections ..................................................................................................................................... 27
         Topology ........................................................................................................................................ 27
         General .......................................................................................................................................... 27
    Geoprocessing .................................................................................................................... 27
         Environment ................................................................................................................................... 27
         Supported Scripting Environments ................................................................................................ 28
         General Data Management............................................................................................................ 28
         Data Comparison ........................................................................................................................... 28
         Table Management ........................................................................................................................ 28
         Editing ............................................................................................................................................ 28
         Field Management ......................................................................................................................... 28
         Feature Class Management........................................................................................................... 29
         Feature Management..................................................................................................................... 29
         File Geodatabase........................................................................................................................... 29
         Generalization ................................................................................................................................ 29
         Projections and Transformations ................................................................................................... 30
         Vector Data Projection ................................................................................................................... 30
         Raster Management....................................................................................................................... 30
         Raster Mosaics .............................................................................................................................. 31
         Raster Conversion ......................................................................................................................... 31
         Raster Transformation/Projection .................................................................................................. 31
         Conversion ..................................................................................................................................... 31
         Layers and Table Views................................................................................................................. 32
         Packaging ...................................................................................................................................... 32
         Parcel Fabric Tools ........................................................................................................................ 32
         Core Analysis ................................................................................................................................. 32
         Spatial Statistics Tools—Analyzing Patterns ................................................................................. 33
         Spatial Statistics Tools—Mapping Clusters ................................................................................... 33
         Spatial Statistics Tools—Measuring Geographic Distributions...................................................... 33
         Spatial Statistics Tools—Modeling Spatial Relationships.............................................................. 33



J-9707                                                                       iv                                                             February 8, 2011
Spatial Statistics Tools—Rendering............................................................................................... 33
          Spatial Statistics Tools—Utilities.................................................................................................... 33
          Multidimensional Tools................................................................................................................... 33
          Workspace Management ............................................................................................................... 34
          Database Management.................................................................................................................. 34
          Table Joins..................................................................................................................................... 34
          Data Indexing ................................................................................................................................. 34
          ArcGIS Server Management.......................................................................................................... 34

Data .............................................................................................................................. 34
     ArcGIS Online Standard Services ..................................................................................... 34
          2D and 3D Basemap Services ....................................................................................................... 34
     Esri Data and Maps ............................................................................................................. 35
          World .............................................................................................................................................. 35
          Europe............................................................................................................................................ 35
          Mexico ............................................................................................................................................ 36
          Image Data..................................................................................................................................... 36
          United States.................................................................................................................................. 36
          StreetMap North America .............................................................................................................. 37




J-9707                                                                        v                                                              February 8, 2011
Mapping
                                                                                    ™             ®               ™              ®
Map Interaction                                                         ArcReader       ArcView       ArcEditor          ArcInfo

Map Navigation
Pan, Zoom, and Rotate the Map                                               ●              ●              ●                  ●
Find an X,Y (Latitude-Longitude) Location on a Map                          ●              ●              ●                  ●
Zoom to the Full Study Area of the Map                                      ●              ●              ●                  ●
Zoom to the Extent of a Layer                                               ●              ●              ●                  ●
Zoom to the Visible Scale of a Layer                                        ●              ●              ●                  ●
Zoom to a Specific Map Scale                                                ●              ●              ●                  ●
Use Spatial Bookmarks                                                       ●              ●              ●                  ●
Access Hyperlinks                                                           ●              ●              ●                  ●
Use Dynamic MapTips                                                         ●              ●              ●                  ●
Use Magnification Window                                                    ●              ●              ●                  ●
Interactively Reveal Areas beneath a Specific Layer (Swipe)                 ●              ●              ●                  ●
Save and Manage Locations for Use with Multiple Maps (My Places)            ●              ●              ●                  ●
Create, Organize, and Share Spatial Bookmarks                                              ●              ●                  ●
Pan and Zoom the Map with the Mouse Wheel                                                  ●              ●                  ●
Pan and Zoom to Selected Features                                                          ●              ●                  ●
Switch Any Tool to a Pan/Zoom Tool Using Hot Keys                                          ●              ●                  ●
Create Hyperlink to External Application, Macro, or URL                                    ●              ●                  ●
Use Overview Window                                                                        ●              ●                  ●
Use Viewer Windows for Displaying Different Parts of a Map                                 ●              ●                  ●
Use Multiple Viewer Windows for Separate Data Frames                                       ●              ●                  ●
Queries
Identify Features in the Map                                                ●              ●              ●                  ●
Interactively Measure Distances and Areas                                   ●              ●              ●                  ●
Find Features in the Map                                                    ●              ●              ●                  ●
                                SM
Find Places Using the ArcGIS Online World Gazetteer                         ●              ●              ●                  ●
Find by Address, including Custom Locators                                  ●              ●              ●                  ●
Show Related Data with Field Properties                                     ●              ●              ●                  ●
View and Toggle Layer Selectability in Table of Contents                                   ●              ●                  ●
Select Data by Location                                                                    ●              ●                  ●
Select Data by Attribute                                                                   ●              ●                  ●
Interactively Select/Unselect Features                                                     ●              ●                  ●
Unselect All, Switch the Selection, or Select All Features                                 ●              ●                  ●
Access Attribute Table and Layer Properties from Identify Dialog Box                       ●              ●                  ●
Tables
Flash, Zoom to, Pan to, Select, and Identify Individual Features in a
                                                                                           ●              ●                  ●
Map Based on a Record in the Attribute Table
Interactively Highlight Selected Records/Features                                          ●              ●                  ●
Zoom to and Unselect Highlighted Records/Features                                          ●              ●                  ●
Interactively Add and Remove Records from a Selection                                      ●              ●                  ●
Copy Selected Records for Pasting into Other Applications                                  ●              ●                  ●
Turn Fields Off and On and Change Field Order and Size                                     ●              ●                  ●
Modify a Table's Appearance by Changing Cell and Field Size, Font,
                                                                                           ●              ●                  ●
and Color
Use Field Properties of Joined Tables                                                      ●              ●                  ●
Reorder Fields                                                                             ●              ●                  ●




J-9707                                                            1                                                   February 8, 2011
Map Interaction                                                      ArcReader   ArcView   ArcEditor       ArcInfo
See Properties of Joins and Relates from Table Properties                          ●          ●               ●
Sort a Table by Multiple Fields                                                    ●          ●               ●
Drag Multiple Tables into the Table Window as Tabs                                 ●          ●               ●
Create a Graph or Report                                                           ●          ●               ●
Find and Replace Attribute Values                                                  ●          ●               ●
Open Attachment Manager for Any Record (when Attachments Are
                                                                                   ●          ●               ●
Enabled on the Layer)
Graphs
Plot Data from a Variety of Datasets in a Single Graph                             ●          ●               ●
Create 2D and 3D Graphs                                                            ●          ●               ●
Overlay Multiple Graphs in a Single Graph                                          ●          ●               ●
Selections Automatically Propagate between Map, Table, and Graph                   ●          ●               ●
Graph Types
Horizontal and Vertical Bar, Line, and Area                                        ●          ●               ●
Histogram Bar                                                                      ●          ●               ●
Scatterplot                                                                        ●          ●               ●
Scatterplot Matrix                                                                 ●          ●               ●
Box Plot                                                                           ●          ●               ●
Bubble                                                                             ●          ●               ●
Polar                                                                              ●          ●               ●
Pie                                                                                ●          ●               ●
Routing Using ArcGIS Online or Network Datasets
(StreetMap™ USA)
North American and European Point-to-Point Street Routing                          ●          ●               ●
Add Route Stops from Addresses and Existing Features and
                                                                                   ●          ●               ●
Interactively Add Stops on the Map
Add Route Barriers from Addresses and Existing Features and
                                                                                   ●          ●               ●
Interactively Add Stops on the Map
Snap Stops to Closest Address Using an Address Locator                             ●          ●               ●
Customize the Route for Quickest or Shortest Route                                 ●          ●               ●
Reorder the Stops to Find the Fastest Route between Unordered
                                                                                   ●          ●               ●
Stops
Modify Speed and Restriction Attributes of the Routing Service                     ●          ●               ●
Specify Trip Planning Timing (Start, Stop, Breaks, etc.)                           ●          ●               ●
Generate HTML Directions Using an Overview Map, Turn-by-Turn
                                                                                   ●          ●               ●
Maps, and Vicinity Maps


Map Display                                                          ArcReader   ArcView   ArcEditor       ArcInfo

General Mapping
Visualize the Map Page or a Specific Set of Data                        ●          ●          ●               ●
Perform On-the-Fly Projection of All Data                               ●          ●          ●               ●
Enable Full Cartographic Visualization of Any PMF File                  ●          ●          ●               ●
Interactively Set Percent Transparency for All Data Layers              ●          ●          ●               ●
Legends Honor Layer Transparency                                        ●          ●          ●               ●
Set a Minimum and Maximum Scale to Display Data                                    ●          ●               ●
Create Custom Relative Scales                                                      ●          ●               ●
Clip the Map Display to a Feature or Graphic                                       ●          ●               ●
Create Graticules, Measured Grids, and Reference Grids                             ●          ●               ●




J-9707                                                           2                                     February 8, 2011
Map Display                                                        ArcReader   ArcView   ArcEditor       ArcInfo
Create Extent Rectangles for Other Data
                                                                                 ●          ●               ●
(Reference and Overview Maps)
Create Variable Depth Layer Masking                                              ●          ●               ●
Convert Graphics (Point, Line, Polygon, Text) to Features                        ●          ●               ●
Create High-Performance Basemap Layers Computed Once for Any
                                                                                 ●          ●               ●
Area
Add Data Menu Accesses Basemaps and Data from ArcGIS Online                      ●          ●               ●
Quick Pan Mode for Continuous Navigation of Basemap and
                                                                                 ●          ●               ●
Accelerated Raster Layers
Tabular Data
Create On-the-Fly Dynamic Joins between Different Databases                      ●          ●               ●
Join Dialog Box Supports Join Validation prior to Execution                      ●          ●               ●
Create and Use Many-to-One and One-to-Many Relationships                         ●          ●               ●
Create Statistics                                                                ●          ●               ●
Summarize Data                                                                   ●          ●               ●
Interactively Change the Visibility of Fields                                    ●          ●               ●
Simplify Field Names with Field Aliases                                          ●          ●               ●
Display Numeric Fields Formatted as Currency, Direction,
                                                                                 ●          ●               ●
Percentage, etc.
Create Charts and Reports                                                        ●          ●               ●
                                   ®
Build Detailed Reports Using Esri Report Wizard                                  ●          ●               ●
Sort by Multiple Attributes                                                      ●          ●               ●
Connect to and Use Remote Database Tables                                        ●          ●               ●
Display Tabular X,Y Point Data from a File or Table on a Map                     ●          ●               ●
View Attachments for a Feature Class                                             ●          ●               ●
Vector Data Display
Control Selection Color for Each Dataset                                         ●          ●               ●
Create MapTips                                                                   ●          ●               ●
Fix Symbology to a Specific Map Scale                                            ●          ●               ●
Interactively Exclude Specific Features from the Display                         ●          ●               ●
Control Which Features to Display Using a SQL Query                              ●          ●               ●
Control Which Data Fields Are Accessible from the Map                            ●          ●               ●
Thematic Vector Data Classifications
Single Symbol                                                                    ●          ●               ●
Unique Value                                                                     ●          ●               ●
Match to Predefined Style                                                        ●          ●               ●
Graduated Colors or Symbols                                                      ●          ●               ●
Proportional Symbols                                                             ●          ●               ●
Dot Density Mapping                                                              ●          ●               ●
Chart Mapping Including Pie and Bar Chart                                        ●          ●               ●
Bivariate and Multivariate Data Rendering                                        ●          ●               ●
Interactive Histogram for Data Classification                                    ●          ●               ●
Symbology
Use Interactive Symbol Composer                                                  ●          ●               ●
Control Symbol Draw Order                                                        ●          ●               ●
Access More than 19,500 Predefined Symbols                                       ●          ●               ●
Search for Symbols by Descriptive Tag                                            ●          ●               ●
Add or Modify Symbol Search Tags                                                 ●          ●               ●




J-9707                                                         3                                     February 8, 2011
Map Display                                                         ArcReader   ArcView   ArcEditor       ArcInfo
Use Halos and Advanced Background Symbols                                         ●          ●               ●
Define Symbols for Fill, Lines, Outlines, and Points                              ●          ●               ●
Support User-Imported Graphic Fill Patterns                                       ●          ●               ●
Elevation Surface Display
TIN Contour with Index Contours                                                   ●          ●               ●
TIN Face, Aspect, Elevation, Slope                                                ●          ●               ●
Digital Elevation Model (DEM) Hillshade with Sun Position Control                 ●          ●               ●
DEM Shaded Relief Using Hillshade and Elevation                                   ●          ●               ●
Terrain Contour with Index Contours                                               ●          ●               ●
Terrain Face, Aspect, Elevation, Slope                                            ●          ●               ●
DEM Elevation                                                                     ●          ●               ●
Raster Data Display
Display Multiband Images by Assigning Color Values to the Bands                   ●          ●               ●
Use Individual Band Settings                                                      ●          ●               ●
Display Each Unique Value with a Discrete Color                                   ●          ●               ●
Display Image Values Using a Color Map                                            ●          ●               ●
Display Multiband Raster Data Using Color Values                                  ●          ●               ●
Save Current Display Statistics                                                   ●          ●               ●
Control Raster Display Contrast and Brightness                                    ●          ●               ●
Orthorectify On the Fly                                                           ●          ●               ●
On-the-Fly Panchromatic Sharpening                                                ●          ●               ●
On-the-Fly Hillshade Effect for Elevation Data                                    ●          ●               ●
Display Raster Catalog Tiles as a Time Series                                     ●          ●               ●
Import Renderer or Statistics from Another Layer                                  ●          ●               ●
Display Raster Values while Navigating the Map with MapTips                       ●          ●               ●
Display Raster Resolution in Map Table of Contents                                ●          ●               ●
Apply and Edit Raster Function Chains                                             ●          ●               ●
Accelerated Display Mode for Raster Layers                                        ●          ●               ●
Raster Display: Gradual Color Ramp Data-
Stretching Algorithms
Standard Deviations                                                               ●          ●               ●
Histogram Equalize                                                                ●          ●               ●
Minimum-Maximum                                                                   ●          ●               ●
Custom                                                                            ●          ●               ●
None                                                                              ●          ●               ●
Raster Display Statistics
Based on the Entire Raster Dataset                                                ●          ●               ●
Based on the Display Extent                                                       ●          ●               ●
Based on a Custom Extent                                                          ●          ●               ●
Raster Display Resample Methods
Nearest Neighbor                                                                  ●          ●               ●
Bilinear Interpolation                                                            ●          ●               ●
Cubic Convolution                                                                 ●          ●               ●
Majority                                                                          ●          ●               ●
Raster Display Classification Methods
Manual Interval                                                                   ●          ●               ●
Equal Interval                                                                    ●          ●               ●
Defined Interval                                                                  ●          ●               ●




J-9707                                                         4                                      February 8, 2011
Map Display                                                          ArcReader   ArcView   ArcEditor       ArcInfo
Quantile Interval                                                                  ●          ●               ●
Natural Breaks (Jenks)                                                             ●          ●               ●
Geometrical Interval                                                               ●          ●               ●
Standard Deviation                                                                 ●          ●               ●
Raster Catalog Footprint Display
Footprints Only                                                                    ●          ●               ●
Selected Footprints                                                                ●          ●               ●
Raster Tools
Pixel Inspector                                                                    ●          ●               ●
Swipe Layer Tool                                                                   ●          ●               ●
Time Animation and Temporal Data
Create Time Series, Layer Transition, or Map Navigation Animation                  ●          ●               ●
Animate Data Change with Tabular (Charts), Vector, Raster Catalog,
                                                                                   ●          ●               ●
and netCDF Data
Export Animations as Sequential Images                                             ●          ●               ●
Create Video from Sequential Images                                                ●          ●               ●
View Temporal Data with the Time Slider                                            ●          ●               ●


Page Layout and Printing                                             ArcReader   ArcView   ArcEditor       ArcInfo

Map Elements
Title                                                                              ●          ●               ●
Text                                                                               ●          ●               ●
Neatlines                                                                          ●          ●               ●
Legend                                                                             ●          ●               ●
North Arrows                                                                       ●          ●               ●
Scale Bar                                                                          ●          ●               ●
Scale Text                                                                         ●          ●               ●
Pictures                                                                           ●          ●               ●
OLE Objects                                                                        ●          ●               ●
Measured Reference Grid                                                            ●          ●               ●
Graticules                                                                         ●          ●               ●
Export Formats
Enhanced Metafile (EMF)                                                            ●          ●               ●
Windows Bitmap (BMP)                                                               ●          ●               ●
Encapsulated PostScript (EPS)                                                      ●          ●               ●
Tagged Image File Format (TIFF)                                                    ●          ●               ●
Portable Document Format (PDF)                                                     ●          ●               ●
Joint Photographic Experts Group (JPEG)                                            ●          ●               ●
Portable Network Graphics (PNG)                                                    ●          ●               ●
Graphic Interchange Format (GIF)                                                   ●          ●               ●
Scalable Vector Graphics (SVG)                                                     ●          ●               ●
Adobe Illustrator (AI)                                                             ●          ●               ●
PostScript Color Separates (with Page Marks)                                       ●          ●               ●
Print with the Following Print Drivers
Windows                                                                 ●          ●          ●               ●
PostScript                                                                         ●          ●               ●
           ™
ArcPress HP RTL (RGB, CMYK, and Monochrome)                                        ●          ●               ●
ArcPress HP PCL (RGB, CMYK, and Monochrome)                                        ●          ●               ●




J-9707                                                        5                                        February 8, 2011
Page Layout and Printing                                             ArcReader   ArcView   ArcEditor       ArcInfo
ArcPress Epson Universal                                                           ●          ●               ●
ArcPress HP Universal                                                              ●          ●               ●
Process Print Jobs on the Local Machine for Faster Printing                        ●          ●               ●


Publishing and Sharing Maps                                          ArcReader   ArcView   ArcEditor       ArcInfo

Creating High-Performance Dynamic Maps
Analyze Maps for Errors, Unsupported Content, Performance Tips                     ●          ●               ●
Preview Your Maps and Estimated Rendering Time                                     ●          ●               ●
Create an Optimized Map Service Document (MSD)                                     ●          ●               ●
                                             ®
Publish a Map Service Document to ArcGIS Server*                                   ●          ●               ●
Sharing Maps, Layers, and Data
Consolidate Layers or Maps into a Folder                                           ●          ●               ●
Create a Layer Package File                                                        ●          ●               ●
Upload a Layer Package File to ArcGIS Online and Share It                          ●          ●               ●
Extract a Layer Package                                                            ●          ●               ●
Create a Map Package File                                                          ●          ●               ●
Upload a Map Package File to ArcGIS Online and Share It                            ●          ●               ●
Extract a Map Package                                                              ●          ●               ●

*Requires ArcGIS Server


Map Text                                                             ArcReader   ArcView   ArcEditor       ArcInfo

Labels
Creating Dynamic On-the-Fly Labels                                                 ●          ●               ●
Automatic Conflict Detection and Label Placement                                   ●          ●               ●
Label Placement Rules for Setting Priority between Layers                          ●          ●               ●
Placement Rules for Setting Importance of Labels vs. Features                      ●          ●               ●
Many Predefined Label Styles (e.g., Highway Shields)                               ●          ●               ●
Labels Rotate from an Attribute Field                                              ●          ●               ●
Multiple Dynamic Labeling Schemes Built for Each Map Layer                         ●          ●               ●
Control Which Features in a Layer Display Labels                                   ●          ●               ●
Advanced Text Formatting Tags for Dynamic Label Symbology                          ●          ●               ●
Annotation
Use Interactive Label Tools (Callout, Label, Spline, and Paragraph
                                                                                   ●          ●               ●
Text)
Create Text Annotation Data from Labels                                            ●          ●               ●
Annotation Editing
Interactively Move, Rotate, and Scale Annotation                                   ●          ●               ●
Add Horizontal or Angled Annotation                                                ●          ●               ●
Add Annotation with a Leader Line                                                  ●          ●               ●
Create Annotation That Follows a Curved Line or the Shape of an
                                                                                   ●          ●               ●
Existing Feature
Dynamically Pull Annotation Values from Layers in the Map                          ●          ●               ●
Interactively Manage Annotation That Could Not Be Placed during
                                                                                   ●          ●               ●
Initial Annotation Creation
Edit Each Word in an Annotation String Independently                               ●          ●               ●
Interactively Stack and Unstack Annotation                                         ●          ●               ●




J-9707                                                          6                                      February 8, 2011
Map Text                                                                  ArcReader   ArcView    ArcEditor       ArcInfo
    Flip Annotation Strings                                                                 ●            ●              ●
    Interactively Modify the Curvature and Orientation of a Line                            ●            ●              ●
    Edit the Symbology of a Single Annotation Feature or a Group of
                                                                                            ●            ●              ●
    Annotation Features Simultaneously
    Annotation and Dimensions Management
    Store Annotation in a Geodatabase or a Map Document                                     ●            ●              ●
    Create Annotation Subclasses                                                            ●            ●              ●
    Create Aligned Dimensions Displaying the True Distance between
                                                                                                         ●              ●
    Points
    Create Linear Dimensions Displaying Horizontal, Vertical, or an
                                                                                                         ●              ●
    Angled Distance between Points
    Create and Edit Feature-Linked Annotation Feature Classes in a
                                                                                                         ●              ●
    Geodatabase


    Advanced Labeling1                                                        ArcReader   ArcView    ArcEditor       ArcInfo

    Advanced Label Placement Rule Set
    Display Advanced Labels with Read-Only Properties                            ●          ●            ●              ●
    Street Placement                                                                                                    ●
    Customizable Dynamic Stacking                                                                                       ●
    Font Reduction                                                                                                      ●
    Customizable Abbreviation                                                                                           ●
    Polygon Boundary Placement                                                                                          ●
    Repeated Labeling                                                                                                   ●
    Character Spreading                                                                                                 ●
    Word Spreading                                                                                                      ●
    Label Overrun on Features                                                                                           ●
    Curved Polygon Placement                                                                                            ●
    Graticule Labeling Alignment                                                                                        ●
    User-Defined Point Label Zones                                                                                      ●
    Background Labeling                                                                                                 ●
    Land Parcel Placement                                                                                               ●
    Advanced Feature Weighting                                                                                          ●
    Advanced Label Offsets                                                                                              ●
    Advanced Line Label Positions                                                                                       ●
    Advanced Curved Label Placement                                                                                     ●
    Watermark-Style Background Labels                                                                                   ●
    Geologic Strike and Dip Symbology                                                                                   ●
    Asian Vertical Text Metric Support                                                                                  ●
    Polygon Hole Avoidance for Callouts                                                                                 ●
    Polygon Zone (Internal, External) Placement                                                                         ●
    Long Boundary Label Repetition                                                                                      ●
    Logically Continuous Feature (Street, River, Contour) Placements                                                    ●
1                                                                         ®
 The advanced labeling functionality is available through the Maplex for ArcGIS extension, which can be purchased with ArcView
or ArcEditor but is automatically included with an ArcInfo license.




J-9707                                                                7                                          February 8, 2011
Advanced Cartography                                                 ArcReader   ArcView   ArcEditor       ArcInfo

Cartographic Editing Tools
Store Multiple Representations of GIS Features in a Geodatabase
                                                                                              ●               ●
for Use in a Variety of Map Products
Create Rules That Dynamically Manipulate the Geometry and
                                                                                              ●               ●
Symbology of a Feature (Representation Rules)
Share Representation Rules through Style Files                                                ●               ●
Change the Shape or Symbology for a Single Feature without
                                                                                              ●               ●
Changing the GIS Data It Represents
Define Feature Visibility and Transparency for Each Feature or
                                                                                              ●               ●
Based on an Attribute
Mask Individual Features or Parts of Features without Masking All
                                                                                              ●               ●
Features in a Layer
Dynamically Place Point Symbols along Lines or Polygons                                       ●               ●
Dynamically Modify the Geometry That Is Displayed for a Feature
                                                                                              ●               ●
(Geometric Effects)
Point Geometric Effects
Buffer                                                                                        ●               ●
Radial from Point                                                                             ●               ●
Regular Polygon                                                                               ●               ●
Line Geometric Effects
Add Control Points                                                                            ●               ●
Arrow                                                                                         ●               ●
Buffer                                                                                        ●               ●
Cut Curve                                                                                     ●               ●
Dashes                                                                                        ●               ●
Enclosing Polygon                                                                             ●               ●
Jog                                                                                           ●               ●
Move                                                                                          ●               ●
Offset Curve                                                                                  ●               ●
Reverse Curve                                                                                 ●               ●
Rotate                                                                                        ●               ●
Scale                                                                                         ●               ●
Simplify                                                                                      ●               ●
Smooth Curve                                                                                  ●               ●
Tapered Polygon                                                                               ●               ●
Wave                                                                                          ●               ●
Polygon Geometric Effects
Add Control Points                                                                            ●               ●
Buffer                                                                                        ●               ●
Cut Curve                                                                                     ●               ●
Dashes                                                                                        ●               ●
Donut                                                                                         ●               ●
Enclosing Polygon                                                                             ●               ●
Move                                                                                          ●               ●
Offset Curve                                                                                  ●               ●
Rotate                                                                                        ●               ●
Scale                                                                                         ●               ●
Simplify                                                                                      ●               ●
Smooth Curve                                                                                  ●               ●
Wave                                                                                          ●               ●




J-9707                                                           8                                     February 8, 2011
Advanced Cartography                                                  ArcReader   ArcView   ArcEditor       ArcInfo

Interactive Symbol Editing
Use the Marker Editor to Edit the Characteristics of a Point Symbol                            ●               ●
Edit the Entire Representation or a Small Portion of One or More
                                                                                               ●               ●
Representations
Move an Entire Symbol                                                                          ●               ●
Move Line Symbols Parallel                                                                     ●               ●
Tool Dialog Boxes Accept Multiple Units of Measurement                                         ●               ●
Add, Delete, or Move Symbol Vertices                                                           ●               ●
Modify the Geometric Effects of a Symbol: Line Width, Hatch Size                               ●               ●
Move Linear Geometries Parallel                                                                ●               ●
Reshape and Move a Feature to Align One Specified Point with
                                                                                               ●               ●
Another (Warp)
Erase All or Part of a Symbol                                                                  ●               ●
Resize a Feature Symbol by Resizing Its Bounding Box                                           ●               ●
Resize a Feature and Its Geometric Effects Simultaneously Using a
                                                                                               ●               ●
Ratio
Rotate Feature Symbols Interactively or by a Specific Angle                                    ●               ●
Orient a Symbol to a Specific Angle                                                            ●               ●
Reshape Symbols with Bézier Curves                                                             ●               ●
Specify Locations along a Symbol Where a Pattern Must Apply
                                                                                               ●               ●
(Control Points)
WYSIWYG Feedback                                                                               ●               ●
Geoprocessing Graphic Quality
Detect Graphic Conflict                                                                                        ●
Propagate Displacement                                                                                         ●
Resolve Building Conflicts                                                                                     ●
Resolve Road Conflicts                                                                                         ●
Geoprocessing Masking Tools
Cul-de-Sac Masks                                                                                               ●
Feature Outline Masks                                                                                          ●
Intersecting Layers Masks                                                                                      ●
Geoprocessing Representation Management
Add Representation                                                                                             ●
Calculate Representation Rule                                                                                  ●
Drop Representation                                                                                            ●
Remove Override                                                                                                ●
Select Feature by Override                                                                                     ●
Set Layer Representation                                                                                       ●
Update Override                                                                                                ●
Geoprocessing Symbolization Refinement
Align Marker to Stroke or Fill                                                                                 ●
Calculate Grid Convergence Angle                                                                               ●
Calculate Line Caps                                                                                            ●
Calculate Polygon Main Angle                                                                                   ●
Create Overpass                                                                                                ●
Create Underpass                                                                                               ●
Disperse Markers                                                                                               ●
Set Representation Control Point at Intersect                                                                  ●
Set Representation Control Point by Angle                                                                      ●




J-9707                                                          9                                       February 8, 2011
Address Matching                                                       ArcReader   ArcView   ArcEditor       ArcInfo

Geocoding Tools
Geocoding Toolbar for Locator Management and Use                                     ●          ●               ●
Single Line Input for ArcGIS 10 Locators                                             ●          ●               ●
Geocode Single or Batch Addresses                                                    ●          ●               ●
Real-Time Batch Geocoding Match Rate Feedback                                        ●          ●               ●
Use Tools for Processing Result Sets, Including Custom Queries                       ●          ●               ●
Use ArcGIS Server for Server-Based Geocoding                                         ●          ●               ●
Use Multiple Geocoding Locators per Data Source                                      ●          ●               ●
Geocode Using Alternate Street Names, Intersection, or Place-Name
                                                                                     ●          ●               ●
Aliases
Aggregate Multiple Geocoding Locators into a Single Geocoding
                                                                                     ●          ●               ●
Locator (Composite Locator)
Distribute Geocoding Locators without the Reference Data                             ●          ●               ●
Address Inspector Finds Address by Map Click                                         ●          ●               ●
                           ™
Drag Locators into ArcMap from the Catalog Window                                    ●          ●               ●
Built-in Dataless Military Grid Reference System (MGRS) Locator                      ●          ●               ●
Create Dynamic Features from Geocoded Locations                                                 ●               ●
ArcGIS Online Locators
North American Locator Service                                                       ●          ●               ●
European Locator Service                                                             ●          ●               ●
World Places Gazetteer Locator Service                                               ●          ●               ●
Geoprocessing
Create Address Locator                                                               ●          ●               ●
Create Composite Address Locator                                                     ●          ●               ●
Geocode Addresses                                                                    ●          ●               ●
Reverse Geocode Point Features                                                       ●          ●               ●
Rebuild Address Locator                                                              ●          ●               ●
Rematch Addresses                                                                    ●          ●               ●
Standardize Addresses                                                                ●          ●               ●




Data Support and Interoperability
Raster Data Support                                                    ArcReader   ArcView   ArcEditor       ArcInfo

Direct Read of Raster Data
ARC Digitized Raster Graphics (ADRG)                                                 ●          ●               ●
Band Interleaved by Line (Esri BIL), Band Interleaved by Pixel (Esri
                                                                                     ●          ●               ●
BIP), or Band Sequential (Esri BSQ)
Bathymetric Attributed Grid (BAG)                                                    ●          ●               ●
Binary Terrain (BT)                                                                  ●          ●               ●
Bitmap, Device Independent Bitmap (DIB) Format, or Microsoft
                                                                                     ●          ●               ●
Windows Bitmap
BSB Nautical Charts                                                                  ●          ●               ●
Compressed ARC Digitized Raster Graphics (CADRG)                                     ●          ●               ●
Controlled Image Base (CIB)                                                          ●          ●               ●
Digital Geographic Information Exchange Standard (DIGEST), ARC
Standard Raster Product (ASRP), or Universal Transverse Mercator
                                                                                     ●          ●               ●
(UTM)/Universal Polar Stereographic (UPS) Standard Raster
Product (USRP)




J-9707                                                          10                                       February 8, 2011
Raster Data Support                                               ArcReader   ArcView   ArcEditor       ArcInfo
Digital Image Map (DIMAP)                                                       ●          ●               ●
Digital Terrain Elevation Data (DTED) Levels 0, 1, and 2                        ●          ●               ●
EOSAT FAST (FST)                                                                ●          ●               ●
ENVI                                                                            ●          ●               ●
ER Mapper's ECW                                                                 ●          ●               ●
ERDAS 7.5 GIS, 7.5 LAN, and RAW                                                 ●          ●               ●
Floating Point Raster (FLT)                                                     ●          ●               ●
Geospatial Data Abstraction Library (GDAL) Virtual Format (VRT)                 ●          ●               ●
Gridded Binary Format (GRIB)                                                    ●          ●               ●
Golden Software Format (GSAG, GSBG, GS7GB)                                      ●          ●               ●
Hierarchical Data Format (HDF) –4, Including Subdatasets                        ●          ●               ●
IDRISI Raster Format (RST)                                                      ●          ●               ●
                              ™                ™
Intergraph Raster Files: CIT Binary Data; COT Grayscale Data                    ●          ●               ●
Integrated Software for Imagers and Spectrometers (ISIS)                        ●          ●               ●
Japanese Aerospace Exploration Agency (1.1 GUD, 1.5 GUD)                        ●          ●               ●
Magellan MapSend (BLX/XLB)                                                      ●          ●               ●
Multiresolution Seamless Image Database (MrSID Generations 2
                                                                                ●          ●               ●
and 3)
National Imagery Transmission Format (NITF), Including
                                                                                ●          ●               ●
Subdatasets
National Land Archive Production System (NLAPS)                                 ●          ●               ●
Oracle Spatial GeoRaster                                                        ●          ●               ●
                                  2
PCI Geomatics PCIDSK (PIX)                                                      ●          ●               ●
Planetary Data System (PDS)—National Aeronautics and Space
                                                                                ●          ●               ●
Administration (NASA) (IMG/LBL)
Portable Network Graphics                                                       ●          ●               ●
                 2
PCRaster (MAP)                                                                  ●          ●               ●
RADARSAT-2                                                                      ●          ●               ●
Raster Product Format                                                           ●          ●               ●
Sandia Synthetic Aperture (GFF)                                                 ●          ●               ●
Shuttle Radar Topography Mission (SRTM)                                         ●          ●               ●
Spatial Data Transfer Standard (SDTS)                                           ●          ●               ●
Terragen Terrain (TER/TERRAIN)                                                  ●          ●               ●
TerraSAR-X                                                                      ●          ●               ●
United States Geological Survey (USGS) ASCII Digital Elevation
      2                                                                         ●          ●               ●
Model
                2
XPixMap (XPM)                                                                   ●          ●               ●
Direct Read and Write of Raster Data
ERDAS IMAGINE                                                                   ●          ●               ●
Esri Grid and Grid Stack                                                        ●          ●               ●
                                                                                 3
Geodatabase Raster                                                              ●          ●               ●
Graphic Interchange Format                                                      ●          ●               ●
Joint File Interchange Format (JFIF)                                            ●          ●               ●
Joint Photographic Experts Group                                                ●          ●               ●
JPEG 2000 (JP2)                                                                 ●          ●               ●
Portable Network Graphics                                                       ●          ●               ●
Tagged Image File Format (GeoTIFF tags are supported.)                          ●          ●               ●
Oracle Spatial GeoRaster                                                                   ●               ●




J-9707                                                       11                                     February 8, 2011
Raster Data Support                                                     ArcReader     ArcView       ArcEditor        ArcInfo

    Geodatabase Raster Management
    Create and Edit Raster Attribute Tables for All Supported Single                          3
                                                                                             ●               ●              ●
    Band Raster Formats
    Create and Manage Rasters in Personal and File Geodatabases                              ●               ●              ●
    Compress Geodatabase Rasters with LZ77, JPEG, or JPEG 2000                                3
                                                                                             ●               ●              ●
    Compression Algorithms
    Create and Manage Raster Data in a Multiuser Geodatabase                                                 ●              ●
    Create Raster Mosaics                                                                                    ●              ●
2                                                                            ™
These formats can be written to through programming with the ArcObjects API.
3
 ArcView can only create geodatabase rasters or raster attribute tables in personal or file geodatabases. ArcEditor and ArcInfo can
create and manage geodatabase rasters in personal, file, and multiuser geodatabases.


    Document and Data Support                                               ArcReader     ArcView       ArcEditor        ArcInfo

    Map and Symbology Files
    Read Published Map Files (from ArcGIS Publisher)                             ●           ●               ●              ●
    Create and Edit Map Documents (.mxd)                                                     ●               ●              ●
    Save Layer Files (.lyr) and Map Documents (.mxd) in ArcGIS 8.3,
                                                                                             ●               ●              ●
    9.0, 9.1, 9.2, or 9.3 Format
    Use Map Documents (.mxd) to Standardize Maps                                             ●               ●              ●
    Import ArcView 3.x AVL Files                                                             ●               ●              ●
    Direct Read of Vector and Raster Data
                                        ®         ™
    Personal Geodatabase for Microsoft Access                                                ●               ●              ●
    File Geodatabase                                                                         ●               ●              ●
    Personal, Workgroup, and Enterprise Geodatabases                                         ●               ●              ●
    Shapefiles                                                                               ●               ●              ●
    ArcInfo Coverages                                                                        ●               ●              ●
                  ™
    PC ARC/INFO Coverages                                                                    ●               ●              ●
    Smart Data Compression (SDC) Data                                                        ●               ●              ●
    Vector Product Format (VPF) Data                                                         ●               ●              ●
    ArcGIS Server Services                                                                   ●               ●              ●
           ®
    ArcIMS Services                                                                          ●               ●              ●
    ArcGIS Server Feature Services                                                           ●               ●              ●
    Open Geospatial Consortium, Inc. (OGC), Web Coverage Service
                                                                                             ●               ●              ●
    (WCS)
    Open Geospatial Consortium, Inc., Web Map Service (WMS)                                  ●               ●              ●
                                       4
    OGC GML Simple Features Access                                                           ●               ●              ●
                                              4
    OGC GML Simple Features Import/Export                                                    ●               ●              ●
    OGC GML Web Feature Service Access for Simple Features-Based
             4                                                                               ●               ●              ●
    Services
    Network Common Data Form (netCDF)                                                        ●               ●              ●
    Direct Editing of Vector Data
    Personal Geodatabase for Access Simple Features                                          ●               ●              ●
    File Geodatabase                                                                         ●               ●              ●
    Shapefiles                                                                               ●               ●              ●
    Personal, Workgroup, and Enterprise Geodatabases                                                         ●              ●
    ArcGIS Server Feature Services                                                                           ●              ●




J-9707                                                                 12                                            February 8, 2011
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix
ArcGIS10 Desktop Functionality Matrix

More Related Content

What's hot

Primavera p6 18.8 planning and scheduling guide r3
Primavera p6 18.8 planning and  scheduling guide r3Primavera p6 18.8 planning and  scheduling guide r3
Primavera p6 18.8 planning and scheduling guide r3Matiwos Tsegaye
 
Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...
Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...
Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...Fiorella58v
 
Mazda 2013-2014 Navigation Owners Manual
Mazda 2013-2014 Navigation Owners ManualMazda 2013-2014 Navigation Owners Manual
Mazda 2013-2014 Navigation Owners ManualNaples Mazda
 
3rd Year Formula Student Frame Project Report
3rd Year Formula Student Frame Project Report3rd Year Formula Student Frame Project Report
3rd Year Formula Student Frame Project ReportJessica Byrne
 
Enterprise portal development cookbook
Enterprise portal development cookbookEnterprise portal development cookbook
Enterprise portal development cookbookAhmed Farag
 
PA Marcellus Shale Advisory Commission Final Report
PA Marcellus Shale Advisory Commission Final ReportPA Marcellus Shale Advisory Commission Final Report
PA Marcellus Shale Advisory Commission Final ReportMarcellus Drilling News
 
Learn MySQL - Online Guide
Learn MySQL - Online GuideLearn MySQL - Online Guide
Learn MySQL - Online Guidebigspire
 
INDUSTRIAL ARTS graphics design
INDUSTRIAL ARTS   graphics designINDUSTRIAL ARTS   graphics design
INDUSTRIAL ARTS graphics designJocelyn Gallegos
 
WHAT CONSTITUTES AN AGILE ORGANIZATION? ? DESCRIPTIVE RESULTS OF AN EMPIRICAL...
WHAT CONSTITUTES AN AGILE ORGANIZATION? ? DESCRIPTIVE RESULTS OF AN EMPIRICAL...WHAT CONSTITUTES AN AGILE ORGANIZATION? ? DESCRIPTIVE RESULTS OF AN EMPIRICAL...
WHAT CONSTITUTES AN AGILE ORGANIZATION? ? DESCRIPTIVE RESULTS OF AN EMPIRICAL...iasaglobal
 
Mastering Mind Is An Addiction [From Www.Metacafe.Com]
Mastering  Mind Is An  Addiction [From Www.Metacafe.Com]Mastering  Mind Is An  Addiction [From Www.Metacafe.Com]
Mastering Mind Is An Addiction [From Www.Metacafe.Com]Ashraf Al Morsy
 
BizTalk Practical Course Preview
BizTalk Practical Course PreviewBizTalk Practical Course Preview
BizTalk Practical Course PreviewMoustafaRefaat
 
School library management system software
School library management system softwareSchool library management system software
School library management system softwareRanganath Shivaram
 

What's hot (18)

Primavera p6 18.8 planning and scheduling guide r3
Primavera p6 18.8 planning and  scheduling guide r3Primavera p6 18.8 planning and  scheduling guide r3
Primavera p6 18.8 planning and scheduling guide r3
 
Corel draw learning file
Corel draw learning fileCorel draw learning file
Corel draw learning file
 
Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...
Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...
Water-Wise Landscaping: Guide for Water Management Planning - Utah State Univ...
 
Mazda 2013-2014 Navigation Owners Manual
Mazda 2013-2014 Navigation Owners ManualMazda 2013-2014 Navigation Owners Manual
Mazda 2013-2014 Navigation Owners Manual
 
3rd Year Formula Student Frame Project Report
3rd Year Formula Student Frame Project Report3rd Year Formula Student Frame Project Report
3rd Year Formula Student Frame Project Report
 
Enterprise portal development cookbook
Enterprise portal development cookbookEnterprise portal development cookbook
Enterprise portal development cookbook
 
PA Marcellus Shale Advisory Commission Final Report
PA Marcellus Shale Advisory Commission Final ReportPA Marcellus Shale Advisory Commission Final Report
PA Marcellus Shale Advisory Commission Final Report
 
Dsp thrissur contents
Dsp thrissur contentsDsp thrissur contents
Dsp thrissur contents
 
Rprogramming
RprogrammingRprogramming
Rprogramming
 
Learn MySQL - Online Guide
Learn MySQL - Online GuideLearn MySQL - Online Guide
Learn MySQL - Online Guide
 
Dissertation Final
Dissertation FinalDissertation Final
Dissertation Final
 
Dynamics AX/ X++
Dynamics AX/ X++Dynamics AX/ X++
Dynamics AX/ X++
 
INDUSTRIAL ARTS graphics design
INDUSTRIAL ARTS   graphics designINDUSTRIAL ARTS   graphics design
INDUSTRIAL ARTS graphics design
 
Transport Assessment
Transport AssessmentTransport Assessment
Transport Assessment
 
WHAT CONSTITUTES AN AGILE ORGANIZATION? ? DESCRIPTIVE RESULTS OF AN EMPIRICAL...
WHAT CONSTITUTES AN AGILE ORGANIZATION? ? DESCRIPTIVE RESULTS OF AN EMPIRICAL...WHAT CONSTITUTES AN AGILE ORGANIZATION? ? DESCRIPTIVE RESULTS OF AN EMPIRICAL...
WHAT CONSTITUTES AN AGILE ORGANIZATION? ? DESCRIPTIVE RESULTS OF AN EMPIRICAL...
 
Mastering Mind Is An Addiction [From Www.Metacafe.Com]
Mastering  Mind Is An  Addiction [From Www.Metacafe.Com]Mastering  Mind Is An  Addiction [From Www.Metacafe.Com]
Mastering Mind Is An Addiction [From Www.Metacafe.Com]
 
BizTalk Practical Course Preview
BizTalk Practical Course PreviewBizTalk Practical Course Preview
BizTalk Practical Course Preview
 
School library management system software
School library management system softwareSchool library management system software
School library management system software
 

Similar to ArcGIS10 Desktop Functionality Matrix

ArcGIS10.1 for Desktop Functionality Matrix
ArcGIS10.1 for Desktop Functionality MatrixArcGIS10.1 for Desktop Functionality Matrix
ArcGIS10.1 for Desktop Functionality MatrixEsri
 
ArcGIS 10.2.1 for Desktop Functionality Matrix
ArcGIS 10.2.1 for Desktop Functionality MatrixArcGIS 10.2.1 for Desktop Functionality Matrix
ArcGIS 10.2.1 for Desktop Functionality MatrixEsri
 
ArcGIS 10.2.2 for Desktop Functionality Matrix
ArcGIS 10.2.2 for Desktop Functionality MatrixArcGIS 10.2.2 for Desktop Functionality Matrix
ArcGIS 10.2.2 for Desktop Functionality MatrixEsri
 
ArcGIS10.2 Desktop Functionality Matrix
ArcGIS10.2 Desktop Functionality MatrixArcGIS10.2 Desktop Functionality Matrix
ArcGIS10.2 Desktop Functionality MatrixEsri
 
95763406 atoll-3-1-0-user-manual-lte
95763406 atoll-3-1-0-user-manual-lte95763406 atoll-3-1-0-user-manual-lte
95763406 atoll-3-1-0-user-manual-ltearif budiman
 
Qgis 1.7.0 user-guide_en
Qgis 1.7.0 user-guide_enQgis 1.7.0 user-guide_en
Qgis 1.7.0 user-guide_enxp5000
 
Sage Intelligence 101 Microsoft® Excel® tips and tricks
Sage Intelligence 101 Microsoft® Excel® tips and tricksSage Intelligence 101 Microsoft® Excel® tips and tricks
Sage Intelligence 101 Microsoft® Excel® tips and tricksBurCom Consulting Ltd.
 
Multilocalesite
MultilocalesiteMultilocalesite
MultilocalesiteZychoFlow
 
Soa In The Real World
Soa In The Real WorldSoa In The Real World
Soa In The Real Worldssiliveri
 

Similar to ArcGIS10 Desktop Functionality Matrix (20)

ArcGIS10.1 for Desktop Functionality Matrix
ArcGIS10.1 for Desktop Functionality MatrixArcGIS10.1 for Desktop Functionality Matrix
ArcGIS10.1 for Desktop Functionality Matrix
 
ArcGIS 10.2.1 for Desktop Functionality Matrix
ArcGIS 10.2.1 for Desktop Functionality MatrixArcGIS 10.2.1 for Desktop Functionality Matrix
ArcGIS 10.2.1 for Desktop Functionality Matrix
 
ArcGIS 10.2.2 for Desktop Functionality Matrix
ArcGIS 10.2.2 for Desktop Functionality MatrixArcGIS 10.2.2 for Desktop Functionality Matrix
ArcGIS 10.2.2 for Desktop Functionality Matrix
 
ArcGIS10.2 Desktop Functionality Matrix
ArcGIS10.2 Desktop Functionality MatrixArcGIS10.2 Desktop Functionality Matrix
ArcGIS10.2 Desktop Functionality Matrix
 
95763406 atoll-3-1-0-user-manual-lte
95763406 atoll-3-1-0-user-manual-lte95763406 atoll-3-1-0-user-manual-lte
95763406 atoll-3-1-0-user-manual-lte
 
Qgis 1.7.0 user-guide_en
Qgis 1.7.0 user-guide_enQgis 1.7.0 user-guide_en
Qgis 1.7.0 user-guide_en
 
Google Search Quality Rating Program General Guidelines 2011
Google Search Quality Rating Program General Guidelines 2011Google Search Quality Rating Program General Guidelines 2011
Google Search Quality Rating Program General Guidelines 2011
 
Google General Guidelines 2011
Google General Guidelines 2011Google General Guidelines 2011
Google General Guidelines 2011
 
General guidelines 2011
General guidelines 2011General guidelines 2011
General guidelines 2011
 
R intro
R introR intro
R intro
 
Lesson 1...Guide
Lesson 1...GuideLesson 1...Guide
Lesson 1...Guide
 
Surfer9 guide
Surfer9 guideSurfer9 guide
Surfer9 guide
 
Addendum
AddendumAddendum
Addendum
 
Sage Intelligence 101 Microsoft® Excel® tips and tricks
Sage Intelligence 101 Microsoft® Excel® tips and tricksSage Intelligence 101 Microsoft® Excel® tips and tricks
Sage Intelligence 101 Microsoft® Excel® tips and tricks
 
Multilocalesite
MultilocalesiteMultilocalesite
Multilocalesite
 
Soa In The Real World
Soa In The Real WorldSoa In The Real World
Soa In The Real World
 
R Ints
R IntsR Ints
R Ints
 
Ivis
IvisIvis
Ivis
 
GI25_TutorialGuide
GI25_TutorialGuideGI25_TutorialGuide
GI25_TutorialGuide
 
GI25_TutorialGuide
GI25_TutorialGuideGI25_TutorialGuide
GI25_TutorialGuide
 

More from Esri

INIA- CISA: Análisis de las amenazas en la fauna silvestre
INIA- CISA: Análisis de las amenazas en la fauna silvestreINIA- CISA: Análisis de las amenazas en la fauna silvestre
INIA- CISA: Análisis de las amenazas en la fauna silvestreEsri
 
Aena Aeropuerto Adolfo Suárez-Barajas crea potentes aplicaciones para sus cli...
Aena Aeropuerto Adolfo Suárez-Barajas crea potentes aplicaciones para sus cli...Aena Aeropuerto Adolfo Suárez-Barajas crea potentes aplicaciones para sus cli...
Aena Aeropuerto Adolfo Suárez-Barajas crea potentes aplicaciones para sus cli...Esri
 
Plataforma Smart City de Móstoles
Plataforma Smart City de MóstolesPlataforma Smart City de Móstoles
Plataforma Smart City de MóstolesEsri
 
ArcGIS Online para Organizaciones
ArcGIS Online para OrganizacionesArcGIS Online para Organizaciones
ArcGIS Online para OrganizacionesEsri
 
Molina de Segura se convierte en una smart city
Molina de Segura se convierte en una smart cityMolina de Segura se convierte en una smart city
Molina de Segura se convierte en una smart cityEsri
 
Portal for ArcGIS
Portal for ArcGISPortal for ArcGIS
Portal for ArcGISEsri
 
GIS-Based Web Services Provide Rapid Analysis and Dissemination of Maritime Data
GIS-Based Web Services Provide Rapid Analysis and Dissemination of Maritime DataGIS-Based Web Services Provide Rapid Analysis and Dissemination of Maritime Data
GIS-Based Web Services Provide Rapid Analysis and Dissemination of Maritime DataEsri
 
An Effective Tool for Drinking Water Protection
An Effective Tool for Drinking Water ProtectionAn Effective Tool for Drinking Water Protection
An Effective Tool for Drinking Water ProtectionEsri
 
GeoCollector for ArcPad
GeoCollector for ArcPadGeoCollector for ArcPad
GeoCollector for ArcPadEsri
 
GeoCollector for ArcGIS for Windows Mobile
GeoCollector for ArcGIS for Windows MobileGeoCollector for ArcGIS for Windows Mobile
GeoCollector for ArcGIS for Windows MobileEsri
 
Data Appliance for ArcGIS
Data Appliance for ArcGISData Appliance for ArcGIS
Data Appliance for ArcGISEsri
 
Esri and BlackBridge
Esri and BlackBridgeEsri and BlackBridge
Esri and BlackBridgeEsri
 
GeoPlanner for ArcGIS
GeoPlanner for ArcGISGeoPlanner for ArcGIS
GeoPlanner for ArcGISEsri
 
Esri and AccuWeather
Esri and AccuWeatherEsri and AccuWeather
Esri and AccuWeatherEsri
 
Esri and Airbus Defense & Space
Esri and Airbus Defense & SpaceEsri and Airbus Defense & Space
Esri and Airbus Defense & SpaceEsri
 
Esri US Data Fact Sheet
Esri US Data Fact SheetEsri US Data Fact Sheet
Esri US Data Fact SheetEsri
 
ArcGIS for Server on Microsoft Azure Jumpstart
ArcGIS for Server on Microsoft Azure JumpstartArcGIS for Server on Microsoft Azure Jumpstart
ArcGIS for Server on Microsoft Azure JumpstartEsri
 
ArcGIS for the Military--Maritime Operations
ArcGIS for the Military--Maritime OperationsArcGIS for the Military--Maritime Operations
ArcGIS for the Military--Maritime OperationsEsri
 
Esri Geoportal Server
Esri Geoportal ServerEsri Geoportal Server
Esri Geoportal ServerEsri
 
ArcGIS GeoEvent Extension for Server
ArcGIS GeoEvent Extension for ServerArcGIS GeoEvent Extension for Server
ArcGIS GeoEvent Extension for ServerEsri
 

More from Esri (20)

INIA- CISA: Análisis de las amenazas en la fauna silvestre
INIA- CISA: Análisis de las amenazas en la fauna silvestreINIA- CISA: Análisis de las amenazas en la fauna silvestre
INIA- CISA: Análisis de las amenazas en la fauna silvestre
 
Aena Aeropuerto Adolfo Suárez-Barajas crea potentes aplicaciones para sus cli...
Aena Aeropuerto Adolfo Suárez-Barajas crea potentes aplicaciones para sus cli...Aena Aeropuerto Adolfo Suárez-Barajas crea potentes aplicaciones para sus cli...
Aena Aeropuerto Adolfo Suárez-Barajas crea potentes aplicaciones para sus cli...
 
Plataforma Smart City de Móstoles
Plataforma Smart City de MóstolesPlataforma Smart City de Móstoles
Plataforma Smart City de Móstoles
 
ArcGIS Online para Organizaciones
ArcGIS Online para OrganizacionesArcGIS Online para Organizaciones
ArcGIS Online para Organizaciones
 
Molina de Segura se convierte en una smart city
Molina de Segura se convierte en una smart cityMolina de Segura se convierte en una smart city
Molina de Segura se convierte en una smart city
 
Portal for ArcGIS
Portal for ArcGISPortal for ArcGIS
Portal for ArcGIS
 
GIS-Based Web Services Provide Rapid Analysis and Dissemination of Maritime Data
GIS-Based Web Services Provide Rapid Analysis and Dissemination of Maritime DataGIS-Based Web Services Provide Rapid Analysis and Dissemination of Maritime Data
GIS-Based Web Services Provide Rapid Analysis and Dissemination of Maritime Data
 
An Effective Tool for Drinking Water Protection
An Effective Tool for Drinking Water ProtectionAn Effective Tool for Drinking Water Protection
An Effective Tool for Drinking Water Protection
 
GeoCollector for ArcPad
GeoCollector for ArcPadGeoCollector for ArcPad
GeoCollector for ArcPad
 
GeoCollector for ArcGIS for Windows Mobile
GeoCollector for ArcGIS for Windows MobileGeoCollector for ArcGIS for Windows Mobile
GeoCollector for ArcGIS for Windows Mobile
 
Data Appliance for ArcGIS
Data Appliance for ArcGISData Appliance for ArcGIS
Data Appliance for ArcGIS
 
Esri and BlackBridge
Esri and BlackBridgeEsri and BlackBridge
Esri and BlackBridge
 
GeoPlanner for ArcGIS
GeoPlanner for ArcGISGeoPlanner for ArcGIS
GeoPlanner for ArcGIS
 
Esri and AccuWeather
Esri and AccuWeatherEsri and AccuWeather
Esri and AccuWeather
 
Esri and Airbus Defense & Space
Esri and Airbus Defense & SpaceEsri and Airbus Defense & Space
Esri and Airbus Defense & Space
 
Esri US Data Fact Sheet
Esri US Data Fact SheetEsri US Data Fact Sheet
Esri US Data Fact Sheet
 
ArcGIS for Server on Microsoft Azure Jumpstart
ArcGIS for Server on Microsoft Azure JumpstartArcGIS for Server on Microsoft Azure Jumpstart
ArcGIS for Server on Microsoft Azure Jumpstart
 
ArcGIS for the Military--Maritime Operations
ArcGIS for the Military--Maritime OperationsArcGIS for the Military--Maritime Operations
ArcGIS for the Military--Maritime Operations
 
Esri Geoportal Server
Esri Geoportal ServerEsri Geoportal Server
Esri Geoportal Server
 
ArcGIS GeoEvent Extension for Server
ArcGIS GeoEvent Extension for ServerArcGIS GeoEvent Extension for Server
ArcGIS GeoEvent Extension for Server
 

Recently uploaded

WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 

Recently uploaded (20)

WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 

ArcGIS10 Desktop Functionality Matrix

  • 1. ArcGIS® Desktop 10 Functionality Matrix
  • 2. ArcGIS Desktop 10 Functionality Matrix Mapping ......................................................................................................................... 1 Map Interaction...................................................................................................................... 1 Map Navigation ................................................................................................................................ 1 Queries............................................................................................................................................. 1 Tables............................................................................................................................................... 1 Graphs ............................................................................................................................................. 2 Graph Types .................................................................................................................................... 2 Routing Using ArcGIS Online or Network Datasets (StreetMap™ USA).......................................... 2 Map Display ........................................................................................................................... 2 General Mapping.............................................................................................................................. 2 Tabular Data .................................................................................................................................... 3 Vector Data Display ......................................................................................................................... 3 Thematic Vector Data Classifications .............................................................................................. 3 Symbology ....................................................................................................................................... 3 Elevation Surface Display ................................................................................................................ 4 Raster Data Display ......................................................................................................................... 4 Raster Display: Gradual Color Ramp Data-Stretching Algorithms .................................................. 4 Raster Display Statistics .................................................................................................................. 4 Raster Display Resample Methods.................................................................................................. 4 Raster Display Classification Methods............................................................................................. 4 Raster Catalog Footprint Display ..................................................................................................... 5 Raster Tools..................................................................................................................................... 5 Time Animation and Temporal Data ................................................................................................ 5 Page Layout and Printing..................................................................................................... 5 Map Elements .................................................................................................................................. 5 Export Formats................................................................................................................................. 5 Print with the Following Print Drivers ............................................................................................... 5 Publishing and Sharing Maps.............................................................................................. 6 Creating High-Performance Dynamic Maps .................................................................................... 6 Sharing Maps, Layers, and Data ..................................................................................................... 6 Map Text................................................................................................................................. 6 Labels............................................................................................................................................... 6 Annotation ........................................................................................................................................ 6 Annotation Editing ............................................................................................................................ 6 Annotation and Dimensions Management ....................................................................................... 7 Advanced Labeling ............................................................................................................... 7 Advanced Label Placement Rule Set .............................................................................................. 7 Advanced Cartography......................................................................................................... 8 Cartographic Editing Tools............................................................................................................... 8 Point Geometric Effects ................................................................................................................... 8 Line Geometric Effects..................................................................................................................... 8 Polygon Geometric Effects .............................................................................................................. 8 Interactive Symbol Editing ............................................................................................................... 9 Geoprocessing Graphic Quality ....................................................................................................... 9 Geoprocessing Masking Tools......................................................................................................... 9 Geoprocessing Representation Management ................................................................................. 9 Geoprocessing Symbolization Refinement ...................................................................................... 9 J-9707 i February 8, 2011
  • 3. Address Matching ............................................................................................................... 10 Geocoding Tools ............................................................................................................................ 10 ArcGIS Online Locators ................................................................................................................. 10 Geoprocessing ............................................................................................................................... 10 Data Support and Interoperability.............................................................................. 10 Raster Data Support ........................................................................................................... 10 Direct Read of Raster Data ............................................................................................................ 10 Direct Read and Write of Raster Data ........................................................................................... 11 Geodatabase Raster Management................................................................................................ 12 Document and Data Support.............................................................................................. 12 Map and Symbology Files.............................................................................................................. 12 Direct Read of Vector and Raster Data ......................................................................................... 12 Direct Editing of Vector Data.......................................................................................................... 12 Direct Read of Other Data ............................................................................................................. 13 Coordinate Systems....................................................................................................................... 13 CAD Support........................................................................................................................ 13 CAD File Support ........................................................................................................................... 13 Direct Read of CAD Data ............................................................................................................... 13 Editing with CAD Data.................................................................................................................... 13 Coordinate Systems....................................................................................................................... 13 Geoprocessing—See Geoprocessing Conversion ........................................................................ 13 Application Framework............................................................................................... 14 Application Customization................................................................................................. 14 Application Look and Feel.............................................................................................................. 14 Customization ................................................................................................................................ 14 Data Automation.......................................................................................................... 14 Data Editing ......................................................................................................................... 14 General Editing .............................................................................................................................. 14 Snapping Types ............................................................................................................................. 14 Snapping to Topology Elements .................................................................................................... 14 Snapping Tolerance ....................................................................................................................... 15 Geometry Construction Options..................................................................................................... 15 Geometry Creation Tools ............................................................................................................... 15 Feature Manipulation Tasks........................................................................................................... 15 Feature Editing Tools ..................................................................................................................... 16 Attribute Editing.............................................................................................................................. 16 Multipart Features (Point, Line, and Polygon) ............................................................................... 16 Map Navigation while Editing......................................................................................................... 16 Vector Data Transformations ......................................................................................................... 16 Generalization ................................................................................................................................ 16 Coordinate Geometry..................................................................................................................... 17 Parcel Editing ................................................................................................................................. 17 Raster Editing and Vectorization....................................................................................... 17 Vectorize All Raster Formats Supported in ArcGIS ....................................................................... 17 ArcGIS Integration.......................................................................................................................... 17 Raster Snapping Geometry ........................................................................................................... 17 Raster Snapping Environment ....................................................................................................... 17 Vectorization Tracing ..................................................................................................................... 17 J-9707 ii February 8, 2011
  • 4. Automatic Vectorization ................................................................................................................. 18 Vectorization Parameters............................................................................................................... 18 Vectorization Preview..................................................................................................................... 18 Raster Cell Selection...................................................................................................................... 18 Raster Cleanup Environment......................................................................................................... 18 Raster Cleanup Painting Tools ...................................................................................................... 18 Support Tools................................................................................................................................. 18 Mobile................................................................................................................................... 18 GPS Support .................................................................................................................................. 18 Tablet PC ....................................................................................................................................... 18 ArcGIS Mobile Support .................................................................................................................. 19 Multiuser Geodatabase Editing ......................................................................................... 19 General Editing .............................................................................................................................. 19 Administration Geoprocessing ....................................................................................................... 19 Versioning Geoprocessing ............................................................................................................. 19 Short Transaction Editing............................................................................................................... 19 Multiuser Geodatabase Archiving ..................................................................................... 19 Display and Query.......................................................................................................................... 19 Manage .......................................................................................................................................... 19 Distributed Geodatabases.................................................................................................. 20 Manage Replicas ........................................................................................................................... 20 Disconnected Editing Geoprocessing ............................................................................................ 20 Distributed Geodatabases Geoprocessing .................................................................................... 20 Spatial Referencing Image Data (Georeferencing) .......................................................... 20 Tools............................................................................................................................................... 20 Transformation Methods ................................................................................................................ 20 Save Spatial Reference Information .............................................................................................. 20 Data Management and Validation .............................................................................. 21 Data Management ............................................................................................................... 21 General .......................................................................................................................................... 21 Search for GIS Data By.................................................................................................................. 21 Manage Coverage Data ................................................................................................................. 21 Geodatabase Administration.......................................................................................................... 21 Geodatabase XML File Import/Export............................................................................................ 21 Attribute Validation ............................................................................................................. 21 Subtypes Geoprocessing ............................................................................................................... 21 Domains Geoprocessing................................................................................................................ 21 Create and Edit Relationships for Features ................................................................................... 22 Geodatabase Relationship Behavior ............................................................................................. 22 Relationship Class Geoprocessing ................................................................................................ 22 Topology .............................................................................................................................. 22 Map Display ................................................................................................................................... 22 Editing ............................................................................................................................................ 22 Geodatabase Topology Rule Violation Fix Operations.................................................................. 23 Geodatabase Topology Management............................................................................................ 23 Geodatabase Topology Rules ....................................................................................................... 23 Geoprocessing ............................................................................................................................... 24 J-9707 iii February 8, 2011
  • 5. Networks .............................................................................................................................. 24 Utility (Geometric) Network Analysis.............................................................................................. 24 Data Management.......................................................................................................................... 24 Geometric Network Connectivity Rules ......................................................................................... 24 Geometric Network Editing ............................................................................................................ 24 Linear Referencing (Routes) .............................................................................................. 25 Display............................................................................................................................................ 25 Editing ............................................................................................................................................ 25 Geoprocessing ............................................................................................................................... 25 Metadata............................................................................................................................... 25 General .......................................................................................................................................... 25 Managing Metadata Using a Variety of Styles ............................................................................... 25 Geoprocessing ............................................................................................................................... 25 Data Manipulation and Analysis ................................................................................ 26 Coverage Geoprocessing................................................................................................... 26 Application Framework................................................................................................................... 26 Analysis.......................................................................................................................................... 26 Conversion ..................................................................................................................................... 26 Aggregation.................................................................................................................................... 26 Composite Features....................................................................................................................... 27 Generalization ................................................................................................................................ 27 Table Management ........................................................................................................................ 27 Projections ..................................................................................................................................... 27 Topology ........................................................................................................................................ 27 General .......................................................................................................................................... 27 Geoprocessing .................................................................................................................... 27 Environment ................................................................................................................................... 27 Supported Scripting Environments ................................................................................................ 28 General Data Management............................................................................................................ 28 Data Comparison ........................................................................................................................... 28 Table Management ........................................................................................................................ 28 Editing ............................................................................................................................................ 28 Field Management ......................................................................................................................... 28 Feature Class Management........................................................................................................... 29 Feature Management..................................................................................................................... 29 File Geodatabase........................................................................................................................... 29 Generalization ................................................................................................................................ 29 Projections and Transformations ................................................................................................... 30 Vector Data Projection ................................................................................................................... 30 Raster Management....................................................................................................................... 30 Raster Mosaics .............................................................................................................................. 31 Raster Conversion ......................................................................................................................... 31 Raster Transformation/Projection .................................................................................................. 31 Conversion ..................................................................................................................................... 31 Layers and Table Views................................................................................................................. 32 Packaging ...................................................................................................................................... 32 Parcel Fabric Tools ........................................................................................................................ 32 Core Analysis ................................................................................................................................. 32 Spatial Statistics Tools—Analyzing Patterns ................................................................................. 33 Spatial Statistics Tools—Mapping Clusters ................................................................................... 33 Spatial Statistics Tools—Measuring Geographic Distributions...................................................... 33 Spatial Statistics Tools—Modeling Spatial Relationships.............................................................. 33 J-9707 iv February 8, 2011
  • 6. Spatial Statistics Tools—Rendering............................................................................................... 33 Spatial Statistics Tools—Utilities.................................................................................................... 33 Multidimensional Tools................................................................................................................... 33 Workspace Management ............................................................................................................... 34 Database Management.................................................................................................................. 34 Table Joins..................................................................................................................................... 34 Data Indexing ................................................................................................................................. 34 ArcGIS Server Management.......................................................................................................... 34 Data .............................................................................................................................. 34 ArcGIS Online Standard Services ..................................................................................... 34 2D and 3D Basemap Services ....................................................................................................... 34 Esri Data and Maps ............................................................................................................. 35 World .............................................................................................................................................. 35 Europe............................................................................................................................................ 35 Mexico ............................................................................................................................................ 36 Image Data..................................................................................................................................... 36 United States.................................................................................................................................. 36 StreetMap North America .............................................................................................................. 37 J-9707 v February 8, 2011
  • 7. Mapping ™ ® ™ ® Map Interaction ArcReader ArcView ArcEditor ArcInfo Map Navigation Pan, Zoom, and Rotate the Map ● ● ● ● Find an X,Y (Latitude-Longitude) Location on a Map ● ● ● ● Zoom to the Full Study Area of the Map ● ● ● ● Zoom to the Extent of a Layer ● ● ● ● Zoom to the Visible Scale of a Layer ● ● ● ● Zoom to a Specific Map Scale ● ● ● ● Use Spatial Bookmarks ● ● ● ● Access Hyperlinks ● ● ● ● Use Dynamic MapTips ● ● ● ● Use Magnification Window ● ● ● ● Interactively Reveal Areas beneath a Specific Layer (Swipe) ● ● ● ● Save and Manage Locations for Use with Multiple Maps (My Places) ● ● ● ● Create, Organize, and Share Spatial Bookmarks ● ● ● Pan and Zoom the Map with the Mouse Wheel ● ● ● Pan and Zoom to Selected Features ● ● ● Switch Any Tool to a Pan/Zoom Tool Using Hot Keys ● ● ● Create Hyperlink to External Application, Macro, or URL ● ● ● Use Overview Window ● ● ● Use Viewer Windows for Displaying Different Parts of a Map ● ● ● Use Multiple Viewer Windows for Separate Data Frames ● ● ● Queries Identify Features in the Map ● ● ● ● Interactively Measure Distances and Areas ● ● ● ● Find Features in the Map ● ● ● ● SM Find Places Using the ArcGIS Online World Gazetteer ● ● ● ● Find by Address, including Custom Locators ● ● ● ● Show Related Data with Field Properties ● ● ● ● View and Toggle Layer Selectability in Table of Contents ● ● ● Select Data by Location ● ● ● Select Data by Attribute ● ● ● Interactively Select/Unselect Features ● ● ● Unselect All, Switch the Selection, or Select All Features ● ● ● Access Attribute Table and Layer Properties from Identify Dialog Box ● ● ● Tables Flash, Zoom to, Pan to, Select, and Identify Individual Features in a ● ● ● Map Based on a Record in the Attribute Table Interactively Highlight Selected Records/Features ● ● ● Zoom to and Unselect Highlighted Records/Features ● ● ● Interactively Add and Remove Records from a Selection ● ● ● Copy Selected Records for Pasting into Other Applications ● ● ● Turn Fields Off and On and Change Field Order and Size ● ● ● Modify a Table's Appearance by Changing Cell and Field Size, Font, ● ● ● and Color Use Field Properties of Joined Tables ● ● ● Reorder Fields ● ● ● J-9707 1 February 8, 2011
  • 8. Map Interaction ArcReader ArcView ArcEditor ArcInfo See Properties of Joins and Relates from Table Properties ● ● ● Sort a Table by Multiple Fields ● ● ● Drag Multiple Tables into the Table Window as Tabs ● ● ● Create a Graph or Report ● ● ● Find and Replace Attribute Values ● ● ● Open Attachment Manager for Any Record (when Attachments Are ● ● ● Enabled on the Layer) Graphs Plot Data from a Variety of Datasets in a Single Graph ● ● ● Create 2D and 3D Graphs ● ● ● Overlay Multiple Graphs in a Single Graph ● ● ● Selections Automatically Propagate between Map, Table, and Graph ● ● ● Graph Types Horizontal and Vertical Bar, Line, and Area ● ● ● Histogram Bar ● ● ● Scatterplot ● ● ● Scatterplot Matrix ● ● ● Box Plot ● ● ● Bubble ● ● ● Polar ● ● ● Pie ● ● ● Routing Using ArcGIS Online or Network Datasets (StreetMap™ USA) North American and European Point-to-Point Street Routing ● ● ● Add Route Stops from Addresses and Existing Features and ● ● ● Interactively Add Stops on the Map Add Route Barriers from Addresses and Existing Features and ● ● ● Interactively Add Stops on the Map Snap Stops to Closest Address Using an Address Locator ● ● ● Customize the Route for Quickest or Shortest Route ● ● ● Reorder the Stops to Find the Fastest Route between Unordered ● ● ● Stops Modify Speed and Restriction Attributes of the Routing Service ● ● ● Specify Trip Planning Timing (Start, Stop, Breaks, etc.) ● ● ● Generate HTML Directions Using an Overview Map, Turn-by-Turn ● ● ● Maps, and Vicinity Maps Map Display ArcReader ArcView ArcEditor ArcInfo General Mapping Visualize the Map Page or a Specific Set of Data ● ● ● ● Perform On-the-Fly Projection of All Data ● ● ● ● Enable Full Cartographic Visualization of Any PMF File ● ● ● ● Interactively Set Percent Transparency for All Data Layers ● ● ● ● Legends Honor Layer Transparency ● ● ● ● Set a Minimum and Maximum Scale to Display Data ● ● ● Create Custom Relative Scales ● ● ● Clip the Map Display to a Feature or Graphic ● ● ● Create Graticules, Measured Grids, and Reference Grids ● ● ● J-9707 2 February 8, 2011
  • 9. Map Display ArcReader ArcView ArcEditor ArcInfo Create Extent Rectangles for Other Data ● ● ● (Reference and Overview Maps) Create Variable Depth Layer Masking ● ● ● Convert Graphics (Point, Line, Polygon, Text) to Features ● ● ● Create High-Performance Basemap Layers Computed Once for Any ● ● ● Area Add Data Menu Accesses Basemaps and Data from ArcGIS Online ● ● ● Quick Pan Mode for Continuous Navigation of Basemap and ● ● ● Accelerated Raster Layers Tabular Data Create On-the-Fly Dynamic Joins between Different Databases ● ● ● Join Dialog Box Supports Join Validation prior to Execution ● ● ● Create and Use Many-to-One and One-to-Many Relationships ● ● ● Create Statistics ● ● ● Summarize Data ● ● ● Interactively Change the Visibility of Fields ● ● ● Simplify Field Names with Field Aliases ● ● ● Display Numeric Fields Formatted as Currency, Direction, ● ● ● Percentage, etc. Create Charts and Reports ● ● ● ® Build Detailed Reports Using Esri Report Wizard ● ● ● Sort by Multiple Attributes ● ● ● Connect to and Use Remote Database Tables ● ● ● Display Tabular X,Y Point Data from a File or Table on a Map ● ● ● View Attachments for a Feature Class ● ● ● Vector Data Display Control Selection Color for Each Dataset ● ● ● Create MapTips ● ● ● Fix Symbology to a Specific Map Scale ● ● ● Interactively Exclude Specific Features from the Display ● ● ● Control Which Features to Display Using a SQL Query ● ● ● Control Which Data Fields Are Accessible from the Map ● ● ● Thematic Vector Data Classifications Single Symbol ● ● ● Unique Value ● ● ● Match to Predefined Style ● ● ● Graduated Colors or Symbols ● ● ● Proportional Symbols ● ● ● Dot Density Mapping ● ● ● Chart Mapping Including Pie and Bar Chart ● ● ● Bivariate and Multivariate Data Rendering ● ● ● Interactive Histogram for Data Classification ● ● ● Symbology Use Interactive Symbol Composer ● ● ● Control Symbol Draw Order ● ● ● Access More than 19,500 Predefined Symbols ● ● ● Search for Symbols by Descriptive Tag ● ● ● Add or Modify Symbol Search Tags ● ● ● J-9707 3 February 8, 2011
  • 10. Map Display ArcReader ArcView ArcEditor ArcInfo Use Halos and Advanced Background Symbols ● ● ● Define Symbols for Fill, Lines, Outlines, and Points ● ● ● Support User-Imported Graphic Fill Patterns ● ● ● Elevation Surface Display TIN Contour with Index Contours ● ● ● TIN Face, Aspect, Elevation, Slope ● ● ● Digital Elevation Model (DEM) Hillshade with Sun Position Control ● ● ● DEM Shaded Relief Using Hillshade and Elevation ● ● ● Terrain Contour with Index Contours ● ● ● Terrain Face, Aspect, Elevation, Slope ● ● ● DEM Elevation ● ● ● Raster Data Display Display Multiband Images by Assigning Color Values to the Bands ● ● ● Use Individual Band Settings ● ● ● Display Each Unique Value with a Discrete Color ● ● ● Display Image Values Using a Color Map ● ● ● Display Multiband Raster Data Using Color Values ● ● ● Save Current Display Statistics ● ● ● Control Raster Display Contrast and Brightness ● ● ● Orthorectify On the Fly ● ● ● On-the-Fly Panchromatic Sharpening ● ● ● On-the-Fly Hillshade Effect for Elevation Data ● ● ● Display Raster Catalog Tiles as a Time Series ● ● ● Import Renderer or Statistics from Another Layer ● ● ● Display Raster Values while Navigating the Map with MapTips ● ● ● Display Raster Resolution in Map Table of Contents ● ● ● Apply and Edit Raster Function Chains ● ● ● Accelerated Display Mode for Raster Layers ● ● ● Raster Display: Gradual Color Ramp Data- Stretching Algorithms Standard Deviations ● ● ● Histogram Equalize ● ● ● Minimum-Maximum ● ● ● Custom ● ● ● None ● ● ● Raster Display Statistics Based on the Entire Raster Dataset ● ● ● Based on the Display Extent ● ● ● Based on a Custom Extent ● ● ● Raster Display Resample Methods Nearest Neighbor ● ● ● Bilinear Interpolation ● ● ● Cubic Convolution ● ● ● Majority ● ● ● Raster Display Classification Methods Manual Interval ● ● ● Equal Interval ● ● ● Defined Interval ● ● ● J-9707 4 February 8, 2011
  • 11. Map Display ArcReader ArcView ArcEditor ArcInfo Quantile Interval ● ● ● Natural Breaks (Jenks) ● ● ● Geometrical Interval ● ● ● Standard Deviation ● ● ● Raster Catalog Footprint Display Footprints Only ● ● ● Selected Footprints ● ● ● Raster Tools Pixel Inspector ● ● ● Swipe Layer Tool ● ● ● Time Animation and Temporal Data Create Time Series, Layer Transition, or Map Navigation Animation ● ● ● Animate Data Change with Tabular (Charts), Vector, Raster Catalog, ● ● ● and netCDF Data Export Animations as Sequential Images ● ● ● Create Video from Sequential Images ● ● ● View Temporal Data with the Time Slider ● ● ● Page Layout and Printing ArcReader ArcView ArcEditor ArcInfo Map Elements Title ● ● ● Text ● ● ● Neatlines ● ● ● Legend ● ● ● North Arrows ● ● ● Scale Bar ● ● ● Scale Text ● ● ● Pictures ● ● ● OLE Objects ● ● ● Measured Reference Grid ● ● ● Graticules ● ● ● Export Formats Enhanced Metafile (EMF) ● ● ● Windows Bitmap (BMP) ● ● ● Encapsulated PostScript (EPS) ● ● ● Tagged Image File Format (TIFF) ● ● ● Portable Document Format (PDF) ● ● ● Joint Photographic Experts Group (JPEG) ● ● ● Portable Network Graphics (PNG) ● ● ● Graphic Interchange Format (GIF) ● ● ● Scalable Vector Graphics (SVG) ● ● ● Adobe Illustrator (AI) ● ● ● PostScript Color Separates (with Page Marks) ● ● ● Print with the Following Print Drivers Windows ● ● ● ● PostScript ● ● ● ™ ArcPress HP RTL (RGB, CMYK, and Monochrome) ● ● ● ArcPress HP PCL (RGB, CMYK, and Monochrome) ● ● ● J-9707 5 February 8, 2011
  • 12. Page Layout and Printing ArcReader ArcView ArcEditor ArcInfo ArcPress Epson Universal ● ● ● ArcPress HP Universal ● ● ● Process Print Jobs on the Local Machine for Faster Printing ● ● ● Publishing and Sharing Maps ArcReader ArcView ArcEditor ArcInfo Creating High-Performance Dynamic Maps Analyze Maps for Errors, Unsupported Content, Performance Tips ● ● ● Preview Your Maps and Estimated Rendering Time ● ● ● Create an Optimized Map Service Document (MSD) ● ● ● ® Publish a Map Service Document to ArcGIS Server* ● ● ● Sharing Maps, Layers, and Data Consolidate Layers or Maps into a Folder ● ● ● Create a Layer Package File ● ● ● Upload a Layer Package File to ArcGIS Online and Share It ● ● ● Extract a Layer Package ● ● ● Create a Map Package File ● ● ● Upload a Map Package File to ArcGIS Online and Share It ● ● ● Extract a Map Package ● ● ● *Requires ArcGIS Server Map Text ArcReader ArcView ArcEditor ArcInfo Labels Creating Dynamic On-the-Fly Labels ● ● ● Automatic Conflict Detection and Label Placement ● ● ● Label Placement Rules for Setting Priority between Layers ● ● ● Placement Rules for Setting Importance of Labels vs. Features ● ● ● Many Predefined Label Styles (e.g., Highway Shields) ● ● ● Labels Rotate from an Attribute Field ● ● ● Multiple Dynamic Labeling Schemes Built for Each Map Layer ● ● ● Control Which Features in a Layer Display Labels ● ● ● Advanced Text Formatting Tags for Dynamic Label Symbology ● ● ● Annotation Use Interactive Label Tools (Callout, Label, Spline, and Paragraph ● ● ● Text) Create Text Annotation Data from Labels ● ● ● Annotation Editing Interactively Move, Rotate, and Scale Annotation ● ● ● Add Horizontal or Angled Annotation ● ● ● Add Annotation with a Leader Line ● ● ● Create Annotation That Follows a Curved Line or the Shape of an ● ● ● Existing Feature Dynamically Pull Annotation Values from Layers in the Map ● ● ● Interactively Manage Annotation That Could Not Be Placed during ● ● ● Initial Annotation Creation Edit Each Word in an Annotation String Independently ● ● ● Interactively Stack and Unstack Annotation ● ● ● J-9707 6 February 8, 2011
  • 13. Map Text ArcReader ArcView ArcEditor ArcInfo Flip Annotation Strings ● ● ● Interactively Modify the Curvature and Orientation of a Line ● ● ● Edit the Symbology of a Single Annotation Feature or a Group of ● ● ● Annotation Features Simultaneously Annotation and Dimensions Management Store Annotation in a Geodatabase or a Map Document ● ● ● Create Annotation Subclasses ● ● ● Create Aligned Dimensions Displaying the True Distance between ● ● Points Create Linear Dimensions Displaying Horizontal, Vertical, or an ● ● Angled Distance between Points Create and Edit Feature-Linked Annotation Feature Classes in a ● ● Geodatabase Advanced Labeling1 ArcReader ArcView ArcEditor ArcInfo Advanced Label Placement Rule Set Display Advanced Labels with Read-Only Properties ● ● ● ● Street Placement ● Customizable Dynamic Stacking ● Font Reduction ● Customizable Abbreviation ● Polygon Boundary Placement ● Repeated Labeling ● Character Spreading ● Word Spreading ● Label Overrun on Features ● Curved Polygon Placement ● Graticule Labeling Alignment ● User-Defined Point Label Zones ● Background Labeling ● Land Parcel Placement ● Advanced Feature Weighting ● Advanced Label Offsets ● Advanced Line Label Positions ● Advanced Curved Label Placement ● Watermark-Style Background Labels ● Geologic Strike and Dip Symbology ● Asian Vertical Text Metric Support ● Polygon Hole Avoidance for Callouts ● Polygon Zone (Internal, External) Placement ● Long Boundary Label Repetition ● Logically Continuous Feature (Street, River, Contour) Placements ● 1 ® The advanced labeling functionality is available through the Maplex for ArcGIS extension, which can be purchased with ArcView or ArcEditor but is automatically included with an ArcInfo license. J-9707 7 February 8, 2011
  • 14. Advanced Cartography ArcReader ArcView ArcEditor ArcInfo Cartographic Editing Tools Store Multiple Representations of GIS Features in a Geodatabase ● ● for Use in a Variety of Map Products Create Rules That Dynamically Manipulate the Geometry and ● ● Symbology of a Feature (Representation Rules) Share Representation Rules through Style Files ● ● Change the Shape or Symbology for a Single Feature without ● ● Changing the GIS Data It Represents Define Feature Visibility and Transparency for Each Feature or ● ● Based on an Attribute Mask Individual Features or Parts of Features without Masking All ● ● Features in a Layer Dynamically Place Point Symbols along Lines or Polygons ● ● Dynamically Modify the Geometry That Is Displayed for a Feature ● ● (Geometric Effects) Point Geometric Effects Buffer ● ● Radial from Point ● ● Regular Polygon ● ● Line Geometric Effects Add Control Points ● ● Arrow ● ● Buffer ● ● Cut Curve ● ● Dashes ● ● Enclosing Polygon ● ● Jog ● ● Move ● ● Offset Curve ● ● Reverse Curve ● ● Rotate ● ● Scale ● ● Simplify ● ● Smooth Curve ● ● Tapered Polygon ● ● Wave ● ● Polygon Geometric Effects Add Control Points ● ● Buffer ● ● Cut Curve ● ● Dashes ● ● Donut ● ● Enclosing Polygon ● ● Move ● ● Offset Curve ● ● Rotate ● ● Scale ● ● Simplify ● ● Smooth Curve ● ● Wave ● ● J-9707 8 February 8, 2011
  • 15. Advanced Cartography ArcReader ArcView ArcEditor ArcInfo Interactive Symbol Editing Use the Marker Editor to Edit the Characteristics of a Point Symbol ● ● Edit the Entire Representation or a Small Portion of One or More ● ● Representations Move an Entire Symbol ● ● Move Line Symbols Parallel ● ● Tool Dialog Boxes Accept Multiple Units of Measurement ● ● Add, Delete, or Move Symbol Vertices ● ● Modify the Geometric Effects of a Symbol: Line Width, Hatch Size ● ● Move Linear Geometries Parallel ● ● Reshape and Move a Feature to Align One Specified Point with ● ● Another (Warp) Erase All or Part of a Symbol ● ● Resize a Feature Symbol by Resizing Its Bounding Box ● ● Resize a Feature and Its Geometric Effects Simultaneously Using a ● ● Ratio Rotate Feature Symbols Interactively or by a Specific Angle ● ● Orient a Symbol to a Specific Angle ● ● Reshape Symbols with Bézier Curves ● ● Specify Locations along a Symbol Where a Pattern Must Apply ● ● (Control Points) WYSIWYG Feedback ● ● Geoprocessing Graphic Quality Detect Graphic Conflict ● Propagate Displacement ● Resolve Building Conflicts ● Resolve Road Conflicts ● Geoprocessing Masking Tools Cul-de-Sac Masks ● Feature Outline Masks ● Intersecting Layers Masks ● Geoprocessing Representation Management Add Representation ● Calculate Representation Rule ● Drop Representation ● Remove Override ● Select Feature by Override ● Set Layer Representation ● Update Override ● Geoprocessing Symbolization Refinement Align Marker to Stroke or Fill ● Calculate Grid Convergence Angle ● Calculate Line Caps ● Calculate Polygon Main Angle ● Create Overpass ● Create Underpass ● Disperse Markers ● Set Representation Control Point at Intersect ● Set Representation Control Point by Angle ● J-9707 9 February 8, 2011
  • 16. Address Matching ArcReader ArcView ArcEditor ArcInfo Geocoding Tools Geocoding Toolbar for Locator Management and Use ● ● ● Single Line Input for ArcGIS 10 Locators ● ● ● Geocode Single or Batch Addresses ● ● ● Real-Time Batch Geocoding Match Rate Feedback ● ● ● Use Tools for Processing Result Sets, Including Custom Queries ● ● ● Use ArcGIS Server for Server-Based Geocoding ● ● ● Use Multiple Geocoding Locators per Data Source ● ● ● Geocode Using Alternate Street Names, Intersection, or Place-Name ● ● ● Aliases Aggregate Multiple Geocoding Locators into a Single Geocoding ● ● ● Locator (Composite Locator) Distribute Geocoding Locators without the Reference Data ● ● ● Address Inspector Finds Address by Map Click ● ● ● ™ Drag Locators into ArcMap from the Catalog Window ● ● ● Built-in Dataless Military Grid Reference System (MGRS) Locator ● ● ● Create Dynamic Features from Geocoded Locations ● ● ArcGIS Online Locators North American Locator Service ● ● ● European Locator Service ● ● ● World Places Gazetteer Locator Service ● ● ● Geoprocessing Create Address Locator ● ● ● Create Composite Address Locator ● ● ● Geocode Addresses ● ● ● Reverse Geocode Point Features ● ● ● Rebuild Address Locator ● ● ● Rematch Addresses ● ● ● Standardize Addresses ● ● ● Data Support and Interoperability Raster Data Support ArcReader ArcView ArcEditor ArcInfo Direct Read of Raster Data ARC Digitized Raster Graphics (ADRG) ● ● ● Band Interleaved by Line (Esri BIL), Band Interleaved by Pixel (Esri ● ● ● BIP), or Band Sequential (Esri BSQ) Bathymetric Attributed Grid (BAG) ● ● ● Binary Terrain (BT) ● ● ● Bitmap, Device Independent Bitmap (DIB) Format, or Microsoft ● ● ● Windows Bitmap BSB Nautical Charts ● ● ● Compressed ARC Digitized Raster Graphics (CADRG) ● ● ● Controlled Image Base (CIB) ● ● ● Digital Geographic Information Exchange Standard (DIGEST), ARC Standard Raster Product (ASRP), or Universal Transverse Mercator ● ● ● (UTM)/Universal Polar Stereographic (UPS) Standard Raster Product (USRP) J-9707 10 February 8, 2011
  • 17. Raster Data Support ArcReader ArcView ArcEditor ArcInfo Digital Image Map (DIMAP) ● ● ● Digital Terrain Elevation Data (DTED) Levels 0, 1, and 2 ● ● ● EOSAT FAST (FST) ● ● ● ENVI ● ● ● ER Mapper's ECW ● ● ● ERDAS 7.5 GIS, 7.5 LAN, and RAW ● ● ● Floating Point Raster (FLT) ● ● ● Geospatial Data Abstraction Library (GDAL) Virtual Format (VRT) ● ● ● Gridded Binary Format (GRIB) ● ● ● Golden Software Format (GSAG, GSBG, GS7GB) ● ● ● Hierarchical Data Format (HDF) –4, Including Subdatasets ● ● ● IDRISI Raster Format (RST) ● ● ● ™ ™ Intergraph Raster Files: CIT Binary Data; COT Grayscale Data ● ● ● Integrated Software for Imagers and Spectrometers (ISIS) ● ● ● Japanese Aerospace Exploration Agency (1.1 GUD, 1.5 GUD) ● ● ● Magellan MapSend (BLX/XLB) ● ● ● Multiresolution Seamless Image Database (MrSID Generations 2 ● ● ● and 3) National Imagery Transmission Format (NITF), Including ● ● ● Subdatasets National Land Archive Production System (NLAPS) ● ● ● Oracle Spatial GeoRaster ● ● ● 2 PCI Geomatics PCIDSK (PIX) ● ● ● Planetary Data System (PDS)—National Aeronautics and Space ● ● ● Administration (NASA) (IMG/LBL) Portable Network Graphics ● ● ● 2 PCRaster (MAP) ● ● ● RADARSAT-2 ● ● ● Raster Product Format ● ● ● Sandia Synthetic Aperture (GFF) ● ● ● Shuttle Radar Topography Mission (SRTM) ● ● ● Spatial Data Transfer Standard (SDTS) ● ● ● Terragen Terrain (TER/TERRAIN) ● ● ● TerraSAR-X ● ● ● United States Geological Survey (USGS) ASCII Digital Elevation 2 ● ● ● Model 2 XPixMap (XPM) ● ● ● Direct Read and Write of Raster Data ERDAS IMAGINE ● ● ● Esri Grid and Grid Stack ● ● ● 3 Geodatabase Raster ● ● ● Graphic Interchange Format ● ● ● Joint File Interchange Format (JFIF) ● ● ● Joint Photographic Experts Group ● ● ● JPEG 2000 (JP2) ● ● ● Portable Network Graphics ● ● ● Tagged Image File Format (GeoTIFF tags are supported.) ● ● ● Oracle Spatial GeoRaster ● ● J-9707 11 February 8, 2011
  • 18. Raster Data Support ArcReader ArcView ArcEditor ArcInfo Geodatabase Raster Management Create and Edit Raster Attribute Tables for All Supported Single 3 ● ● ● Band Raster Formats Create and Manage Rasters in Personal and File Geodatabases ● ● ● Compress Geodatabase Rasters with LZ77, JPEG, or JPEG 2000 3 ● ● ● Compression Algorithms Create and Manage Raster Data in a Multiuser Geodatabase ● ● Create Raster Mosaics ● ● 2 ™ These formats can be written to through programming with the ArcObjects API. 3 ArcView can only create geodatabase rasters or raster attribute tables in personal or file geodatabases. ArcEditor and ArcInfo can create and manage geodatabase rasters in personal, file, and multiuser geodatabases. Document and Data Support ArcReader ArcView ArcEditor ArcInfo Map and Symbology Files Read Published Map Files (from ArcGIS Publisher) ● ● ● ● Create and Edit Map Documents (.mxd) ● ● ● Save Layer Files (.lyr) and Map Documents (.mxd) in ArcGIS 8.3, ● ● ● 9.0, 9.1, 9.2, or 9.3 Format Use Map Documents (.mxd) to Standardize Maps ● ● ● Import ArcView 3.x AVL Files ● ● ● Direct Read of Vector and Raster Data ® ™ Personal Geodatabase for Microsoft Access ● ● ● File Geodatabase ● ● ● Personal, Workgroup, and Enterprise Geodatabases ● ● ● Shapefiles ● ● ● ArcInfo Coverages ● ● ● ™ PC ARC/INFO Coverages ● ● ● Smart Data Compression (SDC) Data ● ● ● Vector Product Format (VPF) Data ● ● ● ArcGIS Server Services ● ● ● ® ArcIMS Services ● ● ● ArcGIS Server Feature Services ● ● ● Open Geospatial Consortium, Inc. (OGC), Web Coverage Service ● ● ● (WCS) Open Geospatial Consortium, Inc., Web Map Service (WMS) ● ● ● 4 OGC GML Simple Features Access ● ● ● 4 OGC GML Simple Features Import/Export ● ● ● OGC GML Web Feature Service Access for Simple Features-Based 4 ● ● ● Services Network Common Data Form (netCDF) ● ● ● Direct Editing of Vector Data Personal Geodatabase for Access Simple Features ● ● ● File Geodatabase ● ● ● Shapefiles ● ● ● Personal, Workgroup, and Enterprise Geodatabases ● ● ArcGIS Server Feature Services ● ● J-9707 12 February 8, 2011