1
CURRICULUM VITAE
I. Personal Details:
1. Name: Anas Adnan Younes Abu Tabaneh
2. Date of Birth: 21/11/1989
3. Sex: Male
4. Place of Birth: Jerusalem
5. Nationality: Jordanian
6. Country of Residence: Palestine
7. Marital status: Married
8. Mobile:00970599990679
9. Personal Email:anasabutabaneh@gmail.com.
10. Business Email: atbane@ppu.edu.
11. Current Job: Research & Teaching Assistant at Palestine Polytechnic University
(PPU) , Hebron, Palestine.
12. Previous Job: Technical Sales Engineer at PROTECHNOLOGY, Dubai, UAE.
II. Education:
Institution
[Date from – Date to ]
Degree(s) Obtained
Palestine Polytechnic
University
Hebron- Palestine
2007-2012
Bachelor of Engineering degree in Electrical Engineering ,
Communication and Electronics Engineering Branch Field with an
accumulative average of (81.0 %) and graded with V. Good. Also
with major accumulative average of (83.9%).
GRADUATON PROJECT:
" Performance Analysis of Fixed Gain Amplify and Forward
Based Cooperative Diversity in MIMO Relay Channels" . Which is
anew topic in Communications Engineering.
The graduation project achieved the highest mark in the
Department of Electrical Engineering in that semester and took mark
of 92.
Hekmat AL-Muhtaseb
Secondary Boys School
Hebron- Palestine
2006-2007
Certificate of General Secondary Examination ( Tawjihi
Certificate) in scientific field with an accumulative average of (93.2
%) and graded with Excellent.
2
III. Work Experience:
Company
[Date from – Date to ]
Duties and Responsibilities
PALESTINE POLYTECHNIC
UNIVERSITY
2014-2016
Research and Teaching assistant in Electrical Engineering
Department :
a. act as teaching assistant for these courses :
1. Digital Lab.
2. Digital Design.
3. Digital Design Principles.
4. Microwaves.
5. Antennas.
6. Electromagnetic.
7. Transmission Lines.
8. Mobile communication.
9. Radar Systems.
10.Advanced Computer Networks.
11.Advanced Computer Networks Lab.
12.Digital Communication.
13.Introduction to Graduation Project.
14.Graduation Project.
15.Control System Lab.
b. act as research assistant for these topics:
1. " Performance Analysis of Fixed Gain Amplify and Forward
Based Cooperative Diversity in MIMO Relay Channels" .
2. MIMO Systems.
3. Relaying Systems.
4. MIMO Relaying Systems.
5. MIMO OFDM Systems.
6. MIMO OFDM Relaying Systems.
PROTECHNOLGY
(AUTHORIZED APPLE
RESSELLER )
( AUTHORIZED APPLE
SERVICE CENTER )
DUBAI-UAE
2012-2014
 Apple Showroom Sales Manager / Technical Support Engineer
for more than 2 years.
 Participating in many Exhibitions over UAE and act as
Technical Sales Engineer for many brands such as Apple,
LACIE, Cupify, Koubachi, Sonic Chair, Cinemizer,
FreshFiber, DICOTA, Buffalo and JCPAL. Also Managing the
company stand in Local and international Exhibitions for more
than 15 Exhibitions in Dubai World Trade Center, Jumeirah
Emirates Towers, Dubai Media City, Dubai international City
and TECOM.
 Meet suppliers, customers, organization representation to
achieve the sales and technical purposes.
 Showroom management including the accounting management
for more than 1 year.
 Technical Sales Engineer for Apple, LACIE, Cupify, Koubachi,
Sonic Chair, Cinemizer and DICOTA in the company.
3
 Out-door sales manager for more than 1 year.
 APPLE Corporate Sales Manager for APPLE in APPLE
Business Division for more than1 year.
IV. Professional Training During University:
Date
From-To
Location Company Position Time
Period
Description
19/6/2011
to
7/7/2011
Ramallah-
Palestine
Palestine Cellular
Communications
Co., JAWWAL
Trainee 90 Hours  Construction of Cellular
Networks.
 Cellular Network Planning
and Optimization.
 Construction of Microwave
Networks.
 GSM Theory.
 Transmission Planning and
Tools Simulations.
 RF Planning.
20/6/2010
to
20/7/2010
Hebron-
Palestine
Palestinian
Telecommunicati
on Company,
PALTEL.
Trainee 120
Hours
 Construction,
maintenance and
troubleshooting of
telephone networks.
 Construction,
maintenance and
troubleshooting of ADSL
Internet lines.
 Installation, maintenance
and programming ADSL
routers.
V. Leadership and Voluntary Experience During University:
Date
From-To
Location Institution Position Time
Period
Description
17/4/2012
to
27/5/2012
Hebron-
Palestine
Palestinian
Society for
Consumer
Protection,
Hebron
Branch
Volunteer 70 Hours Computer Technical
Support Engineer.
5/7/2011
to
Hebron-
Palestine
Palestine
Polytechnic
Organization
Committee
50 Hours Organization and
Administration.
4
VI. Professional Training Courses:
10/7/2011 University Member
Ship for
Annual
Graduation
Ceremony
16/9/2009
to
15/1/2010
Hebron-
Palestine
Palestine
Polytechnic
University
Technical
support in
electrical
lab
50 Hours Support the lab
supervisor for teaching
and operating the
experiences.
2009
to
2010
Hebron-
Palestine
Palestine
Polytechnic
University
Member
ship in
scientific
innovation
journey
50 Hours Preparation and
supervision.
Date
From
-
To
Location Company Position Time
Period
Description
1/1/2016
TO
30/3/2016
Dubai-
UAE
Apple Trainee 3 Months Apple Product Professional
( APP) for year of 2016.
1/1/2015
TO
30/3/2015
Dubai-
UAE
Apple Trainee 3 Months Apple Product Professional
( APP) for year of 2015.
1/1/2014
TO
30/3/2014
Dubai-
UAE
Apple Trainee 3 Months Apple Product Professional
( APP) for year of 2014.
15/8/2013
To
15/11/2013
Dubai-
UAE
Apple Trainee 3 Months Apple Sales Professional
( ASTO) for year of 2013.
15/4/2013
To
15/6/2013
Dubai-
UAE
Apple Trainee 2 Months Apple iOS Technical
Professional .
20/3/2013
To
20/5/2013
Dubai-
UAE
Arrive
Systems, Inc.
Trainee 2 Months Arrive Sales Professional.
15/12/2012
To
Dubai-
UAE
Apple Trainee 2 Months Apple IPHONE and IPAD
Technical Professional.
5
VII. Conference Participation:
Participate in the 1st Students Innovation Conference, Palestine Polytechnic
University, 13-14/6/2012. After the conference the Palestine Polytechnic University Published a
paper under this name in the conference website: "MATLAB Simulation for Fixed Gain
15/2/2013
1/9/2012
TO
30/11/2012
Dubai-
UAE
Apple Trainee 3 Months Apple Product Professional
( APP) for year of 2012.
15/9/2012
To
15/12/20122
Dubai-
UAE
Apple Trainee 3 Months Apple Sales Professional
( ASTO) for year of 2012.
15/6/2012
To
20/7/2012
Hebron-
Palestine
Excellence
Center for
Education and
Training
Services
Trainee 60 Hours Professional American
English Accent.
15/6/2012
To
20/7/2012
Hebron-
Palestine
Center for
Entrepreneurs
hip & Career
Development ,
Friends of
Fawzi Kawash
IT Center of
Excellence/
Palestine
Polytechnic
University
Trainee 80 Hours Leadership and Management
Skills.
21/1/2012
To
23/3/2012.
Hebron-
Palestine
Friends of
Fawzi
Kawash IT
Center of
Excellence/
Palestine
Polytechnic
University
Trainee 70 Hours CISCO Certified Network
Associate – CCNA:
 Semester1: Network
Fundamentals.
 Semester2: Routing
Protocols and Concepts.
 Semester3: LAN Switching
and Wireless.
 Semester 4: Accessing the
WAN
6
Amplify and Forward MIMO Relaying System using OSTBC under Flat Fading Rayleigh
Channel".
VIII. Membership of Professional Bodies:
Membership of Jordan Engineers Association (JEA), Electrical Engineering Division,
Section of Electronics Engineering, Branch of Telecommunication Engineering since 5/8/2012.
IX. Computer and Professional Skills:
 Installation, Troubleshooting, Backing up, reformatting and updating
Microsoft Windows OS, Mac OS and Mobile iOS systems.
 Installation, Troubleshooting of printers and peripheral devices.
 Very good experience on computer hardware and software systems and
programs.
 Installation, Configuration, Troubleshooting and updating Microsoft Office
applications (Word, Excel, PowerPoint, Outlook, Ms-Project,...., etc).
 Very good experience in Cellular network planning tools.
 Expert in programming routers for ADSL and Wi-Fi technologies.
 Expert in Computer networks cabling, configuring and troubleshooting.
 Very Good experience in computer based simulation programs specially
MATLAB.
 Very good experience with LAN and WAN technologies.
 Very Good experience with TCP/IP, DHCP, DNS and wireless data
communications.
 The ability to assist the sales functions in pre-sales technical support in
sales meetings and follow up documentation.
 The ability to Work with customers to capture their requirements, design
their solution and plan its delivery and implementation.
 Very good experience in Apple products sales and retail plus technical
support experience for more 2 year.
 Expert in LACIE Storage and Networks devices including sales,
installation and troubleshooting for more than 2 years.
 Expert in audit accounting program for more than 2 years.
 Expert in Light Speed accounting system for more than 2 years.
 Expert in Remote Software for Desktop/Mac troubleshooting on
networking (wired and wireless).
 Expert in Cloud Computing Technologies.
X. Language Skills:
Language Reading Speaking Writing
Arabic 1 1 1
English 1 2 2
1 For indicate Excellent.
7
2 For indicate very Good.
XI. Personal Features:
1. The ability to work under pressure.
2. The ability to work in team environment.
3. I have Car driving license plus international driving license from UAE.
XII. References:
Name Company Telephone Email
Dr. Ghandi Manasrah Palestine
Polytechnic
University
(+972) 599823787 ghandi@ppu.edu
Dr. Murad Abu Subaih Palestine
Polytechnic
University
(+972) 597982002 murads@ppu.edu
Dr. Osama Ata Palestine
Polytechnic
University
(+972) 598236366 oata@ppu.edu
Saeed Kaloti PROTECH (+971) 555582680 Saeed7@me.com

Anas Cv

  • 1.
    1 CURRICULUM VITAE I. PersonalDetails: 1. Name: Anas Adnan Younes Abu Tabaneh 2. Date of Birth: 21/11/1989 3. Sex: Male 4. Place of Birth: Jerusalem 5. Nationality: Jordanian 6. Country of Residence: Palestine 7. Marital status: Married 8. Mobile:00970599990679 9. Personal Email:anasabutabaneh@gmail.com. 10. Business Email: atbane@ppu.edu. 11. Current Job: Research & Teaching Assistant at Palestine Polytechnic University (PPU) , Hebron, Palestine. 12. Previous Job: Technical Sales Engineer at PROTECHNOLOGY, Dubai, UAE. II. Education: Institution [Date from – Date to ] Degree(s) Obtained Palestine Polytechnic University Hebron- Palestine 2007-2012 Bachelor of Engineering degree in Electrical Engineering , Communication and Electronics Engineering Branch Field with an accumulative average of (81.0 %) and graded with V. Good. Also with major accumulative average of (83.9%). GRADUATON PROJECT: " Performance Analysis of Fixed Gain Amplify and Forward Based Cooperative Diversity in MIMO Relay Channels" . Which is anew topic in Communications Engineering. The graduation project achieved the highest mark in the Department of Electrical Engineering in that semester and took mark of 92. Hekmat AL-Muhtaseb Secondary Boys School Hebron- Palestine 2006-2007 Certificate of General Secondary Examination ( Tawjihi Certificate) in scientific field with an accumulative average of (93.2 %) and graded with Excellent.
  • 2.
    2 III. Work Experience: Company [Datefrom – Date to ] Duties and Responsibilities PALESTINE POLYTECHNIC UNIVERSITY 2014-2016 Research and Teaching assistant in Electrical Engineering Department : a. act as teaching assistant for these courses : 1. Digital Lab. 2. Digital Design. 3. Digital Design Principles. 4. Microwaves. 5. Antennas. 6. Electromagnetic. 7. Transmission Lines. 8. Mobile communication. 9. Radar Systems. 10.Advanced Computer Networks. 11.Advanced Computer Networks Lab. 12.Digital Communication. 13.Introduction to Graduation Project. 14.Graduation Project. 15.Control System Lab. b. act as research assistant for these topics: 1. " Performance Analysis of Fixed Gain Amplify and Forward Based Cooperative Diversity in MIMO Relay Channels" . 2. MIMO Systems. 3. Relaying Systems. 4. MIMO Relaying Systems. 5. MIMO OFDM Systems. 6. MIMO OFDM Relaying Systems. PROTECHNOLGY (AUTHORIZED APPLE RESSELLER ) ( AUTHORIZED APPLE SERVICE CENTER ) DUBAI-UAE 2012-2014  Apple Showroom Sales Manager / Technical Support Engineer for more than 2 years.  Participating in many Exhibitions over UAE and act as Technical Sales Engineer for many brands such as Apple, LACIE, Cupify, Koubachi, Sonic Chair, Cinemizer, FreshFiber, DICOTA, Buffalo and JCPAL. Also Managing the company stand in Local and international Exhibitions for more than 15 Exhibitions in Dubai World Trade Center, Jumeirah Emirates Towers, Dubai Media City, Dubai international City and TECOM.  Meet suppliers, customers, organization representation to achieve the sales and technical purposes.  Showroom management including the accounting management for more than 1 year.  Technical Sales Engineer for Apple, LACIE, Cupify, Koubachi, Sonic Chair, Cinemizer and DICOTA in the company.
  • 3.
    3  Out-door salesmanager for more than 1 year.  APPLE Corporate Sales Manager for APPLE in APPLE Business Division for more than1 year. IV. Professional Training During University: Date From-To Location Company Position Time Period Description 19/6/2011 to 7/7/2011 Ramallah- Palestine Palestine Cellular Communications Co., JAWWAL Trainee 90 Hours  Construction of Cellular Networks.  Cellular Network Planning and Optimization.  Construction of Microwave Networks.  GSM Theory.  Transmission Planning and Tools Simulations.  RF Planning. 20/6/2010 to 20/7/2010 Hebron- Palestine Palestinian Telecommunicati on Company, PALTEL. Trainee 120 Hours  Construction, maintenance and troubleshooting of telephone networks.  Construction, maintenance and troubleshooting of ADSL Internet lines.  Installation, maintenance and programming ADSL routers. V. Leadership and Voluntary Experience During University: Date From-To Location Institution Position Time Period Description 17/4/2012 to 27/5/2012 Hebron- Palestine Palestinian Society for Consumer Protection, Hebron Branch Volunteer 70 Hours Computer Technical Support Engineer. 5/7/2011 to Hebron- Palestine Palestine Polytechnic Organization Committee 50 Hours Organization and Administration.
  • 4.
    4 VI. Professional TrainingCourses: 10/7/2011 University Member Ship for Annual Graduation Ceremony 16/9/2009 to 15/1/2010 Hebron- Palestine Palestine Polytechnic University Technical support in electrical lab 50 Hours Support the lab supervisor for teaching and operating the experiences. 2009 to 2010 Hebron- Palestine Palestine Polytechnic University Member ship in scientific innovation journey 50 Hours Preparation and supervision. Date From - To Location Company Position Time Period Description 1/1/2016 TO 30/3/2016 Dubai- UAE Apple Trainee 3 Months Apple Product Professional ( APP) for year of 2016. 1/1/2015 TO 30/3/2015 Dubai- UAE Apple Trainee 3 Months Apple Product Professional ( APP) for year of 2015. 1/1/2014 TO 30/3/2014 Dubai- UAE Apple Trainee 3 Months Apple Product Professional ( APP) for year of 2014. 15/8/2013 To 15/11/2013 Dubai- UAE Apple Trainee 3 Months Apple Sales Professional ( ASTO) for year of 2013. 15/4/2013 To 15/6/2013 Dubai- UAE Apple Trainee 2 Months Apple iOS Technical Professional . 20/3/2013 To 20/5/2013 Dubai- UAE Arrive Systems, Inc. Trainee 2 Months Arrive Sales Professional. 15/12/2012 To Dubai- UAE Apple Trainee 2 Months Apple IPHONE and IPAD Technical Professional.
  • 5.
    5 VII. Conference Participation: Participatein the 1st Students Innovation Conference, Palestine Polytechnic University, 13-14/6/2012. After the conference the Palestine Polytechnic University Published a paper under this name in the conference website: "MATLAB Simulation for Fixed Gain 15/2/2013 1/9/2012 TO 30/11/2012 Dubai- UAE Apple Trainee 3 Months Apple Product Professional ( APP) for year of 2012. 15/9/2012 To 15/12/20122 Dubai- UAE Apple Trainee 3 Months Apple Sales Professional ( ASTO) for year of 2012. 15/6/2012 To 20/7/2012 Hebron- Palestine Excellence Center for Education and Training Services Trainee 60 Hours Professional American English Accent. 15/6/2012 To 20/7/2012 Hebron- Palestine Center for Entrepreneurs hip & Career Development , Friends of Fawzi Kawash IT Center of Excellence/ Palestine Polytechnic University Trainee 80 Hours Leadership and Management Skills. 21/1/2012 To 23/3/2012. Hebron- Palestine Friends of Fawzi Kawash IT Center of Excellence/ Palestine Polytechnic University Trainee 70 Hours CISCO Certified Network Associate – CCNA:  Semester1: Network Fundamentals.  Semester2: Routing Protocols and Concepts.  Semester3: LAN Switching and Wireless.  Semester 4: Accessing the WAN
  • 6.
    6 Amplify and ForwardMIMO Relaying System using OSTBC under Flat Fading Rayleigh Channel". VIII. Membership of Professional Bodies: Membership of Jordan Engineers Association (JEA), Electrical Engineering Division, Section of Electronics Engineering, Branch of Telecommunication Engineering since 5/8/2012. IX. Computer and Professional Skills:  Installation, Troubleshooting, Backing up, reformatting and updating Microsoft Windows OS, Mac OS and Mobile iOS systems.  Installation, Troubleshooting of printers and peripheral devices.  Very good experience on computer hardware and software systems and programs.  Installation, Configuration, Troubleshooting and updating Microsoft Office applications (Word, Excel, PowerPoint, Outlook, Ms-Project,...., etc).  Very good experience in Cellular network planning tools.  Expert in programming routers for ADSL and Wi-Fi technologies.  Expert in Computer networks cabling, configuring and troubleshooting.  Very Good experience in computer based simulation programs specially MATLAB.  Very good experience with LAN and WAN technologies.  Very Good experience with TCP/IP, DHCP, DNS and wireless data communications.  The ability to assist the sales functions in pre-sales technical support in sales meetings and follow up documentation.  The ability to Work with customers to capture their requirements, design their solution and plan its delivery and implementation.  Very good experience in Apple products sales and retail plus technical support experience for more 2 year.  Expert in LACIE Storage and Networks devices including sales, installation and troubleshooting for more than 2 years.  Expert in audit accounting program for more than 2 years.  Expert in Light Speed accounting system for more than 2 years.  Expert in Remote Software for Desktop/Mac troubleshooting on networking (wired and wireless).  Expert in Cloud Computing Technologies. X. Language Skills: Language Reading Speaking Writing Arabic 1 1 1 English 1 2 2 1 For indicate Excellent.
  • 7.
    7 2 For indicatevery Good. XI. Personal Features: 1. The ability to work under pressure. 2. The ability to work in team environment. 3. I have Car driving license plus international driving license from UAE. XII. References: Name Company Telephone Email Dr. Ghandi Manasrah Palestine Polytechnic University (+972) 599823787 ghandi@ppu.edu Dr. Murad Abu Subaih Palestine Polytechnic University (+972) 597982002 murads@ppu.edu Dr. Osama Ata Palestine Polytechnic University (+972) 598236366 oata@ppu.edu Saeed Kaloti PROTECH (+971) 555582680 Saeed7@me.com