Jeddah – K.S.A
Mobile: - +966509927706
Email: haltaf742@gmail.com
Altaf Hussain Aslam Ali
Job Title: Document Controller
Professional Summary
Current Work Experience
 05th Feb. 2013 to Till Date (3 Years)
Designation : Document Controller/Office Assistant
Organization : Saudi Bin Laden Group - ABCD
Logistic Department
Head Office, Jeddah – K.S.A
Projects : KAP3 (King Abdullah Project 3)
KAP0 (King Abdullah Project 0)
Phase 1 Extension
Job Profile:
 Responsible for encoding correspondence, emails & business documents both in Microsoft
Excel, Word, PowerPoint (MS- Office)
 Responsible for understanding of the work-flow the information-flow
 Check the work of other document control employees/contractors for making sure consistency
and conformance with Company standards, policies practices
 Interface with project management staff to ascertain schedule of deliverables, distribution lists
- matrices - for projects
 Perform all clerical works which include filing, typing, photocopying, fax correspondence and
other works being assigned by superiors form time to time.
 Maintain organize files of - controlled - documents, including incoming outgoing transmittals
 Provide data for progress reporting including percent complete, earned value other
schedule/status reporting
 Receiving payment and issuing receipt to the subscriber.
 Maintain tracking database of - controlled - documents
 Handling incoming calls and assist others upon needed.
 Schedule work of self to document, distribute, file and report on - controlled - documents to
meet internal external deadlines
 Ensuring all documents is as up to date as possible within electronic filing systems. Provide
inventory reports for the daily sales.
 Routine check-up of stocks to avoid run out of supply.
 Responsible for making paper works for the best sellers and slow moving items to inform the
department.
 Follow established Company and department guidelines and practices to include consistent
use of filing documentation conventions
 Check all work for compliance to the project plan, Company policies/procedures database
conventions/standards
 Prioritize work assignments of self-others
Previous Work Experience:
 18th October 2009 to 28 Jan. 2013 (3.4 Year)
Designation : Manpower Coordinator/Document Controller
Organization : Saudi Bin Laden Group – ABCD Finishing Div.
Site, Riyadh – K.S.A
Project : PNU P- 1099(Princess Noura University Project)
KAP0 (King Abdullah Project 0)
Job Profile:
 Understanding and implementing nature of work as per Sites
 Setting All manpower updating every day
 Completing manpower report inspections and checks as requested by the senior Engineer.
 Submitting all manpower report to technical manager
 Preparing and submitting daily report of work to the Administrator
 Arrange Manpower List for transfer from one site to another as per instruction from the
Administrator.
 Implement other works as per instruction from the administrator
 10th August 2006 to 19th May 2009 (2.9 Years) In India
Designation : Document Controller/Secretary
Organization : New India Construction Private Ltd.
Project : Builder's & Developers (Mumbai-India)
Job Profile:
 Maintaining a tracking facility to enable documents to be updated easily.
 Scanning in all relevant new documents.
 Checking dispatch documents are accurate.
 Presentation and filing of documents and drawings.
 Responsible for maintaining hard copy information.
 Issuing and distributing controlled copies of information.
 Ensuring all documents is as up to date as possible within electronic filing systems.
Core Competencies
 Organizational and planning skills
 Teamwork
 Data collection and management
 Attention to detail
 Problem-solving
 Confidentiality
 Reliability
Education Qualification:
 Class 10th from Rajasthan Ajmer Board (Year 2000)
 Class 12th from Rajasthan Ajmer Board (Year 2002)
 B.Com From University of Rajasthan by Seth R.N. Ruia PG College, Ramgarh Shekhawati in
(Year 2005 )
TECHNICAL QUALIFICATION:
 Diploma in computer application (DCA) from Chandigarh.
 Rajasthan stat certificate in information technology (RKCL) V.M.O. University KOTA.
OFFICE QUALIFICATION:
 MS-Office all version ( MS-excel, MS-word, MS-powerpoint, , MS-publication)
 MS – Visio 2003,2007
 Internet & MS Outlook 2010
 With Arabic Typing.
Personal Details:
Name : Altaf Hussain
Father’s Name : Aslam Ali
Date of Birth : 06th June 1987
Religion : Muslim
Language Known : English, Arabic, Hindi (with Arabic Typing)
Marital Status : Married
Iqama Details:
Iqama Number : 2282331772
Date of Exp. : 1/02/1438
Status : Transferable
Declaration:
I hereby declare that the information given above is true to the best of my knowledge and belief.
Signature
(Altaf Hussain)

Altaf updated

  • 1.
    Jeddah – K.S.A Mobile:- +966509927706 Email: haltaf742@gmail.com Altaf Hussain Aslam Ali Job Title: Document Controller Professional Summary Current Work Experience  05th Feb. 2013 to Till Date (3 Years) Designation : Document Controller/Office Assistant Organization : Saudi Bin Laden Group - ABCD Logistic Department Head Office, Jeddah – K.S.A Projects : KAP3 (King Abdullah Project 3) KAP0 (King Abdullah Project 0) Phase 1 Extension Job Profile:  Responsible for encoding correspondence, emails & business documents both in Microsoft Excel, Word, PowerPoint (MS- Office)  Responsible for understanding of the work-flow the information-flow  Check the work of other document control employees/contractors for making sure consistency and conformance with Company standards, policies practices  Interface with project management staff to ascertain schedule of deliverables, distribution lists - matrices - for projects  Perform all clerical works which include filing, typing, photocopying, fax correspondence and other works being assigned by superiors form time to time.  Maintain organize files of - controlled - documents, including incoming outgoing transmittals  Provide data for progress reporting including percent complete, earned value other schedule/status reporting  Receiving payment and issuing receipt to the subscriber.  Maintain tracking database of - controlled - documents  Handling incoming calls and assist others upon needed.  Schedule work of self to document, distribute, file and report on - controlled - documents to meet internal external deadlines  Ensuring all documents is as up to date as possible within electronic filing systems. Provide inventory reports for the daily sales.  Routine check-up of stocks to avoid run out of supply.
  • 2.
     Responsible formaking paper works for the best sellers and slow moving items to inform the department.  Follow established Company and department guidelines and practices to include consistent use of filing documentation conventions  Check all work for compliance to the project plan, Company policies/procedures database conventions/standards  Prioritize work assignments of self-others Previous Work Experience:  18th October 2009 to 28 Jan. 2013 (3.4 Year) Designation : Manpower Coordinator/Document Controller Organization : Saudi Bin Laden Group – ABCD Finishing Div. Site, Riyadh – K.S.A Project : PNU P- 1099(Princess Noura University Project) KAP0 (King Abdullah Project 0) Job Profile:  Understanding and implementing nature of work as per Sites  Setting All manpower updating every day  Completing manpower report inspections and checks as requested by the senior Engineer.  Submitting all manpower report to technical manager  Preparing and submitting daily report of work to the Administrator  Arrange Manpower List for transfer from one site to another as per instruction from the Administrator.  Implement other works as per instruction from the administrator  10th August 2006 to 19th May 2009 (2.9 Years) In India Designation : Document Controller/Secretary Organization : New India Construction Private Ltd. Project : Builder's & Developers (Mumbai-India) Job Profile:  Maintaining a tracking facility to enable documents to be updated easily.  Scanning in all relevant new documents.  Checking dispatch documents are accurate.  Presentation and filing of documents and drawings.  Responsible for maintaining hard copy information.  Issuing and distributing controlled copies of information.  Ensuring all documents is as up to date as possible within electronic filing systems.
  • 3.
    Core Competencies  Organizationaland planning skills  Teamwork  Data collection and management  Attention to detail  Problem-solving  Confidentiality  Reliability Education Qualification:  Class 10th from Rajasthan Ajmer Board (Year 2000)  Class 12th from Rajasthan Ajmer Board (Year 2002)  B.Com From University of Rajasthan by Seth R.N. Ruia PG College, Ramgarh Shekhawati in (Year 2005 ) TECHNICAL QUALIFICATION:  Diploma in computer application (DCA) from Chandigarh.  Rajasthan stat certificate in information technology (RKCL) V.M.O. University KOTA. OFFICE QUALIFICATION:  MS-Office all version ( MS-excel, MS-word, MS-powerpoint, , MS-publication)  MS – Visio 2003,2007  Internet & MS Outlook 2010  With Arabic Typing. Personal Details: Name : Altaf Hussain Father’s Name : Aslam Ali Date of Birth : 06th June 1987 Religion : Muslim Language Known : English, Arabic, Hindi (with Arabic Typing) Marital Status : Married Iqama Details: Iqama Number : 2282331772 Date of Exp. : 1/02/1438 Status : Transferable Declaration: I hereby declare that the information given above is true to the best of my knowledge and belief. Signature (Altaf Hussain)