Learning Technology Service
ProgramDevelopment Report for
NorthCarolinaState University
Accessible Licensure Program inScience Education
Preparedfor
LearningTechnologyServices,DistanceEducation&Learning
TechnologyApplications
and
CollegeofEducation
NorthCarolinaStateUniversity
by
EdrieGreer,Ph.D.
MiriamE.Guthrie,Ph.D.
June2003
ProgramDevelopment Report for
NCStateUniversity-AccessibleLicensurePrograminScienceEducation
Table of Contents
Executive Summary………………………………………………………………….. 3
I. Program Overview………………………………………………………………… 4
II. Status Report……………………………………………………………………… 6
III. General Program Development………………………………………………… 9
Program Development Overview
Program Model
Program Guidelines
Engagement & Planning
Program Support
Marketing & Promotion
Production & Maintenance
Delivery
Evaluation & Assessment
IV. Accessible Licensure: Findings & Recommendations………………………… 22
Engagement & Planning
Program Support
Marketing & Promotion
Production & Maintenance
Delivery
Evaluation & Assessment
V. Accessible Licensure: Fiscal Year 2003-2004 Proposed Deliverables………… 29
Appendices…………………………………………………………………………… 31
Appendix A: Accessible Licensure Course Listing
Appendix B: Licensure Programs in North Carolina
Appendix C: Course-Related Considerations
Appendix D: Marketing Opportunities and Venues
Appendix E: Equipment
Appendix F: Proposed Program Website Overview
Appendix G: References/Resources
________________________
Greer/Guthrie 2
Learning Technology Services
Appendix H: AL Faculty Manual for Web Course Development
Program Development Report for
NCStateUniversity-AccessibleLicensurePrograminScienceEducation
Executive Summary
The purpose of this Program Development Report is two-fold. First, the report details the
current status of North Carolina State University’s Accessible Licensure (AL) Program in
Science Education for the DELTA division (Learning Technology Services) and the NCSU
College of Education. Second, the report provides direction for the AL Program within the
context of a changing educational environment–specifically, an environment that seeks to
incorporate e-learning technologies within the University of North Carolina System and NCSU.
The report provides a general overview of program development considerations (per the request
of DELTA) by defining a program development model and guidelines. The specific process
used for development of this plan is a synthesis of accepted generic program development
models (see Appendix G: References/Resources) plus the authors’ experience in designing and
developing distance education programs and courses. Six categories of program development
guidelines were used: Engagement and Planning, Program Support, Marketing and Promotion,
Production and Maintenance, Delivery, and Evaluation and Assessment.
The report also lists findings and recommendations for the AL program in general, and proposes
deliverables for next year that, among other things, target the development of distance education
and supporting technologies and services within the Department of Mathematics, Science and
Technology Education. Thirty-five recommendations are included in this report, organized under
the guideline headings noted above.
Finally, appendices provide supporting materials for program analysis, growth and development.
The materials include a current course listing, marketing considerations, equipment used for the
project, program website considerations, and a manual that orients faculty on how to use the
standard course templates that were developed for this program.
It is clear that the Accessible Licensure Program can have tremendous and positive results
regarding the need to certify and provide additional training for science teachers throughout the
state of North Carolina. It is our hope that the College of Education, working closely with
DELTA and faculty and staff colleagues, will develop action steps to clarify the mission and
objectives of this program, and find the appropriate resources that will achieve the best practices
presented in this document.
________________________
Greer/Guthrie 3
Learning Technology Services
Accessible Licensure Program in Science Education
Program Overview
INSTITUTION MISSION
The mission of North Carolina State University is to serve its students and the people of North
Carolina as a doctoral/research-extensive, land-grant university. Through the active integration
of teaching, research, extension, and engagement, North Carolina State University creates an
innovative learning environment that stresses mastery of fundamentals, intellectual discipline,
creativity, problem solving, and responsibility. Enhancing its historic strengths in agriculture,
science, and engineering with a commitment to excellence in a comprehensive range of academic
disciplines, North Carolina State University provides leadership for intellectual, cultural, social,
economic, and technological development within the state, the nation, and the world.
PROGRAM MISSION
The mission of the Accessible Licensure Program in Science Education is to increase the number
of qualified science teachers within North Carolina public schools through the implementation of
partnerships between the North Carolina State University Department of Mathematics, Science
and Technology Education and North Carolina Community Colleges.
PROGRAM DESCRIPTION
The Accessible Licensure Program in Science Education has the potential to be an engaging
educational program offered by North Carolina State University and the College of Education to
students and practitioners seeking advanced licensure in K-12 science-related fields. The
program would primarily target North Carolina residents and be delivered through a blend of
face-to-face and technology-rich learning environments. Working closely with North Carolina
Community Colleges and the Science Education Program at NC State University, the program
would provide students with seamless articulation between program partners. Most courses
identified for inclusion in the program are three credit hour semester-length courses, which
follow NC State’s traditional fifteen-week calendar. Applicants would ideally enter the program
prior to Fall, Spring, and Summer semesters. The proposed program web site would contain
detailed information about both the program and courses, such as admissions requirements,
registration, forms, policies and procedures, technologies, required textbooks, syllabus, and
contact information.
PROGRAM GOALS
 To increase accessibility of licensure coursework in science education via distance
education venues
 To increase enrollment in science education programs by recruiting from rural
populations and from the pool of personnel seeking lateral entry licensure and/or
alternative licensure in science education
 To develop seamless articulation between North Carolina Community Colleges and
the Science Education program at North Carolina State University
________________________
Greer/Guthrie 4
Learning Technology Services
TARGET AUDIENCES
 Community college students presently unable to locally access science education
university degrees
 Undergraduate students who may work full-time during the day
 Individuals with science or science-related BS degrees who wish to add teacher
licensure
 Classroom teachers seeking advanced licensure
COMPETITION
Five of the 15 institutions within the North Carolina University system offer the same type of
licensure in science education as that available to North Carolina State graduates. This licensure
is a “comprehensive science” license, enabling the licensee to teach all the 9-12 disciplines
(biology, chemistry, earth science, environmental science, and physics). The public institutions
that offer this comprehensive science license to undergraduates include East Carolina, UNC-
Ashville, UNC-Charlotte, UNC-Pembroke, and UNC-Wilmington. In addition, only six of the 31
private institutions with teacher education programs offer the comprehensive science licensure
option. These institutions are Barton, Campbell, Duke, Elon, Lees-McRae, and Lenoir-Rhyne.
Where available, an overview of each institution’s program or informational links are provided
in Appendix B.
RELATIONSHIP TO NC TEACH
Presently, the relationship is unclear between the Accessible Licensure Program and North
Carolina’s NC Teach initiative. NC TEACH is a statewide teacher licensure program
administered by the University of North Carolina, in collaboration with the North Carolina
Department of Public Instruction. NC TEACH recruits, prepares, and supports mid-career
professionals as they begin a teaching career in North Carolina’s public schools. Participants in
the 2003 NC TEACH program will begin courses in Fall 2003. It is anticipated that they will
complete licensure through an accelerated program, earn up to 18 semester hours of graduate
credit for their NC Teach course work, and receive support during their first year of teaching.
DEFINITIONS
This document relies on several terms to specify aspects of technology use for teaching and
learning. Definitions of these terms are provided directly below:
 Distance Education (DE) has traditionally involved the use of a variety of media to
extend the learning experience from the campus to the learner. Media can include written
materials, broadcast video, videotapes, interactive video, live or recorded audio, CD-
ROM’s, or Internet-based (online) technologies.
 Hybrid/Web-enhanced/Web-supplemented/Web-intense/Blended Learning includes
combinations of the different media mentioned in the previous paragraph with face-to-
face, or on-ground, traditional learning.
________________________
Greer/Guthrie 5
Learning Technology Services
Accessible Licensure Program in Science Education
Status Report
OVERVIEW
This portion of the report addresses Accessible Licensure Program objectives, completed and in
progress, that served as initiative benchmarks for the 2002-2003 funding period. It also
identifies products created and program development planning conducted through contracted and
full-time personnel who were partially supported by funds from the Teacher Education/Distance
Education funds provided by DELTA and the College of Education.
BACKGROUND
The project contracted with the consultants who developed this program planning report and
facilitated instructional design assistance and development of a faculty online course guide. In
order to prepare the report, meetings and correspondence were conducted with NCSU staff,
including: John Penick, John Park, Jim Haynie, Eileen Parsons, Rita Hagevik, Angelia Reid-
Griffin, and David Slykhuis in Science Education; Grant Holley, Coordinator of Lateral Entry
Programs, and Susan Butler, former Coordinator of the Accessible Licensure Program in Science
Education. Diane Chapman from Training and Development, as well as Rebecca Swanson,
Connie Ingram, Scott Cason, Kay Zimmerman and Sharon Pitt from DELTA also participated.
(Attempts made to contact Richard Haley, who oversees the Masters in School Administration
DE degree, were not fruitful.) Also part of this team were instructional designer, Sarah Minier
Johnson, and multimedia specialist, Jason Gorfine, who developed the standard course templates
(HTML plus WebCT), an AL faculty guide, and assisted faculty with course design and
development.
PROGRESS TO DATE
During the funding period, the following objectives were accomplished:
I. Courses
The original Accessible Licensure Business Plan states the following course development
objectives for Year 1 and Year 2:
Year 1
 Create and develop curriculum for a new 300 level science education course to be
offered as a distance education course that would incorporate concepts from ECI 305
(Teaching Diverse Populations), ECI 416 (Teaching Exceptional Children), ELP 344
(School and Society) as well as ED 310 (Tutoring Adolescents). Expand the
curriculum of this course in order to offer it as a 500 level course as well.
 Complete Course Action Forms and submit to college curriculum committee.
 Establish an Academic Supervisor within the Science Education faculty to oversee
advising applicants to the Accessible Licensure Program in Science Education.
Status: A new 300 level science education course has not been developed; it has been
approved, however, and plans are to teach it in 2005. The College of Education implemented
________________________
Greer/Guthrie 6
Learning Technology Services
a new position under the Director of Education to aid applicants seeking alternative routes to
teacher licensure. Dr. Grant Holley currently holds this position in the College. The plan for
the Accessible Licensure program is to utilize this office for the academic advising of
students.
Year 2
 Implement revised courses via distance education venues, including EMS 101 J
(Orientation to Science Education), EMS 477 (Instructional Materials in Science),
EMS 594K (Methods for Teaching Science), EMS 594I (Technological Tools in
Science), and EMS 641 (Practicum in Teaching Science).
 Recruit College of Education faculty to adapt two additional educational foundation
courses for distance education venues. These include PSY 304 (Educational
Psychology) and PSY 476 (Adolescent Development).
 Recruit faculty from PAMS and Agriculture and Life Sciences to adapt science
content courses in Biology, Physics, Chemistry, and Earth Science for distance
education venues. Targeted courses include MEA 410, PY 123, PY 124, PY 126, PY
203,PY 341, PY 341, MEA 451,CH 223, CH 331, CH 315, BCH 451, BO 360, and
ZO 421.
Status: EMS 101J has not been implemented. Web modules for EMS 477 have been
developed. EMS 594K is partially developed. EMS 594I (now EMS 573) was developed for
online use but may not be appropriate for a totally online environment per John Park. EMS
641 has not been developed. There has been no progress to date on educational foundation,
PAMS, or Agriculture and Life Sciences distance education courses. New course being
developed in GIS (EMS 594-Hagevik); will be finished before fall and not by the end of
June. Other courses developed or revised for distance education for Fall 2003 are: EMS 501
(Readings I), EMS 502 (Readings II), EMS 531 Introduction to Research in Science
Education, and TED 359, Electronics Technology.
Overall Course Status: Provided in Appendix A is an up-to-date list of courses identified for
potential inclusion in the AL Program, along with their development and delivery status.
II. Other Course Related Products
A. Standard course templates: One basic online course template in WebCT was created,
plus an additional HTML template. The HTML template is intended for faculty
members who want a few pages for their course outside the WebCT environment, but
require that their pages be readily identified as part of the AL program. Due to the
time constraints of this project, these templates have been only partially tested.
It would be a good idea to test them further to make certain they are completely
bug-free under most working conditions.
B. Accessible Licensure Faculty Manual for Web Course Development—This guide is
for AL faculty new to distance education and covers how to use the AL course
templates, basic online course pedagogy, and where to obtain additional resources
and courses at NCSU.
________________________
Greer/Guthrie 7
Learning Technology Services
III. Project Report
An Accessible Licensure in Science Education Program Development Report was
completed by July 2, 2003. This report includes: a status report for the fiscal year 2002-
2003, a general program development model and guidelines, findings and recommendations
regarding the Accessible Licensure project, marketing and program website considerations,
and a web course development guide for AL faculty.
IV. Related Project Products
A. One of the many goals of this project was to begin developing a marketing and
communications plan for the Accessible Licensure program. Critical to defining
market strategies and designing and developing marketing campaigns is the
clarification of program goals, objectives, milestones and audiences. This process is
still taking place. As a result, the following information is provided in Appendix D:
key issues influencing program promotion, marketing opportunities, an example of a
distance education electronic marketing campaign, and a chart that details potential
marketing venues, types of media placement, and advertising information as
available.
B. Noted later in this report, it is strongly recommended that a program website be
created for the AL program. Based on e-learning research, program models,
experience of the authors’, and conversations held with key stakeholders throughout
this project, components that may be considered for inclusion in the AL program
website were identified and are provided as recommendations in Appendix F.
V. Equipment
Computers and software purchased through DELTA for use by faculty and consultants. See
Appendix E for details.
ISSUES
The departure of Dr. Susan Butler, a Principle Investigator of the AL Program, from the
University in November 2002 impacted significantly the momentum of the initiative. The
departure left the project with little programmatic and administrative oversight, which created
continuity issues and a leadership gap. Also, as in the previous year, the notification of the
budgetary award was not given until Nov. 2002, which left only six months to implement the
program, and April – June 2003 to prepare the final report and provide instructional design and
graphic assistance. With this shortened time frame, once again it was not possible to fulfill all of
the objectives intended in the original proposal. Budgetary constraints were further exacerbated
when state budgets were frozen for several weeks in the spring–an action that further hampered
the completion of project development and the purchasing of critical resources. Taking these
issues into consideration, findings and recommendations for the AL Program are provided in
Section IV.
ADDITIONAL RESOURCE REQUIREMENTS
Refer to Section V: Accessible Licensure: Fiscal Year 2003-2004 Proposed Deliverables.
________________________
Greer/Guthrie 8
Learning Technology Services
Accessible Licensure Program in Science Education
General Program Development
PROGRAM DEVELOPMENT OVERVIEW
In order to facilitate the design, development and delivery of distance education programs at
NCSU, a host of factors must be considered. Any successful model takes into account nationally
recognized best practices that have been effective to date and relies on the latest research to
substantiate it. The Commission on Institutions of Higher Education (CIHE) indicates that
instructional programs leading to degrees with integrity must be organized around substantive
and coherent curricula that define expected learning outcomes; also, that institutions accept the
obligation to address learner needs related to and to provide the resources necessary for their
academic success (CIHE, 2000). The UNC System guiding principles for distance education
also stipulate that distance education courses and programs maintain the academic standards of
on-ground, face-to-face students and do not unnecessarily duplicate resources (UNC Board of
Governors, 2000). In order for this to happen, the institution must offer consistent quality
support to faculty, the learners, as well as the program.
The best program development models are systematic (Diamond, 1989) and focus on the
learners, many of whom are adults with full time jobs, families, volunteer and other
commitments (Cross, 1992). They may have little or no experience using distance education
technologies and methods. What will they experience as they take individual courses? Will they
want to take more? Will they feel like their concerns and anxieties are heard? Will their time
and money (or their employer’s) have been well spent? What is the overall context of the
distance learner as she makes her way through her programs (Gibson, 1998)?
NCSU distance education programs and courses must be high quality and meet the needs of their
learners. This means that the content, structure, and instructional design must be sound. Course
design and layout, as well as technologies, should be consistent between similar courses.
Students must receive timely feedback to their questions and comments regardless of whether the
courses are totally online or offered via a blend of technology-rich environments (Martyn, 2003).
Many best practices associated with instructional design course elements are covered in the
faculty training sessions and materials offered by the Learning Technology Service (LTS) within
Delta. LTS also offers a variety of other services for faculty, staff and graduate students
instructing or preparing distance or distributed courses. These services include:
 training in emerging tools and technologies for faculty, staff, and graduate students
engaged in online instruction;
 seminars, workshops, custom training sessions, and other faculty development programs
and experiences that support efforts to intersect teaching and learning with technology;
 instructional house calls and help desk support;
 instructional design services such as project planning, instruction, and consultation;
 development and production services in multimedia, graphic design, web applications,
and other technologies related to delivery of online instruction;
________________________
Greer/Guthrie 9
Learning Technology Services
 project management services that include administration of DELTA IDEA grant projects
and LTS and DELTA-initiated special projects; and
 resources such as materials and up-to-date information for development of online courses
and programs.
While there is a vast array of successful individual courses being offered via instructional
technologies, it is the degree programs that ultimately prove of highest benefit to learners. Many
adult learners derive benefit from certificate or degree programs that provide career enhancement
skills or training for new careers. Developing or converting a degree program for distance
education requires careful thought prior to teaching the first course on the web or via interactive
video. In addition, programs must be scalable, and adhere to the institution’s overall mission
(Moloney & Tello, 2003), as well as include all of the services needed for delivery (Houdek,
1990; Waterhouse & Harris, 2002).
PROGRAM MODEL
For the purposes of this report, a program development model was constructed and guidelines
created to ensure successful, informed and research-based transformation of educational
offerings by institutions. Directly following the model are detailed program development
guidelines, which can help a program achieve high standards with a minimum of “pain.”
In the following model, learners/students are at the core of the program. They often come into
contact with distance education courses one at a time and over time, the progression may lead to
taking the classes of an entire program. During the course of their studies, students engage with,
and learn from, faculty members and receive support from the institution. Technology may
mediate much, if not all, of this process.
Distance Education Program Development Model
________________________
Greer/Guthrie 10
Learning Technology Services
Program
Technology
Institution
Course
Faculty
Learner
Learning and Support
PROGRAM GUIDELINES
The program guidelines that follow are based upon the previous Distance Education Program
Development Model. While the model is high level, the guidelines are more specific and have
been organized into six areas of strategic planning. These six areas address aspects of
Engagement & Planning, Production & Maintenance, Delivery, Support, Marketing &
Promotion, and Evaluation & Assessment. Where helpful, sample questions and associated
aspects of program development have been included. Note that most of the guidelines fall within
engagement and planning, because that is where most of the work should be done.
While similar in nature, course development guidelines drill down in more detail to specific
course design, development and delivery needs. Specific course guidelines are not expanded
upon in this document; however, an overview of recommended course-related considerations is
provided in Appendix C. The overview identifies considerations for faculty and staff engaged in
the design, development, delivery and instruction of program courses. Considerations for course
development have been organized into the four primary headings of Course Planning, Course
Design & Production, Course Delivery, and Evaluation and Assessment.
Engagement & Planning
 The stakeholders in your department/college/university who will impact or be
impacted by the success or failure of the distance education program have been
identified. Who will make the final decisions about if and how the program will be
delivered at a distance? Are different stakeholders concerned with different
objectives, data or success indicators? Have faculty members been involved in the
discussions and has their support for teaching through distance education been
secured?
 An environmental scan and needs assessment have been conducted for the program.
If the scan/assessment has been conducted, what were the results? Does this program
provide learning opportunities for a viable number of students and meet a state or
university need? Is it congruent with the university mission? Does it support
institution, college(s), or department(s) planning and overall academic goals? Have
specific programs/areas been targeted to deliver at a distance? Is there a priority or
timeline for different programs/areas? Will old programs be phased out, and why?
How will issues of parity be addressed (e.g. the digital divide)? What lessons have
been learned, if any, from ad-hoc courses previously offered in the program?
 The goals and objectives of the program have been clearly defined up front by all
stakeholders and plans for evaluation commence at the beginning. What are the
specific goals and objectives of the program (learning outcomes, increased student
retention, financial return on investment)? Do those goals include helping students
acquire increased technology skills? What are the indicators of success for the
program (i.e. how will you know it’s been successful)? Are these measurable and
practical?
 Strategic planning for the program is available in an appropriate format/depth and
has a designated lead administrator/faculty/board. Is there a curricular board
________________________
Greer/Guthrie 11
Learning Technology Services
established to address questions? Is there an advisory board established to quickly
address university, partner or program concerns and academic or resource needs?
Are all support groups (e.g. DELTA, library, admissions, financial aid) represented in
the strategic planning for programs?
 Strategic planning for the program includes fiscal and enrollment modeling.
Does the program assist in meeting NCSU enrollment goals? What are the current
and project enrollments for this program? What are the anticipated instructional costs
and needs? Are the incentives for faculty? For department(s)? For college(s)?
 Distance education programs have been included in the institution’s overall budget
structure. Has the institution set aside sufficient financial resources to support the
ongoing development and improvement of distance education programs and
faculty/student skills? Are technologies updated on a regular basis? Are they
scalable?
 The initiating college/department/faculty has identified a person(s) responsible for
program administration and planning within the academic department. Is this
Principal Investigator a champion of distance education? Does s/he have enough
clout or influence with the faculty and the departmental chairperson to promote
distance education within the department? Has s/he successfully developed and
taught distance education courses?
 The initiating college/department/faculty has identified a person(s) responsible for
project management. Are program planning services required of the distance
education support group? Does the academic program or distance education program
desire a distance education program liaison? Are project management services
required?
 There is adequate campus and off-campus technical infrastructure to successfully
deliver the program. Are only standardized hardware and software supported by the
institution and have infrastructure standards and guidelines been clearly
communicated to faculty, staff and students? Have server and FTP requirements for
courses been defined and appropriate equipment purchased?
 Hardware/Software requirements for faculty have been clearly defined and
communicated. What equipment and software do faculty members need in order to
participate successfully in the program? Are there any specialty technologies or
software needed by faculty that are not standard or supported by the institution?
 Hardware/Software requirements for students have been clearly defined and
communicated. What equipment and software do students need in order to participate
successfully in the program? What is the level of Internet access for students? What
percentage of students has access to computers? Will hardware and software costs be
prohibitive, particularly if specialty wares are required by faculty?
________________________
Greer/Guthrie 12
Learning Technology Services
 Adequate provisions have been made to protect student privacy. Do learners have
access to their own personal information online? Is learners’ personal information
secure?
 The institution has a Faculty Development or Professional Development Plan. Is
there a list of courses/resources available to the faculty and are they adequately
promoted? Have distance education competencies for faculty been defined?
 Administrators, faculty and staff are aware of the reasons for using instructional
technology. Do faculty members clearly understand the value of instructional
technology, and of Learning Management Systems and other media/resources for
distance education courses offered by the university? Are they aware of the
importance of using consistent course templates, selected course development
models, as well as the possibilities of appropriate technologies, media and
instructional design for distance education? Is their departmental chairperson on
board with these concepts as well? Are institutional support groups and their staff
members fully cognizant of the value of distance education and its possible uses? Are
they sufficiently staffed to support this program?
 A quality assessment and control philosophy has been determined. When is the next
accreditation visit? What concerns and policies are currently in place to facilitate
quality program and course development? Who will control course quality (both
content and design)?
 Intellectual Property Issues are defined and guidelines for courses are in place. Who
will own online courses? Does the institution have a consistent intellectual property
policy that has been communicated across all departments and is based on current
laws? Is ownership portable without causing undue hardship for the institution (i.e.
if a faculty member leaves the university, can s/he still use the course they
developed)? Are the courses and resources in the program cleared for use via the
institution’s copyright guidelines? Who will assist with this task?
 The content of the curriculum has been clearly described. Have unique features of
the current program / area (i.e., weekend offerings, remote sites) and relevant learner
characteristics (i.e., older, working adults) been defined? Has a survey been
conducted with the current learner population assessing their perceptions and
recommendations for the program/area? Has the program has been approved by
faculty before it is offered online? Has the curriculum been approved by the
appropriate institutional authorities at the university and Office of the President levels
to ensure SACS compliance? How many new courses will need to be created from
scratch? Has the time to develop and receive approval to offer these courses been
factored into the program’s timeline?
 Based on the needs assessment and curriculum, the course design and development
model has been determined. Are faculty members responsible for deciding how
much the coursework is available at a distance and how much is taught face-to-face?
Will cohorts be used? Will the program have open or traditional enrollment?
________________________
Greer/Guthrie 13
Learning Technology Services
 Human Resources/Personnel issues have been resolved. Will new faculty need to be
hired? If so, what is the timeline and how will they be paid? Will they be full time or
part-time faculty? Tenure track or adjunct? If not, how will existing faculty
workloads be allocated? Will new support staff be required (e.g. instructional
designers, multimedia specialists)? Do new faculty hired meet basic instructional
technology competencies? Are performance expectations of faculty teaching online
are clearly delineated. Are faculty participating in the program under no duress to do
so and can opt out without professional consequences?
 Faculty performance guidelines and rewards have been determined. Have faculty
demonstrated any resistance to moving to distance education courses? Do faculty
members have access to clearly stated institutional, college and departmental policies
and guidelines regarding distance education courses? Will faculty members receive
rewards and incentives for good work, including promotion and tenure and special
awards (e.g. equipment, software, etc.)?
 An adequate budget has been developed and funds are available to successfully
conduct the program. If grants need to be written, will they be developed using solid
needs assessment data and well in advance of expenditure of funds? Will any of the
targeted programs/areas be funded by grants? If so, are there any
limitations/considerations necessary?
 The necessary cross-agency or academic partners (e.g. AHECs, community colleges,
etc.) needed to support and deliver the program have been identified and planning
has commenced. Which agencies and partners should participate in this program?
Has discussion been initiated with appropriate supporting entities or partners? How
will their participation be structured? Should Memorandums of Understanding be
created? Are they willing to participate in the overall evaluation of the program?
 Secondary values of the program been discussed, including research and
scholarship. Are faculty encouraged and funded to research and share their findings
regarding their distance education efforts in the wider academic community?
 Since the effective delivery of distance education programs in particular depends on a
concerted institutional system-wide effort, the necessary institutional Service Level
Agreements (SLAs) have been discussed and are in place to deliver ancillary support:
 Marketing & communications planning
 Student support services planning
 Website design and development planning
 Technology resources and program delivery planning
 Course development and maintenance planning
 Faculty support services planning
 Distance education support services planning
 Intellectual property agreements
________________________
Greer/Guthrie 14
Learning Technology Services
Program Support – Students
 Registration/grades. Is registration easy and automated? Are grades readily
available to students at the appropriate time? Do students need to travel to campus?
 Admissions. Are the roles of the Graduate School, Undergraduate Admissions, and
Lifelong Education clearly defined?
 Financial Aid. Do students have adequate access to financial aid information online?
 Testing. Are testing facilities available when warranted? Are individualized
proctoring arrangements available for remote students?
 Academic/Career Advising. Have the advisors been determined and do they have
adequate interaction with distance education students in their given programs? Are
students given the opportunity to pursue internships when practical?
 Mentoring/Tutoring. Are advisors available to assist students proactively when they
have potential or real problems with courses?
 Bookstore. Can course books and resources be easily ordered online during course
registration? Can books be sent to the student’s home on a timely basis? Are books
searchable by course?
 Technical Support. Can all of the critical on-campus services be effectively accessed
online? Will technical problems be able to be easily resolved before the first class?
Is a help desk available to students for not only productivity and internet applications
but also any learning management system used? Are on-campus computers available
to students who do not have access to these at home or work?
 Computer skills support. How will students who are not familiar with the use of
computers know how to use them effectively in distance education courses?
 Library. Are sufficient library services available online and/or through toll-free
support (i.e., catalog, databases, special collections, e-journals)? Are reserve
materials and ILL available quickly and free of charge for all students, including
undergraduates? Can students obtain a library card remotely?
 Student Orientation. Are first time distance education learners given a clear
explanation in advance of the distance education environment and how they can be
most successful? Is a self-assessment for distance education readiness available to
students? Is adequate support available to help learners effectively use the program
and/or course sites and materials? How will students be fully informed of this
support?
________________________
Greer/Guthrie 15
Learning Technology Services
 ADA accessibility. Is all administrative and course information accessible to students
with disabilities?
 Alumni. Do graduates of the program have continued access to value-added
resources, such as a career advising or job boards?
 In general, equivalent services are available to all distance education students across
the board when compared with on-campus students. Can students easily access
“real” staff members on a timely basis when they have a problem, preferably both
online and via phone? Is adequate information on how to use all services provided
during a single student orientation or is it piecemeal? Are links to student services
also offered on program and/or course web pages?
Program Support - Faculty
 Customized faculty development/technology training and support. Does the
institution have a multimedia and faculty support center? Do faculty have access to
adequate instructional support? Are staff available to assist faculty while they are
developing courses? If specialized content or instructional knowledge is needed, are
funds available to obtain this knowledge? Do faculty have baseline knowledge of
instructional design and quality course criteria before teaching at a distance? Have
faculty satisfied basic computer competencies before teaching at a distance? Are staff
available for assistance to faculty after training? Is this assistance technical,
pedagogical, or both? Are faculty given sufficient time to acquire these skills? Is
acquiring the skills encouraged within the department? Are technology mentors
available to assist faculty within the department?
 Instructional Design. Are faculty encouraged to work with experienced distance
education instructional designers if available? If the Subject Matter
Expert/Instructional Designer (SME/ID) model is used, are faculty encouraged to act
as team players in the process?
 Technical. Is computer hardware and software technical support available to assist
faculty most of the time? Is expert technical assistance readily at hand when faculty
are using interactive video facilities (even in the evening)?
 ADA accessibility. Is all administrative and programmatic information accessible to
faculty with disabilities? Do faculty have the support necessary to insure that their
courses are accessible?
 Library. How will library services be integrated into online programs and courses?
Are services such as copyright clearance available to faculty? Does the library offer a
distance education faculty orientation to acquaint prospective faculty with distance
education services and support available to facilitate the teaching and learning
experience?
________________________
Greer/Guthrie 16
Learning Technology Services
Marketing & Promotion
 A strategic market planning process has been conducted. What is the mission of the
institution? Is the program congruent with this mission? What is the program’s
mission, goals and objectives? How are these operationalized to include a marketing
environment, the distinctive competencies of the university, and motivation required
for action? What are the current products of the program? What are the anticipated
future products of the program? What is the target audience(s) and are these products
appropriate for the selected audience(s)? What marketing strategies should be
applied for current and future products where strategies are dependent on working
within either existing or new markets and with either existing or current educational
products (e.g., set of tools, that when blended, produce the desired market response)?
What marketing strategies are presently occurring, within which the program can
participate? What are potentially problematic assumptions about marketing the
program? Are appropriately supporting budgets in place or available? How will the
strategies be evaluated? Is a path defined for revising the marketing plan based on
evaluation results?
 Market planning for student recruitment is in place. What are the results of a
consumer analysis with respect to demand and measurement forecasting, market
segmentation, market targeting, and market positioning? Has the institution’s current
market position been defined? Have competitive advantages, opportunities and threats
been defined from a student recruitment perspective (e.g., convenience, quality, price,
cost)? Have influential issues and products been clearly defined for student
recruitment?
 Controls are in place for prospective and current student tracking. How will
marketing control for measuring and evaluating results and taking corrective action
for plan revision? How will the controls be implemented (e.g., internet, surveys,
phone calls, databases)? Are infrastructure, personnel or fiscal resources required and
available to put these controls in place? Will results be available in a timeframe
effective for adjusting controls on a 3-cycle per year or annual basis?
 A campaign has been designed and developed, based on defined/available strategies,
and it clearly identifies required media, resources, measures and timelines. Does both
a marketing plan and communications plan exist? Will the campaign be
predominantly electronic, print, or blended? Are there opportunities for campaign
partnering? What types of venues will be used – newspapers, journal, magazines,
press releases, online or print directories, push emails, websites (internal or external
to the university), radio, television, course catalogs, information sessions,
conferences, open houses?
 Media design & development considerations have been discussed. In what format
should media be available (i.e., electronic or print) based on selected markets/budget?
Will creative services be required? If so, what types of skills will be needed (i.e.,
graphic designer, web master, programmer)? Will media demands require external
contracting or can they be completed within the university?
________________________
Greer/Guthrie 17
Learning Technology Services
Production & Maintenance
 A program website has been created for promotion and support. Does the website
accurately reflect and promote the mission of the program? Is the program website
fully functional before class begins? Does it effectively address the needs of
prospective students, current students, faculty and stakeholders? Does it visually and
functionally create an umbrella for individual courses, serving as a gateway for
students to access both courses and course / program related information such as
course and instructor descriptions, forms and schedules, advising, admissions,
technical support, textbook purchases and library resources, software and hardware
requirements, orientations to the university/program/technology, and contact
information?
 Guidelines for course development and maintenance have been established and
agreed upon by departments and participating faculty. Will pilot courses be offered
first? Are the courses completely ready before class begins? Can changes to the
courses be easily made once they have started? Have course quality considerations
been determined and met? What is the estimated life-cycle of individual course
content? Of individual course technologies? What percent of course
content/technology will need to be updated and when? If extensive or highly technical
course updates are required, are resources available at the university to assist the
department or individual faculty? If the faculty instructing or updating a course is
distinct from the faculty who created the course, how will teaching styles and
preferences be taken into consideration and how will course materials/orientation be
transferred?
 Geography, technology, and disabilities have been considered with respect to faculty
and student access. Does the program adequately address access issues for persons
with disabilities? Geographic dispersion? Low bandwidth?
 Courses are built upon solid instructional design principles, the results of which can
be definitively supported for the duration of the program. Have quality standards for
courses been established and clearly communicated? How will the program ensure
that appropriate media, technologies and pedagogies be considered and used for the
courses in the program? Are specific media or technology formats
recommended/discouraged based on infrastructure, available support, or
development/expertise requirements? Are instructional resources available to support
faculty in course transformation (e.g., graduate assistants, instructional designers,
multimedia specialists, web programmers)?
 Schedules and agreements have been created to ensure an environment of support
and success. Does a schedule exist for course development, delivery and
maintenance? Would departmental or faculty level agreements be helpful to ensure
timely course development, delivery, instruction, and maintenance?
________________________
Greer/Guthrie 18
Learning Technology Services
 Incentives have been determined and clearly communicated. Will incentives be
provided to departments or individual faculty? If so, what type(s) and what are the
requirements for receiving incentives? Do requirements differ between faculty
developing versus instructing versus maintaining a course in the program? Have
incentives been clearly communicated?
 Class rosters and grade rolls are available online. Are current rosters are readily
available for faculty? What, if any, permissions do students have to email an entire
class or view class rosters? Are grade rolls readily accessible online and completely
confidential? Can they be quickly updated by faculty?
 Services and resources available through DELTA organizations have been identified
and communicated to faculty, staff, current students and prospective students. Are
the faculty aware of workshops, technology resources, and support available through
Learning Technology Services? Are they aware of Distance Education’s Service
Center assistance that helps with questions, concerns, ongoing support throughout
semester?
Delivery
 Marketing strategies and a program communication plan have been implemented in
a manner timely to enrollment acquisition and program delivery (see above section,
Marketing and Promotion).
 Technologies have been identified for both delivery of the program and the individual
courses. What standard and specialized technologies does the institution presently
support? What are the costs to the program or institution associated with
selected/available technologies? Can the program or institution continue to support
these costs? How will current students and prospective students acquire information
about the program? Will individual courses be delivered (i.e., via the World Wide
Web, videoconferencing, CD-ROM, VHS, cable broadcasting, H.323, face-to-face, or
a blend of technologies)? Are there instructional/pedagogical recommendations or
institutional policies and procedures that should be shared with faculty and students?
Will all courses be required to have a course website? Will a learning management
system be available or required?
 Technology-related needs for successful program and course delivery have been
considered. What specialized technologies, software or storage space will be
required based on individual course or faculty/student needs (i.e., audiographics,
exams, surveys, communication, collaboration, projects, portfolios)? How will
consistency and proficiency of technology use be ensured? What is the faculty or
student comfort level with the selected/available technologies? Will technology
orientations or training be made available? Is technical support available for students
or faculty?
 Courses have been identified that will require CD-ROM or videotape course
materials for students. How will the program ensure that course materials on CD-
________________________
Greer/Guthrie 19
Learning Technology Services
ROM or videotape will be created and made available to the students in a timely
fashion? What resources will be required to produce and update these materials? How
will students be notified that these materials will be required for class? How will
students and faculty request and receive these course materials?
 Schedules have been established to ensure timely availability and delivery of
program information and courses. Has a delivery schedule been created that
identifies courses to be instructed, associated instructors, and delivery needs with
respect to support, hardware and software? Have students been notified when their
courses will be ‘open’? When will faculty be notified that they will be instructing the
courses? When do faculty need to submit special instructional assistance or
technology requests? How will program and course maintenance schedules integrate
with the scheduled delivery of courses?
 Policies, codes and general access requirements that will influence receipt of the
program and access to the courses have been clearly defined. Are conduct codes and
academic policies clearly communicated? Is there a need to define access to course
materials in relation to actions related to a course, such as dropping, adding,
withdrawing, auditing, and incompletes? Do students understand the role of their
institution ID for accessing protected course materials or campus resources?
Evaluation & Assessment
 An evaluation plan is in place for the program at partner, program and participant
levels. Is an evaluation and assessment plan developed that addresses the goals and
objectives of the program (i.e., recruitment, attrition, cost, satisfaction)? Have specific
measures and milestones been identified? Who or what will be targeted for
evaluation (i.e., partners, faculty, adjuncts, graduate assistants, students, technology,
course curriculum) and what methodology(ies) will be used? Has consideration been
given to how evaluation and assessment of the program can address or support
institution-, state- and accreditation-based responsibilities?
 Partnerships and key dependencies have been identified and on-board. What
activities are presently occurring within or external to the institution that the program
can participate in (i.e., through DELTA, the college, department or corporate or
institutional partners)? What, if any, will be the role of institutional research?
University Planning & Analysis? Records & Registrar? Disabilities & Student
Services? Personnel? DELTA? Library? Information Systems?
 Evaluation addresses both standard and custom needs of the program, institution and
individual faculty, staff and students. Does the institution, college or department
require specific evaluations of their students or faculty? Do instruments exist or will
they need to be created? As an incentive, how will faculty be provided customized
course assessment assistance to support research and scholarship efforts for
promotion and tenure? Do instruments exist or will they need to be created?
________________________
Greer/Guthrie 20
Learning Technology Services
 Resources and infrastructure have been secured to ensure timely, informative and
successful program evaluation. What resources and infrastructure will be required to
create, disseminate, collect and analyze the results? What is the frequency and
duration of evaluation/assessment activities? How will the program ensure timely
analyses of the results and integration into individual courses and the program to
allow for continuous improvement?
 A schedule and mode(s) of distribution has been created for recommendations and
reports.
________________________
Greer/Guthrie 21
Learning Technology Services
Accessible Licensure Program in Science Education
Accessible Licensure: Findings and Recommendations
To date, a number of distance education programs have been developed in the United States and
United Kingdom to provide professional development to teachers as well as to train pre-service
students and those needing alternative licensure (Bourdillon & Burgess, 1998; Egbert & Thomas,
2001; Glenn, 2001; Gruenhagen, McCracken, & True, 1999; Leach, 1996; Levin, Waddoups,
Levin, & Buell, 2001; Parker, 2000; Perry, 2002; Rodes, Knapczyk, Chapman, Chung & Haejin,
2000; Saunders, 2001; Sullivan, 1995; Twomey, 2002; Vrasidas, 2002; Zirkle, 2002).
Previous efforts conducted at NCSU include online graduate programs in the College of
Education in Training and Development, School Administration, and Business and Marketing
Education. The latter program developed an accelerated alternative licensure program that was
designed to lead to initial licensure and interface with a master of education degree program in
the same area. According to the published report, the university based its program design entirely
on the distance education model and “found that the quality of instruction increased dramatically
through Internet delivery, used its extension mission to address financial issues, utilized the
revenue created by extension courses to employ experienced teachers as university supervisors,
and developed reciprocity agreements with every state other than Louisiana” (O’Brien, 2001).
Research conducted with the Teacher Education Alliance (TEA), a component of the Iowa
Distance Education Alliance, Iowa's Star Schools Project included the following
recommendations:
While funding and human resources may expedite the innovation process,
convincing both faculty and administration of the need to innovate is of
high priority. As long as these individuals believe distance education is an
add-on to an already overcrowded curriculum the integration of distance
education into the teacher education program will not occur. For distance
education to diffuse, the change agent will need to assist these institutions
in seeing how distance education not only fulfills a need of the institution
but is compatible with institutional values and beliefs. In addition,
institutions that prepare teachers need to dedicate funding or locate
alternative funding sources to assist in acquiring technology as well as in
the training of education faculty to use the technology. Until these
professors have adequate access to technology and can develop their own
comfort level, few will model effective uses of technology in the methods
classes. (Maushak, 1997, p. 2172).
While most of the preceding literature focuses on instructional design best practices within
courses, a number of findings point to specific steps institutions can take to augment their teacher
education programs offered at a distance. These, coupled with the general program development
guidelines discussed earlier in this report, lay the foundation for the following recommendations.
________________________
Greer/Guthrie 22
Learning Technology Services
Engagement & Planning
1. A formal environmental scan and needs assessment have not been conducted for
the program. The college, working in concert with the Dean and Provost, should
revisit its goals in terms of developing a new timeline and budget. Specific goals
and objectives of the program (learning outcomes, actual percentages of increased
student retention, financial return on investment) should be more clearly defined.
After speaking with several different stakeholders, it is not clear who are the
audiences of this program. Are they teachers in nearby counties or the entire
eastern half of the state? Dr. John E. Penick, the Mathematics, Science and
Technology Education department chairperson, mentioned “cornering the market.”
Is this also a goal of the College and the University?
2. Issues of parity need be addressed (e.g. the digital divide). How will teachers from
economically disadvantaged areas be assisted to participate in this program? In
addition, a thorough understanding of the pros and cons of using technology to
facilitate alternative certification would be helpful. Sometimes distance education
requires compromises. One of the administrators does not want to let go of the
face-to-face interaction with full-time students. But this is not possible if you want
to increase your enrollments and access to working part-time adult students.
3. Strategic planning for the program does not have a designated interdepartmental
board. The management team listed in the Business Plan consists only of science
education faculty and no one from other College of Education departments, even
though partnering is a goal of the program and courses have been identified in other
departments for inclusion in the program. Community college and school
personnel are only on board for the first year. While the board should not grow in
size as to be unwieldy, all support groups (e.g. DELTA, library, admissions,
financial aid) need to be further represented in the strategic planning for the
program, at least in the beginning, and a liaison to each support group be
designated. Also, we recommend a student (teacher) representative serve on the
board to facilitate their needs.
4. Fiscal and enrollment models have not been determined and the extent to which the
program will assist in meeting NCSU enrollment goals in unclear. It is
recommended that through a needs assessment, market analysis, and
college/departmental deliberations that current and projected enrollment numbers
be determined. Since the use of technology does not define or establish a course as
an NCSU Distance Education course, will the AL Program be included in NCSU’s
Distance Education offerings? We recommend that program administrators
consider the programmatic effects and different funding mechanisms available
through DELTA if the program is offered as Distance Education.
5. Since the departure of Susan Butler earlier this academic year, there is no one
responsible for program administration and planning within the academic
department. We recommend that someone be selected as soon as possible to
________________________
Greer/Guthrie 23
Learning Technology Services
champion the use of distance education and that this person have experience with
these instructional technologies as well as tenure.
6. The initiating college/department/faculty has not identified a person(s) responsible
for project management. We recommend that a Program Memorandum of
Understanding be developed with DELTA to (1) ensure a supportive environment,
(2) to offer an overview of DELTA resources available and highlight the benefits of
collaboration, and (3) to identify and clarify program related needs in order to
provide the best support possible to program constituents.
7. Earlier in the school year, Dr. Butler taught EMS 203, Introduction to Teaching
Science via NC-REN. Review of these videotapes, which are available in VHS
only (there are no S-VHS masters), shows that they were not aired with adequate
consideration of distance education students. In addition, the graphics used are not
legible on the TV screen. Therefore, our recommendation is that these videotapes
should not substitute for a full-length course and a new course should be developed
entirely online or in blended mode. (The faculty successor for this course has
subsequently left the university as well.)
8. Not all faculty and staff in the Mathematics, Science and Technology Education
department seem aware of how to effectively use instructional technology for
distance education. There is certainly a lack of understanding as to the value of
using learning management systems such as WebCT. In addition, faculty do not
seem to be informed about the services that DELTA could potentially provide, nor
of the value of working with an instructional designer (they are education faculty
and there is a sense that some don’t believe that they need instructional design
help). Only two faculty members (Hagevik and Reid-Griffin) accepted this
project’s offer of instructional design assistance, although Jim Haynie is working
with DELTA production staff to videotape and edit learning objects used in his
TED 359 course, and David Slykhuis has requested the standard HTML template
for his course. We recommend that the departmental chairperson encourage faculty
to use these resources if and when available. We also recommend that one or more
formal orientation sessions be offered to the Science and Technology education
faculty by DELTA and peer faculty who have already taught at a distance using
WebCT. Diane Chapman is willing to speak with the faculty about her experiences
in the online Training and Development program, and faculty from other successful
distance education programs in the College of Education, such as School
Administration and Business Education, might be willing to participate as well.
We are confident additional instructional design help can be utilized for future
courses if faculty are apprised of the value of this assistance and the funds are
available.
9. There are many workshops and courses on distance education technologies and
design available through LTS/DELTA. Faculty participating in the AL program
should be encouraged and given sufficient time to acquire the skills needed to
develop and teach their courses. The department should also look to the use of
________________________
Greer/Guthrie 24
Learning Technology Services
technology mentors (other faculty and graduate students) to assist faculty with their
courses.
10. A quality assessment and control philosophy needs to be determined. If programs
are to achieve high enrollment, basic course design issues, such as use of a common
course template and guidelines for teaching courses (e.g. all student email will be
answered within one business day), as well as ADA compliance, must be stipulated
for all courses. Faculty should be encouraged by the departmental chairperson to
adhere to course design standards suggested by LTS/DELTA. Note: this project
has prepared two standard course design templates for use by faculty and a guide
for new AL instructors teaching online.
11. Faculty should have access to the revised NCSU intellectual property guidelines
that are currently under review.
12. An AL curriculum map, with routes delineating paths for different student
populations, is needed. To date there has been little progress on developing AL
courses in Educational Foundations and other science courses. It would be helpful
to investigate developing a Master of Arts in Teaching (MAT) degree, similar to
UNC-CH and other institutions.
13. The course design and development model should be determined. Faculty should
be responsible for deciding how much their coursework is available at a distance
and how much is taught face to face; however, the Principal Investigator and
DELTA Program Liaison need to make recommendations based on the overall
program needs and budget as well. Will cohorts be used? Pilot courses? Open or
traditional enrollment? In order to facilitate rapid development of quality courses
(if that is the eventual program goal), a Subject Matter Expert/Instructional
Designer Model is recommended. Development of a multi-year course
development and delivery plan with milestones and specific faculty assignments
should be a top priority.
14. Dr. Haynie has been a pioneer in the department in developing reusable learning
objects. Funding should be available to purchase existing objects and to develop
new ones and a depository established to house them.
15. Due to the points made previously, human resources/personnel issues have not
been resolved. Dr. Penick indicates he does not have enough faculty to teach these
AL courses. While at least two new faculty members will be joining the department
this fall, it is not known yet what their role will be in the program, and how long it
would take for them to become fully involved. If the College and NCSU want to
fast-track this program, qualified part-time and/or adjunct faculty would need to be
hired as well as new support staff (e.g. instructional designers, multimedia
specialists). Performance expectations of faculty teaching online should be clearly
delineated and proper incentives given. Faculty should be encouraged and funded
to conduct research on their distance education efforts and present their findings in
the wider academic community.
________________________
Greer/Guthrie 25
Learning Technology Services
16. It is not clear if an adequate budget has been developed and funds are available to
successfully conduct the program. Several faculty have indicated interest in
converting programs to distance education, but no money is available as of yet for
later development. With the uncertain and late-arriving funding, it is difficult to
inspire faculty confidence in the future of the program.
17. Dr. Butler was also pursuing partnerships with various NC community colleges
(e.g. Nash, Edgecombe, Central Carolina). She worked with Carteret to develop a
feeder program into the Science Education program at NCSU, and a brochure was
created for students. With Central and Nash, she had made initial contact visits and
demonstrated to them the Carteret program. These relationships need to be
resuscitated to avoid credibility gaps for the NCSU AL Science Education
program.
18. The relationship of the AL program to NC Teach should be clarified. John Penick
believes that there are insufficient funds to participate, but the advantage of NC
Teach is that it can reach Lateral Entry students before they teach. He also is
concerned about the extent to which he can modify NC Teach materials.
19. A comprehensive program website needs to be developed and maintained once
above issues have been addressed.
Support
20. In general, the AL program needs to work with DELTA to make sure all student
and faculty support services are readily available and working, and that students
and faculty are fully aware of these services.
Marketing & Promotion
21. Strategic market planning needs to be conducted for the Accessible Licensure
program. Critical to the planning is agreement upon program goals, objectives,
results of a market analysis, target audience(s) and products. To date, the defining
of these foundational components is underway; however, it is not yet complete.
Building upon the program foundation, marketing for the program will be better
able to work with university members and institution partners to design and
develop an appropriate campaign and associated media. Program administrators
may consider working with DELTA’s Distance Education and Marketing Services
Office.
22. Similar to the market planning noted above, a market analysis may have been
conducted, but very little information is presently available about the results.
Program administrators should take a closer look at competition in- and out-of-state
to clearly identify distinguishable competitive advantages, opportunities and areas
of overlap. In addition, this process should take into consideration not only the
acquisition of enrollments, but that the appropriate audiences for the program are
________________________
Greer/Guthrie 26
Learning Technology Services
indeed being targeted to assist in reducing potential attrition and increasing
“goodness of fit” for both the student and the institution. Distinguishing the
program from other state and institutional outreach efforts, such as NC Teach,
needs to be considered.
23. Currently DELTA’s marketing efforts include solid mechanisms for tracking
prospective students. The College of Education may desire to work closely with
DELTA’s Marketing Services Office to gather data on the effectiveness of selected
marketing strategies for prospective students. With respect to current students, it
will be critical to quickly create a means (i.e., a database with web entry interface)
that assists with data maintenance and to coordinate with key university
stakeholders on data acquisition, where data may include demographic data,
employment status, goals, number of courses taken, attrition, etc. This information
should tie closely to programmatic evaluation and assessment and may include
random entry and exit interviews.
24. A communication plan should be developed that covers the first two years of
program marketing.
Production & Maintenance
25. A program website should be created for promotion and support once the program
mission, revised objectives and revisited audience has been further defined. This
website should visually and functionally “tie in” with the standard templates for the
courses, and be a part of the WebCT LMS, as well as offer links to the College of
Education and university.
26. Guidelines for initial course development and maintenance should be established
and agreed upon by College of Education departments and faculty participating in
the AL program. Developing the courses is only a first step. How much each
course can be changed by subsequent teachers, as well as who will oversee quality
and accessibility considerations, must be determined, and timelines established for
these tasks.
27. Class rosters and grade rolls should be readily available online and student
administrative information should readily interface with the rest of the campus
databases. Use of WebCT (particularly VISTA) in most, if not all online classes,
will facilitate this task.
Delivery
28. Program goals and target audiences must be defined before identifying the
technology(ies) that will serve as cornerstones of this program. Faculty should be
given a breadth of supporting technologies to select from, provided institutional
infrastructure, technical support, and faculty development is available.
________________________
Greer/Guthrie 27
Learning Technology Services
29. Technologies required by individual faculty may vary based on educational
objectives, yet consistency and simplicity of course delivery is critical to faculty
and student comfort levels and as such, the use of a university supported learning
management system (i.e., WebCT) for a framework for faculty to build within and
around is strongly recommended. Use of a LMS would also assist in protecting
copyrighted and course materials, provide an architecture that generally adheres to
instructional design principles and ADA compliance, and provide a set of
collaboration and communication tools.
30. All participating faculty should be involved in faculty development that addresses
both the technology(ies) selected for the program and instructional strategies
associated with selected technologies. If possible, customized sessions that are
program specific should be held, which allow for faculty to share best practices.
31. CD-ROM and videotaped materials take additional time and expertise to create and
distribute. Courses requiring these delivery formats should be identified as quickly
as possible.
32. Delivery and maintenance schedules should be developed by
College/Department(s) and faculty.
Evaluation & Assessment
33. A program evaluation plan must be developed to include objectives, instruments,
measures, milestones and resources required. The plan should take into
consideration evaluation and assessment at the partner, program and participant
levels.
34. The College of Education may consider working closely with DELTA
organizations and/or university constituents such as University Planning &
Analysis, Records & Registrar, Disabilities & Student Services, Personnel,
Library, Information Systems, etc.
35. Per faculty request, customized evaluations should complement standard course
evaluations as an incentive for faculty research and scholarship.
________________________
Greer/Guthrie 28
Learning Technology Services
Accessible Licensure Program in Science Education
Accessible Licensure: Fiscal Year 2003-2004 Proposed Deliverables
After two years, the NCSU Accessible Licensure program is off to a good start. However, if it is
to successfully continue, additional tasks need to be considered. In the original Business Plan,
the Year Three Objectives included:
 Revise/adapt advanced licensure coursework including EMS 594M (Readings I) and
EMS 594W (Readings II).
 Implement revised courses via distance education venues, including EMS 475
(Methods of Teaching Science), EMS 476 (Student Teaching in Science), and EMS
495 (Senior Seminar in Science Education).
 Implement the newly developed 300/500 science education course via a distance
education venue.
 Implement revised courses via distance education venues, including PSY 304 and
PSY 476.
 Continue to recruit faculty from PAMS and Agriculture and Life Sciences to adapt
science content courses in Biology, Physics, Chemistry, and Earth Science for
distance education venues. Targeted courses include MEA 410, PY 123, PY 124, PY
126, PY 203, PY 341, PY 341, MEA 451, CH 223, CH 331, CH 315, BCH 451, BO
360, and ZO 421.
 Recruit faculty currently teaching general education required classes to adapt such
courses for distance education venues. Targeted courses include: 100 and 200 level
PE courses, history elective, social science elective, humanities elective, literature
elective, history/philosophy of science elective, philosophy/religion/art elective,
multicultural elective.
 Submit grant proposals to federal, state, and private sources to retain funding for
travel, graduate teaching assistants, project coordinator, and/or any further revision of
courses needed.
The Year 3 objectives should be revisited, as well as the unfinished tasks originally proposed for
Years 1 and 2 (see Status Report, Section II). While some of these tasks have been
accomplished or are on track, many are not. One of the primary challenges discussed in the
Findings and Recommendations section includes recruiting new faculty for interdisciplinary
courses. Some of the deliverables needed to accomplish this and other goals could include:
 Program/Curriculum Development Plan. Including updated list of courses, with
specifics on when they will be developed, piloted, taught and by which faculty.
 Program Path/Map for Students. What are the various sequences of courses different
student audiences can take to attain their licensure and possibly a degree?
 AL Faculty Development/Training Plan. How and when will AL faculty learn the
skills they need to successfully develop and teach online? Which additional skills are
needed? What additional materials will they require? (A guide to acquaint new AL
________________________
Greer/Guthrie 29
Learning Technology Services
faculty to generic online design principles and use of templates for the program has
been developed and is appended to this report.)
 Evaluation/Assessment Plan and Implementation. Collect data throughout the year
on enrollments, attrition, student satisfaction, number of distance education students
served, grouping data by degree and/or certification sought by the student. Solicit
student evaluations of courses and of new technologies utilized. Solicit faculty
evaluations of courses and of new technologies utilized. Compile data collected by
individual faculty conducting research related to the revised/new courses. Write
Year-End Report.
 Development and Maintenance of Program Web Site. Includes curriculum, plus
general information on program advising, registration, library, textbooks information,
etc.
 Marketing and Communications Plan. Includes results of market analysis, marketing
strategies, marketing campaign information, required media, budget and two-year
communications plan.
 Project Plan for all of the above. Includes resources, milestones and dependencies
for implementation.
Progress cannot be achieved without an interdisciplinary program planning committee, as was
discussed in Findings and Recommendations. Scheduling the presentation to members of the
Department of Mathematics, Science and Technology Education to demonstrate capabilities and
opportunities of distance education programs is vital to continuing the good work that has been
accomplished to date in the NCSU Accessible Licensure program. Such a presentation could
provide fertile ground for the emergence of a faculty and administrative groundswell needed for
the program’s continued success.
________________________
Greer/Guthrie 30
Learning Technology Services
Accessible Licensure Program in Science Education
Appendix A: Course Listing
________________________
Greer/Guthrie 31
Learning Technology Services
CourseandProgramInformation,FacultyandStaffing,CourseDeliveryandSupportforEMSDistanceEducationCourses–updated
Coursesinboldtobedevelopedby6/30/03aspartofYr2plan
Coursesfoundonncsu.edu/sciencejunction(exceptwherenoted)
Number & Title
Cred
its
Degree/Certificate Developed/
Taught By
Type of Load Technologies To
Be Utilize
Status
(developed,
piloted/revised,
taught)
Comments
#1 priority course to
develop EMS 203 Intro
to Teaching Science
3 BS in SED, MSS Butler/Butler Regular Interactive
Television
Developed New DE
instructor
unknown;
videotapes not
usable for future
courses (except
excerpts). May
be taught in
Spring 2004.
EMS 375 Methods in
Science Ed I (use modules
from EMS 475)
3 BS and Licensure in
SED, MSS
Parsons/Parsons
?
Regular WebCT, video,
CD and computer
labs and the
equipment
therein (e.g.
smartboard,
projection) to
supplement face-
to-face
meetings.
Not developed New course;
teaching in 2005
EMS 475 Methods of
Teaching Science
3 BS in SED, MSS Butler/Jones Regular Interactive
Television,
Video
Taught every fall Modules; no
revisions needed
EMS 476 Student Teaching
in Science
8 BS in SED, MSS Management
Team/Graduate
Teaching
Assistants
Regular Web, Video,
Face-to-Face
Observations
Taught every fall Taught later
EMS 477 Instructional 3 BS in SED, MSS Park/Park Regular Web Taught every fall Modules; no
Materials in Science revisions
needed--JP
EMS 495 Senior Seminar in
Science Education
2 BS in SED, MSS Parsons/Parsons Regular WebCT, F2F Developed June
2002
Fall 2003, F2F
meetings will be
decreased
in number and
the WebCT
discussion
boards,
chatrooms and
other WebCT
components will
be used more
often.
EMS 501 Readings I 1 Advanced
Licensure in SED,
MSS
Slykhuis
(developer
only)/Park?
Regular Web (100%) Online Fall 02;
revisions by
6/30/03
Teaching in Fall
2004;
enrollment 100
EMS 502 Readings II 1 Advanced
Licensure in SED,
MSS
Park/Park Regular Web (100%) Developed by
6/30/03
Teaching in fall
2003;
enrollment 100
EMS 531 Intro to
Research in Science
Education
3 Advanced
Licensure in SED,
MSS
Reid-Griffin
(developer);
Park/Carter
(instructors)
Regular CD/web-
enhanced
Developed by
6/30/03; taught
odd yrs
Enrollment: 20
EMS 573 Technological
Tools in Science
3 Licensure in SED,
MSS
Park/Park Overload Web - how
much F2F in
future?
Taught summer
02
No revisions
needed; used to
be EMS 594I;
Online; hard to
teach online?
EMS 594K Methods for
Teaching Science
3 Licensure in SED,
MSS
Holley/Holley Adjunct
Faculty
Interactive
Television,
Video, Web ??
Will be taught
next spring F2F
Similar to EMS
476; partially
developed for
DE; needs
additional
funding to finish
DE development
EMS 594 Introduction to
using Geographic
3 Advanced
Licensure in SED,
Hagevik/Hagev
ik
Overload WebCT (100%) Developed by
Fall 03; Taught
New course;
open labs;
________________________
Greer/Guthrie 33
Learning Technology Services
Information System (GIS)
in Earth/Environmental
Science
MSS in spring 04 enrollment 25
TED 359 – Electronics
Technology
3 BS Degree;
Licensure in TED,
MSS
Haynie/Haynie Overload Blended (2
weekend labs);
some video
Ready by fall 03 Taught every
fall; enrollment
30 (10 distance)
many students
may choose 359
TED 556 – Lab
Management & Safety
3 BS Degree;
Licensure in TED,
MSS
Haynie/Haynie Overload Blended Taught spring 03 Taught every
spring
http://www4.ncsu
.edu/~wjhaynie/te
d556/; most
students will
need 556
Until facultyareidentifiedfromPAMS,AgricultureandLifeScience,GeneralEducationRequiredCoursesandPsychology,
informationastodeveloper/teacher,typeofload,andtypeoftechnologytobeutilizedcannotbeascertained. Allcoursesarerequiredfor
BSinSEDandMSS. Manyofthesciencecoursesarealsorequiredforparticularsciencemajors(Biology,Chemistry,Physics,etc.).All
courseslistedare3-4semesterhourcoursesotherthanthetwoPEcourses,whichare1semesterhoureach.
________________________
Greer/Guthrie 34
Learning Technology Services
Timeline for Science Education Courses Development and Implementation
Course Year One (2002) Year Two (2003) Year Three (2004) Year Four (2005)
EMS 203 Implement
EMS 477 (will be EMS 373) Revise/Adapt Implement
EMS 594K Revise/Adapt Implement
EMS 594I (EMS 573) Revise/Adapt Implement
EMS 501 (formerly EMS
594M)
Revise/Adapt Implement
EMS 502 (formerly EMS
594W)
Revise/Adapt/Implement
EMS 531 Revise/Adapt/Implement
EMS 475 Revise/Adapt Implement
EMS 495 Revise/Adapt Implement
EMS 375 (new course) Create/Develop Implement
EMS 594M Revise/Adapt Implement
EMS 594W Revise/Adapt Implement
Original timeline for Foundation Courses Development and Implementation
(all of the following are not confirmed at this time and year two timelines are incorrect)
Course Year One Year Two Year Three Year Four
NR ??? Revise/Adapt/ Implement?
MEA 410 Revise/Adapt Implement
PY 123 Revise/Adapt Implement
PY 124 Revise/Adapt Implement
PY 126 Revise/Adapt Implement
CH 223 Revise/Adapt Implement
BCH 451 Revise/Adapt Implement
BO 360/365 Revise/Adapt Implement
PY 203 Revise/Adapt Implement
PY 341 Revise/Adapt Implement
MEA 451 Revise/Adapt Implement
CH 331 Revise/Adapt Implement
________________________
Greer/Guthrie 35
Learning Technology Services
CH315 Revise/Adapt Implement
ZO 421 Revise/Adapt Implement
Original timeline for Other Required Courses Development and Implementation
(all of the following in this section are question marks)
Course Year One Year Two Year Three Year Four
PSY 304 Revise/Adapt Implement
PSY 475 Revise/Adapt Implement
PE 1__ Revise/Adapt Implement
PE 2__ Revise/Adapt Implement
History Elective Revise/Adapt Implement
Social Science Elective Revise/Adapt Implement
Humanities Elective Revise/Adapt Implement
Literature Elective Revise/Adapt Implement
Hist/Philos Sci Elective Revise/Adapt Implement
Philos/Reli/Art Elective Revise/Adapt Implement
Multicultural Elective Revise/Adapt Implement
Can be used for Science LE program (All of the Pure Science Classes could also be used)
2)EMS 594K Methods for
Teaching Science
3 Licensure in SED, MSS Holley/Holley Adjunct Faculty? Interactive Television,
Video, Web
3)EMS 573 Technological
Tools in Science
3 Licensure in SED, MSS Park/Park Overload Web
4)EMS 501M Readings I 1 Advanced Licensure in SED,
MSS
Slykhuis/Park? Regular Web
Can be used for ALL LE programs
1)PSY 304 Now listed as EDP 304 Revise/Adapt Implement
5) PSY 475
Now listedas PSY476
Revise/Adapt Implement
6)Multicultural Elective Revise/Adapt Implement
________________________
Greer/Guthrie 36
Learning Technology Services
________________________
Greer/Guthrie 37
Learning Technology Services
Accessible Licensure Program in Science Education
Appendix B: Licensure Programs in North Carolina
“Constituent institutions with teacher education programs approved by the State Board of
Education may offer specific course clusters in approved teacher licensure areas which meet
licensure requirements of the State Board of Education but do not lead to the conferral of a
particular degree or a Certificate of Advanced Study. These may be at the entry level or
advanced level of teacher licensure.[…] A current inventory of teacher licensure programs
approved by the State Board of Education is available from the North Carolina Department of
Public Instruction.”
Public Institutions (North Carolina University System)
EAST CAROLINA UNIVERSITY
(http://www.coe.ecu.edu/teached/teached.htm)
ECU offers a total of 27 licensure areas, of which 4 are math and science related. Two of these four are designated for
middle grades. Extensive information on alternative licensure programming and lateral entry licensure options is available
in East Carolina’s Teacher Education handbook: http://www.coe.ecu.edu/teached/ABwelcome.htm.
UNC-ASHEVILLE
(http://www.unca.edu/education/catalog/licensure.htm)
UNC-Asheville provides both primary and secondary education licensure options. Secondary licensure options
associated with science and math include Biology, Chemistry, Mathematics, Physics, and Science. The Teacher
Education program is offered at the baccalaureate level (Class "A" Licensure) for undergraduate and postgraduate
students. In addition to the appropriate education program, undergraduates must complete the general education
requirements of the University and the requirements of a major department in the University. Postgraduates with a
baccalaureate degree and a grade point average of 2.50 from an accredited college or university need to complete the
appropriate education program and also any requirements for a major appropriate to their own area of specialization but
lacking in their prior academic experience. A handbook is available that details clinical and academic requirements. The
handbook is posted at http://www.coe.ecu.edu/teached/ABwelcome.htm. Web-based information on each secondary
licensure program is also available. Reference links are provided directly below.
Math Licensure: http://www.unca.edu/education/catalog/math9-12.htm
Biology Licensure: http://www.unca.edu/education/catalog/science9-12.htm
Physics Licensure: http://www.unca.edu/education/catalog/science9-12.htm
Science Licensure: http://www.unca.edu/education/catalog/science9-12.htm
Chemistry Licensure: http://www.unca.edu/education/catalog/science9-12.htm
UNC-CHARLOTTE
(http://education.uncc.edu/teal/ and http://education.uncc.edu/mdsk/)
UNC-Charlotte provides both initial and advanced licensure programs. For students entering a program to acquire initial
licensure, areas available for licensure that relate to science and mathematics include Mathematics, Biology, Chemistry,
Earth Science, Physics, and Comprehensive Science. A program overview and requirements section is placed directly
below, and is followed by information on UNC-Charlotte’s offerings for advanced licensure.
Degree Requirements: The undergraduate program in secondary education requires a major in the College of Arts and
Sciences in a discipline relevant to the curriculum in grades 9-12 and a maximum of 128 hours as follows:
General Education (26-41 hours). These course requirements vary with a student’s academic major in arts and sciences
and are defined by faculty in each major.
Core and Related Courses in an Appropriate Arts and Sciences Major (30-78 hours). Academic majors relevant to
secondary education include English, History, Mathematics, Biology, Chemistry, Earth Sciences, and Physics. The
requirements for each major are defined by faculty in that major.
Secondary Education (44 hours)
EDUC 2100 An Introduction to Education and Diversity in Schools (3)
SPED 2100 Introduction to Students with Special Needs (2)
(Corequisite courses EDUC 2100 and SPED 2100 should be taken during a student’s sophomore year; both must be
completed with a grade of "C" or better for the student to qualify for admission to the Teacher Education Program in the
selected field of secondary education)
SECD 3140 The Adolescent Learner (3)
SECD 3141 Secondary Schools (3)
MDSK 3150 Research and Analysis of Teaching Middle and Secondary School Learners (3)
MDSK 3151 Instructional Design and the Use of Technology with Middle and Secondary School Learners (3)
KNES 3152 Health and Safety Issues in Middle and Secondary Schools (2)
SECD 3142 Issues in Secondary Education (2)
SPED 3290 Modifying Instruction for Learners with Diverse Needs (2)
MDSK 4251 Teaching Science to Middle and Secondary School Learners (3) or
MAED 4252 Teaching Mathematics to Secondary School Learners (3) or
MDSK 4253 Teaching Social Studies to Middle and Secondary School Learners (3) or
ENGL 4254 Teaching English/Communication Skills to Middle and Secondary School Learners (3)
READ 3255 Integrating Reading and Writing Across Content Areas (W) (3)
SECD 3441 Student Teaching/Seminar: 9-12 Secondary Science (15) or
SECD 3442 Student Teaching/Seminar: 9-12 Secondary Mathematics (15) or
SECD 3443 Student Teaching/Seminar: 9-12 Secondary Social Studies (15) or
SECD 3444 Student Teaching/Seminar: 9-12 Secondary English (15)
Information on advanced licensure is available at http://education.uncc.edu/teal/page11.htm. All programs lead to a
Master of Education, a Master of Arts degree and/or a teaching license. A program overview of the advanced
licensure/degree option is provided below.
Program Overview: This 39-hour program is designed to provide programs of advanced study which are built upon a
body of knowledge and expertise common to educational professionals. The program is composed of five strands that
concentrate on developing knowledgeable, effective, reflective and responsive practitioners who will become leaders in
the profession. The program includes study in areas such as educational research methodology, curriculum theory,
analysis of teaching, advanced methodology, and curriculum material development including the application of technology
in teaching. In addition, the program includes advanced coursework in the candidate's respective discipline (i.e., Social
Studies, Biology, Chemistry, Physics and Earth Science). Courses are also appropriate for teacher licensure renewal or
individual professional growth.
UNC-PEMBROKE
(http://www.uncp.edu/soe/)
UNC at Pembroke offers both undergraduate and graduate licensure programs. Information on graduate programs is
located at http://www.uncp.edu/soe/undergraduate.htm. Information for graduate programs is provided at
http://www.uncp.edu/soe/graduate.htm. At the undergraduate level, 12 licensure areas of offered. Those related to
science and math include Biology, Mathematics, and Science. Little information was available on the web site that
addresses program information or requirements at the undergraduate level. Similarly, the graduate program pages
requested contact be made with the School of Graduate Studies for more information.
UNC-WILMINGTON
(http://www.uncwil.edu/ed/degrees.html)
UNC-Wilmington offers secondary education licensure programs in seven primary areas, with Mathematics and Science
being two of them. A detailed overview of the Mathematics Licensure is available at
http://www.uncwil.edu/ed/deglicenpdfs/mathjuly2002.pdf. The course requirements are listed below.
Mathematics Licensure Requirements
Students who plan to become licensed teachers in the North Carolina public schools must complete the university’s
Basic Studies expectations, all requirements in the major, and be formally admitted to the Watson School of
Education. Requirements for admission are listed in the UNCW Undergraduate Catalogue, and also are listed on the
Program Information handout available in King 211. In addition to the requirements for the academic major, the
Psychology and Education courses listed below are required for licensure. A grade of “C” or better must be earned in
the following courses:
PSY 223 Lifespan Human Development (3)
EDN 200 Teacher, School and Society (3)
EDNL 200 Field Studies (1)
EDN 203 Psychological Foundations of Teaching (3)
EDN 301 Instructional Design and Evaluation (3)
EDN 303 Instructional Technology (3)
NOTE: The courses listed below require admission to the Watson School of Education.
EDN 321 Meeting Needs of Special Students in High Schools (2)
EDN 356 Reading in the Secondary School (3)
EDN 402 Classroom Management in Secondary Schools (1)
EDN 404 Theory and Practice in Teaching Secondary Mathematics (3)
EDNL 404 Field Experience in Secondary Mathematics (1)
________________________
Greer/Guthrie 39
Learning Technology Services
EDN 408 Instructional Seminar (2)
EDN 409 Practicum (12) Total = 40 semester hours
A detailed overview of the Science Licensure is available http://www.uncwil.edu/ed/deglicenpdfs/sciencejuly2002.pdf.
The course requirements are listed below.
Science Licensure Program
In addition to the requirements for the academic major, the Psychology and Education courses listed below are
required for licensure. A grade of “C” or better must be earned in the following courses:
PSY 223 Lifespan Human Development (3)
EDN 200 Teacher, School and Society (3)
EDNL 200 Field Studies (1)
EDN 203 Psychological Foundations of Teaching (3)
EDN 301 Instructional Design and Evaluation (3)
EDN 303 Instructional Technology (3)
NOTE: The courses listed below require admission to the Watson School of Education.
EDN 321 Meeting Needs of Special Students in High Schools (2)
EDN 356 Reading in the Secondary School (3)
EDN 402 Classroom Management in Secondary Schools (1)
EDN 406 Theory and Practice in Teaching Secondary Science (3)
EDNL 406 Field Experience in Secondary Science (1)
EDN 408 Instructional Seminar (2)
EDN 409 Practicum (12) Total = 40 semester hours
Private Institutions
BARTON COLLEGE
(http://www.barton.edu/Schools/doe/Secondary.htm#anchor105836)
Students seeking licensure will major in the desired content area and will also take methods courses required for licensure
in the area. (General Catalog not available online for review. NOTE, four areas offered for licensure were stated on
website, however only Social Sciences, English and Math were listed.)
CAMPBELL UNIVERSITY
Licensure Requirements for Secondary Education
(http://www.campbell.edu/education/proedu/sve.html)
All students seeking licensure as secondary, K-12, or vocational education teachers, are required to take Art 131, Music
131, or Drama 131 which will meet the general education requirement for the fine arts area. They must also complete two
mathematics courses as designated by the major. CIS 125, Introduction to Computers, is strongly recommended as a
substitute for one mathematics course. Additional courses are required as part of the general education requirements and
two laboratory science courses, Religion 101 and a religion elective, Exercise Science 185 and 111 or 112.
Mathematics (9-12 Licensure) (CIP 13.1311)
Twenty-nine semester semester hours in mathematics above the 200-level including courses in linear algebra, geometry,
probability and statistics, modern algebra, and computer science. It is recommended that eight semester hours of physics
or chemistry be completed as well.
Biology (9-12 Licensure) (CIP 13.1322)
A minimum of thirty-five semester hours including Biology 111, 202, 203, 205, 327 or 542, 342, and 430 or 437;
Mathematics 112 or 122, and 160; Chemistry 111, 113, and 227; Physics 221 and222; Science Education 453; and the
professional education sequence.
Professional Education Sequence:
Students desiring licensure in a secondary teaching area (9-12), Spanish or French (k-12), music (Kk-12), physical
education (K-12) or Family and Consumer Sciences (7-12) education must meet all the admission criteria of the Teacher
Education Program and complete the following courses: Psychology 222; the pertinent subject area methods course
(offered in the spring semester of the senior year as block courses prior to student teaching), and the following Education
courses:
1. EDUC 221 Introduction to Education (3)
2. EDUC 225 Writing Seminar (3)
3. EDUC 341 Child and Adolescent Development (3)
4. EDUC 385 Curriculum Trends in K-12 and Secondary Education (3)
5. EDUC 431 Educational Psychology (3)
6. EDUC 432* Practicum (1)
7. EDUC 441 Teaching Reading in the Middle and Secondary School (3)
8. EDUC 453 Effective Teaching Strategies (Secondary and K-12) (3)
________________________
Greer/Guthrie 40
Learning Technology Services
9. EDUC 454 Student Teaching Seminar (3)
10. EDUC 458 Student Teaching (Secondary, K-12, and Vocational (6)
DUKE UNIVERSITY
Secondary Science Teacher Preparation Program
(http://www.duke.edu/web/education/secondary/subjects/science.html)
To become eligible for North Carolina Level A Licensure for Grades 9-12, a student must successfully complete those
courses required by Duke in General Studies, courses required for the science major, and certain courses in the area of
professional knowledge. Students must major in a biological or physical science or an approved interdisciplinary program,
with a total of at least 14 courses distributed among biology, chemistry, geology and physics. Students must acquire
competencies in biology, chemistry, physics and earth science required by the state of North Carolina.
Students must meet the requirement for general studies.
- Curriculum 2000 students need 3 or more courses in Arts and Literatures; Civilizations; Natural Sciences and
Mathematics; or Social Sciences. All requirements for Curriculum 2000 must be met.
- One course in Psychology (e.g., Developmental or Adolescent)
Students must meet the following professional studies requirements.
- Foundations of Education (Edu 100, fall or spring)
- Trends, Techniques & Innovative Technologies (EDU 190, fall)
- Educational Psychology (Edu 118, senior spring)
- Seminar in Secondary School Teaching - discipline methods (Edu 215S, senior spring)
- Secondary Education Internship - student teaching (Edu 216, senior spring) *counts 2 cc.
Coursework and field experiences in the professional knowledge area are sequenced. For example, students complete
Educational Psychology (Edu 118) and the Seminar in Secondary School Teaching (Edu 215S) in the spring semester of
their senior year as part of the student teaching block. Edu 118 and Edu 215S are accelerated during the spring semester
to provide students an opportunity to engage in student teaching for ten weeks. A course may meet more than one
requirement; for example, some Education courses count as Social Science electives. Candidates must acquire
professional knowledge and specialty area competencies required by the state of North Carolina. Requirements may be
met through advanced placement, Duke course credit, independent study, or other means approved by the Director of the
Program in Education.
ELON UNIVERSITY
Secondary Education Licensure/Teacher Education Program (35 sh)
(http://www.elon.edu/academics/education/edudept/second.asp)
The student who successfully completes any of the teacher education programs at Elon will be eligible for licensure to
teach in North Carolina. The student planning to teach at the high school level completes a major in a discipline and the
necessary Professional Studies courses for teacher licensure at the secondary level (grades 9-12). Secondary education
licensure is available in biology, chemistry, comprehensive science, English, history, mathematics, physics and social
studies. Specific requirements for each program are listed with the appropriate department in this catalog. In general, the
following Professional Studies courses must be satisfactorily completed:
EDU 211 Introduction to Education with Practicum 4 sh
EDU 322 Reading in the Content Areas 2 sh
Choose an appropriate methods course: 4 sh
EDU 421 Materials and Methods of Teaching Middle Grades and High School English
EDU 422 Materials and Methods of Teaching Middle Grades and Secondary Mathematics
EDU 424 Materials and Methods of Teaching Middle Grades and Secondary Science
EDU 425 Materials and Methods of Teaching Middle Grades and High School Social Studies
EDU 430 Foundations of Education 3 sh
EDU 450 Meeting Special Learning Needs of Children 3 sh
EDU 480 Student Teaching Seminar 2 sh
EDU 481 Supervised Observation and Student Teaching 10 sh
CIS 220 Computers and Teaching 3 sh
(Not required for Mathematics Education majors)
PSY 321 Educational Psychology 4 sh
LEES-MCRAE COLLEGE
(Information not available via current university website. Catalog/Handbook not online.)
LENOIR-RHYNE
(http://www.lrc.edu/edu/majors.htm)
________________________
Greer/Guthrie 41
Learning Technology Services
Lenoir-Rhyne College offers related undergraduate Licensure programs in Biology, Chemistry, Mathematics, Physics and
Science for Teachers. An average of 20 additional credits is required to obtain a licensure. The following URLs link to
Adobe Acrobat files that detail the requirements to receive licensure in each of the above areas.
Biology http://www.lrc.edu/edu/pdfFiles/checksheets/9-12%20bio.pdf
Chemistry http://www.lrc.edu/edu/pdfFiles/checksheets/9-12chem%20.pdf
Mathematics http://www.lrc.edu/edu/pdfFiles/checksheets/9-12mat.pdf
Physics http://www.lrc.edu/edu/pdfFiles/checksheets/9-12phy%20doc.pdf
Science for Teachers http://www.lrc.edu/edu/pdfFiles/checksheets/9-12gssci.pdf
________________________
Greer/Guthrie 42
Learning Technology Services
Accessible Licensure Program in Science Education
Appendix C: Course-Related Considerations
Planning & Engagement
 Notification/Introduction to Course
 Course Components
 Student Assessment (Entering
Characteristics/Knowledge)
 Textbooks/Course Packs
 Technology Orientation
(Faculty, Student, Assistants)
 Faculty Development
 Instructional Technology Assistant
Program (ITAP)
 Hardware/Software Requirements
 Hardware/Software Resources
(University, Specialized)
 Fiscal/Resource Availability &
Requirements
 Faculty Research/Scholarship Goals
Design & Production
 Project Management
 Instructional Technologies & Tools
 Instructional Design
 Graphics Development
 Multimedia Development
 Web Application Development
 Video Production and Direction
 Database Development
 Copyright Acquisition
 Curricular Assessment
 Assessment of Learning (Tools and
Techniques)
Delivery & Support
 InfoFacts Preparation (if applicable)
 Textbook/coursepack orders
 E-reserves
 Intellectual Property considerations
 CD-ROM Development
 CD-ROM Distribution
 VHS Distribution
 Cable Broadcast
 Student Services
 Server Requirements
 FTP Requirements
 Hardware Requirements
 Software Requirements
 Technical Support Agreement
 Student Orientation
 Graduate Assistant Orientation
 Technology assessment
Other Evaluation & Assessment
 Standard DELTA course assessment
 Customized course assessment
 Instructor Evaluations (Online, Paper)
Accessible Licensure Program in Science Education
Appendix D: Marketing Opportunities and Venues
The purpose of this Appendix is to present an overview of marketing and promotion of the
Accessible Licensure Program. Encompassed within this overview are (1) key program issues,
(2) marketing opportunities, (3) a sample campaign, and (4) possible venues, placement types
and associated advertisement information/rate card links where available.
KEY PROGRAM ISSUES
There are a number of key issues influencing the capacity to market and promote the Accessible
Licensure Program. These issues are listed below:
 Marketing efforts do not presently exist that specifically target the Accessible Licensure
program. In part this is due to the fact that there is already a high demand for the courses
included in the AL program and that the target audiences, program products and program
goals have not been fully defined.
 With respect to those students either previously or currently enrolled in the program
courses, there is the concern that they are predominantly ‘self-selected’ and, as a result,
are found to have higher attrition rates or not an appropriate fit for the program.
 A market analysis has not been conducted, or the results are no longer available. As a
result, uncertainty exists with respect to certain environmental factors such as market
segment, market needs, market advantage, and competition.
 Presently, the relationship is unclear with respect to the Accessible Licensure Program
and North Carolina’s NC Teach initiative. It is possible that a resource conflicts may
exist for delivery of the AL program and that NC Teach may draw from the pool of
potential program candidates.
MARKETING OPPORTUNITIES
Generally, colleges and departments are responsible for marketing and promoting their own
programs. However, four primary marketing modes are readily available for the promotion of
the Accessible Licensure program – two of which are available through NC State. The first is to
market the program through established NC State networks, which might include bundling
informational media with general lateral entry marketing, partnering with science and math
marketing presently being conducted, or marketing to military networks available to NC State.
A second marketing mode readily available to the College of Education are the marketing
campaigns conducted by DELTA for all distance education courses and programs. This may be
supplemented by assistance from DELTA’s Marketing Services Office for electronic or print
campaign design and selection recommendations, partnering, and creative media design and
production. The third marketing mode is external to NC State and resides with efforts being
conducted by community colleges and other partners. Finally, if programs are find it in their best
interest, campaign design, implementation, management and evaluation can be contracted to an
external source – as can the development of creative print or electronic media.
SAMPLE DISTANCE EDUCATION CAMPAIGN BY DELTA
Currently DELTA marketing efforts are acquisition-based, versus a branding thrust, and
predominantly in-state and with electronic media. General distance advertisements, to include
________________________
Greer/Guthrie
Learning Technology Services
44
highlighting of Flexible Access programming, primary target the triangle and triad areas.
Communication plans generally run on a 3-cycle year while individual marketing campaigns are
predominantly semester-based. Sample venues, including direct mail catalogs, are available
upon request for courses and programs. Other options include press releases/
banner/bookend/sponsorship advertisements, text advertisements, and pushed email to purchased
lists. Integrated into the marketing campaigns whenever possible are mechanisms for tracking
prospective students. For example, when requesting a catalog or clicking on an advertisement, a
database is used to store information and then follow-ups are made either through the delivery of
program materials, such as a CD-ROM or brochure, a telephone call or email.
Example Marketing Campaign:
 Marketing within current DELTA marketing for distance education
o Distance Education Course Catalog
o Vinyl Banners for on-campus publication
o Online program and course listings
o Distance Education Electronic Campaigns
 Example Campaign, Spring 2003
• Career Journal
• Careermarketplace
• College Journal
• NewsObserver
• WRAL.com
• Wall Street Journal
• Yahoo Banners
• eList Marketers
• enr.com
POSSIBLE VENUES, PLACEMENT FORMATS AND COSTS
The table below provides marketing organized within the categories of Newspapers, Electronic,
Media and Other. Use of the venues varies at NC State. The list is by no means exhaustive.
Where available, types of common placements, associated placement information, and links to
advertising information/rate cards are provided.
Category Placement
Type(s)
Related Information
(i.e., URL, Target Audience)
Advertising Information
and/or Rate Card Links
Newspapers
(Online/Print)
Raleigh News &
Observer
Variable http://www.news-observer.com/ http://about.newsobserver.com/display/
Durham Herald Variable http://www.herald-sun.com/ http://www.heraldsun.com/advertisinginfo/
Fayetteville
Observer
Variable http://www.fayettevillenc.com/ advertising@fayetevillenc.com
Greensboro News
& Record
Variable http://www.news-record.com/ http://www.news-record.com/advertising/
________________________
Greer/Guthrie
Learning Technology Services
45
Category Placement
Type(s)
Related Information
(i.e., URL, Target Audience)
Advertising Information
and/or Rate Card Links
Winston-Salem
Journal
Variable http://www.journalnow.com/ http://www.journalnow.com/servlet/Satellite?
pagename=WSJC%2FPage%2FWSJC_
ContentPage&c=Page&cid=1051216105615
Charlotte Observer Variable http://www.charlotte.com/mld/observer
/
na
Wall Street Journal Variable Registered Users, Target NC
http://online.wsj.com/public/us
http://advertising.wsj.com/
Electronic
Career Journal 120x600 Banner, Target NC
EI Academic Variable Annual Listing, Target International
eLearners.com Variable Annual Listing, Target International
Petersons.Com Variable Annual Listing, Target International
Career Market
Place
Variable Career specific site targeting
College Journal 120x600 Banner, Target NC
WRAL.com 120x90
378x150
200x30
468x60
120x90
Education Page Tile Sponsor
Rotating Spotlight
Rotating Bookend Ad
News Channel
Weather Channel
Yahoo.com 728x90
300x250
120x600
Occupation-based Target, NC
Occupation-based Target, NC
Occupation-based Target, NC
NewsObserver 120x60
Text link
468x60
250x250
120x90
Education Guide Sponsor, Target NC
Banner
Banner
Banner
eList Marketers 4.28
5.5
5.12
4.28
Occupation-based Email Drop
Occupation-based Email Drop
Occupation-based Email Drop
HR-based Target Email Drop
enr.com 468x60 Banner, Target NC
Media
________________________
Greer/Guthrie
Learning Technology Services
46
Image Piece
Brochure
2-, 4-color Program Specific, Target Variable
Category Placement
Type(s)
Related Information
(i.e., URL, Target Audience)
Advertising Information
and/or Rate Card Links
CD-ROM Program Specific, Target Variable
One-page Flier 2-, 4-color Program Specific, Target Variable
Tri-fold Brochure 2-, 4-color Program Specific, Target Variable
Program Business
Cards
Program Specific, Target Variable
3x7 Business Fliers 2-, 4-color Program Specific, Target Variable
Other
Information
Sessions
Open Houses
Conferences
________________________
Greer/Guthrie
Learning Technology Services
47
Accessible Licensure Program in Science Education
Appendix E: Equipment
Accessible Licensure Laptops
Two laptops were purchased during fiscal year 2002-2003 in support of the Accessible Licensure program. These
laptops are intended for use by instructional designers and support staff, faculty, and administrators involved with
development, delivery, and maintenance of AL course materials, program website, and/or marketing materials. The
laptops have the following specifications:
Hardware Specifications:
Base Unit: Latitude D800,1.30GHz, Pentium M, 15.4 WXGA, English
Memory: 512MB, 2 Dimms, Double Data Rate for Dell Latitude D600 Notebooks
Video Card: NVIDIA GeForce4 4200 Go 4XAGP graphics with 32 MB DDR Video
Mem for Latitude D800
Hard Drive: 40GB Hard Drive 9.5MM 5400RPM for Dell Latitude D800
Floppy Disk Drive: Floppy Drive, Internal/External for Dell Latitude D-Family, Notebooks,
Factory Tied
Operating System: Windows XP ProSP1, English for Dell Latitude DFAM Notebooks
Modem: Internal 56K Modem for Dell Latitude D-Family Notebooks
CD-ROM or DVD-ROM Drive: 24X CDRW/DVD for Latitude D-Family
Processor Cable: Dell TrueMobile 1300 WLAN (802.11b/g, 54Mbps) miniPCI Card
Feature 9-Cell/72-WHr Primary Battery for Dell Latitude D800
Service: Next Business Day On-Site and CompleteCare Service, Initial Year
Service: Next Business Day On-Site and CompleteCare Service, 2 Year
Extended
Dirline: Gold Technical Support Service Latitude, 3 Years
Misc: OMCI 7.0 Systems Management For Latitude
Misc: Windows NT/2000,NTFS File System
Misc: USB Memory Key 64MB for Latitude D-Family
Software Specifications:
Each laptop includes the following software: Microsoft Windows NT/2000, Microsoft Office 2000, Acrobat 5,
Photoshop 7, and Macromedia Studio MX.
________________________
Greer/Guthrie
Learning Technology Services
48
Accessible Licensure Program in Science Education
Appendix F: Proposed Program Website Overview
About AL Program
 Letter from "Director"
 Program Overview (e.g., Degree information, course descriptions, faculty)
 Events/Open Houses
 Common Questions
 Contact Information
The AL "Experience"
 About NC State University (Overview, Resources for Distance Learners, Directions)
 Overview of "typical" course (online, video, etc.)
 Testimonials
 Expectations (e.g., Honor Codes, Registration, Graduate School, Acceptable Use
Guidelines)
 Requirements (e.g., Software, Hardware, Honor Codes, Plan of Study, Participation,
Textbooks)
 Application Process (e.g., Online App?, Financial Aid, Bursars Office)
Resources and Support
 University Resources (e.g., Advising, Textbook purchases, Counseling, Library,
Tutorials, Writing Labs, Software/Hardware/Computer Purchases)
 Proctoring/Tests
 Program Support (Contact information)
 Library
 Technical Support
 Program Forms (e.g., Application, Plan of Study, Graduation, etc.)
Courses
 Course Listing/Description with Requirements (Computer, Text, Lab) and Instructor
if known include: Delineation of Online courses, IVC courses, Face to Face, Blended
courses with descriptions of each, include: link directly to course itself if WebCT
supplement
 Course Projections (approximately 3 semesters out for plan of study)
 Links to participating Departments/College(s)
* Note: a separate section of the website can be made for faculty and stakeholders, providing
access to reports, results of evaluations, online "getting started" guides, instructional design
guides, and resources addressing development and/or instructional needs.
________________________
Greer/Guthrie
Learning Technology Services
49
Accessible Licensure Program in Science Education
Appendix G: References/Resources
Bourdillon, H. & Burgess, H. (1998, April). Open learning, new technologies and the
development of a new model of pre-service education and training: The open university, UK
experience. Paper presented at the Annual Meeting of the American Educational Research
Association, San Diego, CA.
Commission on Institutes of Higher Education (CIHE) (2000, September). Best practices for
electronically offered degree and certificate programs. Available at <
http://www.neasc.org/cihe/evaluation_electronically_offered_degree.htm>.
Cross, K.P. (1992). Adults as learners: Increasing participation and facilitating learning.
San Francisco: Jossey-Bass.
Diamond, R.M. (1989). Designing and improving courses and curricula in higher education.
San Francisco: Jossey-Bass.
Egbert, J., Thomas, M. (2001). The new frontier: A case study in applying instructional design
for distance teacher education, Journal of Technology and Teacher Education, 9(3), 391-405.
Gibson, C.C. (1998). The distance learner in context. In C. C. Gibson (Ed), Distance Learners
in Higher Education: Institutional Responses for Quality Outcomes (113-125). Madison,
WI: Atwood Publishing.
Glenn, J.M.L. (2001). Supporting teacher learning: Professional development goes online,
Business Education Forum, 56(2), 8-13.
Gruenhagen, K., McCracken, T., & True, J. (Summer/Fall 1999). Using distance education
technologies for the supervision of student teachers in remote rural schools, Rural Special
Education Quarterly, 18(3/4), 58.
Houdek, E. (1990). Managing distance education courses. Urbana, IL: Board of Trustees of
University of Illinois.
Leach, J. (1996, November). Teacher education—Online! Educational Leadership
International, 54(3), 68.
Levin, S.R., Waddoups, G.L., Levin, J., Buell, J. (2001). Highly interactive and effective online
learning environments for teacher professional development,” International Journal of
Educational Technology, 2(2).
Martyn, M. (2003). The hybrid online model: Good practice. Educause Quarterly, 26(1), 18-
23.
________________________
Greer/Guthrie
Learning Technology Services
50
Maushak, N.J.P. (1997). Distance education, innovativeness, and teacher education: Status in
Iowa independent, four-year colleges and universities. Dissertation Abstracts International,
58-06A, 2172.
Moloney, J & Tello, S. (2003). Principles for building success in online education. Syllabus,
16(7), 15-17.
O'Brien, T.P. (2001). Meeting the challenges of delivering accelerated alternative licensure and
graduate programs via distance education, Business Education Forum, 55(4), 30-33.
Parker, D. R. (2000, November). Using technology to certify secondary teachers: The
Alternative Certification Project. Paper presented at the Annual Meeting of the Mid-South
Educational Research Association, Bowling Green, KY.
Perry, G.Y. (2002). The use of online video case studies and teacher education. Dissertation
Abstracts International, 63-03A, 908.
Rodes, P., Knapczyk, D., Chapman, C., & Chung, H. (May 2000). Involving teachers in web-
based professional development, T H E Journal, 27(10), 94.
Saunders, E.A. (2001). Interactive online learning for teachers, NASSP Bulletin, 85(628), 51-57.
Sullivan, M.E. (1995, March). Rural settings: One approach to meeting teacher staffing needs
via alternative certification. In Reaching to the Future: Boldly Facing Challenges in Rural
Communities. Conference Proceedings of the American Council on Rural Special Education
(ACRES), Las Vegas, Nevada.
Twomey, Sylvia M. (2002, February). The Virtual Teacher Training Center: A one-year
program to transform subject-matter experts into licensed career and technical education
teachers. Paper prepared for the National Career and Technical Teacher Education Institute,
"A Call for Renaissance in Career and Technical Teacher Education," Scottsdale, AZ
University of North Carolina Board of Governors (December 2000). Regulations for planning
and conducting degree-related extension and distance education. UNC Policy Manual:
Available at: <http://www.northcarolina.edu/content.php/legal/policymanual/contents.htm >
400.1.1.1[R], sections B.4. and C.
Waterhouse, S & Harris, R. (2002). A ten-step guide to establishing instructional technology.
Washington, DC: Executive Leadership Foundation.
Vrasidas, C. (2002). A working typology of intentions driving face-to-face and online interaction
in a graduate teacher education course. Journal of Technology and Teacher Education, 10(2),
273-96.
Zirkle, C. (Oct-Nov 2002). Utilizing the Internet and web enhancements in the preparation of
technical education, ATEA Journal, 30(1), 14-16.
________________________
Greer/Guthrie
Learning Technology Services
51
Accessible Licensure Program in Science Education
Appendix H: Faculty Manual
________________________
Greer/Guthrie
Learning Technology Services
52
Accessible Licensure Faculty Manual
for Web Course Development
________________________
Greer/Guthrie
Learning Technology Services
53
Contents
Introduction.....................................................…………………........ 1
Overview.................................................................…………………. 2
Course Design..........................................................………………… 3
Course Requirements……………………………………………….. 6
Creating Web-enhanced Course Materials.............…………………. 7
Using the Standard Template.……….....................…………………. 8
Using the WebCT Template...................................…………………. 12
Resources................................................................…………………. 18
Introduction
The purpose of this manual is to assist you in developing Web course materials and provide
guidance in using the Web templates that have been designed specifically for the Accessible
Licensure (AL) program.
The information in this manual should help you develop course materials that are appropriate for
online delivery, determine which AL template is appropriate, and guide you through using the
template.
The AL Faculty Manual supplements classes and instructional materials provided by NC State
University/DELTA on how to prepare online courses and course materials. For more
information on how to deliver your course online using WebCT or other technologies, contact
the Learning Technology Service within DELTA. Be sure to check the Web site for current
listings of workshops and other services: http://delta.ncsu.edu/lts.
See the Resources section of this manual for additional information and assistance.
NOTE: Please read the “Overview” and “Course Design” sections before proceeding to the
information on course templates.
________________________
Greer/Guthrie
Learning Technology Services
54
Overview
Definitions
A “Web-enhanced” course combines traditional “face-to-face” classes with online components.
These courses generally require students to attend classes or labs on campus.
A “fully online” course is asynchronous: that is, the course can be taken anywhere at any time.
Students are not required to come to the campus, and instructors generally don’t meet the
students in person. These courses are most convenient for students at a distance, as well as
students with work and other obligations.
Overview of Templates
Two templates have been designed specifically for AL courses. One template is for courses
using WebCT (WebCT template); the other, called the standard template, is for non-WebCT
courses.
Which template should you use? If you plan to develop a fully online course, use the WebCT
template. If you’re developing a Web-enhanced course, template selection depends on which
specific online functions you plan to use.
Use the WebCT template for Web-enhanced courses that require interactivities, including
discussion forums, message boards, student tracking, posting of student assignments and
presentations online, and so on.
The standard template is designed for Web-enhanced courses with minimal interactivity. Use
this template if you simply want to include your syllabus, list of assignments, lecture notes,
resource list, and other print-oriented, non-interactive materials online. Interactivity on the
standard template is limited to links to your e-mail address and other Web sites.
Although NCSU has available interactive tools (such as WolfWare) that could be used with the
standard template, we do not recommend using them. The goal is to provide a consistent user
interface among courses in the AL sequence. Having students learn a single user interface
(WebCT) for interactive elements will reduce the number of technical questions, allowing
students and instructors to focus on course content instead of technical issues.
Detailed information on how to use the two templates is available under “Using the Standard
Course Template” and “Using the WebCT Template.”
________________________
Greer/Guthrie
Learning Technology Services
55
Course Design
Fully Online Courses vs. Web-enhanced Courses
Fully online courses
Fully online courses are available to a larger number of students than Web-enhanced courses.
Since these courses are not time- or place-dependent, students (as well as instructors) can work
on the course during convenient hours, from convenient locations.
Keep in mind that fully online courses can be taken by students in different time zones and
remote areas. It’s important to remember that your students may not have access to academic
libraries. Therefore, all course materials should be available online and linked to your course
(excluding textbooks or required software, which students should be able to order online). This
includes journal articles and other materials. Some of these materials may be available online
through NCSU library, an online version of the journal, or the author’s Web site. For other
materials, you may need to receive copyright permission and create PDFs. (See the Resources
section for information.)
Due to the asynchronous nature of fully online courses, we discourage use of chat rooms, which
require student involvement at a particular time. If offered, chat rooms should be optional and
archived for student review.
Any time-dependent component should be supplemented by an asynchronous method. For
example, if you offer online office hours, you should also be available to students through e-mail
and/or a message board as well.
You may want to include media such as streaming audio and video in your Web course. For
more information, contact the Learning Technology Service within DELTA.
Web-enhanced courses
Some courses are not suited to a fully online environment. These include courses that require
students to perform on-site laboratory work or display interactive presentation skills. In general,
if a course has elements that are time- or place-dependent, then it is better developed as a Web-
enhanced course. (Note: Web-enhanced courses are also called “blended,” “Web-supplemented”
and “Web-intense” courses.)
For a Web-enhanced course, you may want to include an online syllabus, list of assignments and
readings, and course calendar. You may want to accept assignments online or administer self-
tests that allow students to assess their skills. You may also want to post grades online, or make
your e-mail address available for students with questions outside the class period.
In addition, Web-enhanced courses can take advantage of other technologies, such as interactive
video. You may also want to include media such as streaming audio and video on your Web site.
________________________
Greer/Guthrie
Learning Technology Services
56
For more info
To learn more about using the Web and other technologies, contact the Learning Technology
Service within DELTA. Check the Web site for current listings of workshops and other services:
http://delta.ncsu.edu/lts.
Elements of Effective Teaching
Technology cannot substitute for effective teaching. Instead, it should enhance teaching and
make course materials more accessible to a greater number of students.
Hines and Cooke-Plagwitz (2001) note that effective teaching includes the following:
 Reading & research, including resources for finding more information.
 Class discussions of relevant topics, led by the instructor.
 Relevant, concise lectures that share the instructor’s expertise with students.
 Individual & group assignments.
 Examinations that gauge students’ knowledge and abilities.
 Labs & practicums that assess skills used in context.
 Clear demonstration of the relevance & timeliness of theories and concepts.
 Private consultations between the instructor and each student to answer individual
questions and concerns.
 Feedback from students to the instructor on teaching effectiveness, and grading
feedback from the instructor to the students.
 Thorough record-keeping of the students’ work as well as the instructor’s work.
Refer to the Resources section of this manual for sources of more information.
Interactivity
Effective teaching also engages active learning. Just as good classroom instruction is largely
experiential (rather than relying solely on lectures), online teaching needs to be more than typed
lecture notes or videotaped lectures. Good online teaching uses interactive elements to promote
active learning.
Examples of online interactive elements include:
 Threaded discussion groups in which students comment substantively on the work of
their classmates.
 Analysis of a case study.
 Multiple-choice quizzes and self-assessments that provide feedback to responses.
 “Round robin” assignments, in which students submit assignments to two other students
for feedback. For example, Student A answers a question; Student B critiques the
response, and Student C remarks on the original response and the critique. Meanwhile,
________________________
Greer/Guthrie
Learning Technology Services
57
Student B submits her original response to Student C, who submits his original response
to Student A.
Contact DELTA for more suggestions on how you can include interactive elements in your
courses.
Elements of Online Course Design
Online courses should begin with clearly-stated goals and learning objectives/outcomes. All
materials and information in a course should relate to these goals and objectives.
General goals should be established for the overall course: for example, one goal may be to
introduce students to basic research techniques. Based on these goals, objectives are established
for each lesson (for example, one lesson may describe and show examples of specific survey
instruments). All information included in the lesson should relate to a learning objective that
states the knowledge you want students to gain, and what skills they should acquire, by taking
the course. Each lesson should begin with a list of learning objectives that are specific and can
be practically measured. For example: “After you complete this lesson, you will be able to
define the differences between qualitative and quantitative research, and describe three specific
survey instruments for each type of research.”
How will you assess learning? Learning assessments should be closely tied to learning
objectives and outcomes. Include self-tests as well as opportunities for peer review (such as
critiques of classmates’ assignments). And make sure the expectations and workload for each
online course is similar to that found in traditional classroom courses.
Keep in mind that your course may need to support the development of competencies beyond the
stated course goals and objectives, including mastery of software.
“Chunking” Course Materials
An important aspect to effective online course design is the organization of lessons into smaller,
topic-based segments, or “chunks.”
Endless scrolling is not an effective format for online learning, particularly in the “Lecture
Notes” segments of your course. Students learn from online materials better when the
information is organized into chunks no larger than 2-1/2 screens in length. (NOTE: The
standard template includes 16 pages for lecture notes, or one page per week. The WebCT
template includes three pages each week for lecture notes.)
This method for dividing course materials does not apply to ancillary pages such as Resources
pages, reading lists, and other alphabetized information (unless the page is extremely long and/or
chunking the materials would increase ease of use).
________________________
Greer/Guthrie
Learning Technology Services
58
Course Requirements
NCSU Course Requirements
NSCU requires specific items, such as copyright notice and contact information, to be included
on each Web page. This list of requirements (along with URLs for sample online courses,
important links and more) is available in the DELTA publication, “Designing an Online
Learning Environment.”
Check the DELTA Web site for current listings of workshops and other services:
http://delta.ncsu.edu/lts.
System & Browser Requirements
In order to use the templates, you and your students will need to use Windows 98 or higher.
Macintosh users should use OS 9.2 or higher. Your browser must be Internet Explorer version 5
or Netscape version 6 or higher.
ADA Guidelines
The Americans with Disabilities Act (ADA) influences the design and development of web
pages. Following is a brief list of guidelines that will help make your course accessible to
everyone.
Images
 Each .gif and .jpg image should have a meaningful ALT (text alternative) attribute that
describes the image in the <IMG> tag. In the Dreamweaver “design view,” select the image,
then type the description in the “Alt” box.
 If you use images that contain critical information (such as charts or graphs), be sure to
include a text description of the information.
Numbered & Bulleted Lists
 Identify the number of items in numbered or bulleted lists in the sentence preceding the list.
For example, “After this lesson, you should be able to describe the following three items.”
 Use numbers for lists of four or more items. Bullets are fine for lists of three or fewer items.
Links
 Make sure to include the Web address in the text for all hyperlinks. For example:
NC State University (http://www.ncsu.edu)
________________________
Greer/Guthrie
Learning Technology Services
59
Tables
 Do not develop complex tables for the Web; screen readers cannot decipher them. Instead,
lay out the information in a simple linear format.
 Tables should be restricted to two columns. The first column should relate solely to the
information in the second column, NOT to titles in the first row. Text in the first column
should be limited to one or two words; if you use two words in the first column, make sure
the table is wide enough so both words appear on one line. The second column can include
as many words as you need. The following example is an acceptable table:
Instructor: Dr. Jim Smith
E-mail: j_smith@ncsu.edu
Office hours: Monday, Wednesday & Friday,
10:00 to11:00 a.m.
 The table will need a “summary” that describes its purpose and number of columns. Add this
information to the table tag in the HTML code. For example, the above table is described by
the following “summary”:
<table width="50%" border="1" summary="This 2 column table displays: (column 1) the
type of information in the second column and (column 2) contact information for the
instructor." align="center">
Creating Web-enhanced Course Materials
If your course requires classroom meetings and face-to-face interactions, it can still be enhanced
by online materials, interactivities and other options.
To determine which template to use, decide what online functions your course requires. If you
simply want to post course information online (such as your syllabus, list of assignments, lecture
notes and office hours), use the standard template. You can also use this template for sending
and receiving e-mail (including attached assignments) and providing links to other Web
resources.
Use the WebCT template for Web-enhanced courses that require interactivities, including
discussion forums, message boards, student tracking, posting of student assignments and
presentations online, and so on.
Note that the links on both templates can be changed. We recommend minimal changes,
however, in order to maintain a consistent user interface for students.
Refer to directions for “Using the Standard Course Template” or “Using the WebCT Template.”
________________________
Greer/Guthrie
Learning Technology Services
60
Using the Standard Template
The standard template includes these pages:
 Home page (index.htm).
 Syllabus (syllabus.htm). This page includes links to the browsers required for the course
(Internet Explorer version 5.0 or Netscape version 6.0 or higher).
 Lectures (lecture_introduction, followed by lecture1.htm through lecture16.htm). Post
introductory materials on the “lecture_introduction” page. This page also contains links
to materials for 16 course weeks. Sixteen “lecture” pages are numbered to correspond
with weeks, should you decide to post lecture notes each week. You can use as many or
as few of these pages as you need. You can also post lecture notes that are grouped into
topic modules instead of weeks.
 Assignments (assignments.htm). This page is intended for lists and descriptions of
assignments only. If you’d like to have an interactive assignments function, please use
the Web CT template.
 Resources (resources.htm), including links to NCSU information & services.
 Contact information (contact.htm), including office hours and an e-mail link.
You can change or delete the pages if needed, although it’s preferable not to do so. A consistent
template throughout AL courses will cause less confusion for the students.
Making changes to template functions (like button names) must be done in HTML and requires a
rudimentary knowledge of this computer language. However, simply adding course information
to the templates does not require using HTML.
Adding Course Information to the Template
1. Locate the standard template on the WebCT support page: http://webct.ncsu.edu.
Save the template pages on your local computer or disk. NOTE: Images on the template will
not appear on your local computer unless you also copy the folder labeled “images.”
Template images must be left in this folder.
2. Review the pages in the template to get a sense of how it’s organized. Note that the
“Syllabus” page already has a section titled “Software” with links to Internet Explorer and
Netscape. The “Resources” page also has some built-in links.
3. Most of your course information can be written using a word processing program. On some
pages, however, it will be easier to enter the information directly into Dreamweaver. These
pages include “Assignments,” “Contact” and possibly “Resources.” (Note that hyperlinks
created in Microsoft Word will not transfer to Dreamweaver, even if you save the document
as HTML. You’ll need to create the links in Dreamweaver.)
For text written in a word processing program:
4. Select the information you want to place on a Web page and copy it.
5. Using Dreamweaver, open the appropriate template file, as listed above next to the page
name (such as “index.htm” for the Home page).
________________________
Greer/Guthrie
Learning Technology Services
61
6. Click the cursor in the part of the document that says, “Place course information here.”
7. Paste the information into the template, and erase the on-screen instructions.
On all pages:
8. Create hyperlinks where needed. See “Links,” below, for more information.
9. The template contains a style sheet that specifies font colors and sizes for “Heading 1”
through “Heading 4.” (The titles at the top of each page, such as “Home,” are formatted as
“Heading 1.”) If you want to format sub-headers in your text, select the sub-header and
choose a heading size in the Format box.
10. Make sure the copyright date is correct in the footer.
11. Save the file using its original file name. If you change the file name, the links to this page
won’t work.
Posting Lectures
1. Decide whether to organize lecture notes by week or by module topics.
2. Follow the above directions for “Adding course information to the template.” Place
introductory information in “lecture_introduction.htm.” This page also contains links to 16
weeks of lecture material or 10 modules.
3. Use the “Lectures” templates in numeric order, beginning with “lecture1.htm” for the Week
One lecture or the first module. The Lecture Notes pages are linked to the introductory page,
so it’s important to use these pages in the proper sequence so the links will work.
4. If you’re organizing materials by week, delete the “Modules” button bar from the
“Introduction” page (“lecture_introduction.htm”). In Dreamweaver’s “design view,” click
the cursor on the “Modules” button bar and select Modify>Table>Delete Row.
 If your course has fewer than 16 weeks: Delete any extra weeks on each “Lecture”
page. After you finish pasting content into the page for the last week, delete the “Next”
button at the bottom of the page.
5. If you’re organizing materials by modules, delete the “Week” button bar from the
“Introduction” page (“lecture_introduction.htm”). In Dreamweaver’s “design view,” click
the cursor on the “Weeks” button bar and select Modify>Table>Delete Row. Add the name
of each module between the brackets, but do not delete the brackets or the HTML code will
be deleted, too. The template includes links for ten modules; delete any extra links. Also,
after you finish pasting content into the last module page, delete the “Next” button at the
bottom of the page.
Changing Topic Names
Topic names on the red bar (Home, Syllabus, Assignments, etc.) must be changed in HTML; if
you change them in Dreamweaver’s “design view” (i.e., WYSIWYG screen), the link to the page
will be deleted.
To change topic names: Scroll down the HTML page until you see the following. Then
change the names only (shown below in boldface) that appear between the hyperlinks, leaving
the links intact:
________________________
Greer/Guthrie
Learning Technology Services
62
<!--EDIT BUTTONS BELOW -->
<tr>
<td id="bottomLEFT" width="224" height="22"><img
src="images/bottomLEFT.gif" alt="Accessible Licenture in Science Education (header
graphic)"></td>
<td id="bottomRIGHT"><a href="index.htm" class="current">Home</a><a
href="syllabus.htm" class="link">Syllabus</a><a href="lecture_introduction.htm"
class="link">Lectures</a><a href="assignments.htm" class="link">Assignments</a><a
href="resources.htm" class="link">Resources</a><a href="contact.htm"
class="link">Contact</a></td>
</tr>
Be sure to make the change to every Web page in the template. Remember to change the title on
the affected Web page, too. You can do this in Dreamweaver’s “design view.”
Links
In the text, include the title of each link, URL, and a brief description of the information
available at the link. As much as possible, try to include external links only on a few pages;
these links tend to change often, and grouping external links together can minimize maintenance
problems.
If you link to a large file (such as a PDF), include the file size. If you create PDFs for your
course, make sure to use Adobe Acrobat 5.0 or higher (these versions comply with the
Americans with Disabilties Act). Check with DELTA to make sure any large files you create
can be stored on the server.
Linked Web sites should appear in pop-up windows or separate browser screens, as described
below. If you are uncomfortable working with HTML code, use a new browser screen.
Full-sized new browser screen
If you want a link to open in a full-sized browser screen, make sure to specify a blank target
screen for the link so students won’t accidentally leave your course. You can do this using
Dreamweaver’s “design view” (i.e., WYSIWYG screen). After you create a link, go to the
“Target” box and select “_blank”.
Pop-up windows
Each page of the template includes a pop-up window function called “open sesame.” Use this
function when you prefer to have linked information open in a pop-up window rather than a full-
sized browser screen. To create a link that opens in a pop-up window, use the following HTML
code with the link.
________________________
Greer/Guthrie
Learning Technology Services
63
<a href="Javascript:sesame(‘URL of
link','location=yes,scrollbars=yes,resizable=yes,width=500,height=400')"> name of your
link</a>
You can copy this code from links on the “Resources” page (resources.htm).
________________________
Greer/Guthrie
Learning Technology Services
64
Using the WebCT Template
Stand-alone Pages
Some pages in the WebCT template are stand-alone pages: “Syllabus” (syllabus.htm), “Course
Readings” (readings.htm), “Course Assignments” (assignments_course.htm), “Course Schedule”
(schedule.htm) and “Resources” (resources.htm). These pages should have their own links (and
their own icons) on the WebCT Home page for the course. See “Adding course information to
stand-alone pages,” below. NOTE: The “Syllabus” page includes links to browsers required
for the course (Internet Explorerer version 5.0 or Netscape version 6.0 or higher).
“Lectures” Pages
The following template pages are linked together. These pages comprise the weekly content
materials, and should be added to the WebCT Home page as “Lectures.” See “Adding course
information to ‘Lectures’ pages,” below.
The “Lectures” pages include:
 Introduction (introduction_week1.htm through introduction_week16.htm). Each week’s
introduction page should include objectives for the lesson as well as introductory
information.
 Readings (readings_week1.htm through readings_week16.htm). Each page should
contain readings for the current week only. A list compiling readings for all weeks
should be included in the stand-alone page, “Course Readings” (readings.htm), and
linked to the WebCT Home page. NOTE: If you include readings on the “Course
Schedule” page, then the “Course Readings” page may not be necessary.
 Lecture Notes (lecture_week1_page1.htm through lecture_week16_page3.htm). Each
week, you’ll have up to three pages to allow you to “chunk” the lecture notes. You can
use as many of these pages as you need. You can also post lecture notes that are grouped
into topic modules instead of weeks. See below for more information.
 Assignments (assignments_week1.htm through assignments_week16.htm). This page is
intended for lists and descriptions of assignments for the current lesson only. Use
WebCT’s “Assignments” function for interactive assignments and link the function to the
Home page.
 For more (more_week1.htm through more_week16.htm) should contain links to Web
sites or other materials that are relevant to the current lesson. Links to NCSU information
& services are included on the “Resources” page.
You can change or delete the pages if needed, although it’s preferable not to do so. A consistent
template throughout AL courses will cause less confusion for the students.
Making changes to template functions (like button names) must be done in HTML and requires a
rudimentary knowledge of this computer language. (Simply adding course information to the
templates does not require HTML.) Changing template functions is also a lengthy process, since
it requires changing dozens of pages in the “Lectures” template.
________________________
Greer/Guthrie
Learning Technology Services
65
Adding Course Information to Stand-alone Pages
The following directions apply to stand-alone pages only. These pages include “Syllabus”
(syllabus.htm), “Course Readings” (readings.htm), “Course Assignments” (assignments.htm),
“Course Schedule” (schedule.htm) and “Resources” (resources.htm). Link these pages to the
WebCT Home page for the course.
1. Locate the WebCT template on the WebCT support page: http://webct.ncsu.edu. Save
the template pages on your local computer or disk. NOTE: Images on the template will not
appear on your local computer unless you also copy the folder labeled “images.” Template
images must be left in this folder.
2. Review the pages in the template to get a sense of how it’s organized. Note that the
“Syllabus” page already has a section titled “Software” with links to Internet Explorer and
Netscape. The “Resources” page also includes several links. The pages for “Course
Readings,” “Course Schedule” and “Course Assignments” include internal links within the
page for each week. Note that pages intended for lecture materials have been divided into
folders labeled “week_1,” “week_2,” etc. For more information on working with the lecture
materials pages, see “Adding Course Information to ‘Lectures’ Pages,” below. Also
note: Some of the pages would be redundant if you used them all (for example, “Course
Schedule” and “Course Assignments.”) Use only the pages that are most appropriate for
your course.
3. On the stand-alone course pages, it’s easier to enter the information directly into
Dreamweaver rather than using a word processing program.
4. Change any headings and other information as indicated on the template.
5. Create hyperlinks where needed. See “Links,” below, for more information.
6. The template contains a style sheet that specifies font colors and sizes for Heading 1 through
Heading 4. If you want to format sub-headers in your text, select the sub-header and choose a
heading size in the Format box.
7. Make sure the copyright date is correct in the footer.
8. Save the file using its original file name. If you change the file name, the links to this page
won’t work.
Adding Course Information to “Lectures” Pages
1. Decide whether to organize lecture notes by week or by module topics.
2. Write the information for your “Lectures” pages using a word processing program. The
exception is the weekly “Introduction” page, which may be easier to enter directly into
Dreamweaver. (Note that hyperlinks created in Microsoft Word will not transfer to
Dreamweaver, even if you save the document as HTML. You’ll need to create the links in
Dreamweaver.)
3. Select the information you want to place on a Web page and copy it.
4. Using Dreamweaver, open the appropriate template file, as listed above next to the page
name (such as “introduction_week1.htm” for the introduction to the Week One or Module
One lecture). For lecture notes, use the “Lecture” templates in numeric order, beginning with
“lecture1_week1_page1.htm.” The Lecture Notes pages link to each other using directional
arrows, so it’s important to use these pages in the proper sequence.
________________________
Greer/Guthrie
Learning Technology Services
66
⇒NOTE: You have up to three pages to use for each week’s lecture notes. Be sure to
“chunk” the lecture notes for each week, and paste the notes on the appropriate pages.
5. Click the cursor in the part of the document that says, “Place course information here.” Paste
the information into the template, and erase the on-screen instructions.
⇒NOTE: If you use fewer than three pages for a week’s lecture notes, delete the “Next”
arrow at the bottom of the last page.
6. Type the name of the module or lecture at the top of the first page of lecture notes. Make
sure the format is “Heading 2.” Change any other information as indicated on the template.
(NOTE: The template contains a style sheet that specifies font colors and sizes for Heading 1
through Heading 4. If you want to format sub-headers in your text, select the sub-header and
choose a heading size in the Format box.)
7. Create hyperlinks where needed. See “Links,” below, for more information.
8. Make sure the copyright date is correct in the footer.
9. Save the file using its original file name. If you change the file name, the links to this page
won’t work.
Changing Topic Names on “Lectures” Pages
Topic names appear in the narrow red band near the top of each “Lectures” page. They are:
 Introduction
 Readings
 Lecture Notes
 Assignments
 For More
You can change the topic names, but it must be done in HTML. (If you change them in
Dreamweaver’s “design view” (i.e., WYSIWYG screen), the link to the page will be deleted.)
Scroll down the HTML page until you see the following. Then change the names only (shown
below in boldface) that appear between the hyperlinks, leaving the links intact:
<!--EDIT BUTTONS BELOW -->
<tr>
<td id="bottom" colspan="2"><a href="introduction_week1.htm"
class="link">Introduction</a><a href="readings_week1.htm"
class="link">Readings</a><a href="lecture1_week1.htm" class="current">Lecture
Notes</a><a href="assignments_week1.htm" class="link">Assignments</a><a
href="more_week1.htm" class="link">For More</a></td>
</tr>
</table>
Be sure to make the change to every Web page in the template.
________________________
Greer/Guthrie
Learning Technology Services
67
Remember to change the title in the black bar on all affected Web pages, too. You can do this in
Dreamweaver’s “design view.”
Links
In the text, include the title of each link, URL, and a brief description of the information
available at the link. As much as possible, try to include external links only on a few pages,
preferably the “Resources” page and “For More” pages. External links tend to change often, and
grouping them together can minimize maintenance problems.
If you link to a large file (such as a PDF), include the file size. If you create PDFs for your
course, make sure to use Adobe Acrobat 5.0 or higher (these versions comply with the
Americans with Disabilities Act). Check with DELTA to make sure any large files you create
can be stored on the server.
Linked Web sites should appear in pop-up windows or separate browser screens, as described
below. If you are uncomfortable working with HTML code, use a new browser screen. Also, if
the site to which you’re linking uses pop-up windows, use a new browser screen instead of a pop-
up window, since WebCT may not recognize the second pop-up window.
Full-sized new browser screen
If you want a link to open in a full-sized browser screen, make sure to specify a blank target
screen for the link so students won’t accidentally leave your course. You can do this using
Dreamweaver’s “design view” (i.e., WYSIWYG screen). After you create a link, go to the
“Target” box and select “_blank”.
Pop-up windows
Each page of the template includes a pop-up window function called “open sesame.” Use this
function when you prefer to have linked information open in a pop-up window rather than a full-
sized browser screen.
Note that you need to add this code to the HTML yourself. Also note that if you’re linking to a
site that uses pop-up windows, use a new browser screen instead. In WebCT, if you try to access
a pop-up window from a pop-up window, the link won’t work.
To create a link that opens in a pop-up window, use the following HTML code with the link.
<a href="Javascript:sesame(‘URL of
link','location=yes,scrollbars=yes,resizable=yes,width=500,height=400')"> name of your
link</a>
You can copy this code from links on the “Resources” page (resources.htm).
________________________
Greer/Guthrie
Learning Technology Services
68
Mounting Pages on WebCT
The following information is specific to mounting the template. This information does not
replace WebCT training offered by the Learning Technology Service within DELTA. Check the
Web site for current listings of workshops and other services: http://delta.ncsu.edu/lts.
Uploading
1. Prepare the files for uploading. Due to the large number of “Lectures” pages in the WebCT
template, folders were created for each week to simplify template use. When uploading the
“Lectures” pages, you’ll place them all in the same file (called “My-files”).
To simply the uploading process, delete the “images” folder inside each weekly folder
(“week_1,” “week_2,” etc.). DO NOT delete the primary “images” folder, which you’ll see
in the same location as the weekly folders and the stand-alone pages
(“assignments_course.htm,” etc.). Next, to greatly speed up the uploading process, zip the
individual weekly files. Also zip the files in the “images” folder.
2. Upload your pages. In WebCT, select “Manage Files” from the “Control Panel” on the left
green bar. Select File Options>Upload a file>Go. Browse your computer for the appropriate
files, then select “Upload.” (NOTE: Unless you zip your files, you’ll have to upload them
one at a time.) Upload all HTML files to the “My-files” folder.
3. Select the “My-files” folder by checking the box to the left of the name. Select Folder
Options>Create New>Go. Name the new folder “images” (all lower case, no quotation
marks).
4. Select the “images” folder by checking the box to the left of the name. Select File
Options>Upload a file>Go. Browse your computer for the appropriate files, then select
“Upload.” Make sure the “Destination folder” is “images.”
Create links to pages
For the stand-alone pages (including “Syllabus,” “Course Assignments,” “Schedule” and any
other stand-along pages you use), do the following:
 From the “Control Panel” (left green bar), select “Add Page or Tool.” Select “Single Page”
(under “Pages”). Be sure to include links on the Navigation Bar (left green bar) as well as
the Homepage.
For “Lectures” pages, do the following:
 From the “Control Panel” (left green bar), select “Add Page or Tool.” Select “Content
Module” (under “Course Content Tools”). Title the page “Lectures.” Be sure to include
links on the Navigation Bar (left green bar) as well as the Homepage.
________________________
Greer/Guthrie
Learning Technology Services
69
 From the Homepage, open the new “Lectures” link to display a Table of Contents. Select
“Designer Options” from the top blue bar. Under “Edit Table of Contents,” add headings for
each week or each module.
 After you’ve created the headings, select the first heading, then select Add files>Go. Select
the “Introduction” page for that week’s lecture (beginning with “introduction_week1.htm”).
Add only the “Introduction” page for each week.
Other pages
Add links for Communication Tools (such as the Discussion Forum) and other tools you need to
the WebCT Homepage.
________________________
Greer/Guthrie
Learning Technology Services
70
Resources
NCSU Resources
1. The standard and WebCT templates are available on the WebCT support page:
http://webct.ncsu.edu
2. NC State University/DELTA Instructional Resources. This site includes information on
DELTA workshops and training, how to create online courses, grants, and much more.
http://delta.ncsu.edu/lts/resources/instresources.cfm.
3. NCSU Libraries Electronic Reserve System. The library provides assistance with
copyright requests, as well as scanning, publishing and archiving readings for your courses.
http://www.lib.ncsu.edu/rbr/
4. For information on copyright law, see The TEACH Toolkit, which contains information on
The Technology, Education, and Copyright Harmonization Act (TEACH Act).
http://www.lib.ncsu.edu/scc/legislative/teachkit/index.html
5. Also from NCSU Libraries, see The Copyright Tutorial for more information on using
copyrighted materials:
http://www.lib.ncsu.edu/scc/tutorial/main.html
6. This Sample Permission Form is available through The Copyright Tutorial (see above). It’s
a generic form for obtaining permission to use copyrighted materials.
http://www.lib.ncsu.edu/scc/tutorial/permission1.html
Course Design Reference Materials
Chickering, Arthur W. & Ehrmann, Stephen C. Implementing the Seven Principles: Technology
as Lever (1996). AAHE Bulletin, October 1996. Available at:
<http://www.tltgroup.org/programs/seven.html>
Committee for Evaluation of Exemplary Online Courses. Rubric for Online Instruction (2002).
Chico, CA: California State University, Chico.
________________________
Greer/Guthrie
Learning Technology Services
71

ALPROGRAM(3)_Final

  • 1.
    Learning Technology Service ProgramDevelopmentReport for NorthCarolinaState University Accessible Licensure Program inScience Education Preparedfor LearningTechnologyServices,DistanceEducation&Learning TechnologyApplications and CollegeofEducation NorthCarolinaStateUniversity by EdrieGreer,Ph.D. MiriamE.Guthrie,Ph.D. June2003
  • 2.
    ProgramDevelopment Report for NCStateUniversity-AccessibleLicensurePrograminScienceEducation Tableof Contents Executive Summary………………………………………………………………….. 3 I. Program Overview………………………………………………………………… 4 II. Status Report……………………………………………………………………… 6 III. General Program Development………………………………………………… 9 Program Development Overview Program Model Program Guidelines Engagement & Planning Program Support Marketing & Promotion Production & Maintenance Delivery Evaluation & Assessment IV. Accessible Licensure: Findings & Recommendations………………………… 22 Engagement & Planning Program Support Marketing & Promotion Production & Maintenance Delivery Evaluation & Assessment V. Accessible Licensure: Fiscal Year 2003-2004 Proposed Deliverables………… 29 Appendices…………………………………………………………………………… 31 Appendix A: Accessible Licensure Course Listing Appendix B: Licensure Programs in North Carolina Appendix C: Course-Related Considerations Appendix D: Marketing Opportunities and Venues Appendix E: Equipment Appendix F: Proposed Program Website Overview Appendix G: References/Resources ________________________ Greer/Guthrie 2 Learning Technology Services
  • 3.
    Appendix H: ALFaculty Manual for Web Course Development Program Development Report for NCStateUniversity-AccessibleLicensurePrograminScienceEducation Executive Summary The purpose of this Program Development Report is two-fold. First, the report details the current status of North Carolina State University’s Accessible Licensure (AL) Program in Science Education for the DELTA division (Learning Technology Services) and the NCSU College of Education. Second, the report provides direction for the AL Program within the context of a changing educational environment–specifically, an environment that seeks to incorporate e-learning technologies within the University of North Carolina System and NCSU. The report provides a general overview of program development considerations (per the request of DELTA) by defining a program development model and guidelines. The specific process used for development of this plan is a synthesis of accepted generic program development models (see Appendix G: References/Resources) plus the authors’ experience in designing and developing distance education programs and courses. Six categories of program development guidelines were used: Engagement and Planning, Program Support, Marketing and Promotion, Production and Maintenance, Delivery, and Evaluation and Assessment. The report also lists findings and recommendations for the AL program in general, and proposes deliverables for next year that, among other things, target the development of distance education and supporting technologies and services within the Department of Mathematics, Science and Technology Education. Thirty-five recommendations are included in this report, organized under the guideline headings noted above. Finally, appendices provide supporting materials for program analysis, growth and development. The materials include a current course listing, marketing considerations, equipment used for the project, program website considerations, and a manual that orients faculty on how to use the standard course templates that were developed for this program. It is clear that the Accessible Licensure Program can have tremendous and positive results regarding the need to certify and provide additional training for science teachers throughout the state of North Carolina. It is our hope that the College of Education, working closely with DELTA and faculty and staff colleagues, will develop action steps to clarify the mission and objectives of this program, and find the appropriate resources that will achieve the best practices presented in this document. ________________________ Greer/Guthrie 3 Learning Technology Services
  • 4.
    Accessible Licensure Programin Science Education Program Overview INSTITUTION MISSION The mission of North Carolina State University is to serve its students and the people of North Carolina as a doctoral/research-extensive, land-grant university. Through the active integration of teaching, research, extension, and engagement, North Carolina State University creates an innovative learning environment that stresses mastery of fundamentals, intellectual discipline, creativity, problem solving, and responsibility. Enhancing its historic strengths in agriculture, science, and engineering with a commitment to excellence in a comprehensive range of academic disciplines, North Carolina State University provides leadership for intellectual, cultural, social, economic, and technological development within the state, the nation, and the world. PROGRAM MISSION The mission of the Accessible Licensure Program in Science Education is to increase the number of qualified science teachers within North Carolina public schools through the implementation of partnerships between the North Carolina State University Department of Mathematics, Science and Technology Education and North Carolina Community Colleges. PROGRAM DESCRIPTION The Accessible Licensure Program in Science Education has the potential to be an engaging educational program offered by North Carolina State University and the College of Education to students and practitioners seeking advanced licensure in K-12 science-related fields. The program would primarily target North Carolina residents and be delivered through a blend of face-to-face and technology-rich learning environments. Working closely with North Carolina Community Colleges and the Science Education Program at NC State University, the program would provide students with seamless articulation between program partners. Most courses identified for inclusion in the program are three credit hour semester-length courses, which follow NC State’s traditional fifteen-week calendar. Applicants would ideally enter the program prior to Fall, Spring, and Summer semesters. The proposed program web site would contain detailed information about both the program and courses, such as admissions requirements, registration, forms, policies and procedures, technologies, required textbooks, syllabus, and contact information. PROGRAM GOALS  To increase accessibility of licensure coursework in science education via distance education venues  To increase enrollment in science education programs by recruiting from rural populations and from the pool of personnel seeking lateral entry licensure and/or alternative licensure in science education  To develop seamless articulation between North Carolina Community Colleges and the Science Education program at North Carolina State University ________________________ Greer/Guthrie 4 Learning Technology Services
  • 5.
    TARGET AUDIENCES  Communitycollege students presently unable to locally access science education university degrees  Undergraduate students who may work full-time during the day  Individuals with science or science-related BS degrees who wish to add teacher licensure  Classroom teachers seeking advanced licensure COMPETITION Five of the 15 institutions within the North Carolina University system offer the same type of licensure in science education as that available to North Carolina State graduates. This licensure is a “comprehensive science” license, enabling the licensee to teach all the 9-12 disciplines (biology, chemistry, earth science, environmental science, and physics). The public institutions that offer this comprehensive science license to undergraduates include East Carolina, UNC- Ashville, UNC-Charlotte, UNC-Pembroke, and UNC-Wilmington. In addition, only six of the 31 private institutions with teacher education programs offer the comprehensive science licensure option. These institutions are Barton, Campbell, Duke, Elon, Lees-McRae, and Lenoir-Rhyne. Where available, an overview of each institution’s program or informational links are provided in Appendix B. RELATIONSHIP TO NC TEACH Presently, the relationship is unclear between the Accessible Licensure Program and North Carolina’s NC Teach initiative. NC TEACH is a statewide teacher licensure program administered by the University of North Carolina, in collaboration with the North Carolina Department of Public Instruction. NC TEACH recruits, prepares, and supports mid-career professionals as they begin a teaching career in North Carolina’s public schools. Participants in the 2003 NC TEACH program will begin courses in Fall 2003. It is anticipated that they will complete licensure through an accelerated program, earn up to 18 semester hours of graduate credit for their NC Teach course work, and receive support during their first year of teaching. DEFINITIONS This document relies on several terms to specify aspects of technology use for teaching and learning. Definitions of these terms are provided directly below:  Distance Education (DE) has traditionally involved the use of a variety of media to extend the learning experience from the campus to the learner. Media can include written materials, broadcast video, videotapes, interactive video, live or recorded audio, CD- ROM’s, or Internet-based (online) technologies.  Hybrid/Web-enhanced/Web-supplemented/Web-intense/Blended Learning includes combinations of the different media mentioned in the previous paragraph with face-to- face, or on-ground, traditional learning. ________________________ Greer/Guthrie 5 Learning Technology Services
  • 6.
    Accessible Licensure Programin Science Education Status Report OVERVIEW This portion of the report addresses Accessible Licensure Program objectives, completed and in progress, that served as initiative benchmarks for the 2002-2003 funding period. It also identifies products created and program development planning conducted through contracted and full-time personnel who were partially supported by funds from the Teacher Education/Distance Education funds provided by DELTA and the College of Education. BACKGROUND The project contracted with the consultants who developed this program planning report and facilitated instructional design assistance and development of a faculty online course guide. In order to prepare the report, meetings and correspondence were conducted with NCSU staff, including: John Penick, John Park, Jim Haynie, Eileen Parsons, Rita Hagevik, Angelia Reid- Griffin, and David Slykhuis in Science Education; Grant Holley, Coordinator of Lateral Entry Programs, and Susan Butler, former Coordinator of the Accessible Licensure Program in Science Education. Diane Chapman from Training and Development, as well as Rebecca Swanson, Connie Ingram, Scott Cason, Kay Zimmerman and Sharon Pitt from DELTA also participated. (Attempts made to contact Richard Haley, who oversees the Masters in School Administration DE degree, were not fruitful.) Also part of this team were instructional designer, Sarah Minier Johnson, and multimedia specialist, Jason Gorfine, who developed the standard course templates (HTML plus WebCT), an AL faculty guide, and assisted faculty with course design and development. PROGRESS TO DATE During the funding period, the following objectives were accomplished: I. Courses The original Accessible Licensure Business Plan states the following course development objectives for Year 1 and Year 2: Year 1  Create and develop curriculum for a new 300 level science education course to be offered as a distance education course that would incorporate concepts from ECI 305 (Teaching Diverse Populations), ECI 416 (Teaching Exceptional Children), ELP 344 (School and Society) as well as ED 310 (Tutoring Adolescents). Expand the curriculum of this course in order to offer it as a 500 level course as well.  Complete Course Action Forms and submit to college curriculum committee.  Establish an Academic Supervisor within the Science Education faculty to oversee advising applicants to the Accessible Licensure Program in Science Education. Status: A new 300 level science education course has not been developed; it has been approved, however, and plans are to teach it in 2005. The College of Education implemented ________________________ Greer/Guthrie 6 Learning Technology Services
  • 7.
    a new positionunder the Director of Education to aid applicants seeking alternative routes to teacher licensure. Dr. Grant Holley currently holds this position in the College. The plan for the Accessible Licensure program is to utilize this office for the academic advising of students. Year 2  Implement revised courses via distance education venues, including EMS 101 J (Orientation to Science Education), EMS 477 (Instructional Materials in Science), EMS 594K (Methods for Teaching Science), EMS 594I (Technological Tools in Science), and EMS 641 (Practicum in Teaching Science).  Recruit College of Education faculty to adapt two additional educational foundation courses for distance education venues. These include PSY 304 (Educational Psychology) and PSY 476 (Adolescent Development).  Recruit faculty from PAMS and Agriculture and Life Sciences to adapt science content courses in Biology, Physics, Chemistry, and Earth Science for distance education venues. Targeted courses include MEA 410, PY 123, PY 124, PY 126, PY 203,PY 341, PY 341, MEA 451,CH 223, CH 331, CH 315, BCH 451, BO 360, and ZO 421. Status: EMS 101J has not been implemented. Web modules for EMS 477 have been developed. EMS 594K is partially developed. EMS 594I (now EMS 573) was developed for online use but may not be appropriate for a totally online environment per John Park. EMS 641 has not been developed. There has been no progress to date on educational foundation, PAMS, or Agriculture and Life Sciences distance education courses. New course being developed in GIS (EMS 594-Hagevik); will be finished before fall and not by the end of June. Other courses developed or revised for distance education for Fall 2003 are: EMS 501 (Readings I), EMS 502 (Readings II), EMS 531 Introduction to Research in Science Education, and TED 359, Electronics Technology. Overall Course Status: Provided in Appendix A is an up-to-date list of courses identified for potential inclusion in the AL Program, along with their development and delivery status. II. Other Course Related Products A. Standard course templates: One basic online course template in WebCT was created, plus an additional HTML template. The HTML template is intended for faculty members who want a few pages for their course outside the WebCT environment, but require that their pages be readily identified as part of the AL program. Due to the time constraints of this project, these templates have been only partially tested. It would be a good idea to test them further to make certain they are completely bug-free under most working conditions. B. Accessible Licensure Faculty Manual for Web Course Development—This guide is for AL faculty new to distance education and covers how to use the AL course templates, basic online course pedagogy, and where to obtain additional resources and courses at NCSU. ________________________ Greer/Guthrie 7 Learning Technology Services
  • 8.
    III. Project Report AnAccessible Licensure in Science Education Program Development Report was completed by July 2, 2003. This report includes: a status report for the fiscal year 2002- 2003, a general program development model and guidelines, findings and recommendations regarding the Accessible Licensure project, marketing and program website considerations, and a web course development guide for AL faculty. IV. Related Project Products A. One of the many goals of this project was to begin developing a marketing and communications plan for the Accessible Licensure program. Critical to defining market strategies and designing and developing marketing campaigns is the clarification of program goals, objectives, milestones and audiences. This process is still taking place. As a result, the following information is provided in Appendix D: key issues influencing program promotion, marketing opportunities, an example of a distance education electronic marketing campaign, and a chart that details potential marketing venues, types of media placement, and advertising information as available. B. Noted later in this report, it is strongly recommended that a program website be created for the AL program. Based on e-learning research, program models, experience of the authors’, and conversations held with key stakeholders throughout this project, components that may be considered for inclusion in the AL program website were identified and are provided as recommendations in Appendix F. V. Equipment Computers and software purchased through DELTA for use by faculty and consultants. See Appendix E for details. ISSUES The departure of Dr. Susan Butler, a Principle Investigator of the AL Program, from the University in November 2002 impacted significantly the momentum of the initiative. The departure left the project with little programmatic and administrative oversight, which created continuity issues and a leadership gap. Also, as in the previous year, the notification of the budgetary award was not given until Nov. 2002, which left only six months to implement the program, and April – June 2003 to prepare the final report and provide instructional design and graphic assistance. With this shortened time frame, once again it was not possible to fulfill all of the objectives intended in the original proposal. Budgetary constraints were further exacerbated when state budgets were frozen for several weeks in the spring–an action that further hampered the completion of project development and the purchasing of critical resources. Taking these issues into consideration, findings and recommendations for the AL Program are provided in Section IV. ADDITIONAL RESOURCE REQUIREMENTS Refer to Section V: Accessible Licensure: Fiscal Year 2003-2004 Proposed Deliverables. ________________________ Greer/Guthrie 8 Learning Technology Services
  • 9.
    Accessible Licensure Programin Science Education General Program Development PROGRAM DEVELOPMENT OVERVIEW In order to facilitate the design, development and delivery of distance education programs at NCSU, a host of factors must be considered. Any successful model takes into account nationally recognized best practices that have been effective to date and relies on the latest research to substantiate it. The Commission on Institutions of Higher Education (CIHE) indicates that instructional programs leading to degrees with integrity must be organized around substantive and coherent curricula that define expected learning outcomes; also, that institutions accept the obligation to address learner needs related to and to provide the resources necessary for their academic success (CIHE, 2000). The UNC System guiding principles for distance education also stipulate that distance education courses and programs maintain the academic standards of on-ground, face-to-face students and do not unnecessarily duplicate resources (UNC Board of Governors, 2000). In order for this to happen, the institution must offer consistent quality support to faculty, the learners, as well as the program. The best program development models are systematic (Diamond, 1989) and focus on the learners, many of whom are adults with full time jobs, families, volunteer and other commitments (Cross, 1992). They may have little or no experience using distance education technologies and methods. What will they experience as they take individual courses? Will they want to take more? Will they feel like their concerns and anxieties are heard? Will their time and money (or their employer’s) have been well spent? What is the overall context of the distance learner as she makes her way through her programs (Gibson, 1998)? NCSU distance education programs and courses must be high quality and meet the needs of their learners. This means that the content, structure, and instructional design must be sound. Course design and layout, as well as technologies, should be consistent between similar courses. Students must receive timely feedback to their questions and comments regardless of whether the courses are totally online or offered via a blend of technology-rich environments (Martyn, 2003). Many best practices associated with instructional design course elements are covered in the faculty training sessions and materials offered by the Learning Technology Service (LTS) within Delta. LTS also offers a variety of other services for faculty, staff and graduate students instructing or preparing distance or distributed courses. These services include:  training in emerging tools and technologies for faculty, staff, and graduate students engaged in online instruction;  seminars, workshops, custom training sessions, and other faculty development programs and experiences that support efforts to intersect teaching and learning with technology;  instructional house calls and help desk support;  instructional design services such as project planning, instruction, and consultation;  development and production services in multimedia, graphic design, web applications, and other technologies related to delivery of online instruction; ________________________ Greer/Guthrie 9 Learning Technology Services
  • 10.
     project managementservices that include administration of DELTA IDEA grant projects and LTS and DELTA-initiated special projects; and  resources such as materials and up-to-date information for development of online courses and programs. While there is a vast array of successful individual courses being offered via instructional technologies, it is the degree programs that ultimately prove of highest benefit to learners. Many adult learners derive benefit from certificate or degree programs that provide career enhancement skills or training for new careers. Developing or converting a degree program for distance education requires careful thought prior to teaching the first course on the web or via interactive video. In addition, programs must be scalable, and adhere to the institution’s overall mission (Moloney & Tello, 2003), as well as include all of the services needed for delivery (Houdek, 1990; Waterhouse & Harris, 2002). PROGRAM MODEL For the purposes of this report, a program development model was constructed and guidelines created to ensure successful, informed and research-based transformation of educational offerings by institutions. Directly following the model are detailed program development guidelines, which can help a program achieve high standards with a minimum of “pain.” In the following model, learners/students are at the core of the program. They often come into contact with distance education courses one at a time and over time, the progression may lead to taking the classes of an entire program. During the course of their studies, students engage with, and learn from, faculty members and receive support from the institution. Technology may mediate much, if not all, of this process. Distance Education Program Development Model ________________________ Greer/Guthrie 10 Learning Technology Services Program Technology Institution Course Faculty Learner Learning and Support
  • 11.
    PROGRAM GUIDELINES The programguidelines that follow are based upon the previous Distance Education Program Development Model. While the model is high level, the guidelines are more specific and have been organized into six areas of strategic planning. These six areas address aspects of Engagement & Planning, Production & Maintenance, Delivery, Support, Marketing & Promotion, and Evaluation & Assessment. Where helpful, sample questions and associated aspects of program development have been included. Note that most of the guidelines fall within engagement and planning, because that is where most of the work should be done. While similar in nature, course development guidelines drill down in more detail to specific course design, development and delivery needs. Specific course guidelines are not expanded upon in this document; however, an overview of recommended course-related considerations is provided in Appendix C. The overview identifies considerations for faculty and staff engaged in the design, development, delivery and instruction of program courses. Considerations for course development have been organized into the four primary headings of Course Planning, Course Design & Production, Course Delivery, and Evaluation and Assessment. Engagement & Planning  The stakeholders in your department/college/university who will impact or be impacted by the success or failure of the distance education program have been identified. Who will make the final decisions about if and how the program will be delivered at a distance? Are different stakeholders concerned with different objectives, data or success indicators? Have faculty members been involved in the discussions and has their support for teaching through distance education been secured?  An environmental scan and needs assessment have been conducted for the program. If the scan/assessment has been conducted, what were the results? Does this program provide learning opportunities for a viable number of students and meet a state or university need? Is it congruent with the university mission? Does it support institution, college(s), or department(s) planning and overall academic goals? Have specific programs/areas been targeted to deliver at a distance? Is there a priority or timeline for different programs/areas? Will old programs be phased out, and why? How will issues of parity be addressed (e.g. the digital divide)? What lessons have been learned, if any, from ad-hoc courses previously offered in the program?  The goals and objectives of the program have been clearly defined up front by all stakeholders and plans for evaluation commence at the beginning. What are the specific goals and objectives of the program (learning outcomes, increased student retention, financial return on investment)? Do those goals include helping students acquire increased technology skills? What are the indicators of success for the program (i.e. how will you know it’s been successful)? Are these measurable and practical?  Strategic planning for the program is available in an appropriate format/depth and has a designated lead administrator/faculty/board. Is there a curricular board ________________________ Greer/Guthrie 11 Learning Technology Services
  • 12.
    established to addressquestions? Is there an advisory board established to quickly address university, partner or program concerns and academic or resource needs? Are all support groups (e.g. DELTA, library, admissions, financial aid) represented in the strategic planning for programs?  Strategic planning for the program includes fiscal and enrollment modeling. Does the program assist in meeting NCSU enrollment goals? What are the current and project enrollments for this program? What are the anticipated instructional costs and needs? Are the incentives for faculty? For department(s)? For college(s)?  Distance education programs have been included in the institution’s overall budget structure. Has the institution set aside sufficient financial resources to support the ongoing development and improvement of distance education programs and faculty/student skills? Are technologies updated on a regular basis? Are they scalable?  The initiating college/department/faculty has identified a person(s) responsible for program administration and planning within the academic department. Is this Principal Investigator a champion of distance education? Does s/he have enough clout or influence with the faculty and the departmental chairperson to promote distance education within the department? Has s/he successfully developed and taught distance education courses?  The initiating college/department/faculty has identified a person(s) responsible for project management. Are program planning services required of the distance education support group? Does the academic program or distance education program desire a distance education program liaison? Are project management services required?  There is adequate campus and off-campus technical infrastructure to successfully deliver the program. Are only standardized hardware and software supported by the institution and have infrastructure standards and guidelines been clearly communicated to faculty, staff and students? Have server and FTP requirements for courses been defined and appropriate equipment purchased?  Hardware/Software requirements for faculty have been clearly defined and communicated. What equipment and software do faculty members need in order to participate successfully in the program? Are there any specialty technologies or software needed by faculty that are not standard or supported by the institution?  Hardware/Software requirements for students have been clearly defined and communicated. What equipment and software do students need in order to participate successfully in the program? What is the level of Internet access for students? What percentage of students has access to computers? Will hardware and software costs be prohibitive, particularly if specialty wares are required by faculty? ________________________ Greer/Guthrie 12 Learning Technology Services
  • 13.
     Adequate provisionshave been made to protect student privacy. Do learners have access to their own personal information online? Is learners’ personal information secure?  The institution has a Faculty Development or Professional Development Plan. Is there a list of courses/resources available to the faculty and are they adequately promoted? Have distance education competencies for faculty been defined?  Administrators, faculty and staff are aware of the reasons for using instructional technology. Do faculty members clearly understand the value of instructional technology, and of Learning Management Systems and other media/resources for distance education courses offered by the university? Are they aware of the importance of using consistent course templates, selected course development models, as well as the possibilities of appropriate technologies, media and instructional design for distance education? Is their departmental chairperson on board with these concepts as well? Are institutional support groups and their staff members fully cognizant of the value of distance education and its possible uses? Are they sufficiently staffed to support this program?  A quality assessment and control philosophy has been determined. When is the next accreditation visit? What concerns and policies are currently in place to facilitate quality program and course development? Who will control course quality (both content and design)?  Intellectual Property Issues are defined and guidelines for courses are in place. Who will own online courses? Does the institution have a consistent intellectual property policy that has been communicated across all departments and is based on current laws? Is ownership portable without causing undue hardship for the institution (i.e. if a faculty member leaves the university, can s/he still use the course they developed)? Are the courses and resources in the program cleared for use via the institution’s copyright guidelines? Who will assist with this task?  The content of the curriculum has been clearly described. Have unique features of the current program / area (i.e., weekend offerings, remote sites) and relevant learner characteristics (i.e., older, working adults) been defined? Has a survey been conducted with the current learner population assessing their perceptions and recommendations for the program/area? Has the program has been approved by faculty before it is offered online? Has the curriculum been approved by the appropriate institutional authorities at the university and Office of the President levels to ensure SACS compliance? How many new courses will need to be created from scratch? Has the time to develop and receive approval to offer these courses been factored into the program’s timeline?  Based on the needs assessment and curriculum, the course design and development model has been determined. Are faculty members responsible for deciding how much the coursework is available at a distance and how much is taught face-to-face? Will cohorts be used? Will the program have open or traditional enrollment? ________________________ Greer/Guthrie 13 Learning Technology Services
  • 14.
     Human Resources/Personnelissues have been resolved. Will new faculty need to be hired? If so, what is the timeline and how will they be paid? Will they be full time or part-time faculty? Tenure track or adjunct? If not, how will existing faculty workloads be allocated? Will new support staff be required (e.g. instructional designers, multimedia specialists)? Do new faculty hired meet basic instructional technology competencies? Are performance expectations of faculty teaching online are clearly delineated. Are faculty participating in the program under no duress to do so and can opt out without professional consequences?  Faculty performance guidelines and rewards have been determined. Have faculty demonstrated any resistance to moving to distance education courses? Do faculty members have access to clearly stated institutional, college and departmental policies and guidelines regarding distance education courses? Will faculty members receive rewards and incentives for good work, including promotion and tenure and special awards (e.g. equipment, software, etc.)?  An adequate budget has been developed and funds are available to successfully conduct the program. If grants need to be written, will they be developed using solid needs assessment data and well in advance of expenditure of funds? Will any of the targeted programs/areas be funded by grants? If so, are there any limitations/considerations necessary?  The necessary cross-agency or academic partners (e.g. AHECs, community colleges, etc.) needed to support and deliver the program have been identified and planning has commenced. Which agencies and partners should participate in this program? Has discussion been initiated with appropriate supporting entities or partners? How will their participation be structured? Should Memorandums of Understanding be created? Are they willing to participate in the overall evaluation of the program?  Secondary values of the program been discussed, including research and scholarship. Are faculty encouraged and funded to research and share their findings regarding their distance education efforts in the wider academic community?  Since the effective delivery of distance education programs in particular depends on a concerted institutional system-wide effort, the necessary institutional Service Level Agreements (SLAs) have been discussed and are in place to deliver ancillary support:  Marketing & communications planning  Student support services planning  Website design and development planning  Technology resources and program delivery planning  Course development and maintenance planning  Faculty support services planning  Distance education support services planning  Intellectual property agreements ________________________ Greer/Guthrie 14 Learning Technology Services
  • 15.
    Program Support –Students  Registration/grades. Is registration easy and automated? Are grades readily available to students at the appropriate time? Do students need to travel to campus?  Admissions. Are the roles of the Graduate School, Undergraduate Admissions, and Lifelong Education clearly defined?  Financial Aid. Do students have adequate access to financial aid information online?  Testing. Are testing facilities available when warranted? Are individualized proctoring arrangements available for remote students?  Academic/Career Advising. Have the advisors been determined and do they have adequate interaction with distance education students in their given programs? Are students given the opportunity to pursue internships when practical?  Mentoring/Tutoring. Are advisors available to assist students proactively when they have potential or real problems with courses?  Bookstore. Can course books and resources be easily ordered online during course registration? Can books be sent to the student’s home on a timely basis? Are books searchable by course?  Technical Support. Can all of the critical on-campus services be effectively accessed online? Will technical problems be able to be easily resolved before the first class? Is a help desk available to students for not only productivity and internet applications but also any learning management system used? Are on-campus computers available to students who do not have access to these at home or work?  Computer skills support. How will students who are not familiar with the use of computers know how to use them effectively in distance education courses?  Library. Are sufficient library services available online and/or through toll-free support (i.e., catalog, databases, special collections, e-journals)? Are reserve materials and ILL available quickly and free of charge for all students, including undergraduates? Can students obtain a library card remotely?  Student Orientation. Are first time distance education learners given a clear explanation in advance of the distance education environment and how they can be most successful? Is a self-assessment for distance education readiness available to students? Is adequate support available to help learners effectively use the program and/or course sites and materials? How will students be fully informed of this support? ________________________ Greer/Guthrie 15 Learning Technology Services
  • 16.
     ADA accessibility.Is all administrative and course information accessible to students with disabilities?  Alumni. Do graduates of the program have continued access to value-added resources, such as a career advising or job boards?  In general, equivalent services are available to all distance education students across the board when compared with on-campus students. Can students easily access “real” staff members on a timely basis when they have a problem, preferably both online and via phone? Is adequate information on how to use all services provided during a single student orientation or is it piecemeal? Are links to student services also offered on program and/or course web pages? Program Support - Faculty  Customized faculty development/technology training and support. Does the institution have a multimedia and faculty support center? Do faculty have access to adequate instructional support? Are staff available to assist faculty while they are developing courses? If specialized content or instructional knowledge is needed, are funds available to obtain this knowledge? Do faculty have baseline knowledge of instructional design and quality course criteria before teaching at a distance? Have faculty satisfied basic computer competencies before teaching at a distance? Are staff available for assistance to faculty after training? Is this assistance technical, pedagogical, or both? Are faculty given sufficient time to acquire these skills? Is acquiring the skills encouraged within the department? Are technology mentors available to assist faculty within the department?  Instructional Design. Are faculty encouraged to work with experienced distance education instructional designers if available? If the Subject Matter Expert/Instructional Designer (SME/ID) model is used, are faculty encouraged to act as team players in the process?  Technical. Is computer hardware and software technical support available to assist faculty most of the time? Is expert technical assistance readily at hand when faculty are using interactive video facilities (even in the evening)?  ADA accessibility. Is all administrative and programmatic information accessible to faculty with disabilities? Do faculty have the support necessary to insure that their courses are accessible?  Library. How will library services be integrated into online programs and courses? Are services such as copyright clearance available to faculty? Does the library offer a distance education faculty orientation to acquaint prospective faculty with distance education services and support available to facilitate the teaching and learning experience? ________________________ Greer/Guthrie 16 Learning Technology Services
  • 17.
    Marketing & Promotion A strategic market planning process has been conducted. What is the mission of the institution? Is the program congruent with this mission? What is the program’s mission, goals and objectives? How are these operationalized to include a marketing environment, the distinctive competencies of the university, and motivation required for action? What are the current products of the program? What are the anticipated future products of the program? What is the target audience(s) and are these products appropriate for the selected audience(s)? What marketing strategies should be applied for current and future products where strategies are dependent on working within either existing or new markets and with either existing or current educational products (e.g., set of tools, that when blended, produce the desired market response)? What marketing strategies are presently occurring, within which the program can participate? What are potentially problematic assumptions about marketing the program? Are appropriately supporting budgets in place or available? How will the strategies be evaluated? Is a path defined for revising the marketing plan based on evaluation results?  Market planning for student recruitment is in place. What are the results of a consumer analysis with respect to demand and measurement forecasting, market segmentation, market targeting, and market positioning? Has the institution’s current market position been defined? Have competitive advantages, opportunities and threats been defined from a student recruitment perspective (e.g., convenience, quality, price, cost)? Have influential issues and products been clearly defined for student recruitment?  Controls are in place for prospective and current student tracking. How will marketing control for measuring and evaluating results and taking corrective action for plan revision? How will the controls be implemented (e.g., internet, surveys, phone calls, databases)? Are infrastructure, personnel or fiscal resources required and available to put these controls in place? Will results be available in a timeframe effective for adjusting controls on a 3-cycle per year or annual basis?  A campaign has been designed and developed, based on defined/available strategies, and it clearly identifies required media, resources, measures and timelines. Does both a marketing plan and communications plan exist? Will the campaign be predominantly electronic, print, or blended? Are there opportunities for campaign partnering? What types of venues will be used – newspapers, journal, magazines, press releases, online or print directories, push emails, websites (internal or external to the university), radio, television, course catalogs, information sessions, conferences, open houses?  Media design & development considerations have been discussed. In what format should media be available (i.e., electronic or print) based on selected markets/budget? Will creative services be required? If so, what types of skills will be needed (i.e., graphic designer, web master, programmer)? Will media demands require external contracting or can they be completed within the university? ________________________ Greer/Guthrie 17 Learning Technology Services
  • 18.
    Production & Maintenance A program website has been created for promotion and support. Does the website accurately reflect and promote the mission of the program? Is the program website fully functional before class begins? Does it effectively address the needs of prospective students, current students, faculty and stakeholders? Does it visually and functionally create an umbrella for individual courses, serving as a gateway for students to access both courses and course / program related information such as course and instructor descriptions, forms and schedules, advising, admissions, technical support, textbook purchases and library resources, software and hardware requirements, orientations to the university/program/technology, and contact information?  Guidelines for course development and maintenance have been established and agreed upon by departments and participating faculty. Will pilot courses be offered first? Are the courses completely ready before class begins? Can changes to the courses be easily made once they have started? Have course quality considerations been determined and met? What is the estimated life-cycle of individual course content? Of individual course technologies? What percent of course content/technology will need to be updated and when? If extensive or highly technical course updates are required, are resources available at the university to assist the department or individual faculty? If the faculty instructing or updating a course is distinct from the faculty who created the course, how will teaching styles and preferences be taken into consideration and how will course materials/orientation be transferred?  Geography, technology, and disabilities have been considered with respect to faculty and student access. Does the program adequately address access issues for persons with disabilities? Geographic dispersion? Low bandwidth?  Courses are built upon solid instructional design principles, the results of which can be definitively supported for the duration of the program. Have quality standards for courses been established and clearly communicated? How will the program ensure that appropriate media, technologies and pedagogies be considered and used for the courses in the program? Are specific media or technology formats recommended/discouraged based on infrastructure, available support, or development/expertise requirements? Are instructional resources available to support faculty in course transformation (e.g., graduate assistants, instructional designers, multimedia specialists, web programmers)?  Schedules and agreements have been created to ensure an environment of support and success. Does a schedule exist for course development, delivery and maintenance? Would departmental or faculty level agreements be helpful to ensure timely course development, delivery, instruction, and maintenance? ________________________ Greer/Guthrie 18 Learning Technology Services
  • 19.
     Incentives havebeen determined and clearly communicated. Will incentives be provided to departments or individual faculty? If so, what type(s) and what are the requirements for receiving incentives? Do requirements differ between faculty developing versus instructing versus maintaining a course in the program? Have incentives been clearly communicated?  Class rosters and grade rolls are available online. Are current rosters are readily available for faculty? What, if any, permissions do students have to email an entire class or view class rosters? Are grade rolls readily accessible online and completely confidential? Can they be quickly updated by faculty?  Services and resources available through DELTA organizations have been identified and communicated to faculty, staff, current students and prospective students. Are the faculty aware of workshops, technology resources, and support available through Learning Technology Services? Are they aware of Distance Education’s Service Center assistance that helps with questions, concerns, ongoing support throughout semester? Delivery  Marketing strategies and a program communication plan have been implemented in a manner timely to enrollment acquisition and program delivery (see above section, Marketing and Promotion).  Technologies have been identified for both delivery of the program and the individual courses. What standard and specialized technologies does the institution presently support? What are the costs to the program or institution associated with selected/available technologies? Can the program or institution continue to support these costs? How will current students and prospective students acquire information about the program? Will individual courses be delivered (i.e., via the World Wide Web, videoconferencing, CD-ROM, VHS, cable broadcasting, H.323, face-to-face, or a blend of technologies)? Are there instructional/pedagogical recommendations or institutional policies and procedures that should be shared with faculty and students? Will all courses be required to have a course website? Will a learning management system be available or required?  Technology-related needs for successful program and course delivery have been considered. What specialized technologies, software or storage space will be required based on individual course or faculty/student needs (i.e., audiographics, exams, surveys, communication, collaboration, projects, portfolios)? How will consistency and proficiency of technology use be ensured? What is the faculty or student comfort level with the selected/available technologies? Will technology orientations or training be made available? Is technical support available for students or faculty?  Courses have been identified that will require CD-ROM or videotape course materials for students. How will the program ensure that course materials on CD- ________________________ Greer/Guthrie 19 Learning Technology Services
  • 20.
    ROM or videotapewill be created and made available to the students in a timely fashion? What resources will be required to produce and update these materials? How will students be notified that these materials will be required for class? How will students and faculty request and receive these course materials?  Schedules have been established to ensure timely availability and delivery of program information and courses. Has a delivery schedule been created that identifies courses to be instructed, associated instructors, and delivery needs with respect to support, hardware and software? Have students been notified when their courses will be ‘open’? When will faculty be notified that they will be instructing the courses? When do faculty need to submit special instructional assistance or technology requests? How will program and course maintenance schedules integrate with the scheduled delivery of courses?  Policies, codes and general access requirements that will influence receipt of the program and access to the courses have been clearly defined. Are conduct codes and academic policies clearly communicated? Is there a need to define access to course materials in relation to actions related to a course, such as dropping, adding, withdrawing, auditing, and incompletes? Do students understand the role of their institution ID for accessing protected course materials or campus resources? Evaluation & Assessment  An evaluation plan is in place for the program at partner, program and participant levels. Is an evaluation and assessment plan developed that addresses the goals and objectives of the program (i.e., recruitment, attrition, cost, satisfaction)? Have specific measures and milestones been identified? Who or what will be targeted for evaluation (i.e., partners, faculty, adjuncts, graduate assistants, students, technology, course curriculum) and what methodology(ies) will be used? Has consideration been given to how evaluation and assessment of the program can address or support institution-, state- and accreditation-based responsibilities?  Partnerships and key dependencies have been identified and on-board. What activities are presently occurring within or external to the institution that the program can participate in (i.e., through DELTA, the college, department or corporate or institutional partners)? What, if any, will be the role of institutional research? University Planning & Analysis? Records & Registrar? Disabilities & Student Services? Personnel? DELTA? Library? Information Systems?  Evaluation addresses both standard and custom needs of the program, institution and individual faculty, staff and students. Does the institution, college or department require specific evaluations of their students or faculty? Do instruments exist or will they need to be created? As an incentive, how will faculty be provided customized course assessment assistance to support research and scholarship efforts for promotion and tenure? Do instruments exist or will they need to be created? ________________________ Greer/Guthrie 20 Learning Technology Services
  • 21.
     Resources andinfrastructure have been secured to ensure timely, informative and successful program evaluation. What resources and infrastructure will be required to create, disseminate, collect and analyze the results? What is the frequency and duration of evaluation/assessment activities? How will the program ensure timely analyses of the results and integration into individual courses and the program to allow for continuous improvement?  A schedule and mode(s) of distribution has been created for recommendations and reports. ________________________ Greer/Guthrie 21 Learning Technology Services
  • 22.
    Accessible Licensure Programin Science Education Accessible Licensure: Findings and Recommendations To date, a number of distance education programs have been developed in the United States and United Kingdom to provide professional development to teachers as well as to train pre-service students and those needing alternative licensure (Bourdillon & Burgess, 1998; Egbert & Thomas, 2001; Glenn, 2001; Gruenhagen, McCracken, & True, 1999; Leach, 1996; Levin, Waddoups, Levin, & Buell, 2001; Parker, 2000; Perry, 2002; Rodes, Knapczyk, Chapman, Chung & Haejin, 2000; Saunders, 2001; Sullivan, 1995; Twomey, 2002; Vrasidas, 2002; Zirkle, 2002). Previous efforts conducted at NCSU include online graduate programs in the College of Education in Training and Development, School Administration, and Business and Marketing Education. The latter program developed an accelerated alternative licensure program that was designed to lead to initial licensure and interface with a master of education degree program in the same area. According to the published report, the university based its program design entirely on the distance education model and “found that the quality of instruction increased dramatically through Internet delivery, used its extension mission to address financial issues, utilized the revenue created by extension courses to employ experienced teachers as university supervisors, and developed reciprocity agreements with every state other than Louisiana” (O’Brien, 2001). Research conducted with the Teacher Education Alliance (TEA), a component of the Iowa Distance Education Alliance, Iowa's Star Schools Project included the following recommendations: While funding and human resources may expedite the innovation process, convincing both faculty and administration of the need to innovate is of high priority. As long as these individuals believe distance education is an add-on to an already overcrowded curriculum the integration of distance education into the teacher education program will not occur. For distance education to diffuse, the change agent will need to assist these institutions in seeing how distance education not only fulfills a need of the institution but is compatible with institutional values and beliefs. In addition, institutions that prepare teachers need to dedicate funding or locate alternative funding sources to assist in acquiring technology as well as in the training of education faculty to use the technology. Until these professors have adequate access to technology and can develop their own comfort level, few will model effective uses of technology in the methods classes. (Maushak, 1997, p. 2172). While most of the preceding literature focuses on instructional design best practices within courses, a number of findings point to specific steps institutions can take to augment their teacher education programs offered at a distance. These, coupled with the general program development guidelines discussed earlier in this report, lay the foundation for the following recommendations. ________________________ Greer/Guthrie 22 Learning Technology Services
  • 23.
    Engagement & Planning 1.A formal environmental scan and needs assessment have not been conducted for the program. The college, working in concert with the Dean and Provost, should revisit its goals in terms of developing a new timeline and budget. Specific goals and objectives of the program (learning outcomes, actual percentages of increased student retention, financial return on investment) should be more clearly defined. After speaking with several different stakeholders, it is not clear who are the audiences of this program. Are they teachers in nearby counties or the entire eastern half of the state? Dr. John E. Penick, the Mathematics, Science and Technology Education department chairperson, mentioned “cornering the market.” Is this also a goal of the College and the University? 2. Issues of parity need be addressed (e.g. the digital divide). How will teachers from economically disadvantaged areas be assisted to participate in this program? In addition, a thorough understanding of the pros and cons of using technology to facilitate alternative certification would be helpful. Sometimes distance education requires compromises. One of the administrators does not want to let go of the face-to-face interaction with full-time students. But this is not possible if you want to increase your enrollments and access to working part-time adult students. 3. Strategic planning for the program does not have a designated interdepartmental board. The management team listed in the Business Plan consists only of science education faculty and no one from other College of Education departments, even though partnering is a goal of the program and courses have been identified in other departments for inclusion in the program. Community college and school personnel are only on board for the first year. While the board should not grow in size as to be unwieldy, all support groups (e.g. DELTA, library, admissions, financial aid) need to be further represented in the strategic planning for the program, at least in the beginning, and a liaison to each support group be designated. Also, we recommend a student (teacher) representative serve on the board to facilitate their needs. 4. Fiscal and enrollment models have not been determined and the extent to which the program will assist in meeting NCSU enrollment goals in unclear. It is recommended that through a needs assessment, market analysis, and college/departmental deliberations that current and projected enrollment numbers be determined. Since the use of technology does not define or establish a course as an NCSU Distance Education course, will the AL Program be included in NCSU’s Distance Education offerings? We recommend that program administrators consider the programmatic effects and different funding mechanisms available through DELTA if the program is offered as Distance Education. 5. Since the departure of Susan Butler earlier this academic year, there is no one responsible for program administration and planning within the academic department. We recommend that someone be selected as soon as possible to ________________________ Greer/Guthrie 23 Learning Technology Services
  • 24.
    champion the useof distance education and that this person have experience with these instructional technologies as well as tenure. 6. The initiating college/department/faculty has not identified a person(s) responsible for project management. We recommend that a Program Memorandum of Understanding be developed with DELTA to (1) ensure a supportive environment, (2) to offer an overview of DELTA resources available and highlight the benefits of collaboration, and (3) to identify and clarify program related needs in order to provide the best support possible to program constituents. 7. Earlier in the school year, Dr. Butler taught EMS 203, Introduction to Teaching Science via NC-REN. Review of these videotapes, which are available in VHS only (there are no S-VHS masters), shows that they were not aired with adequate consideration of distance education students. In addition, the graphics used are not legible on the TV screen. Therefore, our recommendation is that these videotapes should not substitute for a full-length course and a new course should be developed entirely online or in blended mode. (The faculty successor for this course has subsequently left the university as well.) 8. Not all faculty and staff in the Mathematics, Science and Technology Education department seem aware of how to effectively use instructional technology for distance education. There is certainly a lack of understanding as to the value of using learning management systems such as WebCT. In addition, faculty do not seem to be informed about the services that DELTA could potentially provide, nor of the value of working with an instructional designer (they are education faculty and there is a sense that some don’t believe that they need instructional design help). Only two faculty members (Hagevik and Reid-Griffin) accepted this project’s offer of instructional design assistance, although Jim Haynie is working with DELTA production staff to videotape and edit learning objects used in his TED 359 course, and David Slykhuis has requested the standard HTML template for his course. We recommend that the departmental chairperson encourage faculty to use these resources if and when available. We also recommend that one or more formal orientation sessions be offered to the Science and Technology education faculty by DELTA and peer faculty who have already taught at a distance using WebCT. Diane Chapman is willing to speak with the faculty about her experiences in the online Training and Development program, and faculty from other successful distance education programs in the College of Education, such as School Administration and Business Education, might be willing to participate as well. We are confident additional instructional design help can be utilized for future courses if faculty are apprised of the value of this assistance and the funds are available. 9. There are many workshops and courses on distance education technologies and design available through LTS/DELTA. Faculty participating in the AL program should be encouraged and given sufficient time to acquire the skills needed to develop and teach their courses. The department should also look to the use of ________________________ Greer/Guthrie 24 Learning Technology Services
  • 25.
    technology mentors (otherfaculty and graduate students) to assist faculty with their courses. 10. A quality assessment and control philosophy needs to be determined. If programs are to achieve high enrollment, basic course design issues, such as use of a common course template and guidelines for teaching courses (e.g. all student email will be answered within one business day), as well as ADA compliance, must be stipulated for all courses. Faculty should be encouraged by the departmental chairperson to adhere to course design standards suggested by LTS/DELTA. Note: this project has prepared two standard course design templates for use by faculty and a guide for new AL instructors teaching online. 11. Faculty should have access to the revised NCSU intellectual property guidelines that are currently under review. 12. An AL curriculum map, with routes delineating paths for different student populations, is needed. To date there has been little progress on developing AL courses in Educational Foundations and other science courses. It would be helpful to investigate developing a Master of Arts in Teaching (MAT) degree, similar to UNC-CH and other institutions. 13. The course design and development model should be determined. Faculty should be responsible for deciding how much their coursework is available at a distance and how much is taught face to face; however, the Principal Investigator and DELTA Program Liaison need to make recommendations based on the overall program needs and budget as well. Will cohorts be used? Pilot courses? Open or traditional enrollment? In order to facilitate rapid development of quality courses (if that is the eventual program goal), a Subject Matter Expert/Instructional Designer Model is recommended. Development of a multi-year course development and delivery plan with milestones and specific faculty assignments should be a top priority. 14. Dr. Haynie has been a pioneer in the department in developing reusable learning objects. Funding should be available to purchase existing objects and to develop new ones and a depository established to house them. 15. Due to the points made previously, human resources/personnel issues have not been resolved. Dr. Penick indicates he does not have enough faculty to teach these AL courses. While at least two new faculty members will be joining the department this fall, it is not known yet what their role will be in the program, and how long it would take for them to become fully involved. If the College and NCSU want to fast-track this program, qualified part-time and/or adjunct faculty would need to be hired as well as new support staff (e.g. instructional designers, multimedia specialists). Performance expectations of faculty teaching online should be clearly delineated and proper incentives given. Faculty should be encouraged and funded to conduct research on their distance education efforts and present their findings in the wider academic community. ________________________ Greer/Guthrie 25 Learning Technology Services
  • 26.
    16. It isnot clear if an adequate budget has been developed and funds are available to successfully conduct the program. Several faculty have indicated interest in converting programs to distance education, but no money is available as of yet for later development. With the uncertain and late-arriving funding, it is difficult to inspire faculty confidence in the future of the program. 17. Dr. Butler was also pursuing partnerships with various NC community colleges (e.g. Nash, Edgecombe, Central Carolina). She worked with Carteret to develop a feeder program into the Science Education program at NCSU, and a brochure was created for students. With Central and Nash, she had made initial contact visits and demonstrated to them the Carteret program. These relationships need to be resuscitated to avoid credibility gaps for the NCSU AL Science Education program. 18. The relationship of the AL program to NC Teach should be clarified. John Penick believes that there are insufficient funds to participate, but the advantage of NC Teach is that it can reach Lateral Entry students before they teach. He also is concerned about the extent to which he can modify NC Teach materials. 19. A comprehensive program website needs to be developed and maintained once above issues have been addressed. Support 20. In general, the AL program needs to work with DELTA to make sure all student and faculty support services are readily available and working, and that students and faculty are fully aware of these services. Marketing & Promotion 21. Strategic market planning needs to be conducted for the Accessible Licensure program. Critical to the planning is agreement upon program goals, objectives, results of a market analysis, target audience(s) and products. To date, the defining of these foundational components is underway; however, it is not yet complete. Building upon the program foundation, marketing for the program will be better able to work with university members and institution partners to design and develop an appropriate campaign and associated media. Program administrators may consider working with DELTA’s Distance Education and Marketing Services Office. 22. Similar to the market planning noted above, a market analysis may have been conducted, but very little information is presently available about the results. Program administrators should take a closer look at competition in- and out-of-state to clearly identify distinguishable competitive advantages, opportunities and areas of overlap. In addition, this process should take into consideration not only the acquisition of enrollments, but that the appropriate audiences for the program are ________________________ Greer/Guthrie 26 Learning Technology Services
  • 27.
    indeed being targetedto assist in reducing potential attrition and increasing “goodness of fit” for both the student and the institution. Distinguishing the program from other state and institutional outreach efforts, such as NC Teach, needs to be considered. 23. Currently DELTA’s marketing efforts include solid mechanisms for tracking prospective students. The College of Education may desire to work closely with DELTA’s Marketing Services Office to gather data on the effectiveness of selected marketing strategies for prospective students. With respect to current students, it will be critical to quickly create a means (i.e., a database with web entry interface) that assists with data maintenance and to coordinate with key university stakeholders on data acquisition, where data may include demographic data, employment status, goals, number of courses taken, attrition, etc. This information should tie closely to programmatic evaluation and assessment and may include random entry and exit interviews. 24. A communication plan should be developed that covers the first two years of program marketing. Production & Maintenance 25. A program website should be created for promotion and support once the program mission, revised objectives and revisited audience has been further defined. This website should visually and functionally “tie in” with the standard templates for the courses, and be a part of the WebCT LMS, as well as offer links to the College of Education and university. 26. Guidelines for initial course development and maintenance should be established and agreed upon by College of Education departments and faculty participating in the AL program. Developing the courses is only a first step. How much each course can be changed by subsequent teachers, as well as who will oversee quality and accessibility considerations, must be determined, and timelines established for these tasks. 27. Class rosters and grade rolls should be readily available online and student administrative information should readily interface with the rest of the campus databases. Use of WebCT (particularly VISTA) in most, if not all online classes, will facilitate this task. Delivery 28. Program goals and target audiences must be defined before identifying the technology(ies) that will serve as cornerstones of this program. Faculty should be given a breadth of supporting technologies to select from, provided institutional infrastructure, technical support, and faculty development is available. ________________________ Greer/Guthrie 27 Learning Technology Services
  • 28.
    29. Technologies requiredby individual faculty may vary based on educational objectives, yet consistency and simplicity of course delivery is critical to faculty and student comfort levels and as such, the use of a university supported learning management system (i.e., WebCT) for a framework for faculty to build within and around is strongly recommended. Use of a LMS would also assist in protecting copyrighted and course materials, provide an architecture that generally adheres to instructional design principles and ADA compliance, and provide a set of collaboration and communication tools. 30. All participating faculty should be involved in faculty development that addresses both the technology(ies) selected for the program and instructional strategies associated with selected technologies. If possible, customized sessions that are program specific should be held, which allow for faculty to share best practices. 31. CD-ROM and videotaped materials take additional time and expertise to create and distribute. Courses requiring these delivery formats should be identified as quickly as possible. 32. Delivery and maintenance schedules should be developed by College/Department(s) and faculty. Evaluation & Assessment 33. A program evaluation plan must be developed to include objectives, instruments, measures, milestones and resources required. The plan should take into consideration evaluation and assessment at the partner, program and participant levels. 34. The College of Education may consider working closely with DELTA organizations and/or university constituents such as University Planning & Analysis, Records & Registrar, Disabilities & Student Services, Personnel, Library, Information Systems, etc. 35. Per faculty request, customized evaluations should complement standard course evaluations as an incentive for faculty research and scholarship. ________________________ Greer/Guthrie 28 Learning Technology Services
  • 29.
    Accessible Licensure Programin Science Education Accessible Licensure: Fiscal Year 2003-2004 Proposed Deliverables After two years, the NCSU Accessible Licensure program is off to a good start. However, if it is to successfully continue, additional tasks need to be considered. In the original Business Plan, the Year Three Objectives included:  Revise/adapt advanced licensure coursework including EMS 594M (Readings I) and EMS 594W (Readings II).  Implement revised courses via distance education venues, including EMS 475 (Methods of Teaching Science), EMS 476 (Student Teaching in Science), and EMS 495 (Senior Seminar in Science Education).  Implement the newly developed 300/500 science education course via a distance education venue.  Implement revised courses via distance education venues, including PSY 304 and PSY 476.  Continue to recruit faculty from PAMS and Agriculture and Life Sciences to adapt science content courses in Biology, Physics, Chemistry, and Earth Science for distance education venues. Targeted courses include MEA 410, PY 123, PY 124, PY 126, PY 203, PY 341, PY 341, MEA 451, CH 223, CH 331, CH 315, BCH 451, BO 360, and ZO 421.  Recruit faculty currently teaching general education required classes to adapt such courses for distance education venues. Targeted courses include: 100 and 200 level PE courses, history elective, social science elective, humanities elective, literature elective, history/philosophy of science elective, philosophy/religion/art elective, multicultural elective.  Submit grant proposals to federal, state, and private sources to retain funding for travel, graduate teaching assistants, project coordinator, and/or any further revision of courses needed. The Year 3 objectives should be revisited, as well as the unfinished tasks originally proposed for Years 1 and 2 (see Status Report, Section II). While some of these tasks have been accomplished or are on track, many are not. One of the primary challenges discussed in the Findings and Recommendations section includes recruiting new faculty for interdisciplinary courses. Some of the deliverables needed to accomplish this and other goals could include:  Program/Curriculum Development Plan. Including updated list of courses, with specifics on when they will be developed, piloted, taught and by which faculty.  Program Path/Map for Students. What are the various sequences of courses different student audiences can take to attain their licensure and possibly a degree?  AL Faculty Development/Training Plan. How and when will AL faculty learn the skills they need to successfully develop and teach online? Which additional skills are needed? What additional materials will they require? (A guide to acquaint new AL ________________________ Greer/Guthrie 29 Learning Technology Services
  • 30.
    faculty to genericonline design principles and use of templates for the program has been developed and is appended to this report.)  Evaluation/Assessment Plan and Implementation. Collect data throughout the year on enrollments, attrition, student satisfaction, number of distance education students served, grouping data by degree and/or certification sought by the student. Solicit student evaluations of courses and of new technologies utilized. Solicit faculty evaluations of courses and of new technologies utilized. Compile data collected by individual faculty conducting research related to the revised/new courses. Write Year-End Report.  Development and Maintenance of Program Web Site. Includes curriculum, plus general information on program advising, registration, library, textbooks information, etc.  Marketing and Communications Plan. Includes results of market analysis, marketing strategies, marketing campaign information, required media, budget and two-year communications plan.  Project Plan for all of the above. Includes resources, milestones and dependencies for implementation. Progress cannot be achieved without an interdisciplinary program planning committee, as was discussed in Findings and Recommendations. Scheduling the presentation to members of the Department of Mathematics, Science and Technology Education to demonstrate capabilities and opportunities of distance education programs is vital to continuing the good work that has been accomplished to date in the NCSU Accessible Licensure program. Such a presentation could provide fertile ground for the emergence of a faculty and administrative groundswell needed for the program’s continued success. ________________________ Greer/Guthrie 30 Learning Technology Services
  • 31.
    Accessible Licensure Programin Science Education Appendix A: Course Listing ________________________ Greer/Guthrie 31 Learning Technology Services
  • 32.
    CourseandProgramInformation,FacultyandStaffing,CourseDeliveryandSupportforEMSDistanceEducationCourses–updated Coursesinboldtobedevelopedby6/30/03aspartofYr2plan Coursesfoundonncsu.edu/sciencejunction(exceptwherenoted) Number & Title Cred its Degree/CertificateDeveloped/ Taught By Type of Load Technologies To Be Utilize Status (developed, piloted/revised, taught) Comments #1 priority course to develop EMS 203 Intro to Teaching Science 3 BS in SED, MSS Butler/Butler Regular Interactive Television Developed New DE instructor unknown; videotapes not usable for future courses (except excerpts). May be taught in Spring 2004. EMS 375 Methods in Science Ed I (use modules from EMS 475) 3 BS and Licensure in SED, MSS Parsons/Parsons ? Regular WebCT, video, CD and computer labs and the equipment therein (e.g. smartboard, projection) to supplement face- to-face meetings. Not developed New course; teaching in 2005 EMS 475 Methods of Teaching Science 3 BS in SED, MSS Butler/Jones Regular Interactive Television, Video Taught every fall Modules; no revisions needed EMS 476 Student Teaching in Science 8 BS in SED, MSS Management Team/Graduate Teaching Assistants Regular Web, Video, Face-to-Face Observations Taught every fall Taught later EMS 477 Instructional 3 BS in SED, MSS Park/Park Regular Web Taught every fall Modules; no
  • 33.
    Materials in Sciencerevisions needed--JP EMS 495 Senior Seminar in Science Education 2 BS in SED, MSS Parsons/Parsons Regular WebCT, F2F Developed June 2002 Fall 2003, F2F meetings will be decreased in number and the WebCT discussion boards, chatrooms and other WebCT components will be used more often. EMS 501 Readings I 1 Advanced Licensure in SED, MSS Slykhuis (developer only)/Park? Regular Web (100%) Online Fall 02; revisions by 6/30/03 Teaching in Fall 2004; enrollment 100 EMS 502 Readings II 1 Advanced Licensure in SED, MSS Park/Park Regular Web (100%) Developed by 6/30/03 Teaching in fall 2003; enrollment 100 EMS 531 Intro to Research in Science Education 3 Advanced Licensure in SED, MSS Reid-Griffin (developer); Park/Carter (instructors) Regular CD/web- enhanced Developed by 6/30/03; taught odd yrs Enrollment: 20 EMS 573 Technological Tools in Science 3 Licensure in SED, MSS Park/Park Overload Web - how much F2F in future? Taught summer 02 No revisions needed; used to be EMS 594I; Online; hard to teach online? EMS 594K Methods for Teaching Science 3 Licensure in SED, MSS Holley/Holley Adjunct Faculty Interactive Television, Video, Web ?? Will be taught next spring F2F Similar to EMS 476; partially developed for DE; needs additional funding to finish DE development EMS 594 Introduction to using Geographic 3 Advanced Licensure in SED, Hagevik/Hagev ik Overload WebCT (100%) Developed by Fall 03; Taught New course; open labs; ________________________ Greer/Guthrie 33 Learning Technology Services
  • 34.
    Information System (GIS) inEarth/Environmental Science MSS in spring 04 enrollment 25 TED 359 – Electronics Technology 3 BS Degree; Licensure in TED, MSS Haynie/Haynie Overload Blended (2 weekend labs); some video Ready by fall 03 Taught every fall; enrollment 30 (10 distance) many students may choose 359 TED 556 – Lab Management & Safety 3 BS Degree; Licensure in TED, MSS Haynie/Haynie Overload Blended Taught spring 03 Taught every spring http://www4.ncsu .edu/~wjhaynie/te d556/; most students will need 556 Until facultyareidentifiedfromPAMS,AgricultureandLifeScience,GeneralEducationRequiredCoursesandPsychology, informationastodeveloper/teacher,typeofload,andtypeoftechnologytobeutilizedcannotbeascertained. Allcoursesarerequiredfor BSinSEDandMSS. Manyofthesciencecoursesarealsorequiredforparticularsciencemajors(Biology,Chemistry,Physics,etc.).All courseslistedare3-4semesterhourcoursesotherthanthetwoPEcourses,whichare1semesterhoureach. ________________________ Greer/Guthrie 34 Learning Technology Services
  • 35.
    Timeline for ScienceEducation Courses Development and Implementation Course Year One (2002) Year Two (2003) Year Three (2004) Year Four (2005) EMS 203 Implement EMS 477 (will be EMS 373) Revise/Adapt Implement EMS 594K Revise/Adapt Implement EMS 594I (EMS 573) Revise/Adapt Implement EMS 501 (formerly EMS 594M) Revise/Adapt Implement EMS 502 (formerly EMS 594W) Revise/Adapt/Implement EMS 531 Revise/Adapt/Implement EMS 475 Revise/Adapt Implement EMS 495 Revise/Adapt Implement EMS 375 (new course) Create/Develop Implement EMS 594M Revise/Adapt Implement EMS 594W Revise/Adapt Implement Original timeline for Foundation Courses Development and Implementation (all of the following are not confirmed at this time and year two timelines are incorrect) Course Year One Year Two Year Three Year Four NR ??? Revise/Adapt/ Implement? MEA 410 Revise/Adapt Implement PY 123 Revise/Adapt Implement PY 124 Revise/Adapt Implement PY 126 Revise/Adapt Implement CH 223 Revise/Adapt Implement BCH 451 Revise/Adapt Implement BO 360/365 Revise/Adapt Implement PY 203 Revise/Adapt Implement PY 341 Revise/Adapt Implement MEA 451 Revise/Adapt Implement CH 331 Revise/Adapt Implement ________________________ Greer/Guthrie 35 Learning Technology Services
  • 36.
    CH315 Revise/Adapt Implement ZO421 Revise/Adapt Implement Original timeline for Other Required Courses Development and Implementation (all of the following in this section are question marks) Course Year One Year Two Year Three Year Four PSY 304 Revise/Adapt Implement PSY 475 Revise/Adapt Implement PE 1__ Revise/Adapt Implement PE 2__ Revise/Adapt Implement History Elective Revise/Adapt Implement Social Science Elective Revise/Adapt Implement Humanities Elective Revise/Adapt Implement Literature Elective Revise/Adapt Implement Hist/Philos Sci Elective Revise/Adapt Implement Philos/Reli/Art Elective Revise/Adapt Implement Multicultural Elective Revise/Adapt Implement Can be used for Science LE program (All of the Pure Science Classes could also be used) 2)EMS 594K Methods for Teaching Science 3 Licensure in SED, MSS Holley/Holley Adjunct Faculty? Interactive Television, Video, Web 3)EMS 573 Technological Tools in Science 3 Licensure in SED, MSS Park/Park Overload Web 4)EMS 501M Readings I 1 Advanced Licensure in SED, MSS Slykhuis/Park? Regular Web Can be used for ALL LE programs 1)PSY 304 Now listed as EDP 304 Revise/Adapt Implement 5) PSY 475 Now listedas PSY476 Revise/Adapt Implement 6)Multicultural Elective Revise/Adapt Implement ________________________ Greer/Guthrie 36 Learning Technology Services
  • 37.
  • 38.
    Accessible Licensure Programin Science Education Appendix B: Licensure Programs in North Carolina “Constituent institutions with teacher education programs approved by the State Board of Education may offer specific course clusters in approved teacher licensure areas which meet licensure requirements of the State Board of Education but do not lead to the conferral of a particular degree or a Certificate of Advanced Study. These may be at the entry level or advanced level of teacher licensure.[…] A current inventory of teacher licensure programs approved by the State Board of Education is available from the North Carolina Department of Public Instruction.” Public Institutions (North Carolina University System) EAST CAROLINA UNIVERSITY (http://www.coe.ecu.edu/teached/teached.htm) ECU offers a total of 27 licensure areas, of which 4 are math and science related. Two of these four are designated for middle grades. Extensive information on alternative licensure programming and lateral entry licensure options is available in East Carolina’s Teacher Education handbook: http://www.coe.ecu.edu/teached/ABwelcome.htm. UNC-ASHEVILLE (http://www.unca.edu/education/catalog/licensure.htm) UNC-Asheville provides both primary and secondary education licensure options. Secondary licensure options associated with science and math include Biology, Chemistry, Mathematics, Physics, and Science. The Teacher Education program is offered at the baccalaureate level (Class "A" Licensure) for undergraduate and postgraduate students. In addition to the appropriate education program, undergraduates must complete the general education requirements of the University and the requirements of a major department in the University. Postgraduates with a baccalaureate degree and a grade point average of 2.50 from an accredited college or university need to complete the appropriate education program and also any requirements for a major appropriate to their own area of specialization but lacking in their prior academic experience. A handbook is available that details clinical and academic requirements. The handbook is posted at http://www.coe.ecu.edu/teached/ABwelcome.htm. Web-based information on each secondary licensure program is also available. Reference links are provided directly below. Math Licensure: http://www.unca.edu/education/catalog/math9-12.htm Biology Licensure: http://www.unca.edu/education/catalog/science9-12.htm Physics Licensure: http://www.unca.edu/education/catalog/science9-12.htm Science Licensure: http://www.unca.edu/education/catalog/science9-12.htm Chemistry Licensure: http://www.unca.edu/education/catalog/science9-12.htm UNC-CHARLOTTE (http://education.uncc.edu/teal/ and http://education.uncc.edu/mdsk/) UNC-Charlotte provides both initial and advanced licensure programs. For students entering a program to acquire initial licensure, areas available for licensure that relate to science and mathematics include Mathematics, Biology, Chemistry, Earth Science, Physics, and Comprehensive Science. A program overview and requirements section is placed directly below, and is followed by information on UNC-Charlotte’s offerings for advanced licensure. Degree Requirements: The undergraduate program in secondary education requires a major in the College of Arts and Sciences in a discipline relevant to the curriculum in grades 9-12 and a maximum of 128 hours as follows: General Education (26-41 hours). These course requirements vary with a student’s academic major in arts and sciences and are defined by faculty in each major. Core and Related Courses in an Appropriate Arts and Sciences Major (30-78 hours). Academic majors relevant to secondary education include English, History, Mathematics, Biology, Chemistry, Earth Sciences, and Physics. The requirements for each major are defined by faculty in that major. Secondary Education (44 hours) EDUC 2100 An Introduction to Education and Diversity in Schools (3) SPED 2100 Introduction to Students with Special Needs (2)
  • 39.
    (Corequisite courses EDUC2100 and SPED 2100 should be taken during a student’s sophomore year; both must be completed with a grade of "C" or better for the student to qualify for admission to the Teacher Education Program in the selected field of secondary education) SECD 3140 The Adolescent Learner (3) SECD 3141 Secondary Schools (3) MDSK 3150 Research and Analysis of Teaching Middle and Secondary School Learners (3) MDSK 3151 Instructional Design and the Use of Technology with Middle and Secondary School Learners (3) KNES 3152 Health and Safety Issues in Middle and Secondary Schools (2) SECD 3142 Issues in Secondary Education (2) SPED 3290 Modifying Instruction for Learners with Diverse Needs (2) MDSK 4251 Teaching Science to Middle and Secondary School Learners (3) or MAED 4252 Teaching Mathematics to Secondary School Learners (3) or MDSK 4253 Teaching Social Studies to Middle and Secondary School Learners (3) or ENGL 4254 Teaching English/Communication Skills to Middle and Secondary School Learners (3) READ 3255 Integrating Reading and Writing Across Content Areas (W) (3) SECD 3441 Student Teaching/Seminar: 9-12 Secondary Science (15) or SECD 3442 Student Teaching/Seminar: 9-12 Secondary Mathematics (15) or SECD 3443 Student Teaching/Seminar: 9-12 Secondary Social Studies (15) or SECD 3444 Student Teaching/Seminar: 9-12 Secondary English (15) Information on advanced licensure is available at http://education.uncc.edu/teal/page11.htm. All programs lead to a Master of Education, a Master of Arts degree and/or a teaching license. A program overview of the advanced licensure/degree option is provided below. Program Overview: This 39-hour program is designed to provide programs of advanced study which are built upon a body of knowledge and expertise common to educational professionals. The program is composed of five strands that concentrate on developing knowledgeable, effective, reflective and responsive practitioners who will become leaders in the profession. The program includes study in areas such as educational research methodology, curriculum theory, analysis of teaching, advanced methodology, and curriculum material development including the application of technology in teaching. In addition, the program includes advanced coursework in the candidate's respective discipline (i.e., Social Studies, Biology, Chemistry, Physics and Earth Science). Courses are also appropriate for teacher licensure renewal or individual professional growth. UNC-PEMBROKE (http://www.uncp.edu/soe/) UNC at Pembroke offers both undergraduate and graduate licensure programs. Information on graduate programs is located at http://www.uncp.edu/soe/undergraduate.htm. Information for graduate programs is provided at http://www.uncp.edu/soe/graduate.htm. At the undergraduate level, 12 licensure areas of offered. Those related to science and math include Biology, Mathematics, and Science. Little information was available on the web site that addresses program information or requirements at the undergraduate level. Similarly, the graduate program pages requested contact be made with the School of Graduate Studies for more information. UNC-WILMINGTON (http://www.uncwil.edu/ed/degrees.html) UNC-Wilmington offers secondary education licensure programs in seven primary areas, with Mathematics and Science being two of them. A detailed overview of the Mathematics Licensure is available at http://www.uncwil.edu/ed/deglicenpdfs/mathjuly2002.pdf. The course requirements are listed below. Mathematics Licensure Requirements Students who plan to become licensed teachers in the North Carolina public schools must complete the university’s Basic Studies expectations, all requirements in the major, and be formally admitted to the Watson School of Education. Requirements for admission are listed in the UNCW Undergraduate Catalogue, and also are listed on the Program Information handout available in King 211. In addition to the requirements for the academic major, the Psychology and Education courses listed below are required for licensure. A grade of “C” or better must be earned in the following courses: PSY 223 Lifespan Human Development (3) EDN 200 Teacher, School and Society (3) EDNL 200 Field Studies (1) EDN 203 Psychological Foundations of Teaching (3) EDN 301 Instructional Design and Evaluation (3) EDN 303 Instructional Technology (3) NOTE: The courses listed below require admission to the Watson School of Education. EDN 321 Meeting Needs of Special Students in High Schools (2) EDN 356 Reading in the Secondary School (3) EDN 402 Classroom Management in Secondary Schools (1) EDN 404 Theory and Practice in Teaching Secondary Mathematics (3) EDNL 404 Field Experience in Secondary Mathematics (1) ________________________ Greer/Guthrie 39 Learning Technology Services
  • 40.
    EDN 408 InstructionalSeminar (2) EDN 409 Practicum (12) Total = 40 semester hours A detailed overview of the Science Licensure is available http://www.uncwil.edu/ed/deglicenpdfs/sciencejuly2002.pdf. The course requirements are listed below. Science Licensure Program In addition to the requirements for the academic major, the Psychology and Education courses listed below are required for licensure. A grade of “C” or better must be earned in the following courses: PSY 223 Lifespan Human Development (3) EDN 200 Teacher, School and Society (3) EDNL 200 Field Studies (1) EDN 203 Psychological Foundations of Teaching (3) EDN 301 Instructional Design and Evaluation (3) EDN 303 Instructional Technology (3) NOTE: The courses listed below require admission to the Watson School of Education. EDN 321 Meeting Needs of Special Students in High Schools (2) EDN 356 Reading in the Secondary School (3) EDN 402 Classroom Management in Secondary Schools (1) EDN 406 Theory and Practice in Teaching Secondary Science (3) EDNL 406 Field Experience in Secondary Science (1) EDN 408 Instructional Seminar (2) EDN 409 Practicum (12) Total = 40 semester hours Private Institutions BARTON COLLEGE (http://www.barton.edu/Schools/doe/Secondary.htm#anchor105836) Students seeking licensure will major in the desired content area and will also take methods courses required for licensure in the area. (General Catalog not available online for review. NOTE, four areas offered for licensure were stated on website, however only Social Sciences, English and Math were listed.) CAMPBELL UNIVERSITY Licensure Requirements for Secondary Education (http://www.campbell.edu/education/proedu/sve.html) All students seeking licensure as secondary, K-12, or vocational education teachers, are required to take Art 131, Music 131, or Drama 131 which will meet the general education requirement for the fine arts area. They must also complete two mathematics courses as designated by the major. CIS 125, Introduction to Computers, is strongly recommended as a substitute for one mathematics course. Additional courses are required as part of the general education requirements and two laboratory science courses, Religion 101 and a religion elective, Exercise Science 185 and 111 or 112. Mathematics (9-12 Licensure) (CIP 13.1311) Twenty-nine semester semester hours in mathematics above the 200-level including courses in linear algebra, geometry, probability and statistics, modern algebra, and computer science. It is recommended that eight semester hours of physics or chemistry be completed as well. Biology (9-12 Licensure) (CIP 13.1322) A minimum of thirty-five semester hours including Biology 111, 202, 203, 205, 327 or 542, 342, and 430 or 437; Mathematics 112 or 122, and 160; Chemistry 111, 113, and 227; Physics 221 and222; Science Education 453; and the professional education sequence. Professional Education Sequence: Students desiring licensure in a secondary teaching area (9-12), Spanish or French (k-12), music (Kk-12), physical education (K-12) or Family and Consumer Sciences (7-12) education must meet all the admission criteria of the Teacher Education Program and complete the following courses: Psychology 222; the pertinent subject area methods course (offered in the spring semester of the senior year as block courses prior to student teaching), and the following Education courses: 1. EDUC 221 Introduction to Education (3) 2. EDUC 225 Writing Seminar (3) 3. EDUC 341 Child and Adolescent Development (3) 4. EDUC 385 Curriculum Trends in K-12 and Secondary Education (3) 5. EDUC 431 Educational Psychology (3) 6. EDUC 432* Practicum (1) 7. EDUC 441 Teaching Reading in the Middle and Secondary School (3) 8. EDUC 453 Effective Teaching Strategies (Secondary and K-12) (3) ________________________ Greer/Guthrie 40 Learning Technology Services
  • 41.
    9. EDUC 454Student Teaching Seminar (3) 10. EDUC 458 Student Teaching (Secondary, K-12, and Vocational (6) DUKE UNIVERSITY Secondary Science Teacher Preparation Program (http://www.duke.edu/web/education/secondary/subjects/science.html) To become eligible for North Carolina Level A Licensure for Grades 9-12, a student must successfully complete those courses required by Duke in General Studies, courses required for the science major, and certain courses in the area of professional knowledge. Students must major in a biological or physical science or an approved interdisciplinary program, with a total of at least 14 courses distributed among biology, chemistry, geology and physics. Students must acquire competencies in biology, chemistry, physics and earth science required by the state of North Carolina. Students must meet the requirement for general studies. - Curriculum 2000 students need 3 or more courses in Arts and Literatures; Civilizations; Natural Sciences and Mathematics; or Social Sciences. All requirements for Curriculum 2000 must be met. - One course in Psychology (e.g., Developmental or Adolescent) Students must meet the following professional studies requirements. - Foundations of Education (Edu 100, fall or spring) - Trends, Techniques & Innovative Technologies (EDU 190, fall) - Educational Psychology (Edu 118, senior spring) - Seminar in Secondary School Teaching - discipline methods (Edu 215S, senior spring) - Secondary Education Internship - student teaching (Edu 216, senior spring) *counts 2 cc. Coursework and field experiences in the professional knowledge area are sequenced. For example, students complete Educational Psychology (Edu 118) and the Seminar in Secondary School Teaching (Edu 215S) in the spring semester of their senior year as part of the student teaching block. Edu 118 and Edu 215S are accelerated during the spring semester to provide students an opportunity to engage in student teaching for ten weeks. A course may meet more than one requirement; for example, some Education courses count as Social Science electives. Candidates must acquire professional knowledge and specialty area competencies required by the state of North Carolina. Requirements may be met through advanced placement, Duke course credit, independent study, or other means approved by the Director of the Program in Education. ELON UNIVERSITY Secondary Education Licensure/Teacher Education Program (35 sh) (http://www.elon.edu/academics/education/edudept/second.asp) The student who successfully completes any of the teacher education programs at Elon will be eligible for licensure to teach in North Carolina. The student planning to teach at the high school level completes a major in a discipline and the necessary Professional Studies courses for teacher licensure at the secondary level (grades 9-12). Secondary education licensure is available in biology, chemistry, comprehensive science, English, history, mathematics, physics and social studies. Specific requirements for each program are listed with the appropriate department in this catalog. In general, the following Professional Studies courses must be satisfactorily completed: EDU 211 Introduction to Education with Practicum 4 sh EDU 322 Reading in the Content Areas 2 sh Choose an appropriate methods course: 4 sh EDU 421 Materials and Methods of Teaching Middle Grades and High School English EDU 422 Materials and Methods of Teaching Middle Grades and Secondary Mathematics EDU 424 Materials and Methods of Teaching Middle Grades and Secondary Science EDU 425 Materials and Methods of Teaching Middle Grades and High School Social Studies EDU 430 Foundations of Education 3 sh EDU 450 Meeting Special Learning Needs of Children 3 sh EDU 480 Student Teaching Seminar 2 sh EDU 481 Supervised Observation and Student Teaching 10 sh CIS 220 Computers and Teaching 3 sh (Not required for Mathematics Education majors) PSY 321 Educational Psychology 4 sh LEES-MCRAE COLLEGE (Information not available via current university website. Catalog/Handbook not online.) LENOIR-RHYNE (http://www.lrc.edu/edu/majors.htm) ________________________ Greer/Guthrie 41 Learning Technology Services
  • 42.
    Lenoir-Rhyne College offersrelated undergraduate Licensure programs in Biology, Chemistry, Mathematics, Physics and Science for Teachers. An average of 20 additional credits is required to obtain a licensure. The following URLs link to Adobe Acrobat files that detail the requirements to receive licensure in each of the above areas. Biology http://www.lrc.edu/edu/pdfFiles/checksheets/9-12%20bio.pdf Chemistry http://www.lrc.edu/edu/pdfFiles/checksheets/9-12chem%20.pdf Mathematics http://www.lrc.edu/edu/pdfFiles/checksheets/9-12mat.pdf Physics http://www.lrc.edu/edu/pdfFiles/checksheets/9-12phy%20doc.pdf Science for Teachers http://www.lrc.edu/edu/pdfFiles/checksheets/9-12gssci.pdf ________________________ Greer/Guthrie 42 Learning Technology Services
  • 43.
    Accessible Licensure Programin Science Education Appendix C: Course-Related Considerations Planning & Engagement  Notification/Introduction to Course  Course Components  Student Assessment (Entering Characteristics/Knowledge)  Textbooks/Course Packs  Technology Orientation (Faculty, Student, Assistants)  Faculty Development  Instructional Technology Assistant Program (ITAP)  Hardware/Software Requirements  Hardware/Software Resources (University, Specialized)  Fiscal/Resource Availability & Requirements  Faculty Research/Scholarship Goals Design & Production  Project Management  Instructional Technologies & Tools  Instructional Design  Graphics Development  Multimedia Development  Web Application Development  Video Production and Direction  Database Development  Copyright Acquisition  Curricular Assessment  Assessment of Learning (Tools and Techniques) Delivery & Support  InfoFacts Preparation (if applicable)  Textbook/coursepack orders  E-reserves  Intellectual Property considerations  CD-ROM Development  CD-ROM Distribution  VHS Distribution  Cable Broadcast  Student Services  Server Requirements  FTP Requirements  Hardware Requirements  Software Requirements  Technical Support Agreement  Student Orientation  Graduate Assistant Orientation  Technology assessment Other Evaluation & Assessment  Standard DELTA course assessment  Customized course assessment  Instructor Evaluations (Online, Paper)
  • 44.
    Accessible Licensure Programin Science Education Appendix D: Marketing Opportunities and Venues The purpose of this Appendix is to present an overview of marketing and promotion of the Accessible Licensure Program. Encompassed within this overview are (1) key program issues, (2) marketing opportunities, (3) a sample campaign, and (4) possible venues, placement types and associated advertisement information/rate card links where available. KEY PROGRAM ISSUES There are a number of key issues influencing the capacity to market and promote the Accessible Licensure Program. These issues are listed below:  Marketing efforts do not presently exist that specifically target the Accessible Licensure program. In part this is due to the fact that there is already a high demand for the courses included in the AL program and that the target audiences, program products and program goals have not been fully defined.  With respect to those students either previously or currently enrolled in the program courses, there is the concern that they are predominantly ‘self-selected’ and, as a result, are found to have higher attrition rates or not an appropriate fit for the program.  A market analysis has not been conducted, or the results are no longer available. As a result, uncertainty exists with respect to certain environmental factors such as market segment, market needs, market advantage, and competition.  Presently, the relationship is unclear with respect to the Accessible Licensure Program and North Carolina’s NC Teach initiative. It is possible that a resource conflicts may exist for delivery of the AL program and that NC Teach may draw from the pool of potential program candidates. MARKETING OPPORTUNITIES Generally, colleges and departments are responsible for marketing and promoting their own programs. However, four primary marketing modes are readily available for the promotion of the Accessible Licensure program – two of which are available through NC State. The first is to market the program through established NC State networks, which might include bundling informational media with general lateral entry marketing, partnering with science and math marketing presently being conducted, or marketing to military networks available to NC State. A second marketing mode readily available to the College of Education are the marketing campaigns conducted by DELTA for all distance education courses and programs. This may be supplemented by assistance from DELTA’s Marketing Services Office for electronic or print campaign design and selection recommendations, partnering, and creative media design and production. The third marketing mode is external to NC State and resides with efforts being conducted by community colleges and other partners. Finally, if programs are find it in their best interest, campaign design, implementation, management and evaluation can be contracted to an external source – as can the development of creative print or electronic media. SAMPLE DISTANCE EDUCATION CAMPAIGN BY DELTA Currently DELTA marketing efforts are acquisition-based, versus a branding thrust, and predominantly in-state and with electronic media. General distance advertisements, to include ________________________ Greer/Guthrie Learning Technology Services 44
  • 45.
    highlighting of FlexibleAccess programming, primary target the triangle and triad areas. Communication plans generally run on a 3-cycle year while individual marketing campaigns are predominantly semester-based. Sample venues, including direct mail catalogs, are available upon request for courses and programs. Other options include press releases/ banner/bookend/sponsorship advertisements, text advertisements, and pushed email to purchased lists. Integrated into the marketing campaigns whenever possible are mechanisms for tracking prospective students. For example, when requesting a catalog or clicking on an advertisement, a database is used to store information and then follow-ups are made either through the delivery of program materials, such as a CD-ROM or brochure, a telephone call or email. Example Marketing Campaign:  Marketing within current DELTA marketing for distance education o Distance Education Course Catalog o Vinyl Banners for on-campus publication o Online program and course listings o Distance Education Electronic Campaigns  Example Campaign, Spring 2003 • Career Journal • Careermarketplace • College Journal • NewsObserver • WRAL.com • Wall Street Journal • Yahoo Banners • eList Marketers • enr.com POSSIBLE VENUES, PLACEMENT FORMATS AND COSTS The table below provides marketing organized within the categories of Newspapers, Electronic, Media and Other. Use of the venues varies at NC State. The list is by no means exhaustive. Where available, types of common placements, associated placement information, and links to advertising information/rate cards are provided. Category Placement Type(s) Related Information (i.e., URL, Target Audience) Advertising Information and/or Rate Card Links Newspapers (Online/Print) Raleigh News & Observer Variable http://www.news-observer.com/ http://about.newsobserver.com/display/ Durham Herald Variable http://www.herald-sun.com/ http://www.heraldsun.com/advertisinginfo/ Fayetteville Observer Variable http://www.fayettevillenc.com/ advertising@fayetevillenc.com Greensboro News & Record Variable http://www.news-record.com/ http://www.news-record.com/advertising/ ________________________ Greer/Guthrie Learning Technology Services 45
  • 46.
    Category Placement Type(s) Related Information (i.e.,URL, Target Audience) Advertising Information and/or Rate Card Links Winston-Salem Journal Variable http://www.journalnow.com/ http://www.journalnow.com/servlet/Satellite? pagename=WSJC%2FPage%2FWSJC_ ContentPage&c=Page&cid=1051216105615 Charlotte Observer Variable http://www.charlotte.com/mld/observer / na Wall Street Journal Variable Registered Users, Target NC http://online.wsj.com/public/us http://advertising.wsj.com/ Electronic Career Journal 120x600 Banner, Target NC EI Academic Variable Annual Listing, Target International eLearners.com Variable Annual Listing, Target International Petersons.Com Variable Annual Listing, Target International Career Market Place Variable Career specific site targeting College Journal 120x600 Banner, Target NC WRAL.com 120x90 378x150 200x30 468x60 120x90 Education Page Tile Sponsor Rotating Spotlight Rotating Bookend Ad News Channel Weather Channel Yahoo.com 728x90 300x250 120x600 Occupation-based Target, NC Occupation-based Target, NC Occupation-based Target, NC NewsObserver 120x60 Text link 468x60 250x250 120x90 Education Guide Sponsor, Target NC Banner Banner Banner eList Marketers 4.28 5.5 5.12 4.28 Occupation-based Email Drop Occupation-based Email Drop Occupation-based Email Drop HR-based Target Email Drop enr.com 468x60 Banner, Target NC Media ________________________ Greer/Guthrie Learning Technology Services 46
  • 47.
    Image Piece Brochure 2-, 4-colorProgram Specific, Target Variable Category Placement Type(s) Related Information (i.e., URL, Target Audience) Advertising Information and/or Rate Card Links CD-ROM Program Specific, Target Variable One-page Flier 2-, 4-color Program Specific, Target Variable Tri-fold Brochure 2-, 4-color Program Specific, Target Variable Program Business Cards Program Specific, Target Variable 3x7 Business Fliers 2-, 4-color Program Specific, Target Variable Other Information Sessions Open Houses Conferences ________________________ Greer/Guthrie Learning Technology Services 47
  • 48.
    Accessible Licensure Programin Science Education Appendix E: Equipment Accessible Licensure Laptops Two laptops were purchased during fiscal year 2002-2003 in support of the Accessible Licensure program. These laptops are intended for use by instructional designers and support staff, faculty, and administrators involved with development, delivery, and maintenance of AL course materials, program website, and/or marketing materials. The laptops have the following specifications: Hardware Specifications: Base Unit: Latitude D800,1.30GHz, Pentium M, 15.4 WXGA, English Memory: 512MB, 2 Dimms, Double Data Rate for Dell Latitude D600 Notebooks Video Card: NVIDIA GeForce4 4200 Go 4XAGP graphics with 32 MB DDR Video Mem for Latitude D800 Hard Drive: 40GB Hard Drive 9.5MM 5400RPM for Dell Latitude D800 Floppy Disk Drive: Floppy Drive, Internal/External for Dell Latitude D-Family, Notebooks, Factory Tied Operating System: Windows XP ProSP1, English for Dell Latitude DFAM Notebooks Modem: Internal 56K Modem for Dell Latitude D-Family Notebooks CD-ROM or DVD-ROM Drive: 24X CDRW/DVD for Latitude D-Family Processor Cable: Dell TrueMobile 1300 WLAN (802.11b/g, 54Mbps) miniPCI Card Feature 9-Cell/72-WHr Primary Battery for Dell Latitude D800 Service: Next Business Day On-Site and CompleteCare Service, Initial Year Service: Next Business Day On-Site and CompleteCare Service, 2 Year Extended Dirline: Gold Technical Support Service Latitude, 3 Years Misc: OMCI 7.0 Systems Management For Latitude Misc: Windows NT/2000,NTFS File System Misc: USB Memory Key 64MB for Latitude D-Family Software Specifications: Each laptop includes the following software: Microsoft Windows NT/2000, Microsoft Office 2000, Acrobat 5, Photoshop 7, and Macromedia Studio MX. ________________________ Greer/Guthrie Learning Technology Services 48
  • 49.
    Accessible Licensure Programin Science Education Appendix F: Proposed Program Website Overview About AL Program  Letter from "Director"  Program Overview (e.g., Degree information, course descriptions, faculty)  Events/Open Houses  Common Questions  Contact Information The AL "Experience"  About NC State University (Overview, Resources for Distance Learners, Directions)  Overview of "typical" course (online, video, etc.)  Testimonials  Expectations (e.g., Honor Codes, Registration, Graduate School, Acceptable Use Guidelines)  Requirements (e.g., Software, Hardware, Honor Codes, Plan of Study, Participation, Textbooks)  Application Process (e.g., Online App?, Financial Aid, Bursars Office) Resources and Support  University Resources (e.g., Advising, Textbook purchases, Counseling, Library, Tutorials, Writing Labs, Software/Hardware/Computer Purchases)  Proctoring/Tests  Program Support (Contact information)  Library  Technical Support  Program Forms (e.g., Application, Plan of Study, Graduation, etc.) Courses  Course Listing/Description with Requirements (Computer, Text, Lab) and Instructor if known include: Delineation of Online courses, IVC courses, Face to Face, Blended courses with descriptions of each, include: link directly to course itself if WebCT supplement  Course Projections (approximately 3 semesters out for plan of study)  Links to participating Departments/College(s) * Note: a separate section of the website can be made for faculty and stakeholders, providing access to reports, results of evaluations, online "getting started" guides, instructional design guides, and resources addressing development and/or instructional needs. ________________________ Greer/Guthrie Learning Technology Services 49
  • 50.
    Accessible Licensure Programin Science Education Appendix G: References/Resources Bourdillon, H. & Burgess, H. (1998, April). Open learning, new technologies and the development of a new model of pre-service education and training: The open university, UK experience. Paper presented at the Annual Meeting of the American Educational Research Association, San Diego, CA. Commission on Institutes of Higher Education (CIHE) (2000, September). Best practices for electronically offered degree and certificate programs. Available at < http://www.neasc.org/cihe/evaluation_electronically_offered_degree.htm>. Cross, K.P. (1992). Adults as learners: Increasing participation and facilitating learning. San Francisco: Jossey-Bass. Diamond, R.M. (1989). Designing and improving courses and curricula in higher education. San Francisco: Jossey-Bass. Egbert, J., Thomas, M. (2001). The new frontier: A case study in applying instructional design for distance teacher education, Journal of Technology and Teacher Education, 9(3), 391-405. Gibson, C.C. (1998). The distance learner in context. In C. C. Gibson (Ed), Distance Learners in Higher Education: Institutional Responses for Quality Outcomes (113-125). Madison, WI: Atwood Publishing. Glenn, J.M.L. (2001). Supporting teacher learning: Professional development goes online, Business Education Forum, 56(2), 8-13. Gruenhagen, K., McCracken, T., & True, J. (Summer/Fall 1999). Using distance education technologies for the supervision of student teachers in remote rural schools, Rural Special Education Quarterly, 18(3/4), 58. Houdek, E. (1990). Managing distance education courses. Urbana, IL: Board of Trustees of University of Illinois. Leach, J. (1996, November). Teacher education—Online! Educational Leadership International, 54(3), 68. Levin, S.R., Waddoups, G.L., Levin, J., Buell, J. (2001). Highly interactive and effective online learning environments for teacher professional development,” International Journal of Educational Technology, 2(2). Martyn, M. (2003). The hybrid online model: Good practice. Educause Quarterly, 26(1), 18- 23. ________________________ Greer/Guthrie Learning Technology Services 50
  • 51.
    Maushak, N.J.P. (1997).Distance education, innovativeness, and teacher education: Status in Iowa independent, four-year colleges and universities. Dissertation Abstracts International, 58-06A, 2172. Moloney, J & Tello, S. (2003). Principles for building success in online education. Syllabus, 16(7), 15-17. O'Brien, T.P. (2001). Meeting the challenges of delivering accelerated alternative licensure and graduate programs via distance education, Business Education Forum, 55(4), 30-33. Parker, D. R. (2000, November). Using technology to certify secondary teachers: The Alternative Certification Project. Paper presented at the Annual Meeting of the Mid-South Educational Research Association, Bowling Green, KY. Perry, G.Y. (2002). The use of online video case studies and teacher education. Dissertation Abstracts International, 63-03A, 908. Rodes, P., Knapczyk, D., Chapman, C., & Chung, H. (May 2000). Involving teachers in web- based professional development, T H E Journal, 27(10), 94. Saunders, E.A. (2001). Interactive online learning for teachers, NASSP Bulletin, 85(628), 51-57. Sullivan, M.E. (1995, March). Rural settings: One approach to meeting teacher staffing needs via alternative certification. In Reaching to the Future: Boldly Facing Challenges in Rural Communities. Conference Proceedings of the American Council on Rural Special Education (ACRES), Las Vegas, Nevada. Twomey, Sylvia M. (2002, February). The Virtual Teacher Training Center: A one-year program to transform subject-matter experts into licensed career and technical education teachers. Paper prepared for the National Career and Technical Teacher Education Institute, "A Call for Renaissance in Career and Technical Teacher Education," Scottsdale, AZ University of North Carolina Board of Governors (December 2000). Regulations for planning and conducting degree-related extension and distance education. UNC Policy Manual: Available at: <http://www.northcarolina.edu/content.php/legal/policymanual/contents.htm > 400.1.1.1[R], sections B.4. and C. Waterhouse, S & Harris, R. (2002). A ten-step guide to establishing instructional technology. Washington, DC: Executive Leadership Foundation. Vrasidas, C. (2002). A working typology of intentions driving face-to-face and online interaction in a graduate teacher education course. Journal of Technology and Teacher Education, 10(2), 273-96. Zirkle, C. (Oct-Nov 2002). Utilizing the Internet and web enhancements in the preparation of technical education, ATEA Journal, 30(1), 14-16. ________________________ Greer/Guthrie Learning Technology Services 51
  • 52.
    Accessible Licensure Programin Science Education Appendix H: Faculty Manual ________________________ Greer/Guthrie Learning Technology Services 52
  • 53.
    Accessible Licensure FacultyManual for Web Course Development ________________________ Greer/Guthrie Learning Technology Services 53
  • 54.
    Contents Introduction.....................................................…………………........ 1 Overview.................................................................…………………. 2 CourseDesign..........................................................………………… 3 Course Requirements……………………………………………….. 6 Creating Web-enhanced Course Materials.............…………………. 7 Using the Standard Template.……….....................…………………. 8 Using the WebCT Template...................................…………………. 12 Resources................................................................…………………. 18 Introduction The purpose of this manual is to assist you in developing Web course materials and provide guidance in using the Web templates that have been designed specifically for the Accessible Licensure (AL) program. The information in this manual should help you develop course materials that are appropriate for online delivery, determine which AL template is appropriate, and guide you through using the template. The AL Faculty Manual supplements classes and instructional materials provided by NC State University/DELTA on how to prepare online courses and course materials. For more information on how to deliver your course online using WebCT or other technologies, contact the Learning Technology Service within DELTA. Be sure to check the Web site for current listings of workshops and other services: http://delta.ncsu.edu/lts. See the Resources section of this manual for additional information and assistance. NOTE: Please read the “Overview” and “Course Design” sections before proceeding to the information on course templates. ________________________ Greer/Guthrie Learning Technology Services 54
  • 55.
    Overview Definitions A “Web-enhanced” coursecombines traditional “face-to-face” classes with online components. These courses generally require students to attend classes or labs on campus. A “fully online” course is asynchronous: that is, the course can be taken anywhere at any time. Students are not required to come to the campus, and instructors generally don’t meet the students in person. These courses are most convenient for students at a distance, as well as students with work and other obligations. Overview of Templates Two templates have been designed specifically for AL courses. One template is for courses using WebCT (WebCT template); the other, called the standard template, is for non-WebCT courses. Which template should you use? If you plan to develop a fully online course, use the WebCT template. If you’re developing a Web-enhanced course, template selection depends on which specific online functions you plan to use. Use the WebCT template for Web-enhanced courses that require interactivities, including discussion forums, message boards, student tracking, posting of student assignments and presentations online, and so on. The standard template is designed for Web-enhanced courses with minimal interactivity. Use this template if you simply want to include your syllabus, list of assignments, lecture notes, resource list, and other print-oriented, non-interactive materials online. Interactivity on the standard template is limited to links to your e-mail address and other Web sites. Although NCSU has available interactive tools (such as WolfWare) that could be used with the standard template, we do not recommend using them. The goal is to provide a consistent user interface among courses in the AL sequence. Having students learn a single user interface (WebCT) for interactive elements will reduce the number of technical questions, allowing students and instructors to focus on course content instead of technical issues. Detailed information on how to use the two templates is available under “Using the Standard Course Template” and “Using the WebCT Template.” ________________________ Greer/Guthrie Learning Technology Services 55
  • 56.
    Course Design Fully OnlineCourses vs. Web-enhanced Courses Fully online courses Fully online courses are available to a larger number of students than Web-enhanced courses. Since these courses are not time- or place-dependent, students (as well as instructors) can work on the course during convenient hours, from convenient locations. Keep in mind that fully online courses can be taken by students in different time zones and remote areas. It’s important to remember that your students may not have access to academic libraries. Therefore, all course materials should be available online and linked to your course (excluding textbooks or required software, which students should be able to order online). This includes journal articles and other materials. Some of these materials may be available online through NCSU library, an online version of the journal, or the author’s Web site. For other materials, you may need to receive copyright permission and create PDFs. (See the Resources section for information.) Due to the asynchronous nature of fully online courses, we discourage use of chat rooms, which require student involvement at a particular time. If offered, chat rooms should be optional and archived for student review. Any time-dependent component should be supplemented by an asynchronous method. For example, if you offer online office hours, you should also be available to students through e-mail and/or a message board as well. You may want to include media such as streaming audio and video in your Web course. For more information, contact the Learning Technology Service within DELTA. Web-enhanced courses Some courses are not suited to a fully online environment. These include courses that require students to perform on-site laboratory work or display interactive presentation skills. In general, if a course has elements that are time- or place-dependent, then it is better developed as a Web- enhanced course. (Note: Web-enhanced courses are also called “blended,” “Web-supplemented” and “Web-intense” courses.) For a Web-enhanced course, you may want to include an online syllabus, list of assignments and readings, and course calendar. You may want to accept assignments online or administer self- tests that allow students to assess their skills. You may also want to post grades online, or make your e-mail address available for students with questions outside the class period. In addition, Web-enhanced courses can take advantage of other technologies, such as interactive video. You may also want to include media such as streaming audio and video on your Web site. ________________________ Greer/Guthrie Learning Technology Services 56
  • 57.
    For more info Tolearn more about using the Web and other technologies, contact the Learning Technology Service within DELTA. Check the Web site for current listings of workshops and other services: http://delta.ncsu.edu/lts. Elements of Effective Teaching Technology cannot substitute for effective teaching. Instead, it should enhance teaching and make course materials more accessible to a greater number of students. Hines and Cooke-Plagwitz (2001) note that effective teaching includes the following:  Reading & research, including resources for finding more information.  Class discussions of relevant topics, led by the instructor.  Relevant, concise lectures that share the instructor’s expertise with students.  Individual & group assignments.  Examinations that gauge students’ knowledge and abilities.  Labs & practicums that assess skills used in context.  Clear demonstration of the relevance & timeliness of theories and concepts.  Private consultations between the instructor and each student to answer individual questions and concerns.  Feedback from students to the instructor on teaching effectiveness, and grading feedback from the instructor to the students.  Thorough record-keeping of the students’ work as well as the instructor’s work. Refer to the Resources section of this manual for sources of more information. Interactivity Effective teaching also engages active learning. Just as good classroom instruction is largely experiential (rather than relying solely on lectures), online teaching needs to be more than typed lecture notes or videotaped lectures. Good online teaching uses interactive elements to promote active learning. Examples of online interactive elements include:  Threaded discussion groups in which students comment substantively on the work of their classmates.  Analysis of a case study.  Multiple-choice quizzes and self-assessments that provide feedback to responses.  “Round robin” assignments, in which students submit assignments to two other students for feedback. For example, Student A answers a question; Student B critiques the response, and Student C remarks on the original response and the critique. Meanwhile, ________________________ Greer/Guthrie Learning Technology Services 57
  • 58.
    Student B submitsher original response to Student C, who submits his original response to Student A. Contact DELTA for more suggestions on how you can include interactive elements in your courses. Elements of Online Course Design Online courses should begin with clearly-stated goals and learning objectives/outcomes. All materials and information in a course should relate to these goals and objectives. General goals should be established for the overall course: for example, one goal may be to introduce students to basic research techniques. Based on these goals, objectives are established for each lesson (for example, one lesson may describe and show examples of specific survey instruments). All information included in the lesson should relate to a learning objective that states the knowledge you want students to gain, and what skills they should acquire, by taking the course. Each lesson should begin with a list of learning objectives that are specific and can be practically measured. For example: “After you complete this lesson, you will be able to define the differences between qualitative and quantitative research, and describe three specific survey instruments for each type of research.” How will you assess learning? Learning assessments should be closely tied to learning objectives and outcomes. Include self-tests as well as opportunities for peer review (such as critiques of classmates’ assignments). And make sure the expectations and workload for each online course is similar to that found in traditional classroom courses. Keep in mind that your course may need to support the development of competencies beyond the stated course goals and objectives, including mastery of software. “Chunking” Course Materials An important aspect to effective online course design is the organization of lessons into smaller, topic-based segments, or “chunks.” Endless scrolling is not an effective format for online learning, particularly in the “Lecture Notes” segments of your course. Students learn from online materials better when the information is organized into chunks no larger than 2-1/2 screens in length. (NOTE: The standard template includes 16 pages for lecture notes, or one page per week. The WebCT template includes three pages each week for lecture notes.) This method for dividing course materials does not apply to ancillary pages such as Resources pages, reading lists, and other alphabetized information (unless the page is extremely long and/or chunking the materials would increase ease of use). ________________________ Greer/Guthrie Learning Technology Services 58
  • 59.
    Course Requirements NCSU CourseRequirements NSCU requires specific items, such as copyright notice and contact information, to be included on each Web page. This list of requirements (along with URLs for sample online courses, important links and more) is available in the DELTA publication, “Designing an Online Learning Environment.” Check the DELTA Web site for current listings of workshops and other services: http://delta.ncsu.edu/lts. System & Browser Requirements In order to use the templates, you and your students will need to use Windows 98 or higher. Macintosh users should use OS 9.2 or higher. Your browser must be Internet Explorer version 5 or Netscape version 6 or higher. ADA Guidelines The Americans with Disabilities Act (ADA) influences the design and development of web pages. Following is a brief list of guidelines that will help make your course accessible to everyone. Images  Each .gif and .jpg image should have a meaningful ALT (text alternative) attribute that describes the image in the <IMG> tag. In the Dreamweaver “design view,” select the image, then type the description in the “Alt” box.  If you use images that contain critical information (such as charts or graphs), be sure to include a text description of the information. Numbered & Bulleted Lists  Identify the number of items in numbered or bulleted lists in the sentence preceding the list. For example, “After this lesson, you should be able to describe the following three items.”  Use numbers for lists of four or more items. Bullets are fine for lists of three or fewer items. Links  Make sure to include the Web address in the text for all hyperlinks. For example: NC State University (http://www.ncsu.edu) ________________________ Greer/Guthrie Learning Technology Services 59
  • 60.
    Tables  Do notdevelop complex tables for the Web; screen readers cannot decipher them. Instead, lay out the information in a simple linear format.  Tables should be restricted to two columns. The first column should relate solely to the information in the second column, NOT to titles in the first row. Text in the first column should be limited to one or two words; if you use two words in the first column, make sure the table is wide enough so both words appear on one line. The second column can include as many words as you need. The following example is an acceptable table: Instructor: Dr. Jim Smith E-mail: j_smith@ncsu.edu Office hours: Monday, Wednesday & Friday, 10:00 to11:00 a.m.  The table will need a “summary” that describes its purpose and number of columns. Add this information to the table tag in the HTML code. For example, the above table is described by the following “summary”: <table width="50%" border="1" summary="This 2 column table displays: (column 1) the type of information in the second column and (column 2) contact information for the instructor." align="center"> Creating Web-enhanced Course Materials If your course requires classroom meetings and face-to-face interactions, it can still be enhanced by online materials, interactivities and other options. To determine which template to use, decide what online functions your course requires. If you simply want to post course information online (such as your syllabus, list of assignments, lecture notes and office hours), use the standard template. You can also use this template for sending and receiving e-mail (including attached assignments) and providing links to other Web resources. Use the WebCT template for Web-enhanced courses that require interactivities, including discussion forums, message boards, student tracking, posting of student assignments and presentations online, and so on. Note that the links on both templates can be changed. We recommend minimal changes, however, in order to maintain a consistent user interface for students. Refer to directions for “Using the Standard Course Template” or “Using the WebCT Template.” ________________________ Greer/Guthrie Learning Technology Services 60
  • 61.
    Using the StandardTemplate The standard template includes these pages:  Home page (index.htm).  Syllabus (syllabus.htm). This page includes links to the browsers required for the course (Internet Explorer version 5.0 or Netscape version 6.0 or higher).  Lectures (lecture_introduction, followed by lecture1.htm through lecture16.htm). Post introductory materials on the “lecture_introduction” page. This page also contains links to materials for 16 course weeks. Sixteen “lecture” pages are numbered to correspond with weeks, should you decide to post lecture notes each week. You can use as many or as few of these pages as you need. You can also post lecture notes that are grouped into topic modules instead of weeks.  Assignments (assignments.htm). This page is intended for lists and descriptions of assignments only. If you’d like to have an interactive assignments function, please use the Web CT template.  Resources (resources.htm), including links to NCSU information & services.  Contact information (contact.htm), including office hours and an e-mail link. You can change or delete the pages if needed, although it’s preferable not to do so. A consistent template throughout AL courses will cause less confusion for the students. Making changes to template functions (like button names) must be done in HTML and requires a rudimentary knowledge of this computer language. However, simply adding course information to the templates does not require using HTML. Adding Course Information to the Template 1. Locate the standard template on the WebCT support page: http://webct.ncsu.edu. Save the template pages on your local computer or disk. NOTE: Images on the template will not appear on your local computer unless you also copy the folder labeled “images.” Template images must be left in this folder. 2. Review the pages in the template to get a sense of how it’s organized. Note that the “Syllabus” page already has a section titled “Software” with links to Internet Explorer and Netscape. The “Resources” page also has some built-in links. 3. Most of your course information can be written using a word processing program. On some pages, however, it will be easier to enter the information directly into Dreamweaver. These pages include “Assignments,” “Contact” and possibly “Resources.” (Note that hyperlinks created in Microsoft Word will not transfer to Dreamweaver, even if you save the document as HTML. You’ll need to create the links in Dreamweaver.) For text written in a word processing program: 4. Select the information you want to place on a Web page and copy it. 5. Using Dreamweaver, open the appropriate template file, as listed above next to the page name (such as “index.htm” for the Home page). ________________________ Greer/Guthrie Learning Technology Services 61
  • 62.
    6. Click thecursor in the part of the document that says, “Place course information here.” 7. Paste the information into the template, and erase the on-screen instructions. On all pages: 8. Create hyperlinks where needed. See “Links,” below, for more information. 9. The template contains a style sheet that specifies font colors and sizes for “Heading 1” through “Heading 4.” (The titles at the top of each page, such as “Home,” are formatted as “Heading 1.”) If you want to format sub-headers in your text, select the sub-header and choose a heading size in the Format box. 10. Make sure the copyright date is correct in the footer. 11. Save the file using its original file name. If you change the file name, the links to this page won’t work. Posting Lectures 1. Decide whether to organize lecture notes by week or by module topics. 2. Follow the above directions for “Adding course information to the template.” Place introductory information in “lecture_introduction.htm.” This page also contains links to 16 weeks of lecture material or 10 modules. 3. Use the “Lectures” templates in numeric order, beginning with “lecture1.htm” for the Week One lecture or the first module. The Lecture Notes pages are linked to the introductory page, so it’s important to use these pages in the proper sequence so the links will work. 4. If you’re organizing materials by week, delete the “Modules” button bar from the “Introduction” page (“lecture_introduction.htm”). In Dreamweaver’s “design view,” click the cursor on the “Modules” button bar and select Modify>Table>Delete Row.  If your course has fewer than 16 weeks: Delete any extra weeks on each “Lecture” page. After you finish pasting content into the page for the last week, delete the “Next” button at the bottom of the page. 5. If you’re organizing materials by modules, delete the “Week” button bar from the “Introduction” page (“lecture_introduction.htm”). In Dreamweaver’s “design view,” click the cursor on the “Weeks” button bar and select Modify>Table>Delete Row. Add the name of each module between the brackets, but do not delete the brackets or the HTML code will be deleted, too. The template includes links for ten modules; delete any extra links. Also, after you finish pasting content into the last module page, delete the “Next” button at the bottom of the page. Changing Topic Names Topic names on the red bar (Home, Syllabus, Assignments, etc.) must be changed in HTML; if you change them in Dreamweaver’s “design view” (i.e., WYSIWYG screen), the link to the page will be deleted. To change topic names: Scroll down the HTML page until you see the following. Then change the names only (shown below in boldface) that appear between the hyperlinks, leaving the links intact: ________________________ Greer/Guthrie Learning Technology Services 62
  • 63.
    <!--EDIT BUTTONS BELOW--> <tr> <td id="bottomLEFT" width="224" height="22"><img src="images/bottomLEFT.gif" alt="Accessible Licenture in Science Education (header graphic)"></td> <td id="bottomRIGHT"><a href="index.htm" class="current">Home</a><a href="syllabus.htm" class="link">Syllabus</a><a href="lecture_introduction.htm" class="link">Lectures</a><a href="assignments.htm" class="link">Assignments</a><a href="resources.htm" class="link">Resources</a><a href="contact.htm" class="link">Contact</a></td> </tr> Be sure to make the change to every Web page in the template. Remember to change the title on the affected Web page, too. You can do this in Dreamweaver’s “design view.” Links In the text, include the title of each link, URL, and a brief description of the information available at the link. As much as possible, try to include external links only on a few pages; these links tend to change often, and grouping external links together can minimize maintenance problems. If you link to a large file (such as a PDF), include the file size. If you create PDFs for your course, make sure to use Adobe Acrobat 5.0 or higher (these versions comply with the Americans with Disabilties Act). Check with DELTA to make sure any large files you create can be stored on the server. Linked Web sites should appear in pop-up windows or separate browser screens, as described below. If you are uncomfortable working with HTML code, use a new browser screen. Full-sized new browser screen If you want a link to open in a full-sized browser screen, make sure to specify a blank target screen for the link so students won’t accidentally leave your course. You can do this using Dreamweaver’s “design view” (i.e., WYSIWYG screen). After you create a link, go to the “Target” box and select “_blank”. Pop-up windows Each page of the template includes a pop-up window function called “open sesame.” Use this function when you prefer to have linked information open in a pop-up window rather than a full- sized browser screen. To create a link that opens in a pop-up window, use the following HTML code with the link. ________________________ Greer/Guthrie Learning Technology Services 63
  • 64.
    <a href="Javascript:sesame(‘URL of link','location=yes,scrollbars=yes,resizable=yes,width=500,height=400')">name of your link</a> You can copy this code from links on the “Resources” page (resources.htm). ________________________ Greer/Guthrie Learning Technology Services 64
  • 65.
    Using the WebCTTemplate Stand-alone Pages Some pages in the WebCT template are stand-alone pages: “Syllabus” (syllabus.htm), “Course Readings” (readings.htm), “Course Assignments” (assignments_course.htm), “Course Schedule” (schedule.htm) and “Resources” (resources.htm). These pages should have their own links (and their own icons) on the WebCT Home page for the course. See “Adding course information to stand-alone pages,” below. NOTE: The “Syllabus” page includes links to browsers required for the course (Internet Explorerer version 5.0 or Netscape version 6.0 or higher). “Lectures” Pages The following template pages are linked together. These pages comprise the weekly content materials, and should be added to the WebCT Home page as “Lectures.” See “Adding course information to ‘Lectures’ pages,” below. The “Lectures” pages include:  Introduction (introduction_week1.htm through introduction_week16.htm). Each week’s introduction page should include objectives for the lesson as well as introductory information.  Readings (readings_week1.htm through readings_week16.htm). Each page should contain readings for the current week only. A list compiling readings for all weeks should be included in the stand-alone page, “Course Readings” (readings.htm), and linked to the WebCT Home page. NOTE: If you include readings on the “Course Schedule” page, then the “Course Readings” page may not be necessary.  Lecture Notes (lecture_week1_page1.htm through lecture_week16_page3.htm). Each week, you’ll have up to three pages to allow you to “chunk” the lecture notes. You can use as many of these pages as you need. You can also post lecture notes that are grouped into topic modules instead of weeks. See below for more information.  Assignments (assignments_week1.htm through assignments_week16.htm). This page is intended for lists and descriptions of assignments for the current lesson only. Use WebCT’s “Assignments” function for interactive assignments and link the function to the Home page.  For more (more_week1.htm through more_week16.htm) should contain links to Web sites or other materials that are relevant to the current lesson. Links to NCSU information & services are included on the “Resources” page. You can change or delete the pages if needed, although it’s preferable not to do so. A consistent template throughout AL courses will cause less confusion for the students. Making changes to template functions (like button names) must be done in HTML and requires a rudimentary knowledge of this computer language. (Simply adding course information to the templates does not require HTML.) Changing template functions is also a lengthy process, since it requires changing dozens of pages in the “Lectures” template. ________________________ Greer/Guthrie Learning Technology Services 65
  • 66.
    Adding Course Informationto Stand-alone Pages The following directions apply to stand-alone pages only. These pages include “Syllabus” (syllabus.htm), “Course Readings” (readings.htm), “Course Assignments” (assignments.htm), “Course Schedule” (schedule.htm) and “Resources” (resources.htm). Link these pages to the WebCT Home page for the course. 1. Locate the WebCT template on the WebCT support page: http://webct.ncsu.edu. Save the template pages on your local computer or disk. NOTE: Images on the template will not appear on your local computer unless you also copy the folder labeled “images.” Template images must be left in this folder. 2. Review the pages in the template to get a sense of how it’s organized. Note that the “Syllabus” page already has a section titled “Software” with links to Internet Explorer and Netscape. The “Resources” page also includes several links. The pages for “Course Readings,” “Course Schedule” and “Course Assignments” include internal links within the page for each week. Note that pages intended for lecture materials have been divided into folders labeled “week_1,” “week_2,” etc. For more information on working with the lecture materials pages, see “Adding Course Information to ‘Lectures’ Pages,” below. Also note: Some of the pages would be redundant if you used them all (for example, “Course Schedule” and “Course Assignments.”) Use only the pages that are most appropriate for your course. 3. On the stand-alone course pages, it’s easier to enter the information directly into Dreamweaver rather than using a word processing program. 4. Change any headings and other information as indicated on the template. 5. Create hyperlinks where needed. See “Links,” below, for more information. 6. The template contains a style sheet that specifies font colors and sizes for Heading 1 through Heading 4. If you want to format sub-headers in your text, select the sub-header and choose a heading size in the Format box. 7. Make sure the copyright date is correct in the footer. 8. Save the file using its original file name. If you change the file name, the links to this page won’t work. Adding Course Information to “Lectures” Pages 1. Decide whether to organize lecture notes by week or by module topics. 2. Write the information for your “Lectures” pages using a word processing program. The exception is the weekly “Introduction” page, which may be easier to enter directly into Dreamweaver. (Note that hyperlinks created in Microsoft Word will not transfer to Dreamweaver, even if you save the document as HTML. You’ll need to create the links in Dreamweaver.) 3. Select the information you want to place on a Web page and copy it. 4. Using Dreamweaver, open the appropriate template file, as listed above next to the page name (such as “introduction_week1.htm” for the introduction to the Week One or Module One lecture). For lecture notes, use the “Lecture” templates in numeric order, beginning with “lecture1_week1_page1.htm.” The Lecture Notes pages link to each other using directional arrows, so it’s important to use these pages in the proper sequence. ________________________ Greer/Guthrie Learning Technology Services 66
  • 67.
    ⇒NOTE: You haveup to three pages to use for each week’s lecture notes. Be sure to “chunk” the lecture notes for each week, and paste the notes on the appropriate pages. 5. Click the cursor in the part of the document that says, “Place course information here.” Paste the information into the template, and erase the on-screen instructions. ⇒NOTE: If you use fewer than three pages for a week’s lecture notes, delete the “Next” arrow at the bottom of the last page. 6. Type the name of the module or lecture at the top of the first page of lecture notes. Make sure the format is “Heading 2.” Change any other information as indicated on the template. (NOTE: The template contains a style sheet that specifies font colors and sizes for Heading 1 through Heading 4. If you want to format sub-headers in your text, select the sub-header and choose a heading size in the Format box.) 7. Create hyperlinks where needed. See “Links,” below, for more information. 8. Make sure the copyright date is correct in the footer. 9. Save the file using its original file name. If you change the file name, the links to this page won’t work. Changing Topic Names on “Lectures” Pages Topic names appear in the narrow red band near the top of each “Lectures” page. They are:  Introduction  Readings  Lecture Notes  Assignments  For More You can change the topic names, but it must be done in HTML. (If you change them in Dreamweaver’s “design view” (i.e., WYSIWYG screen), the link to the page will be deleted.) Scroll down the HTML page until you see the following. Then change the names only (shown below in boldface) that appear between the hyperlinks, leaving the links intact: <!--EDIT BUTTONS BELOW --> <tr> <td id="bottom" colspan="2"><a href="introduction_week1.htm" class="link">Introduction</a><a href="readings_week1.htm" class="link">Readings</a><a href="lecture1_week1.htm" class="current">Lecture Notes</a><a href="assignments_week1.htm" class="link">Assignments</a><a href="more_week1.htm" class="link">For More</a></td> </tr> </table> Be sure to make the change to every Web page in the template. ________________________ Greer/Guthrie Learning Technology Services 67
  • 68.
    Remember to changethe title in the black bar on all affected Web pages, too. You can do this in Dreamweaver’s “design view.” Links In the text, include the title of each link, URL, and a brief description of the information available at the link. As much as possible, try to include external links only on a few pages, preferably the “Resources” page and “For More” pages. External links tend to change often, and grouping them together can minimize maintenance problems. If you link to a large file (such as a PDF), include the file size. If you create PDFs for your course, make sure to use Adobe Acrobat 5.0 or higher (these versions comply with the Americans with Disabilities Act). Check with DELTA to make sure any large files you create can be stored on the server. Linked Web sites should appear in pop-up windows or separate browser screens, as described below. If you are uncomfortable working with HTML code, use a new browser screen. Also, if the site to which you’re linking uses pop-up windows, use a new browser screen instead of a pop- up window, since WebCT may not recognize the second pop-up window. Full-sized new browser screen If you want a link to open in a full-sized browser screen, make sure to specify a blank target screen for the link so students won’t accidentally leave your course. You can do this using Dreamweaver’s “design view” (i.e., WYSIWYG screen). After you create a link, go to the “Target” box and select “_blank”. Pop-up windows Each page of the template includes a pop-up window function called “open sesame.” Use this function when you prefer to have linked information open in a pop-up window rather than a full- sized browser screen. Note that you need to add this code to the HTML yourself. Also note that if you’re linking to a site that uses pop-up windows, use a new browser screen instead. In WebCT, if you try to access a pop-up window from a pop-up window, the link won’t work. To create a link that opens in a pop-up window, use the following HTML code with the link. <a href="Javascript:sesame(‘URL of link','location=yes,scrollbars=yes,resizable=yes,width=500,height=400')"> name of your link</a> You can copy this code from links on the “Resources” page (resources.htm). ________________________ Greer/Guthrie Learning Technology Services 68
  • 69.
    Mounting Pages onWebCT The following information is specific to mounting the template. This information does not replace WebCT training offered by the Learning Technology Service within DELTA. Check the Web site for current listings of workshops and other services: http://delta.ncsu.edu/lts. Uploading 1. Prepare the files for uploading. Due to the large number of “Lectures” pages in the WebCT template, folders were created for each week to simplify template use. When uploading the “Lectures” pages, you’ll place them all in the same file (called “My-files”). To simply the uploading process, delete the “images” folder inside each weekly folder (“week_1,” “week_2,” etc.). DO NOT delete the primary “images” folder, which you’ll see in the same location as the weekly folders and the stand-alone pages (“assignments_course.htm,” etc.). Next, to greatly speed up the uploading process, zip the individual weekly files. Also zip the files in the “images” folder. 2. Upload your pages. In WebCT, select “Manage Files” from the “Control Panel” on the left green bar. Select File Options>Upload a file>Go. Browse your computer for the appropriate files, then select “Upload.” (NOTE: Unless you zip your files, you’ll have to upload them one at a time.) Upload all HTML files to the “My-files” folder. 3. Select the “My-files” folder by checking the box to the left of the name. Select Folder Options>Create New>Go. Name the new folder “images” (all lower case, no quotation marks). 4. Select the “images” folder by checking the box to the left of the name. Select File Options>Upload a file>Go. Browse your computer for the appropriate files, then select “Upload.” Make sure the “Destination folder” is “images.” Create links to pages For the stand-alone pages (including “Syllabus,” “Course Assignments,” “Schedule” and any other stand-along pages you use), do the following:  From the “Control Panel” (left green bar), select “Add Page or Tool.” Select “Single Page” (under “Pages”). Be sure to include links on the Navigation Bar (left green bar) as well as the Homepage. For “Lectures” pages, do the following:  From the “Control Panel” (left green bar), select “Add Page or Tool.” Select “Content Module” (under “Course Content Tools”). Title the page “Lectures.” Be sure to include links on the Navigation Bar (left green bar) as well as the Homepage. ________________________ Greer/Guthrie Learning Technology Services 69
  • 70.
     From theHomepage, open the new “Lectures” link to display a Table of Contents. Select “Designer Options” from the top blue bar. Under “Edit Table of Contents,” add headings for each week or each module.  After you’ve created the headings, select the first heading, then select Add files>Go. Select the “Introduction” page for that week’s lecture (beginning with “introduction_week1.htm”). Add only the “Introduction” page for each week. Other pages Add links for Communication Tools (such as the Discussion Forum) and other tools you need to the WebCT Homepage. ________________________ Greer/Guthrie Learning Technology Services 70
  • 71.
    Resources NCSU Resources 1. Thestandard and WebCT templates are available on the WebCT support page: http://webct.ncsu.edu 2. NC State University/DELTA Instructional Resources. This site includes information on DELTA workshops and training, how to create online courses, grants, and much more. http://delta.ncsu.edu/lts/resources/instresources.cfm. 3. NCSU Libraries Electronic Reserve System. The library provides assistance with copyright requests, as well as scanning, publishing and archiving readings for your courses. http://www.lib.ncsu.edu/rbr/ 4. For information on copyright law, see The TEACH Toolkit, which contains information on The Technology, Education, and Copyright Harmonization Act (TEACH Act). http://www.lib.ncsu.edu/scc/legislative/teachkit/index.html 5. Also from NCSU Libraries, see The Copyright Tutorial for more information on using copyrighted materials: http://www.lib.ncsu.edu/scc/tutorial/main.html 6. This Sample Permission Form is available through The Copyright Tutorial (see above). It’s a generic form for obtaining permission to use copyrighted materials. http://www.lib.ncsu.edu/scc/tutorial/permission1.html Course Design Reference Materials Chickering, Arthur W. & Ehrmann, Stephen C. Implementing the Seven Principles: Technology as Lever (1996). AAHE Bulletin, October 1996. Available at: <http://www.tltgroup.org/programs/seven.html> Committee for Evaluation of Exemplary Online Courses. Rubric for Online Instruction (2002). Chico, CA: California State University, Chico. ________________________ Greer/Guthrie Learning Technology Services 71