2. UDN11 cluster Information
UDN11 Cluster Site Number
3G Site 56
New Site 56
Existing Site 0
Macro site Drive test 48
Pico site Drive test 0
Azimuth Tuning Site #
E-Tilt Tuning Site #
Route DT of UDN11
3. ATBJ
Overshoot sector 1 (PSC=6) and sector 2 (PSC= 14)
Solution: down E-tilt sector 1 and sector 2 two degree.