SlideShare a Scribd company logo
airsight
EASA Aerodrome Regulations
EASA Aerodrome Regulations
airsight training and consulting services
Introduction
The European Commission has officially published the
aerodrome regulations (Commission Regulation EU No
139/2014) prepared by the European Aviation Safety
Agency (EASA). These are now in force in all EASA Member
States.
For Aerodromes within the scope of the regulations these
new standards will supersede the national implementati-
on of ICAO aerodrome requirements. Until 31 December
2017 concerned Aerodromes have to „convert“ existing
certificates into certificates that comply with the new
regulations.
Challenge and Paradigm Shift for Aerodrome
Operators
■■ The new EASA aerodrome regulations, though
aligned to ICAO, differ in form and content as well as
include brand new requirements and responsibilities.
■■ While within the ICAO certification procedure, the CAA
was the main actor and verified compliance to the
applicable requirements (e.g. through inspect)ions),
the aerodromes are now required to demonstrate by
themselves compliance against the applicable requi-
rements based on documented evidences – resulting
in significant efforts.
■■ Aerodrome may use alternative means than the one
proposed by EASA to comply with the rule, but will
need to demonstrate compliance with the regula-
tions to their competent authority.
■■ Deviations to the applicable specifications for airport
planning can be tolerated, however in a much more
structure and formalised manner as under ICAO
regulations, often requiring a documented Safety
Assessment.
airsight services related to EASA aerodrome
regulations for aerodromes
airsight has been actively following the development of
the new EASA regulations, and has years of experience in
both aerodrome operations and infrastructure.
airsight is therefore able to guide aerodromes efficiently
through the certification process, as well as to provide
specialised support where required (training, inspections,
safety assessments, documentation).
Example of new requirements
EASA regulations introduce new requirements for
aerodrome operators, such as:
■■ Personnel requirements, including training
■■ Management of changes
■■ Compliance monitoring and record keeping
■■ Coordination with other organisations (inclu-
ding contracted activities and safety program-
mes)
■■ Procedures for fire prevention and use of
alcohol etc.
■■ Emergency Response Planning
■■ Quality Management System for aeronautical
data and information
EASA Aerodrome Regulations
airsight training and consulting services
Proposed methodology
The following elements represent the possible steps of the certification procedure together with airsight associated
support services:
Each airport is unique!
airsight‘s experience is that each aerodrome is unique. The above methodology should therefore be adapted
to match the aerodrome specific environment. Notably, the role and involvement of the NAAs will have a strong
impact on the certification procedure and the approach to follow (e.g. publication of national AltMOCs based on
previous national regulations, provision of guidance material, availability of compliance evidences).
EASA Aerodrome Regulations
airsight training and consulting services
Consultation with the Competent Authority for the Certification
Procedure
The first step of a certification procedure is to consult with the Competent Authority,
responsible for the certification process and the issuance of a certification to agree
on objectives, general requirements and constraints, as well as an intentional project
schedule. The Aerodrome Operator may formalise later its application for a certificate, in
accordance with the procedures defined by EASA.
airsight provides its assistance in this crucial project phase, to ensure that the stakehol-
ders share a common vision, and that both their interests are met.
Training on EASA aerodrome regulations
EASA aerodrome regulations are complex and may be at first difficult to understand. Whi-
le ICAO Annex 14 contained in a single document the main Standards and Recommen-
dations for aerodrome design and operations, EASA regulations are divided into several
documents and in the form of IR, AMC, CS and GM.
It is crucial that all stakeholders involved in the certification have a good and common
understanding of the EASA aerodrome regulations, and a strategy how to proceed with
the different steps of the certification procedure.
airsight proposes a comprehensive training programme to EASA regulations, which con-
siderably accelerates the process of understanding these complex regulations.
Establishment of the Project Management Organisation
A project organisation structure should be well defined in order to facilitate the coordina-
tion and implementation of certification activities. The main project responsible per-
sons shall be identified, as well as their roles and responsibilities. Ideally, a Compliance
Manager could be deployed, and be responsible for the certification process as well as
maintaining compliance after obtention of the certificate.
Further, a Project Management Plan should be created, which shall serve to manage effi-
ciently the project execution (activities and their related objectives, schedule, resources,
risks, etc.).
airsight develops in collaboration with the project stakeholders an efficient project
organisation and project management plan with clear objectives and responsibilities, as
well as activities schedules and costs – making the later conduction of the project more
efficient.
Step 1
Step 2
Step 3
EASA Aerodrome Regulations
airsight training and consulting services
Development Check-Lists, Initial Gap Analysis and Impact Assessment,
Certification Concept and methodology to manage compliance
Check-Lists
There are probably over 1 000 specific items (in 500 pages, divided in three documents)
that require a demonstration of compliance. Therefore, it is certainly not practicable to
distribute EASA regulations among an organisation “as it is”, and to require each con-
cerned department to demonstrate compliance to the rules that may be relevant for their
department.
Demonstrating compliance to EASA rules requires first the right instruments, such as
structured Check-Lists (e.g. for OR, OPS, and CS) organised around topics, compiling IR,
AMC/CS and GM. Check-Lists may serve during the entire project to monitor the areas
of responsibilities, the status of compliance, as well as the activities required to ensure
compliance.
airsight developed and uses comprehensive check-lists based on the published regu-
lations, which clearly organise the EASA requirements around topics and classifies the
requirements depending on their nature and binding characters.
Initial Gap Analysis
Aerodromes previously subject to a certification procedure according to ICAO are already
mainly compliant to EASA regulations: most documentation required to demonstrate
compliance may already exists at the aerodrome. There is therefore no need to fully
rewrite the aerodrome manual or fully revise most existing relevant procedures. However,
it is crucial to assess early the possible efforts required and the impact of the certification
procedure on the organisation (in terms of additional work-load to fill-in the gaps, cont-
ractual requirements etc.).
An initial Gap-Analysis may be performed by a small core-team and mainly based on the
material used for the initial ICAO certification, in order to assess “fast and roughly” if the
aerodrome operator meets EASA requirements. This Gap-Analysis represents probably
half of the job: it serves to monitor existing compliance, to identify the responsible de-
partments and to structure activities required to meet the requirements.
As demonstrated by numerous previous projects, airsight excels in compliance analysis
and gap-assessments. airsight can conduct gap-analysis based on the available docu-
mentation (e.g. aerodrome manual and related documents) and structured interviews
with the responsible persons to assess the gaps, as well as the efforts required to match
EASA requirements.
Certification Programme concept and methods to manage compliance
Based on the results of the Gap-Analysis, a Certification Concept can be established
together with a common methodology for the management of compliance (check-list,
documented evidence, findings, etc.).
The Certification Concept consists of a description of all the means (instruments) requi-
red to manage and document the certification procedure within the organisation, i.e.
activities, workflows, compliance lists, deviations and findings, documented evidences.
Possibly, a special attention could be set to the classification or prioritisation of the
findings, as well as AltMOCs and other justification to a deviation to the CS (ELOS, SC,
DAAD). The Certification Concept may be proposed to the Competent Authority, nota-
bly to agree on possible arrangements (such as the utilisation of previously performed
inspection results, national AltMOCs or Special Conditions).
airsight offers its assistance to develop an efficient certification programme in close
collaboration with the responsible project stakeholders.
Step 4
EASA Aerodrome Regulations
airsight training and consulting services
Demonstration of Compliance to the Organisation and Operations Re-
quirements (OR, OPS)
Aerodrome operators shall demonstrate compliance with the applicable requirements
(IR, AMC) and provide to the authority the means by which compliance has been de-
monstrated (e.g. audits and inspections). This will probably induce tremendous efforts
for the stakeholders, and has to be well managed within the organisation.
The demonstration of Compliance to the OR and OPS requirements shall be performed
ideally by the subject-matter experts (e.g. operations manager, safety manager, human
resources and training manager etc.) under the coordination and support of the compli-
ance manager.
Subject-matter experts are usually very busy within their duties, and should therefore be
“spoon-fed” by the compliance manager to minimise the efforts required to demonstrate
compliance. For instance, a compliance manager may distribute structured checklists
and conduct interviews – rather than distribute regulations in their raw format.
airsight is able to assist aerodrome operators to organise and document the collection
of the material evidences required within the certification procedure. With its structu-
red approach and already developed compliance lists and tools, airsight considerably
reduces the efforts on demonstrating compliance.
Management of activities required to ensure Compliance with the Orga-
nisation and Operations Requirements (OR, OPS)
Certainly no aerodrome is able to demonstrate immediately compliance with the IRs or
EASA’s proposed AMCs. Becoming compliant will therefore consist in managing efficient-
ly multiple activities within the organisation, either to fill in the possible gaps to the AMCs
or to propose Alternative Means of Compliance (AltMOC).
This long-lasting process is strongly iterative, as it may involve notably the responsible
competent authorities as well as third parties.
airsight offers its assistance in the management of compliance activities (i.e. identifica-
tion, prioritisation, scheduling, conduction) , as well as in drafting possible AltMOC and
liaising with the responsible authorities to ensure their acceptance.
Step 5
Step 6
EASA Aerodrome Regulations
airsight training and consulting services
Development of Certification Basis and Demonstration of Compliance
The Certification Basis (CB) shall accompany the application for a new certificate. The
CB has to be proposed by aerodrome operators and consists of a set of Certification
Specifications (CS) the Competent Authority finds applicable to the design and the type
of operations of the aerodrome. Once the CB is established, aerodrome operators shall
demonstrate compliance with the applicable CS, and provide to the authority the means
by which compliance has been demonstrated. For this purpose, aerodrome operators
have to compile all relevant documents (audit checklists and results, CAD plans etc.) and
may have to conduct additional inspections if no documented evidence is available.
airsight has extensive knowledge in national and international specifications for the
planning and design, and liaising with aviation authorities. Therefore, airsight proposes
to efficiently and accurately identify aerodrome specifically applicable requirements (i.e.
building the CB) and to assess compliance. If required, airsight is also capable to perform
the additional audits and inspections.
Management of deviations from the Certification Specifications
Certification Specifications are non-binding by nature, as was generally the national
implementation of ICAO Recommendations. The main change is that deviations must be
formalised in accordance with the mechanisms allotted by EASA, namely an Equivalent
Level of Safety (ELOS), Special Conditions (CS), or Deviations Acceptance and Action
Document (DAAD).
As mentioned by EASA itself in their “certification simulation exercise“ on a fictive ae-
rodrome, the review of the existing deviations and their classification can be very time
consuming. Notably, additional Safety Assessments (qualitative or quantitative) may be
required to demonstrate how the intent of the requirements is met.
airsight excels in the management of deviations from applicable standards and proposes
its expertise to classify existing deviations in accordance with the scheme proposed by
EASA, as well as to conduct possible Safety Assessments if required.
Submission of the application to the Competent Authority
The formal application for a certificate shall be made in the specific form and manner as
established by the Competent Authority. It shall primarily contain a complete documen-
tation about the aerodrome infrastructure and operations, as well as about its complian-
ce with the applicable requirements.
airsight proposes to assist aerodrome operators in verifying the adequacy of the form
and content of their application, as well as to support possible negotiations with the
authorities.
Step 7
Step 8
Step 9
airsight GmbH
Gustav-Meyer-Allee 25
13355 Berlin
Germany
Tel +49 30 45 80 31 77
Fax +49 30 45 80 31 88
info@airsight.de
www.airsight.de
2015-02

More Related Content

Viewers also liked

DesireeThayer1Resume2015
DesireeThayer1Resume2015DesireeThayer1Resume2015
DesireeThayer1Resume2015Desiree Thayer
 
eficacia de las herramientas
eficacia de las herramientas eficacia de las herramientas
eficacia de las herramientas
Carlitos Lugardo
 
Keynote technicals currency intraday levels for 211112
Keynote technicals currency intraday levels for 211112Keynote technicals currency intraday levels for 211112
Keynote technicals currency intraday levels for 211112Keynote Capitals Ltd.
 
Presentacion orientacion educativa
Presentacion orientacion educativaPresentacion orientacion educativa
Presentacion orientacion educativa
Ibrahin Jose Hidalgo Alastre
 
Проект волшебница зима - группа 6
Проект волшебница зима - группа 6Проект волшебница зима - группа 6
Проект волшебница зима - группа 6
gymnasium1306
 
Prysmian BICON G10TS Hydraulic Crimping Tools
Prysmian BICON G10TS Hydraulic Crimping ToolsPrysmian BICON G10TS Hydraulic Crimping Tools
Prysmian BICON G10TS Hydraulic Crimping Tools
Thorne & Derrick International
 
Red Bull Air Force Jumps with UConn Skydiving
Red Bull Air Force Jumps with UConn SkydivingRed Bull Air Force Jumps with UConn Skydiving
Red Bull Air Force Jumps with UConn SkydivingWesley Mitchell-Lewis
 
DERECHOS DE PRIVACIDAD Y DE INFORMACIÓN
DERECHOS DE PRIVACIDAD Y DE INFORMACIÓNDERECHOS DE PRIVACIDAD Y DE INFORMACIÓN
DERECHOS DE PRIVACIDAD Y DE INFORMACIÓN
Xiomara Poveda
 
Radio-ulnar and Wrist joints
Radio-ulnar and Wrist joints Radio-ulnar and Wrist joints
Radio-ulnar and Wrist joints
birajsanjay
 
Zorihans preview
Zorihans previewZorihans preview
Zorihans preview
ShirlyFCosta
 

Viewers also liked (11)

DesireeThayer1Resume2015
DesireeThayer1Resume2015DesireeThayer1Resume2015
DesireeThayer1Resume2015
 
Presentation3
Presentation3Presentation3
Presentation3
 
eficacia de las herramientas
eficacia de las herramientas eficacia de las herramientas
eficacia de las herramientas
 
Keynote technicals currency intraday levels for 211112
Keynote technicals currency intraday levels for 211112Keynote technicals currency intraday levels for 211112
Keynote technicals currency intraday levels for 211112
 
Presentacion orientacion educativa
Presentacion orientacion educativaPresentacion orientacion educativa
Presentacion orientacion educativa
 
Проект волшебница зима - группа 6
Проект волшебница зима - группа 6Проект волшебница зима - группа 6
Проект волшебница зима - группа 6
 
Prysmian BICON G10TS Hydraulic Crimping Tools
Prysmian BICON G10TS Hydraulic Crimping ToolsPrysmian BICON G10TS Hydraulic Crimping Tools
Prysmian BICON G10TS Hydraulic Crimping Tools
 
Red Bull Air Force Jumps with UConn Skydiving
Red Bull Air Force Jumps with UConn SkydivingRed Bull Air Force Jumps with UConn Skydiving
Red Bull Air Force Jumps with UConn Skydiving
 
DERECHOS DE PRIVACIDAD Y DE INFORMACIÓN
DERECHOS DE PRIVACIDAD Y DE INFORMACIÓNDERECHOS DE PRIVACIDAD Y DE INFORMACIÓN
DERECHOS DE PRIVACIDAD Y DE INFORMACIÓN
 
Radio-ulnar and Wrist joints
Radio-ulnar and Wrist joints Radio-ulnar and Wrist joints
Radio-ulnar and Wrist joints
 
Zorihans preview
Zorihans previewZorihans preview
Zorihans preview
 

Similar to airsight - EASA aerodrome regulations

Aviation Audits
Aviation AuditsAviation Audits
Aviation Audits
Seda Eskiler
 
Quality and Safety are 2 Sides of the Same Coin
Quality and Safety are 2 Sides of the Same CoinQuality and Safety are 2 Sides of the Same Coin
Quality and Safety are 2 Sides of the Same Coin
Rohit Tomar
 
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
 AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael StandarALIAS Network
 
airsight GmbH - Company Profile
airsight GmbH - Company Profileairsight GmbH - Company Profile
airsight GmbH - Company Profile
airsight GmbH
 
Pg og sms 018 procedimento de integridade mecânica eng
Pg og sms 018   procedimento de integridade mecânica engPg og sms 018   procedimento de integridade mecânica eng
Pg og sms 018 procedimento de integridade mecânica engFernanda Lopes
 
Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)Bouchaib Dolla
 
AERODROME SAFETY MANAGEMENT SYSTEM.pptx
AERODROME SAFETY MANAGEMENT SYSTEM.pptxAERODROME SAFETY MANAGEMENT SYSTEM.pptx
AERODROME SAFETY MANAGEMENT SYSTEM.pptx
ALPINEGROUPOFINSITUT
 
Introduction of afraa members training managers meeting
Introduction of afraa members training managers meetingIntroduction of afraa members training managers meeting
Introduction of afraa members training managers meeting
Hassen SEDDIK
 
Uas nas uas symposium briefing sd
Uas nas uas symposium briefing sdUas nas uas symposium briefing sd
Uas nas uas symposium briefing sd
sUAS News
 
Quality Management Course work A
Quality Management Course work AQuality Management Course work A
Quality Management Course work AJohn Davou
 
OHSAS 18001 checklist
OHSAS 18001 checklistOHSAS 18001 checklist
OHSAS 18001 checklist
Craig Willetts ISO Expert
 
Management review procedure for legal practices
Management review procedure for legal practicesManagement review procedure for legal practices
Management review procedure for legal practices
Val Antoff
 
Planning for software quality assurance lecture 6
Planning for software quality assurance lecture 6Planning for software quality assurance lecture 6
Planning for software quality assurance lecture 6Abdul Basit
 
Presentation Workshop Beograd Octobar2012
Presentation Workshop Beograd Octobar2012Presentation Workshop Beograd Octobar2012
Presentation Workshop Beograd Octobar2012Miodrag Huber
 
Tiêu chuẩn GLP - OECD trong quản lý hệ thống vi tính
Tiêu chuẩn GLP - OECD trong quản lý hệ thống vi tínhTiêu chuẩn GLP - OECD trong quản lý hệ thống vi tính
Tiêu chuẩn GLP - OECD trong quản lý hệ thống vi tính
Công ty Cổ phần Tư vấn Thiết kế GMP EU
 
Management of Change 22.4.15
Management of Change 22.4.15Management of Change 22.4.15
Management of Change 22.4.15SANJIV SONI
 
SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018
S P Singh
 

Similar to airsight - EASA aerodrome regulations (20)

Aviation Audits
Aviation AuditsAviation Audits
Aviation Audits
 
Quality and Safety are 2 Sides of the Same Coin
Quality and Safety are 2 Sides of the Same CoinQuality and Safety are 2 Sides of the Same Coin
Quality and Safety are 2 Sides of the Same Coin
 
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
 AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
AUTOMATION: LESSONS LEARNT FROM SESAR by Michael Standar
 
airsight GmbH - Company Profile
airsight GmbH - Company Profileairsight GmbH - Company Profile
airsight GmbH - Company Profile
 
Pg og sms 018 procedimento de integridade mecânica eng
Pg og sms 018   procedimento de integridade mecânica engPg og sms 018   procedimento de integridade mecânica eng
Pg og sms 018 procedimento de integridade mecânica eng
 
Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)Iata operational safety_audit_(iosa)
Iata operational safety_audit_(iosa)
 
CV Rev.5 2017
CV Rev.5 2017CV Rev.5 2017
CV Rev.5 2017
 
AERODROME SAFETY MANAGEMENT SYSTEM.pptx
AERODROME SAFETY MANAGEMENT SYSTEM.pptxAERODROME SAFETY MANAGEMENT SYSTEM.pptx
AERODROME SAFETY MANAGEMENT SYSTEM.pptx
 
Introduction of afraa members training managers meeting
Introduction of afraa members training managers meetingIntroduction of afraa members training managers meeting
Introduction of afraa members training managers meeting
 
Uas nas uas symposium briefing sd
Uas nas uas symposium briefing sdUas nas uas symposium briefing sd
Uas nas uas symposium briefing sd
 
Quality Management Course work A
Quality Management Course work AQuality Management Course work A
Quality Management Course work A
 
OHSAS 18001 checklist
OHSAS 18001 checklistOHSAS 18001 checklist
OHSAS 18001 checklist
 
Audit solution airline
Audit solution airlineAudit solution airline
Audit solution airline
 
Management review procedure for legal practices
Management review procedure for legal practicesManagement review procedure for legal practices
Management review procedure for legal practices
 
Planning for software quality assurance lecture 6
Planning for software quality assurance lecture 6Planning for software quality assurance lecture 6
Planning for software quality assurance lecture 6
 
Presentation Workshop Beograd Octobar2012
Presentation Workshop Beograd Octobar2012Presentation Workshop Beograd Octobar2012
Presentation Workshop Beograd Octobar2012
 
Tiêu chuẩn GLP - OECD trong quản lý hệ thống vi tính
Tiêu chuẩn GLP - OECD trong quản lý hệ thống vi tínhTiêu chuẩn GLP - OECD trong quản lý hệ thống vi tính
Tiêu chuẩn GLP - OECD trong quản lý hệ thống vi tính
 
Management of Change 22.4.15
Management of Change 22.4.15Management of Change 22.4.15
Management of Change 22.4.15
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018
 

Recently uploaded

ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
FIA officials brutally tortured innocent and snatched 200 Bitcoins of worth 4...
FIA officials brutally tortured innocent and snatched 200 Bitcoins of worth 4...FIA officials brutally tortured innocent and snatched 200 Bitcoins of worth 4...
FIA officials brutally tortured innocent and snatched 200 Bitcoins of worth 4...
jamalseoexpert1978
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Lviv Startup Club
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
Adani case
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 

Recently uploaded (20)

ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
FIA officials brutally tortured innocent and snatched 200 Bitcoins of worth 4...
FIA officials brutally tortured innocent and snatched 200 Bitcoins of worth 4...FIA officials brutally tortured innocent and snatched 200 Bitcoins of worth 4...
FIA officials brutally tortured innocent and snatched 200 Bitcoins of worth 4...
 
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
Helen Lubchak: Тренди в управлінні проєктами та miltech (UA)
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
In the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptxIn the Adani-Hindenburg case, what is SEBI investigating.pptx
In the Adani-Hindenburg case, what is SEBI investigating.pptx
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 

airsight - EASA aerodrome regulations

  • 2. EASA Aerodrome Regulations airsight training and consulting services Introduction The European Commission has officially published the aerodrome regulations (Commission Regulation EU No 139/2014) prepared by the European Aviation Safety Agency (EASA). These are now in force in all EASA Member States. For Aerodromes within the scope of the regulations these new standards will supersede the national implementati- on of ICAO aerodrome requirements. Until 31 December 2017 concerned Aerodromes have to „convert“ existing certificates into certificates that comply with the new regulations. Challenge and Paradigm Shift for Aerodrome Operators ■■ The new EASA aerodrome regulations, though aligned to ICAO, differ in form and content as well as include brand new requirements and responsibilities. ■■ While within the ICAO certification procedure, the CAA was the main actor and verified compliance to the applicable requirements (e.g. through inspect)ions), the aerodromes are now required to demonstrate by themselves compliance against the applicable requi- rements based on documented evidences – resulting in significant efforts. ■■ Aerodrome may use alternative means than the one proposed by EASA to comply with the rule, but will need to demonstrate compliance with the regula- tions to their competent authority. ■■ Deviations to the applicable specifications for airport planning can be tolerated, however in a much more structure and formalised manner as under ICAO regulations, often requiring a documented Safety Assessment. airsight services related to EASA aerodrome regulations for aerodromes airsight has been actively following the development of the new EASA regulations, and has years of experience in both aerodrome operations and infrastructure. airsight is therefore able to guide aerodromes efficiently through the certification process, as well as to provide specialised support where required (training, inspections, safety assessments, documentation). Example of new requirements EASA regulations introduce new requirements for aerodrome operators, such as: ■■ Personnel requirements, including training ■■ Management of changes ■■ Compliance monitoring and record keeping ■■ Coordination with other organisations (inclu- ding contracted activities and safety program- mes) ■■ Procedures for fire prevention and use of alcohol etc. ■■ Emergency Response Planning ■■ Quality Management System for aeronautical data and information
  • 3. EASA Aerodrome Regulations airsight training and consulting services Proposed methodology The following elements represent the possible steps of the certification procedure together with airsight associated support services: Each airport is unique! airsight‘s experience is that each aerodrome is unique. The above methodology should therefore be adapted to match the aerodrome specific environment. Notably, the role and involvement of the NAAs will have a strong impact on the certification procedure and the approach to follow (e.g. publication of national AltMOCs based on previous national regulations, provision of guidance material, availability of compliance evidences).
  • 4. EASA Aerodrome Regulations airsight training and consulting services Consultation with the Competent Authority for the Certification Procedure The first step of a certification procedure is to consult with the Competent Authority, responsible for the certification process and the issuance of a certification to agree on objectives, general requirements and constraints, as well as an intentional project schedule. The Aerodrome Operator may formalise later its application for a certificate, in accordance with the procedures defined by EASA. airsight provides its assistance in this crucial project phase, to ensure that the stakehol- ders share a common vision, and that both their interests are met. Training on EASA aerodrome regulations EASA aerodrome regulations are complex and may be at first difficult to understand. Whi- le ICAO Annex 14 contained in a single document the main Standards and Recommen- dations for aerodrome design and operations, EASA regulations are divided into several documents and in the form of IR, AMC, CS and GM. It is crucial that all stakeholders involved in the certification have a good and common understanding of the EASA aerodrome regulations, and a strategy how to proceed with the different steps of the certification procedure. airsight proposes a comprehensive training programme to EASA regulations, which con- siderably accelerates the process of understanding these complex regulations. Establishment of the Project Management Organisation A project organisation structure should be well defined in order to facilitate the coordina- tion and implementation of certification activities. The main project responsible per- sons shall be identified, as well as their roles and responsibilities. Ideally, a Compliance Manager could be deployed, and be responsible for the certification process as well as maintaining compliance after obtention of the certificate. Further, a Project Management Plan should be created, which shall serve to manage effi- ciently the project execution (activities and their related objectives, schedule, resources, risks, etc.). airsight develops in collaboration with the project stakeholders an efficient project organisation and project management plan with clear objectives and responsibilities, as well as activities schedules and costs – making the later conduction of the project more efficient. Step 1 Step 2 Step 3
  • 5. EASA Aerodrome Regulations airsight training and consulting services Development Check-Lists, Initial Gap Analysis and Impact Assessment, Certification Concept and methodology to manage compliance Check-Lists There are probably over 1 000 specific items (in 500 pages, divided in three documents) that require a demonstration of compliance. Therefore, it is certainly not practicable to distribute EASA regulations among an organisation “as it is”, and to require each con- cerned department to demonstrate compliance to the rules that may be relevant for their department. Demonstrating compliance to EASA rules requires first the right instruments, such as structured Check-Lists (e.g. for OR, OPS, and CS) organised around topics, compiling IR, AMC/CS and GM. Check-Lists may serve during the entire project to monitor the areas of responsibilities, the status of compliance, as well as the activities required to ensure compliance. airsight developed and uses comprehensive check-lists based on the published regu- lations, which clearly organise the EASA requirements around topics and classifies the requirements depending on their nature and binding characters. Initial Gap Analysis Aerodromes previously subject to a certification procedure according to ICAO are already mainly compliant to EASA regulations: most documentation required to demonstrate compliance may already exists at the aerodrome. There is therefore no need to fully rewrite the aerodrome manual or fully revise most existing relevant procedures. However, it is crucial to assess early the possible efforts required and the impact of the certification procedure on the organisation (in terms of additional work-load to fill-in the gaps, cont- ractual requirements etc.). An initial Gap-Analysis may be performed by a small core-team and mainly based on the material used for the initial ICAO certification, in order to assess “fast and roughly” if the aerodrome operator meets EASA requirements. This Gap-Analysis represents probably half of the job: it serves to monitor existing compliance, to identify the responsible de- partments and to structure activities required to meet the requirements. As demonstrated by numerous previous projects, airsight excels in compliance analysis and gap-assessments. airsight can conduct gap-analysis based on the available docu- mentation (e.g. aerodrome manual and related documents) and structured interviews with the responsible persons to assess the gaps, as well as the efforts required to match EASA requirements. Certification Programme concept and methods to manage compliance Based on the results of the Gap-Analysis, a Certification Concept can be established together with a common methodology for the management of compliance (check-list, documented evidence, findings, etc.). The Certification Concept consists of a description of all the means (instruments) requi- red to manage and document the certification procedure within the organisation, i.e. activities, workflows, compliance lists, deviations and findings, documented evidences. Possibly, a special attention could be set to the classification or prioritisation of the findings, as well as AltMOCs and other justification to a deviation to the CS (ELOS, SC, DAAD). The Certification Concept may be proposed to the Competent Authority, nota- bly to agree on possible arrangements (such as the utilisation of previously performed inspection results, national AltMOCs or Special Conditions). airsight offers its assistance to develop an efficient certification programme in close collaboration with the responsible project stakeholders. Step 4
  • 6. EASA Aerodrome Regulations airsight training and consulting services Demonstration of Compliance to the Organisation and Operations Re- quirements (OR, OPS) Aerodrome operators shall demonstrate compliance with the applicable requirements (IR, AMC) and provide to the authority the means by which compliance has been de- monstrated (e.g. audits and inspections). This will probably induce tremendous efforts for the stakeholders, and has to be well managed within the organisation. The demonstration of Compliance to the OR and OPS requirements shall be performed ideally by the subject-matter experts (e.g. operations manager, safety manager, human resources and training manager etc.) under the coordination and support of the compli- ance manager. Subject-matter experts are usually very busy within their duties, and should therefore be “spoon-fed” by the compliance manager to minimise the efforts required to demonstrate compliance. For instance, a compliance manager may distribute structured checklists and conduct interviews – rather than distribute regulations in their raw format. airsight is able to assist aerodrome operators to organise and document the collection of the material evidences required within the certification procedure. With its structu- red approach and already developed compliance lists and tools, airsight considerably reduces the efforts on demonstrating compliance. Management of activities required to ensure Compliance with the Orga- nisation and Operations Requirements (OR, OPS) Certainly no aerodrome is able to demonstrate immediately compliance with the IRs or EASA’s proposed AMCs. Becoming compliant will therefore consist in managing efficient- ly multiple activities within the organisation, either to fill in the possible gaps to the AMCs or to propose Alternative Means of Compliance (AltMOC). This long-lasting process is strongly iterative, as it may involve notably the responsible competent authorities as well as third parties. airsight offers its assistance in the management of compliance activities (i.e. identifica- tion, prioritisation, scheduling, conduction) , as well as in drafting possible AltMOC and liaising with the responsible authorities to ensure their acceptance. Step 5 Step 6
  • 7. EASA Aerodrome Regulations airsight training and consulting services Development of Certification Basis and Demonstration of Compliance The Certification Basis (CB) shall accompany the application for a new certificate. The CB has to be proposed by aerodrome operators and consists of a set of Certification Specifications (CS) the Competent Authority finds applicable to the design and the type of operations of the aerodrome. Once the CB is established, aerodrome operators shall demonstrate compliance with the applicable CS, and provide to the authority the means by which compliance has been demonstrated. For this purpose, aerodrome operators have to compile all relevant documents (audit checklists and results, CAD plans etc.) and may have to conduct additional inspections if no documented evidence is available. airsight has extensive knowledge in national and international specifications for the planning and design, and liaising with aviation authorities. Therefore, airsight proposes to efficiently and accurately identify aerodrome specifically applicable requirements (i.e. building the CB) and to assess compliance. If required, airsight is also capable to perform the additional audits and inspections. Management of deviations from the Certification Specifications Certification Specifications are non-binding by nature, as was generally the national implementation of ICAO Recommendations. The main change is that deviations must be formalised in accordance with the mechanisms allotted by EASA, namely an Equivalent Level of Safety (ELOS), Special Conditions (CS), or Deviations Acceptance and Action Document (DAAD). As mentioned by EASA itself in their “certification simulation exercise“ on a fictive ae- rodrome, the review of the existing deviations and their classification can be very time consuming. Notably, additional Safety Assessments (qualitative or quantitative) may be required to demonstrate how the intent of the requirements is met. airsight excels in the management of deviations from applicable standards and proposes its expertise to classify existing deviations in accordance with the scheme proposed by EASA, as well as to conduct possible Safety Assessments if required. Submission of the application to the Competent Authority The formal application for a certificate shall be made in the specific form and manner as established by the Competent Authority. It shall primarily contain a complete documen- tation about the aerodrome infrastructure and operations, as well as about its complian- ce with the applicable requirements. airsight proposes to assist aerodrome operators in verifying the adequacy of the form and content of their application, as well as to support possible negotiations with the authorities. Step 7 Step 8 Step 9
  • 8. airsight GmbH Gustav-Meyer-Allee 25 13355 Berlin Germany Tel +49 30 45 80 31 77 Fax +49 30 45 80 31 88 info@airsight.de www.airsight.de 2015-02