STUDIES
Ø June 2008: ENIS – National School of Engineers of Sfax
Electro - mechanical Engineer diploma
Ø June 2005: IPEIS – Preparatory Institute for Engineering studies of Sfax
Qualification for the Engineering Studies (Specialty: Physics – Chemistry)
Ø June 2003: Secondary school (Hedi Chaker, Sfax)
Baccalaureate diploma (Specialty: mathematics)
PROFESSIONAL EXPERIENCE
Maintenance Engineering
v From August 2008 to August 2009:
§ Maintenance Engineer at CFTP (Franco - Tunisian Company of oils): Exploration &
Production Company (Joint Venture between Tunisian government “ETAP” & SPYKER
ENERGY)
Petroleum Production Engineering
v From September 2009 to March 2013:
§ Production Engineer at CFTP (Companie Franco – Tunisienne des Pétroles): Exploration &
Production Company (Joint Venture between Tunisian government “ETAP” & SPYKER
ENERGY)
v Since April 2013:
§ Production Engineer at TPS (Thyna Petroleum Services): Exploration & Production
Company (Joint Venture between ETAP & OMV)
Page 2 of 3
Teaching Experience
v Since 2014:
§ Instructor at IPSAS (Institut polytechnique de sciences avancées à Sfax): Petroleum
Engineering branch
Topic: Artificial Lift by Pumping: ESP & SRP
PROFESSIONAL TRAININGS & COURSES
April 2011 at IFP (Institut Français du Pétrole): Reservoir Management training
Training with Wood-Group: ESP installation and cable splicing.
Training with Schlumberger: PIPESIM software
Training with Baker Hughes: AutographPC software
June 2014 at IFP: Oil & Gas Field Processing
Training with SSW: First emergency aid
June 2013: Training with Anglo-Australian Communications (AAC): Presenting for Professionals
Training with IIFEE: MS Project
Training with ADVANCIA: Excel 2010 “High level”
SKILLS
Production Engineer
o Production monitoring and optimization
o Wellbore modeling using nodal analysis software for production optimization
§ PROSPER (Petroleum Expert)
§ PIPESIM 2009 (Schlumberger)
§ DesignRite 7.1.0 (Schlumberger)
§ AuographPC (Baker Hughes)
§ Solutions 3.1 (GE Oil & Gas)
§ ECHOMETER QRod2.4 (QRod: Only for sucker rod pumps)
o Good understanding of the reservoir behavior and its phenomena
o Very good understanding and large knowledge in physics, hydraulics, mechanics and electricity
(Background: Electro-mechanical Engineering) that allows the control of: Inflow, outflow, artificial
lift technologies and surface flow assurance…
o Very good command of artificial lift design and well modeling software: PROSPER (Petroleum
Expert), AuographPC (Baker Hughes), Solutions 3.1 (GE Oil & Gas), DesignRite 7.1.0
(Schlumberger), PIPESIM 2009 (Schlumberger), ECHOMETER QRod2.4 (QRod: Only for sucker
rod pumps)
o ESP, Sucker Rod Pump, PCP, Jet pump and Gas lift: Design & troubleshooting
o Large experience with ESP & Sucker rod: Very good understanding and strong background
o Artificial lift systems tendering: Preparation of call for tenders and tenders evaluation
o Flow assurance: Surface Network modeling and optimization
o Very good command of surface network modeling software: PIPESIM 2009 (Schlumberger), GAP
(Petroleum Expert)
o Selection and optimization of the artificial lift systems
o Artificial lift technologies (ESP, Sucker rod, Gas lift, PCP…): performance evaluation
Page 3 of 3
o Experience with sour gas (H2S/CO2)
o Field experience
o Experience in Onshore & Offshore fields
o Reserve evaluation using decline curves (log10 (Fo) Vs Np)
o Production planning, forecasts
o Well completion design (sweet and sour environment)
o Supporting the well interventions (Work Overs, acidizing, logging…)
o Supporting the preparation of OPEX & CAPEX: planning and forecasts
ACHIEVEMENTS
Production Engineering:
- Troubleshooting, root cause identification and remedial job proposal: “Proved interpretation”
· SIT18: Well was activated by ESP. Casing leak.
· SIT34: Well was activated by sucker rod pump. Build-up of skin (Plugged perforations).
· CER1: Well was activated by ESP. pump gas lock.
· CER6AS: Well activated by ESP. Coming of viscous fluid
· GUE5A: Well activated by ESP. Plugging in the casing below the pump (above the
permanent packer) causing the production parameters instability
· GUE5A: Well activated by ESP. Circulation (Leak in the tubing string)
· GUE12: New drilled well, activated by ESP. Viscous deposits in the casing and sucked by the
pump…
- Creation of booklet describing the wells state and evaluating the remaining reserves (decline curves:
log10 (Fo) Vs Np). It contains all well completions, remaining reserves and interesting geological
layers
- Production Optimization study: Review of the installed artificial lift technologies and their production
parameters and identification of the wells requiring the used technology replacement. “Study was
checked and approved by expert”
- Wells modeling: ESP & SRP design (Using: Hand calculation, PROSPER, DesignRite, Solutions, AutographPC,
ECHOMETER QRod, and PIPESIM)
- Surface Network modeling and optimization (Using PIPESIM software)
- Replacement of CERCINA expedition pumps (offshore field): Network modeling & installation
design (Used pump was TRIPLEX / the new one is PCP pump)
- Preparation of ESP’s call for tenders: Preparation of the scope of work and tenders evaluation (Scope
of Work, evaluation strategy and tender evaluation)
- Participation to the PtL (Produce the limit) sessions
- ESP stock optimization by ESP sets standardization (Use of the minimum ESP sets for the maximum number
of wells)
LANGUAGES & SOFTWARE
Languages: Arabic, French, English: fluent
Production Engineering Software: Petroleum Experts IPM 7.5 (PROSPER, GAP), PIPESIM 2009,
AutographPC (Baker Hughes), Solutions 3.1 (GE Oil & Gas), DesignRite 7.1.0 (Schlumberger),
ECHOMETER QRod2.4
Maintenance Management Software: AQ Manager (GMAO)
Computer: MS project, Microsoft Office…

Ahmed FEHRI_CV_2015

  • 1.
    Page 1 of3 FEHRI Ahmed Road of Tunis, 4.5 km, Sfax Post office box: N° 115 – Le grand Maghreb – 3049 Sfax Tunisia È(+216) 99 797 177 (+216) 58 428 074 šafehri@tps.com.tn / ahmedelfehri@yahoo.fr Production Engineer STUDIES Ø June 2008: ENIS – National School of Engineers of Sfax Electro - mechanical Engineer diploma Ø June 2005: IPEIS – Preparatory Institute for Engineering studies of Sfax Qualification for the Engineering Studies (Specialty: Physics – Chemistry) Ø June 2003: Secondary school (Hedi Chaker, Sfax) Baccalaureate diploma (Specialty: mathematics) PROFESSIONAL EXPERIENCE Maintenance Engineering v From August 2008 to August 2009: § Maintenance Engineer at CFTP (Franco - Tunisian Company of oils): Exploration & Production Company (Joint Venture between Tunisian government “ETAP” & SPYKER ENERGY) Petroleum Production Engineering v From September 2009 to March 2013: § Production Engineer at CFTP (Companie Franco – Tunisienne des Pétroles): Exploration & Production Company (Joint Venture between Tunisian government “ETAP” & SPYKER ENERGY) v Since April 2013: § Production Engineer at TPS (Thyna Petroleum Services): Exploration & Production Company (Joint Venture between ETAP & OMV)
  • 2.
    Page 2 of3 Teaching Experience v Since 2014: § Instructor at IPSAS (Institut polytechnique de sciences avancées à Sfax): Petroleum Engineering branch Topic: Artificial Lift by Pumping: ESP & SRP PROFESSIONAL TRAININGS & COURSES April 2011 at IFP (Institut Français du Pétrole): Reservoir Management training Training with Wood-Group: ESP installation and cable splicing. Training with Schlumberger: PIPESIM software Training with Baker Hughes: AutographPC software June 2014 at IFP: Oil & Gas Field Processing Training with SSW: First emergency aid June 2013: Training with Anglo-Australian Communications (AAC): Presenting for Professionals Training with IIFEE: MS Project Training with ADVANCIA: Excel 2010 “High level” SKILLS Production Engineer o Production monitoring and optimization o Wellbore modeling using nodal analysis software for production optimization § PROSPER (Petroleum Expert) § PIPESIM 2009 (Schlumberger) § DesignRite 7.1.0 (Schlumberger) § AuographPC (Baker Hughes) § Solutions 3.1 (GE Oil & Gas) § ECHOMETER QRod2.4 (QRod: Only for sucker rod pumps) o Good understanding of the reservoir behavior and its phenomena o Very good understanding and large knowledge in physics, hydraulics, mechanics and electricity (Background: Electro-mechanical Engineering) that allows the control of: Inflow, outflow, artificial lift technologies and surface flow assurance… o Very good command of artificial lift design and well modeling software: PROSPER (Petroleum Expert), AuographPC (Baker Hughes), Solutions 3.1 (GE Oil & Gas), DesignRite 7.1.0 (Schlumberger), PIPESIM 2009 (Schlumberger), ECHOMETER QRod2.4 (QRod: Only for sucker rod pumps) o ESP, Sucker Rod Pump, PCP, Jet pump and Gas lift: Design & troubleshooting o Large experience with ESP & Sucker rod: Very good understanding and strong background o Artificial lift systems tendering: Preparation of call for tenders and tenders evaluation o Flow assurance: Surface Network modeling and optimization o Very good command of surface network modeling software: PIPESIM 2009 (Schlumberger), GAP (Petroleum Expert) o Selection and optimization of the artificial lift systems o Artificial lift technologies (ESP, Sucker rod, Gas lift, PCP…): performance evaluation
  • 3.
    Page 3 of3 o Experience with sour gas (H2S/CO2) o Field experience o Experience in Onshore & Offshore fields o Reserve evaluation using decline curves (log10 (Fo) Vs Np) o Production planning, forecasts o Well completion design (sweet and sour environment) o Supporting the well interventions (Work Overs, acidizing, logging…) o Supporting the preparation of OPEX & CAPEX: planning and forecasts ACHIEVEMENTS Production Engineering: - Troubleshooting, root cause identification and remedial job proposal: “Proved interpretation” · SIT18: Well was activated by ESP. Casing leak. · SIT34: Well was activated by sucker rod pump. Build-up of skin (Plugged perforations). · CER1: Well was activated by ESP. pump gas lock. · CER6AS: Well activated by ESP. Coming of viscous fluid · GUE5A: Well activated by ESP. Plugging in the casing below the pump (above the permanent packer) causing the production parameters instability · GUE5A: Well activated by ESP. Circulation (Leak in the tubing string) · GUE12: New drilled well, activated by ESP. Viscous deposits in the casing and sucked by the pump… - Creation of booklet describing the wells state and evaluating the remaining reserves (decline curves: log10 (Fo) Vs Np). It contains all well completions, remaining reserves and interesting geological layers - Production Optimization study: Review of the installed artificial lift technologies and their production parameters and identification of the wells requiring the used technology replacement. “Study was checked and approved by expert” - Wells modeling: ESP & SRP design (Using: Hand calculation, PROSPER, DesignRite, Solutions, AutographPC, ECHOMETER QRod, and PIPESIM) - Surface Network modeling and optimization (Using PIPESIM software) - Replacement of CERCINA expedition pumps (offshore field): Network modeling & installation design (Used pump was TRIPLEX / the new one is PCP pump) - Preparation of ESP’s call for tenders: Preparation of the scope of work and tenders evaluation (Scope of Work, evaluation strategy and tender evaluation) - Participation to the PtL (Produce the limit) sessions - ESP stock optimization by ESP sets standardization (Use of the minimum ESP sets for the maximum number of wells) LANGUAGES & SOFTWARE Languages: Arabic, French, English: fluent Production Engineering Software: Petroleum Experts IPM 7.5 (PROSPER, GAP), PIPESIM 2009, AutographPC (Baker Hughes), Solutions 3.1 (GE Oil & Gas), DesignRite 7.1.0 (Schlumberger), ECHOMETER QRod2.4 Maintenance Management Software: AQ Manager (GMAO) Computer: MS project, Microsoft Office…