KEEPING THE PROMISE




AIDS HEALTHCARE FOUNDATION >> 2010-2011 Progress Report
OUR MISSION
Cutting-edge medicine and
advocacy, regardless of the
ability to pay.
Keeping the Promise
Every man, woman and child living with HIV/AIDS must

have access to treatment—AIDS Healthcare Foundation

is committed to keeping that promise of life.




                                                AHF Progress Report 1
Message                               From the President

                               Twenty-five years of fighting AIDS teaches you a lot about patience. It is challenging to have patience when
                               more than 5,000 people die of AIDS every day and even more become infected. Maintaining urgency in a crisis
                               that has gone on for thirty years can be daunting. But, the essential reality of AIDS remains. A still relatively
                               new, incurable, killer, infectious disease, that is primarily transmitted through sexual contact, has invaded
                               the world.

                               We are patient in the sense that we recognize that we cannot falter in this battle, no matter how long it
                               takes to win it, especially now that we are on the road to controlling AIDS in the world. A successful strategy
Many things have changed       of condom promotion, rapid testing and access to treatment has resulted in more than five million people

in twenty-five years. But,     currently being treated for HIV; death rates have decreased and new infections are going down.


AHF’s mission of cutting
                               On the other hand, we cannot become complacent. Our very success is becoming our downfall. AIDS is
                               seldom front-page news in many places and funding commitments are being cut or withdrawn.
edge medicine and advocacy
                               At this quarter of a century mark AHF has recommitted itself to the battle to control AIDS. We are marching
regardless of ability to pay   toward 250,000 patients in our care worldwide. Our condom promotion and distribution systems have been

is as strong as it has ever
                               increased dramatically. AHF itself did more than half a million rapid HIV tests in 2010. However, most of
                               all AHF remains a steadfast advocate. At all levels, locally, nationally and internationally AHF clients and
been. With your support,       staff are lifting our voices to change policies that restrict our ability to win the war against AIDS. Our unique

our voice will be heard ever
                               vantage point, as a direct care provider, greatly enhances our ability to design practical solutions that will
                               translate into successful strategies on the ground.
more strongly, across the
                               Many things have changed in twenty-five years. But, AHF’s mission of cutting edge medicine and advocacy
globe, until the fight has     regardless of ability to pay is as strong as it has ever been. With your support, our voice will be heard ever
                               more strongly, across the globe, until the fight has been won and we can retire from the field.
been won and we can retire
from the field.”
—Michael Weinstein


                               Michael Weinstein
                               President, AIDS Healthcare Foundation
Photo of Michael Weinstein (opposite page) by Mel Melcon. Copyright © 2004. Los Angeles Times. Reprinted with Permission.



Love Condoms distributed free at the Water Festival - Phnom Penh, Cambodia                                                  AHF Progress Report 3
48 States
Visited by AHF “Magic Johnson”
Mobile Testing unit for free HIV tests




AHF’s “Testing America” Tour stopped in Birmingham, Alabama where 441 students were tested during a one-day event at Miles College
Saving Lives
Delivering expert medical care
AIDS Healthcare Foundation provides the highest-quality medical care
available for people living with HIV/AIDS.

Founded in 1987 as a grassroots Los Angeles-based         in 2010. Other new clinics include the AHF “Blair
                                                                                                                      Featured in the “If Not Now...” documentary
group committed to “fight for the living and care         Underwood” Healthcare Center, which opened in
for the dying,” AHF is now the largest global AIDS        hard-hit Washington D.C.—the first to bear the name
organization. We provide lifesaving medical care and/     of actor and activist Blair Underwood.                      Meet Mariam
or services regardless of ability to pay to more than
                                                          Compassionate care is our calling card. We are proud        Masaka, Uganda
166,000 individuals in 25 countries worldwide in the
United States, Africa, Latin America/Caribbean, the
                                                          to say that in our most recent U.S. Client Satisfaction     Orphaned by parents who
                                                                                                                      died of AIDS, Mariam lives
                                                          Survey, 95% would recommend AHF to a friend.
Asia/Pacific Region and Europe.

All of our efforts are aimed at saving lives and          Dispensing hope—                                            with her grandmother. A
serving those most in need.                               worldwide reach                                             little bird reminds her to
                                                          Globally, AIDS Healthcare Foundation partners with          take her medication by
Ensuring access to quality care—
U.S. programs
                                                          local organizations, city health officials and national     “speaking” to her from
                                                                                                                      atop a tree-branch: “It’s
                                                          ministries of health to meet the needs of patients on
AHF operates seventeen AHF Healthcare Centers             the ground. AHF operates free Healthcare Centers,
in California, Florida and Washington D.C. and is         offering lifesaving antiretroviral treatment (ART)          morning, it’s morning, it’s
the largest nonprofit provider of HIV/AIDS medical        and/or testing and outreach services in Amsterdam,          morning” it caws. Then,
care in the U.S. The comprehensive, compassion-
ate, patient-centered care we offer is unparalleled.
                                                          Cambodia, China, Costa Rica, Ecuador, Estonia,
                                                          Ethiopia, Guatemala, Haiti, India, Kenya, Lithuania,
                                                                                                                      “It’s evening, it’s evening,
It includes specialized HIV medical care providers,       Mexico, Nepal, Nigeria, Russia, Rwanda, Sierra              it’s evening.”
access to additional specialists and seventeen AHF        Leone, South Africa, Swaziland, Uganda, Ukraine,
Pharmacy locations, many of them inside AHF               United States, Vietnam and Zambia.                          With the help of her
Healthcare Centers.                                                                                                   teenaged brother Emmanuel,
                                                          In the book, “AIDS Policy in Uganda” AHF/Uganda
Groundbreaking managed care and disease manage-           Cares is credited as the first free AIDS treatment clinic   who walks her to AHF’s
ments programs in California and Florida round            to Uganda and “the very first group in Uganda, per-         free HIV/AIDS clinic each
out our wide-ranging cadre of services. For more          haps in Africa, to seek to guarantee both equitable and     month, Mariam Nazziwa is
information, visit: www.HIVCare.org and
                                                                                                                      now a healthy little girl.
                                                          sustainable treatment.”
www.positivehealthcare.org.
                                                          AHF is keeping the commitment to save lives around
AHF opened its fifth clinic named after and in partner-   the world by providing lifesaving antiretroviral treat-
ship with basketball legend Earvin “Magic” Johnson,       ment (ART) to people who otherwise might not have
Jr. in Miami, Florida with a ribbon-cutting ceremony      access to it. We dispense hope through lifesaving
                                                          medical care.

                                                                                                                                          AHF Progress Report 5
Worldwide Impact 2011
                               AFRICA                                                              ASIA PACIFIC
                               AHF has a presence in: Ethiopia, Kenya,                             AHF has a presence in: Cambodia, China,
                               Nigeria, Rwanda, Sierra Leone, South Africa,                        India, Nepal, Vietnam
                               Swaziland, Uganda, Zambia                                           •  9,436 tests administered through AHF
                                                                                                     6
                               •  66,845 HIV tests administered through AHF
                                 4                                                                 • 960,000 condoms provided by AHF
                               • 6,500,000 condoms provided by AHF

AHF: Keeping the Promise


On AIDS                                                            2
                                                                    2.5 million people
                                                                   living w/ HIV/AIDS
                                                                                                          5 million people
                                                                                                          living w/ HIV/AIDS


Around the world, AHF is
keeping the promise on AIDS
by providing high-quality
HIV/AIDS medical care,
testing, outreach, education
and advocacy. Our efforts
have increased exponentially                                              Growth of AHF Global HIV Testing
over the years—and so has                                       820,000
our reach. We provide free                                      700,000
lifesaving antiretroviral
                                      Number of people tested




                                                                600,000
treatment (ART) to 166,000
patients in 25 countries.                                       500,000

In addition, AHF provides                                       400,000
services to millions more                                       300,000
in many countries, including                                    200,000
free HIV testing, education                                     100,000
and advocacy.                                                        0
                                                                                2009      2010         2011            2012
THE AMERICAS                                                                EASTERN EUROPE/RUSSIA
 AHF has a presence in: Ecuador, Guatemala,                                  AHF has a presence in: Amsterdam, Estonia,
 Haiti, Mexico, Costa Rica, United States                                    Lithuania, Russia, Ukraine
 • 120,665 tests administered through AHF                                    • 42,566 tests administered through AHF
 • 1,900,500 condoms provided by AHF                                         • 639,500 condoms provided by AHF




           3 million people                                                                 1.5 million people
           living w/ HIV/AIDS                                                               living w/ HIV/AIDS




  n 2009 AHF launched a global Condom Initiative to promote
   I                                                                                                     Growth of condom distribution
  access to condoms and distributed 10 million free AHF-branded LOVE Condoms
  in Africa, Asia, Europe and the Americas. The scale-up of distribution to 15 million          20 Mil
  in 2010 revealed logistical and political barriers. In order to streamline the process,
  AHF scaled back to 10 million in 2011. In 2012, AHF plans to distribute 20 million
  and continue its drive to increase worldwide access to condoms.                               15 Mil
  n 2008, AHF pioneered a streamlined model of rapid HIV testing
   I
  in order to reach more people. After 1.6 million people were successfully tested
  during World AIDS Day events, AHF proceeded to implement the model in 2009                    10 Mil
  as the Rapid Testing Program (RTP). The program also links HIV-positive clients
  into treatment. RTP reached 700,000 clients in 17 countries in 2011. AHF will test
  1 million per year by mid 2013, while continuing to advocate for streamlined
                                                                                                    0
  rapid models.
                                                                                                                 2009     2010       2011          2012

                                                                                                                                            AHF Progress Report 7
Breaking Barriers
                                              Redefining the Status Quo
                                              In the earliest days of the epidemic, AHF’s founders overcame significant
                                              barriers to access and passed legislation to create the first licensed
                                              HIV/AIDS facility for the terminally ill in California. The Foundation has been
                                              breaking new ground ever since.
Featured in the “If Not Now...” documentary

                                              Nowhere can AHF’s commitment to innovation be            AHF’s month-long 2009 “Testing Millions” World
From the Field: Jude  Julius                 seen, than in its ambitious and effective testing and    AIDS Day campaign set the stage for major change.
                                              prevention programs. Through our Public Health           The initiative helped shatter myths and prejudices sur-
Masaka, Uganda
                                              Division in the U.S. and our global programs, AHF        rounding large, public testing events by testing more
The first time HIV-positive                   provided more than half a million rapid HIV tests in     than 4 million people in 23 countries in the month
Jude Sserugo brought his                      2010 alone.                                              leading up to World AIDS Day, December 1st. The
                                                                                                       172,000 people who tested positive during the cam-
son Julius Katongole to the                   Testing America                                          paign were immediately linked to lifesaving treatment.
AHF Healthcare Center in                      In 2010, AHF kept the promise of testing access by       In 2010, the campaign evolved into AHF’s “Test
Masaka, Uganda, Julius had                    taking its effective community-based brand of HIV        and Treat” campaign. Crowds in the thousands
just started on lifesaving                    screening on the road. A small team of AHF testing       attended events in dozens of cities around the world
treatment. He had been                        counselors conducted a six-month, 48-state tour of the   in the weeks before and after World AIDS Day 2010
                                              U.S., in AHF’s state-of-the-art Testing America “Magic
diagnosed just two weeks
                                                                                                       to get tested and raise awareness about the importance
                                              Johnson” mobile testing unit, offering free testing at   of knowing your HIV status. This groundbreaking
earlier. Little Julius was very               events across the U.S. This collaborative effort suc-    approach is shifting the global testing paradigm and
thin and sick then. Not even                  ceeded in testing 5,255 Americans and helped move        saving lives. Visit www.testandtreat.org to find

riding the merry-go-round
                                              the nation toward a streamlined, accessible HIV          out more.
                                              testing model.
in the yard of the clinic,                                                                             The highly successful LOVE Condoms campaign has

brought a smile to his face.
                                                                                                       gone hand in hand with AHF’s global testing initia-
                                              Striving for universal access                            tives. This global advocacy campaign has included the
                                              to testing
Now father and son are                        The majority of the 34 million people living with HIV
                                                                                                       mass distribution of AHF’s special LOVE-branded
                                                                                                       condoms at events around the world. The universal
thriving together.                            do not know their status. Those who are HIV-positive     message behind the campaign—“Love Yourself, Love
                                              but do not know it are the unwitting source of the       Your Partner”—has been embraced from Estonia to
                                              majority of new infections. AHF believes that the best   Cambodia to Swaziland and beyond. For more infor-
                                              way to contain the epidemic is to break the chain of     mation, please visit: www.lovecondoms.org.
                                              infection by getting people tested and, if needed,
                                              linked into treatment.



8 AIDS Healthcare Foundation
34 Million
                                                                    People living with HIV/AIDS worldwide




A free, AHF-supported HIV testing event in Freetown, Sierra Leone
25 Years
AHF has been leading the fight
against AIDS




“Give More, Take Less” from the Global Fund - Outside the Chinese Embassy, Los Angeles, CA
Fighting For What’s Right                                                                                              A Mother’s Story
                                                                                                                       Tallinn, Estonia
Overcoming Obstacles to Access                                                                                         Katya Jekaterina Boinova
                                                                                                                       was 18 years old when she
AIDS Healthcare Foundation continues to fight for the interests of patients
                                                                                                                       tested positive for HIV.
in the halls of power.
                                                                                                                       She remembers how her
The group’s efforts to influence public policy in the      drug giant Merck  Co. doubled the discount for its         mother cried and her father
U.S. and globally are aimed at maximizing limited          key HIV/AIDS drug Isentress to cash-strapped AIDS           was shocked. Ten years
resources to deliver lifesaving medical care to the        Drug Assistance Programs for low-income Americans.          later she became pregnant.
                                                                                                                       She went to her doctor’s
people most in need.                                       Key to the campaign’s success were the Foundation’s
                                                           creative awareness-raising tactics such as public
Keeping the promise                                        protests, e-letters, postcards and train station banners    appointments and took her
Funding reductions threaten to undermine the
                                                           placed at platforms near the company’s headquarters.        pills everyday. “Rejoice!
progress in the global HIV/AIDS fight. Commitments
                                                           Similar campaigns led Bristol Myers-Squibb, Gilead
                                                           Sciences Inc. and Johnson  Johnson to follow suit.
                                                                                                                       Her baby was born healthy.
made to men, women and children around the world                                                                       Mother and child are both
                                                                                                                       doing well.”
through programs such as President George W. Bush’s        Contributing to the success of AHF’s advocacy is
landmark AIDS funding program the President’s              the rapid growth of its online community’s more than
Emergency Plan for AIDS Relief (PEPFAR) are not            500,000 supporters. Active Facebook and Twitter pages
being kept.                                                provide the latest HIV/AIDS news and action alerts.

AIDS Healthcare Foundation is dedicated in its efforts
to keep the promise of life to all people living with      Bringing the message home
HIV/AIDS. We lobbied successfully in Washington            AHF is leading the way toward normalizing HIV and
D.C. to ensure PEPFAR funding focused on lifesav-          STD (sexually-transmitted disease) testing. In California
ing medical care. AHF providers and patients from          and Florida, innovative and accessible billboard and
Uganda and South Africa speak to Senators and their        print-ad campaigns have become a regular fixture.
staffers to personally bring home the notion that          With eye-catching graphics and thought-provoking
treatment equals life. AHF is also holding countries       messages, the ads direct viewers to find a testing
accountable to promises made through the Global            location at: www.freehivtest.net.
Fund to Fight AIDS, Tuberculosisi and Malaria and
                                                           A trio of successive billboard campaigns posed the
is a leader on Global Fund reform efforts.
                                                           questions “Sexually Active? “Sexually Risky?”
                                                           “Sexually Reckless?” These groundbreaking ads have
Ensuring social responsibility                             broadened the target audience for sexual health social
Our advocacy is aimed at encouraging drug companies        marketing and have led people to seek testing, through
to lower prices and increase accessibility. Whether the    AHF Wellness Centers, www.freeSTDcheck.org or
need is affordable generics for patients in the develop-   other healthcare sources.
                                                                                                                       Featured in the “If Not Now...” documentary
ing world, or lower prices for safety net programs that
                                                           Join the conversation at www.facebook.com/
serve low-income Americans, AHF continues to raise
its voice in the service of saving more lives. After an
                                                           aidshealth and www.twitter.com/aidshealthcare.
innovative, years long campaign spearheaded by AHF,
                                                                                                                                         AHF Progress Report 11
Innovating For Humanity
                                              Sustaining  Advancing
                                              Innovative thinking—followed by bold action—is what has kept AIDS Healthcare
                                              Foundation at the forefront of efforts to end the epidemic.

Featured in the “If Not Now...” documentary
                                              Thriving in uncertain times                                Shifting the paradigm
                                              AHF’s ability to maintain our independence is              Having successfully operated the Florida AIDS Walk
                                              a core strength. In addition to donations and              (www.FloridaAIDSwalk.org) in Ft. Lauderdale, Florida
A Life Changed                                grants, AHF self-funds though unique social enter-         since 2006, in 2010 AHF launched the 1st annual
Francisco Sarabia, Mexico                     prises. Our successful retail chain of twenty-one          California AIDS Walk. The California AIDS Walk ush-
                                              Out of the Closet Thrift Stores in Southern California,
At 8 months pregnant,
                                                                                                         ered in a new era of AIDS fundraising events, offering a
                                              Northern California and South Florida, have gener-         food and music festival in Los Angeles’ beautiful Griffith
Oronia Hernandez found                        ated millions for the organization since the first store   Park, as well as a dance concert at the historic Greek

out her husband was HIV-
                                              opened in 1989. Many locations also offer free and         Theatre. In addition to raising funds for AIDS Healthcare
                                              confidential HIV testing. To learn more, visit: www.       Foundation, the California AIDS Walk also benefits other
positive. She tested positive                 outofthecloset.org.                                        local HIV/AIDS organizations that serve traditionally
and thought she was going                     AHF’s non-profit, retail pharmacies help the orga-         underserved populations, such as African-Americans,
                                                                                                         Latinos and women. www.walkeatdance.org.
to die. Oronia is raising her
                                              nization to self-sustain. With seventeen locations
                                              in California, Florida and Washington D.C., AHF
3 children and doing well                     Pharmacy reinvents the idea of a local, neighborhood       Expanding our reach
on treatment from the                         pharmacy as a way to give back. As actor, activist and
                                              AHF spokesperson Blair Underwood says “Any phar-
                                                                                                         AHF continues to go boldly toward where its services are
                                                                                                         needed most. Just as the organization has in other parts of
AHF Healthcare Center in                      macy can fill a prescription, but there’s only one that    the world, AHF is bringing its high-quality medical care
Mexico City, Mexico.                          can change lives.”                                         and services to places where the epidemic is growing in
                                                                                                         the U.S. and where existing services are minimal. Already
                                              The Foundation’s latest advancement is the opening
“My life is changing now                      of several “all-in-one” locations in which an AHF
                                                                                                         longtime partners in six free AHF “Magic Johnson”
                                                                                                         Healthcare Centers, three more such centers are planned
that I am on my treatment.                    Pharmacy—or even an AHF Healthcare Center—is
                                                                                                         for Atlanta, Georgia, Ft. Worth, Texas and Brooklyn,
                                              located right alongside an Out of the Closet Thrift
I would tell people that                      Store location, offering many convenient services all
                                                                                                         New York. In addition, AHF will bring its unique brand

live with HIV to think
                                                                                                         of fundraising to the midwest, with its 23rd Out of the
                                              in one place. www.AHFPharmacy.org.
                                                                                                         Closet Thrift Store opening in Columbus, Ohio—along
positive. You think that you                  Ninety-six cents of every dollar earned by Out of the      with an AHF Pharmacy, free HIV testing and a nearby

are going to die. But if you
                                              Closet and AHF Pharmacy goes right back into AHF’s         AHF Healthcare Center.
                                              innovative treatment, prevention and outreach pro-
take your medication, you                     grams in the U.S. and globally.
                                                                                                         AIDS Healthcare Foundation will continue its 25-year
                                                                                                         tradition of innovating and keeping the promise to ensure
will not die.”                                                                                           that every man, woman and child who needs access to
                                                                                                         HIV/AIDS services, has it.

12 AIDS Healthcare Foundation
                                              To learn more about AIDS Healthcare Foundation and its programs, please visit: www.aidshealth.org.
Audited Financial Statements and Supplementary Information



                                                                                                            Years ended December 31, 2010 and 2009
                                                                                                            with Report of Independent Auditors
                                                                                                            AIDS Healthcare Foundation
 f Not Now... documents the race to test millions of people worldwide.
 I
 From India to Mexico, Ukraine to Uganda, this compelling documentary
 proves that the demand for accessible HIV Testing around the world is a
 challenge we must meet.
W




    AHF Board of Directors              Senior Management                      GLOBAL HEADQUARTERS
    Rodney L. Wright, M.D.              Michael Weinstein                      General Secretariat
    Chair of the Board                  President                              Keizersgracht 518
    Cynthia Davis                       Peter D. Reis                          1017 EK Amsterdam
    Domestic Vice Chair                 Senior Vice President                  The Netherlands
    Diana Hoorzuk                       Penninah Iutung Amor                   Tel. +31 (0)20 626 6267
    Global Vice Chair                   Bureau Chief, Africa                   Regional Bureau Offices
    Lawrence Peters, M.S.               Laura Boudreau, Esq.                   AFRICA BUREAU
    Treasurer                           Chief Counsel for Operations           1 Baker Road
    Agapito Diaz                        Scott Carruthers                       Kampala, Uganda
    Secretary                           National Director of Pharmacy          Tel. +256 414 346 311
    William Arroyo, M.D.                Wayne Chen, M.D.                       ASIA PACIFIC BUREAU
    Mary Ashley                         Sr. Medical Director of Managed Care   #14 Street 99
                                         Acting Chief of Medicine             Sangkat Boeung Trabek
    Curley L. Bonds, M.D.
                                        Terri Ford                             Khann Chamkarmon
    Steve L. Carlton, Esq.              Senior Director of Global Policy       Phnom Penh, Cambodia
    Condessa Curley, M.D.               and Advocacy                           Tel. +855 23 221 606
    Laurent Fischer, M.D.               Lyle Honig                             EUROPE  CENTRAL ASIA BUREAU
    Scott Galvin                        Assoc. Chief Financial Officer         Office 12, 10 Malopidvalna Str.,
    Judith Marsh                        Michael Kahane                         Kyiv, Ukraine 02000
    Elizabeth Mendia                    Bureau Chief, Southern Region          Tel. +38 044 2797436
    Angelina C. Wapakabulo              Tom Myers, Esq.                        LATIN AMERICA BUREAU
                                        Chief of Public Affairs and            Calle San Luis Potosi #223
    Michael Weinstein
                                        General Counsel                        Colonia Roma Delegacion Cuauhtemoc
    Anita Ann Williams
                                        Laura Nelson                           CP 06700 Mexico DF
                                        Chief Financial Officer                Tel: (+52)55 52648208

    Now Celebrating                     Kevin D. Shim
                                        Chief Information Officer
                                        Donna Stidham
                                        Chief of Managed Care
                                        Timothy Tandon
                                        Director of Human Resources
                                        Chris Wilson
                                        National Director of Sales


    6255 West Sunset Boulevard | 21st Floor
    Los Angeles, CA 90028-7403 | USA
    Tel: +1 323 860 5200
    Fax: +1 323 962 8513
    www.aidshealth.org

AHF 2010-2011 Progress Report

  • 1.
    KEEPING THE PROMISE AIDSHEALTHCARE FOUNDATION >> 2010-2011 Progress Report
  • 2.
    OUR MISSION Cutting-edge medicineand advocacy, regardless of the ability to pay.
  • 3.
    Keeping the Promise Everyman, woman and child living with HIV/AIDS must have access to treatment—AIDS Healthcare Foundation is committed to keeping that promise of life. AHF Progress Report 1
  • 4.
    Message From the President Twenty-five years of fighting AIDS teaches you a lot about patience. It is challenging to have patience when more than 5,000 people die of AIDS every day and even more become infected. Maintaining urgency in a crisis that has gone on for thirty years can be daunting. But, the essential reality of AIDS remains. A still relatively new, incurable, killer, infectious disease, that is primarily transmitted through sexual contact, has invaded the world. We are patient in the sense that we recognize that we cannot falter in this battle, no matter how long it takes to win it, especially now that we are on the road to controlling AIDS in the world. A successful strategy Many things have changed of condom promotion, rapid testing and access to treatment has resulted in more than five million people in twenty-five years. But, currently being treated for HIV; death rates have decreased and new infections are going down. AHF’s mission of cutting On the other hand, we cannot become complacent. Our very success is becoming our downfall. AIDS is seldom front-page news in many places and funding commitments are being cut or withdrawn. edge medicine and advocacy At this quarter of a century mark AHF has recommitted itself to the battle to control AIDS. We are marching regardless of ability to pay toward 250,000 patients in our care worldwide. Our condom promotion and distribution systems have been is as strong as it has ever increased dramatically. AHF itself did more than half a million rapid HIV tests in 2010. However, most of all AHF remains a steadfast advocate. At all levels, locally, nationally and internationally AHF clients and been. With your support, staff are lifting our voices to change policies that restrict our ability to win the war against AIDS. Our unique our voice will be heard ever vantage point, as a direct care provider, greatly enhances our ability to design practical solutions that will translate into successful strategies on the ground. more strongly, across the Many things have changed in twenty-five years. But, AHF’s mission of cutting edge medicine and advocacy globe, until the fight has regardless of ability to pay is as strong as it has ever been. With your support, our voice will be heard ever more strongly, across the globe, until the fight has been won and we can retire from the field. been won and we can retire from the field.” —Michael Weinstein Michael Weinstein President, AIDS Healthcare Foundation
  • 5.
    Photo of MichaelWeinstein (opposite page) by Mel Melcon. Copyright © 2004. Los Angeles Times. Reprinted with Permission. Love Condoms distributed free at the Water Festival - Phnom Penh, Cambodia AHF Progress Report 3
  • 6.
    48 States Visited byAHF “Magic Johnson” Mobile Testing unit for free HIV tests AHF’s “Testing America” Tour stopped in Birmingham, Alabama where 441 students were tested during a one-day event at Miles College
  • 7.
    Saving Lives Delivering expertmedical care AIDS Healthcare Foundation provides the highest-quality medical care available for people living with HIV/AIDS. Founded in 1987 as a grassroots Los Angeles-based in 2010. Other new clinics include the AHF “Blair Featured in the “If Not Now...” documentary group committed to “fight for the living and care Underwood” Healthcare Center, which opened in for the dying,” AHF is now the largest global AIDS hard-hit Washington D.C.—the first to bear the name organization. We provide lifesaving medical care and/ of actor and activist Blair Underwood. Meet Mariam or services regardless of ability to pay to more than Compassionate care is our calling card. We are proud Masaka, Uganda 166,000 individuals in 25 countries worldwide in the United States, Africa, Latin America/Caribbean, the to say that in our most recent U.S. Client Satisfaction Orphaned by parents who died of AIDS, Mariam lives Survey, 95% would recommend AHF to a friend. Asia/Pacific Region and Europe. All of our efforts are aimed at saving lives and Dispensing hope— with her grandmother. A serving those most in need. worldwide reach little bird reminds her to Globally, AIDS Healthcare Foundation partners with take her medication by Ensuring access to quality care— U.S. programs local organizations, city health officials and national “speaking” to her from atop a tree-branch: “It’s ministries of health to meet the needs of patients on AHF operates seventeen AHF Healthcare Centers the ground. AHF operates free Healthcare Centers, in California, Florida and Washington D.C. and is offering lifesaving antiretroviral treatment (ART) morning, it’s morning, it’s the largest nonprofit provider of HIV/AIDS medical and/or testing and outreach services in Amsterdam, morning” it caws. Then, care in the U.S. The comprehensive, compassion- ate, patient-centered care we offer is unparalleled. Cambodia, China, Costa Rica, Ecuador, Estonia, Ethiopia, Guatemala, Haiti, India, Kenya, Lithuania, “It’s evening, it’s evening, It includes specialized HIV medical care providers, Mexico, Nepal, Nigeria, Russia, Rwanda, Sierra it’s evening.” access to additional specialists and seventeen AHF Leone, South Africa, Swaziland, Uganda, Ukraine, Pharmacy locations, many of them inside AHF United States, Vietnam and Zambia. With the help of her Healthcare Centers. teenaged brother Emmanuel, In the book, “AIDS Policy in Uganda” AHF/Uganda Groundbreaking managed care and disease manage- Cares is credited as the first free AIDS treatment clinic who walks her to AHF’s ments programs in California and Florida round to Uganda and “the very first group in Uganda, per- free HIV/AIDS clinic each out our wide-ranging cadre of services. For more haps in Africa, to seek to guarantee both equitable and month, Mariam Nazziwa is information, visit: www.HIVCare.org and now a healthy little girl. sustainable treatment.” www.positivehealthcare.org. AHF is keeping the commitment to save lives around AHF opened its fifth clinic named after and in partner- the world by providing lifesaving antiretroviral treat- ship with basketball legend Earvin “Magic” Johnson, ment (ART) to people who otherwise might not have Jr. in Miami, Florida with a ribbon-cutting ceremony access to it. We dispense hope through lifesaving medical care. AHF Progress Report 5
  • 8.
    Worldwide Impact 2011 AFRICA ASIA PACIFIC AHF has a presence in: Ethiopia, Kenya, AHF has a presence in: Cambodia, China, Nigeria, Rwanda, Sierra Leone, South Africa, India, Nepal, Vietnam Swaziland, Uganda, Zambia • 9,436 tests administered through AHF 6 • 66,845 HIV tests administered through AHF 4 • 960,000 condoms provided by AHF • 6,500,000 condoms provided by AHF AHF: Keeping the Promise On AIDS 2 2.5 million people living w/ HIV/AIDS 5 million people living w/ HIV/AIDS Around the world, AHF is keeping the promise on AIDS by providing high-quality HIV/AIDS medical care, testing, outreach, education and advocacy. Our efforts have increased exponentially Growth of AHF Global HIV Testing over the years—and so has 820,000 our reach. We provide free 700,000 lifesaving antiretroviral Number of people tested 600,000 treatment (ART) to 166,000 patients in 25 countries. 500,000 In addition, AHF provides 400,000 services to millions more 300,000 in many countries, including 200,000 free HIV testing, education 100,000 and advocacy. 0 2009 2010 2011 2012
  • 9.
    THE AMERICAS EASTERN EUROPE/RUSSIA AHF has a presence in: Ecuador, Guatemala, AHF has a presence in: Amsterdam, Estonia, Haiti, Mexico, Costa Rica, United States Lithuania, Russia, Ukraine • 120,665 tests administered through AHF • 42,566 tests administered through AHF • 1,900,500 condoms provided by AHF • 639,500 condoms provided by AHF 3 million people 1.5 million people living w/ HIV/AIDS living w/ HIV/AIDS n 2009 AHF launched a global Condom Initiative to promote I Growth of condom distribution access to condoms and distributed 10 million free AHF-branded LOVE Condoms in Africa, Asia, Europe and the Americas. The scale-up of distribution to 15 million 20 Mil in 2010 revealed logistical and political barriers. In order to streamline the process, AHF scaled back to 10 million in 2011. In 2012, AHF plans to distribute 20 million and continue its drive to increase worldwide access to condoms. 15 Mil n 2008, AHF pioneered a streamlined model of rapid HIV testing I in order to reach more people. After 1.6 million people were successfully tested during World AIDS Day events, AHF proceeded to implement the model in 2009 10 Mil as the Rapid Testing Program (RTP). The program also links HIV-positive clients into treatment. RTP reached 700,000 clients in 17 countries in 2011. AHF will test 1 million per year by mid 2013, while continuing to advocate for streamlined 0 rapid models. 2009 2010 2011 2012 AHF Progress Report 7
  • 10.
    Breaking Barriers Redefining the Status Quo In the earliest days of the epidemic, AHF’s founders overcame significant barriers to access and passed legislation to create the first licensed HIV/AIDS facility for the terminally ill in California. The Foundation has been breaking new ground ever since. Featured in the “If Not Now...” documentary Nowhere can AHF’s commitment to innovation be AHF’s month-long 2009 “Testing Millions” World From the Field: Jude Julius seen, than in its ambitious and effective testing and AIDS Day campaign set the stage for major change. prevention programs. Through our Public Health The initiative helped shatter myths and prejudices sur- Masaka, Uganda Division in the U.S. and our global programs, AHF rounding large, public testing events by testing more The first time HIV-positive provided more than half a million rapid HIV tests in than 4 million people in 23 countries in the month Jude Sserugo brought his 2010 alone. leading up to World AIDS Day, December 1st. The 172,000 people who tested positive during the cam- son Julius Katongole to the Testing America paign were immediately linked to lifesaving treatment. AHF Healthcare Center in In 2010, AHF kept the promise of testing access by In 2010, the campaign evolved into AHF’s “Test Masaka, Uganda, Julius had taking its effective community-based brand of HIV and Treat” campaign. Crowds in the thousands just started on lifesaving screening on the road. A small team of AHF testing attended events in dozens of cities around the world treatment. He had been counselors conducted a six-month, 48-state tour of the in the weeks before and after World AIDS Day 2010 U.S., in AHF’s state-of-the-art Testing America “Magic diagnosed just two weeks to get tested and raise awareness about the importance Johnson” mobile testing unit, offering free testing at of knowing your HIV status. This groundbreaking earlier. Little Julius was very events across the U.S. This collaborative effort suc- approach is shifting the global testing paradigm and thin and sick then. Not even ceeded in testing 5,255 Americans and helped move saving lives. Visit www.testandtreat.org to find riding the merry-go-round the nation toward a streamlined, accessible HIV out more. testing model. in the yard of the clinic, The highly successful LOVE Condoms campaign has brought a smile to his face. gone hand in hand with AHF’s global testing initia- Striving for universal access tives. This global advocacy campaign has included the to testing Now father and son are The majority of the 34 million people living with HIV mass distribution of AHF’s special LOVE-branded condoms at events around the world. The universal thriving together. do not know their status. Those who are HIV-positive message behind the campaign—“Love Yourself, Love but do not know it are the unwitting source of the Your Partner”—has been embraced from Estonia to majority of new infections. AHF believes that the best Cambodia to Swaziland and beyond. For more infor- way to contain the epidemic is to break the chain of mation, please visit: www.lovecondoms.org. infection by getting people tested and, if needed, linked into treatment. 8 AIDS Healthcare Foundation
  • 11.
    34 Million People living with HIV/AIDS worldwide A free, AHF-supported HIV testing event in Freetown, Sierra Leone
  • 12.
    25 Years AHF hasbeen leading the fight against AIDS “Give More, Take Less” from the Global Fund - Outside the Chinese Embassy, Los Angeles, CA
  • 13.
    Fighting For What’sRight A Mother’s Story Tallinn, Estonia Overcoming Obstacles to Access Katya Jekaterina Boinova was 18 years old when she AIDS Healthcare Foundation continues to fight for the interests of patients tested positive for HIV. in the halls of power. She remembers how her The group’s efforts to influence public policy in the drug giant Merck Co. doubled the discount for its mother cried and her father U.S. and globally are aimed at maximizing limited key HIV/AIDS drug Isentress to cash-strapped AIDS was shocked. Ten years resources to deliver lifesaving medical care to the Drug Assistance Programs for low-income Americans. later she became pregnant. She went to her doctor’s people most in need. Key to the campaign’s success were the Foundation’s creative awareness-raising tactics such as public Keeping the promise protests, e-letters, postcards and train station banners appointments and took her Funding reductions threaten to undermine the placed at platforms near the company’s headquarters. pills everyday. “Rejoice! progress in the global HIV/AIDS fight. Commitments Similar campaigns led Bristol Myers-Squibb, Gilead Sciences Inc. and Johnson Johnson to follow suit. Her baby was born healthy. made to men, women and children around the world Mother and child are both doing well.” through programs such as President George W. Bush’s Contributing to the success of AHF’s advocacy is landmark AIDS funding program the President’s the rapid growth of its online community’s more than Emergency Plan for AIDS Relief (PEPFAR) are not 500,000 supporters. Active Facebook and Twitter pages being kept. provide the latest HIV/AIDS news and action alerts. AIDS Healthcare Foundation is dedicated in its efforts to keep the promise of life to all people living with Bringing the message home HIV/AIDS. We lobbied successfully in Washington AHF is leading the way toward normalizing HIV and D.C. to ensure PEPFAR funding focused on lifesav- STD (sexually-transmitted disease) testing. In California ing medical care. AHF providers and patients from and Florida, innovative and accessible billboard and Uganda and South Africa speak to Senators and their print-ad campaigns have become a regular fixture. staffers to personally bring home the notion that With eye-catching graphics and thought-provoking treatment equals life. AHF is also holding countries messages, the ads direct viewers to find a testing accountable to promises made through the Global location at: www.freehivtest.net. Fund to Fight AIDS, Tuberculosisi and Malaria and A trio of successive billboard campaigns posed the is a leader on Global Fund reform efforts. questions “Sexually Active? “Sexually Risky?” “Sexually Reckless?” These groundbreaking ads have Ensuring social responsibility broadened the target audience for sexual health social Our advocacy is aimed at encouraging drug companies marketing and have led people to seek testing, through to lower prices and increase accessibility. Whether the AHF Wellness Centers, www.freeSTDcheck.org or need is affordable generics for patients in the develop- other healthcare sources. Featured in the “If Not Now...” documentary ing world, or lower prices for safety net programs that Join the conversation at www.facebook.com/ serve low-income Americans, AHF continues to raise its voice in the service of saving more lives. After an aidshealth and www.twitter.com/aidshealthcare. innovative, years long campaign spearheaded by AHF, AHF Progress Report 11
  • 14.
    Innovating For Humanity Sustaining Advancing Innovative thinking—followed by bold action—is what has kept AIDS Healthcare Foundation at the forefront of efforts to end the epidemic. Featured in the “If Not Now...” documentary Thriving in uncertain times Shifting the paradigm AHF’s ability to maintain our independence is Having successfully operated the Florida AIDS Walk a core strength. In addition to donations and (www.FloridaAIDSwalk.org) in Ft. Lauderdale, Florida A Life Changed grants, AHF self-funds though unique social enter- since 2006, in 2010 AHF launched the 1st annual Francisco Sarabia, Mexico prises. Our successful retail chain of twenty-one California AIDS Walk. The California AIDS Walk ush- Out of the Closet Thrift Stores in Southern California, At 8 months pregnant, ered in a new era of AIDS fundraising events, offering a Northern California and South Florida, have gener- food and music festival in Los Angeles’ beautiful Griffith Oronia Hernandez found ated millions for the organization since the first store Park, as well as a dance concert at the historic Greek out her husband was HIV- opened in 1989. Many locations also offer free and Theatre. In addition to raising funds for AIDS Healthcare confidential HIV testing. To learn more, visit: www. Foundation, the California AIDS Walk also benefits other positive. She tested positive outofthecloset.org. local HIV/AIDS organizations that serve traditionally and thought she was going AHF’s non-profit, retail pharmacies help the orga- underserved populations, such as African-Americans, Latinos and women. www.walkeatdance.org. to die. Oronia is raising her nization to self-sustain. With seventeen locations in California, Florida and Washington D.C., AHF 3 children and doing well Pharmacy reinvents the idea of a local, neighborhood Expanding our reach on treatment from the pharmacy as a way to give back. As actor, activist and AHF spokesperson Blair Underwood says “Any phar- AHF continues to go boldly toward where its services are needed most. Just as the organization has in other parts of AHF Healthcare Center in macy can fill a prescription, but there’s only one that the world, AHF is bringing its high-quality medical care Mexico City, Mexico. can change lives.” and services to places where the epidemic is growing in the U.S. and where existing services are minimal. Already The Foundation’s latest advancement is the opening “My life is changing now of several “all-in-one” locations in which an AHF longtime partners in six free AHF “Magic Johnson” Healthcare Centers, three more such centers are planned that I am on my treatment. Pharmacy—or even an AHF Healthcare Center—is for Atlanta, Georgia, Ft. Worth, Texas and Brooklyn, located right alongside an Out of the Closet Thrift I would tell people that Store location, offering many convenient services all New York. In addition, AHF will bring its unique brand live with HIV to think of fundraising to the midwest, with its 23rd Out of the in one place. www.AHFPharmacy.org. Closet Thrift Store opening in Columbus, Ohio—along positive. You think that you Ninety-six cents of every dollar earned by Out of the with an AHF Pharmacy, free HIV testing and a nearby are going to die. But if you Closet and AHF Pharmacy goes right back into AHF’s AHF Healthcare Center. innovative treatment, prevention and outreach pro- take your medication, you grams in the U.S. and globally. AIDS Healthcare Foundation will continue its 25-year tradition of innovating and keeping the promise to ensure will not die.” that every man, woman and child who needs access to HIV/AIDS services, has it. 12 AIDS Healthcare Foundation To learn more about AIDS Healthcare Foundation and its programs, please visit: www.aidshealth.org.
  • 15.
    Audited Financial Statementsand Supplementary Information Years ended December 31, 2010 and 2009 with Report of Independent Auditors AIDS Healthcare Foundation f Not Now... documents the race to test millions of people worldwide. I From India to Mexico, Ukraine to Uganda, this compelling documentary proves that the demand for accessible HIV Testing around the world is a challenge we must meet.
  • 16.
    W AHF Board of Directors Senior Management GLOBAL HEADQUARTERS Rodney L. Wright, M.D. Michael Weinstein General Secretariat Chair of the Board President Keizersgracht 518 Cynthia Davis Peter D. Reis 1017 EK Amsterdam Domestic Vice Chair Senior Vice President The Netherlands Diana Hoorzuk Penninah Iutung Amor Tel. +31 (0)20 626 6267 Global Vice Chair Bureau Chief, Africa Regional Bureau Offices Lawrence Peters, M.S. Laura Boudreau, Esq. AFRICA BUREAU Treasurer Chief Counsel for Operations 1 Baker Road Agapito Diaz Scott Carruthers Kampala, Uganda Secretary National Director of Pharmacy Tel. +256 414 346 311 William Arroyo, M.D. Wayne Chen, M.D. ASIA PACIFIC BUREAU Mary Ashley Sr. Medical Director of Managed Care #14 Street 99 Acting Chief of Medicine Sangkat Boeung Trabek Curley L. Bonds, M.D. Terri Ford Khann Chamkarmon Steve L. Carlton, Esq. Senior Director of Global Policy Phnom Penh, Cambodia Condessa Curley, M.D. and Advocacy Tel. +855 23 221 606 Laurent Fischer, M.D. Lyle Honig EUROPE CENTRAL ASIA BUREAU Scott Galvin Assoc. Chief Financial Officer Office 12, 10 Malopidvalna Str., Judith Marsh Michael Kahane Kyiv, Ukraine 02000 Elizabeth Mendia Bureau Chief, Southern Region Tel. +38 044 2797436 Angelina C. Wapakabulo Tom Myers, Esq. LATIN AMERICA BUREAU Chief of Public Affairs and Calle San Luis Potosi #223 Michael Weinstein General Counsel Colonia Roma Delegacion Cuauhtemoc Anita Ann Williams Laura Nelson CP 06700 Mexico DF Chief Financial Officer Tel: (+52)55 52648208 Now Celebrating Kevin D. Shim Chief Information Officer Donna Stidham Chief of Managed Care Timothy Tandon Director of Human Resources Chris Wilson National Director of Sales 6255 West Sunset Boulevard | 21st Floor Los Angeles, CA 90028-7403 | USA Tel: +1 323 860 5200 Fax: +1 323 962 8513 www.aidshealth.org