Company confidential – Do not distribute without notice ©AE 2014  1
Fromservervirtualization
tohybridcloud
How to benefit from
a successful implementation
18/06
Matthias Pyck
Principal Consultant ALM & Cloud
Company confidential – Do not distribute without notice ©AE 2014  2
19/02 Mobilebydesign
Howtodesign,build,runformobilefirst
23/04 R&Hadoop
Theperfectmarriageforyouranalytics?
18/06 Fromprivatecloudtohybridcloud
Howtobenefitfromasuccessfulimplementation
01/10 Prepareforthedigitalenterprise
Businessdrivenenterprisearchitecture
26/11 Multi-devicefront-endengineering
Howbusinessesbenefitfromapplyingthistechnicalskill
Company confidential – Do not distribute without notice ©AE 2014  3
Introduction
SETTING THE SCENE
Company confidential – Do not distribute without notice ©AE 2014  4
Company confidential – Do not distribute without notice ©AE 2014  5
ae nv/sa
Interleuvenlaan 27b, B-3001 Heverlee
T +32 16 39 30 60 - F +32 16 39 30 70
www.ae.be
From server virtualization
to Hybrid Cloud
Matthias Pyck
Principal Consultant, AE
matthias.pyck@ae.be
Company confidential – Do not distribute without notice ©AE 2014  7
The question is:
What is clouding? The question is:
Who cares?!
Company confidential – Do not distribute without notice ©AE 2014  8
To Cloud Or Not To Cloud?
That Is NOT The Question!
Company confidential – Do not distribute without notice ©AE 2014  9
Goals
 Having better insight of the Cloud & the challenges
 Understand the drivers, trends & consequences of virtualization
 Share our vision and experience with Private & Hybrid Cloud
 Harvest ideas, examples & technology possibilities
 Retain some do’s & don’ts
 Feel free to ask your questions as session progresses
Company confidential – Do not distribute without notice ©AE 2014  10
Agenda
 Trends – Food for Thought
 Are we “Clouding”?
 How to get in the “Cloud”?
 Q&A
Company confidential – Do not distribute without notice ©AE 2014  11
2014 CIO Technology Priorities (Gartner)
Source: Gartner
Company confidential – Do not distribute without notice ©AE 2014  12
Clouding or Cloudy? (Gartner)
Source: Gartner
Company confidential – Do not distribute without notice ©AE 2014  13
The Hypes of 2012 (Gartner)
Company confidential – Do not distribute without notice ©AE 2014  14
The Hypes of 2013 (Gartner)
Company confidential – Do not distribute without notice ©AE 2014  15
The “Enlightened”
 Infrastructure as a Service (IaaS)
 Provides elastic infrastructure (often virtual)
 Composed by servers, network & storage components
 Software as a Service (SaaS)
 Service provider delivers Applications
 Merely modern web based user interfaces (html5, ajax, …)
 Compliant with most of the current devices (pc, tablet, phone, …)
 Cloud/Web platforms
 Technologies to provide programmatic access to functionality on the Cloud/Web
(technology, business, community, …)
 Also related to Provisioning, Storage & Computer power
Company confidential – Do not distribute without notice ©AE 2014  16
Those “Crystalizing”
 Platform as a Service (PaaS)
 Offers (middleware) services through which applications can be structured &
integrated (e.g. identity & access management, portal functionalities, integration
capabilities, …).
 Private Cloud Computing
 Organization completely isolated from others
 Real Time Infrastructure (RTI)
 SLA driven, dynamic allocation and optimization of IT resources
 Elasticity, functionality and dynamic optimization and tuning of the runtime
environment based on policies and principles
 Elastic Multi-tenancy
 A common computer environment with logical isolation of the different
applications (tenants)
Company confidential – Do not distribute without notice ©AE 2014  17
Challenge : Diversity for Disruption
Cloud Services
Skill shifts
Reduced
budgets
24/7
Shorter
development
times
Complexity
growth
Faster change
cycles
Company confidential – Do not distribute without notice ©AE 2014  18
The Critical Success Factors
Source: Gartner 2014
Company confidential – Do not distribute without notice ©AE 2014  19
Agenda
 Trends – Food for Thought
 Are we “Clouding”?
 How to get in the “Cloud”?
 Q&A
Company confidential – Do not distribute without notice ©AE 2014  20
Are You Already in Cloud Computing Model?
 <You are> if the answer is “Yes” to the following 4 questions:
 Do you think about your resources (servers, storage, networking) in a pooled
fashion rather than as individual entities?
 Can you provide elasticity in services and applications, so that they can expand
with demand and contract when it goes away?
 Can you track usage so that you can show back or charge back to users, or user
departments, the compute power they are using?
 Have your end users self provisioning capabilities?
Company confidential – Do not distribute without notice ©AE 2014  21
Typical Current Situation
Company confidential – Do not distribute without notice ©AE 2014  22
Real Numbers (Overview)
Company confidential – Do not distribute without notice ©AE 2014  23
Real Numbers (Zoom)
Company confidential – Do not distribute without notice ©AE 2014  24
The Real Process
Company confidential – Do not distribute without notice ©AE 2014  25
The Real Assets
Company confidential – Do not distribute without notice ©AE 2014  26
N° of participants for server intake
Company confidential – Do not distribute without notice ©AE 2014  27
TCO is a lot more than Purchase price
Company confidential – Do not distribute without notice ©AE 2014  28
Operational Debt defined (by Gartner)
 Not adopting infrastructure and operations standards due to a lack of architectural
blueprints resulting in higher costs of technical support as well as potentially lower
service quality, as sufficient resources may be unable to be spread across
heterogeneous environments.
 Continuing to perform manual operations and not implement automated workflows
that could result in higher personnel costs.
 Downplaying capacity planning, which could result in unnecessary hardware, software
or services procurement, plus new labor costs to support the new infrastructure.
 Neglecting to document the infrastructure because of lack of resources resulting in
increased mean time to diagnose potential problems.
 Failing to invest in training and education that could result in poorly performed work
due to low morale issues.
Company confidential – Do not distribute without notice ©AE 2014  29
Agenda
 Trends – Food for Thought
 Are we “Clouding”?
 How to get in the “Cloud”?
 Q&A
Company confidential – Do not distribute without notice ©AE 2014  30
Today
 A multitude of variations in set-up
 Setting up infrastructure is primarily manually, undocumented and only in the minds of
the people
 Large number of people involved in installations
 Diverse application & infrastructure portfolio
 Diversity of infrastructure components (hardware, networking, storage, ...)
 Diversity of middleware
 Diversity of frameworks
 Diversity of …
 Who knows what is true and what is running?
 A problem of repeatability in the design and deployment of infrastructure
components across environments around
 A problem of predictability: nothing is what it seems to be
 Do we make best use of our hardware, licenses and facilities?
 A call that the Cloud will resolve all our problems
 High Operational Debt
Company confidential – Do not distribute without notice ©AE 2014  31
Were we want to get
 Infrastructural consistency across environment & applications
 (Dev, QA, …, Prod)
 Very fast (de)provisioning (hours versus days) of infrastructure & operations
 Reduce operational debt
 SLA based Service models in place:
 Serviced
 Self-Service
 Automated Serviced (elasticity)
 Pay for the time a server is required.
 Freedom of
 Location
 Cloud provider
 Outsource Partnerships
 Software stack in line with the market
 (example: JBoss common, weblogic rare)
Company confidential – Do not distribute without notice ©AE 2014  32
Vision
Server
Virtualization
Industrialized
Operations
Private Cloud
Self Service
Serviced -
Automated Serviced
Hybrid Cloud
€ are driving
OperationsMaturity
CompanyMaturity
Operations
AsaService
Operationsasa
business
“Metal in-
house”
Elasticity/Agility
is driving
D
Y
N
A
M
IC
I
N
F
R
A
S
T
R
U
C
T
U
R
E
Stable situation
Company confidential – Do not distribute without notice ©AE 2014  33
Phased approach
Server Virtualization
Industrialized Operations
Private Cloud
Hybrid Cloud
Manual
(De)provisioning
Automated
(De)provisioning
Hardwarein-house
Hardwareoutside
PaaS
IaaS
Manual
SaaS
Auotmated
SaaS
X X X
/ X X / X
/ X X X / X
/ X X X X X / X
Company confidential – Do not distribute without notice ©AE 2014  34
Server virtualization  Industrialized Operations
 Assess current situation
 Define Industrialized
 Automated (de)provisioning
 Infrastructure as Data
• the data which identifies & defines is the documentation
 Critical success factors
• Simplification
• Standardization (HW & SW)
 Aligned with current monitoring, back-up, DRP
 Prepare & Present Business Case
 CAPEX & OPEX
 ROI
 Roadmap / Implementation Plan
 Implement
Company confidential – Do not distribute without notice ©AE 2014  35
Today’s issues addressed by phase 1
Infrastructural consistency across environment & applications
(Dev, QA, …, Prod)
Very fast (de) provisioning (hours versus days) of infrastructure & operations
 Reduce operational debt
 SLA based Service models in place:
 Serviced
 Self-Service
 Automated Serviced (elasticity)
 Pay for the time a server is required.
 Freedom of
 Location
 Cloud provider
Outsource Partnerships
 Software stack in line with the market
 (example: JBoss common, weblogic rare)
Company confidential – Do not distribute without notice ©AE 2014  36
Industrialized Operations  Private Cloud
 Look at alternatives for facilities & HW €?
 Select / Investigate Cloud Model that implements your
strategic direction in terms of applications and technologies
 Think IaaS, PaaS, SaaS, …
 Based on selected Cloud Model:
 Adapt Integrated Server Backup
 Adapt Integrated Monitoring
 Adapt DRP
 Decide & implement base service model(s)
 Serviced
 Self-servicing
Company confidential – Do not distribute without notice ©AE 2014  37
Today’s issues addressed by phase 2
Infrastructural consistency across environment & applications
(Dev, QA, …, Prod)
Very fast (de) provisioning (hours versus days) of infrastructure & operations
Reduce operational debt
 SLA based Service models in place:
Serviced
Self-Service
 Automated Serviced (elasticity)
 Pay for the time a server is required.
Freedom of
Location
Cloud provider
Outsource Partnerships
Software stack in line with the market
(example: JBoss common, weblogic rare)
Company confidential – Do not distribute without notice ©AE 2014  38
Private Cloud  Hybrid Cloud
 Implement platform release management
 Imbed in the organization as a regular exercise
 Align with application lifecycle management
 Re-evaluate / reconsider previous choices
 Determine & show the price €
 Resources are not unlimited
• Why not sharing resources?
• Why not reusing resources?
 Why are you getting an invoice when you have no clients?
 Not all applications need massive gold @ all moments
 Automate bendable infrastructure
 SLA based automation
 Get the things ‘hybrid” (aka “Go external when cheaper”)
• Private Cloud = covering the base demand
• Public Cloud = getting the work done at peak moments
o Be aware of legal constraints
Company confidential – Do not distribute without notice ©AE 2014  39
Today’s issues addressed by phase 3
Infrastructural consistency across environment & applications
(Dev, QA, …, Prod)
Very fast (de) provisioning (hours versus days) of infrastructure & operations
Reduce operational debt
SLA based Service models in place:
Serviced
Self-Service
Automated Serviced (elasticity)
Pay for the time a server is required.
Freedom of
Location
Cloud provider
Outsource Partnerships
Software stack in line with the market
(example: JBoss common, weblogic rare)
Company confidential – Do not distribute without notice ©AE 2014  40
Getting started
Assess
Deliver
Implementation
Roadmap & ROI
Deliver
Project Plan -
Activities to
implement
Roadmap
Execute
Roadmap Timeline1. Assessment - Where are we? Where do we want to be?
• Alignment with long term vision
• Inventory of inefficiencies/complaints and their root causes
• Who is involved in the server setup process
• What process is involved when setting up a server?
• Inventory of current software & hardware stack + facilities
• License strategy & costs
• Analyze data according to the AE model
2. Recommendations and Strategy
3. Get a GO for next step
1. Collect real evidence: facts and figures
2. Establish business case ROI
Establish implementation Plan
Company confidential – Do not distribute without notice ©AE 2014  41
Take aways : AE research example 1
 Don’t forget to involve the application guys !
 Design & technological change needed for elasticity
Company confidential – Do not distribute without notice ©AE 2014  42
Take aways : AE research example 2
 Cloud performance might be less than expected
Company confidential – Do not distribute without notice ©AE 2014  43
The question is:
What is clouding? The question is:
Who dares?!
Company confidential – Do not distribute without notice ©AE 2014  44
Help us help you!
 Free assessment of your environment
 Horizontal view: your FTE (workload) estimates
• Excel spreadsheet (“FTE estimates”)
• +/- exhaustive list of tasks within categories
• Infrastructure, Platform, Software (applications) & Process
 Vertical view: your server infrastructure composition
• Excel spreadsheet (“Facts & Figures”)
 What’s in for you?
 Anonymous benchmark against consolidated data
 Starting point for improvement track business case
 Email to matthias.pyck@ae.be
Company confidential – Do not distribute without notice ©AE 2014  45
Agenda
 Trends – Food for Thought
 Are we “Clouding”?
 How to get in the “Cloud”?
 Q&A
Company confidential – Do not distribute without notice ©AE 2014  46
Next stop: AE Blog
Visit blog.ae.be
Sharing of AE insights and experiences
@ae_nv blog.ae.be

AE foyer: From Server Virtualization to Hybrid Cloud

  • 1.
    Company confidential –Do not distribute without notice ©AE 2014  1 Fromservervirtualization tohybridcloud How to benefit from a successful implementation 18/06 Matthias Pyck Principal Consultant ALM & Cloud
  • 2.
    Company confidential –Do not distribute without notice ©AE 2014  2 19/02 Mobilebydesign Howtodesign,build,runformobilefirst 23/04 R&Hadoop Theperfectmarriageforyouranalytics? 18/06 Fromprivatecloudtohybridcloud Howtobenefitfromasuccessfulimplementation 01/10 Prepareforthedigitalenterprise Businessdrivenenterprisearchitecture 26/11 Multi-devicefront-endengineering Howbusinessesbenefitfromapplyingthistechnicalskill
  • 3.
    Company confidential –Do not distribute without notice ©AE 2014  3 Introduction SETTING THE SCENE
  • 4.
    Company confidential –Do not distribute without notice ©AE 2014  4
  • 5.
    Company confidential –Do not distribute without notice ©AE 2014  5
  • 6.
    ae nv/sa Interleuvenlaan 27b,B-3001 Heverlee T +32 16 39 30 60 - F +32 16 39 30 70 www.ae.be From server virtualization to Hybrid Cloud Matthias Pyck Principal Consultant, AE matthias.pyck@ae.be
  • 7.
    Company confidential –Do not distribute without notice ©AE 2014  7 The question is: What is clouding? The question is: Who cares?!
  • 8.
    Company confidential –Do not distribute without notice ©AE 2014  8 To Cloud Or Not To Cloud? That Is NOT The Question!
  • 9.
    Company confidential –Do not distribute without notice ©AE 2014  9 Goals  Having better insight of the Cloud & the challenges  Understand the drivers, trends & consequences of virtualization  Share our vision and experience with Private & Hybrid Cloud  Harvest ideas, examples & technology possibilities  Retain some do’s & don’ts  Feel free to ask your questions as session progresses
  • 10.
    Company confidential –Do not distribute without notice ©AE 2014  10 Agenda  Trends – Food for Thought  Are we “Clouding”?  How to get in the “Cloud”?  Q&A
  • 11.
    Company confidential –Do not distribute without notice ©AE 2014  11 2014 CIO Technology Priorities (Gartner) Source: Gartner
  • 12.
    Company confidential –Do not distribute without notice ©AE 2014  12 Clouding or Cloudy? (Gartner) Source: Gartner
  • 13.
    Company confidential –Do not distribute without notice ©AE 2014  13 The Hypes of 2012 (Gartner)
  • 14.
    Company confidential –Do not distribute without notice ©AE 2014  14 The Hypes of 2013 (Gartner)
  • 15.
    Company confidential –Do not distribute without notice ©AE 2014  15 The “Enlightened”  Infrastructure as a Service (IaaS)  Provides elastic infrastructure (often virtual)  Composed by servers, network & storage components  Software as a Service (SaaS)  Service provider delivers Applications  Merely modern web based user interfaces (html5, ajax, …)  Compliant with most of the current devices (pc, tablet, phone, …)  Cloud/Web platforms  Technologies to provide programmatic access to functionality on the Cloud/Web (technology, business, community, …)  Also related to Provisioning, Storage & Computer power
  • 16.
    Company confidential –Do not distribute without notice ©AE 2014  16 Those “Crystalizing”  Platform as a Service (PaaS)  Offers (middleware) services through which applications can be structured & integrated (e.g. identity & access management, portal functionalities, integration capabilities, …).  Private Cloud Computing  Organization completely isolated from others  Real Time Infrastructure (RTI)  SLA driven, dynamic allocation and optimization of IT resources  Elasticity, functionality and dynamic optimization and tuning of the runtime environment based on policies and principles  Elastic Multi-tenancy  A common computer environment with logical isolation of the different applications (tenants)
  • 17.
    Company confidential –Do not distribute without notice ©AE 2014  17 Challenge : Diversity for Disruption Cloud Services Skill shifts Reduced budgets 24/7 Shorter development times Complexity growth Faster change cycles
  • 18.
    Company confidential –Do not distribute without notice ©AE 2014  18 The Critical Success Factors Source: Gartner 2014
  • 19.
    Company confidential –Do not distribute without notice ©AE 2014  19 Agenda  Trends – Food for Thought  Are we “Clouding”?  How to get in the “Cloud”?  Q&A
  • 20.
    Company confidential –Do not distribute without notice ©AE 2014  20 Are You Already in Cloud Computing Model?  <You are> if the answer is “Yes” to the following 4 questions:  Do you think about your resources (servers, storage, networking) in a pooled fashion rather than as individual entities?  Can you provide elasticity in services and applications, so that they can expand with demand and contract when it goes away?  Can you track usage so that you can show back or charge back to users, or user departments, the compute power they are using?  Have your end users self provisioning capabilities?
  • 21.
    Company confidential –Do not distribute without notice ©AE 2014  21 Typical Current Situation
  • 22.
    Company confidential –Do not distribute without notice ©AE 2014  22 Real Numbers (Overview)
  • 23.
    Company confidential –Do not distribute without notice ©AE 2014  23 Real Numbers (Zoom)
  • 24.
    Company confidential –Do not distribute without notice ©AE 2014  24 The Real Process
  • 25.
    Company confidential –Do not distribute without notice ©AE 2014  25 The Real Assets
  • 26.
    Company confidential –Do not distribute without notice ©AE 2014  26 N° of participants for server intake
  • 27.
    Company confidential –Do not distribute without notice ©AE 2014  27 TCO is a lot more than Purchase price
  • 28.
    Company confidential –Do not distribute without notice ©AE 2014  28 Operational Debt defined (by Gartner)  Not adopting infrastructure and operations standards due to a lack of architectural blueprints resulting in higher costs of technical support as well as potentially lower service quality, as sufficient resources may be unable to be spread across heterogeneous environments.  Continuing to perform manual operations and not implement automated workflows that could result in higher personnel costs.  Downplaying capacity planning, which could result in unnecessary hardware, software or services procurement, plus new labor costs to support the new infrastructure.  Neglecting to document the infrastructure because of lack of resources resulting in increased mean time to diagnose potential problems.  Failing to invest in training and education that could result in poorly performed work due to low morale issues.
  • 29.
    Company confidential –Do not distribute without notice ©AE 2014  29 Agenda  Trends – Food for Thought  Are we “Clouding”?  How to get in the “Cloud”?  Q&A
  • 30.
    Company confidential –Do not distribute without notice ©AE 2014  30 Today  A multitude of variations in set-up  Setting up infrastructure is primarily manually, undocumented and only in the minds of the people  Large number of people involved in installations  Diverse application & infrastructure portfolio  Diversity of infrastructure components (hardware, networking, storage, ...)  Diversity of middleware  Diversity of frameworks  Diversity of …  Who knows what is true and what is running?  A problem of repeatability in the design and deployment of infrastructure components across environments around  A problem of predictability: nothing is what it seems to be  Do we make best use of our hardware, licenses and facilities?  A call that the Cloud will resolve all our problems  High Operational Debt
  • 31.
    Company confidential –Do not distribute without notice ©AE 2014  31 Were we want to get  Infrastructural consistency across environment & applications  (Dev, QA, …, Prod)  Very fast (de)provisioning (hours versus days) of infrastructure & operations  Reduce operational debt  SLA based Service models in place:  Serviced  Self-Service  Automated Serviced (elasticity)  Pay for the time a server is required.  Freedom of  Location  Cloud provider  Outsource Partnerships  Software stack in line with the market  (example: JBoss common, weblogic rare)
  • 32.
    Company confidential –Do not distribute without notice ©AE 2014  32 Vision Server Virtualization Industrialized Operations Private Cloud Self Service Serviced - Automated Serviced Hybrid Cloud € are driving OperationsMaturity CompanyMaturity Operations AsaService Operationsasa business “Metal in- house” Elasticity/Agility is driving D Y N A M IC I N F R A S T R U C T U R E Stable situation
  • 33.
    Company confidential –Do not distribute without notice ©AE 2014  33 Phased approach Server Virtualization Industrialized Operations Private Cloud Hybrid Cloud Manual (De)provisioning Automated (De)provisioning Hardwarein-house Hardwareoutside PaaS IaaS Manual SaaS Auotmated SaaS X X X / X X / X / X X X / X / X X X X X / X
  • 34.
    Company confidential –Do not distribute without notice ©AE 2014  34 Server virtualization  Industrialized Operations  Assess current situation  Define Industrialized  Automated (de)provisioning  Infrastructure as Data • the data which identifies & defines is the documentation  Critical success factors • Simplification • Standardization (HW & SW)  Aligned with current monitoring, back-up, DRP  Prepare & Present Business Case  CAPEX & OPEX  ROI  Roadmap / Implementation Plan  Implement
  • 35.
    Company confidential –Do not distribute without notice ©AE 2014  35 Today’s issues addressed by phase 1 Infrastructural consistency across environment & applications (Dev, QA, …, Prod) Very fast (de) provisioning (hours versus days) of infrastructure & operations  Reduce operational debt  SLA based Service models in place:  Serviced  Self-Service  Automated Serviced (elasticity)  Pay for the time a server is required.  Freedom of  Location  Cloud provider Outsource Partnerships  Software stack in line with the market  (example: JBoss common, weblogic rare)
  • 36.
    Company confidential –Do not distribute without notice ©AE 2014  36 Industrialized Operations  Private Cloud  Look at alternatives for facilities & HW €?  Select / Investigate Cloud Model that implements your strategic direction in terms of applications and technologies  Think IaaS, PaaS, SaaS, …  Based on selected Cloud Model:  Adapt Integrated Server Backup  Adapt Integrated Monitoring  Adapt DRP  Decide & implement base service model(s)  Serviced  Self-servicing
  • 37.
    Company confidential –Do not distribute without notice ©AE 2014  37 Today’s issues addressed by phase 2 Infrastructural consistency across environment & applications (Dev, QA, …, Prod) Very fast (de) provisioning (hours versus days) of infrastructure & operations Reduce operational debt  SLA based Service models in place: Serviced Self-Service  Automated Serviced (elasticity)  Pay for the time a server is required. Freedom of Location Cloud provider Outsource Partnerships Software stack in line with the market (example: JBoss common, weblogic rare)
  • 38.
    Company confidential –Do not distribute without notice ©AE 2014  38 Private Cloud  Hybrid Cloud  Implement platform release management  Imbed in the organization as a regular exercise  Align with application lifecycle management  Re-evaluate / reconsider previous choices  Determine & show the price €  Resources are not unlimited • Why not sharing resources? • Why not reusing resources?  Why are you getting an invoice when you have no clients?  Not all applications need massive gold @ all moments  Automate bendable infrastructure  SLA based automation  Get the things ‘hybrid” (aka “Go external when cheaper”) • Private Cloud = covering the base demand • Public Cloud = getting the work done at peak moments o Be aware of legal constraints
  • 39.
    Company confidential –Do not distribute without notice ©AE 2014  39 Today’s issues addressed by phase 3 Infrastructural consistency across environment & applications (Dev, QA, …, Prod) Very fast (de) provisioning (hours versus days) of infrastructure & operations Reduce operational debt SLA based Service models in place: Serviced Self-Service Automated Serviced (elasticity) Pay for the time a server is required. Freedom of Location Cloud provider Outsource Partnerships Software stack in line with the market (example: JBoss common, weblogic rare)
  • 40.
    Company confidential –Do not distribute without notice ©AE 2014  40 Getting started Assess Deliver Implementation Roadmap & ROI Deliver Project Plan - Activities to implement Roadmap Execute Roadmap Timeline1. Assessment - Where are we? Where do we want to be? • Alignment with long term vision • Inventory of inefficiencies/complaints and their root causes • Who is involved in the server setup process • What process is involved when setting up a server? • Inventory of current software & hardware stack + facilities • License strategy & costs • Analyze data according to the AE model 2. Recommendations and Strategy 3. Get a GO for next step 1. Collect real evidence: facts and figures 2. Establish business case ROI Establish implementation Plan
  • 41.
    Company confidential –Do not distribute without notice ©AE 2014  41 Take aways : AE research example 1  Don’t forget to involve the application guys !  Design & technological change needed for elasticity
  • 42.
    Company confidential –Do not distribute without notice ©AE 2014  42 Take aways : AE research example 2  Cloud performance might be less than expected
  • 43.
    Company confidential –Do not distribute without notice ©AE 2014  43 The question is: What is clouding? The question is: Who dares?!
  • 44.
    Company confidential –Do not distribute without notice ©AE 2014  44 Help us help you!  Free assessment of your environment  Horizontal view: your FTE (workload) estimates • Excel spreadsheet (“FTE estimates”) • +/- exhaustive list of tasks within categories • Infrastructure, Platform, Software (applications) & Process  Vertical view: your server infrastructure composition • Excel spreadsheet (“Facts & Figures”)  What’s in for you?  Anonymous benchmark against consolidated data  Starting point for improvement track business case  Email to matthias.pyck@ae.be
  • 45.
    Company confidential –Do not distribute without notice ©AE 2014  45 Agenda  Trends – Food for Thought  Are we “Clouding”?  How to get in the “Cloud”?  Q&A
  • 46.
    Company confidential –Do not distribute without notice ©AE 2014  46 Next stop: AE Blog Visit blog.ae.be Sharing of AE insights and experiences
  • 47.