B Power Generation, Power Systems Division, Abril 2012



  ABB
  Power Generation
Compañia Lider en Tegnologia de Potencia y Automatizacion
con fuerte posicionamiento del mercado.

                                 117,000 empleados en cerca de
                                  100 paises
                                 $32 billion en revenues (2009)
                                 Fundada en 1988 de la union de
                                  companias de ingenieria Suizas y
                                  Suecas
                                 Predecesores fundados en 1883 y
                                  1891
                                 Compania Publica con cuartel
                                  general en Suiza




© ABB Group
May 16, 2012 | Slide 2
Como esta Organizada ABB
Cinco Divisiones Globales



                                                                        Discrete
                               Power                Power                                    Low Voltage      Process
                                                                       Automation
                              Products             Systems                                    Products       Automation
                                                                       and Motion
                             $11.2 billion        $6.5 billion          $5.4 billion          $4.1 billion    $7.8 billion
                               33,500               16,000                18,000                19,000          28,000
                             empleados            empleados             empleados             empleados       empleados
                         2009 revenues (US$; pro-forma figures for automation divisions)


                            El Portafolio ABB Cubre:
                                  Electricidad, Automatizacion,                          Low-voltage products
                                   Control e Instrumentacion
                                   para Generacion de                                     Motores & drives
                                   Potencia y procesos                                    Sistemas inteligentes de
                                   Industriales
                                                                                           edificaciones
                                  Sisttemas De Transmision
                                   de Potencia                                            Robots & Systemas

                                  Soluciones de Distribucion
© ABB Group
May 16, 2012 | Slide 3
Hacer frente a los desafíos de la sociedad en el camino de la
era de baja- emisión de carbono
Ayudar a los clientes a hacer más con menos
                         Crecimiento de el consumo de                       ABB Nuestras soluciones son
                         Electricidad a 2030
                         Source: IEA, World Energy Outlook 2009
                                                                                  Encontrar los picos de
                                                                +76%               demanda electrica
                         30,000
                         Terrawatt-hours
                                                                                  Incrementar la eficiencia
                         (TWh)                                                     energetica y reduccion
                                                                                   de la emision de CO2
                                                                   29,000
                         20,000
                                                                                  Aumentar la
                                                       20,000



                                                                                   productividad para
                                                                                   alcanzar mejoras en la
                                                   12,500
                                         16,500




                         10,000
                                                                                   competitividad de los
                                                                                   negocios y empresas de
                                                                                   servicios

                                      2007        2015            2030



© ABB Group
May 16, 2012 | Slide 4
Innovadores proyectos en el mundo
Empujando los limites de las tecnologias
                                      First commercial                     Longest underwater    Most remote offshore
             Mine hoist for           wave power plant                     power link            wind farm linked to grid
             largest potash mine                          First platform connected                          Europe’s largest
                                                          to mainland grid                                  thermal solar
                                                                                                            power plant
     Largest battery


                                                                                                                       Longest and highest
                                                                                                                       capacity power link
          Largest SVC
          installation
                                                                                                                      Longest conveyor belt

                         Automation of largest                                                                         Largest SCADA
                         alumina plant                                                                                 network

                                                                                                                    Longest underground
                                                                                                                    power link
                    Largest gearless mill
                    drive (for crushing ore)                  Largest reverse-
                                                              osmosis
                                                                                   Power and automation
                                                              desalination plant                        Substation in world’s
                                               First 600 kV                        of largest chemical
                                                                                                        tallest building
                                               power link                          cellulose plant

© ABB Group
May 16, 2012 | Slide 5
La Innovacion es la llave de ABB como ventaja competitiva
Liderazgo basado en una consistente inversion en nuevos
desarrollos
 * Comprises
 non-order
 related R&D and
 order-related
 development




                            Mas de $1 billion invertidos anualmente en R&D*
                            6,000 cientificos e ingenieros
                            Colaboracion en mas de 70 Universidades
                                MIT (US), Tsinghua (China), KTH Royal Institute of
                                 Technology (Sweden), Indian Institute of Science
                                 (Bangalore), ETH (Switzerland), Karlsruhe (Germany),
                                 AGH University of Science and Technology (Poland)

© ABB Group
May 16, 2012 | Slide 6
ABB en Generacion de Potencia


          Negocios a nivel mundial cerca de 2,000 MUSD
          Productos negociados a nivel mundial cerca de 2,000
           MUSD
          El negocio de Generacion de Potencia representa dentro
           del grupo ABB un grupo eficiente y exitoso
          Localizada dento del “Top 10“ dentro de el negocio de
           Generacion de Potencia
ABB en Generacion de Potencia en el Mundo




                   48 Local Business Units                                                        8 Regional Centers
Argentina   Croatia        India             Netherland    Romania        Switzerland            USA            Sweden
Australia   Czech Rep.     Indonesia         New Zealand   Russia         Taiwan                 China          Singapore
Austria     Denmark        Israel            Norway        Saudi Arabia   Thailand               Brazil         UAE
Belgium     Egypt          Italy             Peru          Singapore      Turkey                 Italy
Brazil      Finland        Japan             Poland                       United Arab Emirates   Germany
                                                           Slovakia
Canada      France         Kuwait            Portugal      South Africa   United Kingdom
Chile       Germany        Malaysia          Qatar         Spain          United States
China       Greece         Mexico            Korean Rep.   Sweden         Vietnam
Aplicaciones Tipicas de Plantas de Generacion




           Fossil-Fired   Ciclos Combinados turbinas      Diesel




             Nuclear               Solar                   Hydro




          Co-generation     Waste-to-Energy            Desalinizacion
La Diferencia - ABB en Generacion de Potencia


                             ABB fue un constructor de plantas de generacion llave
                              en mano
                                  Sabemos de Plantas tipo hydro, nucleares, ciclo
                                   combinado hasta plantas de carbon
                                  Tenemos la mayor experiencia de base instalada en
                                   el mundo
                             Por lo tanto
                                  Tenemos un extenso know-how del proceso
                                  Tenemos un extenso know-how de los sistemas




© ABB Group
May 16, 2012 | Slide 10
Jesus Rubio, ABB PANAMA   Abril 2011


    ABB Power Generation
    Hacemos la Energia Solar Confiable
    y Adsequible
© ABB Group
May 16, 2012 | Slide 11
El recurso solar es abundante
En 6 horas los desiertos reciben más energía del sol que la humanidad
consume en un año.  «Dr. Gerhard Knies, Desertec »




                                          Las Plantas Solares
                                          construidas en este recuadro
                                          en el desierto de el Sahara
                                          podrian cubrir la demanda de
                                          energa mundial




© ABB Group
Altas Areas de Incidencia Solar en el Mundo
Altas Eficiencias en CSP y CPV
                                    North   Africa and Medditerane:                         India:
SW  USA:
                                    CSP  references built in Spain by                       First CSP plant by Novatec about to
Excellent conditions for CPV
and CSP. Many CPV                   Novatec. Further development with                        start execution.
references by Greenvolts.           focus on Northafrica.                                    ABB/Novatec offer the Solar Boiler
                                                                                             for CSP plants and turn key CPV.




                                                                               Middle   East:
                                                                               ABB  is developping a
                                                                               number of CSP and
                                                                               CPV project in the
                                                                               region, leveraging on
                                                                               the local EPC
                                                                               experience.

                                             South   Africa:                         Australia:
Chile:
Excellent solar resources in                 ABB    has delivered the first          ABB   is well positioned with its
remote areas.                                utility PV plant .                       subsidiary Powercorp who is
Focus on remote operations such                                                       specialized in the integration of
                                             ABB    is developing a number
as mining and offer solar process                                                     solar resources into islands
© ABB Group                                  of utility PV, CPV and CSP
heat and solar electricity.                                                           grids.
                                             plants.
Plantas de energía solar para el cinturón solar del mundo
Centros de excelencia ABB para cubrir los mercados solares




Solar   Irradiation

   2’500 kWh/m2


    2’000


    1’500


    1’000


     500


                          Power Generation Business Units of ABB
Solar Power in ABB
Tecnologias Solares

                                Proyectos Solares estan divididos en dos grandes grupos
                                     Solar Fotovoltaico (PV)
                                          Absorcion de Luz por los materiales que generan corriente
                                           electrica
                                          Uso de Luz solar directa o indirectamente
                                          Posibilidad de ubicacion en TODAS las locaciones
                                     Concentracion de Potencia Solar (CSP)
                                          Espejos concentran la Luz solar para generar vapor y
                                           manjear una turbina
                                          Uso de luz solar directa unicamente
                                          Aplicaciones en locaciones especiales




©   ABB Group
May   16, 2012 | Slide 15
ABB ofrece Plantas de Generacion Solar Llave en Mano
 Ejecucion Fiable y Rendimiento Garantizado

       CSP power plants                    CPV power plants                     PV power plants
    Costo efectivo directo para        Excepcional rendimiento            Solucion Optimizada e
     generacion a vapor                  solar eléctrico con céldas de       integrada
                                         triple unión y el seguimiento
    Alta eficiencia en plantas de                                          Maximo rendimiento a
                                         de doble eje.
     generacion a vapor con                                                  cualquier momento del dia
     parametros hasta 130 bar,           .Sistema Modular                  Integracion dentro de la red
     530°C de vapor                      prefabricado y probado para
                                         ser un sistema plug and play       Independiente de el
    Mayor rendiemiento por m2
                                                                             suplidor de los modulos o
     de terreno                         En cooperacion con                  celdas
    En cooperacion con Novatec          Greenvolts
     Solar
Tres tegnologias Solares para distintas aplicaciones
Mas Alto rendimiento para cualquier entorno
              CSP power plants          CPV power plants                  PV power plants
    Plantas de Generacion           Plantas de Generacion           Plantas de Generacion
     Electrica desde 50 MW            Electrica desde 50 MW            Electrica desde 1 a 100
     hasta 250 MW                     hasta 250 MW                     MW
    Energia Generada desde la       Plantas de poder                Aplicacion Industrial de
     planta con alamacenamiento       Descentralizadas desde           techo hasta 500 kW
     termico
                                      100 kW
    Proceso Calor / Vapor                                            Fuente Solar a todos los
                                     Fuente Solar para areas de       niveles de irradiacion
    Fuente Solar para areas de       alta Incidencia                  global
     alta incidencia




© ABB Group
Concentrated Solar Power
En cooperacion con Novatec Solar
Concentrated Solar Power
Concepto Tecnico

                           La radiación solar se recoge y se
                           concentra por un reflector de Fresnel.
                            Ocho filas de espejos están
                           continuamente rastreadas para enfocar
                           la radiación al receptor.
                            El agua se bombea a través del tubo
                           receptor, generando vapor a 100 bar
                           con temperaturas de hasta 500 ° C.
                           El vapor se ejecuta una turbina para
                           generar electricidad o se utiliza para
                           otros procesos.
                            ABB colabora exclusivamente con
                           NOVATEC Solar que ha desarrollado la
                           tecnología CSP más eficiente

© ABB Group
Concentrated Solar Power
Aplicaciones
CSP Power Plants                         CSP Proceso de Vapor
   Nuevas Centrales Termosolares           Desalinizacion de agua salada o mar
    De 50 a 250 MW                          Enfriamiento Solar
    Eficiente con 500 ° C / 100 bar
                                                 Redes de Enfriamiento
    De ciclo combinado solar
                                                 Produccion LNG
    Solar sólo en días, CC en la noche
                                                 Recuperacion Mejorada de petroleo
    Fossil Fuel Saver
                                            Procesos de Vapor para la industris




© ABB Group
Alta Eficiencia Tegnlogia Linea Fresnel
Generacion directa de vapor con super calentadores

La última generación de tecnología Fresnel lineal en funcionamiento desde agosto de 2011:
   700 m del evaporador, seguido de 300 m de la sección del super calentador
   Vapor de agua estable y controlado de hasta 130 bar y una temperatura estable hasta 530 ° C
   Turbinas de vapor como estándar diseñadas para centrales de ciclo combinado permite una alta eficiencia
    de 38% que se traduce en menores costos




© ABB Group
Mantenimiento de Campo de Espejos
Bajos costos con Espejos planos




     Parabolico                Espejos planos limpieza a traves de robot


      Alto consumo de Agua       Muy bajo cnsumo de Agua
      Alto costo de labor        Bajo costo de labor


      2
Systema de Manufactura automatizado
Fabrica de construccion en sitio, cerca del sitio

                                Fabricacion loca de componentes principales
                                Procesos estandarizados que garantizan alto
                                 nivel de calidad
                                Alto potencial de contenido local
                                Alta creacion de empleo local
                                Bajos costos logisticos
                                Valuacion de creacion local
Modular System
Quick and Easy Site Assembly

                           Rapido ensamblaje en sitio debido al alto
                             nivel de prefabricacion
                            Estructuras soporte basadas en
                             componentes estandar conseguidos en todos
                             los mercados
CSP Planta un concepto puramente solar
Alta eficiencia con Super Calentadores de vapor




     2
CSP Planta un concepto puramente solar
Solucion de 3 Tanques con Super Calentadores de vapor
CSP Vapor competetitividad al mundo del Gas Natural
Cual Tegnologia provee un precio justo?

                                                                                                        ?

                                                                                                        ?




                                                                                Years       Later ...




                                                                               the    Golden End


© ABB Group   Assumptions: Gas Boiler: 90% Boiler efficiency, no tax on gas, no CO2 tax
              Assumptions: Solar Boiler: Latitudes 25° , 7% WAAC, 25 years, no grants or CO2 credits considered
Comparacion de Tegnolgias CSP (1)
Menor costo de operacion LCOE con ABB / Novatec
                           Parabolic trough    ABB Novatec
Temperatura de Operacion   390°C               Hasta 530°C
Power block eficiencia     36%                 38%

Perdidas de Calor          10 %                5%
Material por ano MWh       Alto                Bajo
rendimiento termico
Uso de tierra eficiencia   270 kWh th per m²   370 kWh th
                                               per m²
Tegnologia de almacenaje   Sales Fundidas      Sales Fundidas




       2
Comparacion de Tegnolgias CSP (2)
Menor costo de operacion LCOE con ABB / Novatec

                        Parabolic trough   ABB Novatec   Saving
Espejos tracking              5 kWh            1 kWh     (- 80%)
Bomba                        20 kWh            7 kWh     (- 65%)
Costo Mantenimiento            € 3.7            € 2.0    (- 46%)
Consumo Agua
                            13.4 litros       2 litros   (- 85%)
Limpieza




All   numbers per MW per year
CSP: ABB ofrece la tegnologia mas eficiente
Esto hace que la tecnología de ABB CSP asequible

              Sistema de manufactura automatizado
              • Eficiente Proceso con control de calidad
              • Costos de produccion local minimiza transporte y costos de logistica



              Simple, Plano y Liviano de construir


              Alta eficiencia de las tierras en uso eficiente (30% mas que PT)
              • Bajo consumo electrico(70% menos que un PT)



              Produccion directa de vapor hasta 530°C, 130 bar
              • Alta eficiencia de bloque energetico (5% mayor a la salida de un PT)
              • Bajas perdidas de calor (50% menos que un PT)

              Facil de Mantener y Limpiar
              • Limpieza por robot
              • Bajo consumo de agua(85% menos que un PT)


© ABB Group
CSP Reference: Puerto Errado 1, Spain
12 MWth, 1.4 Mwel in operation since spring 2010

  Key Data

  EPC Contractor           Novatec Solar

  Owner                    Novatec Solar

                           3 rows of linear Fresnel collectors,
  Layout                   conventional steam turbine
                           equipment and generator, storage

  Solar field length       806.40 m

  Net aperture area        21,571.2 m²

  Operating temperature Up to 500 °C

  Operating pressure       Up to 65 bar

  Peak thermal output      12 MW th

  Peak electrical output   1.4 MWel

  Electrical production    2.2 GWh p.a.




www.novatecsolar.com
CSP Reference: Puerto Errado 2, Spain
150 MWth, 30 MWel in operation since Jan 2012

 Key data

 EPC Contractor           Novatec Solar

                          Tubo Sol PE2 S.L.
 Owners                   owned by 5 Swiss utilities (85%)
                          and Novatec Solar (15%)
                          28 rows of linear Fresnel
                          collectors, conventional steam
 Layout
                          turbine equipment and generator,
                          storage

 Solar field length       940.8 m

 Net aperture area        302,000 m²

 Operating temperature    270 °C

 Operating pressure       55 bar

 Peak thermal output      150 MW th

 Peak electrical output   30 MWel

 Electrical production    49 GWh/year

 Fuel                     Solar Only
CSP Reference: Liddell, Australia
9.3 MW thermal, under hot commissioning in Jan 2012

    Key data

    EPC Contractor            Novatec Solar

    Owner                     Macquarie Generation

                              4 rows of linear Fresnel
    Model                     collectors, solar augmentation
                              of a coal fired power station

    Solar field length        403,2 m

    Net aperture area         18,489.60 m²

    Operating temperature     Up to 270°C

    Operating pressure        Up to 55 bar

    Peak thermal output       9.3 MW th

    Thermal Output per year   13,550 MWhth




www.novatecsolar.com
Solar Power in ABB
Solares por Concentración de Potencia Solar CSP

                          Concentracion Potencia Solar - Torre de Potencia
                                       Heliostatos reflejando sobre una Torre donde se recibe calor y por transferencia a un
                                       fluido se genera vapor para manejar la turbina
                                      ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos
                                       de 2 ejes, motores, drives,Paneles de MV y LV, Proteccion,
                                       seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica
                                      Potencia Tipica: 10 MW to 50 MW



                          Concentracion Potencia Solar – A traves de Espejos o laminas Parabolicas
                                        Espejos Parabolicos concentrando la luz en un tubo con liquido de alta y facil
                                         transferencia de calor ( HTF) que generara el vapor para manejar la turbina
                                       ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos
                                        de 2 ejes, motores, drives,Paneles de MV y LV, Proteccion,
                                        seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica
                                        automation, transformers, cabling, substation
                                        Potencia Tipica: 50 MW to 300 MW


© ABB Group
May 16, 2012 | Slide 34
Solar Power in ABB
Solares por Concentración de Potencia Solar CSP

                            Concentracion Potencia Solar – Linear Fresnel
                               Espejos Planos concentran la Luz solar en un tubo con agua que genera vapor
                                para manejar la turbina
                               ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos
                                de 1 eje, motores, drives,Paneles de MV y LV, Proteccion,
                                seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica
                               Potencia Tipica: 3 MW to 50 MW




                          Concentracion Potencia Solar – Platos Parabolicos
                                Nueva Tecnologia a traves de platos parabólicos concentran el sol en un motor
                                 Stirling
                                ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos
                                 de 2 ejes para control de estructura de el motor, alternador, drives,Paneles de MV y
                                 LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion
                                 Electrica
                                Potencia Tipica: 10 MW to 25 MW per Stirling dish


© ABB Group
May 16, 2012 | Slide 35
Solar Power in ABB
Otras Tecnologias

                           HCPV Torre heliostatica FV
                                Alta Potencia, Torre heliostatica FV logra concentrar 1500 sun de alta eficiencia en
                                 paneles
                                ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos
                                 de 2 ejes para control de estructura de el motor, alternador, drives,Paneles de MV y
                                 LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion
                                 Electrica
                                Potencia Tipica: 50 MW a 150 MW


                          Chimenea en Torre para convencion de gases
                              Aire caliente a traves de un vidrio colector en la base que lleva el intercambio de
                               calor a la chimenea
                              Etapa experimental
                              ABB Ejecuta (ICE): Switchgear, automatizacion, transformadores, estacion
                                Potencia Tipica: 50 MW a 200 MW




© ABB Group
May 16, 2012 | Slide 36
Jesus Rubio PAABB



 Concentrated Photovoltaic
 En Cooperacion Greenvolts
CPV: Concentrated Photovoltaic
Concepto Tecnico
                          Un preciso mecanismo de dos ejes del
                          sistema de seguimiento de los módulos de
                          CPV ,se centran, precisamente, hacia el sol.
                           Los módulos concentran la luz en el receptor
                          insertado en el celda
                           Una célda solar de triple unión muy eficiente
                          convierte la luz con una eficiencia del 38% en
                          electricidad. Estas células se utilizan en la
                          industria aeroespacial para las aplicaciones
                          críticas en los satélites.
                           El receptor está diseñado como un disipador
                          de calor y enfría la celda pasivamente.
                           Toda la electrónica y el software para cada
                          conjunto se integran en el punto de control
                          del sistema. El CSP proporciona una
                          potencia de 16 kW a 480 VCA.


© ABB Group
CPV: Sistema Integrado y full Modularizado
Optimizacion para Alta Eficiencia y Alta confiabilidad

                        x                           x                          x   4
                       24                        16

Receiver:    10.4W          Module:   250W              Paddle   Pair: 4kW                  Array:   16kW
                                                                                          (primary   building block)




  System     Control Point: SCP
(Control,   Inverter, Comms, Geo)
                                                      Pier           SCP       Stanchion     Roll   beam
                                               (5   per array*) (1 per array) (5 per array*) (1 per array)
CPV: Despacho tipo Plug and Play System
Rapido y Facil Instalacion fuera del contenedor
                                “5-packs”  loaded
                                  into 40’ cargo
                                    containers




   Mount    Stanchions       Assemble   Roll Beams      Mount   Roll Beams




    Slide   on the Paddles      Hang    SCPs         Auto-Commission
CPV: Operacion Remota de el panel de potencias
Gerencia de Manejo sofisticado y servicio Movil
Sistema operativo controla todas las funciones clave de cada matriz 16kW
   Monitoreo en tiempo real del módulo, el perseguidor, y los sistemas de conversión de energía
   Direcciones IP individuales permiten la solución de problemas hasta a los subsistemas dentro de cada gama 16kW
   Toda la información de monitoreo y calibración disponibles a través de VPN segura inalámbrica
   El tiempo en activo y de telemetría solar
CPV: Aplicaciones
Arreglos flexibles de 16KW
CPV Power Plants                                               CPV Remote Power
   CPV Centrales Eléctricas                                    Agrícola estaciones de bombeo
                                                                Estaciones de transmisión para redes móviles
    La integración local de baja tensión para pequeña
                                                                Disfrute de sombra
    capacidad de 16 a 200 kW
                                                                Zona de juegos para el sombreado
    La integración industrial y agrícola para unos pocos       Ganado de sombreado
    cientos de kW
                                                                Sombra para parque de coches
   Utilidad de la estación de energía solar de hasta 50
    MW




© ABB Group
CPV: ABB ofrece Plantas CPV o modelo adecuado
La Necesidad del Cliente define nuestra recomendacion

CPV Llave en mano                               CPV Sistema




                                                ABB entrena y certifica a los terceros
ABB actúa como EPC y entrega la planta          contratistas EPC para diseñar, vender y
llave en mano por encargo.
                                                construir nuestro sistema CPV.
 ABB ofrece un servicio completo ciclo de
vida desde la etapa inicial de diseño, sobre    El sistema completo de CPV se entrega en
el proyecto de conexión a la red, realización   módulos de 16 kW / 480 V CA en el sitio.
, la operación y el mantenimiento de la          Construcción y integración en la red por el
planta
                                                cliente o un tercero


.
© ABB Group
                                                .
CPV: Key Advantages of our Technology
Outstanding and reliable performance

              Alta eficiencia
              •Las células solares de triple unión ofrecen una eficiencia del 100% mayor que las células de silicio
              • Los resultados de seguimiento de doble eje en altos rendimientos constantes durante todo el día
              • Sistema bien diseñado de enfriamiento pasivo mantiene la célula y el máximo rendimiento



              Sistema Modular Plug and Play System
              •Altos estándares de calidad se cumplen, como los módulos están conectados, montados y probados en la
               fábrica
              • Permite una rápida respuesta de la fábrica al mercado
              • Instalación rápida y eficiente


              Diseno para ambientes rudos
              •Al revés de la posición protege contra rocío, escombros, suciedad, el granizo y el viento
              • La resistencia del viento ha sido probado, automático de la cara abajo con vientos fuertes
              • Múltiples unidades pequeñas son menos sensibles al viento que los grandes sistemas centrales



              Operacion remota
              •No requiere personal en sitio
              •Monitoreo, manejo movil y a tiempo real
              •Indicadores de limpieza cuando se requiere mantenimiento para mejorar la eficiencia



© ABB Group
CPV Reference: Utility Wholesale in Byron, CA
320 kW, in operation since spring 2011
CPV Reference: Insectary in Redding, CA
288 kW, in operation since Sep 2011
CPV Reference: Education Yuma, AZ
1 MW, in operation since Sep 2011
Photovoltaic Power
Integrated Solution
Solar power in ABB
Solar FV
                            FV Instalacion en Techo– Estructura Fija
                               Bajo/Media Potencia Fotovoltaica sobre techo o sobre techo con estructuras
                               ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante
                                chasis mecanicos de estructuras fijas, motores, drives,Paneles de MV y LV,
                                Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion
                                Electrica , trabajos civiles
                               Potencia Tipica: 10 kW to 500 kW




                          FV Instalacion en Techos bajos– Estructura Fija
                             Bajo/Media Potencia Fotovoltaica sobre techo o sobre techo con estructuras
                             ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante
                              chasis mecanicos de estructuras fijas, motores, drives,Paneles de MV y LV,
                              Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion
                              Electrica , trabajos civiles
                             Potencia Tipica: 10 kW to 500 kW



© ABB Group
May 16, 2012 | Slide 49
Solar power in ABB
Solar PV
                          FV Concentrado a Tierra– Estructura Fija
                                 Mediana y Alta potencia- instalacion en estructuras fijas
                                ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante chasis
                                 mecanicos de 2 ejes Multiple o polo simple, motores, drives,Paneles de MV y LV,
                                 Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion
                                 Electrica , trabajos civiles
                                Potencia Tipica: 50 MW to 100 MW




                          FV Concentrado a Tierra– 1 / 2 eje con soportes
                                 Mediana y Alta potencia- instalacion en estructuras fijas
                                 ABB ejecuta (EPC): 1 or 2 axis trackers, Instrumentacion Control y Electrificacion
                                  mediante chasis mecanicos de 1 o 2 ejes con mecanismo, motores, drives,Paneles
                                  de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y
                                  Estacion Electrica , trabajos civiles
                                Potencia Tipica: 50 MW to 100 MW



© ABB Group
May 16, 2012 | Slide 50
Solar power in ABB
Solar CPV
                          FV Concentrado a Tierra -3 puntos de sol
                               Mediana y Alta potencia- instalacion en estructuras de 2 ejes y 3 puntos de
                                concentracion de sol
                                 ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante chasis
                                  mecanicos de 2 ejes Multiple o polo simple, motores, drives,Paneles de MV y LV,
                                  Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion
                                  Electrica automation, transformers, cabling, substation
                                 Potencia Tipica: 100 MW to 50 MW




                          FV Concentrado a Tierra– 500 puntos de sol
                                  Medium/High power photovoltaic installation 2 axes structure and 500 sun
                                   concentration
                                 ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante chasis
                                  mecanicos de 2 ejes Multiple o polo simple, motores, drives,Paneles de MV y LV,
                                  Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion
                                  Electrica y pequenas obras civiles
                                 Potencia Tipica: 100 MW to 50 MW


© ABB Group
May 16, 2012 | Slide 51
Solar power in ABB
Tecnologia Fotovoltaica

                                Fotones de luz solar inciden sobre el panel
                                 solar y son aborbidos por materiales
                                 semiconductores como el silicon
                                Los electrones que fluyen libres por el material
                                 producen electricidad. Debido a la
                                 composicion especial de las celdas solares,
                                 los electrones solo se mueven en una
                                 direccion. Las complementarias cargas
                                 positivas creadas son llamadas Huecos y
                                 circulan en direccion opuesta de el electron y
                                 de el panel de silicone
                                Las celdas solares convierten la energia solar
                                 en energia y corriente directa DC
                                Cada Panel solar o Modulo contine decenas
                                 de celdas solares



©   ABB Group
May   16, 2012 | Slide 52
©   ABB Group
May   16, 2012 | Slide 53
©   ABB Group
May   16, 2012 | Slide 54
©   ABB Group
May   16, 2012 | Slide 55
Solar power in ABB
Major PV technologies

                               Technology              Description           Stage         Strengths            Weaknesses


                                                                                                           Dependance on silicon
                                                Wafer-scale                             Proven (mature)
                             Wafer-based PV                                                                Weight
                                                semiconductor silicon      Commercial   High efficiency
                              (crystalline)                                                                Degradation at high
                                                diodes in modular arrays                Mass production
                                                                                                           temperature

                                                                                        Low material use
                                                Thin layers of
                                                                                        Low cost           Low efficiency
                                                semiconductor materials
                                                                                        Low energy input   Degradation
                             Thin-film          (a-Si, CdTe, CIGS) on      Commercial
                                                                                        Light weight       Material availability
                                                glass/steel/flexible
                                                                                        Low temperature    Toxicity
                                                substrates
                                                                                        degradation

                                                                                                           High cost
                                                Multijunction PV                                           Not commercially
                             Multijunction PV                                 Pilot     High efficiency
                                                Concentrating PV                                           available
                                                                                                           Tracking mandatory


                                                Nanotechnologies                                           Technical immaturity
                             Emerging PV                                   Laboratory   Low cost
                                                Organic materials                                          Low efficiency



©   ABB Group
May   16, 2012 | Slide 56
©   ABB Group
May   16, 2012 | Slide 57
©   ABB Group
May   16, 2012 | Slide 58
©   ABB Group
May   16, 2012 | Slide 59
©   ABB Group
May   16, 2012 | Slide 60
Solar power in ABB
Tecnologia Fotovoltaica




                                La conexion serie de los modulos incrementan el voltaje y lo
                                 adaptan a el rango apropiado a traves de los Inversores
                                La conexion en Paralelo se efectua a un panel primario que
                                 concentra la carga para pasar a los inversores
                                Los Inversores deben tener una concentracion maxima de carga
                                 que permite que brinden energia a un maximo nivel de eficiencia



©   ABB Group
May   16, 2012 | Slide 61
©   ABB Group
May   16, 2012 | Slide 62
© ABB Group
May 16, 2012 | Slide 63
© ABB Group
May 16, 2012 | Slide 64
© ABB Group
May 16, 2012 | Slide 65
© ABB Group
May 16, 2012 | Slide 66
© ABB Group
May 16, 2012 | Slide 67
© ABB Group
May 16, 2012 | Slide 68
© ABB Group
May 16, 2012 | Slide 69
© ABB Group
May 16, 2012 | Slide 70
© ABB Group
May 16, 2012 | Slide 71
© ABB Group
May 16, 2012 | Slide 72
© ABB Group
May 16, 2012 | Slide 73
Solar power in ABB
Tecnologia Fotovoltaica




©   ABB Group
May   16, 2012 | Slide 74
Solar Power in ABB
ABB en Proyectos de Energia Solar

                                ABB ejecuta proyectos en el Mercado de Enerigia Solar
                                      Instalaciones en tierra, Companias de Servicio con grandes
                                       plantas generadoras (Fijas- moviles)
                                ABB y sus Capacidades incluyendo Proyectos Llave en Mano (EPC)
                                            Modulos Fotovoltaicos con optimizacion de costos al cliente
                                            Consorcios con Fabricantes de Celdas PV como opcion
                                            Sistemas de Control y Electrificacion como opcion
                                ABB tiene experiencia en mas de 22 en plantas de concentracion solar
                                 y 27 Proyectos de celdas Fotovoltaicas de gran escala
                                Ventajas de trabajar con ABB
                                      Acceso a la Banca Internacional
                                      Prescencia Internacional como empresa Global
                                      Proveemos soluciones estandard
                                      Flexibilidad en los disenos
                                      Experiencia en Sun Estaciones y Conecciones de Automatizacion

©   ABB Group
May   16, 2012 | Slide 75
Solar Power in ABB
Contenido propio de ABB

                                PV modules                          Non-ABB
                                Structures/Trackers                 Non-ABB
                                PCBx                                ABB*
                                Cables                              Non-ABB
                                Inverters                           ABB*
                                Transformers                        ABB
                                LV/MV switchgear                    ABB
                                DCS/SCADA                           ABB
                                Substation                          ABB
                                Step-up transformer                 ABB
                                Engineering, PM, SM                 ABB
                                Construction/Installation           Non-ABB


                             * Depending on technical requirements

©   ABB Group
May   16, 2012 | Slide 76
Solar power in ABB
Forma de Contratacion– BOS solamente Independent Engineer
                                                                    Utility

                                                                                               Module purchase
          ABB PSPG
                                                           Project developer (SPC)
        M&M contract
       M&M needs                                                              EPC contract
           to be
        awarded to
       ABB in order                                              ABB PSPG                                        PV panel
       to guarantee                                                                             Technical        supplier
       performance                                                                             coordination
                                                    EQUIPMENT                    SERVICES
                                                                                              and execution
                                               PCBx                      Engineering             support

                                               Inverters                 Project management
                                               Transformers              Commissioning
                                               LV/MV Switchgear
                                               DCS/SCADA
                                               Substation
                         Subcontracts
             EQUIPMENT            SERVICES
          Trackers              Construction
          Cables                Installation
                                Logistics




©   ABB Group
May   16, 2012 | Slide 77
Solar power in ABB
Forma de Contratacion– Consorcios                                              Independent Engineer
                                                     Utility


          ABB PSPG
                                      Project developer (SPC)
        M&M contract
       M&M needs                                               EPC contract
           to be
        awarded to
       ABB in order            Consortium ABB-PV panel supplier
       to guarantee
       performance
                                       ABB                 PV PANEL SUPPLIER
                             ABB equipment                PV panel supply
                             Third-party equipment
                             Engineering, PM, SM
                             Construction and
                             installation services




©   ABB Group
May   16, 2012 | Slide 78
Solar power in ABB


                              REFERENCIAS




©   ABB Group
May   16, 2012 | Slide 79
ABB Solar Experience
Reference List




    CSP (22 projects)                                      PV (27 projects)
              SEGS VI, VII, VIII,   Kuraymat                   Totana           Francofonte
               IX
                                     Hassi   R’Mel              La Robla         Duccotto
              PSA
                                     Martin   8                 Aprilia 1        La Sugarella
              Andasol 1&2
                                     Vallesol     1&2           Sapeu            Spinasanta
              eSolar Sierra
                                        …                       Monreale         …
              Extresol 1&2
© ABB Group
May 16, 2012 | Slide 80
Concentrating Solar Power


© ABB Group
May 16, 2012 | Slide 81
SEGS VI, VII, VIII & IX Solar Power Plant


                                                         ABB’s supply
                                                            Steam Turbines and Generators
                                                            Steam Turbine Control System


                                                         Customer benefits
                                                            Ability to meet schedule
                                                            High degree of availability
                                                            Low cost life-cycle regarding O&M and future
                                                             extensions
                          SEGS
                          Sizes: 2 x 30 MW, 2 x 80 MW
                          Customer: Luz Solar Partners
                          End user: FP&L/Terra Gen
                          Year of ABB commissioning:
                             DCS: 1988 - 1990



© ABB Group
May 16, 2012 | Slide 82
PSA Solar Power Plant


                                                       ABB’s supply
                                                          Distributed Control System (DCS) for the DISS test
                                                           loop (1.3 MW)


                                                       Customer benefits
                                                          Constitutes an excellent experimental system for
                                                           investigating the two-phase flow and direct steam
                                                           generation for electricity production.
                                                          High degree of standardization in planning and
                                                           documentation
                          PSA SPP
                                                          Extremely flexible system regarding O&M and future
                          Size: 1 x 1.3 MW                 extensions
                          Customer: CIEMAT
                          End user: All companies
                          Year of ABB commissioning:
                             DCS: 1998



© ABB Group
May 16, 2012 | Slide 83
Andasol 1 Solar Power Plant


                                                                                    ABB’s supply
                                                                                       Distributed Control System (DCS)
                                                                                       MV Switchgear
                                                                                       Motors & Drives
                                                                                       Unit Transformers


                                                                                    Customer benefits
                                            UTE ANDASOL Property – Not to be used
                                              without UTE ANDASOL authorization        ABB’s flexibility and experience with complex power
                                                                                        systems
                          Andasol 1 SPP (Spain)                                        High degree of standardization in planning and
                                                                                        documentation
                          Size: 1 x 50 MW
                                                                                       Extremely flexible system regarding O&M and future
                          Customer: Cobra/Sener                                         extensions
                          End user: ACS                                                Thermal Energy Storage (TES) and Heat Transfer
                                                                                        Fluid (HTF) control
                          Year of ABB commissioning:
                             DCS: 2008



© ABB Group
May 16, 2012 | Slide 84
Andasol 2 Solar Power Plant


                                                                                    ABB’s supply
                                                                                       Distributed Control System (DCS)
                                                                                       MV Switchgear
                                                                                       Motors & Drives
                                                                                       Unit Transformers


                                                                                    Customer benefits
                                            UTE ANDASOL Property – Not to be used
                                              without UTE ANDASOL authorization        ABB’s flexibility and experience with complex power
                                                                                        systems
                          Andasol 2 SPP (Spain)                                        High degree of standardization in planning and
                                                                                        documentation
                          Size: 1 x 50 MW
                                                                                       Extremely flexible system regarding O&M and future
                          Customer: Cobra/Sener                                         extensions
                          End user: ACS                                                Thermal Energy Storage (TES) and Heat Transfer
                                                                                        Fluid (HTF) control
                          Year of ABB commissioning:
                             DCS: 2009



© ABB Group
May 16, 2012 | Slide 85
eSolar Sierra Solar Power Plant


                                                       ABB’s supply
                                                          Distributed Control System (DCS)




                                                       Customer benefits
                                                          ABB’s high quality products guarantee plant
                                                           reliability and performance
                          eSolar Sierra SPP (USA)         ABB is able to deliver within eSolar’s aggressive
                                                           time line
                          Size: 2 x 2.5 MW
                                                          ABB’s modular design is in alignment with eSolar’s
                          Customer: eSolar                 strategy
                          End user: eSolar                ABB’s global footprint ensures standardization of
                                                           projects throughout the globe
                          Year of ABB commissioning:
                             DCS: 2009



© ABB Group
May 16, 2012 | Slide 86
Extresol 1 Solar Power Plant


                                                       ABB’s supply
                                                          Distributed Control System (DCS)
                                                          Solar Field Communications System (SCS)
                                                          Solar Field Control System (LOC): 624 units
                                                          MV Switchgear
                                                          Motors & Drives
                                                          Unit Transformers


                                                       Customer benefits
                          Extresol 1 SPP (Spain)
                                                          ABB’s flexibility and experience with complex power
                          Size: 1 x 50 MW                  systems
                                                          Extremely flexible system regarding O&M and future
                          Customer: Cobra/Sener            extensions
                          End user: ACS                   Totally integrated and compatible control scope
                                                           solution
                          Year of ABB commissioning:
                                                          Short installation and commissioning time
                             DCS, SCS, LOC: 2009
                                                          Thermal Energy Storage (TES) and Heat Transfer
                                                           Fluid (HTF) control

© ABB Group
May 16, 2012 | Slide 87
Extresol 2 Solar Power Plant


                                                       ABB’s supply
                                                          Distributed Control System (DCS)
                                                          Solar Field Communications System (SCS)
                                                          Solar Field Control System (LOC): 624 units
                                                          MV Switchgear
                                                          Motors & Drives
                                                          Unit Transformers


                                                       Customer benefits
                          Extresol 2 SPP (Spain)
                                                          ABB’s flexibility and experience with complex power
                          Size: 1 x 50 MW                  systems
                                                          Extremely flexible system regarding O&M and future
                          Customer: Cobra/Sener            extensions
                          End user: ACS                   Totally integrated and compatible control scope
                                                           solution
                          Year of ABB commissioning:
                                                          Short installation and commissioning time
                             DCS, SCS, LOC: 2010
                                                          Thermal Energy Storage (TES) and Heat Transfer
                                                           Fluid (HTF) control

© ABB Group
May 16, 2012 | Slide 88
Kuraymat Integrated Solar Combined Cycle


                                                        ABB’s supply
                                                           Distributed Control System (DCS): Power Block +
                                                            Solar Field
                                                           MV Switchgear
                                                           Motors & Drives


                                                        Customer benefits
                                                           ABB assumes responsibility for engineering and
                                                            coordination activities towards control & electrical
                          Kuraymat ISCC (Egypt)             systems
                          Size: 1 x 160 MW                 Extremely flexible system regarding O&M and future
                                                            extensions
                          Customer: Iberdrola/Flagsol
                          End user: NREA
                          Year of ABB commissioning:
                             DCS: 2010



© ABB Group
May 16, 2012 | Slide 89
Hassi R’Mel Integrated Solar Combined Cycle


                                                       ABB’s supply
                                                          EBOP concept, including:
                                                                Transformers
                                                                MV Switchgear
                                                                LV Switchgear
                                                                Complete Electrical System
                                                                Cabling


                          Hassi R’Mel ISCC (Algeria)   Customer benefits
                                                          Totally integrated and compatible full scope solution
                          Size: 1 x 150 MW
                                                          High degree of standardization in planning and
                          Customer: Abener                 documentation
                          End user: Sonatrach             Extremely flexible system regarding O&M and future
                          Year of ABB commissioning:       extensions

                             EBOP: 2010



© ABB Group
May 16, 2012 | Slide 90
Martin Integrated Solar Combined Cycle


                                                          ABB’s supply
                                                             Solar Field Control System (LOC): 1.136 units


                                                          Customer benefits
                                                             ABB’s experience in solar collector positioning
                                                             Extremely short delivery schedule
                                                             High degree of standardization in planning and
                                                              documentation
                                                             High degree of flexibility in engineering and LOC
                          Martin Next Generation Solar        design
                          Energy Center (USA)
                                                             High integration level into existing DCS
                          Size: 1 x 75 MW (Solar Field)
                          Customer: FPL/NextEra
                          End user: FPL/NextEra
                          Year of ABB commissioning:
                             LOC: 2010


© ABB Group
May 16, 2012 | Slide 91
Manchasol 1 Solar Power Plant


                                                       ABB’s supply
                                                          Distributed Control System (DCS)
                                                          Solar Field Communications System (SCS)
                                                          Solar Field Control System (LOC): 624 units

                                                       Customer benefits
                                                          High degree of standardization in planning and
                                                           documentation
                                                          Extremely flexible system regarding O&M and future
                          Manchasol 1 SPP (Spain)          extensions
                          Size: 1 x 50 MW                 Totally integrated and compatible control scope
                                                           solution
                          Customer: Cobra/Initec
                                                          Short installation and commissioning time
                          End user: ACS
                                                          Thermal Energy Storage (TES) and Heat Transfer
                          Year of ABB commissioning:
                                                           Fluid (HTF) control
                             DCS, SCS, LOC: 2010



© ABB Group
May 16, 2012 | Slide 92
Manchasol 2 Solar Power Plant


                                                       ABB’s supply
                                                          Distributed Control System (DCS)
                                                          Solar Field Communications System (SCS)
                                                          Solar Field Control System (LOC): 624 units

                                                       Customer benefits
                                                          High degree of standardization in planning and
                                                           documentation
                                                          Extremely flexible system regarding O&M and future
                          Manchasol 2 SPP (Spain)          extensions
                          Size: 1 x 50 MW                 Totally integrated and compatible control scope
                                                           solution
                          Customer: Cobra/Initec
                                                          Short installation and commissioning time
                          End user: ACS
                                                          Thermal Energy Storage (TES) and Heat Transfer
                          Year of ABB commissioning:
                                                           Fluid (HTF) control
                             DCS, SCS, LOC: 2011



© ABB Group
May 16, 2012 | Slide 93
Vallesol 1 Solar Power Plant


                                                                                    ABB’s supply
                                                                                       Distributed Control System (DCS)
                                                                                       Solar Field Communications System (SCS)
                                                                                       Solar Field Control System (LOC): 624 units
                                                                                       Unit Transformers
                                                                                    Customer benefits
                                            UTE ANDASOL Property – Not to be used
                                              without UTE ANDASOL authorization
                                                                                       ABB’s flexibility and experience with complex power
                                                                                        systems
                                                                                       High degree of standardization in planning and
                          Vallesol 1 SPP (Spain)
                                                                                        documentation
                          Size: 1 x 50 MW                                              Extremely flexible system regarding O&M and future
                          Customer: Cobra/Sener                                         extensions

                          End user: Torresol Energy                                    Totally integrated and compatible control scope
                                                                                        solution
                          Year of ABB commissioning:
                                                                                       Short installation and commissioning time
                             DCS, SCS, LOC: 2011



© ABB Group
May 16, 2012 | Slide 94
Vallesol 2 Solar Power Plant


                                                                                    ABB’s supply
                                                                                       Distributed Control System (DCS)
                                                                                       Solar Field Communications System (SCS)
                                                                                       Solar Field Control System (LOC): 624 units
                                                                                       Unit Transformers
                                                                                    Customer benefits
                                            UTE ANDASOL Property – Not to be used
                                              without UTE ANDASOL authorization
                                                                                       ABB’s flexibility and experience with complex power
                                                                                        systems
                                                                                       High degree of standardization in planning and
                          Vallesol 2 SPP (Spain)
                                                                                        documentation
                          Size: 1 x 50 MW                                              Extremely flexible system regarding O&M and future
                          Customer: Cobra/Sener                                         extensions

                          End user: Torresol Energy                                    Totally integrated and compatible control scope
                                                                                        solution
                          Year of ABB commissioning:
                                                                                       Short installation and commissioning time
                             DCS, SCS, LOC: 2011



© ABB Group
May 16, 2012 | Slide 95
Prometeo Project at PSA Solar Power Plant


                                                           ABB’s supply
                                                              Experimental, high-technology Distributed Control
                                                               System (DCS)
                                                           Customer benefits
                                                              Extremely advanced testing systems for new HTF
                                                               technologies
                                                              Highly flexible system for changes and testing
                                                              Short installation and commissioning time

                          Prometeo Project at PSA SPP
                          (Spain)
                          Size: experimental loop test
                          Customer: Iberdrola Ingeniería
                          End user: Iberdrola Ingeniería
                          Year of ABB commissioning:
                             DCS: 2010


© ABB Group
May 16, 2012 | Slide 96
Soluz Guzmán Solar Power Plant


                                                       ABB’s supply
                                                          Solar Field Control System (LOC): 384 units
                                                       Customer benefits
                                                          Advanced solar field control system
                                                          Short installation and commissioning time
                                                          Integration into Emerson DCS



                          Soluz Guzmán SPP (Spain)
                          Size: 1 x 50 MW
                          Customer: Sener
                          End user:
                          Espelsa/Abantia/Idom
                          Year of ABB commissioning:
                             DCS: 2011


© ABB Group
May 16, 2012 | Slide 97
Extresol 3 Solar Power Plant


                                                       ABB’s supply
                                                          Distributed Control System (DCS)
                                                          Solar Field Communications System (SCS)
                                                          Solar Field Control System (LOC): 624 units
                                                          MV Switchgear
                                                          Motors & Drives
                                                          Unit Transformers


                                                       Customer benefits
                          Extresol 3 SPP (Spain)
                                                          ABB’s flexibility and experience with complex power
                          Size: 1 x 50 MW                  systems
                                                          Extremely flexible system regarding O&M and future
                          Customer: Cobra/Sener            extensions
                          End user: ACS                   Totally integrated and compatible control scope
                                                           solution
                          Year of ABB commissioning:
                                                          Short installation and commissioning time
                             DCS, SCS, LOC: 2011
                                                          Thermal Energy Storage (TES) and Heat Transfer
                                                           Fluid (HTF) control

© ABB Group
May 16, 2012 | Slide 98
Termosol 1 Solar Power Plant


                                                       ABB’s supply
                                                          Distributed Control System (DCS)
                                                          Solar Field Communications System (SCS)
                                                          Solar Field Control System (LOC): 624 units
                                                       Customer benefits
                                                          ABB’s flexibility and experience with complex power
                                                           systems
                                                          High degree of standardization in planning and
                                                           documentation
                          Termosol 1 SPP (Spain)
                                                          Extremely flexible system regarding O&M and future
                          Size: 1 x 50 MW                  extensions
                          Customer: FPL/NextEra           Totally integrated and compatible control scope
                                                           solution
                          End user: FPL/NextEra
                                                          Short installation and commissioning time
                          Year of ABB commissioning:
                             DCS, SCS, LOC: 2011



© ABB Group
May 16, 2012 | Slide 99
Termosol 2 Solar Power Plant


                                                        ABB’s supply
                                                           Distributed Control System (DCS)
                                                           Solar Field Communications System (SCS)
                                                           Solar Field Control System (LOC): 624 units
                                                        Customer benefits
                                                           ABB’s flexibility and experience with complex power
                                                            systems
                                                           High degree of standardization in planning and
                                                            documentation
                           Termosol 2 SPP (Spain)
                                                           Extremely flexible system regarding O&M and future
                           Size: 1 x 50 MW                  extensions
                           Customer: FPL/NextEra           Totally integrated and compatible control scope
                                                            solution
                           End user: FPL/NextEra
                                                           Short installation and commissioning time
                           Year of ABB commissioning:
                              DCS, SCS, LOC: 2011



© ABB Group
May 16, 2012 | Slide 100
Photovoltaic Solar Power


© ABB Group
May 16, 2012 | Slide 101
Totana PV Solar Plant


                                                              Customer needs
                                                                 Maximize plant performance and reliability
                                                                 Complete EPC solution
                                                                 Plant in operation in less than 6 months


                                                              ABB response
                                                                 ABB delivers the complete plant in consortium with a
                                                                  mechanical partner
                                                                 ABB applies an efficiency improvement system to maximize
                                                                  the overall performance of the plant
                                                                 ABB scope:
                           Totana PV Plant (Spain)                   • Supply: DC cabinets, AC cabinets, unit transformers,

                           Size: 1 MWp, 2-axis tracker                 switchgears, equipment housing, system optimization,
                                                                       control and SCADA
                           Customer: Global Capital Finance          • Installation, ground & civil works: inverters, trackers,
                                                                       PV modules, transformers, switchgears, cabinets,
                           Scope: EPC
                                                                       housing, system optimization, control, SCADA, security
                           Year of commissioning:                      system, cabling, etc
                                                                 Partner scope: PV modules (supply)
                              EPC: 2008
                                                                 Client met deadline and qualified for Spanish feed-in tariff



© ABB Group
May 16, 2012 | Slide 102
La Robla PV Solar Plant


                                                            Customer needs
                                                               First class automation and electrical systems
                                                               Modular solution: 3 phases
                                                               Plant in operation in 3 months


                                                            ABB response
                                                               ABB delivers the complete plant in consortium with a panel
                                                                manufacturer
                                                               ABB applies an efficiency improvement system to maximize
                                                                the overall performance of the PV solar plant
                                                               ABB scope:
                           La Robla PV Plant (Spain)
                                                                  • Supply: inverters, trackers, DC & AC cabinets,
                           Size: 13.3 MWp, 1-axis tracker            transformers, switchgears, cabling, equipment housing,
                                                                     system optimization, control, SCADA, substation
                           Customer: GA Solar
                                                                  • Installation & civil works: inverters, trackers, DC & AC

                           Scope: EPC                                cabinets, transformers, switchgears, cabling,
                                                                     equipment housing, system optimization, control,
                           Year of commissioning:                    SCADA, substation, fencing, security system, PV
                                                                     modules
                              EPC: 2010
                                                               Partner scope: PV modules (supply)



© ABB Group
May 16, 2012 | Slide 103
Golf PV Solar Plant


                                                           Customer needs
                                                              First class automation and electrical systems
                                                              Plant in operation in 3 months


                                                           ABB response
                                                              ABB delivers the complete plant in consortium with a panel
                                                               manufacturer
                                                              ABB applies an efficiency improvement system to maximize
                                                               the overall performance of the PV solar plant
                                                              ABB scope:
                                                                 •   Supply: DC & AC cabinets, transformers, switchgears,
                           Golf PV Plant (Spain)
                                                                     cabling, equipment housing, system optimization,
                           Size: 6.2 MWp, 1-axis tracker             control, SCADA, substation
                                                                 •   Installation & civil works: inverters, trackers, DC & AC
                           Customer: GA Solar                        cabinets, transformers, switchgears, cabling,
                           Scope: EPC                                equipment housing, system optimization, control,
                                                                     SCADA, substation, fencing, security system, PV
                           Year of commissioning:                    modules
                                                              Partner scope: PV modules (supply)
                              EPC: 2010



© ABB Group
May 16, 2012 | Slide 104
Aprilia 1 PV Solar Plant


                                                             Customer needs
                                                                First class automation and electrical systems
                                                                Maximize plant performance and reliability



                                                             ABB response
                                                                ABB delivers a complete electrical solution
                                                                ABB applies an efficiency improvement system to maximize
                                                                 the overall performance of the PV solar plant
                                                                ABB scope:
                           Aprilia 1 PV Plant (Italy)              •   Supply: inverter centers, DC & AC cabinets,
                                                                       transformers, switchgears, cabling, equipment housing,
                           Size: 9.7 MWp, fix installation             protection equipment, MV connection line
                                                                   •   Installation: inverter centers, DC & AC cabinets,
                           Customer: Kinexia
                                                                       transformers, switchgears, cabling, equipment housing,
                           Scope: EBOP/iICE                            protection equipment, MV connection line, PV modules
                                                                       electrical connection
                           Year of commissioning:
                              EBOP/iICE: 2010



© ABB Group
May 16, 2012 | Slide 105
Sapeu PV Solar Plant


                                                             Customer needs
                                                                First class automation and electrical systems
                                                                Maximize plant performance and reliability


                                                             ABB response
                                                                ABB delivers the complete plant in consortium with a panel
                                                                 manufacturer
                                                                ABB applies an efficiency improvement system to maximize
                                                                 the overall performance of the PV solar plant
                                                                ABB scope:
                                                                   •   Supply: DC & AC cabinets, unit transformers,
                           Sapeu PV Plant (Italy)
                                                                       switchgears, equipment housing, system optimization,
                           Size: 3.9 MWp, fix installation             control, SCADA, substation
                                                                   •   Installation, ground & civil works: inverters, structures,
                           Customer: GA Solar                          DC & AC cabinets, transformers, switchgears, cabling,
                           Scope: EPC                                  equipment housing, system optimization, control,
                                                                       SCADA, substation, fencing, security system, PV
                           Year of commissioning:                      modules
                                                             •   Partner scope: PV modules (supply)
                              EPC: 2010



© ABB Group
May 16, 2012 | Slide 106
Monreale PV Solar Plant


                                                              Customer needs
                                                                 First class automation and electrical systems
                                                                 Maximize plant performance and reliability


                                                              ABB response
                                                                 ABB delivers the complete plant in consortium with a panel
                                                                  manufacturer
                                                                 ABB applies an efficiency improvement system to maximize
                                                                  the overall performance of the PV solar plant
                                                                 ABB scope:
                                                                    •   Supply: DC & AC cabinets, unit transformers,
                           Monreale PV Plant (Italy)
                                                                        switchgears, equipment housing, system optimization,
                           Size: 3.27 MWp, fix installation             control, SCADA, substation
                                                                    •   Installation, ground & civil works: inverters, structures,
                           Customer: GA Solar                           DC & AC cabinets, transformers, switchgears, cabling,
                           Scope: EPC                                   equipment housing, system optimization, control,
                                                                        SCADA, substation, fencing, security system, PV
                           Year of commissioning:                       modules
                                                              •   Partner scope: PV modules (supply)
                              EPC: 2010



© ABB Group
May 16, 2012 | Slide 107
Francofonte PV Solar Plant


                                                              Customer needs
                                                                 First class automation and electrical systems
                                                                 Maximize plant performance and reliability


                                                              ABB response
                                                                 ABB delivers the complete plant in consortium with a panel
                                                                  manufacturer
                                                                 ABB applies an efficiency improvement system to maximize
                                                                  the overall performance of the PV solar plant
                                                                 ABB scope:
                                                                    •   Supply: DC & AC cabinets, unit transformers,
                           Francofonte PV Plant (Italy)
                                                                        switchgears, equipment housing, system optimization,
                           Size: 2.50 MWp, fix installation             control, SCADA, substation
                                                                    •   Installation, ground & civil works: inverters, structures,
                           Customer: GA Solar                           DC & AC cabinets, transformers, switchgears, cabling,
                           Scope: EPC                                   equipment housing, system optimization, control,
                                                                        SCADA, substation, fencing, security system, PV
                           Year of commissioning:                       modules
                                                              •   Partner scope: PV modules (supply)
                              EPC: 2010



© ABB Group
May 16, 2012 | Slide 108
Duccotto PV Solar Plant


                                                                  Customer needs
                                                                     First class automation and electrical systems
                                                                     Maximize plant performance and reliability
                                                                     Fix (6.5 MWp) and 2-axis (500 kW) installation
                                                                     Monocrystalline (500 kW), polycrystalline (6 MW) and thin-
                                                                      film (500 kW) PV modules


                                                                  ABB response
                                                                     ABB delivers the complete plant in consortium with a panel
                                                                      manufacturer
                                                                     ABB applies an efficiency improvement system to maximize
                           Duccotto PV Plant (Italy)
                                                                      the overall performance of the PV solar plant
                           Size: 7 MWp, fix/2-axis installation      ABB scope:
                                                                         • Supply: DC & AC cabinets, unit transformers,
                           Customer: GA Solar
                                                                           switchgears, equipment housing, system optimization,
                           Scope: EPC                                      control, SCADA, substation
                                                                         • Installation, ground & civil works: inverters, structures,
                           Year of commissioning:                          DC & AC cabinets, transformers, switchgears, cabling,
                              EPC: 2010                                   equipment housing, system optimization, control,
                                                                           SCADA, substation, fencing, security system, PV
                                                                           modules
                                                                  •   Partner scope: PV modules (supply)
© ABB Group
May 16, 2012 | Slide 109
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica
Abb power generation   solar  presentacion ieee costa rica

More Related Content

What's hot

Presentation or kuwait green building forum
Presentation or kuwait green building forum Presentation or kuwait green building forum
Presentation or kuwait green building forum greenbuilding
 
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...Eamon Keane
 
Keith Sue - Distributed Energy Storage
Keith Sue - Distributed Energy StorageKeith Sue - Distributed Energy Storage
Keith Sue - Distributed Energy StorageANUECI
 
Smart City Expo: What is next?
Smart City Expo: What is next?Smart City Expo: What is next?
Smart City Expo: What is next?
Siemens España
 
Philippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentationPhilippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentation
Global CCS Institute
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camco
crifcambs
 
John Campion Esb
John Campion EsbJohn Campion Esb
John Campion Esb
Nick Craig
 
DESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion TechnologiesDESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion TechnologiesIPPAI
 
TimberRock Capabilities
TimberRock CapabilitiesTimberRock Capabilities
TimberRock Capabilities
Andrew Maus
 
2nd International Conference E/E Systems for Wind Turbines
2nd International Conference E/E Systems for Wind Turbines2nd International Conference E/E Systems for Wind Turbines
2nd International Conference E/E Systems for Wind Turbines
Torben Haagh
 
AREVA, Business & strategy overview - November 2009
AREVA, Business & strategy overview - November 2009AREVA, Business & strategy overview - November 2009
AREVA, Business & strategy overview - November 2009
AREVA
 
Peter breithaupt ocf 2.0 arnhem nl 21 may 2011
Peter breithaupt ocf 2.0 arnhem nl 21 may 2011Peter breithaupt ocf 2.0 arnhem nl 21 may 2011
Peter breithaupt ocf 2.0 arnhem nl 21 may 2011
Peter Breithaupt
 
The power to change Peter Birkner
The power to change   Peter BirknerThe power to change   Peter Birkner
The power to change Peter Birkner
Innovation Norway
 
Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...
Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...
Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...
John Chowdhury
 

What's hot (15)

Presentation or kuwait green building forum
Presentation or kuwait green building forum Presentation or kuwait green building forum
Presentation or kuwait green building forum
 
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
E. Larsen, "Efficient integration of EVs with wind power production," in Effi...
 
Keith Sue - Distributed Energy Storage
Keith Sue - Distributed Energy StorageKeith Sue - Distributed Energy Storage
Keith Sue - Distributed Energy Storage
 
Smart City Expo: What is next?
Smart City Expo: What is next?Smart City Expo: What is next?
Smart City Expo: What is next?
 
Brochure rwe ag
Brochure rwe agBrochure rwe ag
Brochure rwe ag
 
Philippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentationPhilippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentation
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camco
 
John Campion Esb
John Campion EsbJohn Campion Esb
John Campion Esb
 
DESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion TechnologiesDESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion Technologies
 
TimberRock Capabilities
TimberRock CapabilitiesTimberRock Capabilities
TimberRock Capabilities
 
2nd International Conference E/E Systems for Wind Turbines
2nd International Conference E/E Systems for Wind Turbines2nd International Conference E/E Systems for Wind Turbines
2nd International Conference E/E Systems for Wind Turbines
 
AREVA, Business & strategy overview - November 2009
AREVA, Business & strategy overview - November 2009AREVA, Business & strategy overview - November 2009
AREVA, Business & strategy overview - November 2009
 
Peter breithaupt ocf 2.0 arnhem nl 21 may 2011
Peter breithaupt ocf 2.0 arnhem nl 21 may 2011Peter breithaupt ocf 2.0 arnhem nl 21 may 2011
Peter breithaupt ocf 2.0 arnhem nl 21 may 2011
 
The power to change Peter Birkner
The power to change   Peter BirknerThe power to change   Peter Birkner
The power to change Peter Birkner
 
Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...
Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...
Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...
 

Similar to Abb power generation solar presentacion ieee costa rica

CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology VenturesCED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CEDPrograms
 
Ei Storage Presentation
Ei Storage PresentationEi Storage Presentation
Ei Storage Presentationadyjohn
 
Solar Renewable Energy - Now
Solar Renewable Energy - NowSolar Renewable Energy - Now
Solar Renewable Energy - Now
MDV-SEIA
 
Nidec asi corporate overview
Nidec asi corporate overviewNidec asi corporate overview
Nidec asi corporate overview
Nidec Corporation
 
Building Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United StatesBuilding Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United States
International Energy Agency
 
Equity_Story_slides.pdf
Equity_Story_slides.pdfEquity_Story_slides.pdf
Equity_Story_slides.pdf
jfkuh
 
csp today power plant automation optimization
csp today power plant automation optimizationcsp today power plant automation optimization
csp today power plant automation optimization
esmesm
 
final2abbgrouppresentation2013en-150524090737-lva1-app6892.ppt
final2abbgrouppresentation2013en-150524090737-lva1-app6892.pptfinal2abbgrouppresentation2013en-150524090737-lva1-app6892.ppt
final2abbgrouppresentation2013en-150524090737-lva1-app6892.ppt
CharbelRahme2
 
Abb mv presentation 2012 master
Abb mv presentation 2012 masterAbb mv presentation 2012 master
Abb mv presentation 2012 masterRahul Kumar
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
IJERD Editor
 
Mughees mehmood.docx
Mughees mehmood.docxMughees mehmood.docx
Mughees mehmood.docx
MugheesMehmood1
 
Jinpan ndr presentation_march_2013
Jinpan ndr presentation_march_2013Jinpan ndr presentation_march_2013
Jinpan ndr presentation_march_2013dgiplcorponline
 
Sma company presentation-en
Sma company presentation-enSma company presentation-en
Sma company presentation-enProAkademia
 
ABB Contact 3/12 (India) Energy Efficiency Issue
ABB Contact 3/12 (India) Energy Efficiency IssueABB Contact 3/12 (India) Energy Efficiency Issue
ABB Contact 3/12 (India) Energy Efficiency Issue
ABBCONTACT
 
Knowledge Management Report On ABB Company.
Knowledge Management Report On ABB Company.Knowledge Management Report On ABB Company.
Knowledge Management Report On ABB Company.
Waheed Iqbal Boss
 
KEPCO's Demand Side Management Programs
KEPCO's Demand Side Management ProgramsKEPCO's Demand Side Management Programs
KEPCO's Demand Side Management Programs
IEA DSM Implementing Agreement (IA)
 
Energy finance for building retrofits: Energy Performance Contracting UK
Energy finance for building retrofits: Energy Performance Contracting UKEnergy finance for building retrofits: Energy Performance Contracting UK
Energy finance for building retrofits: Energy Performance Contracting UK
drpaulfisher
 

Similar to Abb power generation solar presentacion ieee costa rica (20)

CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology VenturesCED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
CED CleanLinks Forum Feb. 9, 2012 -- ABB Technology Ventures
 
SMPS
SMPSSMPS
SMPS
 
Ei Storage Presentation
Ei Storage PresentationEi Storage Presentation
Ei Storage Presentation
 
Solar Renewable Energy - Now
Solar Renewable Energy - NowSolar Renewable Energy - Now
Solar Renewable Energy - Now
 
Nidec asi corporate overview
Nidec asi corporate overviewNidec asi corporate overview
Nidec asi corporate overview
 
Building Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United StatesBuilding Energy Efficiency Policies and Programs of the United States
Building Energy Efficiency Policies and Programs of the United States
 
Equity_Story_slides.pdf
Equity_Story_slides.pdfEquity_Story_slides.pdf
Equity_Story_slides.pdf
 
csp today power plant automation optimization
csp today power plant automation optimizationcsp today power plant automation optimization
csp today power plant automation optimization
 
final2abbgrouppresentation2013en-150524090737-lva1-app6892.ppt
final2abbgrouppresentation2013en-150524090737-lva1-app6892.pptfinal2abbgrouppresentation2013en-150524090737-lva1-app6892.ppt
final2abbgrouppresentation2013en-150524090737-lva1-app6892.ppt
 
Abb mv presentation 2012 master
Abb mv presentation 2012 masterAbb mv presentation 2012 master
Abb mv presentation 2012 master
 
Customer magazine insider october 2012 final
Customer magazine insider october 2012 finalCustomer magazine insider october 2012 final
Customer magazine insider october 2012 final
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Mughees mehmood.docx
Mughees mehmood.docxMughees mehmood.docx
Mughees mehmood.docx
 
C c chan
C c chanC c chan
C c chan
 
Jinpan ndr presentation_march_2013
Jinpan ndr presentation_march_2013Jinpan ndr presentation_march_2013
Jinpan ndr presentation_march_2013
 
Sma company presentation-en
Sma company presentation-enSma company presentation-en
Sma company presentation-en
 
ABB Contact 3/12 (India) Energy Efficiency Issue
ABB Contact 3/12 (India) Energy Efficiency IssueABB Contact 3/12 (India) Energy Efficiency Issue
ABB Contact 3/12 (India) Energy Efficiency Issue
 
Knowledge Management Report On ABB Company.
Knowledge Management Report On ABB Company.Knowledge Management Report On ABB Company.
Knowledge Management Report On ABB Company.
 
KEPCO's Demand Side Management Programs
KEPCO's Demand Side Management ProgramsKEPCO's Demand Side Management Programs
KEPCO's Demand Side Management Programs
 
Energy finance for building retrofits: Energy Performance Contracting UK
Energy finance for building retrofits: Energy Performance Contracting UKEnergy finance for building retrofits: Energy Performance Contracting UK
Energy finance for building retrofits: Energy Performance Contracting UK
 

More from IEEE

Hipertiroidismo
HipertiroidismoHipertiroidismo
Hipertiroidismo
IEEE
 
Software Universal para pruebas a Relevadores de Protección
Software Universal para pruebas a Relevadores de ProtecciónSoftware Universal para pruebas a Relevadores de Protección
Software Universal para pruebas a Relevadores de Protección
IEEE
 
Presentación Ingeniería forense_costa_rica_enero_9_2014
Presentación Ingeniería forense_costa_rica_enero_9_2014Presentación Ingeniería forense_costa_rica_enero_9_2014
Presentación Ingeniería forense_costa_rica_enero_9_2014
IEEE
 
El futuro de las microrredes
El futuro de las microrredesEl futuro de las microrredes
El futuro de las microrredesIEEE
 
Conferencia
ConferenciaConferencia
ConferenciaIEEE
 
Experiencias con la energia solar 2.1
Experiencias con la energia solar 2.1Experiencias con la energia solar 2.1
Experiencias con la energia solar 2.1
IEEE
 
Urgencia de una ley electrica
Urgencia de una ley electricaUrgencia de una ley electrica
Urgencia de una ley electrica
IEEE
 
Mam ieee 24 04-2012
Mam ieee 24 04-2012Mam ieee 24 04-2012
Mam ieee 24 04-2012
IEEE
 
Variabilidad climatica y generación eledtrica
Variabilidad climatica y generación eledtricaVariabilidad climatica y generación eledtrica
Variabilidad climatica y generación eledtrica
IEEE
 
Gn combustible alternativo ieee 24 abril 2012
Gn combustible alternativo ieee 24 abril 2012Gn combustible alternativo ieee 24 abril 2012
Gn combustible alternativo ieee 24 abril 2012
IEEE
 

More from IEEE (10)

Hipertiroidismo
HipertiroidismoHipertiroidismo
Hipertiroidismo
 
Software Universal para pruebas a Relevadores de Protección
Software Universal para pruebas a Relevadores de ProtecciónSoftware Universal para pruebas a Relevadores de Protección
Software Universal para pruebas a Relevadores de Protección
 
Presentación Ingeniería forense_costa_rica_enero_9_2014
Presentación Ingeniería forense_costa_rica_enero_9_2014Presentación Ingeniería forense_costa_rica_enero_9_2014
Presentación Ingeniería forense_costa_rica_enero_9_2014
 
El futuro de las microrredes
El futuro de las microrredesEl futuro de las microrredes
El futuro de las microrredes
 
Conferencia
ConferenciaConferencia
Conferencia
 
Experiencias con la energia solar 2.1
Experiencias con la energia solar 2.1Experiencias con la energia solar 2.1
Experiencias con la energia solar 2.1
 
Urgencia de una ley electrica
Urgencia de una ley electricaUrgencia de una ley electrica
Urgencia de una ley electrica
 
Mam ieee 24 04-2012
Mam ieee 24 04-2012Mam ieee 24 04-2012
Mam ieee 24 04-2012
 
Variabilidad climatica y generación eledtrica
Variabilidad climatica y generación eledtricaVariabilidad climatica y generación eledtrica
Variabilidad climatica y generación eledtrica
 
Gn combustible alternativo ieee 24 abril 2012
Gn combustible alternativo ieee 24 abril 2012Gn combustible alternativo ieee 24 abril 2012
Gn combustible alternativo ieee 24 abril 2012
 

Recently uploaded

The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 

Recently uploaded (20)

The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 

Abb power generation solar presentacion ieee costa rica

  • 1. B Power Generation, Power Systems Division, Abril 2012 ABB Power Generation
  • 2. Compañia Lider en Tegnologia de Potencia y Automatizacion con fuerte posicionamiento del mercado.  117,000 empleados en cerca de 100 paises  $32 billion en revenues (2009)  Fundada en 1988 de la union de companias de ingenieria Suizas y Suecas  Predecesores fundados en 1883 y 1891  Compania Publica con cuartel general en Suiza © ABB Group May 16, 2012 | Slide 2
  • 3. Como esta Organizada ABB Cinco Divisiones Globales Discrete Power Power Low Voltage Process Automation Products Systems Products Automation and Motion $11.2 billion $6.5 billion $5.4 billion $4.1 billion $7.8 billion 33,500 16,000 18,000 19,000 28,000 empleados empleados empleados empleados empleados 2009 revenues (US$; pro-forma figures for automation divisions)  El Portafolio ABB Cubre:  Electricidad, Automatizacion,  Low-voltage products Control e Instrumentacion para Generacion de  Motores & drives Potencia y procesos  Sistemas inteligentes de Industriales edificaciones  Sisttemas De Transmision de Potencia  Robots & Systemas  Soluciones de Distribucion © ABB Group May 16, 2012 | Slide 3
  • 4. Hacer frente a los desafíos de la sociedad en el camino de la era de baja- emisión de carbono Ayudar a los clientes a hacer más con menos Crecimiento de el consumo de ABB Nuestras soluciones son Electricidad a 2030 Source: IEA, World Energy Outlook 2009  Encontrar los picos de +76% demanda electrica 30,000 Terrawatt-hours  Incrementar la eficiencia (TWh) energetica y reduccion de la emision de CO2 29,000 20,000  Aumentar la 20,000 productividad para alcanzar mejoras en la 12,500 16,500 10,000 competitividad de los negocios y empresas de servicios 2007 2015 2030 © ABB Group May 16, 2012 | Slide 4
  • 5. Innovadores proyectos en el mundo Empujando los limites de las tecnologias First commercial Longest underwater Most remote offshore Mine hoist for wave power plant power link wind farm linked to grid largest potash mine First platform connected Europe’s largest to mainland grid thermal solar power plant Largest battery Longest and highest capacity power link Largest SVC installation Longest conveyor belt Automation of largest Largest SCADA alumina plant network Longest underground power link Largest gearless mill drive (for crushing ore) Largest reverse- osmosis Power and automation desalination plant Substation in world’s First 600 kV of largest chemical tallest building power link cellulose plant © ABB Group May 16, 2012 | Slide 5
  • 6. La Innovacion es la llave de ABB como ventaja competitiva Liderazgo basado en una consistente inversion en nuevos desarrollos * Comprises non-order related R&D and order-related development  Mas de $1 billion invertidos anualmente en R&D*  6,000 cientificos e ingenieros  Colaboracion en mas de 70 Universidades  MIT (US), Tsinghua (China), KTH Royal Institute of Technology (Sweden), Indian Institute of Science (Bangalore), ETH (Switzerland), Karlsruhe (Germany), AGH University of Science and Technology (Poland) © ABB Group May 16, 2012 | Slide 6
  • 7. ABB en Generacion de Potencia  Negocios a nivel mundial cerca de 2,000 MUSD  Productos negociados a nivel mundial cerca de 2,000 MUSD  El negocio de Generacion de Potencia representa dentro del grupo ABB un grupo eficiente y exitoso  Localizada dento del “Top 10“ dentro de el negocio de Generacion de Potencia
  • 8. ABB en Generacion de Potencia en el Mundo 48 Local Business Units 8 Regional Centers Argentina Croatia India Netherland Romania Switzerland USA Sweden Australia Czech Rep. Indonesia New Zealand Russia Taiwan China Singapore Austria Denmark Israel Norway Saudi Arabia Thailand Brazil UAE Belgium Egypt Italy Peru Singapore Turkey Italy Brazil Finland Japan Poland United Arab Emirates Germany Slovakia Canada France Kuwait Portugal South Africa United Kingdom Chile Germany Malaysia Qatar Spain United States China Greece Mexico Korean Rep. Sweden Vietnam
  • 9. Aplicaciones Tipicas de Plantas de Generacion Fossil-Fired Ciclos Combinados turbinas Diesel Nuclear Solar Hydro Co-generation Waste-to-Energy Desalinizacion
  • 10. La Diferencia - ABB en Generacion de Potencia  ABB fue un constructor de plantas de generacion llave en mano  Sabemos de Plantas tipo hydro, nucleares, ciclo combinado hasta plantas de carbon  Tenemos la mayor experiencia de base instalada en el mundo  Por lo tanto  Tenemos un extenso know-how del proceso  Tenemos un extenso know-how de los sistemas © ABB Group May 16, 2012 | Slide 10
  • 11. Jesus Rubio, ABB PANAMA Abril 2011 ABB Power Generation Hacemos la Energia Solar Confiable y Adsequible © ABB Group May 16, 2012 | Slide 11
  • 12. El recurso solar es abundante En 6 horas los desiertos reciben más energía del sol que la humanidad consume en un año.  «Dr. Gerhard Knies, Desertec » Las Plantas Solares construidas en este recuadro en el desierto de el Sahara podrian cubrir la demanda de energa mundial © ABB Group
  • 13. Altas Areas de Incidencia Solar en el Mundo Altas Eficiencias en CSP y CPV North Africa and Medditerane: India: SW USA: CSP references built in Spain by First CSP plant by Novatec about to Excellent conditions for CPV and CSP. Many CPV Novatec. Further development with start execution. references by Greenvolts. focus on Northafrica. ABB/Novatec offer the Solar Boiler for CSP plants and turn key CPV. Middle East: ABB is developping a number of CSP and CPV project in the region, leveraging on the local EPC experience. South Africa: Australia: Chile: Excellent solar resources in ABB has delivered the first ABB is well positioned with its remote areas. utility PV plant . subsidiary Powercorp who is Focus on remote operations such specialized in the integration of ABB is developing a number as mining and offer solar process solar resources into islands © ABB Group of utility PV, CPV and CSP heat and solar electricity. grids. plants.
  • 14. Plantas de energía solar para el cinturón solar del mundo Centros de excelencia ABB para cubrir los mercados solares Solar Irradiation  2’500 kWh/m2 2’000 1’500 1’000 500   Power Generation Business Units of ABB
  • 15. Solar Power in ABB Tecnologias Solares  Proyectos Solares estan divididos en dos grandes grupos  Solar Fotovoltaico (PV)  Absorcion de Luz por los materiales que generan corriente electrica  Uso de Luz solar directa o indirectamente  Posibilidad de ubicacion en TODAS las locaciones  Concentracion de Potencia Solar (CSP)  Espejos concentran la Luz solar para generar vapor y manjear una turbina  Uso de luz solar directa unicamente  Aplicaciones en locaciones especiales © ABB Group May 16, 2012 | Slide 15
  • 16. ABB ofrece Plantas de Generacion Solar Llave en Mano Ejecucion Fiable y Rendimiento Garantizado CSP power plants CPV power plants PV power plants  Costo efectivo directo para  Excepcional rendimiento  Solucion Optimizada e generacion a vapor solar eléctrico con céldas de integrada triple unión y el seguimiento  Alta eficiencia en plantas de  Maximo rendimiento a de doble eje. generacion a vapor con cualquier momento del dia parametros hasta 130 bar,  .Sistema Modular  Integracion dentro de la red 530°C de vapor prefabricado y probado para ser un sistema plug and play  Independiente de el  Mayor rendiemiento por m2 suplidor de los modulos o de terreno  En cooperacion con celdas  En cooperacion con Novatec Greenvolts Solar
  • 17. Tres tegnologias Solares para distintas aplicaciones Mas Alto rendimiento para cualquier entorno CSP power plants CPV power plants PV power plants  Plantas de Generacion  Plantas de Generacion  Plantas de Generacion Electrica desde 50 MW Electrica desde 50 MW Electrica desde 1 a 100 hasta 250 MW hasta 250 MW MW  Energia Generada desde la  Plantas de poder  Aplicacion Industrial de planta con alamacenamiento Descentralizadas desde techo hasta 500 kW termico 100 kW  Proceso Calor / Vapor  Fuente Solar a todos los  Fuente Solar para areas de niveles de irradiacion  Fuente Solar para areas de alta Incidencia global alta incidencia © ABB Group
  • 18. Concentrated Solar Power En cooperacion con Novatec Solar
  • 19. Concentrated Solar Power Concepto Tecnico La radiación solar se recoge y se concentra por un reflector de Fresnel. Ocho filas de espejos están continuamente rastreadas para enfocar la radiación al receptor. El agua se bombea a través del tubo receptor, generando vapor a 100 bar con temperaturas de hasta 500 ° C. El vapor se ejecuta una turbina para generar electricidad o se utiliza para otros procesos. ABB colabora exclusivamente con NOVATEC Solar que ha desarrollado la tecnología CSP más eficiente © ABB Group
  • 20. Concentrated Solar Power Aplicaciones CSP Power Plants CSP Proceso de Vapor  Nuevas Centrales Termosolares  Desalinizacion de agua salada o mar De 50 a 250 MW  Enfriamiento Solar Eficiente con 500 ° C / 100 bar  Redes de Enfriamiento  De ciclo combinado solar  Produccion LNG Solar sólo en días, CC en la noche  Recuperacion Mejorada de petroleo Fossil Fuel Saver  Procesos de Vapor para la industris © ABB Group
  • 21. Alta Eficiencia Tegnlogia Linea Fresnel Generacion directa de vapor con super calentadores La última generación de tecnología Fresnel lineal en funcionamiento desde agosto de 2011:  700 m del evaporador, seguido de 300 m de la sección del super calentador  Vapor de agua estable y controlado de hasta 130 bar y una temperatura estable hasta 530 ° C  Turbinas de vapor como estándar diseñadas para centrales de ciclo combinado permite una alta eficiencia de 38% que se traduce en menores costos © ABB Group
  • 22. Mantenimiento de Campo de Espejos Bajos costos con Espejos planos  Parabolico  Espejos planos limpieza a traves de robot Alto consumo de Agua Muy bajo cnsumo de Agua Alto costo de labor Bajo costo de labor 2
  • 23. Systema de Manufactura automatizado Fabrica de construccion en sitio, cerca del sitio  Fabricacion loca de componentes principales  Procesos estandarizados que garantizan alto nivel de calidad  Alto potencial de contenido local  Alta creacion de empleo local  Bajos costos logisticos  Valuacion de creacion local
  • 24. Modular System Quick and Easy Site Assembly   Rapido ensamblaje en sitio debido al alto nivel de prefabricacion  Estructuras soporte basadas en componentes estandar conseguidos en todos los mercados
  • 25. CSP Planta un concepto puramente solar Alta eficiencia con Super Calentadores de vapor 2
  • 26. CSP Planta un concepto puramente solar Solucion de 3 Tanques con Super Calentadores de vapor
  • 27. CSP Vapor competetitividad al mundo del Gas Natural Cual Tegnologia provee un precio justo? ? ? Years Later ... the Golden End © ABB Group Assumptions: Gas Boiler: 90% Boiler efficiency, no tax on gas, no CO2 tax Assumptions: Solar Boiler: Latitudes 25° , 7% WAAC, 25 years, no grants or CO2 credits considered
  • 28. Comparacion de Tegnolgias CSP (1) Menor costo de operacion LCOE con ABB / Novatec Parabolic trough ABB Novatec Temperatura de Operacion 390°C Hasta 530°C Power block eficiencia 36% 38% Perdidas de Calor 10 % 5% Material por ano MWh Alto Bajo rendimiento termico Uso de tierra eficiencia 270 kWh th per m² 370 kWh th per m² Tegnologia de almacenaje Sales Fundidas Sales Fundidas 2
  • 29. Comparacion de Tegnolgias CSP (2) Menor costo de operacion LCOE con ABB / Novatec Parabolic trough ABB Novatec Saving Espejos tracking 5 kWh 1 kWh (- 80%) Bomba 20 kWh 7 kWh (- 65%) Costo Mantenimiento € 3.7 € 2.0 (- 46%) Consumo Agua 13.4 litros 2 litros (- 85%) Limpieza All numbers per MW per year
  • 30. CSP: ABB ofrece la tegnologia mas eficiente Esto hace que la tecnología de ABB CSP asequible Sistema de manufactura automatizado • Eficiente Proceso con control de calidad • Costos de produccion local minimiza transporte y costos de logistica Simple, Plano y Liviano de construir Alta eficiencia de las tierras en uso eficiente (30% mas que PT) • Bajo consumo electrico(70% menos que un PT) Produccion directa de vapor hasta 530°C, 130 bar • Alta eficiencia de bloque energetico (5% mayor a la salida de un PT) • Bajas perdidas de calor (50% menos que un PT) Facil de Mantener y Limpiar • Limpieza por robot • Bajo consumo de agua(85% menos que un PT) © ABB Group
  • 31. CSP Reference: Puerto Errado 1, Spain 12 MWth, 1.4 Mwel in operation since spring 2010 Key Data EPC Contractor Novatec Solar Owner Novatec Solar 3 rows of linear Fresnel collectors, Layout conventional steam turbine equipment and generator, storage Solar field length 806.40 m Net aperture area 21,571.2 m² Operating temperature Up to 500 °C Operating pressure Up to 65 bar Peak thermal output 12 MW th Peak electrical output 1.4 MWel Electrical production 2.2 GWh p.a. www.novatecsolar.com
  • 32. CSP Reference: Puerto Errado 2, Spain 150 MWth, 30 MWel in operation since Jan 2012 Key data EPC Contractor Novatec Solar Tubo Sol PE2 S.L. Owners owned by 5 Swiss utilities (85%) and Novatec Solar (15%) 28 rows of linear Fresnel collectors, conventional steam Layout turbine equipment and generator, storage Solar field length 940.8 m Net aperture area 302,000 m² Operating temperature 270 °C Operating pressure 55 bar Peak thermal output 150 MW th Peak electrical output 30 MWel Electrical production 49 GWh/year Fuel Solar Only
  • 33. CSP Reference: Liddell, Australia 9.3 MW thermal, under hot commissioning in Jan 2012 Key data EPC Contractor Novatec Solar Owner Macquarie Generation 4 rows of linear Fresnel Model collectors, solar augmentation of a coal fired power station Solar field length 403,2 m Net aperture area 18,489.60 m² Operating temperature Up to 270°C Operating pressure Up to 55 bar Peak thermal output 9.3 MW th Thermal Output per year 13,550 MWhth www.novatecsolar.com
  • 34. Solar Power in ABB Solares por Concentración de Potencia Solar CSP Concentracion Potencia Solar - Torre de Potencia  Heliostatos reflejando sobre una Torre donde se recibe calor y por transferencia a un fluido se genera vapor para manejar la turbina  ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos de 2 ejes, motores, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica  Potencia Tipica: 10 MW to 50 MW Concentracion Potencia Solar – A traves de Espejos o laminas Parabolicas  Espejos Parabolicos concentrando la luz en un tubo con liquido de alta y facil transferencia de calor ( HTF) que generara el vapor para manejar la turbina  ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos de 2 ejes, motores, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica automation, transformers, cabling, substation  Potencia Tipica: 50 MW to 300 MW © ABB Group May 16, 2012 | Slide 34
  • 35. Solar Power in ABB Solares por Concentración de Potencia Solar CSP Concentracion Potencia Solar – Linear Fresnel  Espejos Planos concentran la Luz solar en un tubo con agua que genera vapor para manejar la turbina  ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos de 1 eje, motores, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica  Potencia Tipica: 3 MW to 50 MW Concentracion Potencia Solar – Platos Parabolicos  Nueva Tecnologia a traves de platos parabólicos concentran el sol en un motor Stirling  ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos de 2 ejes para control de estructura de el motor, alternador, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica  Potencia Tipica: 10 MW to 25 MW per Stirling dish © ABB Group May 16, 2012 | Slide 35
  • 36. Solar Power in ABB Otras Tecnologias HCPV Torre heliostatica FV  Alta Potencia, Torre heliostatica FV logra concentrar 1500 sun de alta eficiencia en paneles  ABB ejecuta la Instrumentacion Control y Electrificacion mediante chasis mecanicos de 2 ejes para control de estructura de el motor, alternador, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica  Potencia Tipica: 50 MW a 150 MW Chimenea en Torre para convencion de gases  Aire caliente a traves de un vidrio colector en la base que lleva el intercambio de calor a la chimenea  Etapa experimental  ABB Ejecuta (ICE): Switchgear, automatizacion, transformadores, estacion  Potencia Tipica: 50 MW a 200 MW © ABB Group May 16, 2012 | Slide 36
  • 37. Jesus Rubio PAABB Concentrated Photovoltaic En Cooperacion Greenvolts
  • 38. CPV: Concentrated Photovoltaic Concepto Tecnico Un preciso mecanismo de dos ejes del sistema de seguimiento de los módulos de CPV ,se centran, precisamente, hacia el sol. Los módulos concentran la luz en el receptor insertado en el celda Una célda solar de triple unión muy eficiente convierte la luz con una eficiencia del 38% en electricidad. Estas células se utilizan en la industria aeroespacial para las aplicaciones críticas en los satélites. El receptor está diseñado como un disipador de calor y enfría la celda pasivamente. Toda la electrónica y el software para cada conjunto se integran en el punto de control del sistema. El CSP proporciona una potencia de 16 kW a 480 VCA. © ABB Group
  • 39. CPV: Sistema Integrado y full Modularizado Optimizacion para Alta Eficiencia y Alta confiabilidad x x x 4 24 16 Receiver: 10.4W Module: 250W Paddle Pair: 4kW Array: 16kW (primary building block) System Control Point: SCP (Control, Inverter, Comms, Geo) Pier SCP Stanchion Roll beam (5 per array*) (1 per array) (5 per array*) (1 per array)
  • 40. CPV: Despacho tipo Plug and Play System Rapido y Facil Instalacion fuera del contenedor “5-packs” loaded into 40’ cargo containers Mount Stanchions Assemble Roll Beams Mount Roll Beams Slide on the Paddles Hang SCPs Auto-Commission
  • 41. CPV: Operacion Remota de el panel de potencias Gerencia de Manejo sofisticado y servicio Movil Sistema operativo controla todas las funciones clave de cada matriz 16kW  Monitoreo en tiempo real del módulo, el perseguidor, y los sistemas de conversión de energía  Direcciones IP individuales permiten la solución de problemas hasta a los subsistemas dentro de cada gama 16kW  Toda la información de monitoreo y calibración disponibles a través de VPN segura inalámbrica  El tiempo en activo y de telemetría solar
  • 42. CPV: Aplicaciones Arreglos flexibles de 16KW CPV Power Plants  CPV Remote Power  CPV Centrales Eléctricas Agrícola estaciones de bombeo Estaciones de transmisión para redes móviles  La integración local de baja tensión para pequeña Disfrute de sombra capacidad de 16 a 200 kW Zona de juegos para el sombreado  La integración industrial y agrícola para unos pocos Ganado de sombreado cientos de kW Sombra para parque de coches  Utilidad de la estación de energía solar de hasta 50 MW © ABB Group
  • 43. CPV: ABB ofrece Plantas CPV o modelo adecuado La Necesidad del Cliente define nuestra recomendacion CPV Llave en mano CPV Sistema ABB entrena y certifica a los terceros ABB actúa como EPC y entrega la planta contratistas EPC para diseñar, vender y llave en mano por encargo. construir nuestro sistema CPV. ABB ofrece un servicio completo ciclo de vida desde la etapa inicial de diseño, sobre El sistema completo de CPV se entrega en el proyecto de conexión a la red, realización módulos de 16 kW / 480 V CA en el sitio. , la operación y el mantenimiento de la Construcción y integración en la red por el planta cliente o un tercero . © ABB Group .
  • 44. CPV: Key Advantages of our Technology Outstanding and reliable performance Alta eficiencia •Las células solares de triple unión ofrecen una eficiencia del 100% mayor que las células de silicio • Los resultados de seguimiento de doble eje en altos rendimientos constantes durante todo el día • Sistema bien diseñado de enfriamiento pasivo mantiene la célula y el máximo rendimiento Sistema Modular Plug and Play System •Altos estándares de calidad se cumplen, como los módulos están conectados, montados y probados en la fábrica • Permite una rápida respuesta de la fábrica al mercado • Instalación rápida y eficiente Diseno para ambientes rudos •Al revés de la posición protege contra rocío, escombros, suciedad, el granizo y el viento • La resistencia del viento ha sido probado, automático de la cara abajo con vientos fuertes • Múltiples unidades pequeñas son menos sensibles al viento que los grandes sistemas centrales Operacion remota •No requiere personal en sitio •Monitoreo, manejo movil y a tiempo real •Indicadores de limpieza cuando se requiere mantenimiento para mejorar la eficiencia © ABB Group
  • 45. CPV Reference: Utility Wholesale in Byron, CA 320 kW, in operation since spring 2011
  • 46. CPV Reference: Insectary in Redding, CA 288 kW, in operation since Sep 2011
  • 47. CPV Reference: Education Yuma, AZ 1 MW, in operation since Sep 2011
  • 49. Solar power in ABB Solar FV FV Instalacion en Techo– Estructura Fija  Bajo/Media Potencia Fotovoltaica sobre techo o sobre techo con estructuras  ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante chasis mecanicos de estructuras fijas, motores, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica , trabajos civiles  Potencia Tipica: 10 kW to 500 kW FV Instalacion en Techos bajos– Estructura Fija  Bajo/Media Potencia Fotovoltaica sobre techo o sobre techo con estructuras  ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante chasis mecanicos de estructuras fijas, motores, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica , trabajos civiles  Potencia Tipica: 10 kW to 500 kW © ABB Group May 16, 2012 | Slide 49
  • 50. Solar power in ABB Solar PV FV Concentrado a Tierra– Estructura Fija  Mediana y Alta potencia- instalacion en estructuras fijas  ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante chasis mecanicos de 2 ejes Multiple o polo simple, motores, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica , trabajos civiles  Potencia Tipica: 50 MW to 100 MW FV Concentrado a Tierra– 1 / 2 eje con soportes  Mediana y Alta potencia- instalacion en estructuras fijas  ABB ejecuta (EPC): 1 or 2 axis trackers, Instrumentacion Control y Electrificacion mediante chasis mecanicos de 1 o 2 ejes con mecanismo, motores, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica , trabajos civiles  Potencia Tipica: 50 MW to 100 MW © ABB Group May 16, 2012 | Slide 50
  • 51. Solar power in ABB Solar CPV FV Concentrado a Tierra -3 puntos de sol  Mediana y Alta potencia- instalacion en estructuras de 2 ejes y 3 puntos de concentracion de sol  ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante chasis mecanicos de 2 ejes Multiple o polo simple, motores, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica automation, transformers, cabling, substation  Potencia Tipica: 100 MW to 50 MW FV Concentrado a Tierra– 500 puntos de sol  Medium/High power photovoltaic installation 2 axes structure and 500 sun concentration  ABB ejecuta como EPC la Instrumentacion Control y Electrificacion mediante chasis mecanicos de 2 ejes Multiple o polo simple, motores, drives,Paneles de MV y LV, Proteccion, seguridad,automatizacion,Transformadores, Cableado y Estacion Electrica y pequenas obras civiles  Potencia Tipica: 100 MW to 50 MW © ABB Group May 16, 2012 | Slide 51
  • 52. Solar power in ABB Tecnologia Fotovoltaica  Fotones de luz solar inciden sobre el panel solar y son aborbidos por materiales semiconductores como el silicon  Los electrones que fluyen libres por el material producen electricidad. Debido a la composicion especial de las celdas solares, los electrones solo se mueven en una direccion. Las complementarias cargas positivas creadas son llamadas Huecos y circulan en direccion opuesta de el electron y de el panel de silicone  Las celdas solares convierten la energia solar en energia y corriente directa DC  Cada Panel solar o Modulo contine decenas de celdas solares © ABB Group May 16, 2012 | Slide 52
  • 53. © ABB Group May 16, 2012 | Slide 53
  • 54. © ABB Group May 16, 2012 | Slide 54
  • 55. © ABB Group May 16, 2012 | Slide 55
  • 56. Solar power in ABB Major PV technologies Technology Description Stage Strengths Weaknesses Dependance on silicon Wafer-scale Proven (mature) Wafer-based PV Weight semiconductor silicon Commercial High efficiency (crystalline) Degradation at high diodes in modular arrays Mass production temperature Low material use Thin layers of Low cost Low efficiency semiconductor materials Low energy input Degradation Thin-film (a-Si, CdTe, CIGS) on Commercial Light weight Material availability glass/steel/flexible Low temperature Toxicity substrates degradation High cost Multijunction PV Not commercially Multijunction PV Pilot High efficiency Concentrating PV available Tracking mandatory Nanotechnologies Technical immaturity Emerging PV Laboratory Low cost Organic materials Low efficiency © ABB Group May 16, 2012 | Slide 56
  • 57. © ABB Group May 16, 2012 | Slide 57
  • 58. © ABB Group May 16, 2012 | Slide 58
  • 59. © ABB Group May 16, 2012 | Slide 59
  • 60. © ABB Group May 16, 2012 | Slide 60
  • 61. Solar power in ABB Tecnologia Fotovoltaica  La conexion serie de los modulos incrementan el voltaje y lo adaptan a el rango apropiado a traves de los Inversores  La conexion en Paralelo se efectua a un panel primario que concentra la carga para pasar a los inversores  Los Inversores deben tener una concentracion maxima de carga que permite que brinden energia a un maximo nivel de eficiencia © ABB Group May 16, 2012 | Slide 61
  • 62. © ABB Group May 16, 2012 | Slide 62
  • 63. © ABB Group May 16, 2012 | Slide 63
  • 64. © ABB Group May 16, 2012 | Slide 64
  • 65. © ABB Group May 16, 2012 | Slide 65
  • 66. © ABB Group May 16, 2012 | Slide 66
  • 67. © ABB Group May 16, 2012 | Slide 67
  • 68. © ABB Group May 16, 2012 | Slide 68
  • 69. © ABB Group May 16, 2012 | Slide 69
  • 70. © ABB Group May 16, 2012 | Slide 70
  • 71. © ABB Group May 16, 2012 | Slide 71
  • 72. © ABB Group May 16, 2012 | Slide 72
  • 73. © ABB Group May 16, 2012 | Slide 73
  • 74. Solar power in ABB Tecnologia Fotovoltaica © ABB Group May 16, 2012 | Slide 74
  • 75. Solar Power in ABB ABB en Proyectos de Energia Solar  ABB ejecuta proyectos en el Mercado de Enerigia Solar  Instalaciones en tierra, Companias de Servicio con grandes plantas generadoras (Fijas- moviles)  ABB y sus Capacidades incluyendo Proyectos Llave en Mano (EPC)  Modulos Fotovoltaicos con optimizacion de costos al cliente  Consorcios con Fabricantes de Celdas PV como opcion  Sistemas de Control y Electrificacion como opcion  ABB tiene experiencia en mas de 22 en plantas de concentracion solar y 27 Proyectos de celdas Fotovoltaicas de gran escala  Ventajas de trabajar con ABB  Acceso a la Banca Internacional  Prescencia Internacional como empresa Global  Proveemos soluciones estandard  Flexibilidad en los disenos  Experiencia en Sun Estaciones y Conecciones de Automatizacion © ABB Group May 16, 2012 | Slide 75
  • 76. Solar Power in ABB Contenido propio de ABB  PV modules Non-ABB  Structures/Trackers Non-ABB  PCBx ABB*  Cables Non-ABB  Inverters ABB*  Transformers ABB  LV/MV switchgear ABB  DCS/SCADA ABB  Substation ABB  Step-up transformer ABB  Engineering, PM, SM ABB  Construction/Installation Non-ABB * Depending on technical requirements © ABB Group May 16, 2012 | Slide 76
  • 77. Solar power in ABB Forma de Contratacion– BOS solamente Independent Engineer Utility Module purchase ABB PSPG Project developer (SPC) M&M contract M&M needs EPC contract to be awarded to ABB in order ABB PSPG PV panel to guarantee Technical supplier performance coordination EQUIPMENT SERVICES and execution PCBx Engineering support Inverters Project management Transformers Commissioning LV/MV Switchgear DCS/SCADA Substation Subcontracts EQUIPMENT SERVICES Trackers Construction Cables Installation Logistics © ABB Group May 16, 2012 | Slide 77
  • 78. Solar power in ABB Forma de Contratacion– Consorcios Independent Engineer Utility ABB PSPG Project developer (SPC) M&M contract M&M needs EPC contract to be awarded to ABB in order Consortium ABB-PV panel supplier to guarantee performance ABB PV PANEL SUPPLIER ABB equipment PV panel supply Third-party equipment Engineering, PM, SM Construction and installation services © ABB Group May 16, 2012 | Slide 78
  • 79. Solar power in ABB  REFERENCIAS © ABB Group May 16, 2012 | Slide 79
  • 80. ABB Solar Experience Reference List  CSP (22 projects)  PV (27 projects)  SEGS VI, VII, VIII, Kuraymat  Totana  Francofonte IX Hassi R’Mel  La Robla  Duccotto  PSA Martin 8  Aprilia 1  La Sugarella  Andasol 1&2 Vallesol 1&2  Sapeu  Spinasanta  eSolar Sierra  …  Monreale  …  Extresol 1&2 © ABB Group May 16, 2012 | Slide 80
  • 81. Concentrating Solar Power © ABB Group May 16, 2012 | Slide 81
  • 82. SEGS VI, VII, VIII & IX Solar Power Plant ABB’s supply  Steam Turbines and Generators  Steam Turbine Control System Customer benefits  Ability to meet schedule  High degree of availability  Low cost life-cycle regarding O&M and future extensions SEGS Sizes: 2 x 30 MW, 2 x 80 MW Customer: Luz Solar Partners End user: FP&L/Terra Gen Year of ABB commissioning:  DCS: 1988 - 1990 © ABB Group May 16, 2012 | Slide 82
  • 83. PSA Solar Power Plant ABB’s supply  Distributed Control System (DCS) for the DISS test loop (1.3 MW) Customer benefits  Constitutes an excellent experimental system for investigating the two-phase flow and direct steam generation for electricity production.  High degree of standardization in planning and documentation PSA SPP  Extremely flexible system regarding O&M and future Size: 1 x 1.3 MW extensions Customer: CIEMAT End user: All companies Year of ABB commissioning:  DCS: 1998 © ABB Group May 16, 2012 | Slide 83
  • 84. Andasol 1 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  MV Switchgear  Motors & Drives  Unit Transformers Customer benefits UTE ANDASOL Property – Not to be used without UTE ANDASOL authorization  ABB’s flexibility and experience with complex power systems Andasol 1 SPP (Spain)  High degree of standardization in planning and documentation Size: 1 x 50 MW  Extremely flexible system regarding O&M and future Customer: Cobra/Sener extensions End user: ACS  Thermal Energy Storage (TES) and Heat Transfer Fluid (HTF) control Year of ABB commissioning:  DCS: 2008 © ABB Group May 16, 2012 | Slide 84
  • 85. Andasol 2 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  MV Switchgear  Motors & Drives  Unit Transformers Customer benefits UTE ANDASOL Property – Not to be used without UTE ANDASOL authorization  ABB’s flexibility and experience with complex power systems Andasol 2 SPP (Spain)  High degree of standardization in planning and documentation Size: 1 x 50 MW  Extremely flexible system regarding O&M and future Customer: Cobra/Sener extensions End user: ACS  Thermal Energy Storage (TES) and Heat Transfer Fluid (HTF) control Year of ABB commissioning:  DCS: 2009 © ABB Group May 16, 2012 | Slide 85
  • 86. eSolar Sierra Solar Power Plant ABB’s supply  Distributed Control System (DCS) Customer benefits  ABB’s high quality products guarantee plant reliability and performance eSolar Sierra SPP (USA)  ABB is able to deliver within eSolar’s aggressive time line Size: 2 x 2.5 MW  ABB’s modular design is in alignment with eSolar’s Customer: eSolar strategy End user: eSolar  ABB’s global footprint ensures standardization of projects throughout the globe Year of ABB commissioning:  DCS: 2009 © ABB Group May 16, 2012 | Slide 86
  • 87. Extresol 1 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  Solar Field Communications System (SCS)  Solar Field Control System (LOC): 624 units  MV Switchgear  Motors & Drives  Unit Transformers Customer benefits Extresol 1 SPP (Spain)  ABB’s flexibility and experience with complex power Size: 1 x 50 MW systems  Extremely flexible system regarding O&M and future Customer: Cobra/Sener extensions End user: ACS  Totally integrated and compatible control scope solution Year of ABB commissioning:  Short installation and commissioning time  DCS, SCS, LOC: 2009  Thermal Energy Storage (TES) and Heat Transfer Fluid (HTF) control © ABB Group May 16, 2012 | Slide 87
  • 88. Extresol 2 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  Solar Field Communications System (SCS)  Solar Field Control System (LOC): 624 units  MV Switchgear  Motors & Drives  Unit Transformers Customer benefits Extresol 2 SPP (Spain)  ABB’s flexibility and experience with complex power Size: 1 x 50 MW systems  Extremely flexible system regarding O&M and future Customer: Cobra/Sener extensions End user: ACS  Totally integrated and compatible control scope solution Year of ABB commissioning:  Short installation and commissioning time  DCS, SCS, LOC: 2010  Thermal Energy Storage (TES) and Heat Transfer Fluid (HTF) control © ABB Group May 16, 2012 | Slide 88
  • 89. Kuraymat Integrated Solar Combined Cycle ABB’s supply  Distributed Control System (DCS): Power Block + Solar Field  MV Switchgear  Motors & Drives Customer benefits  ABB assumes responsibility for engineering and coordination activities towards control & electrical Kuraymat ISCC (Egypt) systems Size: 1 x 160 MW  Extremely flexible system regarding O&M and future extensions Customer: Iberdrola/Flagsol End user: NREA Year of ABB commissioning:  DCS: 2010 © ABB Group May 16, 2012 | Slide 89
  • 90. Hassi R’Mel Integrated Solar Combined Cycle ABB’s supply  EBOP concept, including:  Transformers  MV Switchgear  LV Switchgear  Complete Electrical System  Cabling Hassi R’Mel ISCC (Algeria) Customer benefits  Totally integrated and compatible full scope solution Size: 1 x 150 MW  High degree of standardization in planning and Customer: Abener documentation End user: Sonatrach  Extremely flexible system regarding O&M and future Year of ABB commissioning: extensions  EBOP: 2010 © ABB Group May 16, 2012 | Slide 90
  • 91. Martin Integrated Solar Combined Cycle ABB’s supply  Solar Field Control System (LOC): 1.136 units Customer benefits  ABB’s experience in solar collector positioning  Extremely short delivery schedule  High degree of standardization in planning and documentation  High degree of flexibility in engineering and LOC Martin Next Generation Solar design Energy Center (USA)  High integration level into existing DCS Size: 1 x 75 MW (Solar Field) Customer: FPL/NextEra End user: FPL/NextEra Year of ABB commissioning:  LOC: 2010 © ABB Group May 16, 2012 | Slide 91
  • 92. Manchasol 1 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  Solar Field Communications System (SCS)  Solar Field Control System (LOC): 624 units Customer benefits  High degree of standardization in planning and documentation  Extremely flexible system regarding O&M and future Manchasol 1 SPP (Spain) extensions Size: 1 x 50 MW  Totally integrated and compatible control scope solution Customer: Cobra/Initec  Short installation and commissioning time End user: ACS  Thermal Energy Storage (TES) and Heat Transfer Year of ABB commissioning: Fluid (HTF) control  DCS, SCS, LOC: 2010 © ABB Group May 16, 2012 | Slide 92
  • 93. Manchasol 2 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  Solar Field Communications System (SCS)  Solar Field Control System (LOC): 624 units Customer benefits  High degree of standardization in planning and documentation  Extremely flexible system regarding O&M and future Manchasol 2 SPP (Spain) extensions Size: 1 x 50 MW  Totally integrated and compatible control scope solution Customer: Cobra/Initec  Short installation and commissioning time End user: ACS  Thermal Energy Storage (TES) and Heat Transfer Year of ABB commissioning: Fluid (HTF) control  DCS, SCS, LOC: 2011 © ABB Group May 16, 2012 | Slide 93
  • 94. Vallesol 1 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  Solar Field Communications System (SCS)  Solar Field Control System (LOC): 624 units  Unit Transformers Customer benefits UTE ANDASOL Property – Not to be used without UTE ANDASOL authorization  ABB’s flexibility and experience with complex power systems  High degree of standardization in planning and Vallesol 1 SPP (Spain) documentation Size: 1 x 50 MW  Extremely flexible system regarding O&M and future Customer: Cobra/Sener extensions End user: Torresol Energy  Totally integrated and compatible control scope solution Year of ABB commissioning:  Short installation and commissioning time  DCS, SCS, LOC: 2011 © ABB Group May 16, 2012 | Slide 94
  • 95. Vallesol 2 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  Solar Field Communications System (SCS)  Solar Field Control System (LOC): 624 units  Unit Transformers Customer benefits UTE ANDASOL Property – Not to be used without UTE ANDASOL authorization  ABB’s flexibility and experience with complex power systems  High degree of standardization in planning and Vallesol 2 SPP (Spain) documentation Size: 1 x 50 MW  Extremely flexible system regarding O&M and future Customer: Cobra/Sener extensions End user: Torresol Energy  Totally integrated and compatible control scope solution Year of ABB commissioning:  Short installation and commissioning time  DCS, SCS, LOC: 2011 © ABB Group May 16, 2012 | Slide 95
  • 96. Prometeo Project at PSA Solar Power Plant ABB’s supply  Experimental, high-technology Distributed Control System (DCS) Customer benefits  Extremely advanced testing systems for new HTF technologies  Highly flexible system for changes and testing  Short installation and commissioning time Prometeo Project at PSA SPP (Spain) Size: experimental loop test Customer: Iberdrola Ingeniería End user: Iberdrola Ingeniería Year of ABB commissioning:  DCS: 2010 © ABB Group May 16, 2012 | Slide 96
  • 97. Soluz Guzmán Solar Power Plant ABB’s supply  Solar Field Control System (LOC): 384 units Customer benefits  Advanced solar field control system  Short installation and commissioning time  Integration into Emerson DCS Soluz Guzmán SPP (Spain) Size: 1 x 50 MW Customer: Sener End user: Espelsa/Abantia/Idom Year of ABB commissioning:  DCS: 2011 © ABB Group May 16, 2012 | Slide 97
  • 98. Extresol 3 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  Solar Field Communications System (SCS)  Solar Field Control System (LOC): 624 units  MV Switchgear  Motors & Drives  Unit Transformers Customer benefits Extresol 3 SPP (Spain)  ABB’s flexibility and experience with complex power Size: 1 x 50 MW systems  Extremely flexible system regarding O&M and future Customer: Cobra/Sener extensions End user: ACS  Totally integrated and compatible control scope solution Year of ABB commissioning:  Short installation and commissioning time  DCS, SCS, LOC: 2011  Thermal Energy Storage (TES) and Heat Transfer Fluid (HTF) control © ABB Group May 16, 2012 | Slide 98
  • 99. Termosol 1 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  Solar Field Communications System (SCS)  Solar Field Control System (LOC): 624 units Customer benefits  ABB’s flexibility and experience with complex power systems  High degree of standardization in planning and documentation Termosol 1 SPP (Spain)  Extremely flexible system regarding O&M and future Size: 1 x 50 MW extensions Customer: FPL/NextEra  Totally integrated and compatible control scope solution End user: FPL/NextEra  Short installation and commissioning time Year of ABB commissioning:  DCS, SCS, LOC: 2011 © ABB Group May 16, 2012 | Slide 99
  • 100. Termosol 2 Solar Power Plant ABB’s supply  Distributed Control System (DCS)  Solar Field Communications System (SCS)  Solar Field Control System (LOC): 624 units Customer benefits  ABB’s flexibility and experience with complex power systems  High degree of standardization in planning and documentation Termosol 2 SPP (Spain)  Extremely flexible system regarding O&M and future Size: 1 x 50 MW extensions Customer: FPL/NextEra  Totally integrated and compatible control scope solution End user: FPL/NextEra  Short installation and commissioning time Year of ABB commissioning:  DCS, SCS, LOC: 2011 © ABB Group May 16, 2012 | Slide 100
  • 101. Photovoltaic Solar Power © ABB Group May 16, 2012 | Slide 101
  • 102. Totana PV Solar Plant Customer needs  Maximize plant performance and reliability  Complete EPC solution  Plant in operation in less than 6 months ABB response  ABB delivers the complete plant in consortium with a mechanical partner  ABB applies an efficiency improvement system to maximize the overall performance of the plant  ABB scope: Totana PV Plant (Spain) • Supply: DC cabinets, AC cabinets, unit transformers, Size: 1 MWp, 2-axis tracker switchgears, equipment housing, system optimization, control and SCADA Customer: Global Capital Finance • Installation, ground & civil works: inverters, trackers, PV modules, transformers, switchgears, cabinets, Scope: EPC housing, system optimization, control, SCADA, security Year of commissioning: system, cabling, etc  Partner scope: PV modules (supply)  EPC: 2008  Client met deadline and qualified for Spanish feed-in tariff © ABB Group May 16, 2012 | Slide 102
  • 103. La Robla PV Solar Plant Customer needs  First class automation and electrical systems  Modular solution: 3 phases  Plant in operation in 3 months ABB response  ABB delivers the complete plant in consortium with a panel manufacturer  ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant  ABB scope: La Robla PV Plant (Spain) • Supply: inverters, trackers, DC & AC cabinets, Size: 13.3 MWp, 1-axis tracker transformers, switchgears, cabling, equipment housing, system optimization, control, SCADA, substation Customer: GA Solar • Installation & civil works: inverters, trackers, DC & AC Scope: EPC cabinets, transformers, switchgears, cabling, equipment housing, system optimization, control, Year of commissioning: SCADA, substation, fencing, security system, PV modules  EPC: 2010  Partner scope: PV modules (supply) © ABB Group May 16, 2012 | Slide 103
  • 104. Golf PV Solar Plant Customer needs  First class automation and electrical systems  Plant in operation in 3 months ABB response  ABB delivers the complete plant in consortium with a panel manufacturer  ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant  ABB scope: • Supply: DC & AC cabinets, transformers, switchgears, Golf PV Plant (Spain) cabling, equipment housing, system optimization, Size: 6.2 MWp, 1-axis tracker control, SCADA, substation • Installation & civil works: inverters, trackers, DC & AC Customer: GA Solar cabinets, transformers, switchgears, cabling, Scope: EPC equipment housing, system optimization, control, SCADA, substation, fencing, security system, PV Year of commissioning: modules  Partner scope: PV modules (supply)  EPC: 2010 © ABB Group May 16, 2012 | Slide 104
  • 105. Aprilia 1 PV Solar Plant Customer needs  First class automation and electrical systems  Maximize plant performance and reliability ABB response  ABB delivers a complete electrical solution  ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant  ABB scope: Aprilia 1 PV Plant (Italy) • Supply: inverter centers, DC & AC cabinets, transformers, switchgears, cabling, equipment housing, Size: 9.7 MWp, fix installation protection equipment, MV connection line • Installation: inverter centers, DC & AC cabinets, Customer: Kinexia transformers, switchgears, cabling, equipment housing, Scope: EBOP/iICE protection equipment, MV connection line, PV modules electrical connection Year of commissioning:  EBOP/iICE: 2010 © ABB Group May 16, 2012 | Slide 105
  • 106. Sapeu PV Solar Plant Customer needs  First class automation and electrical systems  Maximize plant performance and reliability ABB response  ABB delivers the complete plant in consortium with a panel manufacturer  ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant  ABB scope: • Supply: DC & AC cabinets, unit transformers, Sapeu PV Plant (Italy) switchgears, equipment housing, system optimization, Size: 3.9 MWp, fix installation control, SCADA, substation • Installation, ground & civil works: inverters, structures, Customer: GA Solar DC & AC cabinets, transformers, switchgears, cabling, Scope: EPC equipment housing, system optimization, control, SCADA, substation, fencing, security system, PV Year of commissioning: modules • Partner scope: PV modules (supply)  EPC: 2010 © ABB Group May 16, 2012 | Slide 106
  • 107. Monreale PV Solar Plant Customer needs  First class automation and electrical systems  Maximize plant performance and reliability ABB response  ABB delivers the complete plant in consortium with a panel manufacturer  ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant  ABB scope: • Supply: DC & AC cabinets, unit transformers, Monreale PV Plant (Italy) switchgears, equipment housing, system optimization, Size: 3.27 MWp, fix installation control, SCADA, substation • Installation, ground & civil works: inverters, structures, Customer: GA Solar DC & AC cabinets, transformers, switchgears, cabling, Scope: EPC equipment housing, system optimization, control, SCADA, substation, fencing, security system, PV Year of commissioning: modules • Partner scope: PV modules (supply)  EPC: 2010 © ABB Group May 16, 2012 | Slide 107
  • 108. Francofonte PV Solar Plant Customer needs  First class automation and electrical systems  Maximize plant performance and reliability ABB response  ABB delivers the complete plant in consortium with a panel manufacturer  ABB applies an efficiency improvement system to maximize the overall performance of the PV solar plant  ABB scope: • Supply: DC & AC cabinets, unit transformers, Francofonte PV Plant (Italy) switchgears, equipment housing, system optimization, Size: 2.50 MWp, fix installation control, SCADA, substation • Installation, ground & civil works: inverters, structures, Customer: GA Solar DC & AC cabinets, transformers, switchgears, cabling, Scope: EPC equipment housing, system optimization, control, SCADA, substation, fencing, security system, PV Year of commissioning: modules • Partner scope: PV modules (supply)  EPC: 2010 © ABB Group May 16, 2012 | Slide 108
  • 109. Duccotto PV Solar Plant Customer needs  First class automation and electrical systems  Maximize plant performance and reliability  Fix (6.5 MWp) and 2-axis (500 kW) installation  Monocrystalline (500 kW), polycrystalline (6 MW) and thin- film (500 kW) PV modules ABB response  ABB delivers the complete plant in consortium with a panel manufacturer  ABB applies an efficiency improvement system to maximize Duccotto PV Plant (Italy) the overall performance of the PV solar plant Size: 7 MWp, fix/2-axis installation  ABB scope: • Supply: DC & AC cabinets, unit transformers, Customer: GA Solar switchgears, equipment housing, system optimization, Scope: EPC control, SCADA, substation • Installation, ground & civil works: inverters, structures, Year of commissioning: DC & AC cabinets, transformers, switchgears, cabling,  EPC: 2010 equipment housing, system optimization, control, SCADA, substation, fencing, security system, PV modules • Partner scope: PV modules (supply) © ABB Group May 16, 2012 | Slide 109

Editor's Notes

  1. 17’000 TWh/a, the world energy demand in 2005.
  2. Note the conservative assumptions in this model: for gas boilers only fuel was calculated on a pipeline price level
  3. The III-V triple-junction solar cellsWith control over the entire system, GreenVolts ™ has been able to improve function, aesthetics, and economics. The design has been streamlined and engineered for better performance, quicker installation, and easier maintenance.
  4. fully integrated system, optimized for high efficiency and reliabili