Mohamed Sherif Abaza is a senior architect with over 8 years of experience in architectural design and project management. He has expertise in CAD and BIM software like Revit. Some of his responsibilities include preparing architectural drawings, coordinating with other disciplines, and supervising construction projects. He has managed a variety of project types including hotels, offices, airports, and residential buildings. He is fluent in English and Arabic and holds a BSc in Architectural Engineering from the Arab Academy for Science and Technology.
Document for comment
Stakeholder Forum for the CIC BIM Standards
https://www.eventbrite.hk/e/stakeholder-forum-for-the-cic-bim-standards-registration-12014719349
Waleed moustafa alexandria-head of structural departmentWaleed Moustafa
An accomplished civil/structural engineer with 29+ years of diversified experience in handling high end projects with specific proficiency in project /construction management, structural design consultancy, building contracting services and strategic planning. Track record for solving complex structural integrity and design problems; delivering timely solutions to clients. Seeking a senior level position with a fast-paced growth oriented consultancy/construction firm to contribute accrued skills in augmenting profits and achieving organizational objectives.
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
Document for comment
Stakeholder Forum for the CIC BIM Standards
https://www.eventbrite.hk/e/stakeholder-forum-for-the-cic-bim-standards-registration-12014719349
Waleed moustafa alexandria-head of structural departmentWaleed Moustafa
An accomplished civil/structural engineer with 29+ years of diversified experience in handling high end projects with specific proficiency in project /construction management, structural design consultancy, building contracting services and strategic planning. Track record for solving complex structural integrity and design problems; delivering timely solutions to clients. Seeking a senior level position with a fast-paced growth oriented consultancy/construction firm to contribute accrued skills in augmenting profits and achieving organizational objectives.
BIM Execution Plan (BEP) helps to define a foundational framework to ensure successful deployment of advanced design technologies on our BIM-enabled project.
Property Name: Broward County Judicial Complex (BCJC) Midrise Office
Location: 540 SE 3rd Avenue, Fort Lauderdale, Florida
Project Type: Full Renovation
Sector: Government
Services Rendered: Architectural Designing
Property Owner: Broward County
LEED Certification: GOLD
BIM ROLES AND RESPONSIBLITIES DURING CONSTRUCTION:
The Architecture/Engineering (A/E) design team will develop LOD 300 BIM models during the bidding/permitting phase to incorporate County comments, permitting comments, pre-construction RFI’s, and any coordination changes prior to construction.
The construction team (GC) shall work with Owner and design team to develop the Virtual design & Construction (VDC) plan based on BEP version 3.5 for implementation during construction, to include BIM uses such as: 3D Coordination (clash detection), Phase Planning (4D Modeling), Digital Fabrication, Cost Estimation (quantity take-offs), Existing Conditions Modeling, Space Management and Tracking, and COBie information input into Revit models.
Latest Revit models shall be provided to the GC after permits are approved and at issuance of Notice to Proceed 1 to GC, for development of the LOD 350/400/500 models (shop drawings) as defined by BIM forum and as required by County.
Not all items may need to be developed to LOD 350/400. GC shall coordinate with County and develop MEP-FP, Architectural & Structural items to LOD level required for each discipline as directed by County.
Once construction begins, the GC shall be responsible for all LOD 350/400/500 Revit model developments and any changes to COBie data based on field verification, constructability, final product selection & installation.
The GC shall use BIM 360 Field for the gathering of COBie field data from Construction Manager/ Superintendent and all sub-contractors in order to integrate all information into the BIM models throughout construction.
GC shall review subcontractors BIM proficiency and qualifications.
For instances where drawing modifications are required from A/E team to provide sketches, Supplemental Instructions, etc.
Construction team (GC) shall be responsible to provide a location and access for the upload/ download of the latest Revit models by A/E teams to add information, answer RFI’s, etc. Construction team (GC) shall keep daily backups of all models. Should the GC give ownership of the same model to multiple subcontractors, the GC shall be responsible for organizing and merging all new information into one model including, but not limited to: shop drawing sheets, views, updated Revit components, COBie information, etc.
At the end of construction phase, the GC shall provide as-built full size drawings and PDFs and transfer the latest Revit models to the A/E team for Review.
Alberto is an experienced architectural designer with specific expertise in 3D modeling, schematics, and rendering.
He is an innovative and detail-oriented team player with exceptional collaboration and communication skills.
Alberto's dynamic capabilities and competencies have been attested to as a team leader of the winners of a Puerto-Rico based design challenge, as well as the winner of a sculpture design competition, Canstruction NYC. Alberto aims to continue developing his passion towards the materialization of ideas through a concept-based approach that explores and manifests the relationships between space, movement, and structure.
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Sewell Construction
Partners shared BIM lessons learned to date on the University of Hull's £30 million student accommodation complex.
The project will see six new accommodation blocks, housing 560 students, open in 2016.
A new protocol for Building Information Modelling (BIM) has been followed from the outset of the project, which saw developers Sewell Construction start on site in June.
BIM already sees collaboration and information shared between engineers, clients, architects and contractors in a 3D format and is widely used within the construction industry, however, the Government will mandate BIM Level 2 for all centrally-procured government contracts from April 2016.
Using these new guidelines on the university site means designs and briefs for the project have been more thorough than ever before, providing further cost and quality assurance for the university.
It also includes looking at the whole life of the building and ensuring facilities management plans are in place from the start, reducing variance in design.
Estates staff from the University of Hull along with project partners from Sewell Construction, ARUP, SES, GSS Architecture and Planon have shared their findings of a pragmatic approach to BIM Level 2 to date with University estates teams from across the Yorkshire region, in a bespoke event at the Hull campus.
2nd Qatar BIM User Day Design TechnologyBIM User Day
Speaker: Alan Lemont, Bentley Systems
-What do BIM technologies do for design culture?
-Is it evolutionary or revolutionary for design?
About the Qatar BIM User Day:
Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday
GRAPHISOFT have announced details of their latest model based system and award winning BIM authoring tool, ARCHICAD 21 Teamwork.
Innovative workflows, Intuitiveness and performance have been the key differentiators to other architectural tools on the market and the latest version does not buck this trend. ARCHICAD 21 Teamwork introduces new stair and railing tools, updated ‘world class’ rendering, collision detection and enhancements to OPEN BIM workflows.
For further information please visit www.applecoredesigns.co.uk
BIM has been great at automating documentation of the design intent of architects. ARCHICAD 21 makes a huge step forward with making the BIM tool an active part of the design process itself introducing improvements both to its core design processes as well as its multidisciplinary workflows.
5th Qatar BIM User Day, Understanding stakeholder roles in BIMBIM User Day
Author: Mohammad Obaidullah | Qatar Design Consortium
Content:
- Importance of client interests and involvements
- BIM – an adoption curve
- Case study – Walk through Qatar’s 2022 Al-Bayt Stadium (Al Khor)
About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
All text that is green is for illustrative purposes only and should not be construed as formalized responses to this execution plan. The text can and should be modified to suit the needs of the organization filling out the template.
Alberto is an experienced architectural designer with specific expertise in 3D modeling, schematics, and rendering.
He is an innovative and detail-oriented team player with exceptional collaboration and communication skills.
Alberto's dynamic capabilities and competencies have been attested to as a team leader of the winners of a Puerto-Rico based design challenge, as well as the winner of a sculpture design competition, Canstruction NYC. Alberto aims to continue developing his passion towards the materialization of ideas through a concept-based approach that explores and manifests the relationships between space, movement, and structure.
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Sewell Construction
Partners shared BIM lessons learned to date on the University of Hull's £30 million student accommodation complex.
The project will see six new accommodation blocks, housing 560 students, open in 2016.
A new protocol for Building Information Modelling (BIM) has been followed from the outset of the project, which saw developers Sewell Construction start on site in June.
BIM already sees collaboration and information shared between engineers, clients, architects and contractors in a 3D format and is widely used within the construction industry, however, the Government will mandate BIM Level 2 for all centrally-procured government contracts from April 2016.
Using these new guidelines on the university site means designs and briefs for the project have been more thorough than ever before, providing further cost and quality assurance for the university.
It also includes looking at the whole life of the building and ensuring facilities management plans are in place from the start, reducing variance in design.
Estates staff from the University of Hull along with project partners from Sewell Construction, ARUP, SES, GSS Architecture and Planon have shared their findings of a pragmatic approach to BIM Level 2 to date with University estates teams from across the Yorkshire region, in a bespoke event at the Hull campus.
2nd Qatar BIM User Day Design TechnologyBIM User Day
Speaker: Alan Lemont, Bentley Systems
-What do BIM technologies do for design culture?
-Is it evolutionary or revolutionary for design?
About the Qatar BIM User Day:
Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday
GRAPHISOFT have announced details of their latest model based system and award winning BIM authoring tool, ARCHICAD 21 Teamwork.
Innovative workflows, Intuitiveness and performance have been the key differentiators to other architectural tools on the market and the latest version does not buck this trend. ARCHICAD 21 Teamwork introduces new stair and railing tools, updated ‘world class’ rendering, collision detection and enhancements to OPEN BIM workflows.
For further information please visit www.applecoredesigns.co.uk
BIM has been great at automating documentation of the design intent of architects. ARCHICAD 21 makes a huge step forward with making the BIM tool an active part of the design process itself introducing improvements both to its core design processes as well as its multidisciplinary workflows.
5th Qatar BIM User Day, Understanding stakeholder roles in BIMBIM User Day
Author: Mohammad Obaidullah | Qatar Design Consortium
Content:
- Importance of client interests and involvements
- BIM – an adoption curve
- Case study – Walk through Qatar’s 2022 Al-Bayt Stadium (Al Khor)
About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
All text that is green is for illustrative purposes only and should not be construed as formalized responses to this execution plan. The text can and should be modified to suit the needs of the organization filling out the template.
BEST REVIT ARCHITECTURE COURSE-BURRAQ ENGINEERING SOLUTIONS.pdfirfanakram32
If you want to learn Revit Architecture Training Courses, Burraq Engineering Solutions is an Engineering institute that provides the best Online and Physical Revit Architecture Course in Lahore. You can learn more about Engineering Courses from Burraq Engineering Solutions. Revit Architecture Training Courses is best for Engineering and AutoCAD students. Online and Physical classes are available.
1. MOHAMED SHERIF ABAZA SENIOR ARCHITECT
Page 1 of 3
Over eight years’ experience in preparing architectural detail design drawings using both CAD and BIM Revit software;
identifying functional and spatial requirements, and preparing information regarding architectural planning; applying
knowledge of design, specifications, materials and color; plan layout of project and integrate engineering elements
into unified design; preparing scaled drawings and contract documents for building contractors; coordination with
other departments; preparing bill of quantities; supervise construction projects and co‐ordinate, monitor and inspect
work done by others for a wide range of projects including residential buildings, office buildings, social and sporting
clubs, airports, warehouses, workshops and recreational areas.
SKILLS & AREA OF EXPERTIES:
Design development
Tender package issue
Hardware study
Bill of quantity
Estimating project man hours
Building code application
Working details
BIM and CAD coordinator
Site support
Problem solving
Leadership
EXPERIENCE
ECG Engineering Consultants Group (www.ecgsa.com) has a 46 years track record offering a wide range of design
and construction consultancy services covering all major fields of engineering.
Senior Architect (2010 – present)
Selected Achievements
•Member of the technical advisors team: One of the committee responsible the department CAD standard and
BIM coordination.
•Review building fire safety strategy according to each country standard code of safety.
•One of the interviewers committee.
•Team leadership, leading a team of senior and junior architects.
•Project engineer; projects coordination, disseminating information to all concerned parties and ensuring
mutual understanding and agreement on all project phases.
•Coordination between architectural and other disciplines ensuring high accuracy and project efficiency while
producing timely results.
•As a Senior Architect, I was involved in the following projects:
Porto Agadir – Design Services of Phase 1, Morocco. The project consists of 130 rooms hotel with a BUA of
14,329m2
, commercial areas with BUA of 6,731m2
and apartments with BUA of 68,110m2
. (Using BIM Revit
software).
SARB Field Development – Zirku Island, UAE. The project comprised the facilities related to SARB oil field on
Zirku Island. (Using AutoCAD software).
Al Waha Village – Building Works, KSA. The first phase of village 1 which is approximately 18 Ha comprising of
775 units of total BUA 129,000m2
covering both single and multiple types. The work has to follow a fast track
basis to serve the increasing demand on middle‐income housing at KAEC. (Using BIM Revit software).
2. MOHAMED SHERIF ABAZA SENIOR ARCHITECT
Page 2 of 3
Emal Administrative Complex, UAE. Administrative complex to be built on a plot area of 68,000m2
comprised
of 12 buildings in the UAE. (Using AutoCAD software).
Cairo International Medical City, Egypt. On a land area of 138,258m2
, the medical city includes the main
hospital building, hotel, a wellness resort, a health club, a medical mall and staff accommodation units. ECG
scope encompasses the design and detailing for the hospital’s main building. (Using BIM Revit software).
Horus New Pharmaceutical plant, Egypt. Complete design and engineering for a new pharmaceutical factory
of Eva Pharma, 6th
of October. (using AutoCAD software).
Borg El Arab International Airport Terminal, Egypt. The project comprised Taxiway – 500m and 3,200m;
Apron – 15 aircrafts parking spots; PTB with 30,000m2
floor area, in addition to design and supervision of 3
additional boarding bridges. (Using AutoCAD software).
Cairo New International Airport – new Seasonal Flights Terminal Building, Egypt. A terminal building to serve
the Egyptian pilgrims with 1200 one way peak hour passengers, it was considered a fast track project. (Using
AutoCAD software).
Renovation of Cairo International airport – Terminal Building 2, Egypt. The terminal building circulation was
completely modified to accommodate the 7.5 million passengers per year. (Using AutoCAD software).
Villas and Town Houses – Marasi Sidi Abdel Rahman, Egypt. Marassi’s model homes feature two kinds of
villas. Unique features including state‐of‐the‐art kitchens with elegant cabinetry, living spaces with high
ceilings. (Using AutoCAD software).
Cairo and Alexandria Stock Exchange Office Building, Smart Village, Egypt. (Using AutoCAD software).
Retail Building – Zone 1 – City Gate New Cairo, Egypt. A retail area of 190,000m2
, the project includes 300
residential apartments, a cinema complex, hypermarket, 15 anchors and 340 inline shops; ECG has used the
Revit BIM package throughout the design process. (Using BIM Revit software).
Junior Architect (2007 – 2010)
Selected Achievements
• Implementation of specific architectural works in accordance with the project’s work program.
• Assisting with the preparation of design and competition reports, schemes, bill of quantities, etc.
• Carrying out architectural detailed design drawings, tender documents and construction documents.
• As a Junior Architect, I was involved in the following projects:
Smart Village Shopping Center, Egypt. (Using AutoCAD software).
Two Office Building at Smart Village, Egypt. A Zaha Hadid design. Our tasks were to co‐ordinate with the
other disciplines and develop the construction documents. (Using AutoCAD software).
Madinaty Water Park, Egypt. A large water attraction with a total site area of forty acres. (Using AutoCAD
software).
3. MOHAMED SHERIF ABAZA SENIOR ARCHITECT
Page 3 of 3
Sphinx Real Estate Administration Building, Egypt. An office building comprising two basement floors, ground
and three typical floors. (Using AutoCAD software).
Al Duqm International Airport, Sultanate Oman. (Using AutoCAD software).
Madinaty Sporting Club, Egypt. Total gross area of 450,000m2
, the club consists of three parts; academic
sector, sporting sector and social sector. (Using AutoCAD software).
Renovation of Mena House Oberoi golf course, Egypt. (Using AutoCAD software).
Mall of Arabia – 6th
of October, Egypt. The mall is one of the city’s largest retail centers, unfolding a
contemporary architectural style, the mall is an organic spine arcade wrapped around an open‐air plaza.
(Using AutoCAD software).
Cairo Festival City, Egypt. (Using AutoCAD software).
EDUCATION AND PROFESSIONAL QUALIFICATIONS
B.Sc. in Architectural Engineering & Environmental Design, Arab Academy for Science and Technology (AAST),
Egypt, 2007. With a GPA: 3.32. Recognized by the RIBA (Royal Institute of British Architects) Part 1.
International General Certificate of Secondary Education (I.G.C.S.E.) from Cambridge.
Computer skills
o Autodesk AutoCAD.
o Autodesk Revit.
o Microsoft Office: Excel, Word, PowerPoint and Outlook.
Languages
o Arabic native language.
o English fluent (reading/writing/speaking).
Member of the Egyptian Syndicate of Engineers.
PERSONAL INFORMATION
• Marital Status: Widowed with one kid.
• Nationality: Egyptian.
• Date of birth: February 20th
, 1983.
• Contact information: Email: Mohamed.Sh.Abaza@gmail.com
Mobile: +20 100 180 4067
• Personal skills: Handcrafts and mind puzzles.