The Curb-Tec crew installed a 1700m long temporary water barrier in Plock, Poland over 37 hours to prevent excess water from killing grass along a road during construction. Unlike a permanent curb, this barrier did not require trenching, rebar, or adhesive as it would later be removed. The crew used a rounded 15x15cm mold and minimal finishing since it was a temporary structure.
The Cornwall Agri-food Council in partnership with PKF Francis Clark and the Cornwall and Isles of Scilly Local Enterprise Partnership are delighted to invite you to this seminar, which aims to help you navigate the world of grant funding. A range of support is available to farmers, food processors, forestry businesses, rural businesses and community and voluntary organisations in 2017 and the panel of speakers will guide you through the options available.
For understand the quality in construction work.
For learn about estimating process of cast in situ pile.
For Know the construction procedure of cast in situ pile.
For cheek the preferable condition of cast in situ pile.
For know the construction materials type of cast in situ pile.
IUBAT
IUBAT- International University of Business Agriculture and Technology.
The Cornwall Agri-food Council in partnership with PKF Francis Clark and the Cornwall and Isles of Scilly Local Enterprise Partnership are delighted to invite you to this seminar, which aims to help you navigate the world of grant funding. A range of support is available to farmers, food processors, forestry businesses, rural businesses and community and voluntary organisations in 2017 and the panel of speakers will guide you through the options available.
For understand the quality in construction work.
For learn about estimating process of cast in situ pile.
For Know the construction procedure of cast in situ pile.
For cheek the preferable condition of cast in situ pile.
For know the construction materials type of cast in situ pile.
IUBAT
IUBAT- International University of Business Agriculture and Technology.
Final Presentation Of Internship (Muğla Sıtkı Koçman University)Barış Emre Özçelik
Internship at POLİKAY Atık Yönetimi Gaz Mühendislik ve İnşaat San. ve Tic.Ltd.Şti.
Water Tank Building,concrete road, drainage’s place, storage area, wheel vehicle washing building, weighbridge for tractors are was built in Muğla.
CT-3000 Demo for Warsaw ZDM, One Year On, May 2011Chris Hutchinson
We showcased the CT-3000 on one of Warsaw's main streets for the local road authorities (ZDM) one year ago. They were impressed with the speed and looked forward to seeing the curb one year later after going through a Warsaw winter before fully accepting extrusion curbing on city projects. We periodically checked the curb and it held up fine. We look forward to discussing future possibilities with ZDM now that our extrusion method has proven reliable, less time-consuming and therefore less expensive. We're very excited about upcoming prospects!!!
CT-3000 Demo for Warsaw Local Road Authorities (ZDM), May 2010Chris Hutchinson
We showcased the CT-3000 on one of Warsaw's main streets for the local road authorities (ZDM) one year ago today. They were impressed with the speed and looked forward to seeing the curb one year later after going through a Warsaw winter before fully accepting extrusion curbing on city projects. We have been periodically checking the curb and it's been holding up fine. We look forward to discussing future possibilities with ZDM and will post another slideshow with more photos as soon as possible.
Curb-Tec Europe did a demonstration for guests from Estonia on 18 Mar. The CT-3000 small extrusion curb machine was used to pour a curb over 6 cm tall horizontal rebar. Despite having a less-than-inspiring experience with another manufacturer`s machine, the owners of Betoontoode and Tasandusvalu were pleasantly surprised with the performance of the CT-3000, especially the relationship between the quality of the curb and the simplicity of the machine. Discussions are underway regarding them buying a CT-3000 to be used for a project in Finland calling for rebar.
Curb-Tec Europe did a demonstration for guests from Estonia on 18 Mar. The CT-3000 small extrusion curb machine was used to pour a curb over 6 cm tall horizontal rebar. Despite having a less-than-inspiring experience with another manufacturer`s machine, the owners of Betoontoode and Tasandusvalu were pleasantly surprised with the performance of the CT-3000, especially the relationship between the quality of the curb and the simplicity of the machine. Discussions are underway regarding them buying a CT-3000 to be used for a project in Finland calling for rebar.
Slip Form Machine Presentation for General Directorate for Polish National Ro...Chris Hutchinson
This was part of a presentation we did for General Directorate for Polish National Roads and Highways (GDDKiA) to promote the pour-in-place curbing method using both extrusion and slip form machines of different sizes. This part of the presentation was done by Mr. Irzyniec of Dynapac Poland, who we have a very close working relationship with.
Pour-in-Place Curb Machine Presentation for General Directorate for Polish Na...Chris Hutchinson
This was part of a presentation we did for General Directorate for Polish National Roads and Highways (GDDKiA) to promote the pour-in-place curbing method using both extrusion and slip form machines of different sizes. We did this presentation along with Dynapac Poland, who we have a very close working relationship with.
2. Date: July 16-18, 2007 Place: Plock, PL Number of People: 5 (3 first day) Total Length: 1700 m Time on Jobsite: 37 hours Actual Time: 15 hours This job was to make a water barrier to keep an excess of water from killing the grass alongside and near the road. The water barrier is not intended to be there when the road opens. Therefore, there’s no trench, no rebar, no glue put down first, the mixture is not exactly the same as usual and finishing was minimal. We used a 15X15 cm rounded mold.
3. Budimex-Dromex had most of the edges cleared so preparation consisted only of sweeping the sides to ensure it was free of rocks, etc. as well as putting a chalk line (we didn’t put one in one stretch due to the edge being straight enough to use as a guide) 1
4. Initial part of water barrier, edges would be trimmed on permanent curb 2
5. Initial part of water barrier, edges would be trimmed on permanent curb 3