The Curb-Tec crew installed a 1700m long temporary water barrier in Plock, Poland over 37 hours to prevent excess water from killing grass along a road during construction. Unlike a permanent curb, this barrier did not require trenching, rebar, or adhesive as it would later be removed. The crew used a rounded 15x15cm mold and minimal finishing since it was a temporary structure.