SlideShare a Scribd company logo
1 of 10
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 1 of 10
Document
Name
TRX Path-Balance Check SOP Guideline V1.00
Version V1.00 Effective Date 2010-07-31
Document
Code
L1
Based eTOM
PreparedBy L2
Based eTOM
Reviewed By L3
Based eTOM
Approved By L4
Based eTOM
Applicability Global
Standard
Roles
Analysis engineer
Relevant Process/Regulation
Document Name Document Code
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 2 of 10
Contents
Relevant Process/Regulation................................................................ 1
1 Abstract.............................................................................. 3
2 Purpose............................................................................... 3
Operating Instructions.................................................................... 4
2.1 Link Balance Equations: .......................................................... 4
2.2 Counters used for path-balance Judgment .......................................... 4
2.3 Judgment Criteria ................................................................ 6
2.4 Normal Trend for Path-Balance .................................................... 6
2.5 Weak DL Trend for Path-Balance ................................................... 7
2.6 Weak UL Trend for Path-Balance ................................................... 8
2.7 Misleading Case for Path-Balance ................................................. 9
3 Appendix............................................................................. 10
4 Support Document(s).................................................................. 10
5 Related Document(s).................................................................. 10
6 Record Retention..................................................................... 10
7 Document Preparation/Modification Record............................................. 10
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 3 of 10
1 Abstract
This documentinstructs engineers how to perform the Base Band Hopping audit.
2 Purpose
This documentaims to standardize the operation procedure of Path-Balance Judgment
1. Linkbalance Equations
2. Countersusedforpath-balance Judgment
3. JudgmentCriteria
4. Normal Balance Trend
5. WeakUL Trend
6. WeakDL Trend
7. MisleadingCase
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 4 of 10
Operating Instructions
2.1 Link Balance Equations:
 UL/DL Path balance difference = UL path loss - DL path loss = (MS real transmit
power-UL Rx_Lev) - (BTS cabinet output power-DL Rx_Lev).
 BTS cabinet output power=TRX power-static power class*2 + Power fine tuning -
Combiner loss - DL dynamic PC level*2 + dynamic PBT gain
2.2 Counters used for path-balance Judgment
The below counters define the balance status of the TRX into 11 levels and the balance should be around
level 6
 The levelsbelowlevel 6indicatesthe statusof the UL
 The levelsabove level 6indicatesthe statusof the DL
 Level 1 Indicatesthatthe UL > DL by 15
 Level 1 Indicatesthatthe DL > UL by 15
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 5 of 10
BSC 6900 TRX Level Balance Counters
UL/DL Path-balance
Diffrence Comment
S462A:Number of MRs (Uplink-and-Downlink Balance Level = 1)(none) X <= -15 UL > DL
S462B:Number of MRs (Uplink-and-Downlink Balance Level = 2)(none) -14 < x < -11 UL > DL
S462C:Number of MRs (Uplink-and-Downlink Balance Level = 3)(none) -10 < x < -8 UL > DL
S462D:Number of MRs (Uplink-and-Downlink Balance Level = 4)(none) -7 < x < -5 UL > DL
S462E:Number of MRs (Uplink-and-Downlink Balance Level = 5)(none) -4 < x < -2 UL > DL
S462F:Number of MRs (Uplink-and-Downlink Balance Level = 6)(none) -1 < x < 1 Balance
S462G:Number of MRs (Uplink-and-Downlink Balance Level =
7)(none) 2 < x < 4 DL > UL
S462H:Number of MRs (Uplink-and-Downlink Balance Level = 8)(none) 5 < x < 7 DL > UL
S462I:Number of MRs (Uplink-and-Downlink Balance Level = 9)(none) 8 < x < 10 DL > UL
S462J:Number of MRs (Uplink-and-Downlink Balance Level =
10)(none) 11 < x < 14 DL > UL
S462K:Number of MRs (Uplink-and-Downlink Balance Level =
11)(none) X => 15 DL > UL
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 6 of 10
2.3 Judgment Criteria
The criteriausedto judge if the TRX isBalance or not is as following:
1- `Shape of the graph shouldbe centeredonLevel 6
2- Sumof Levels(1+ 2) shouldbe Less Than 20 % fromthe total value of Levels1to 11 (aroundthe
20 %)
3- Sumof Levels(10+ 11) shouldbe LessThan 25 % fromthe total value of Levels1 to 11 (aroundthe
25 %)
2.4 Normal Trend for Path-Balance
The Normal Trend of the balance meansthat the measurementshouldbe aroundlevel 6as shownbelow
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 7 of 10
2.5 Weak DL Trend for Path-Balance
Weak DL means that the measurement of the UL Level counters is higher than the DL counters (Levels 1+2
isHigherthan 20 % fromthe total Measurement)
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 8 of 10
2.6 Weak UL Trend for Path-Balance
Weak DL means that the measurement of the DL Level counters is higher than the UL counters (Levels
10+11 is Higherthan25 %from the total Measurement)
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 9 of 10
2.7 Misleading Case for Path-Balance
In the below case the measurement of Levels 10+11 is 22% which is good and accepted but from the TRX
chart we can see thatthe TRX suffersfromWeak-ULstatus as shownbelow
So the conclusionfromthiscase isthat:
1- Percentage isjustanindicationtodetermine the worstcases
2- The judgmentmustbe done forcase by case speciallyforthe TRXswithpercentage around20% for
bothUL/DL indicators(Levels1+2or Level 10+11)
TRX Path-Balance Check Confidentiality:
2015-06-23 Huawei Confidential Page 10 of 10
3 Appendix
Not Required
4 Support Document(s)
No. Document name Document code
1.
5 Related Document(s)
Front-end and Back-end Document name Document Code
6 Record Retention
Record
Name
Hand over
Owner
Retention
Owner
Retention
Location
Filing Date Retention
Period
Disposition at
Expiry
Problem
escalation
(GCRMS)
7 Document Preparation/Modification Record
(Manda tory)
Version
Prepared/Modified
By
Preparation/Modification
Date
Content/Reason for Modification
Approved
By
V1.00 Mostafa Ibrahim
701891
(Egypt 3rd
licence)
2010.8.31 New Version Zhu
yongsheng
108866

More Related Content

Viewers also liked

Inventory control
Inventory controlInventory control
Inventory control
Farjana2
 
Aku sekuntum bunga_raya
Aku sekuntum bunga_rayaAku sekuntum bunga_raya
Aku sekuntum bunga_raya
chiengsuiyien
 
Alexander Kremnev Инвестиционные идеи. Ставка на падение австралийского доллара
 Alexander Kremnev Инвестиционные идеи. Ставка на падение австралийского доллара Alexander Kremnev Инвестиционные идеи. Ставка на падение австралийского доллара
Alexander Kremnev Инвестиционные идеи. Ставка на падение австралийского доллара
Alexander Kremnev
 
Pelle Aardema, IATI 3 oktober PARTOS
Pelle Aardema, IATI 3 oktober PARTOSPelle Aardema, IATI 3 oktober PARTOS
Pelle Aardema, IATI 3 oktober PARTOS
Jasper Middendorp
 

Viewers also liked (14)

Inventory control
Inventory controlInventory control
Inventory control
 
Desenvolvimento de função se37
Desenvolvimento de função se37Desenvolvimento de função se37
Desenvolvimento de função se37
 
Aku sekuntum bunga_raya
Aku sekuntum bunga_rayaAku sekuntum bunga_raya
Aku sekuntum bunga_raya
 
4 g
4 g4 g
4 g
 
Chris Beeby - Project Portfolio
Chris Beeby - Project PortfolioChris Beeby - Project Portfolio
Chris Beeby - Project Portfolio
 
PRO27_HIDGlobal_EP2
PRO27_HIDGlobal_EP2PRO27_HIDGlobal_EP2
PRO27_HIDGlobal_EP2
 
DESARROLLO PROYECTUAL ARQUITECTONICO
DESARROLLO PROYECTUAL ARQUITECTONICODESARROLLO PROYECTUAL ARQUITECTONICO
DESARROLLO PROYECTUAL ARQUITECTONICO
 
Cordaid opening up caroline kroon
Cordaid opening up   caroline kroonCordaid opening up   caroline kroon
Cordaid opening up caroline kroon
 
C3 hop kim va gian do pha
C3 hop kim va gian do phaC3 hop kim va gian do pha
C3 hop kim va gian do pha
 
Joni hillman
Joni hillmanJoni hillman
Joni hillman
 
Alexander Kremnev Инвестиционные идеи. Ставка на падение австралийского доллара
 Alexander Kremnev Инвестиционные идеи. Ставка на падение австралийского доллара Alexander Kremnev Инвестиционные идеи. Ставка на падение австралийского доллара
Alexander Kremnev Инвестиционные идеи. Ставка на падение австралийского доллара
 
Sanynovak.sk
Sanynovak.skSanynovak.sk
Sanynovak.sk
 
Bill anderson
Bill andersonBill anderson
Bill anderson
 
Pelle Aardema, IATI 3 oktober PARTOS
Pelle Aardema, IATI 3 oktober PARTOSPelle Aardema, IATI 3 oktober PARTOS
Pelle Aardema, IATI 3 oktober PARTOS
 

Similar to 85171230 trx-path-balance-check-v1-00

ESD_05_ARM_Instructions set for preparation
ESD_05_ARM_Instructions set for preparationESD_05_ARM_Instructions set for preparation
ESD_05_ARM_Instructions set for preparation
ssuser026e94
 
4.oeo000040 lte traffic fault diagnosis issue 1
4.oeo000040 lte traffic fault diagnosis issue 14.oeo000040 lte traffic fault diagnosis issue 1
4.oeo000040 lte traffic fault diagnosis issue 1
Klajdi Husi
 
HACKING THE BRAIN: Customize Evil Protocol to Pwn an SDN Controller
HACKING THE BRAIN: Customize Evil Protocol to Pwn an SDN ControllerHACKING THE BRAIN: Customize Evil Protocol to Pwn an SDN Controller
HACKING THE BRAIN: Customize Evil Protocol to Pwn an SDN Controller
Priyanka Aash
 

Similar to 85171230 trx-path-balance-check-v1-00 (14)

ESD_05_ARM_Instructions set for preparation
ESD_05_ARM_Instructions set for preparationESD_05_ARM_Instructions set for preparation
ESD_05_ARM_Instructions set for preparation
 
topqualityvoice.pptx
topqualityvoice.pptxtopqualityvoice.pptx
topqualityvoice.pptx
 
ARMInst.ppt
ARMInst.pptARMInst.ppt
ARMInst.ppt
 
ARMInst.ppt
ARMInst.pptARMInst.ppt
ARMInst.ppt
 
Ke2 e
Ke2 eKe2 e
Ke2 e
 
SoftQL - Telecom Triage Services
SoftQL - Telecom Triage Services SoftQL - Telecom Triage Services
SoftQL - Telecom Triage Services
 
Synthese
SyntheseSynthese
Synthese
 
Error Detection And Correction
Error Detection And CorrectionError Detection And Correction
Error Detection And Correction
 
4.oeo000040 lte traffic fault diagnosis issue 1
4.oeo000040 lte traffic fault diagnosis issue 14.oeo000040 lte traffic fault diagnosis issue 1
4.oeo000040 lte traffic fault diagnosis issue 1
 
Fuzzy logic
Fuzzy logicFuzzy logic
Fuzzy logic
 
Introduction to Fuzzy Logic in Networks
Introduction to Fuzzy Logic in NetworksIntroduction to Fuzzy Logic in Networks
Introduction to Fuzzy Logic in Networks
 
Compiler Construction | Lecture 10 | Data-Flow Analysis
Compiler Construction | Lecture 10 | Data-Flow AnalysisCompiler Construction | Lecture 10 | Data-Flow Analysis
Compiler Construction | Lecture 10 | Data-Flow Analysis
 
HACKING THE BRAIN: Customize Evil Protocol to Pwn an SDN Controller
HACKING THE BRAIN: Customize Evil Protocol to Pwn an SDN ControllerHACKING THE BRAIN: Customize Evil Protocol to Pwn an SDN Controller
HACKING THE BRAIN: Customize Evil Protocol to Pwn an SDN Controller
 
__MESA presentation,Profitable Adaptive Trading Systems.ppt
__MESA presentation,Profitable Adaptive Trading Systems.ppt__MESA presentation,Profitable Adaptive Trading Systems.ppt
__MESA presentation,Profitable Adaptive Trading Systems.ppt
 

Recently uploaded

Obat Penggugur Kandungan Di Apotik Kimia Farma (087776558899)
Obat Penggugur Kandungan Di Apotik Kimia Farma (087776558899)Obat Penggugur Kandungan Di Apotik Kimia Farma (087776558899)
Obat Penggugur Kandungan Di Apotik Kimia Farma (087776558899)
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (8)

Android Application Components with Implementation & Examples
Android Application Components with Implementation & ExamplesAndroid Application Components with Implementation & Examples
Android Application Components with Implementation & Examples
 
9999266834 Call Girls In Noida Sector 52 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 52 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 52 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 52 (Delhi) Call Girl Service
 
Obat Penggugur Kandungan Di Apotik Kimia Farma (087776558899)
Obat Penggugur Kandungan Di Apotik Kimia Farma (087776558899)Obat Penggugur Kandungan Di Apotik Kimia Farma (087776558899)
Obat Penggugur Kandungan Di Apotik Kimia Farma (087776558899)
 
Mobile Application Development-Android and It’s Tools
Mobile Application Development-Android and It’s ToolsMobile Application Development-Android and It’s Tools
Mobile Application Development-Android and It’s Tools
 
Thane 💋 Call Girls 7738631006 💋 Call Girls in Thane Escort service book now. ...
Thane 💋 Call Girls 7738631006 💋 Call Girls in Thane Escort service book now. ...Thane 💋 Call Girls 7738631006 💋 Call Girls in Thane Escort service book now. ...
Thane 💋 Call Girls 7738631006 💋 Call Girls in Thane Escort service book now. ...
 
Leading Mobile App Development Companies in India (2).pdf
Leading Mobile App Development Companies in India (2).pdfLeading Mobile App Development Companies in India (2).pdf
Leading Mobile App Development Companies in India (2).pdf
 
FULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCR
FULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCRFULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCR
FULL ENJOY - 9999218229 Call Girls in {Mahipalpur}| Delhi NCR
 
Mobile Application Development-Components and Layouts
Mobile Application Development-Components and LayoutsMobile Application Development-Components and Layouts
Mobile Application Development-Components and Layouts
 

85171230 trx-path-balance-check-v1-00

  • 1. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 1 of 10 Document Name TRX Path-Balance Check SOP Guideline V1.00 Version V1.00 Effective Date 2010-07-31 Document Code L1 Based eTOM PreparedBy L2 Based eTOM Reviewed By L3 Based eTOM Approved By L4 Based eTOM Applicability Global Standard Roles Analysis engineer Relevant Process/Regulation Document Name Document Code
  • 2. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 2 of 10 Contents Relevant Process/Regulation................................................................ 1 1 Abstract.............................................................................. 3 2 Purpose............................................................................... 3 Operating Instructions.................................................................... 4 2.1 Link Balance Equations: .......................................................... 4 2.2 Counters used for path-balance Judgment .......................................... 4 2.3 Judgment Criteria ................................................................ 6 2.4 Normal Trend for Path-Balance .................................................... 6 2.5 Weak DL Trend for Path-Balance ................................................... 7 2.6 Weak UL Trend for Path-Balance ................................................... 8 2.7 Misleading Case for Path-Balance ................................................. 9 3 Appendix............................................................................. 10 4 Support Document(s).................................................................. 10 5 Related Document(s).................................................................. 10 6 Record Retention..................................................................... 10 7 Document Preparation/Modification Record............................................. 10
  • 3. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 3 of 10 1 Abstract This documentinstructs engineers how to perform the Base Band Hopping audit. 2 Purpose This documentaims to standardize the operation procedure of Path-Balance Judgment 1. Linkbalance Equations 2. Countersusedforpath-balance Judgment 3. JudgmentCriteria 4. Normal Balance Trend 5. WeakUL Trend 6. WeakDL Trend 7. MisleadingCase
  • 4. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 4 of 10 Operating Instructions 2.1 Link Balance Equations:  UL/DL Path balance difference = UL path loss - DL path loss = (MS real transmit power-UL Rx_Lev) - (BTS cabinet output power-DL Rx_Lev).  BTS cabinet output power=TRX power-static power class*2 + Power fine tuning - Combiner loss - DL dynamic PC level*2 + dynamic PBT gain 2.2 Counters used for path-balance Judgment The below counters define the balance status of the TRX into 11 levels and the balance should be around level 6  The levelsbelowlevel 6indicatesthe statusof the UL  The levelsabove level 6indicatesthe statusof the DL  Level 1 Indicatesthatthe UL > DL by 15  Level 1 Indicatesthatthe DL > UL by 15
  • 5. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 5 of 10 BSC 6900 TRX Level Balance Counters UL/DL Path-balance Diffrence Comment S462A:Number of MRs (Uplink-and-Downlink Balance Level = 1)(none) X <= -15 UL > DL S462B:Number of MRs (Uplink-and-Downlink Balance Level = 2)(none) -14 < x < -11 UL > DL S462C:Number of MRs (Uplink-and-Downlink Balance Level = 3)(none) -10 < x < -8 UL > DL S462D:Number of MRs (Uplink-and-Downlink Balance Level = 4)(none) -7 < x < -5 UL > DL S462E:Number of MRs (Uplink-and-Downlink Balance Level = 5)(none) -4 < x < -2 UL > DL S462F:Number of MRs (Uplink-and-Downlink Balance Level = 6)(none) -1 < x < 1 Balance S462G:Number of MRs (Uplink-and-Downlink Balance Level = 7)(none) 2 < x < 4 DL > UL S462H:Number of MRs (Uplink-and-Downlink Balance Level = 8)(none) 5 < x < 7 DL > UL S462I:Number of MRs (Uplink-and-Downlink Balance Level = 9)(none) 8 < x < 10 DL > UL S462J:Number of MRs (Uplink-and-Downlink Balance Level = 10)(none) 11 < x < 14 DL > UL S462K:Number of MRs (Uplink-and-Downlink Balance Level = 11)(none) X => 15 DL > UL
  • 6. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 6 of 10 2.3 Judgment Criteria The criteriausedto judge if the TRX isBalance or not is as following: 1- `Shape of the graph shouldbe centeredonLevel 6 2- Sumof Levels(1+ 2) shouldbe Less Than 20 % fromthe total value of Levels1to 11 (aroundthe 20 %) 3- Sumof Levels(10+ 11) shouldbe LessThan 25 % fromthe total value of Levels1 to 11 (aroundthe 25 %) 2.4 Normal Trend for Path-Balance The Normal Trend of the balance meansthat the measurementshouldbe aroundlevel 6as shownbelow
  • 7. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 7 of 10 2.5 Weak DL Trend for Path-Balance Weak DL means that the measurement of the UL Level counters is higher than the DL counters (Levels 1+2 isHigherthan 20 % fromthe total Measurement)
  • 8. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 8 of 10 2.6 Weak UL Trend for Path-Balance Weak DL means that the measurement of the DL Level counters is higher than the UL counters (Levels 10+11 is Higherthan25 %from the total Measurement)
  • 9. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 9 of 10 2.7 Misleading Case for Path-Balance In the below case the measurement of Levels 10+11 is 22% which is good and accepted but from the TRX chart we can see thatthe TRX suffersfromWeak-ULstatus as shownbelow So the conclusionfromthiscase isthat: 1- Percentage isjustanindicationtodetermine the worstcases 2- The judgmentmustbe done forcase by case speciallyforthe TRXswithpercentage around20% for bothUL/DL indicators(Levels1+2or Level 10+11)
  • 10. TRX Path-Balance Check Confidentiality: 2015-06-23 Huawei Confidential Page 10 of 10 3 Appendix Not Required 4 Support Document(s) No. Document name Document code 1. 5 Related Document(s) Front-end and Back-end Document name Document Code 6 Record Retention Record Name Hand over Owner Retention Owner Retention Location Filing Date Retention Period Disposition at Expiry Problem escalation (GCRMS) 7 Document Preparation/Modification Record (Manda tory) Version Prepared/Modified By Preparation/Modification Date Content/Reason for Modification Approved By V1.00 Mostafa Ibrahim 701891 (Egypt 3rd licence) 2010.8.31 New Version Zhu yongsheng 108866