SlideShare a Scribd company logo
Chapter 18: 
RCS in Karnataka - Flat 
Primary canal 2 (FPC2) River 
points and Lengths: 
464
Topic series: 449. Topic 1: FPC2 river points: 
FPC2: Bangalore platue: FPC2 will become the main source of water 
for the area of Bangalore platue. 465
Topic series: 449. Topic 1: FPC2 river points: 
S. N.(FPC2 point) (Latitude) (Longitude) 
1(FPC2Start 900) (130034’51.97”N) (750041’43.76”E) 466
Topic series: 449. Topic 1: FPC2 river points: 
2(FPC2T.to Ayyanakere 900) 
(130027’10.31”N) 
(750051’21.55”E) 467
Topic series: 449. Topic 1: FPC2 river points: 
3(FPC2Hagari 900) 
(130014’8.59”N) 
(750056’12.01”E) 468
Topic series: 449. Topic 1: FPC2 river points: 
4(FPC2EE Shimsha 900) 
(130010’40.23”N) 
(760019’11.70”E) 469
Topic series: 449. Topic 1: FPC2 river points: 
5(FPC2EE Arkavathi 900) 
(130015’59.03”N) 
(770033’5.79”E) 470
Topic series: 449. Topic 1: FPC2 river points: 
6(FPC2EE Palar - north end 900) 
(130026’16.11”N) 
(78001’24.60”E) 471
Topic series: 449. Topic 1: FPC2 river points: 
7(FPC2Yagachi 900) 
(120055’54.24”N) 
(76002’24.66”E) 472
Topic series: 449. Topic 1: FPC2 river points: 
8(FPC2Hemavathi 900) 
(120058’15.34”N) 
(750045’58.01”E) 473
Topic series: 449. Topic 1: FPC2 river points: 
9(FPC2Kaveri 900) 
(120022’4.57”N) 
(750030’44.68”E) 474
Topic series: 449. Topic 1: FPC2 river points: 
10(FPC2Lakshmanathreetha 900) 
(12002’35.77”N) 
(76002’50.93”E) 475
Topic series: 449. Topic 1: FPC2 river points: 
11(FPC2Kabini 900) 
(110044’48.39”N) 
(750048’0.37”E) 476
Topic series: 449. Topic 1: FPC2 river points: 
12(FPC2Nugu 900) 
(110038’41.34”N) 
(760024’37.14”E) 477
Topic series: 449. Topic 1: FPC2 river points: 
13(FPC2Suvarnavathi 900) 
(110041’33.60”N) 
(77007’36.24”E) 478
Topic series: 449. Topic 1: FPC2 river points: 
14(FPC2Uduthorehalla 900) 
(110053’2.74”N) 
(770015’37.12”E) 479
Topic series: 449. Topic 1: FPC2 river points: 
15(FPC2Palar south end 900) 
(110053’13.74”N) 
(770017’41.29”E) 480
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
FPC2 Lengths: 
SN. Description. Length in kms 
1.FPC2 Start to T. To Ayyanakere 900. 52.76 kms. 481
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
2.FPC2 T. To Ayyanakere to Hagari 900. 
55.43 482
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
3.FPC2 Hagari to FPC2EE Shimsha 900. 
58.35 483
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
4.FPC2 EE Shimsha to FPC2EE Arkavathi 900. 
191.15 484
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
5.FPC2EE Arkavathi to FPC2EE Palar (North end) 900. 
58.36 485
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
6.FPC2 EE Shimsha to Yagachi 900. 
77.76 486
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
7.FPC2 Yagachi to Hemavathi 900. 
49.80 487
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
8.FPC2 Hemavathi to Kaveri 900. 
196.06 488
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
9.FPC2 Kaveri to Lakshmanathreertha 900. 
98.00 489
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
10.FPC2 Lakshmanathreertha to Kabini 900. 
82.60 490
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
11.FPC2 Kabini to Nugu 900. 
86.33 491
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
12.FPC2 Nugu to Suvarnavathi 900. 
136.00 492
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
13.FPC2 Suvarnavathi to Uduthorehalla 900. 
69.70 493
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
14.FPC2 Uduthorehalla to Palar (South end) 900. 
7.44 494
Total FPC2 CRL Length in Kms is 1219.74 
Total canal length we are going to save with CE, 
215.01 
RE, DCC, BD in Kms. 
Total length of the CE, RE, DCC, BD put 
together in Kms 
11.89 
The Length (Actual) of the probable FPC2 in 
Kms. 
1016.62 
The capacity (Volume) of storable water (with 
the canal width of 200 mts, depth of 25 mts, 
but the maximum level maintained will be 20 
mts) in the FPC2 (4066.48 million cubic meters) 
in TMC. 
150.13 TMC 
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
495
(FPC2 cannot be filled and discharged any 
number of times, unlike FPC1 and FPC4, as 
FPC2 is not having the ‘ever flowing rivers 
as its feeder’. Still, it can provide sufficient 
water to the Bangalore platue in the land 
which lays between ‘900 to 500mts AMSL’, 
because, 
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
496
All the water, which is generated from the river 
Cauvery and the its tributaries will be providing 
water only to the limited area of land between 
900 to 500 mts AMSL, and the area which is 
below 500mts AMSL need not get the water 
from the river Cauvery and its tributaries as they 
will be irrigated by FPC1. 
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
497
The water which is going to be absorbed by the 
ground / percolating in to the ground / the 
water which shifts underground as subsurface 
flow will decrease as the underground water 
will be saturated with water of the FPC1, thus 
‘over the surface’ availability of the water from 
the river Cauvery and its tributaries will 
become more and it will be available for 
irrigation even in summer. 
Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 
498
Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: 
FPC2 – RE, CE, DCC, BD and others are as follows: 
S. N.( FPC2 RE, CE, DCC, BD point) (Latitude) (Longitude) 
FPC2 Hemavathi 900 CE. It is not ideal to do CE distal to the reservoir 
at this place. Think of other possibilities, like doing U tube / aqua duct 
/ CE across River Yagachi and Hemavathi proximal to the reservoir. 499
1(FPC2 Hemavathi 900 CE 
Start) 
(120051’5.84”N) 
(76008’0.47”E) 
2(FPC2 Hemavathi 872CE 
Bottom) 
(120049’8.94”N) 
(76008’13.50”E) 
3(FPC2 Hemavathi 900 CE 
End) 
(120046’20.95”N) 
(76008’31.38”E) 
Length of FPC2 Hemavathi 900 CE: 8.91kms. We 
will save 122.28 Kms of FPC2 creation. 
Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: 
FPC2 Hemavathi 900 CE 
500
Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: 
FPC2 Kaveri 900 RE 
501
1(FPC2 Kaveri 900 RE Start) (120018’15.06”N) 
(750044’41.59”E) 
2(FPC2 Kaveri RE Bottom 
870) 
(120017’17.35”N) 
(750044’28.22”E) 
3(FPC2 Kaveri 900 RE End) (120017’1.09”N) 
(750044’23.17”E) 
Length of FPC2 Kaveri 900 RE 2.31kms. We will save 
60.73Kms of FPC2 creation. 
Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: 
FPC2 Kaveri 900 RE 
502
Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: 
FPC2 Kabini 900 DCC1 
503
1(FPC2 Kabini 900 DCC1 
Start) 
(110041’48.46”N) 
(750056’5.83”E) 
2(FPC2 Kabini DCC1 Top) (110041’44.21”N) 
(750056’3.88”E) 
3(FPC2 Kabini 900 DCC1 
End) 
(110041’36.52”N) 
(750056’19.29”E) 
Length of FPC2 Kabini 900 DCC1: 0.67 kms. We will 
save 32Kms of FPC2 creation. 
Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: 
FPC2 Kabini 900 DCC1 
504

More Related Content

Similar to Interlinking rivers 9 - Interlinking Indian Rivers - Short Presentation 8 - FPC2 (Refer Chapter 18.8)

S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.
S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.
S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.
Shivu P
 
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 - ...
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  ...Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  ...
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 - ...
Shivu P
 
S5c17 chapter 17-flat primary canal (fpc1) – re, ce, dcc, bd and others.
S5c17 chapter 17-flat primary canal (fpc1) – re, ce, dcc, bd and others.S5c17 chapter 17-flat primary canal (fpc1) – re, ce, dcc, bd and others.
S5c17 chapter 17-flat primary canal (fpc1) – re, ce, dcc, bd and others.
Shivu P
 
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
Presentation Fatehpur Substation  TL Final 22.09.2021.pptxPresentation Fatehpur Substation  TL Final 22.09.2021.pptx
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
abhishek357916
 
S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.
S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.
S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.
Shivu P
 
S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.
S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.
S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.
Shivu P
 
S5c13 chapter 13-flat primary canal (fpc1) river points.
S5c13 chapter 13-flat primary canal (fpc1) river points.S5c13 chapter 13-flat primary canal (fpc1) river points.
S5c13 chapter 13-flat primary canal (fpc1) river points.
Shivu P
 
Sor
SorSor
NMML1 Power supply and traction Presentation.pptx
NMML1 Power supply and traction Presentation.pptxNMML1 Power supply and traction Presentation.pptx
NMML1 Power supply and traction Presentation.pptx
aj3456843
 
TL Group Fatehpur.pptx
TL Group Fatehpur.pptxTL Group Fatehpur.pptx
TL Group Fatehpur.pptx
abhishek357916
 
Mvar management
Mvar managementMvar management
Mvar management
vishal laddha
 
Mvar management
Mvar managementMvar management
Mvar management
vishal laddha
 
42 h08nw0011 (copy)
42 h08nw0011 (copy)42 h08nw0011 (copy)
42 h08nw0011 (copy)
RyanPaul Mandel
 
Attachment to KulekhanI–I Hydropower (BEL-069)
Attachment  to KulekhanI–I Hydropower (BEL-069)Attachment  to KulekhanI–I Hydropower (BEL-069)
Attachment to KulekhanI–I Hydropower (BEL-069)
Kabindra Pokharel
 

Similar to Interlinking rivers 9 - Interlinking Indian Rivers - Short Presentation 8 - FPC2 (Refer Chapter 18.8) (14)

S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.
S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.
S5c18 chapter 18-flat primary canal 2 (fpc2) river points and lengths.
 
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 - ...
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  ...Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  ...
Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 - ...
 
S5c17 chapter 17-flat primary canal (fpc1) – re, ce, dcc, bd and others.
S5c17 chapter 17-flat primary canal (fpc1) – re, ce, dcc, bd and others.S5c17 chapter 17-flat primary canal (fpc1) – re, ce, dcc, bd and others.
S5c17 chapter 17-flat primary canal (fpc1) – re, ce, dcc, bd and others.
 
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
Presentation Fatehpur Substation  TL Final 22.09.2021.pptxPresentation Fatehpur Substation  TL Final 22.09.2021.pptx
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
 
S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.
S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.
S5c14 chapter 14-flat primary canal (fpc1) we & ee river points.
 
S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.
S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.
S5c16 chapter 16-flat primary canal (fpc1) we & ee lengths.
 
S5c13 chapter 13-flat primary canal (fpc1) river points.
S5c13 chapter 13-flat primary canal (fpc1) river points.S5c13 chapter 13-flat primary canal (fpc1) river points.
S5c13 chapter 13-flat primary canal (fpc1) river points.
 
Sor
SorSor
Sor
 
NMML1 Power supply and traction Presentation.pptx
NMML1 Power supply and traction Presentation.pptxNMML1 Power supply and traction Presentation.pptx
NMML1 Power supply and traction Presentation.pptx
 
TL Group Fatehpur.pptx
TL Group Fatehpur.pptxTL Group Fatehpur.pptx
TL Group Fatehpur.pptx
 
Mvar management
Mvar managementMvar management
Mvar management
 
Mvar management
Mvar managementMvar management
Mvar management
 
42 h08nw0011 (copy)
42 h08nw0011 (copy)42 h08nw0011 (copy)
42 h08nw0011 (copy)
 
Attachment to KulekhanI–I Hydropower (BEL-069)
Attachment  to KulekhanI–I Hydropower (BEL-069)Attachment  to KulekhanI–I Hydropower (BEL-069)
Attachment to KulekhanI–I Hydropower (BEL-069)
 

More from Shivu P

Impact of Environment on Health of humans
Impact of Environment on Health of humansImpact of Environment on Health of humans
Impact of Environment on Health of humans
Shivu P
 
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Shivu P
 
Save earth
Save earth Save earth
Save earth
Shivu P
 
Sustaining breast feeding together
Sustaining breast feeding togetherSustaining breast feeding together
Sustaining breast feeding together
Shivu P
 
Breast feeding week
Breast feeding weekBreast feeding week
Breast feeding week
Shivu P
 
Method matters in inter linking rivers
Method matters in inter linking rivers  Method matters in inter linking rivers
Method matters in inter linking rivers
Shivu P
 
Summary of the book 'views to make this world developed'
Summary of the book 'views to make this world developed'Summary of the book 'views to make this world developed'
Summary of the book 'views to make this world developed'
Shivu P
 
Preface to this book
Preface to this bookPreface to this book
Preface to this book
Shivu P
 
The author dr shivu
The author dr shivuThe author dr shivu
The author dr shivu
Shivu P
 
Contents of this book - section chapter (Includes all the chapters)
Contents of this book - section   chapter (Includes all the chapters)Contents of this book - section   chapter (Includes all the chapters)
Contents of this book - section chapter (Includes all the chapters)
Shivu P
 
Abbreviations used in this book
Abbreviations used in this bookAbbreviations used in this book
Abbreviations used in this book
Shivu P
 
S13c17 chapter 17-facts and figures on waste management.
S13c17 chapter 17-facts and figures on waste management.S13c17 chapter 17-facts and figures on waste management.
S13c17 chapter 17-facts and figures on waste management.
Shivu P
 
S13c16 chapter 16-facts and figures on urbanisation.
S13c16 chapter 16-facts and figures on urbanisation.S13c16 chapter 16-facts and figures on urbanisation.
S13c16 chapter 16-facts and figures on urbanisation.
Shivu P
 
S13c15 chapter 15-facts and figures on unemployment.
S13c15 chapter 15-facts and figures on unemployment.S13c15 chapter 15-facts and figures on unemployment.
S13c15 chapter 15-facts and figures on unemployment.
Shivu P
 
S13c13 chapter 13-facts and figures on some statistics.
S13c13 chapter 13-facts and figures on some statistics.S13c13 chapter 13-facts and figures on some statistics.
S13c13 chapter 13-facts and figures on some statistics.
Shivu P
 
S13c10 chapter 10-facts and figures on poverty.
S13c10 chapter 10-facts and figures on poverty.S13c10 chapter 10-facts and figures on poverty.
S13c10 chapter 10-facts and figures on poverty.
Shivu P
 
S13c8 chapter 8-facts and figures on life style practices.
S13c8 chapter 8-facts and figures on life style practices.S13c8 chapter 8-facts and figures on life style practices.
S13c8 chapter 8-facts and figures on life style practices.
Shivu P
 
S13c6 chapter 6- facts and figures on health
S13c6 chapter 6- facts and figures on healthS13c6 chapter 6- facts and figures on health
S13c6 chapter 6- facts and figures on health
Shivu P
 
S13c4 chapter 4-facts and figures on economy.
S13c4 chapter 4-facts and figures on economy.S13c4 chapter 4-facts and figures on economy.
S13c4 chapter 4-facts and figures on economy.
Shivu P
 
S16c3 chapter 3-the future.
S16c3 chapter 3-the future.S16c3 chapter 3-the future.
S16c3 chapter 3-the future.
Shivu P
 

More from Shivu P (20)

Impact of Environment on Health of humans
Impact of Environment on Health of humansImpact of Environment on Health of humans
Impact of Environment on Health of humans
 
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...Comments on NWDA's (National Water Development Authority) methodology of ILR ...
Comments on NWDA's (National Water Development Authority) methodology of ILR ...
 
Save earth
Save earth Save earth
Save earth
 
Sustaining breast feeding together
Sustaining breast feeding togetherSustaining breast feeding together
Sustaining breast feeding together
 
Breast feeding week
Breast feeding weekBreast feeding week
Breast feeding week
 
Method matters in inter linking rivers
Method matters in inter linking rivers  Method matters in inter linking rivers
Method matters in inter linking rivers
 
Summary of the book 'views to make this world developed'
Summary of the book 'views to make this world developed'Summary of the book 'views to make this world developed'
Summary of the book 'views to make this world developed'
 
Preface to this book
Preface to this bookPreface to this book
Preface to this book
 
The author dr shivu
The author dr shivuThe author dr shivu
The author dr shivu
 
Contents of this book - section chapter (Includes all the chapters)
Contents of this book - section   chapter (Includes all the chapters)Contents of this book - section   chapter (Includes all the chapters)
Contents of this book - section chapter (Includes all the chapters)
 
Abbreviations used in this book
Abbreviations used in this bookAbbreviations used in this book
Abbreviations used in this book
 
S13c17 chapter 17-facts and figures on waste management.
S13c17 chapter 17-facts and figures on waste management.S13c17 chapter 17-facts and figures on waste management.
S13c17 chapter 17-facts and figures on waste management.
 
S13c16 chapter 16-facts and figures on urbanisation.
S13c16 chapter 16-facts and figures on urbanisation.S13c16 chapter 16-facts and figures on urbanisation.
S13c16 chapter 16-facts and figures on urbanisation.
 
S13c15 chapter 15-facts and figures on unemployment.
S13c15 chapter 15-facts and figures on unemployment.S13c15 chapter 15-facts and figures on unemployment.
S13c15 chapter 15-facts and figures on unemployment.
 
S13c13 chapter 13-facts and figures on some statistics.
S13c13 chapter 13-facts and figures on some statistics.S13c13 chapter 13-facts and figures on some statistics.
S13c13 chapter 13-facts and figures on some statistics.
 
S13c10 chapter 10-facts and figures on poverty.
S13c10 chapter 10-facts and figures on poverty.S13c10 chapter 10-facts and figures on poverty.
S13c10 chapter 10-facts and figures on poverty.
 
S13c8 chapter 8-facts and figures on life style practices.
S13c8 chapter 8-facts and figures on life style practices.S13c8 chapter 8-facts and figures on life style practices.
S13c8 chapter 8-facts and figures on life style practices.
 
S13c6 chapter 6- facts and figures on health
S13c6 chapter 6- facts and figures on healthS13c6 chapter 6- facts and figures on health
S13c6 chapter 6- facts and figures on health
 
S13c4 chapter 4-facts and figures on economy.
S13c4 chapter 4-facts and figures on economy.S13c4 chapter 4-facts and figures on economy.
S13c4 chapter 4-facts and figures on economy.
 
S16c3 chapter 3-the future.
S16c3 chapter 3-the future.S16c3 chapter 3-the future.
S16c3 chapter 3-the future.
 

Recently uploaded

Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener FutureBiomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Dr. P.B.Dharmasena
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
neilsencassidy
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
mvrpcz6
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
PACKAGING OF FROZEN FOODS ( food technology)
PACKAGING OF FROZEN FOODS  ( food technology)PACKAGING OF FROZEN FOODS  ( food technology)
PACKAGING OF FROZEN FOODS ( food technology)
Addu25809
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
CIFOR-ICRAF
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Open Access Research Paper
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENTBASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
AmitKumar619042
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
amishajha2407
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Joshua Orris
 
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
vijaykumar292010
 
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
astuz
 

Recently uploaded (16)

Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener FutureBiomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
PACKAGING OF FROZEN FOODS ( food technology)
PACKAGING OF FROZEN FOODS  ( food technology)PACKAGING OF FROZEN FOODS  ( food technology)
PACKAGING OF FROZEN FOODS ( food technology)
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENTBASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
Wildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environmentWildlife-AnIntroduction.pdf so that you know more about our environment
Wildlife-AnIntroduction.pdf so that you know more about our environment
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
 
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...RoHS stands for Restriction of Hazardous Substances, which is also known as t...
RoHS stands for Restriction of Hazardous Substances, which is also known as t...
 
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
 

Interlinking rivers 9 - Interlinking Indian Rivers - Short Presentation 8 - FPC2 (Refer Chapter 18.8)

  • 1. Chapter 18: RCS in Karnataka - Flat Primary canal 2 (FPC2) River points and Lengths: 464
  • 2. Topic series: 449. Topic 1: FPC2 river points: FPC2: Bangalore platue: FPC2 will become the main source of water for the area of Bangalore platue. 465
  • 3. Topic series: 449. Topic 1: FPC2 river points: S. N.(FPC2 point) (Latitude) (Longitude) 1(FPC2Start 900) (130034’51.97”N) (750041’43.76”E) 466
  • 4. Topic series: 449. Topic 1: FPC2 river points: 2(FPC2T.to Ayyanakere 900) (130027’10.31”N) (750051’21.55”E) 467
  • 5. Topic series: 449. Topic 1: FPC2 river points: 3(FPC2Hagari 900) (130014’8.59”N) (750056’12.01”E) 468
  • 6. Topic series: 449. Topic 1: FPC2 river points: 4(FPC2EE Shimsha 900) (130010’40.23”N) (760019’11.70”E) 469
  • 7. Topic series: 449. Topic 1: FPC2 river points: 5(FPC2EE Arkavathi 900) (130015’59.03”N) (770033’5.79”E) 470
  • 8. Topic series: 449. Topic 1: FPC2 river points: 6(FPC2EE Palar - north end 900) (130026’16.11”N) (78001’24.60”E) 471
  • 9. Topic series: 449. Topic 1: FPC2 river points: 7(FPC2Yagachi 900) (120055’54.24”N) (76002’24.66”E) 472
  • 10. Topic series: 449. Topic 1: FPC2 river points: 8(FPC2Hemavathi 900) (120058’15.34”N) (750045’58.01”E) 473
  • 11. Topic series: 449. Topic 1: FPC2 river points: 9(FPC2Kaveri 900) (120022’4.57”N) (750030’44.68”E) 474
  • 12. Topic series: 449. Topic 1: FPC2 river points: 10(FPC2Lakshmanathreetha 900) (12002’35.77”N) (76002’50.93”E) 475
  • 13. Topic series: 449. Topic 1: FPC2 river points: 11(FPC2Kabini 900) (110044’48.39”N) (750048’0.37”E) 476
  • 14. Topic series: 449. Topic 1: FPC2 river points: 12(FPC2Nugu 900) (110038’41.34”N) (760024’37.14”E) 477
  • 15. Topic series: 449. Topic 1: FPC2 river points: 13(FPC2Suvarnavathi 900) (110041’33.60”N) (77007’36.24”E) 478
  • 16. Topic series: 449. Topic 1: FPC2 river points: 14(FPC2Uduthorehalla 900) (110053’2.74”N) (770015’37.12”E) 479
  • 17. Topic series: 449. Topic 1: FPC2 river points: 15(FPC2Palar south end 900) (110053’13.74”N) (770017’41.29”E) 480
  • 18. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: FPC2 Lengths: SN. Description. Length in kms 1.FPC2 Start to T. To Ayyanakere 900. 52.76 kms. 481
  • 19. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 2.FPC2 T. To Ayyanakere to Hagari 900. 55.43 482
  • 20. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 3.FPC2 Hagari to FPC2EE Shimsha 900. 58.35 483
  • 21. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 4.FPC2 EE Shimsha to FPC2EE Arkavathi 900. 191.15 484
  • 22. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 5.FPC2EE Arkavathi to FPC2EE Palar (North end) 900. 58.36 485
  • 23. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 6.FPC2 EE Shimsha to Yagachi 900. 77.76 486
  • 24. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 7.FPC2 Yagachi to Hemavathi 900. 49.80 487
  • 25. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 8.FPC2 Hemavathi to Kaveri 900. 196.06 488
  • 26. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 9.FPC2 Kaveri to Lakshmanathreertha 900. 98.00 489
  • 27. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 10.FPC2 Lakshmanathreertha to Kabini 900. 82.60 490
  • 28. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 11.FPC2 Kabini to Nugu 900. 86.33 491
  • 29. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 12.FPC2 Nugu to Suvarnavathi 900. 136.00 492
  • 30. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 13.FPC2 Suvarnavathi to Uduthorehalla 900. 69.70 493
  • 31. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 14.FPC2 Uduthorehalla to Palar (South end) 900. 7.44 494
  • 32. Total FPC2 CRL Length in Kms is 1219.74 Total canal length we are going to save with CE, 215.01 RE, DCC, BD in Kms. Total length of the CE, RE, DCC, BD put together in Kms 11.89 The Length (Actual) of the probable FPC2 in Kms. 1016.62 The capacity (Volume) of storable water (with the canal width of 200 mts, depth of 25 mts, but the maximum level maintained will be 20 mts) in the FPC2 (4066.48 million cubic meters) in TMC. 150.13 TMC Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 495
  • 33. (FPC2 cannot be filled and discharged any number of times, unlike FPC1 and FPC4, as FPC2 is not having the ‘ever flowing rivers as its feeder’. Still, it can provide sufficient water to the Bangalore platue in the land which lays between ‘900 to 500mts AMSL’, because, Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 496
  • 34. All the water, which is generated from the river Cauvery and the its tributaries will be providing water only to the limited area of land between 900 to 500 mts AMSL, and the area which is below 500mts AMSL need not get the water from the river Cauvery and its tributaries as they will be irrigated by FPC1. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 497
  • 35. The water which is going to be absorbed by the ground / percolating in to the ground / the water which shifts underground as subsurface flow will decrease as the underground water will be saturated with water of the FPC1, thus ‘over the surface’ availability of the water from the river Cauvery and its tributaries will become more and it will be available for irrigation even in summer. Topic series: 450. Topic 2: FPC2 Lengths and approximate capacity: 498
  • 36. Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: FPC2 – RE, CE, DCC, BD and others are as follows: S. N.( FPC2 RE, CE, DCC, BD point) (Latitude) (Longitude) FPC2 Hemavathi 900 CE. It is not ideal to do CE distal to the reservoir at this place. Think of other possibilities, like doing U tube / aqua duct / CE across River Yagachi and Hemavathi proximal to the reservoir. 499
  • 37. 1(FPC2 Hemavathi 900 CE Start) (120051’5.84”N) (76008’0.47”E) 2(FPC2 Hemavathi 872CE Bottom) (120049’8.94”N) (76008’13.50”E) 3(FPC2 Hemavathi 900 CE End) (120046’20.95”N) (76008’31.38”E) Length of FPC2 Hemavathi 900 CE: 8.91kms. We will save 122.28 Kms of FPC2 creation. Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: FPC2 Hemavathi 900 CE 500
  • 38. Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: FPC2 Kaveri 900 RE 501
  • 39. 1(FPC2 Kaveri 900 RE Start) (120018’15.06”N) (750044’41.59”E) 2(FPC2 Kaveri RE Bottom 870) (120017’17.35”N) (750044’28.22”E) 3(FPC2 Kaveri 900 RE End) (120017’1.09”N) (750044’23.17”E) Length of FPC2 Kaveri 900 RE 2.31kms. We will save 60.73Kms of FPC2 creation. Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: FPC2 Kaveri 900 RE 502
  • 40. Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: FPC2 Kabini 900 DCC1 503
  • 41. 1(FPC2 Kabini 900 DCC1 Start) (110041’48.46”N) (750056’5.83”E) 2(FPC2 Kabini DCC1 Top) (110041’44.21”N) (750056’3.88”E) 3(FPC2 Kabini 900 DCC1 End) (110041’36.52”N) (750056’19.29”E) Length of FPC2 Kabini 900 DCC1: 0.67 kms. We will save 32Kms of FPC2 creation. Topic series: 451. Topic 3: FPC2 – RE, CE, DCC, BD and others: FPC2 Kabini 900 DCC1 504