NetSuite for Trading companies
Ms. Snehal Unawane
NuVista Technologies Pte Ltd
NuVistaPlus™ Overview
Industry Verticals
3
Representative Client List
SME EXCELLENCE AWARD
© NetSuite Inc. 2013 Confidential 5
NetSuite: World’s #1 Cloud ERP
World’s most deployed cloud
business management solution
Used by 16,000+ organizations
Fastest growing top 10 ERP
Used across approx 100 countries
Top 10 Cloud Companies
to Watch
Founded 1998
Publicly traded on NYSE: “N”
Offices in 10 countries
1200+ employees
$309M revenue in FY11
#1 Cloud Business Suite Industry Recognition
Background Performance
Best Financial Management
Best Relationship Mgt.
Best Business Software
Best Cloud Platform
Fastest Growing
Top 10 FMS Vendor
3rd
Year Running
The Typical Way
e -Store
One System for Running a Business
8
CEO
NetSuite
ECOMMERCE
NetSuite
CRM+
NetSuite
FINANCIALS
CFO
Sales Rep/
Manager
Support
Manager
Warehouse
Manager
Operations
Manager
Customers
Vendors Partners
SINGLE
DATA
SOURCEVendor Portal
Customer Portal
Web Site
Web Store Marketing
Campaigns
Sales Force
Automation
Customer
Support
Partner
Mgmt
Order Mgmt
Financials
Billing
Payroll
Purchasing
Inventory Work Orders/
Assemblies
Comprehensive ERP:
9
Complete CRM:
10
Powered by the Cloud:
Mobility
Distributed workforce, outsourcing,
contingent workers, any device
Self-Service
Submit web based time and
expenses and purchase requests via the web
Self-serve customers, vendors, partners
Visibility from Anywhere
Real-time role based dashboards,
Self-service reporting and analytics
Personalized
On-Premise
Do It
Yourself
HARDWARE
License
Maintain
Patch
Replace
DESKTOP OS
License
Maintain
Patch
Replace
SERVER OS
License
Maintain
Patch
Replace
DATABASE
License
Maintain
Tune
Upgrade
APPLICATION
License
Back-up
Upgrade
Migrate
Financials
CRM
HARDWARE
License
Maintain
Patch
Replace
DESKTOP OS
License
Maintain
Patch
Replace
SERVER OS
License
Maintain
Patch
Replace
DATABASE
License
Maintain
Tune
Upgrade
APPLICATION
License
Back-up
Upgrade
Migrate
Ecommerce
HARDWARE
License
Maintain
Patch
Replace
DESKTOP OS
License
Maintain
Patch
Replace
SERVER OS
License
Maintain
Patch
Replace
DATABASE
License
Maintain
Tune
Upgrade
APPLICATION
License
Back-up
Upgrade
Migrate
Suite + Cloud = Efficiency and Savings
NetSuite
Cloud
Suite(ex:NetSuite)
HARDWARE DESKTOP OS SERVER OS DATABASE APPLICATION
Subscribe
© NetSuite Inc. 2011 Confidential 13
Suite Commerce
Suite Commerce
© NetSuite Inc. 2011 Confidential 14
Suite Commerce Features
© NetSuite Inc. 2011 Confidential 15
Suite Commerce Features
© NetSuite Inc. 2011 Confidential 16
Suite Commerce Features
© NetSuite Inc. 2011 Confidential 17
Suite Commerce Features
© NetSuite Inc. 2011 Confidential 18
Managing Multiple Channels
© NetSuite Inc. 2013 Confidential 19
Distributor n /
Customer n
Distributor1 /
Customer 1Supplier 1
PO
SO
SOPOSupplier n
 Financial Management
 Inventory Management
 Purchase Order Management
 Sales Order Management
 Accounting
 Others
 View PRs / POs
 View History
 Update Profile
 Enter Sales Orders
 Track Fulfillment
 View Order History
 View Quotes
 Print Statements
 View Invoices
 Update Profile
Customer
(System Owner)
Real Time Visibility for Today’s Businesses
© NetSuite Inc. 2011 Confidential 20
Evan Brown, Toolfetch
Single version of the truth
Role based dashboards
Real time
Ad hoc analysis
Summary to detail
With NetSuite, I can view with the dashboard what our
receivables are and what our sales reps are doing from a
daily and weekly standpoint. Those tools are priceless to me,
and have made our company 100% more efficient.
‘‘
‘‘
Functional Overview
ERP basics
– G/L, A/P, A/R, Sales Order processing & Delivery, Inventory Management,
Purchasing Management, Invoicing Customers, Singapore Tax Nexus
Advanced ERP
– Billing schedules, revenue recognition, Budgeting, Project Tracking,
Expense Reporting, Multi-Location, Multi-Currency,
CRM basics
– Marketing, Customer Opportunity Tracking, Forecasting, Pipeline,
Case/Support management, Employee/HR Center
Advanced CRM
– Order management, Lead conversion, cross-sell and up-sell, Sales Rep
Commissions, Partner Relationship Management, customer self-service
For Inventory Items
Sales Order Process
Sales Order Reservation
Accept
Payment
Create
Invoice
Fulfillment
Accounting
Postings
Scenarios:
Sales Order – Invoice
Cash Sale (Manual / POS)
Web Orders
Notes :
a) SO Approval Process can be defined
b) Multiple Deliveries in 1 Sales Order is supported
Quotes and Sales Orders Highlights
One click convert
Opportunity to Quote
Opportunity to Order
Quote to Order
Bookings Dashboard
Product & Service Catalog
Parent Item/Hierarchy
Item Groups
Descriptions
Price Levels
Discounts
Per Customer Pricing
Multiple Levels
Inventory Management Highlights
Commitment
Real-time availability
Back order management
Preferred stock levels
Serialized Inventory
Serialized assemblies
Item bar coding
Multi-Location Inventory
Lot Management
Lot Numbers
Expiration Dates
Costing Methods
Assembly/Bill of Materials
Include Non-inventory, Service Items
Component quantities & Printable BOM
General Ledger
© NetSuite Inc. 2011 Confidential 25
– User-defined Chart of Accounts
- Support an unlimited number of GL accounts and sub-accounts – not fixed and extremely
flexible from a reporting standpoints
– Monthly Period Close checklist
– Real-time visibility into GL Impact
- visibility into every transaction with a detailed, always-on audit trail that shows the author and
time of each entry and GL account
– Online journal entry and edit with enforced balancing: Error-free, easy-to-
use processing.
– Multiple company and country capability at the transaction level (not just a
data warehouse)
Chart of Accounts Structure
- eg. 4000 – Sales (can be any or all subsidiaries, locations, etc)
- 4001 – Subscription Sales
- Can associate account with one or more specific subsidiaries, to
limit availability of the account to the selected subsidiaries only
- Class/department/location can be restricted but can only be
selected on transactions where that class, department, and/or
location are also selected
Subsidiary Location Department Class
Account Sub-
Account
Supports an unlimited number of GL accounts and sub-accounts – not fixed
and extremely flexible from a reporting standpoints
Closing of Accounting Periods
© NetSuite Inc. 2011 Confidential 27
An ordered process with controls and audit functionality to close
accounting periods
- Prevent users from posting to the GL while they make adjustments
- Ensure critical process (intercompany, revaluation, etc) are actually performed
prior to sign-off
- Prevent GL changes to closed periods
- Audit who closes / re-opens periods
Closing of Accounting Periods
© NetSuite Inc. 2011 Confidential 28
During closing, you can put
notes for additional
information
During closing, you can put
notes for additional
information
Journal Entries
© NetSuite Inc. 2011 Confidential 29
Approvals can be done for
Journal Entries…
Approvals can be done for
Journal Entries…
Intercompany Journal Entries
is also possible …
Intercompany Journal Entries
is also possible …
Budgeting Highlights
© NetSuite Inc. 2011 Confidential 30
– Multiple Budgets
– CSV Import/Export
– Enter/Copy Budgets
- Streamlined budget entry
- Create new budgets from old
budgets/actuals
– Budget Categories
– Create multiple budgets for same
criteria
– Reports
– Fully customizable Budget Income
Statement and Budget vs. Actual
reports
For Inventory Items
PR / PO Receiving
Bills
Payment
Enter Bills
Update
Inventory
Accounting
Postings
Notes :
a) PO Approval Process can be defined
b) Multiple Receiving is possible
Scenarios:
Purchase Request
Purchase Order
Order items (based on Re-order level)
Purchasing Process
Add work order record to the sales order/build process
Commit raw materials to a build
Link to a sales order or create a ‘production’ work order to add to regular stock of
assembly
Print BOM picking ticket per the qty of the order
Demand for raw materials factors into Advanced Inventory Management feature
Handle multi-level assemblies
Lay the groundwork for future MRP/manufacturing features
Work Order Build WO
Update
Inventory
Accounting
Postings
Assembly
Item
Define the BOM
Print BOM
Light Manufacturing Process
For Inventory Items
Sales Order and Light Manuf. Process
Sales Order Reservation
Accept
Payment
Create
Invoice
Fulfillment
Accounting
Postings
Work Order
Advanced
Forecasting
Product Catalog
Service Catalog
Putting the “C” in CRM
Integrated Quotes/Proposals
Document Management
Document Publishing
Integrated Order Mgmt
Bookings Dashboard
Incentive Management
Customer Portal
Project Tracking
Time & Expense
Upsell/
Cross-sell
Website Hosting
Search Engine
Optimization
Website Analytics
Online Catalog
Lead Dashboard
Intranet Sales &
Marketing Tools
Mass E-Mail
Group Calendaring
Resource Availability
+
Lead
Prospect
Qualify
MeetQuote
Order
Service Delivery
Repurchase
Suspect
+
+
+
+ +
+
+
+
Components of NetSuite
CRM
Sales force Automation (SFA)
 Account Management
 Contact Management
 Activity Management
Marketing Automation
 Lead Management
 Campaign Management
Customer Service and Support
 Case Management
 Knowledgebase Management
 Issue Management
Advance Partner Center
 Partner Center Access
Productivity Tools
 NetSuite – Outlook Integration
 Calendar Sharing
 Opportunity Management
 Quote / Sales Order Generation
 Forecasting
Customer Center Highlights
Password protected access
View Personalized content
– Project status
– Outstanding quotes
– Order/contract status
– Pertinent documents
Customer Service
– Enter trouble tickets
– Support/service history
– Search knowledge base
Lead to Customer Lifecycle
A Contact can be created
anytime throughout a
Customer's Lifecycle
You can create a Saved
Search to display your
Contacts in your Dashboard
Create activities such as
Tasks, Phone Calls and
Events related to a Contact.
Top Search Terms Leads by SourceCampaign ROI
Web Form
Lead Capture
Import Data
Web Site Visitors
Inbound Calls
Lists
Plan and Execute
Marketing Campaign
• Google AdWords
• Email Marketing
• Direct Mail
• Cold Calls
• Partners
• TV
• Radio
• Events
• Trade Shows
• PR
• Set up auto-response emails
-”Thank you for your interest”
-Your trial information
-Event details
• Set up lead assignment rules
-Geography
-Company size
-Product of interest
• Use the import wizard or
Excel connector
• Purchased list
• Trade show
• Legacy data
• “Contact me” request
• Free trial
• Event registration
• Organic Web traffic
• AdWords referrals
• Email responses
• Yellow pages
• Google Maps
• Word-of-mouth referrals
Create New Leads
• Search for the customer in NetSuite
• If one doesn’t exist, create a new lead
Lead Quality
Generate More Leads
On-line Lead Forms:
Used to receive information from customers / leads from your website (customer
registration or survey)
Lead and Territory Management:
Sales Rules
Sales Territories
Leads Management
Month-to-Date Trending Closed Business by Month Top Sales RepsTop 10 Deals
Presentation Proposal Negotiation Won
Yes
No
Open Opportunities
You can monitor your
opportunities reports
and dashboards to keep
track of your top deals
and prioritize your time.
Customize NetSuite to fit your internal
sales methodologies and processes,
making it easier to monitor your sales
pipeline.
Use email marketing and call downs
to re-market to your archived
opportunities.
Keep an archive of your dead opportunities.
NetSuite gives your entire company a
360-degree view of your customers and
facilitates collaboration across your
organization, helping you build strong,
lasting customer relationships.
Sales
Support
Marketing
New Customers
Opportunity Management
• Log call notes
• Create follow-up tasks
• Schedule an event
• Send an email
Log Activities
Funnel Cases from Disparate Customer
Touch Points
• Technical Support
• Billing Question
• Feature Request
• Updated Account Info
Call Support
Log a Case Online
Email Support
Call Sales
Case Deflection
• Customer Portal
• On-line Form
• Press 1 for Support
• Press 2 for Billing
• support@acme.com
• billing@acme.com
• “While I have you on the
phone…”
•” I don’t know who to call but…”
CTI Integration (optional)
The customer’s information
automatically pops up for the
support rep
Log a Case Manually
The salesperson creates a
case on behalf of the
customer
Email-to-Case (optional)
You can setup email-to-case
so that a case is
automatically created based
on an incoming email.
With the customer portal,
you can set it up so the
customer receives a
suggested solution before
submitting a case
Case Is Created
Your Customer Has
a Question
?
Cases by Source Case VolumeCases by CustomerCases by Type
Case Rules
Case Record
Created
Filtered into
Territories
Assigned to a
Support Rep
Case Rules
Case Territories
Closed Loop Case Management Process
Marketing Campaign (email)
© NetSuite Inc. 2011 Confidential 50
Marketing
Campaign
Target
Group
ExecutePlan
Monitor/
Analyze
Text or HTML Format
From Name
From Email Address
Reply To Email Address
Campaign Domain (required for > 10,000 emails)
Email
Marketing
Template
Static or Dynamic Search
Email Blast / Mail Merge
Large Volume E-mail Campaign Automation
Multi-Channel Campaign Tracking
Promotion & Online Form Management
Real-Time Statistics & Complete ROI
HR / Employee Center
Employee Management
– Employee Profile
– Employee Time
HR Reminders
– Reviews, Birthdays,
– Visa Expiration
Self-Service
– Edit Profile
– Paycheck History
– Time Sheets
– Expense Reporting
– Purchase Requests
Account Planning
I can see my customer’s history of events and activities in Netsuite which help me develop an
account strategy and action plan.
I can create my own Action Plans by assigning tasks to myself as To-Do’s.
I have the option to create a follow-up activities & future date them as a reminder to take action.
I can see which accounts I have committed time & if there are positive results as the outcome.
Increase Collaboration (Calendar Sharing)
You can see other calendars
(employees and resources)
You can see other calendars
(employees and resources)
Monitor Activities by Sales Rep
Monitor Activities by Sales Rep
As a Sales Rep, My Managers don’t have
to micro-manage me!
There are no accountability issues since I know what is assigned to me.
If my manager needs a history of events, it can all be found in NetSuite
My managers can look in the application to see what I’ve done instead of asking me
My managers don’t have the time to look at every single detail and record. It’s a
waste of their time! Their objective is to help me meet my goals and targets, just
as much as I would like to.
NetSuite-Outlook Integration saves me
time
I am able to synchronize my Contacts, Tasks and Calendar to and from Outlook and
NetSuite
Emails I send from Outlook can be added to a record in NetSuite.
I don’t have to enter data twice in both applications!
60
#1 for
Software
#1 for
WD
#1 for
Manufacturing
#1 for
Services
#1 for
Etail/Retail
#1 for
Enterprises
NetSuite: World’s #1 Cloud ERP
NuVista’s NetSuite Customers Snapshot
Marine Industry
Part of Listed Company- SINWA
Complex requirements with
multiple work-flows & processes
www.amsmarinegroup.com
Light Manufacturing Industry
EV-Electric Vehicle Conversion
NetSuite powers entire business
operations in ERP/Inventory/CRM
www.evworld.sg
Collins MoversCollins Movers LotteLotte
EV WorldEV World AMS MarineAMS Marine
Logistics & Transportation Industry
Non-standard requirements for
CRM, Costing & Billing Calculations
Replaced multiple disparate
systems for CRM, SO & Accounts
www.collinsmovers.com.sg
FMCG Industry
Korean Conglomerate Subsidiary-
Lotte Confectionery Singapore
No Systems in place with Multiple
Items/SKUs mgmt with integrated
SO, PO & Financials
www.lotte.co.kr
NuVista’s NetSuite Customers Snapshot
Safety Equipments/Training
Industry
Mix of Service & Products
Business model
Integrated Sales, Purchasing,
Inventory, Training/Ops Mgmt
www.asretec.org
Most Reputed Apple authorized
service centre in Singapore
Receive >8000 Customer Cases
per month, with integration req in
Sales, Purchasing, Inventory & Fin
eserv.micro2000.com.sg
WD Industry
MarnixMarnix FortisFortis
Micro2000Micro2000 AsretecAsretec
Financial/Insurance Industry
Japan HQ Global Company
Insurance Broking Non-standard
req for Premium Calculations
Had manual process for Sales, CRM
and Accounts- integrated the same
www.marnix.co.jp
Hospitality/Retail Industry
Premier Hospitality
Management Company that
oversees Travel, Events, and
Privileges Program for our
corporate customers
CRM System
www.fortis.com.sg
Thanks

7. net suite retail

  • 1.
    NetSuite for Tradingcompanies Ms. Snehal Unawane NuVista Technologies Pte Ltd
  • 2.
  • 3.
  • 4.
  • 5.
    SME EXCELLENCE AWARD ©NetSuite Inc. 2013 Confidential 5
  • 6.
    NetSuite: World’s #1Cloud ERP World’s most deployed cloud business management solution Used by 16,000+ organizations Fastest growing top 10 ERP Used across approx 100 countries Top 10 Cloud Companies to Watch Founded 1998 Publicly traded on NYSE: “N” Offices in 10 countries 1200+ employees $309M revenue in FY11 #1 Cloud Business Suite Industry Recognition Background Performance Best Financial Management Best Relationship Mgt. Best Business Software Best Cloud Platform Fastest Growing Top 10 FMS Vendor 3rd Year Running
  • 7.
  • 8.
    One System forRunning a Business 8 CEO NetSuite ECOMMERCE NetSuite CRM+ NetSuite FINANCIALS CFO Sales Rep/ Manager Support Manager Warehouse Manager Operations Manager Customers Vendors Partners SINGLE DATA SOURCEVendor Portal Customer Portal Web Site Web Store Marketing Campaigns Sales Force Automation Customer Support Partner Mgmt Order Mgmt Financials Billing Payroll Purchasing Inventory Work Orders/ Assemblies
  • 9.
  • 10.
  • 11.
    Powered by theCloud: Mobility Distributed workforce, outsourcing, contingent workers, any device Self-Service Submit web based time and expenses and purchase requests via the web Self-serve customers, vendors, partners Visibility from Anywhere Real-time role based dashboards, Self-service reporting and analytics Personalized
  • 12.
    On-Premise Do It Yourself HARDWARE License Maintain Patch Replace DESKTOP OS License Maintain Patch Replace SERVEROS License Maintain Patch Replace DATABASE License Maintain Tune Upgrade APPLICATION License Back-up Upgrade Migrate Financials CRM HARDWARE License Maintain Patch Replace DESKTOP OS License Maintain Patch Replace SERVER OS License Maintain Patch Replace DATABASE License Maintain Tune Upgrade APPLICATION License Back-up Upgrade Migrate Ecommerce HARDWARE License Maintain Patch Replace DESKTOP OS License Maintain Patch Replace SERVER OS License Maintain Patch Replace DATABASE License Maintain Tune Upgrade APPLICATION License Back-up Upgrade Migrate Suite + Cloud = Efficiency and Savings NetSuite Cloud Suite(ex:NetSuite) HARDWARE DESKTOP OS SERVER OS DATABASE APPLICATION Subscribe
  • 13.
    © NetSuite Inc.2011 Confidential 13 Suite Commerce
  • 14.
    Suite Commerce © NetSuiteInc. 2011 Confidential 14
  • 15.
    Suite Commerce Features ©NetSuite Inc. 2011 Confidential 15
  • 16.
    Suite Commerce Features ©NetSuite Inc. 2011 Confidential 16
  • 17.
    Suite Commerce Features ©NetSuite Inc. 2011 Confidential 17
  • 18.
    Suite Commerce Features ©NetSuite Inc. 2011 Confidential 18
  • 19.
    Managing Multiple Channels ©NetSuite Inc. 2013 Confidential 19 Distributor n / Customer n Distributor1 / Customer 1Supplier 1 PO SO SOPOSupplier n  Financial Management  Inventory Management  Purchase Order Management  Sales Order Management  Accounting  Others  View PRs / POs  View History  Update Profile  Enter Sales Orders  Track Fulfillment  View Order History  View Quotes  Print Statements  View Invoices  Update Profile Customer (System Owner)
  • 20.
    Real Time Visibilityfor Today’s Businesses © NetSuite Inc. 2011 Confidential 20 Evan Brown, Toolfetch Single version of the truth Role based dashboards Real time Ad hoc analysis Summary to detail With NetSuite, I can view with the dashboard what our receivables are and what our sales reps are doing from a daily and weekly standpoint. Those tools are priceless to me, and have made our company 100% more efficient. ‘‘ ‘‘
  • 21.
    Functional Overview ERP basics –G/L, A/P, A/R, Sales Order processing & Delivery, Inventory Management, Purchasing Management, Invoicing Customers, Singapore Tax Nexus Advanced ERP – Billing schedules, revenue recognition, Budgeting, Project Tracking, Expense Reporting, Multi-Location, Multi-Currency, CRM basics – Marketing, Customer Opportunity Tracking, Forecasting, Pipeline, Case/Support management, Employee/HR Center Advanced CRM – Order management, Lead conversion, cross-sell and up-sell, Sales Rep Commissions, Partner Relationship Management, customer self-service
  • 22.
    For Inventory Items SalesOrder Process Sales Order Reservation Accept Payment Create Invoice Fulfillment Accounting Postings Scenarios: Sales Order – Invoice Cash Sale (Manual / POS) Web Orders Notes : a) SO Approval Process can be defined b) Multiple Deliveries in 1 Sales Order is supported
  • 23.
    Quotes and SalesOrders Highlights One click convert Opportunity to Quote Opportunity to Order Quote to Order Bookings Dashboard Product & Service Catalog Parent Item/Hierarchy Item Groups Descriptions Price Levels Discounts Per Customer Pricing Multiple Levels
  • 24.
    Inventory Management Highlights Commitment Real-timeavailability Back order management Preferred stock levels Serialized Inventory Serialized assemblies Item bar coding Multi-Location Inventory Lot Management Lot Numbers Expiration Dates Costing Methods Assembly/Bill of Materials Include Non-inventory, Service Items Component quantities & Printable BOM
  • 25.
    General Ledger © NetSuiteInc. 2011 Confidential 25 – User-defined Chart of Accounts - Support an unlimited number of GL accounts and sub-accounts – not fixed and extremely flexible from a reporting standpoints – Monthly Period Close checklist – Real-time visibility into GL Impact - visibility into every transaction with a detailed, always-on audit trail that shows the author and time of each entry and GL account – Online journal entry and edit with enforced balancing: Error-free, easy-to- use processing. – Multiple company and country capability at the transaction level (not just a data warehouse)
  • 26.
    Chart of AccountsStructure - eg. 4000 – Sales (can be any or all subsidiaries, locations, etc) - 4001 – Subscription Sales - Can associate account with one or more specific subsidiaries, to limit availability of the account to the selected subsidiaries only - Class/department/location can be restricted but can only be selected on transactions where that class, department, and/or location are also selected Subsidiary Location Department Class Account Sub- Account Supports an unlimited number of GL accounts and sub-accounts – not fixed and extremely flexible from a reporting standpoints
  • 27.
    Closing of AccountingPeriods © NetSuite Inc. 2011 Confidential 27 An ordered process with controls and audit functionality to close accounting periods - Prevent users from posting to the GL while they make adjustments - Ensure critical process (intercompany, revaluation, etc) are actually performed prior to sign-off - Prevent GL changes to closed periods - Audit who closes / re-opens periods
  • 28.
    Closing of AccountingPeriods © NetSuite Inc. 2011 Confidential 28 During closing, you can put notes for additional information During closing, you can put notes for additional information
  • 29.
    Journal Entries © NetSuiteInc. 2011 Confidential 29 Approvals can be done for Journal Entries… Approvals can be done for Journal Entries… Intercompany Journal Entries is also possible … Intercompany Journal Entries is also possible …
  • 30.
    Budgeting Highlights © NetSuiteInc. 2011 Confidential 30 – Multiple Budgets – CSV Import/Export – Enter/Copy Budgets - Streamlined budget entry - Create new budgets from old budgets/actuals – Budget Categories – Create multiple budgets for same criteria – Reports – Fully customizable Budget Income Statement and Budget vs. Actual reports
  • 31.
    For Inventory Items PR/ PO Receiving Bills Payment Enter Bills Update Inventory Accounting Postings Notes : a) PO Approval Process can be defined b) Multiple Receiving is possible Scenarios: Purchase Request Purchase Order Order items (based on Re-order level) Purchasing Process
  • 32.
    Add work orderrecord to the sales order/build process Commit raw materials to a build Link to a sales order or create a ‘production’ work order to add to regular stock of assembly Print BOM picking ticket per the qty of the order Demand for raw materials factors into Advanced Inventory Management feature Handle multi-level assemblies Lay the groundwork for future MRP/manufacturing features Work Order Build WO Update Inventory Accounting Postings Assembly Item Define the BOM Print BOM Light Manufacturing Process
  • 33.
    For Inventory Items SalesOrder and Light Manuf. Process Sales Order Reservation Accept Payment Create Invoice Fulfillment Accounting Postings Work Order
  • 34.
    Advanced Forecasting Product Catalog Service Catalog Puttingthe “C” in CRM Integrated Quotes/Proposals Document Management Document Publishing Integrated Order Mgmt Bookings Dashboard Incentive Management Customer Portal Project Tracking Time & Expense Upsell/ Cross-sell Website Hosting Search Engine Optimization Website Analytics Online Catalog Lead Dashboard Intranet Sales & Marketing Tools Mass E-Mail Group Calendaring Resource Availability + Lead Prospect Qualify MeetQuote Order Service Delivery Repurchase Suspect + + + + + + + +
  • 35.
    Components of NetSuite CRM Salesforce Automation (SFA)  Account Management  Contact Management  Activity Management Marketing Automation  Lead Management  Campaign Management Customer Service and Support  Case Management  Knowledgebase Management  Issue Management Advance Partner Center  Partner Center Access Productivity Tools  NetSuite – Outlook Integration  Calendar Sharing  Opportunity Management  Quote / Sales Order Generation  Forecasting
  • 36.
    Customer Center Highlights Passwordprotected access View Personalized content – Project status – Outstanding quotes – Order/contract status – Pertinent documents Customer Service – Enter trouble tickets – Support/service history – Search knowledge base
  • 37.
    Lead to CustomerLifecycle A Contact can be created anytime throughout a Customer's Lifecycle You can create a Saved Search to display your Contacts in your Dashboard Create activities such as Tasks, Phone Calls and Events related to a Contact.
  • 38.
    Top Search TermsLeads by SourceCampaign ROI Web Form Lead Capture Import Data Web Site Visitors Inbound Calls Lists Plan and Execute Marketing Campaign • Google AdWords • Email Marketing • Direct Mail • Cold Calls • Partners • TV • Radio • Events • Trade Shows • PR • Set up auto-response emails -”Thank you for your interest” -Your trial information -Event details • Set up lead assignment rules -Geography -Company size -Product of interest • Use the import wizard or Excel connector • Purchased list • Trade show • Legacy data • “Contact me” request • Free trial • Event registration • Organic Web traffic • AdWords referrals • Email responses • Yellow pages • Google Maps • Word-of-mouth referrals Create New Leads • Search for the customer in NetSuite • If one doesn’t exist, create a new lead Lead Quality Generate More Leads
  • 39.
    On-line Lead Forms: Usedto receive information from customers / leads from your website (customer registration or survey)
  • 40.
    Lead and TerritoryManagement: Sales Rules Sales Territories
  • 41.
  • 42.
    Month-to-Date Trending ClosedBusiness by Month Top Sales RepsTop 10 Deals Presentation Proposal Negotiation Won Yes No Open Opportunities You can monitor your opportunities reports and dashboards to keep track of your top deals and prioritize your time. Customize NetSuite to fit your internal sales methodologies and processes, making it easier to monitor your sales pipeline. Use email marketing and call downs to re-market to your archived opportunities. Keep an archive of your dead opportunities. NetSuite gives your entire company a 360-degree view of your customers and facilitates collaboration across your organization, helping you build strong, lasting customer relationships. Sales Support Marketing New Customers Opportunity Management • Log call notes • Create follow-up tasks • Schedule an event • Send an email Log Activities
  • 43.
    Funnel Cases fromDisparate Customer Touch Points • Technical Support • Billing Question • Feature Request • Updated Account Info Call Support Log a Case Online Email Support Call Sales Case Deflection • Customer Portal • On-line Form • Press 1 for Support • Press 2 for Billing • support@acme.com • billing@acme.com • “While I have you on the phone…” •” I don’t know who to call but…” CTI Integration (optional) The customer’s information automatically pops up for the support rep Log a Case Manually The salesperson creates a case on behalf of the customer Email-to-Case (optional) You can setup email-to-case so that a case is automatically created based on an incoming email. With the customer portal, you can set it up so the customer receives a suggested solution before submitting a case Case Is Created Your Customer Has a Question ? Cases by Source Case VolumeCases by CustomerCases by Type
  • 44.
    Case Rules Case Record Created Filteredinto Territories Assigned to a Support Rep Case Rules Case Territories
  • 45.
    Closed Loop CaseManagement Process
  • 46.
    Marketing Campaign (email) ©NetSuite Inc. 2011 Confidential 50 Marketing Campaign Target Group ExecutePlan Monitor/ Analyze Text or HTML Format From Name From Email Address Reply To Email Address Campaign Domain (required for > 10,000 emails) Email Marketing Template Static or Dynamic Search
  • 47.
    Email Blast /Mail Merge Large Volume E-mail Campaign Automation Multi-Channel Campaign Tracking Promotion & Online Form Management Real-Time Statistics & Complete ROI
  • 48.
    HR / EmployeeCenter Employee Management – Employee Profile – Employee Time HR Reminders – Reviews, Birthdays, – Visa Expiration Self-Service – Edit Profile – Paycheck History – Time Sheets – Expense Reporting – Purchase Requests
  • 49.
    Account Planning I cansee my customer’s history of events and activities in Netsuite which help me develop an account strategy and action plan. I can create my own Action Plans by assigning tasks to myself as To-Do’s. I have the option to create a follow-up activities & future date them as a reminder to take action. I can see which accounts I have committed time & if there are positive results as the outcome.
  • 50.
    Increase Collaboration (CalendarSharing) You can see other calendars (employees and resources) You can see other calendars (employees and resources)
  • 51.
  • 52.
  • 53.
    As a SalesRep, My Managers don’t have to micro-manage me! There are no accountability issues since I know what is assigned to me. If my manager needs a history of events, it can all be found in NetSuite My managers can look in the application to see what I’ve done instead of asking me My managers don’t have the time to look at every single detail and record. It’s a waste of their time! Their objective is to help me meet my goals and targets, just as much as I would like to.
  • 54.
    NetSuite-Outlook Integration savesme time I am able to synchronize my Contacts, Tasks and Calendar to and from Outlook and NetSuite Emails I send from Outlook can be added to a record in NetSuite. I don’t have to enter data twice in both applications!
  • 55.
    60 #1 for Software #1 for WD #1for Manufacturing #1 for Services #1 for Etail/Retail #1 for Enterprises NetSuite: World’s #1 Cloud ERP
  • 56.
    NuVista’s NetSuite CustomersSnapshot Marine Industry Part of Listed Company- SINWA Complex requirements with multiple work-flows & processes www.amsmarinegroup.com Light Manufacturing Industry EV-Electric Vehicle Conversion NetSuite powers entire business operations in ERP/Inventory/CRM www.evworld.sg Collins MoversCollins Movers LotteLotte EV WorldEV World AMS MarineAMS Marine Logistics & Transportation Industry Non-standard requirements for CRM, Costing & Billing Calculations Replaced multiple disparate systems for CRM, SO & Accounts www.collinsmovers.com.sg FMCG Industry Korean Conglomerate Subsidiary- Lotte Confectionery Singapore No Systems in place with Multiple Items/SKUs mgmt with integrated SO, PO & Financials www.lotte.co.kr
  • 57.
    NuVista’s NetSuite CustomersSnapshot Safety Equipments/Training Industry Mix of Service & Products Business model Integrated Sales, Purchasing, Inventory, Training/Ops Mgmt www.asretec.org Most Reputed Apple authorized service centre in Singapore Receive >8000 Customer Cases per month, with integration req in Sales, Purchasing, Inventory & Fin eserv.micro2000.com.sg WD Industry MarnixMarnix FortisFortis Micro2000Micro2000 AsretecAsretec Financial/Insurance Industry Japan HQ Global Company Insurance Broking Non-standard req for Premium Calculations Had manual process for Sales, CRM and Accounts- integrated the same www.marnix.co.jp Hospitality/Retail Industry Premier Hospitality Management Company that oversees Travel, Events, and Privileges Program for our corporate customers CRM System www.fortis.com.sg
  • 58.

Editor's Notes

  • #7 If you’re not familiar with NetSuite: NetSuite offers a complete business management solution all running in the cloud at NetSuite’s data center. We’ve experienced dramatic growth since our founding in 1998 – growing double digits We’re on the vanguard of cloud computing as it gains acceptance in the enterprise – just recently we entered the Top 10 financial management / ERP solutions according to Gartner and IDC. Our cloud business management solution runs mission critical applications across finance, CRM and Ecommerce for over 6,600 companies – small and medium size businesses, and divisions of global enterprises., A key foundation to NetSuite’s success is the architecture, performance, security, and reliability of our data center .It provides a level of performance that is practically and economically impossible for a business to achieve with in house/on premise business applications In this presentation you’ll hear what you can expect from NetSuite’s data center, why you can trust NetSuite to run your business processes in the cloud, and how NetSuite sets the benchmark for the cloud data center.