СЭА                                 QUALITY MANAGEMENT SYSTEM
The document
name                      Procedure management of inappropriate production
                                                             Effective date:
Code:                                  SEA P802              15.03.2006




                                        THE MAINTENANCE:


                                  1. THE PURPOSE
                                  2. SCOPE OF APPLICATION

                                  3. REFERENCES TO DOCUMENTS

                                  4. THE INSTRUCTION DESCRIPTION

                                  5. RESPONSIBILITY AND POWERS

                                  6. DESIGNATIONS AND REDUCTIONS

                                  7. APPENDICES




THE                      HAS PREPARED:            HAS CHECKED UP:              HAS CONFIRMED:
DOCUMENT

Post:                Нач. Technological
                        department                The chief engineer           The general   director
 FIRST NAME,
MIDDLE
INITIAL, LAST
                           Varakin O.                 Lerner B.                    Lobach A.
NAME:
The signature:

                 №                1.         2.            3.           4.              5.
Changes          Date:
                 The signature:

SEA P802 Sheet 1 1from 5
СЭА                   QUALITY MANAGEMENT SYSTEM
The document
name                  Procedure management of inappropriate production
                                                     Effective date:
Code:                       SEA P802                 15.03.2006




                           Sheet of mailing of the document


№             The name                                          Date      The
                                            Post
пп           Divisions                                      Receptions   signature
1     The top management      The general director           16.03.06
2                             The chief engineer             16.03.06 г
3                             Head СМК                       16.03.06 г
4                             The chief accountant           16.03.06 г
5                             The agent on supply            16.03.06 г
6                             The manager on the personnel   16.03.06 г
7     Technological           The chief of department        16.03.06 г
      department
8                             The mechanic                   16.03.06 г
9     Industrial site №1      The chief of a site            17.03.06г.
10    Industrial site №2      The chief of a site            17.03.06г.




SEA P802 Sheet 1 2from 5
СЭА                         QUALITY MANAGEMENT SYSTEM
 The document
 name                  Procedure management of inappropriate production
                                                               Effective date:
 Code:                           SEA P802                      15.03.2006


1.   The procedure    purpose:
   The given procedure describes managerial process by production which does not correspond to
requirements of specifications, standards, THAT of the project, etc.

2. Scope of application
     Process is carried out: 1) – heads of divisions, departments;
                               2) – separate workers of departments and divisions on
                                    To the decision of heads of divisions;
                               3) – manufacturers of works on building sites.

3. The reference to documents
     ISO 9001: 2000, the river 8;
     Quality manual of SEA QM-01

4. The process description
Н – the process Beginning.
1. Reception of the information on discrepancy of production or establishment of the fact of
    discrepancy.
The Controller on a platform of building or the manufacturer of works fix discrepancy of production
(a separate element of process, a part of the design documentation, marriage in the put equipment,
etc.). The information is transferred in the form of records, certificates, reports, results of gaugings.
The fact of discrepancy of production to requirements of standard documents, the design or
technological documentation is established at entrance control, at performance of control operations
and acceptance tests in the course of building.
2. Documentation registration.
    The certificate about discrepancy of production is made out. It is carried out by the controller on
    a platform or under the direction of the chief of a site.
3. Isolation of inappropriate production.
4. The discrepancy analysis.
       The commission appointed the Chief engineer which structure includes the qualified experts,
makes the analysis of marriage and defines the further actions with inappropriate production.
5. Probably to use?
       Depending on defect degree decisions on possibility of further use are made.
6. Probably to use without alteration?
7. Transfer to repair or on alteration.
8. Registration, the coordination and the statement of permissions to use of inappropriate
    production.
    The permission is made out by division, the originator of the established discrepancies
    The permission is co-ordinated with the Chief engineer, affirms the General director.
9. Completion or correction of inappropriate production.
   Completion or alteration of inappropriate production is carried out by division, the originator of
the admitted discrepancy
10. Tests or control after completion or alteration of inappropriate production.
SEA P802 Sheet 1 3from 5
СЭА                          QUALITY MANAGEMENT SYSTEM
 The document
 name                 Procedure management of inappropriate production
                                                             Effective date:
 Code:                          SEA P802                     15.03.2006
    Control and test is carried out by the manufacturer of works with the assistance of
    representatives ПТО, according to the procedures developed for these purposes.
11. Production has passed control or tests?
    Whether there has passed production control or tests are defined by the controller or the
commission.
12. Transfer to the further manufacture.
13. Informing of the client.
   The client is informed in the event that it is stipulated in the contract or the contract.
To – the process end

5. Responsibility and powers
Responsibility for an establishment of the facts of discrepancies, them актирования, decision-
making on such production, and its further use, is assigned to controllers on a platform and chief
ПТО
6. Designations and reductions
СМК – quality management System
ПТО – Technological department

8. Appendices
SEA О802.01 «Magazine of registration of discrepancies»
The block the scheme of managerial process by inappropriate production




SEA P802 Sheet 1 4from 5
СЭА                              QUALITY MANAGEMENT SYSTEM
 The document
 name                   Procedure management of inappropriate production
                                                       Effective date:
 Code:                               SEA P802          15.03.2006
The block   – the process scheme.
                                                                                  The appendix

                    Н

                                                Н – the process beginning
                   1
                                                1 – Reception of the information on discrepancy
                   2
                                                of production or an establishment of the fact of
                                                discrepancy
                   3
                                                2 – documentation Registration
                                                It is carried out by the controller on a platform or
                                                the chief of a site
                   4
                                                3 – Isolation of inappropriate production
                                                It is carried out by the chief of a site or the
                   5                            manufacturer of works
        NO
                                                4 – the discrepancy Analysis
                                                It is carried out by the commission
    7             YES
                                                5 – Probably to use?
                           YES                  6 – Probably to use after repair?
                   6                            7 – It is impossible to use
                                                8 – Registration and the permission coordination
                  NO                            It is carried out by division – the originator of
                                 8              marriage
                   9                            9 – Completion or correction of inappropriate
                                                production
                   10                           It is carried out by industrial division - the
                                                originator of marriage
                                                10 – Tests or control after completion or alteration
                   11      NO                   of inappropriate production
                                                It is carried out by the manufacturer of works
                                 13
                  YES                           together with representatives ПТО
                                                11 – Production has passed control or tests?
                                                12 – Transfer to the further manufacture
                                                13 – Informing of the client
                                                14 – the process End
                   12




                  TO




SEA P802 Sheet 1 5from 5

More Related Content

Viewers also liked

12. audit account
12. audit account12. audit account
12. audit accountzemm1
 
4. oh&s policy
4. oh&s policy4. oh&s policy
4. oh&s policyzemm1
 
13. company profile
13. company profile13. company profile
13. company profilezemm1
 
9. c vs of staff
9. c vs of staff9. c vs of staff
9. c vs of staffzemm1
 
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Tư vấn GMP, cGMP, ISO
 
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gspTư vấn GMP, cGMP, ISO
 
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Tư vấn GMP, cGMP, ISO
 
10. list of equipments
10. list of equipments10. list of equipments
10. list of equipmentszemm1
 
Validation of friability test apapraturs
Validation of friability test apapratursValidation of friability test apapraturs
Validation of friability test apapratursRam Mohan S R
 
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Tư vấn GMP, cGMP, ISO
 
Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015DQS Inc.
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3DQS Inc.
 
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY  INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY Ram Mohan S R
 
ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5DQS Inc.
 
problems in tablet manufacturing and coating
problems in tablet manufacturing and coatingproblems in tablet manufacturing and coating
problems in tablet manufacturing and coatingvenkatesh thota
 

Viewers also liked (20)

12. audit account
12. audit account12. audit account
12. audit account
 
design qualification
design qualification design qualification
design qualification
 
4. oh&s policy
4. oh&s policy4. oh&s policy
4. oh&s policy
 
13. company profile
13. company profile13. company profile
13. company profile
 
Market complaints
Market complaintsMarket complaints
Market complaints
 
Tunnel thermographs
Tunnel thermographsTunnel thermographs
Tunnel thermographs
 
9. c vs of staff
9. c vs of staff9. c vs of staff
9. c vs of staff
 
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
 
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
 
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
 
10. list of equipments
10. list of equipments10. list of equipments
10. list of equipments
 
Design qualification
Design qualificationDesign qualification
Design qualification
 
Huong dan quan ly chat luong thuoc.
Huong dan quan ly chat luong thuoc.Huong dan quan ly chat luong thuoc.
Huong dan quan ly chat luong thuoc.
 
Validation of friability test apapraturs
Validation of friability test apapratursValidation of friability test apapraturs
Validation of friability test apapraturs
 
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
 
Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3
 
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY  INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 
ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5ISO 9001:2015 Revision Update Part 5
ISO 9001:2015 Revision Update Part 5
 
problems in tablet manufacturing and coating
problems in tablet manufacturing and coatingproblems in tablet manufacturing and coating
problems in tablet manufacturing and coating
 

Similar to 6. non conformance control

Pharmaceutical Deviation SOP
Pharmaceutical Deviation SOPPharmaceutical Deviation SOP
Pharmaceutical Deviation SOPMohamed Wallash
 
Managing Validation.3
Managing Validation.3Managing Validation.3
Managing Validation.3nenalandim
 
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxProject_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxwoodruffeloisa
 
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...Shashi Kumar
 
PM Notebook - Chapter 5 - Scope Management
PM Notebook - Chapter 5 - Scope ManagementPM Notebook - Chapter 5 - Scope Management
PM Notebook - Chapter 5 - Scope ManagementMohammad Elsheimy
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdfssuser089410
 
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptxValentinoDhiyu1
 
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1Lemon Lee
 
Validation Theory And Application 3
Validation   Theory And Application 3Validation   Theory And Application 3
Validation Theory And Application 3antoi alvarez
 
A folder sysem for uks 2008 2011
A folder sysem for uks 2008   2011A folder sysem for uks 2008   2011
A folder sysem for uks 2008 2011Clive Burgess
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)Prashant Rasekar
 
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdfmmmmm624454
 
Surface treatment seminar introduction
Surface treatment seminar introductionSurface treatment seminar introduction
Surface treatment seminar introductionMuhammad Ahmad
 

Similar to 6. non conformance control (20)

Pharmaceutical Deviation SOP
Pharmaceutical Deviation SOPPharmaceutical Deviation SOP
Pharmaceutical Deviation SOP
 
Managing Validation.3
Managing Validation.3Managing Validation.3
Managing Validation.3
 
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docxProject_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
Project_CharterProject TitleGO HOME!!Black BeltProject ChampionEx.docx
 
Peer Review
Peer ReviewPeer Review
Peer Review
 
Tpm
TpmTpm
Tpm
 
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
 
PM Notebook - Chapter 5 - Scope Management
PM Notebook - Chapter 5 - Scope ManagementPM Notebook - Chapter 5 - Scope Management
PM Notebook - Chapter 5 - Scope Management
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdf
 
Root Cause Analysis.pdf
Root Cause Analysis.pdfRoot Cause Analysis.pdf
Root Cause Analysis.pdf
 
Tpm training
Tpm trainingTpm training
Tpm training
 
tpm olisa vincent
tpm olisa vincenttpm olisa vincent
tpm olisa vincent
 
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems.pptx
 
P dsachin
P dsachinP dsachin
P dsachin
 
Pdsachin 161117105202
Pdsachin 161117105202Pdsachin 161117105202
Pdsachin 161117105202
 
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
Eight steps-for-efficient-pcb-manufacturing-and-assemblypart2-1
 
Validation Theory And Application 3
Validation   Theory And Application 3Validation   Theory And Application 3
Validation Theory And Application 3
 
A folder sysem for uks 2008 2011
A folder sysem for uks 2008   2011A folder sysem for uks 2008   2011
A folder sysem for uks 2008 2011
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
 
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
2015_GMP_Validation_Forum_Deviation-Incident-Non-conformance-Systems (1).pdf
 
Surface treatment seminar introduction
Surface treatment seminar introductionSurface treatment seminar introduction
Surface treatment seminar introduction
 

Recently uploaded

Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetEnjoy Anytime
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Hyundai Motor Group
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 

Recently uploaded (20)

Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 

6. non conformance control

  • 1. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 THE MAINTENANCE: 1. THE PURPOSE 2. SCOPE OF APPLICATION 3. REFERENCES TO DOCUMENTS 4. THE INSTRUCTION DESCRIPTION 5. RESPONSIBILITY AND POWERS 6. DESIGNATIONS AND REDUCTIONS 7. APPENDICES THE HAS PREPARED: HAS CHECKED UP: HAS CONFIRMED: DOCUMENT Post: Нач. Technological department The chief engineer The general director FIRST NAME, MIDDLE INITIAL, LAST Varakin O. Lerner B. Lobach A. NAME: The signature: № 1. 2. 3. 4. 5. Changes Date: The signature: SEA P802 Sheet 1 1from 5
  • 2. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 Sheet of mailing of the document № The name Date The Post пп Divisions Receptions signature 1 The top management The general director 16.03.06 2 The chief engineer 16.03.06 г 3 Head СМК 16.03.06 г 4 The chief accountant 16.03.06 г 5 The agent on supply 16.03.06 г 6 The manager on the personnel 16.03.06 г 7 Technological The chief of department 16.03.06 г department 8 The mechanic 16.03.06 г 9 Industrial site №1 The chief of a site 17.03.06г. 10 Industrial site №2 The chief of a site 17.03.06г. SEA P802 Sheet 1 2from 5
  • 3. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 1. The procedure purpose: The given procedure describes managerial process by production which does not correspond to requirements of specifications, standards, THAT of the project, etc. 2. Scope of application Process is carried out: 1) – heads of divisions, departments; 2) – separate workers of departments and divisions on To the decision of heads of divisions; 3) – manufacturers of works on building sites. 3. The reference to documents ISO 9001: 2000, the river 8; Quality manual of SEA QM-01 4. The process description Н – the process Beginning. 1. Reception of the information on discrepancy of production or establishment of the fact of discrepancy. The Controller on a platform of building or the manufacturer of works fix discrepancy of production (a separate element of process, a part of the design documentation, marriage in the put equipment, etc.). The information is transferred in the form of records, certificates, reports, results of gaugings. The fact of discrepancy of production to requirements of standard documents, the design or technological documentation is established at entrance control, at performance of control operations and acceptance tests in the course of building. 2. Documentation registration. The certificate about discrepancy of production is made out. It is carried out by the controller on a platform or under the direction of the chief of a site. 3. Isolation of inappropriate production. 4. The discrepancy analysis. The commission appointed the Chief engineer which structure includes the qualified experts, makes the analysis of marriage and defines the further actions with inappropriate production. 5. Probably to use? Depending on defect degree decisions on possibility of further use are made. 6. Probably to use without alteration? 7. Transfer to repair or on alteration. 8. Registration, the coordination and the statement of permissions to use of inappropriate production. The permission is made out by division, the originator of the established discrepancies The permission is co-ordinated with the Chief engineer, affirms the General director. 9. Completion or correction of inappropriate production. Completion or alteration of inappropriate production is carried out by division, the originator of the admitted discrepancy 10. Tests or control after completion or alteration of inappropriate production. SEA P802 Sheet 1 3from 5
  • 4. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 Control and test is carried out by the manufacturer of works with the assistance of representatives ПТО, according to the procedures developed for these purposes. 11. Production has passed control or tests? Whether there has passed production control or tests are defined by the controller or the commission. 12. Transfer to the further manufacture. 13. Informing of the client. The client is informed in the event that it is stipulated in the contract or the contract. To – the process end 5. Responsibility and powers Responsibility for an establishment of the facts of discrepancies, them актирования, decision- making on such production, and its further use, is assigned to controllers on a platform and chief ПТО 6. Designations and reductions СМК – quality management System ПТО – Technological department 8. Appendices SEA О802.01 «Magazine of registration of discrepancies» The block the scheme of managerial process by inappropriate production SEA P802 Sheet 1 4from 5
  • 5. СЭА QUALITY MANAGEMENT SYSTEM The document name Procedure management of inappropriate production Effective date: Code: SEA P802 15.03.2006 The block – the process scheme. The appendix Н Н – the process beginning 1 1 – Reception of the information on discrepancy 2 of production or an establishment of the fact of discrepancy 3 2 – documentation Registration It is carried out by the controller on a platform or the chief of a site 4 3 – Isolation of inappropriate production It is carried out by the chief of a site or the 5 manufacturer of works NO 4 – the discrepancy Analysis It is carried out by the commission 7 YES 5 – Probably to use? YES 6 – Probably to use after repair? 6 7 – It is impossible to use 8 – Registration and the permission coordination NO It is carried out by division – the originator of 8 marriage 9 9 – Completion or correction of inappropriate production 10 It is carried out by industrial division - the originator of marriage 10 – Tests or control after completion or alteration 11 NO of inappropriate production It is carried out by the manufacturer of works 13 YES together with representatives ПТО 11 – Production has passed control or tests? 12 – Transfer to the further manufacture 13 – Informing of the client 14 – the process End 12 TO SEA P802 Sheet 1 5from 5