The document provides an overview of electrical maintenance techniques used at HPCL Vishakh Refinery in India. It discusses predictive maintenance methods like infrared thermography, vibration analysis, and motor current signature analysis that are employed to ensure reliability, productivity, and safety. The refinery uses advanced techniques like these to monitor equipment condition and schedule maintenance when needed to minimize breakdowns and downtime.
This document provides an introduction and overview of a 33/11 kV substation in Uttar Pradesh, India. It discusses the key components of the substation including transformers, circuit breakers, insulators, protective equipment. It also covers the types of substations, earthing design methodology, and materials used for earthing. The document aims to provide training on the design, components and operation of electrical substations.
Power Plants Chhatisgarh - For Sealing Compounds for Power Stations Call +91...Project Sales Corp
This document summarizes information about several coal-fired power plants located in the Indian states of Chhattisgarh and Orissa. It provides details on the location, operator, configuration, fuel source, suppliers and key facts about plants such as Bhilai, Jharsuguda, Pathadi-I, Raigarh, Rourkela Phase-II, and Talcher STPS. The document contains photographs and cites its information sources as industcards and Platts UDI World Electric Power Plants Data Base.
EPCOS is a leading manufacturer of electronic components including capacitors, inductors, EMC filters, sensors and sensor systems, nonlinear resistors, and arresters. It focuses on technologically demanding markets in areas like information technology, automotive, industrial, and consumer electronics. EPCOS offers both standard components and application-specific solutions. It has global design, manufacturing and marketing facilities and is continually improving processes and quality management. EPCOS provides a broad portfolio of power factor correction capacitor series and components for optimizing power quality and factor.
1) The document discusses insulation systems for large turbo-generators used in power generation in India. It focuses on Vacuum Pressure Impregnation (VPI), an insulation technique employed by Bharat Heavy Electricals Limited (BHEL) in Hyderabad, India.
2) VPI uses a thermosetting epoxy resin with a low resin content, making it highly reliable with good mechanical and thermal properties while reducing costs. BHEL was the first in India and second in the world after Germany to use this VPI system.
3) The document provides details on BHEL's operations, products, and technologies. It describes the design and components of turbo-generators, focusing on insulation as the
This document discusses the study and manufacturing of an alternator. It begins by introducing the importance of electricity in economic development and the need to increase power generation capacity. It then describes the main components of a turbo generator including the rotor, stator, and exciter. The principles of electromagnetic induction and operation of generators are explained. Details are provided on the construction of the stator core and winding, as well as insulation systems and vacuum pressure impregnation. Finally, the document briefly discusses the different types of exciters used.
Manufacturing process of 500/600MW stator winding barAvinash Kumar
The document discusses the manufacturing process of stator winding bars for 500/600MW generators at BHEL. It describes the key sections of the manufacturing process, including conductor cutting, insulation, impregnation and assembly. It provides details on the size and number of conductors, insulation classifications, transposition process, resin systems, testing procedures and specifications of 600MW generators. The training gave insights into the complex architecture and coordinated working of various units in a large power plant.
Manfacturing of turbo generators at BHELPrabhu Raj
This document discusses the components, operation, and testing of a 200MW turbo generator manufactured by BHEL Hyderabad. It describes the main components of the generator including the stator frame, core, and windings as well as the rotor, cooling system, and testing procedures. Key specifications of the 200MW generator are provided such as a rated output of 200MW, rated voltage of 15.75kV, and efficiency of 98.5%.
500 MW synchronous generator rotor construction reportSumit Singh
This industrial training report summarizes the student's training on the manufacturing process of a 500MW turbo rotor at BHEL Haridwar. It discusses the technical details of the rotor, including its material requirements, cooling system, and manufacturing process for the rotor bars. Key steps include marking coils, drilling cooling holes, assembling coils in the rotor slots, connecting them electrically, and testing the completed rotor through high voltage tests and impedance tests. The report provides insights into the various production departments involved and quality checks conducted to manufacture a large turbo rotor reliably and efficiently.
This document provides an introduction and overview of a 33/11 kV substation in Uttar Pradesh, India. It discusses the key components of the substation including transformers, circuit breakers, insulators, protective equipment. It also covers the types of substations, earthing design methodology, and materials used for earthing. The document aims to provide training on the design, components and operation of electrical substations.
Power Plants Chhatisgarh - For Sealing Compounds for Power Stations Call +91...Project Sales Corp
This document summarizes information about several coal-fired power plants located in the Indian states of Chhattisgarh and Orissa. It provides details on the location, operator, configuration, fuel source, suppliers and key facts about plants such as Bhilai, Jharsuguda, Pathadi-I, Raigarh, Rourkela Phase-II, and Talcher STPS. The document contains photographs and cites its information sources as industcards and Platts UDI World Electric Power Plants Data Base.
EPCOS is a leading manufacturer of electronic components including capacitors, inductors, EMC filters, sensors and sensor systems, nonlinear resistors, and arresters. It focuses on technologically demanding markets in areas like information technology, automotive, industrial, and consumer electronics. EPCOS offers both standard components and application-specific solutions. It has global design, manufacturing and marketing facilities and is continually improving processes and quality management. EPCOS provides a broad portfolio of power factor correction capacitor series and components for optimizing power quality and factor.
1) The document discusses insulation systems for large turbo-generators used in power generation in India. It focuses on Vacuum Pressure Impregnation (VPI), an insulation technique employed by Bharat Heavy Electricals Limited (BHEL) in Hyderabad, India.
2) VPI uses a thermosetting epoxy resin with a low resin content, making it highly reliable with good mechanical and thermal properties while reducing costs. BHEL was the first in India and second in the world after Germany to use this VPI system.
3) The document provides details on BHEL's operations, products, and technologies. It describes the design and components of turbo-generators, focusing on insulation as the
This document discusses the study and manufacturing of an alternator. It begins by introducing the importance of electricity in economic development and the need to increase power generation capacity. It then describes the main components of a turbo generator including the rotor, stator, and exciter. The principles of electromagnetic induction and operation of generators are explained. Details are provided on the construction of the stator core and winding, as well as insulation systems and vacuum pressure impregnation. Finally, the document briefly discusses the different types of exciters used.
Manufacturing process of 500/600MW stator winding barAvinash Kumar
The document discusses the manufacturing process of stator winding bars for 500/600MW generators at BHEL. It describes the key sections of the manufacturing process, including conductor cutting, insulation, impregnation and assembly. It provides details on the size and number of conductors, insulation classifications, transposition process, resin systems, testing procedures and specifications of 600MW generators. The training gave insights into the complex architecture and coordinated working of various units in a large power plant.
Manfacturing of turbo generators at BHELPrabhu Raj
This document discusses the components, operation, and testing of a 200MW turbo generator manufactured by BHEL Hyderabad. It describes the main components of the generator including the stator frame, core, and windings as well as the rotor, cooling system, and testing procedures. Key specifications of the 200MW generator are provided such as a rated output of 200MW, rated voltage of 15.75kV, and efficiency of 98.5%.
500 MW synchronous generator rotor construction reportSumit Singh
This industrial training report summarizes the student's training on the manufacturing process of a 500MW turbo rotor at BHEL Haridwar. It discusses the technical details of the rotor, including its material requirements, cooling system, and manufacturing process for the rotor bars. Key steps include marking coils, drilling cooling holes, assembling coils in the rotor slots, connecting them electrically, and testing the completed rotor through high voltage tests and impedance tests. The report provides insights into the various production departments involved and quality checks conducted to manufacture a large turbo rotor reliably and efficiently.
This document summarizes a presentation given by Prakhar Mehrotra and Siddharth Raj at BHEL Haridwar from June 1-28, 2013. It provides an overview of BHEL, the largest engineering and manufacturing company in India, and its various locations. It then describes the main units at BHEL Haridwar, including turbo generators and exciters. It proceeds to explain the basic workings of a turbo generator, its main components like the stator and rotor, and different types of generators. The document concludes with descriptions of excitation systems, including brush and brushless exciters, and the advantages of brushless excitation.
This document outlines and compares two types of synchronous machines - cylindrical rotor type and salient pole rotor type generators. It describes their construction, working principles, types, and applications. The key differences are that cylindrical rotor type generators have a smooth cylindrical rotor, uniform air gap, operate at high speeds of 1000-3000 RPM, and are used in thermal and gas turbine power plants. Salient pole rotor type generators have projecting poles, non-uniform air gap, larger diameter and operate at lower speeds of 100-500 RPM, often driven by engines.
BHEL is India's largest engineering and manufacturing company established over 40 years ago. It operates a Heavy Electrical Equipment Plant (HEEP) that manufactures turbo generators. The plant has 8 blocks for manufacturing different components. Block 1 focuses on electrical machine assembly including stator winding and rotor assembly for hydro generators and turbo generators. A key product is a 210MW turbo generator with specifications like a rated output of 588MVA, 500MW, and 21kV terminal voltage. It consists of a stator, rotor, bearings, and shaft. The stator contains the frame, core, winding, and other parts. The rotor includes the shaft, winding, wedges, and fans. Vacuum pressure impregnation is used
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEMyash Natani
This document provides an overview of the vocational training received at Bharat Heavy Electricals Limited (BHEL) in Haridwar, India focusing on turbo generators. It describes the various sections and blocks at BHEL Haridwar involved in manufacturing turbo generators and their components. Key points include that BHEL Haridwar is divided into a Central Foundry Forge Plant and a Heavy Electrical Equipment Plant, and within the latter are blocks focused on manufacturing the turbo generator and exciter system, power equipment, steam and gas turbines, windings, water boxes and more. The document also provides details on the components, workings, classifications and manufacturing process of turbo generators.
- A synchronous machine is an important electric machine that uses electromechanical energy conversion. Synchronous generators are used in power plants and synchronous motors are used widely in industries.
- The main components are a stator, rotor, field windings on the rotor, and armature windings on the stator. The rotor rotates inside the stator with an air gap.
- Synchronous machines use distributed multi-phase armature windings on the stator that are connected in a star or delta configuration. The windings are distributed around the stator slots to produce a more sinusoidal induced electromotive force.
This document provides an overview of how alternators work in vehicle charging systems. It discusses the major components of the charging system including the battery, alternator and regulator. It then describes the internal components and functioning of the alternator, including the rotor assembly, stator windings, rectifier bridge and regulator. Diagrams are included to illustrate the charging circuit, alternator component identification and the magnetic and electrical processes within the alternator that produce direct current output.
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATORAnurag Verma
The document summarizes the manufacturing process of stator winding bars for a 600 MW turbo generator at BHEL Haridwar. It describes the various manufacturing blocks involved, including the coil and insulation manufacturing block. This block contains three bays - one for bar winding, one for heavy duty generator bar winding using CNC machines, and one for insulation detail work. The bar winding shop within this block manufactures stator winding coils through processes like conductor cutting, insulation, transposition, stacking and brazing. Each bar undergoes testing for insulation and capacitance before being assembled into the generator stator.
This document discusses synchronous machines and synchronous generators. It contains the following key points:
1. Synchronous machines operate at a constant synchronous speed that is determined by the electrical frequency and number of poles. They can operate as generators or motors.
2. Synchronous generators are widely used in large power applications due to their high efficiency, reliability, and ability to control power factor. They have a rotor winding supplied by DC current and a stator connected to the AC supply.
3. The internal generated voltage of a synchronous generator depends on factors like flux, speed of rotation, and field current. It can supply either lagging or leading reactive current to the system.
4. An open circuit test is
This document provides an overview of turbo generators. It describes their history, working principle, design process, manufacturing of rotor windings, applications, advantages, and disadvantages. Turbo generators are large machines that directly connect turbines to electrical generators in order to generate power. They can be powered by steam, gas, or water turbines. The document outlines the 12 step design process and discusses the construction and components of rotor windings. Turbo generators provide reliable, economic, and renewable energy but require high maintenance costs. Future research focuses on improving insulation testing techniques.
Turbo generator converts mechanical energy into electrical energy.
The Mechanical motion is generated in turbine by using heat in the form of saturated steam.It operates on the fundamental principles ofELECTROMAGNETIC INDUCTION.
Excitation System-The process of generating a magnetic field by means of an electric current is called excitation.
It provides power to the field windings thus produce field for rotor.
This is a special type of turbo generator which may find its usage in typical chemical plants. Here the steam in turbine comes from sulphuric acid plant.So no need of coal handling plant like in thermal power plants.
Synchronous machines have two sets of windings - a three-phase armature winding on the stationary stator and a DC field winding on the rotating rotor. The rotor can have either a salient pole or cylindrical structure. Large generators use brushless excitation systems to avoid maintenance issues associated with slip rings and brushes. Excitation is provided by a small AC generator (brushless exciter) mounted on the stator whose output is rectified to supply DC current to the main field winding. Proper cooling is required to dissipate heat generated in the windings.
This is my Summer Training Report in B.H.E.L., Haridwar on General Awareness Of Steam Turbine in Turbine Block-III in the period 17/06/13 to 31/07/13.
I would like to thank My Mentor Mr. Alok Shukla Sir, My Guide Asst. Prof. Mr. Anuj Dixit Sir. Without their guidance and efforts it was impossible to achieve.
training report NTPC Muzaffarpur Bihar Dilip kumar
This document provides an industrial training report on the generation system of the National Thermal Power Corporation Ltd. (NTPC). It discusses the key components of a thermal power plant that use the modified Rankine cycle to convert the chemical energy of coal into electrical energy. These include the boiler, turbine, condenser, and other auxiliary components. The report also provides an overview of the processes involved in coal handling, steam generation, power generation using steam turbines, and electricity distribution at NTPC power plants. It aims to provide an understanding of the technical aspects and management of thermal power generation.
This document provides an industrial training report on the generation system of the National Thermal Power Corporation Ltd. (NTPC). It discusses the key components of a thermal power plant that use the modified Rankine cycle to convert the chemical energy of coal into electrical energy. These include the boiler, turbine, condenser, and other auxiliary components. The report also provides an overview of the processes involved in coal handling, steam generation, power generation using steam turbines, and electricity distribution at NTPC power plants. It aims to provide an understanding of the technical aspects and management of thermal power generation.
Nikhil kumar project report ON NTPC KANTINikhil Singh
This document provides an overview of a summer vocational training project completed by Nikhil Kumar at the Kanti Bijlee Utpadan Nigam Limited power plant in Muzaffarpur, Bihar, India from June 16th to July 15th 2013. The 3-page report acknowledges those who supported and guided the training, and declares that the report was submitted to fulfill degree requirements. It also includes an abstract that briefly outlines the key components and processes involved in a coal-fired thermal power plant.
This document is an industrial training report submitted by Pawan Agrawal for his Bachelor of Technology degree in Electrical Engineering. The report provides details about Pawan's summer training at the NTPC Faridabad power plant. It begins with an acknowledgment section thanking various NTPC officials who helped with the training. The report then provides information about NTPC as a company, an introduction to the NTPC Faridabad plant including its location, capacity and key features. It describes the basic working of the combined cycle power generation process used at the plant. It also provides details about the fuels used, various mechanical systems including the gas turbine, steam turbine and generator. Other sections cover the switchyard, transformers, DC system, switch
Industrial Training Report on NTPC FaridabadPawan Agrawal
This industrial training report provides an overview of NTPC Faridabad power plant. The report discusses the plant's location, installed capacity, production inputs such as natural gas and naphtha fuels, and key mechanical systems including the gas turbine, waste heat recovery steam generator (WHRSG), and steam turbine. It also describes electrical systems like the switchyard, generator, transformers, and switchgear. In summary, the report details the major components and operations of the combined cycle gas and steam turbine power plant located in Faridabad, Haryana, India.
Training reporton ka tpp by naval kishorNAVAL KISHOR
This document provides a summary of Naval Kishor's summer training at the Kalisindh Super Thermal Power Plant (KaTPP) in Jhalawar, Rajasthan. It begins with an introduction to KaTPP, including its location, capacity of 1200MW from 2 units of 600MW each, and annual coal requirements of 56 lakh tonnes. It then describes the basic working of a thermal power plant based on the Rankine cycle, involving converting chemical energy from coal to heat energy in steam, then to mechanical energy via a turbine, and finally electrical energy using a generator. The document covers various sections of KaTPP including the coal handling plant, important plant components like the boiler, turbine,
This document is a practical training report submitted by Banti Saini to fulfill requirements for a Bachelor of Technology degree in Electrical Engineering. The report summarizes Banti Saini's 30-day industrial training at the NTPC Dadri power plant in Uttar Pradesh, India from May 20th to June 18th 2019. The training covered topics like gas turbine starting systems, fuel systems, gas plant operations, combined cycle power plants, and automation and control systems. The report includes declarations, certificates, acknowledgments, tables of contents, and chapters discussing various aspects of the NTPC Dadri power plant.
This document provides a summary of a seminar on summer vocational training at NTPC thermal power plants. It discusses the key components of a thermal power plant including coal handling, pulverizing, boilers, turbines, generators, condensers, and ash handling. It also describes various equipment like ball mills used in pulverizing coal and control and instrumentation labs that monitor critical parameters. Finally, it lists some major thermal power plants in Rajasthan and references used in preparing the seminar.
This document summarizes a presentation given by Prakhar Mehrotra and Siddharth Raj at BHEL Haridwar from June 1-28, 2013. It provides an overview of BHEL, the largest engineering and manufacturing company in India, and its various locations. It then describes the main units at BHEL Haridwar, including turbo generators and exciters. It proceeds to explain the basic workings of a turbo generator, its main components like the stator and rotor, and different types of generators. The document concludes with descriptions of excitation systems, including brush and brushless exciters, and the advantages of brushless excitation.
This document outlines and compares two types of synchronous machines - cylindrical rotor type and salient pole rotor type generators. It describes their construction, working principles, types, and applications. The key differences are that cylindrical rotor type generators have a smooth cylindrical rotor, uniform air gap, operate at high speeds of 1000-3000 RPM, and are used in thermal and gas turbine power plants. Salient pole rotor type generators have projecting poles, non-uniform air gap, larger diameter and operate at lower speeds of 100-500 RPM, often driven by engines.
BHEL is India's largest engineering and manufacturing company established over 40 years ago. It operates a Heavy Electrical Equipment Plant (HEEP) that manufactures turbo generators. The plant has 8 blocks for manufacturing different components. Block 1 focuses on electrical machine assembly including stator winding and rotor assembly for hydro generators and turbo generators. A key product is a 210MW turbo generator with specifications like a rated output of 588MVA, 500MW, and 21kV terminal voltage. It consists of a stator, rotor, bearings, and shaft. The stator contains the frame, core, winding, and other parts. The rotor includes the shaft, winding, wedges, and fans. Vacuum pressure impregnation is used
BHEL HARIDWAR,CONSTRUCTION OF TURBO GENERATOR AND EXCITATION SYSTEMyash Natani
This document provides an overview of the vocational training received at Bharat Heavy Electricals Limited (BHEL) in Haridwar, India focusing on turbo generators. It describes the various sections and blocks at BHEL Haridwar involved in manufacturing turbo generators and their components. Key points include that BHEL Haridwar is divided into a Central Foundry Forge Plant and a Heavy Electrical Equipment Plant, and within the latter are blocks focused on manufacturing the turbo generator and exciter system, power equipment, steam and gas turbines, windings, water boxes and more. The document also provides details on the components, workings, classifications and manufacturing process of turbo generators.
- A synchronous machine is an important electric machine that uses electromechanical energy conversion. Synchronous generators are used in power plants and synchronous motors are used widely in industries.
- The main components are a stator, rotor, field windings on the rotor, and armature windings on the stator. The rotor rotates inside the stator with an air gap.
- Synchronous machines use distributed multi-phase armature windings on the stator that are connected in a star or delta configuration. The windings are distributed around the stator slots to produce a more sinusoidal induced electromotive force.
This document provides an overview of how alternators work in vehicle charging systems. It discusses the major components of the charging system including the battery, alternator and regulator. It then describes the internal components and functioning of the alternator, including the rotor assembly, stator windings, rectifier bridge and regulator. Diagrams are included to illustrate the charging circuit, alternator component identification and the magnetic and electrical processes within the alternator that produce direct current output.
MANUFACTURING PROCESS OF STATOR BAR; 600 MW TURBO GENERATORAnurag Verma
The document summarizes the manufacturing process of stator winding bars for a 600 MW turbo generator at BHEL Haridwar. It describes the various manufacturing blocks involved, including the coil and insulation manufacturing block. This block contains three bays - one for bar winding, one for heavy duty generator bar winding using CNC machines, and one for insulation detail work. The bar winding shop within this block manufactures stator winding coils through processes like conductor cutting, insulation, transposition, stacking and brazing. Each bar undergoes testing for insulation and capacitance before being assembled into the generator stator.
This document discusses synchronous machines and synchronous generators. It contains the following key points:
1. Synchronous machines operate at a constant synchronous speed that is determined by the electrical frequency and number of poles. They can operate as generators or motors.
2. Synchronous generators are widely used in large power applications due to their high efficiency, reliability, and ability to control power factor. They have a rotor winding supplied by DC current and a stator connected to the AC supply.
3. The internal generated voltage of a synchronous generator depends on factors like flux, speed of rotation, and field current. It can supply either lagging or leading reactive current to the system.
4. An open circuit test is
This document provides an overview of turbo generators. It describes their history, working principle, design process, manufacturing of rotor windings, applications, advantages, and disadvantages. Turbo generators are large machines that directly connect turbines to electrical generators in order to generate power. They can be powered by steam, gas, or water turbines. The document outlines the 12 step design process and discusses the construction and components of rotor windings. Turbo generators provide reliable, economic, and renewable energy but require high maintenance costs. Future research focuses on improving insulation testing techniques.
Turbo generator converts mechanical energy into electrical energy.
The Mechanical motion is generated in turbine by using heat in the form of saturated steam.It operates on the fundamental principles ofELECTROMAGNETIC INDUCTION.
Excitation System-The process of generating a magnetic field by means of an electric current is called excitation.
It provides power to the field windings thus produce field for rotor.
This is a special type of turbo generator which may find its usage in typical chemical plants. Here the steam in turbine comes from sulphuric acid plant.So no need of coal handling plant like in thermal power plants.
Synchronous machines have two sets of windings - a three-phase armature winding on the stationary stator and a DC field winding on the rotating rotor. The rotor can have either a salient pole or cylindrical structure. Large generators use brushless excitation systems to avoid maintenance issues associated with slip rings and brushes. Excitation is provided by a small AC generator (brushless exciter) mounted on the stator whose output is rectified to supply DC current to the main field winding. Proper cooling is required to dissipate heat generated in the windings.
This is my Summer Training Report in B.H.E.L., Haridwar on General Awareness Of Steam Turbine in Turbine Block-III in the period 17/06/13 to 31/07/13.
I would like to thank My Mentor Mr. Alok Shukla Sir, My Guide Asst. Prof. Mr. Anuj Dixit Sir. Without their guidance and efforts it was impossible to achieve.
training report NTPC Muzaffarpur Bihar Dilip kumar
This document provides an industrial training report on the generation system of the National Thermal Power Corporation Ltd. (NTPC). It discusses the key components of a thermal power plant that use the modified Rankine cycle to convert the chemical energy of coal into electrical energy. These include the boiler, turbine, condenser, and other auxiliary components. The report also provides an overview of the processes involved in coal handling, steam generation, power generation using steam turbines, and electricity distribution at NTPC power plants. It aims to provide an understanding of the technical aspects and management of thermal power generation.
This document provides an industrial training report on the generation system of the National Thermal Power Corporation Ltd. (NTPC). It discusses the key components of a thermal power plant that use the modified Rankine cycle to convert the chemical energy of coal into electrical energy. These include the boiler, turbine, condenser, and other auxiliary components. The report also provides an overview of the processes involved in coal handling, steam generation, power generation using steam turbines, and electricity distribution at NTPC power plants. It aims to provide an understanding of the technical aspects and management of thermal power generation.
Nikhil kumar project report ON NTPC KANTINikhil Singh
This document provides an overview of a summer vocational training project completed by Nikhil Kumar at the Kanti Bijlee Utpadan Nigam Limited power plant in Muzaffarpur, Bihar, India from June 16th to July 15th 2013. The 3-page report acknowledges those who supported and guided the training, and declares that the report was submitted to fulfill degree requirements. It also includes an abstract that briefly outlines the key components and processes involved in a coal-fired thermal power plant.
This document is an industrial training report submitted by Pawan Agrawal for his Bachelor of Technology degree in Electrical Engineering. The report provides details about Pawan's summer training at the NTPC Faridabad power plant. It begins with an acknowledgment section thanking various NTPC officials who helped with the training. The report then provides information about NTPC as a company, an introduction to the NTPC Faridabad plant including its location, capacity and key features. It describes the basic working of the combined cycle power generation process used at the plant. It also provides details about the fuels used, various mechanical systems including the gas turbine, steam turbine and generator. Other sections cover the switchyard, transformers, DC system, switch
Industrial Training Report on NTPC FaridabadPawan Agrawal
This industrial training report provides an overview of NTPC Faridabad power plant. The report discusses the plant's location, installed capacity, production inputs such as natural gas and naphtha fuels, and key mechanical systems including the gas turbine, waste heat recovery steam generator (WHRSG), and steam turbine. It also describes electrical systems like the switchyard, generator, transformers, and switchgear. In summary, the report details the major components and operations of the combined cycle gas and steam turbine power plant located in Faridabad, Haryana, India.
Training reporton ka tpp by naval kishorNAVAL KISHOR
This document provides a summary of Naval Kishor's summer training at the Kalisindh Super Thermal Power Plant (KaTPP) in Jhalawar, Rajasthan. It begins with an introduction to KaTPP, including its location, capacity of 1200MW from 2 units of 600MW each, and annual coal requirements of 56 lakh tonnes. It then describes the basic working of a thermal power plant based on the Rankine cycle, involving converting chemical energy from coal to heat energy in steam, then to mechanical energy via a turbine, and finally electrical energy using a generator. The document covers various sections of KaTPP including the coal handling plant, important plant components like the boiler, turbine,
This document is a practical training report submitted by Banti Saini to fulfill requirements for a Bachelor of Technology degree in Electrical Engineering. The report summarizes Banti Saini's 30-day industrial training at the NTPC Dadri power plant in Uttar Pradesh, India from May 20th to June 18th 2019. The training covered topics like gas turbine starting systems, fuel systems, gas plant operations, combined cycle power plants, and automation and control systems. The report includes declarations, certificates, acknowledgments, tables of contents, and chapters discussing various aspects of the NTPC Dadri power plant.
This document provides a summary of a seminar on summer vocational training at NTPC thermal power plants. It discusses the key components of a thermal power plant including coal handling, pulverizing, boilers, turbines, generators, condensers, and ash handling. It also describes various equipment like ball mills used in pulverizing coal and control and instrumentation labs that monitor critical parameters. Finally, it lists some major thermal power plants in Rajasthan and references used in preparing the seminar.
The document is a training report submitted by Amit Kumar describing his one month training at the Kanti Bijlee Utpadan Nigam Limited power plant in Muzaffarpur, Bihar, India. It provides an overview of the plant, describing that it has two 110MW coal-fired generating units. It then summarizes the key components and processes involved in thermal power generation, including converting coal to steam in the boiler, using steam to power the turbine for mechanical energy, and generating electricity through the generator. It concludes by outlining the sections to be covered in the full report.
This internship report summarizes Muhammad Saad Qureshi's internship at the Kapko Power Plant in Muzzafarabad from July 22nd to September 4th 2015. The report provides details about the plant, including that it has 3 blocks with a total capacity of 1600MW and uses natural gas, furnace oil, and diesel to generate electricity. It also describes the plant's operations and maintenance, the Brayton and Rankine cycles used, safety policies, water treatment processes, generator and transformer functions, and the internship experience.
Small Power Generation Plant solution (SPGP) continues to be an important segment of Electrical Energy production. The increasing demand for energy has to be satisfied while considering the impact on the global environment. SPGP plays an important role in industrial applications. Small size cogeneration plants sited close to industrial energy consumption can deliver power with high fuel efficiency and low emissions, and with modest space requirements. CRDenergy can offer to its customers complete solutions from feasibility studies to the actual turnkey cogeneration plant construction, aftermarket services and customized financial solutions. We are using oil and gas industrial port city Port Harcourt city (PH) in Nigeria, African largest economy as a case study, with its complexity, it reflects the shortage of power or barriers and opportunity encountered in every growing economy . Avoiding the structural complexity of building large scale power plant; SPGP offers a flexible, realiable, close to consumer option that can be multipled in multiple units and easily transformed to negbourhood service station in industrial hubs.
This document provides an overview and report on a vocational training project conducted by Tarun Kumar at the Kanti Thermal Power Station. It includes sections on acknowledging those who supported the training, an abstract describing the thermal power generation process, a table of contents, and sections covering topics like the power plant overview, generation process, boiler components, turbines, and control systems. The document aims to provide insight gained from Tarun Kumar's month-long industrial training placement at the thermal power facility.
This document provides an overview and training report on Mejia Thermal Power Station operated by Damodar Valley Corporation. It includes details of the various processes involved in power generation such as coal handling, coal milling, steam generation in boilers, steam turbine generation, water treatment, steam/water circuits, cooling towers, flue gas handling, electrostatic precipitators, ash handling, and the electrical systems including generators, transformers, control and instrumentation. The report was prepared by an engineering student as part of an industrial training program to understand the mechanical, electrical, and operational aspects of a thermal power plant.
Business opportunities in PHWR and technical preparedness from vendors Philip...ProSIM R & D Pvt. Ltd.
The document outlines NPCIL's plans to build nuclear reactors in India in a "fleet mode" whereby 10 reactors of 700MWe each will be constructed simultaneously over the next 10-12 years, presenting challenges for standardized engineering, establishing a robust supply chain, and developing adequate human resources for the nuclear industry to support the rapid expansion.
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
Steam turbine is an excellent prime mover to convert heat energy of steam to mechanical energy. Of all heat engines and prime movers the steam turbine is nearest to the ideal and it is widely used in power plants and in all industries where power is needed for process.
In power generation mostly steam turbine is used because of its greater thermal efficiency and higher power-to-weight ratio. Because the turbine generates rotary motion, it is particularly suited to be used to drive an electrical generator – about 80% of all electricity generation in the world is by use of steam turbines.
Rotor is the heart of the steam turbine and it affects the efficiency of the steam turbine. In this project we have mainly discussed about the working process of a steam turbine. The thermal efficiency of a steam turbine is much higher than that of a steam engine.
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
The document describes a report on an industrial training completed at the NTPC Dadri gas power plant. It provides an overview of NTPC and the Dadri station. The bulk of the document then focuses on introducing gas power plants, describing their components like the gas turbine starting system and fuel system. It explains how combined-cycle power plants work and the advantages they provide over conventional power generation methods.
This document provides an industrial training report on steam turbine manufacturing at Bharat Heavy Electricals Limited (BHEL) in Haridwar, India. It includes an acknowledgement, abstract, introduction to BHEL and its units including the Heavy Electrical Equipment Plant and Central Foundry Forge Plant in Haridwar. The document then discusses the manufacturing of steam turbines, including the principle of operation, advantages, disadvantages and design process. It also covers types of steam turbines, turbine parts, blade features, classifications of blocks in BHEL Haridwar, and the blade shop operations.
This document discusses India's energy sector and initiatives to improve efficiency. It notes that India's economy has grown rapidly at around 9% annually in recent years, driving strong growth in electricity demand. To meet this demand, India plans large additions of new coal, hydro, nuclear and renewable generating capacity. Initiatives to improve existing plants include renovations to enhance efficiency, as well as policies to promote clean coal technologies, ultra-mega power projects, and increasing the share of hydro and renewable energy. The document outlines India's capacity targets through 2032 to support ongoing economic growth in a sustainable manner.
The document provides information about an in-plant training conducted by Bhargav Kumar Tripathy at BPCL Kochi Refinery from 6 July 2015 to 17 July 2015. It includes details about the refinery such as its history, capacity expansions over time, products produced, and departments within the refinery like the Power and Utility section. The Power and Utility section oversees power generation, distribution and utilities operation at the refinery. It discusses the captive power plant that generates and distributes power to meet the refinery's needs.
Similar to 58995925 a-report-on-eletrical-maintenance-in-hpcl (20)
Discover the Beauty and Functionality of The Expert Remodeling Serviceobriengroupinc04
Unlock your kitchen's true potential with expert remodeling services from O'Brien Group Inc. Transform your space into a functional, modern, and luxurious haven with their experienced professionals. From layout reconfiguration to high-end upgrades, they deliver stunning results tailored to your style and needs. Visit obriengroupinc.com to elevate your kitchen's beauty and functionality today.
Cover Story - China's Investment Leader - Dr. Alyce SUmsthrill
In World Expo 2010 Shanghai – the most visited Expo in the World History
https://www.britannica.com/event/Expo-Shanghai-2010
China’s official organizer of the Expo, CCPIT (China Council for the Promotion of International Trade https://en.ccpit.org/) has chosen Dr. Alyce Su as the Cover Person with Cover Story, in the Expo’s official magazine distributed throughout the Expo, showcasing China’s New Generation of Leaders to the World.
The Steadfast and Reliable Bull: Taurus Zodiac Signmy Pandit
Explore the steadfast and reliable nature of the Taurus Zodiac Sign. Discover the personality traits, key dates, and horoscope insights that define the determined and practical Taurus, and learn how their grounded nature makes them the anchor of the zodiac.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Enhancing Adoption of AI in Agri-food: IntroductionCor Verdouw
Introduction to the Panel on: Pathways and Challenges: AI-Driven Technology in Agri-Food, AI4Food, University of Guelph
“Enhancing Adoption of AI in Agri-food: a Path Forward”, 18 June 2024
KALYAN CHART SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women MagazineCIOWomenMagazine
In this article, we will dive into the extraordinary life of Ellen Burstyn, where the curtains rise on a story that's far more attractive than any script.
Prescriptive analytics BA4206 Anna University PPTFreelance
Business analysis - Prescriptive analytics Introduction to Prescriptive analytics
Prescriptive Modeling
Non Linear Optimization
Demonstrating Business Performance Improvement
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Tired of chasing down expiring contracts and drowning in paperwork? Mastering contract management can significantly enhance your business efficiency and productivity. This guide unveils expert secrets to streamline your contract management process. Learn how to save time, minimize risk, and achieve effortless contract management.
1. Abstract
HPCL Vishakh refinery was established in 1957 and was subsequently merged
with ESSO which was multinational oil company of USA, which was setup in
Mumbai and came with a new origin Hindustan Petroleum Corporation of India
Limited (HPCL) in 1998. Electrical maintenance is one of the most crucial aspects
in the refinery to ensure good productivity, reliability and safety against fire
hazards. The industry thus employs one of the most advanced forms of
maintenance techniques, i.e., IR Thermography, Vibration Health Analysis, etc…
This report of the project shows an overview of the employed maintenance
techniques.
1
2. MAINTAINANCE OF POWER IN
HINDUSTHAN PETROLUM COPORATION LIMITED (HPCL)
INDUSTRIAL TRAINING REPORT
SUBMITTED BY
S.YASWANTH VARMA
R.RAVIKANTH SARMA
N.SUDHEER KUMAR
S.K.AVINASH VARMA
In partial fulfillment for the award of the degree of
BACHELOR OF ENGINEERING
in
ELECTRICAL AND ELECTRONICS ENGINEERING
RAGHU ENGINEERING COLLEGE
JUNE 2011
2
3. ACKNOWLEDGEMENT
We would like to thank Mr. S.K.Mishra, Sr. Manager-Training, for
accepting our request for industrial training at HPCL, Visakh Refinery.
We express our deep sense of gratitude and respect to Mr. N.Rajarao,
Chief Manager, and Maintenance Electrical.
We heartily thank B.Jayanth Rao senior Manager, Planning Electrical for giving
us enthusiastic support and guidance.
We express our thanks to Mr. B.J.Benhar Babu, Manager Maintenance,
Mr.Rama Chadra Rao Deputy Manager, Mr.nikki Agarwal Deputy manager,
Mr. Pritam Majamder Engineer for guiding us with great attention, care and
providing vital support at HOCK, Visakh refinery.
3
4. About HPCL
HPCL is a fortune 500 company, with annual turnover of Rs 1,16,428 crores and sales-
/income from operations Rs 1,31,802 crores ( US $25,618M) during FY 2008-09, having
about 20% marketing share in India and is strong market infrastructure. Corresponding
figures for FY 2007-08 are is to turnover of Rs 1,03,837 Crores and sales/ income fr4om
operations of Rs 1,12,098 Crores ( US $ 25,142M).HPCL operates two major refineries
producing a wide variety of petroleum fuels and specialties, one in Mumbai (West coast)
of 6.5 million metric tons per annum (MMTPA) capacity and the other in
Vishakhapatnam, (East coast) with a capacity of 7.5 MMTPA. HPCL holds an equity
state of 16.95% in Mangalore refinery and p0etro chemicals limited, in state-of-the-art
refinery at Mangalore with a capacity of 9 MMTPA. In addition, HPCL is constructing a
refinery at Bhatinda, in state of Punjab. HPCL also owns and operates the largest lube
refinery in the country producing lube based oils of international standards, with a
capacity of 335 TMT. This lube refinery accounts for over 40% of India‘s total lube base
oil production. Presently HPCL produces over 300+ grades of lube, specialties and
greases.HOCK ‗s vast marketing network consists of 13 zonal offices in major cities and
90 regional offices facilitated by a supply and distributio0n infrastructure compressing
terminals, aviation service station, LPG bottling plants, and an inland relay depots and
retail outlets, lube and LPG distributorships . HOCK, over the years has moved from
strength to strength on all fronts the refining capacity sturdily increased from 5.5
MMTPA in 1984/85 to 13 MMTPA presently. On the financial fronts, the turnover grew
from RS 2687 Crores in 1984-85 to an impressive Rs. 1, 16,428 crores in FY 2008-09.
HPCL has an ―Excellent‖ performance for fifteen consecutive years up to 2005-06, since
signing of the first MOU with the ministry of petroleum and natural gas. HPCL won the
prestigious MOU award for the year 2007-08 for excellent overall performance.
Vishakh refinery:
Rapid worldwide industrialization and scientific advancements has resulted in
continuously raising energy requirements in all sectors e.g. industries, transport etc.
petroleum being one of the major source of energy there is a pressing need for
increasing the production of the crude oil as well as the desire fuel production.
Concerted efforts are being made for maximizing the crude oil production from oil fields.
As a result, quality of crude becomes heavier day by day. A simple distillation of crude
oil is not sufficient and economical top meet the demand of the petroleum products esp
due to the increasingly heavy nature of crude oil producing using the modern advanced
4
5. method of crude production. Hence the refineries are required to adopt ―Bottom of
Barrel Processing Concept‖ for meeting the product demand.
In the context, vishakh refinery was established in 1957 and was subsequently merged
with ESSO which was multinational oil company of USA, which was setup in Mumbai
and came with a new origin Hindustan Petroleum Corporation of India Limited (HOCK)
in 1978. Over the year the capacity of the refinery was increased to 1.5 MMTPA by de-
bottlenecking units.
The major refinery capacity augmentation was taken up in 14985 by commissioning
separate streams of 3.0 MMTPA crude distillation units ( CDU-2), fluidized catalytic
cracking unit ( FCCU-2), crude oil receiving facilities at high seas ( Offshore tanker
terminal ) and associated tankage and product dispatch facilities. Thus the installed
capacity has increased to 4.5 MMTPA. The facilities came up in 1985 were the state-of-
the art control system for the better and efficient operation.
An order to cater to the increased LPG consumption, the refinery works instrumental in
developing first LPG import facilities on the eastern coast in 1987. As a step towards
surmounting the frequent power distribution and improve reliability of utilizes a Captive
Power Plant (CPP) of 14 MW capacity was widening its product range commissioned
Propylene Recovery Unit (PRU) in 1992.
In order to adhere to stringent environment norms the refinery had setup Effluent
Treatment Plant (ETP) in 1993 and sulphur recovery unit (SRU) in 1994. With the
second major expansion project VREP-2 completed in 1999 crude processing capacity
increased from 4.5 MMTPA to 7.5 MMTPA and secondary capacity increased from 1.5-
1.6 MMTPA. To meet the stringent diesel fuel specification, Diesel Hydro De
Sulphurisation unit (DHDS) was also commissioned in 1999 /2000. To meet additional
power requirement of these new units, CPP capacity was augmented by 40 MW in
1999, increasing total power generation capacity to 58 MW.
It is a crude oil processing refinery having a capacity of 7.5 MMTPA. The processing
units include crude units, fluidized catalytic cracking units, propylene recovery units and
treating units like DHDS and SRU. The total load of the existing refinery is about 39
MW. This load is being met by the HPCL with the help of four gas turbine generators
and heat recovery steam generators. The combined power and steam output of steam
generating units and the HRSG‘s at fight conditioned is about 54 MW and 174 TPH of
MP steam respectively. The HPCL‘s present power and steam requirements are met by
following in-house GTG‘s and HRSG‘s. 2x9MW FRAME-3, GTG 1 and 2 with HRSG‘s
installed in 1990 2x20MW FRAME-5, GTG 3-6 with HRSG‘s installed in 1999. Apart
from the captive generators, HPCL has two AP TRANSCO grid incomers at 132 KV
level. 11KV supply is derived by two numbers 16/20MVA, 132/KV grid transformers.
5
6. The present contract demand with APTRANSCO in 13MVA at 0.9pf. HPCL is currently
using grid as hot standby and the grid incomers are not paralleled with the GTG‘s under
normal operating conditions.
The refinery is located at latitude of 17‘41‖N and longitude of 83‘17‖ E on an area taken
on a 99 years lease from Vishakhapatnam port trust.
6
8. Table of contents:
Introduction – About HPCL
1
Chapter 1: Electrical Maintenance
What is electrical maintenance? 4
Types of electrical maintenance 5
Breakdown maintenance 5
Preventive maintenance 6
Predictive maintenance 6
Methods used in predictive maintenance 7Infrared
thermography 7
Motor current signature analysis 8
Equipment health analysis 9
Tan delta test 11
Cable fault locating analysis 12
Surge generator 13
Digital time domain reflectometer 13
Indicator Digipoint 15
Cable route tracer 15
High potential test 17
Chapter 2: captive power plant
Introduction 19
Step-up sequence of CPP 19
CPP facilities 20
Gas turbines 20
8
9. Theory of GTG 20
Generators 22
Generator details 23
Functional description 24
Basic cycle 24
Gas turbine equipments 24
Air inlet equipment 25
Compressor section 25
Rotor assembly 26
Stator 26
Fuel system 28
Diesel system 29
Naphtha valve 29
Brushless generator- basics 29
Automatic voltage regulator 30
Heat recovery steam generator 31
Chapter 3: power distribution in HPCL
Substations 32
Switch gear 33
Bus 34
Power transformers 35
Sub 36
Motor control centre 36
Power control centre 36
Single line diagram of power distribution in HPCL
Direct online starters in SS-50 37
Variable frequency drives 38
9
10. Variable frequency motor 39
Variable frequency controller 39
Dynamic breaking 40
Rectifier in VFD 40
Bibliography
41
10
11. Chapter 1:
What is electrical maintenance?
Electrical maintenance is the upkeep and preservation of equipment and systems that
supply electricity to a residential, industrial or commercial building. It may be performed
by the owner or manager of the site or by an outside contractor. The work is commonly
performed on a schedule based on the age of the building, the complexity of
the electrical system or on an as-needed basis.
The main areas of general electrical maintenance commonly include the power outlets
and surge protectors, generators and lighting systems. These supply sources are
checked for structural integrity as well as internal stability.
Preventive electrical maintenance is also generally part of a building‘s upkeep. This plan
ordinarily includes the scheduled inspection of large systems and equipment by a
professional electrician. The purpose of these periodic assessments is to fix small
problems before they escalate into large ones. Preventive electrical maintenance is
particularly important at plants, hospitals and factories that heavily rely on these
systems for daily operation.
Electrical generators, switches and circuit breakers are regularly checked for solid
connections and intact wiring. If flaws are discovered, electricians normally repair the
wiring. Depending on the condition of the wiring, the repairs are typically made by
splicing wires together. In some situations, the wires are encased in metal tubing called
conduit to protect them from wear. Keeping the wiring in good shape ensures a
consistent flow of power to heating, ventilation and air conditioning systems.
11
12. Flow chart showing electrical maintenance
Types of electrical maintenance:
Corrective maintenance:
Breakdown maintenance can be defined as a maintenance task performed to identify,
isolate, and rectify a fault so that the failed equipment, machine, or system can be
restored to an operational condition within the tolerances or limits established for in-
service operations.
Corrective maintenance is the most commonly used maintenance approach but it is
easy to see its limitations. When equipment fails, it often leads to downtime in
production, and sometimes damages other parts. In most cases, this is expensive. Also,
if the equipment needs to be replaced, the cost of replacing it alone can be substantial
12
13. Planned Preventative Maintenance:
('PPM') or more usual just simple Planned Maintenance (PM) or Scheduled
Maintenance is any variety of scheduled maintenance to an object or item of equipment.
Specifically, Planned Maintenance is a scheduled service visit carried out by a
competent and suitable agent, to ensure that an item of equipment is operating correctly
and to therefore avoid any unscheduled breakdown and downtime.
Together with Condition Based Maintenance, Planned maintenance
comprises preventive maintenance, in which the maintenance event is preplanned, and
all future maintenance is preprogrammed. Planned maintenance is created for every
item separately according to manufacturers recommendation or legislation. Plan can be
based on equipment running hours, date based, or for vehicles distance travelled. Good
example of PM program is car maintenance. After so many kilometers or miles oil
should be changed, parts renewed.
Planned maintenance has some advantages over Condition Based Maintenance such
as:
easier planning of maintenance and ordering spares,
costs are distributed more evenly,
No initial costs for instruments for supervision of equipment.
Disadvantages are:
less reliable than equipment with CBM
More expensive due to more frequent parts change.
Predictive maintenance (PdM):
Predictive maintenance techniques help determine the condition of in-service equipment
in order to predict when maintenance should be performed. HPCL mostly uses this type
of maintenance. This approach offers cost savings over routine or time-
based preventive maintenance, because tasks are performed only when warranted.
The main value of Predicted Maintenance is to allow convenient scheduling of
corrective maintenance, and to prevent unexpected equipment failures. The key is "the
right information in the right time". By knowing which equipment that needs
maintenance, the liability. Other values are increased equipment life time, increased
plant safety, less accidents with negative impact on environment, an optimized spare
parts handling, etc.
The "predictive" component of predictive maintenance stems from the goal of predicting
the future trend of the equipment's condition. This approach uses principles of statistical
13
14. process control to determine at what point in the future maintenance activities will be
appropriate.
Most PdM inspections are performed while equipment is in service, thereby minimizing
disruption of normal system operations. Adoption of PdM can result in substantial cost
savings and higher system reliability.
To evaluate equipment condition, predictive maintenance utilizes nondestructive
testing technologies such as infrared, acoustic (partial discharge and airborne
ultrasonic), corona detection in combination with measurement of process performance,
measured by other devices, to trigger maintenance conditions. This is primarily
available in Collaborative Process Automation Systems (CPAS). Site measurements
are often supported by wireless sensor networks to reduce the wiring cost.
Methods used in predictive maintenance at HPCL:
Infrared thermography:
The most popular and widely used application of infrared thermography is electrical
switchgear testing. No other commercial application has achieved the level of interest
than that of electrical infrared thermography. Daily, the electrical switchgear in
thousands of buildings are checked by thermographers all over the country. Electrical
Infrared is now an integral part of any facility manager's preventative/predictive
maintenance (P/PM) program.
Infrared thermography is used to perform P/PM inspections on electrical equipment
because excess resistance on electrical apparatus indicates electrical faults such as
loose connections, , it heats up. Thermography is used to see the excess heat
(resistance) so that problems can be found and maintenance personnel can act to
correct the problem before the component fails, causing damage to the component,
safety hazards and/or production downtime.
14
15. Contacts seen by an Infrathermal camera
Motor current signature analysis:
Traditional CSA (Current Signature Analysis) measurements can result in false alarms
and/or misdiagnosis of healthy machines due to the presence of current frequency
components in the stator current resulting from non-rotor related conditions such as
mechanical load fluctuations, gearboxes, etc. more robust and less error prone
technology.
The operators of electrical drive systems are under continual pressure to reduce
maintenance costs and prevent unscheduled outages that can result in lost production
and revenue. The application of condition based maintenance strategies rely on
specialized monitors to reliably provide a measure of the health of the drive system.
15
16. Fig: Motor current signature analysis
Thus, unexpected failures and consequent downtime may be avoided and/or the time
between planned shutdowns for planned maintenance may be increased. Maintenance
and operational costs are thus reduced. During the past twenty years, there has been a
substantial amount of fundamental research into the creation of condition monitoring
and diagnostic techniques for induction motor drives.
Motor Diagnostic technologies have become even more prevalent through the 1990‘s
and into he new century. The technologies include both Motor Circuit Analysis (MCA)
and Motor Current Signature Analysis (MCSA) applied to both energized and de-
energized electric motor systems. The applications appear to be almost endless.
AC Motors and Alternators
IDC Motors and Generators
Single and Three phase systems
Eddy-Current drives
Variable Frequency Drives
Incoming power quality
Equipment health Analysis:
The emerging trend in the industry and major commercial complexes is Predictive
Maintenance. Predictive maintenance helps in improving up time of equipment or a
system thereby contributing to increased productivity and avoiding unplanned outages.
Vibration monitoring & analysis is one the important and proven tools in analyzing
health of the rotating machines as it can detect 80 to 90% of developing problems.
Vibration values are definitely a good parameter to study the current condition of
rotating equipment. This value can be captured in varied ways. The interval between
these measurements can be optimized through Maintenance Partners for any type of
16
17. machinery. Because of this technique Maintenance Partners offers a powerful tool for
detecting damages in early stage.
Fig: Vibration health analysis
Tan delta test:
The tan delta test is a diagnostic procedure to assess the deterioration of the insulation
of a medium- or high-voltage cable.
Due to the well known water-tree effect the conductivity of the insulation increases, this
reflects in an increase of tan delta values.
So, the interpretation of tan delta test results gives an idea about the aging process in
the cable-insulation and hence, allows an assessment of the operational reliability of the
cable.
The test engineer is able to distinguish between new, strongly aged and faulty cables
and appropriate maintenance and repair measures may be planned.
17
18. Fig: Tan delta test equipment
If however the insulation deteriorates due to moisture the current will also show a
resistive component, and the angle between voltage and current will decrease.
By a highly accurate measurement of the phase lag between current and voltage the
dissipation factor tan d can be determined.
The dissipation factor tan d is defined as the ratio between active current and ideal
capacitive current.
That prevents the device under test from damages during the tan delta test and
guarantees damage-free measurement.
Cable fault locating analysis:
The Process of cable fault location comprises of four distinct, but interrelated stages viz.
1. Testing for detection of the nature of fault.
2. Conditioning / burning of faults for location.
3. Pre-location : Approximate location based on changed electrical relationship due
to fault.
4. Pin Point location.
18
19. Surge Generator:
Instrument has been primarily designed to produce high voltage surges for pre-location
of underground cable fault in combination with inbuilt Reflectometer. LCD Screen for
Reflectometer.
Fig: surge generator
The surges produced help in pinpointing the fault and tracing the route of the cable
when used with acoustic DIGIPOINT, surge generator generates D.C. high voltage for
pressure testing of the underground cables to find out faulty phase and the breakdown
voltage with leakage current.
Digital time domain reflectometer:
Reflectometer is a Laptop based Digital Time Domain Reflectometer for pre-location of
faults in power Cables. Its state-of-art technology makes it easy to use and yet most
reliable for any fault condition. The interactive graphical user interface makes it easy, for
even a layman, to pre-locate the fault distance. Serial Port makes the device extremely
flexible.
The device has three working modes namely IMPULSE MODE and PULSE ECHO
MODE. Pulse echo mode is useful only for open and shot types of faults. The impulse
mode when used with surge generator to pre-locate fault distance of almost all types of
19
20. faults including open, short and intermittent faults by way of ICM, Decay & ARM
Method.
Fig: time domain reflectometer
The software provides a huge storage capacity so that you may use the Reflectometer
test result for future reviews & analysis. The VOP (Velocity of Propagation) control
makes it easy to precisely pre-locate the fault distance on cables with different velocity
of propagation. The test waveforms can be printed as a hardcopy directly from the
software. The fault readings can be transferred over INTERNET for further assistance.
The software is so programmed that it automatically saves all the test results, so that
you never miss any important result. All the files are stored on the bases of date and
time of the reading taken.
Indicator digipoint:
The DIGIPOINT is an easy to use, dual channel Digital Acoustic Fault Locator. It is used
in conjunction with a Surge Generator to determine the exact position of faults in
20
21. underground power cables. The instrument also indicates the cable by sensing and
amplifying the electromagnetic signals produced at the time of surges.
Fig: Digiphone
The DIGIPOINT consists of two units – the Acoustic transducer or pick–up and the
amplifier unit with head phones.
The unique feature of DIGIPOINT provides a relative distance indicator with digital
coincidence figure readout.
This feature is very helpful for the operator in pinpointing the exact location of fault.
Cable route tracer:
The TII Advanced Cable Locator is a microprocessor-based system that incorporates
advanced digital signal processing techniques to quickly and efficiently trace the path
of underground cables, both copper and fiber optic(with metallic trace wire).
• Locates cable path
• Measures cable or sonde depth with the push of a button.
• Measures signal current in the cable.
• Identifies cable using toning function.
• Locates energized power cable with direct readout
of cable depth.
The cable locator provides accurate cable or sonde depth measurements,
giving a digital readout in inches, feet and inches, or centimeters (user-selectable).
Additionally, when used in conjunction with the EMS Marker Locating Accessory, the
locator can:
• Pinpoint the exact location of buried EMS markers
• Trace a cable path while simultaneously finding buried markers along the way.
21
22. Four modes of operation for accurate locates, even in congested areas:
For cable path locating, the receiver uses one of four user selected locating modes –
dual peak, dual null, differential or special peak (which increases the sensitivity of the
receiver for tracing over longer distances). The mode is selected depending on which is
most effective under the locating conditions.
The receiver includes four volume settings, including a special ―expander‖ function that
makes peaks and nulls more pronounced.
The expander feature enhances the amplitude difference between two conductors
carrying the same signal, making the unit extremely accurate, even in congested
areas. A headphone jack is also included.
The Advanced Cable Locator is easy to operate and requires very little training.
Digital liquid crystal display (LCD) readout and push-button operation make the unit
easy to understand, for more precise locates. A ―memory‖ feature remembers operator
set-up from previous use.
The system consists of two basic components:
• Transmitter with built-in ohmmeter, which also senses and measures the presence of
foreign voltage, and tests the continuity of the circuit.
• One-piece hand-held receiver with bar graph that indicates received signal and
proximity to the cable.
The cable locator uses four active trace frequencies - 577 Hz, 8 kHz, 33 kHz
and 200 kHz — which can be used
individually or simultaneously to compensate for varying field conditions.
High potential test:
Hipot is an abbreviation for high potential. Traditionally, Hipot is a term given to a class
of electrical safety testing instruments used to verify electrical insulation in finished
appliances, cables or other wired assemblies, printed circuit boards, electric motors,
and transformers.
Under normal conditions, the insulation in a product can break down, resulting in
excessive leakage current flow. This failure condition can cause shock or death to
anyone that comes into contact with the faulty product.
22
23. Fig: Hipot test equipment
A Hipot test (also called a Dielectric Withstand test) verifies that the insulation of a
product or component is sufficient to protect the operator from electrical shock. In a
typical Hipot test, high voltage is applied between a product's current-carrying
conductors and its metallic shielding. The resulting current that flows through the
insulation, known as leakage current, is monitored by the hipot tester. The theory
behind the test is that if a deliberate over-application of test voltage does not cause the
insulation to break down, the product will be safe to use under normal operating
conditions—hence the name, Dielectric Withstand test. Environmental factors such as
humidity, dirt, vibration, shock and contaminants can close these small gaps and allow
current to flow. This condition can create a shock hazard if the defects are not corrected
at the factory. No other test can uncover this type of defect as well as the Dielectric
Withstand test.
Three types of Hipot tests are commonly used. These three tests differ in the amount of
voltage applied and the amount (or nature) of acceptable current flow:
Dielectric breakdown Test::
The test voltage is increased until the dielectric fails, or breaks down, allowing too
much current to flow. The dielectric is often destroyed by this test so this test is used on
a random sample basis. This test allows designers to estimate the breakdown voltage of
a product's design.
Dielectric Withstand Test:
A standard test voltage is applied (below the established Breakdown Voltage) and the
resulting leakage current is monitored. The leakage current must be below a preset limit
or the test is considered to have failed. This test is non-destructive and is usually
23
24. required by safety agencies to be performed as a 100% production line test on all
products before they leave the factory.
Insulation Resistance Test
This test is used to provide a quantifiable resistance value for all of a product's
insulation. The test voltage is applied in the same fashion as a standard Hipot test, but
is specified to be Direct Current (DC). The voltage and measured current value are
used to calculate the resistance of the insulation.
Chapter 2
Captive power plant:
The power requirement of HPCL–VR was earlier being met from APSEB. However
frequent interruption in power supply were observed which causes crude through put
loss, damage to equipment, fire hazard and unscheduled shutdown. With the above in
view APSEB permitted HPCL, to install CPP. The CPP commissioned in 1991 is bussed
on cogeneration of power and steam, leading to more energy efficient use of fuels as
compared to a conventional power plant. The project step-up includes number of 9 MW
Capacities (ISO) gas turbines generators (GTG‘s) along with two numbers heat
recovery steam generators (HRSG) of 2.94 T/HR at 15 at 256 Centigrade in unfired
condition at GTG base load. For that in view of VR expansion process from 4.5 MMTPA
to 7.5 MMTPA and to meet the power requirement of refinery another set to GTG‘s of
generating capacity to 25MW (ISO) each along with two number of HRSG of 60 T/HR at
15 at 280 centigrade in unfire3d condition at GTG base load another auxiliary
equipment are installed on a part of VREP-H during 1999-2000 at a cost of RS.150
crore approximately.
Start-up sequence of CPP:
Auxiliary lube oil pump starter.
Auxiliary hydraulic pump starts.
Jaw clutch of torque converter accessory gear box engages.
Diesel engine starts and warms up for 120secs. When the timer T2 DW times
out, and the DE speed is 1000rpm Ace. Solenoid picks up.
Diesel engine speed goes to 2000rpm and HP shaft rotates.
24
25. The lock up- solenoid 20DA-2 energies and the DE speed is held constant at
1800 rpm.
At 18% of HP speed, cranking status is displayed on mark-IV up to 25% of HP
speed is cranking.
Purging timer T2TVSC starts when cranking is displaced and times out after 60
seconds.
Diesel stop value opens and firing timer T2F starts and time allow for flame
detection in 60 seconds (if within 60secs. No flame is established machine go
back to cranking).
The turbine warms up for 60seconds (T2W).
At about 52% HP speed jaw clutch disengages and LP shaft starts rotating.
After 5mins diesel engine stops.
From 80% HP and LP shaft speed exceeds HP.
CPP facilities:
The major facilities implemented in CPP are as follows
Gas turbines:
1&2
These are complete package units with enclosure for whether protection, thermal and
acoustic insulation. The individual unit houses gas turbine, load gears box and electrical
generator. The operating speed of a gas turbine is 6000rpm and the trip speed is
7150rpm.
3, 4, 5&6
The operating speed is 5100rpm. When the turbine starting system is actuated and the
clutch is engaged, ambient air is drawn through the air inlet assembly, filtered aand
compressed in 17 stage axial flow compressor. Compressed air from the compressor
flows into the annular space surrounding ten combustion chambers, from which it flows
into the space between the outer combustion gasing. In the combustion liners and
enters the combustion zone through the metering poles in each of the combustion
liners.
Theory of GTG:
Gasses passing through an ideal a gas turbine undergo
three thermodynamic processes. These are isentropic compression, isobaric (constant
25
26. pressure) combustion and isentropic expansion. Together these make up the Brayton
cycle.
In a practical gas turbine, gasses are first accelerated in either a centrifugal or
radial compressor. These gasses are then slowed using a diverging nozzle known as
a diffuser; these processes increase the pressure and temperature of the flow. In an
ideal system this is isentropic. However, in practice energy is lost to heat, due to friction
and turbulence. Gasses then pass from the diffuser to a combustion chamber, or similar
device, where heat is added. In an ideal system this occurs at constant pressure
(isobaric heat addition). As there is no change in pressure the specific volume of the
gasses increases. In practical situations this process is usually accompanied by a slight
loss in pressure, due to friction. Finally, this larger volume of gasses is expanded and
accelerated by nozzle guide vanes before energy is extracted by a turbine. In an ideal
system these are gasses expanded isentropically and leave the turbine at their original
pressure. In practice this process is not isentropic as energy is once again lost to friction
and turbulence.
If the device has been designed to power to a shaft as with an industrial generator or
a turboprop, the exit pressure will be as close to the entry pressure as possible. In
practice it is necessary that some pressure remains at the outlet in order to fully expel
the exhaust gasses. In the case of a jet engine only enough pressure and energy is
extracted from the flow to drive the compressor and other components. The remaining
high pressure gasses are accelerated to provide a jet that can, for example, be used to
propel an aircraft.
Fig: Brayton cycle
As with all cyclic heat engines, higher combustion temperatures can allow for
greater efficiencies. However, temperatures are limited by ability of the steel, nickel,
26
27. ceramic, or other materials that make up the engine to withstand high temperatures and
stresses. To combat this many turbines feature complex blade cooling systems.
As a general rule, the smaller the engine the higher the rotation rate of the shaft(s) must
be to maintain tip speed. Blade tip speed determines the maximum pressure ratios that
can be obtained by the turbine and the compressor. This in turn limits the maximum
power and efficiency that can be obtained by the engine. In order for tip speed to remain
constant, if the diameter of a rotor is reduced by half, the rotational speed must double.
For example large Jet engines operate around 10,000 rpm, while micro turbines spin as
fast as 500,000 rpm.
Mechanically, gas turbines can be considerably less complex than internal
combustion piston engines. Simple turbines might have one moving part: the
shaft/compressor/turbine/alternative-rotor assembly (see image above), not counting
the fuel system. However, the required precision manufacturing for components and
temperature resistant alloys necessary for high efficiency often makes the construction
of a simple turbine more complicated than piston engines.
More sophisticated turbines (such as those found in modern jet engines) may have
multiple shafts (spools), hundreds of turbine blades, movable stator blades, and a vast
system of complex piping, combustors and heat exchangers.
Thrust bearings and journal bearings are a critical part of design. Traditionally, they
have been hydrodynamic oil bearings, or oil-cooled ball bearings. These bearings are
being surpassed by foil bearings, which have been successfully used in micro turbines
and auxiliary power units.
Fig: Turbo shaft engine
Generators:
27
28. 1&2:
Generators which converts mechanical energy is rated for 11.2MVA at 0.8,11kv,3-
phase ,50hz , 4-pole machine which runs at a speed of 1500rpm . the generator is
coupled with the gas turbine through the load gear box which reduces gas turbine of
6500rpmto 1500rpm. Dc excitation current is fed to generator rotor winding
Using brushless excitation system. Automatic voltage regulation keeps the output
voltage constant. The generator is protected by appropriated relays against over
current, short-circuits and earth faults etc. the generator winding is cooled externally
using forced air cooling system. the generator is enclosed within a metal using forced
air cooling systems . the generator is enclosed within a metal enclosure which is
protected by co2 extinguishing system against possible electrical fires.
3, 4, 5&6:
The generator is rated at 27.388mva at 0.8pf, 11kv, 3-phase, 50 Hz. The generator is
2pole machine running at a synchronous speed of3000rpm. The turbine speed is
reduced from 5100rpm to 3000rpm through a load gear box. The generators is provided
with open air ventilation system consisting of air filter unit by 2 axial flow fans located on
the rotor aft one at either end. The generator rotor is supported on 2 journal bearings
lubricants by the turbine oil system
Fig: cut-section of an alternator
Generator – Details
1. Make - Bharat Heavy Electrical Limited
2. output rating - 11,250KVA
3. rated frequency -50hz
4. full load current -590A
5. P.F -0.8
6. rated speed -1500rpm
The generators are provided with a brushless excitation which eliminates the provision
of slip rings and brushes.
Functional Description:
28
29. Definition of gas turbine: A gas turbine is machine or engine in which mechanical power
in the form of shaft is produced when a steam of air rushes on the blades r by buckets
of a wheel it turn round .
Basic Cycle:
A gas turbine operates by
Continuously drawing in fresh air .
Compressing thin air through a higher pressure
Adding and burning fuel in the compressed air to increase its energy level.
Directing the high pressure and temperature air to an expansion turbine
converts the gas energy to mechanical energy of a rotating shaft. The
resulting low pressure, low temperature gases are discharged to
atmosphere
Gas Turbine Equipments
Air inlet equipment:
The air supply for the turbine flows
through a duct assembly prior to
entering compressor the duct contains a
air silencer and trash screen. The air
silencer consisting of a number of
acoustical panels from a section of duct
assembly and attenuates the high
frequency sounds created by
compressor blades.
Compressor section:
The axial flow 15 stage compressor section consists of compressor rotor casing, and to
exit guide vanes. In the compressor the air is confined to the space between the rotor
29
30. and the stator blades where it is compressed in stages by an alternate series of rotting
blades which supply the force needed to compress the air in each stage and the stator
blades guide the air so that it enters the following rotor stage at proper angle. The
compressed air exists through the compressor discharge casing through the
combustion chamber. Air is also extracted from the compressor for the turbine cooling
and for lube oil sealing at the bearings of the turbine.
Rotor assembly:
The compressor rotor is an assembly of 15 wheels two stub shafts assemblies, tie bolts
and the compressor rotor blades and shafts are assembled by mating rabbets and
secured by 12 tie bolts arranged concentrically around the rotor axis. The forward stub
shaft contains the journal and the thrust number for the number one runner and the
thrust bearing assembly, sealing surfaces for the bearing oil deflectors and compressor
flow pressure air deflectors. The aft stub shaft contains for no.2 journal and thrust
bearing assembly, the sealing surfaces for the bearing oil deflectors compressor high-
pressure air seal. The shaft wheel portion of the stub haft contains the first stage
compressor rotor blades. The compressor rotor assembly is dynamically balanced
before it is assembled to the unbalanced turbine rotor assembly. This complete
assembly is then dynamically balanced.
Stator:
The stator (compressor casing) enclosed the compressor portion of the rotor and is
divided into 4 sections; inlet casing, forward compressor, aft compressor and discharge
casing. The inner section, which directs the flow of outside air from the inlet equipment
30
31. to the compressor blades, contains no 1 bearing assembly and low pressure air seals.
The forward section of the compressor casing is downstream of the inlet section
contains the stator for stages 0 through 3. the aft section downstream of the forward
section contains the stator blades for stages 4 through 9.
Combustion section:
The combustion section consists of 10 combustion chambers, fuel nozzles, cross fire
tubes and transition pieces.
The combustion chambers are arranged concentrically around the axial fuel compressor
and are bolted to the compressor discharge section bulkhead. Air for combustion is
supplied directly to the compressor to the combustion chambers. This arrangement is
called a reverse flow system since the compressor discharge air flows forward around
the liners and then enters and flow back towards the turbine. Fuel is fed into the
chambers of the turbine section.
Figure showing combustion section
Turbine section:
In the turbine, high temperatures gases from the combustion section are converted
shaft horse power. This section comprises of the following components
31
32. 1. Turbine casing
2. First stage nozzle
3. Second stage nozzle
4. First stage turbine wheel(hp turbine)
5. Second stage turbine wheel(lp turbine)
6. Diaphragm assembly
7. Inter stage gas parts
Diesel engine:
The diesel engine starting motor (10hp,
125v dc) starts the diesel engine during
startup procedures. The diesel engine
lube oil pressure should be sufficient
enough for startup. Diesel engine
minimum speed sensed by pressure
switch accelerating solenoid .The
accelerating speed of the engine is
nearly 2100rpm. The cooling for this
engine is provided by CWM line.
Hydraulic torque converter:
This is a single stage hydraulic device coupled to the starting diesel engine. It transmits
the DE output torque to the turbine accessory gear; all moving parts of the torque
converter are lubricated with the system lubricating oil. The torque converted housing is
bolted directly to DE flywheel housing. Converter operating temperature will vary with
sum temperature and converter speed ration.
Fuel system:
The turbine can use a variety of liquid and gaseous fuels, which may vary substantially
in hydrocarbon composition, physical properties and levels of contamination. High
pressure fuel pumps how dividers have substantially improved the reliability of these
critical fuels. Naphtha fuel to the GTG‘s is from the two fixed cum floating roof tanks 183
A and 183 B each approximately. 2600KJL diesel system is from tanks 181, 182A each
of approx 300KL. The fuel is pumped from the tank by fuel forwarding pumps. A
32
33. pneumatic control bypass valve is provided in discharge of the pump for recirculation of
fuel back to maintain discharge pressure. The fuel travels to the pressure controller
where the pressure is controlled by pressure control valve (5.5-6 Kg/sqcm) with bypass
valve from where it goes to the filter skid
Diesel System:
From the 25 micron dual filter skid, diesel goes through the trip oil operated stop value
to reach main fuel pump. The servo controlled bypass value in the discharge line of the
main fuel pump enters a 0.5 micron filter and then goes through the filter.
The flow divided as six output ports each connected to a combustion chamber. The flow
divider which is driven by input pressure itself distributes diesel at equal pressure to all
combustion chambers through check values calibrated at 7kg/sqcm pop pressure.
Naphtha Valve:
The fuel from control valve travels two stages. Filtration consists of 25 microns and
6micron dual filter skid. Accumulated pressurized with nitrogen are provided upstream
of a Naphtha control valve to take care of the pressure fluctuations in the system .
Naphtha passes through the three way transfer valve and reached the PFD skid before
naphtha change out takes place, diesel has to enter or pass through naphtha skid to
chamber. the fuel after six micro naphtha filters enters naphtha PFD consists of a trip oil
operated stop valve a screw pump with discharge of which is controlled by a servo
operated by pass valve.
Brushless Generator-Basics:
The permanent magnet generator (PMG) is coupled to shaft of the generator. The PMG
has a permanent magnet on its rotor. The stator has winding after star up of the turbine;
the PMG is also rotating at the same speed as that of generator. The permanent
magnet causes a magnetic flux in the air gap between stator and rotor in the PMG. The
stator windings cut in this flux (on rotation) and thus an emf is reduced in the stator
windings. This is at 220v, 75 Hz.
33
34. The variable dc current output of the AVR is brought to the stator winding of the main
exciter .This winding then induces a magnetic flux in the air gap of the exciter. The rotor
winding as it is rotating at the speed of the generator cuts flux and thus there is an
induced emf (ac) in the rotor. this rotor current is rectified by the diodes and the
consequents direct current(dc) is then fed through cables which run inside the hallow
shaft the generator to the main field winding of the generators since the diodes are
mounted on the rotor of the exciter of the regular maintence of carbon brushes etc.
Fig: brushless generator connected to turbo shaft
Automatic Voltage Regulator:
The AVR is intended for excitation and control of generators equipped with alternator
exciter employing rotating non control rectifier.
Main parts of the regulator equipment are:
1. The closed loop control system including a separate gate control set and thyristor
set each. Field discharge circuit.
2. An open loop control system for exchanging signal between regulator equipment
and control room in power supply in power supply circuits.
Generator voltage control.
Un-delayed limiting control for the output current of the thyristor set.
Limiting control for under excited range.
Delay limiting control for the over excited range.
Automatic field suppression during shutdown of the generator.
34
35. Delayed limiting control for stator over current.
V/Hz limiter
Heat recovery steam generators:
A Heat Recovery Steam Generator (HRSG) is a steam boiler that uses hot exhaust
gases from the gas turbines or reciprocating engines in a CHP plant to heat up water
and generate steam. This steam in turn drives a steam turbine and/or is used in
industrial processes that require heat.
HRSGs used in the CHP industry are distinguished from conventional steam generators
by the following main features:
The HRSG is designed based upon the specific features of the gas turbine or
reciprocating engine that it will be coupled to.
Since the exhaust gas temperature is relatively low, heat transmission is
accomplished mainly through convection.
The exhaust gas velocity is limited by the need to keep head losses down. Thus,
the transmission coefficient is low, which calls for a large heating surface area.
Since the temperature difference between the hot gases and the fluid to be
heated (steam or water) is low, and with the heat transmission coefficient being
low as well, the evaporator and economizer are designed with plate fin heat
exchangers.
35
36. Fig: Heat recovery steam generator
Chapter-3
Power distribution system in HPCL:
The modern distribution system begins as the primary circuit leaves the sub-station and
ends as the secondary service enters the utilities. A variety of methods, materials, and
equipment are used among the various utility companies, but the end result is similar.
First, the energy leaves the sub-station in a primary circuit, usually with all three phases.
Most areas provide three phase industrial service. There is no substitute for three-phase
service to run heavy industrial equipment. A ground is normally provided, connected to
conductive cases and other safety equipment, to keep current away from equipment
and people.
Substations:
A substation is a part of an electrical generation, transmission, and distribution system.
Substations transform voltage from high to low, or the reverse, or perform any of several
36
37. other important functions. Electric power may flow through several substations between
generating plant and consumer, and its voltage may change in several steps.
Fig: Substation
A substation that has a step-up transformer increases the voltage while decreasing
the current, while a step-down transformer decreases the voltage while increasing the
current for domestic and commercial distribution. The word substation comes from the
days before the distribution system became a grid. The first substations were connected
to only one power station, where the generators were housed, and were subsidiaries of
that power station.
Switch gear:
The term switchgear, used in association with the electric power system, or grid, refers
to the combination of electrical disconnects, fusesand/or circuit breakers used to isolate
electrical equipment. Switchgear is used both to de-energize equipment to allow work to
be done and to clear faults downstream. This type of equipment is important because it
is directly linked to the reliability of the electricity supply.
Fig: switch gears
The very earliest central power stations used simple open knife switches, mounted on
insulating panels of marble or asbestos. Power levels and voltages rapidly escalated,
37
38. making open manually-operated switches too dangerous to use for anything other than
isolation of a de-energized circuit. Oil-filled equipment allowed arc energy to be
contained and safely controlled. By the early 20th century, a switchgear line-up would
be a metal-enclosed structure with electrically-operated switching elements, using oil
circuit breakers. Today, oil-filled equipment has largely been replaced by air-blast,
vacuum, or SF6 equipment, allowing large currents and power levels to be safely
controlled by automatic equipment incorporating digital controls, protection, metering
and communications. The technology has been improved over time and can be used
with voltages up to 1,100 kV.
Bus bar system:
In electrical power distribution, a bulbar is a strip of copper or aluminum that
conducts electricity within a switchboard, distribution board, substation or other electrical
apparatus.
Fig: Bus bars
The size of the bus bar determines the maximum amount of current that can be safely
carried. Bus bars can have a cross-sectional area of as little as 10 mm² but electrical
substations may use metal tubes of 50 mm in diameter (1,963 mm²) or more as bus
bars, and an aluminum smelter will have very large bus bars used to carry tens of
thousands of amperes to the electrochemical cells that produce aluminum from molten
salts.
38
39. Transformers:
HPCL uses a wide range of transformers which are very important in the power
distribution system. A transformer is a device that transfers electrical energy from
one circuit to another through coupled conductors—the transformer's coils. A
varying current in the first or primary winding creates a varying magnetic flux in the
transformer's core and thus a varying magnetic field through the secondary winding.
This varying magnetic field induces a varying electromotive force (EMF), or "voltage", in
the secondary winding. This effect is called mutual induction. HPCL is having
approximately 79 transformers in the entire refinery with the ratings like 10MVA/11KVA,
11/3.3KVA, 3.3/1.1KVA, 1.1KVA/415VA and etc.
Fig: 10 MVA power transformer
39
40. Substation-50:
Substation-50 is one of the most peculiar and important substation in the HPCL‘s power
distribution system. In this substation there will be two incomers from the captive power
plant (CPP) which bears 11KV. The panels in this substation are of two kinds, they are
Power Control Centre (PCC) and Motor Control Centre (MCC). The 111KV is first
stepped down into 5 divisions, in this process the outgoing lines are fed to two types of
motors like High Tension motors (HT) and Low Tension motors (LT). then the remaining
lines will fed the 6 Motor Control Centre (MCC) (for motors) and 1 Light Distribution
Board (LDB) panels.
Meter control centre (MCC):
Duly wired with ACB/MCCB/SFU/DOL/STAR-DELTA/ATS Starters.
Various designs provided like single/double front, fixed type, with
Marshaling terminations.
Cubicle type extensible on each side.
Require Control voltage facilities with control.
All starters are provided with type 2 co-ordination where required.
Separate bus bar chamber for vertical droppers.
Can be operating by remote on/off
Fig: MCC panel
Power control centre (PCC):
Main LT Panel, PCC With single, Multiple incomer, bus couplers with
proper interlocking,
Required protection, fault indications, interlocking is provided.
Various designs are offered in PCC like top, Middle, Bottom Horizontal bus
chamber, panel with aluminum/copper bus bars, top/bottom/front/rear
cable termination, combinations of APFC Part with PCC.
40
41. Required facilities like DG Incomer with AMF Functions, Cut-off of nonessential
feeders at the event of failure of mains power.
Panel with provision to connect bus duct at main incomer side.
Fig: PCC panel
Direct on-line starters in SS-50:
A direct on line (DOL) or across the line starter starts electric motors by applying the full
line voltage to the motor terminals. This is the simplest type of motor starter. larger sizes
use an electromechanical contactor (relay) to switch the motor circuit. Solid-state direct
on line starters also exist.
Fig: DOL starter
A direct on line starter can be used if the high inrush current of the motor does not
cause excessive voltage drop in the supply circuit. The maximum size of a motor
allowed on a direct on line starter may be limited by the supply utility for this reason. For
example, a utility may require rural customers to use reduced-voltage starters for
motors larger than 10 kW.
41
42. DOL starter is sometimes used to start small water pumps, compressors, fans and
conveyor belts. In the case of an asynchronous motor, such as the 3-phase squirrel-
cage motor, the motor will draw a high starting current until it has run up to full speed.
This starting current is commonly around six times the full load current, but may be as
high as 6 to 7 times the full load current.
Variable frequency drives:
A variable-frequency drive (VFD) is a system for controlling the rotational speed of
an alternating current (AC) electric motor by controlling the frequency of the electrical
power supplied to the motor.[1][2][3] A variable frequency drive is a specific type
of adjustable-speed drive. Variable-frequency drives are also known as adjustable-
frequency drives (AFD), variable-speed drives (VSD), AC drives, microdrives or inverter
drives. Since the voltage is varied along with frequency, these are sometimes also
called VVVF (variable voltage variable frequency) drives.
Variable-frequency drives are widely used. In ventilation systems for large buildings,
variable-frequency motors on fans save energy by allowing the volume of air moved to
match the system demand. They are also used on pumps, elevator, conveyor and
machine tool drives.
VFD motor:
The motor used in a VFD system is usually a three-phase induction motor. Some types
of single motors can be used, but three-phase motors are usually preferred. Various
types of synchronous motors offer advantages in some situations, but induction motors
are suitable for most purposes and are generally the most economical choice. Motors
that are designed for fixed-speed operation are often used. Certain enhancements to
the standard motor designs offer higher reliability and better VFD performance, such as
MG-31 rated motors.
42
43. Variable frequency controller:
The usual design first converts AC input power to DC intermediate power using
a rectifier or converter bridge. The rectifier is usually a three-phase, full-wave-
diode bridge. The DC intermediate power is then converted to quasi-sinusoidal AC
power using an inverter switching circuit.
VFD system
The inverter circuit is probably the most important section of the VFD, changing DC
energy into three channels of AC energy that can be used by an AC motor. These units
provide improved power factor, less harmonic distortion, and low sensitivity to the
incoming phase sequencing than older phase controlled converter VFD's. Since
incoming power is converted to DC, many units will accept single-phase as well as
three-phase input power (acting as a phase converter as well as a speed controller);
however the unit must be de-rated when using single phase input as only part of the
rectifier bridge is carrying the connected load.
Dynamic breaking:
Using the motor as a generator to absorb energy from the system is called dynamic
braking. Dynamic braking stops the system more quickly than coasting. Since dynamic
braking requires relative motion of the motor's parts, it becomes less effective at low
speed and cannot be used to hold a load at a stopped position. During normal braking
of an electric motor the electrical energy produced by the motor is dissipated as heat
43
44. inside of the rotor, which increases the likelihood of damage and eventual failure.
Therefore, some systems transfer this energy to an outside bank of resistors. Cooling
fans may be used to protect the resistors from damage. Modern systems have thermal
monitoring, so if the temperature of the bank becomes excessive, it will be switched off.
Rectifier in VFD:
A rectifier is an electrical device that converts alternating current (AC), which
periodically reverses direction, to direct current (DC), which is in only one direction, a
process known as rectification. Rectifiers have many uses including as components
of power supplies and as detectors of radio signals. Rectifiers may be made of solid
state diodes, silicon-controlled rectifiers, vacuum tube diodes, mercury arc valves, and
other components.
Bibliography
HPCL official website
Wikipedia.com
Network protection and automation guide
Google.books.com
Google.images.com
Power systems – J.B.Gupta
Electrical machines – P.S.Bhimbhra
44