NO Uraian Pekerjaan
I PEKERJAAN PENDAHULUAN 366,680.000
II PEKERJAAN TANAH DAN PASIR 1,776,867.800
III PEKERJAAN PASANGAN BATU BELAH 5,465,344.000
IV PEKERJAAN STRUKTUR BETON BERTULANG 6,372,407.200
V PEKERJAAN PASANGAN DAN PLESTERAN 15,414,624.400
VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP 27,614,382.470
VII PEKERJAAN FINISHING 4,833,895.000
VIII SALURAN KELILING AIR HUJAN 745,920.000
IX PEKERJAAN PINTU JENDELA DAN KANOPI 15,521,000.000
X PEKERJAAN MEKANIKAL & ELEKTRIKAL
Pekerjaan elektrikal 3,757,500.000
Pekerjaan Mekanikal 5,518,088.500
Jumlah Total 87,386,709.370
REKAPITULASI
Jumlah Harga
( Rp )
Page 1 of 3
Volume Satuan
Jumlah Harga
( Rp ) ( Rp )
I PEKERJAAN PENDAHULUAN
1 Uniset dan bouwplank 4.00 m' 39,920.00 159,680.00
2 Pembersihan lokasi 60.00 m2 3,450.00 207,000.00
Sub Jumlah 366,680.00
II PEKERJAAN TANAH DAN PASIR
1 Galian tanah 38.84 m3 19,170.00 744,562.80
2 Urug tanah kembali 24.05 m3 7,000.00 168,350.00
3 Urug pasir bawah pondasi & lantai 7.89 m3 109,500.00 863,955.00
Sub Jumlah 1,776,867.80
III PEKERJAAN PASANGAN BATU BELAH
1 Pasangan batu belah camp 1pc:5psr 14.80 m3 369,280.00 5,465,344.00
Sub Jumlah 5,465,344.00
IV PEKERJAAN STRUKTUR BETON BERTULANG
Catatan :
Mutu beton : fc' = 22,5 Mpa (camp. 1: 2: 3)
1 Betom sloof 15x20cm & ring balk 1.18 m 3 2,701,360.00 3,187,604.80
2 Beton kolom praktis 15x15cm 1.56 m³ 2,041,540.00 3,184,802.40
Sub Jumlah 6,372,407.20
V PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasang dinding bata camp. 1pc:5psr 24.06 m³ 395,710.00 9,520,782.60
2 Plesteran dinding camp. 1pc:5psr 343.08 m² 15,040.00 5,159,923.20
3 Sponengan 217.78 m1 3,370.00 733,918.60
Sub Jumlah 15,414,624.40
VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP
1 Keramik lantai 30x30 cm (setara platinum) 41.90 m² 75,730.00 3,173,087.00
2 Keramik lantai km 20x20 (setara platinum) 2.25 m² 65,230.00 146,767.50
3 Keramik dinding km 20x25 cm (setara platinum) 9.00 m² 73,480.00 661,320.00
4 Plin keramik 10x30cm (setara platinum) 44.99 m1 25,243.33 1,135,697.57
5 Plafond gypsumboard t=9mm rangka kayu 57.41 m² 72,500.00 4,162,225.00
6 List plafond gypsum 63.44 m' 17,500.00 1,110,200.00
6 List plank kayu (25 tebal 2cm) 14.86 m' 28,870.00 429,008.20
7 Rangka atap (kuda2, usuk, reng kayu kalimantan) 64.08 m² 142,940.00 9,159,595.20
7 Penutup atap(genteng keramik KIA) 64.08 m² 90,750.00 5,815,260.00
8 Bubungan 25.80 m' 70,590.00 1,821,222.00
Sub Jumlah 27,614,382.47
VII PEKERJAAN FINISHING
1 Cat dinding tembok dalam catylac 343.08 m² 12,500.00 4,288,500.00
2 Cat langit-langit 57.41 m² 9,500.00 545,395.00
Sub Jumlah 4,833,895.00
VIII SALURAN KELILING AIR HUJAN
1 Saluran air hujan U 20 6.00 m' 124,320.00 745,920.00
Sub Jumlah 745,920.00
RENCANA ANGGARAN BIAYA
No Uraian Pekerjaan
Harga
Page 2 of 3
Volume Satuan
Jumlah Harga
( Rp ) ( Rp )
No Uraian Pekerjaan
Harga
IX PEKERJAAN PINTU JENDELA DAN KANOPI
1 Pek. Pintu P1 kayu jati finishing melamin 3.000 unit 1,749,000.00 5,247,000.00
2 Pek. Pintu P2 kayu jati finishing melamin 1.000 unit 1,749,000.00 1,749,000.00
3 Pek. Pintu PVC P3 murico 1.000 unit 225,000.00 225,000.00
4 Jendela J1 kayu jati finishing melamin 5.000 unit 895,000.00 4,475,000.00
5 Kanopi polycarbonate (rangka hollow stainless stell) 9.000 m² 425,000.00 3,825,000.00
Sub Jumlah 15,521,000.00
X PEKERJAAN MEKANIKAL & ELEKTRIKAL
A Pekerjaan elektrikal
1 Lampu SL 23 watt philip (termasuk fitting) 6.00 unit 55,000.00 330,000.00
2 Down light swillite DL 5 KBF 4.00 unit 85,000.00 340,000.00
2 Lampu dinding luar 2.00 unit 145,000.00 290,000.00
3 Lampu taman 1.00 unit 220,000.00 220,000.00
3 Instalasi penerangan & stok kontak 26.00 ttk 90,000.00 2,340,000.00
4 Saklar tunggal broco 4.00 bh 17,500.00 70,000.00
4 Saklar double broco 4.00 bh 20,000.00 80,000.00
5 Stop kontak broco 5.00 bh 17,500.00 87,500.00
Sub Jumlah 3,757,500.00
B Pekerjaan Mekanikal
a. Pemipaan & sanitary
- Pipa air bersih 3/4" wavin AW 14.93 m1 26,700.00 398,631.00
- Pipa air bersih 1/2" wavin AW 7.05 m1 21,550.00 151,927.50
- Pipa air bekas 3" wavin AW 10.93 m1 38,500.00 420,805.00
- Pipa air kotor 4" wavin AW 7.23 m1 57,500.00 415,725.00
- Kran air bersih merk TOTO 4.00 m1 125,000.00 500,000.00
- Washtafel merk TOTO 1.00 m1 850,000.00 850,000.00
- Shower tray merk TOTO 1.00 m1 356,000.00 356,000.00
- Closet jongkok merk TOTO 1.00 m1 1,325,000.00 1,325,000.00
b. Septik tank kapasitas 1,5m3 1.00 unit 1,100,000.00 1,100,000.00
Sub Jumlah 5,518,088.50
Page 3 of 3

More Related Content

Viewers also liked

Diego vega actividad1_2mapac
Diego vega actividad1_2mapacDiego vega actividad1_2mapac
Diego vega actividad1_2mapac
Diego Vega Parra
 
Topologi bts tanpa router
Topologi bts tanpa routerTopologi bts tanpa router
Topologi bts tanpa router
Arif Scooters
 
Olivia 3
Olivia 3Olivia 3
Guide créer sa junior association
Guide créer sa junior associationGuide créer sa junior association
Guide créer sa junior association
JA33
 
Tabla del tamaño de los zapatos de bebé- simple y funcional
Tabla del tamaño de los zapatos de bebé- simple y funcionalTabla del tamaño de los zapatos de bebé- simple y funcional
Tabla del tamaño de los zapatos de bebé- simple y funcional
milton_sss
 
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
hkspodf
 
Dhanushka-CV (2)
Dhanushka-CV (2)Dhanushka-CV (2)
Dhanushka-CV (2)
Lanka Thilaka
 
Presentacion
PresentacionPresentacion
Presentacion
ariday21
 
портфоліо рудницький
портфоліо рудницькийпортфоліо рудницький
портфоліо рудницький
marchevska
 
Портфоліо Шпінь
Портфоліо ШпіньПортфоліо Шпінь
Портфоліо Шпінь
marchevska
 
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, EtsyPuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
Puppet
 
Desarrollo de la propuesta de financiamiento.
Desarrollo de la propuesta de financiamiento.Desarrollo de la propuesta de financiamiento.
Desarrollo de la propuesta de financiamiento.
Wenceslao Verdugo Rojas
 
CRBP- Why children do matter for businesses
CRBP- Why  children do matter for businessesCRBP- Why  children do matter for businesses
CRBP- Why children do matter for businesses
The Business Council of Mongolia
 
Media Evaluation Question 3
Media Evaluation Question 3Media Evaluation Question 3
Media Evaluation Question 3
sabirilyasov
 

Viewers also liked (14)

Diego vega actividad1_2mapac
Diego vega actividad1_2mapacDiego vega actividad1_2mapac
Diego vega actividad1_2mapac
 
Topologi bts tanpa router
Topologi bts tanpa routerTopologi bts tanpa router
Topologi bts tanpa router
 
Olivia 3
Olivia 3Olivia 3
Olivia 3
 
Guide créer sa junior association
Guide créer sa junior associationGuide créer sa junior association
Guide créer sa junior association
 
Tabla del tamaño de los zapatos de bebé- simple y funcional
Tabla del tamaño de los zapatos de bebé- simple y funcionalTabla del tamaño de los zapatos de bebé- simple y funcional
Tabla del tamaño de los zapatos de bebé- simple y funcional
 
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
국내카지노 온라인 『OX600』。『COM』 빙고룰 노하우
 
Dhanushka-CV (2)
Dhanushka-CV (2)Dhanushka-CV (2)
Dhanushka-CV (2)
 
Presentacion
PresentacionPresentacion
Presentacion
 
портфоліо рудницький
портфоліо рудницькийпортфоліо рудницький
портфоліо рудницький
 
Портфоліо Шпінь
Портфоліо ШпіньПортфоліо Шпінь
Портфоліо Шпінь
 
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, EtsyPuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
PuppetConf 2016: How You Actually Get Hacked – Ben Hughes, Etsy
 
Desarrollo de la propuesta de financiamiento.
Desarrollo de la propuesta de financiamiento.Desarrollo de la propuesta de financiamiento.
Desarrollo de la propuesta de financiamiento.
 
CRBP- Why children do matter for businesses
CRBP- Why  children do matter for businessesCRBP- Why  children do matter for businesses
CRBP- Why children do matter for businesses
 
Media Evaluation Question 3
Media Evaluation Question 3Media Evaluation Question 3
Media Evaluation Question 3
 

Similar to Rab final bata

Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
Sekertariat_Akmaliah
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
Reguti
 
Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jaya
verytudjuka
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes
Deny Sulistio
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
Omar Faruque
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
ashleyyeap
 
Rab
RabRab
Rab
AL Vet
 
3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
Syahrul Najmi
 
Rehab kantor pariwsata
Rehab kantor pariwsataRehab kantor pariwsata
Rehab kantor pariwsata
Kashmir Brown
 
Builder Sample
Builder SampleBuilder Sample
Builder Sample
Hai Nguyen
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimate
imaduddin91
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
Hai Nguyen
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
Hai Nguyen
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation
imaduddin91
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaiki
kurniawan yusril
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
Syafiq Zariful
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
independiente
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
ahmong4
 
School
SchoolSchool
Single storied house
Single storied houseSingle storied house
Single storied house
RESET Development
 

Similar to Rab final bata (20)

Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Data penawaran subur jaya
Data penawaran subur jayaData penawaran subur jaya
Data penawaran subur jaya
 
2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes2.pengajuanrabcandramas terasdepanatapasbes
2.pengajuanrabcandramas terasdepanatapasbes
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
Rab
RabRab
Rab
 
3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
 
Rehab kantor pariwsata
Rehab kantor pariwsataRehab kantor pariwsata
Rehab kantor pariwsata
 
Builder Sample
Builder SampleBuilder Sample
Builder Sample
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimate
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
Home Owner Sample
Home Owner SampleHome Owner Sample
Home Owner Sample
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation
 
Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaiki
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 
School
SchoolSchool
School
 
Single storied house
Single storied houseSingle storied house
Single storied house
 

Recently uploaded

SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
SVN International Corp.
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
z5h13yqc
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
knox groups real estate
 
Gurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdfGurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdf
jwhrsngh23
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
Farmland Bazaar
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
hawifitumaed
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
Tom Blefko
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
a7xjm8n4
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
olgashriki
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
VickyAulakh1
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
GVRenting
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
VickyAulakh1
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
hawifitumaed
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
Listing Turkey
 

Recently uploaded (15)

SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
 
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
 
Gurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdfGurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdf
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
 

Rab final bata

  • 1. NO Uraian Pekerjaan I PEKERJAAN PENDAHULUAN 366,680.000 II PEKERJAAN TANAH DAN PASIR 1,776,867.800 III PEKERJAAN PASANGAN BATU BELAH 5,465,344.000 IV PEKERJAAN STRUKTUR BETON BERTULANG 6,372,407.200 V PEKERJAAN PASANGAN DAN PLESTERAN 15,414,624.400 VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP 27,614,382.470 VII PEKERJAAN FINISHING 4,833,895.000 VIII SALURAN KELILING AIR HUJAN 745,920.000 IX PEKERJAAN PINTU JENDELA DAN KANOPI 15,521,000.000 X PEKERJAAN MEKANIKAL & ELEKTRIKAL Pekerjaan elektrikal 3,757,500.000 Pekerjaan Mekanikal 5,518,088.500 Jumlah Total 87,386,709.370 REKAPITULASI Jumlah Harga ( Rp ) Page 1 of 3
  • 2. Volume Satuan Jumlah Harga ( Rp ) ( Rp ) I PEKERJAAN PENDAHULUAN 1 Uniset dan bouwplank 4.00 m' 39,920.00 159,680.00 2 Pembersihan lokasi 60.00 m2 3,450.00 207,000.00 Sub Jumlah 366,680.00 II PEKERJAAN TANAH DAN PASIR 1 Galian tanah 38.84 m3 19,170.00 744,562.80 2 Urug tanah kembali 24.05 m3 7,000.00 168,350.00 3 Urug pasir bawah pondasi & lantai 7.89 m3 109,500.00 863,955.00 Sub Jumlah 1,776,867.80 III PEKERJAAN PASANGAN BATU BELAH 1 Pasangan batu belah camp 1pc:5psr 14.80 m3 369,280.00 5,465,344.00 Sub Jumlah 5,465,344.00 IV PEKERJAAN STRUKTUR BETON BERTULANG Catatan : Mutu beton : fc' = 22,5 Mpa (camp. 1: 2: 3) 1 Betom sloof 15x20cm & ring balk 1.18 m 3 2,701,360.00 3,187,604.80 2 Beton kolom praktis 15x15cm 1.56 m³ 2,041,540.00 3,184,802.40 Sub Jumlah 6,372,407.20 V PEKERJAAN PASANGAN DAN PLESTERAN 1 Pasang dinding bata camp. 1pc:5psr 24.06 m³ 395,710.00 9,520,782.60 2 Plesteran dinding camp. 1pc:5psr 343.08 m² 15,040.00 5,159,923.20 3 Sponengan 217.78 m1 3,370.00 733,918.60 Sub Jumlah 15,414,624.40 VI PEKERJAAN LANTAI DAN PLAFOND PENUTUP ATAP 1 Keramik lantai 30x30 cm (setara platinum) 41.90 m² 75,730.00 3,173,087.00 2 Keramik lantai km 20x20 (setara platinum) 2.25 m² 65,230.00 146,767.50 3 Keramik dinding km 20x25 cm (setara platinum) 9.00 m² 73,480.00 661,320.00 4 Plin keramik 10x30cm (setara platinum) 44.99 m1 25,243.33 1,135,697.57 5 Plafond gypsumboard t=9mm rangka kayu 57.41 m² 72,500.00 4,162,225.00 6 List plafond gypsum 63.44 m' 17,500.00 1,110,200.00 6 List plank kayu (25 tebal 2cm) 14.86 m' 28,870.00 429,008.20 7 Rangka atap (kuda2, usuk, reng kayu kalimantan) 64.08 m² 142,940.00 9,159,595.20 7 Penutup atap(genteng keramik KIA) 64.08 m² 90,750.00 5,815,260.00 8 Bubungan 25.80 m' 70,590.00 1,821,222.00 Sub Jumlah 27,614,382.47 VII PEKERJAAN FINISHING 1 Cat dinding tembok dalam catylac 343.08 m² 12,500.00 4,288,500.00 2 Cat langit-langit 57.41 m² 9,500.00 545,395.00 Sub Jumlah 4,833,895.00 VIII SALURAN KELILING AIR HUJAN 1 Saluran air hujan U 20 6.00 m' 124,320.00 745,920.00 Sub Jumlah 745,920.00 RENCANA ANGGARAN BIAYA No Uraian Pekerjaan Harga Page 2 of 3
  • 3. Volume Satuan Jumlah Harga ( Rp ) ( Rp ) No Uraian Pekerjaan Harga IX PEKERJAAN PINTU JENDELA DAN KANOPI 1 Pek. Pintu P1 kayu jati finishing melamin 3.000 unit 1,749,000.00 5,247,000.00 2 Pek. Pintu P2 kayu jati finishing melamin 1.000 unit 1,749,000.00 1,749,000.00 3 Pek. Pintu PVC P3 murico 1.000 unit 225,000.00 225,000.00 4 Jendela J1 kayu jati finishing melamin 5.000 unit 895,000.00 4,475,000.00 5 Kanopi polycarbonate (rangka hollow stainless stell) 9.000 m² 425,000.00 3,825,000.00 Sub Jumlah 15,521,000.00 X PEKERJAAN MEKANIKAL & ELEKTRIKAL A Pekerjaan elektrikal 1 Lampu SL 23 watt philip (termasuk fitting) 6.00 unit 55,000.00 330,000.00 2 Down light swillite DL 5 KBF 4.00 unit 85,000.00 340,000.00 2 Lampu dinding luar 2.00 unit 145,000.00 290,000.00 3 Lampu taman 1.00 unit 220,000.00 220,000.00 3 Instalasi penerangan & stok kontak 26.00 ttk 90,000.00 2,340,000.00 4 Saklar tunggal broco 4.00 bh 17,500.00 70,000.00 4 Saklar double broco 4.00 bh 20,000.00 80,000.00 5 Stop kontak broco 5.00 bh 17,500.00 87,500.00 Sub Jumlah 3,757,500.00 B Pekerjaan Mekanikal a. Pemipaan & sanitary - Pipa air bersih 3/4" wavin AW 14.93 m1 26,700.00 398,631.00 - Pipa air bersih 1/2" wavin AW 7.05 m1 21,550.00 151,927.50 - Pipa air bekas 3" wavin AW 10.93 m1 38,500.00 420,805.00 - Pipa air kotor 4" wavin AW 7.23 m1 57,500.00 415,725.00 - Kran air bersih merk TOTO 4.00 m1 125,000.00 500,000.00 - Washtafel merk TOTO 1.00 m1 850,000.00 850,000.00 - Shower tray merk TOTO 1.00 m1 356,000.00 356,000.00 - Closet jongkok merk TOTO 1.00 m1 1,325,000.00 1,325,000.00 b. Septik tank kapasitas 1,5m3 1.00 unit 1,100,000.00 1,100,000.00 Sub Jumlah 5,518,088.50 Page 3 of 3