This document is a detailed drawing of a ladder and platform for a caustic storage tank. It includes views and details of the ladder components (LC1-LC11), platform frames (PF1-PF17), and support gratings (SG1-SG26). The drawing provides dimensions, material specifications, hole locations and sizes. It was issued for construction by PT Kokoh Semesta for a project owned by PT Pertamina in Balikpapan, Indonesia.
Static Stress Analysis of Connecting Rod Using Finite Element ApproachIOSR Journals
Every vehicle which equipped with internal combustion engine requires connecting rod. In this paper a static stress analysis of connecting rod made up of SS 304 used in Cummins NTA 885 BC engine is conducted, using finite element method. After measuring the dimension of connecting rod, model is developed in CATIA V5 software and imported to ANSYS WORKBENCH 14.0 software. Static analysis is done by fixing the smaller end and load is applied at bigger end of connecting rod. Stress developed at four different sections is used for analysis. Maximum stress point and section prone to failure is finding out by this analysis. Graph between stress and load is plotted at section prone to failure and result of stress analysis is shown with the help of image.
Energy Conversion Engineering laboratory manual prepared by Hareesha N G, Asst. Prof., Dept of Aerospace, DSCE, Bangalore, for BE Students under VTU. Sub code:10AEL57
Static Stress Analysis of Connecting Rod Using Finite Element ApproachIOSR Journals
Every vehicle which equipped with internal combustion engine requires connecting rod. In this paper a static stress analysis of connecting rod made up of SS 304 used in Cummins NTA 885 BC engine is conducted, using finite element method. After measuring the dimension of connecting rod, model is developed in CATIA V5 software and imported to ANSYS WORKBENCH 14.0 software. Static analysis is done by fixing the smaller end and load is applied at bigger end of connecting rod. Stress developed at four different sections is used for analysis. Maximum stress point and section prone to failure is finding out by this analysis. Graph between stress and load is plotted at section prone to failure and result of stress analysis is shown with the help of image.
Energy Conversion Engineering laboratory manual prepared by Hareesha N G, Asst. Prof., Dept of Aerospace, DSCE, Bangalore, for BE Students under VTU. Sub code:10AEL57
ppt ini mengacu ke sni 1729 2020, hal hal yang terdapat di ppt ini adalah pengertian batang tarik baja,beberapa macam batang tarik,konsep luas penampang,menghitung luas penampang netto,pola staggered, shear lag, contoh soal menghitung batang tarik
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
ppt ini mengacu ke sni 1729 2020, hal hal yang terdapat di ppt ini adalah pengertian batang tarik baja,beberapa macam batang tarik,konsep luas penampang,menghitung luas penampang netto,pola staggered, shear lag, contoh soal menghitung batang tarik
6th International Conference on Machine Learning & Applications (CMLA 2024)ClaraZara1
6th International Conference on Machine Learning & Applications (CMLA 2024) will provide an excellent international forum for sharing knowledge and results in theory, methodology and applications of on Machine Learning & Applications.
Online aptitude test management system project report.pdfKamal Acharya
The purpose of on-line aptitude test system is to take online test in an efficient manner and no time wasting for checking the paper. The main objective of on-line aptitude test system is to efficiently evaluate the candidate thoroughly through a fully automated system that not only saves lot of time but also gives fast results. For students they give papers according to their convenience and time and there is no need of using extra thing like paper, pen etc. This can be used in educational institutions as well as in corporate world. Can be used anywhere any time as it is a web based application (user Location doesn’t matter). No restriction that examiner has to be present when the candidate takes the test.
Every time when lecturers/professors need to conduct examinations they have to sit down think about the questions and then create a whole new set of questions for each and every exam. In some cases the professor may want to give an open book online exam that is the student can take the exam any time anywhere, but the student might have to answer the questions in a limited time period. The professor may want to change the sequence of questions for every student. The problem that a student has is whenever a date for the exam is declared the student has to take it and there is no way he can take it at some other time. This project will create an interface for the examiner to create and store questions in a repository. It will also create an interface for the student to take examinations at his convenience and the questions and/or exams may be timed. Thereby creating an application which can be used by examiners and examinee’s simultaneously.
Examination System is very useful for Teachers/Professors. As in the teaching profession, you are responsible for writing question papers. In the conventional method, you write the question paper on paper, keep question papers separate from answers and all this information you have to keep in a locker to avoid unauthorized access. Using the Examination System you can create a question paper and everything will be written to a single exam file in encrypted format. You can set the General and Administrator password to avoid unauthorized access to your question paper. Every time you start the examination, the program shuffles all the questions and selects them randomly from the database, which reduces the chances of memorizing the questions.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
HEAP SORT ILLUSTRATED WITH HEAPIFY, BUILD HEAP FOR DYNAMIC ARRAYS.
Heap sort is a comparison-based sorting technique based on Binary Heap data structure. It is similar to the selection sort where we first find the minimum element and place the minimum element at the beginning. Repeat the same process for the remaining elements.
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...ssuser7dcef0
Power plants release a large amount of water vapor into the
atmosphere through the stack. The flue gas can be a potential
source for obtaining much needed cooling water for a power
plant. If a power plant could recover and reuse a portion of this
moisture, it could reduce its total cooling water intake
requirement. One of the most practical way to recover water
from flue gas is to use a condensing heat exchanger. The power
plant could also recover latent heat due to condensation as well
as sensible heat due to lowering the flue gas exit temperature.
Additionally, harmful acids released from the stack can be
reduced in a condensing heat exchanger by acid condensation. reduced in a condensing heat exchanger by acid condensation.
Condensation of vapors in flue gas is a complicated
phenomenon since heat and mass transfer of water vapor and
various acids simultaneously occur in the presence of noncondensable
gases such as nitrogen and oxygen. Design of a
condenser depends on the knowledge and understanding of the
heat and mass transfer processes. A computer program for
numerical simulations of water (H2O) and sulfuric acid (H2SO4)
condensation in a flue gas condensing heat exchanger was
developed using MATLAB. Governing equations based on
mass and energy balances for the system were derived to
predict variables such as flue gas exit temperature, cooling
water outlet temperature, mole fraction and condensation rates
of water and sulfuric acid vapors. The equations were solved
using an iterative solution technique with calculations of heat
and mass transfer coefficients and physical properties.
26071 v46 a-d-160-01-00012-051_detail drawing of ladder & platform for caustic storage tank (d-160-01)
1. 2
9
8
3
0
2
1
9
0
2
1
1
0
0
1
1
0
0
1
0
5
0
9
5
0
1
2
0
0
6
0
0
2
4
0
0
2
4
0
0
2
0
0
0
2
0
0
0
2
0
0
0
198
RIGHT VIEW
2
3
8
0
0
270
180
135
90
TOP VIEW
TOS EL +108200
TOS EL +106300
ISOMETRIC VIEW
TN
PM WIND
APR-SEPT
WIND
OCT-MAR
W E
S
DESCRIPTION
10 JUL 20
00A
Rev.
Issued for approval
DATE DRWN
Sugeng
APPV
CONTRACTOR
Ir.Esra
CHKD
Ranto
RDMP RU V BALIKPAPAN
RDMP RU BALIKPAPAN JO
PT PERTAMINA
BALIKPAPAN, INDONESIA
DES
Abdul
PROJECT
OWNER
TITLE
VENDOR
PERTAMINA DRAWING NO.
DETAIL DRAWING OF LADDER AND PLATFORM FOR
CAUSTIC STORAGE TANK
(D-160-01)
PT. KOKOH SEMESTA
MANUFACTURES-ENGINEERS-CONTRACTORS
NTS
SCALE
26071
JOB NO.
26071-V46A-D-160-01-00012
DOCUMENT NO.
REV.
SHT NO.
1
051
Ir.Esra
Sugeng
Abdul
Ranto
Issued for approval
28 AUG 20
00B
00C 09 OCT 20 Issued for approval Ranto Abdul Sugeng Ir.Esra
Issued for approval
03 NOV 20
00D Ranto Abdul Sugeng Ir.Esra
Ir.Esra
Sugeng
Abdul
Ranto
Issued for approval
000 20 JAN 20 Ranto Abdul Sugeng Ir.Esra
00E 15 DES 20
050 14 JUN 21 As Built Ranto Abdul Sugeng Ir.Esra
B4T-sc
ISO 9001-2015
NO.506/Q-95/12
Issued for construction
051 14 SEP 21 As Built Ranto Abdul Sugeng Ir.Esra
2. 3
0
2
2
1
9
8
7
3
0
0
@
3
0
0
x
2
3
=
6
9
0
0
1
5
2
A
C
LC1
400 9
9
B
LC2
160
40
DETAIL A
LC6
LC7
LC8
LC10&LC11
6
TYP
1
9
9
6
2
0
H
o
le
s
DETAIL B
LC9
5
TYP
Seal
Weld
D
LC3
LC4
LC5
LC4A
LC5C
4
4
TYP
7
5
75
DETAIL C
LC1 LC2
TYP
LC5A
LC5B
DETAIL D
LC4 LC5
4
4
TYP
248
228
3
5
2
0
2- 14 holes
7
5
DETAIL LC1
R450
2
4
7
4
1
3
1
7
7
8
4
0
65
784
378 456
DETAIL LC3
1778
5
0
1758
18 Holes
2
5
PLATE DETAIL FOR LC3
50
734
5
0
R350
4
1
8
6
6
94
94
DETAIL LC4
1954
5
0
PLATE DETAIL FOR LC4
2
0
9
6
R350
2
7
2
230
DETAIL LC4A
734
5
0
1283
5
0
PLATE DETAIL FOR LC4A
4
2
2
8
1
1
1
2
3
9
1
1
1
6
DETAIL LC5
4
2
3
0
DETAIL LC5A
2
2
3
0
DETAIL LC5C
4
0
1
1
1
2
3
9
1
1
1
6
DETAIL LC5B
75
2
0
0
34
10
5
0
1
0
0
DETAIL LC6 & LC7
LC7
100
40
18 Holes
5
0
1
0
0
2
0
0
FOR 5/8" UNC BOLT/NUT
8
TYP
1
0
0
185
25
2
5
3
8
30 155
DETAIL LC8
200
209
SECTION A-A
DESCRIPTION
10 JUL 20
00A
Rev.
Issued for approval
DATE DRWN
Sugeng
APPV
CONTRACTOR
Ir.Esra
CHKD
Ranto
RDMP RU V BALIKPAPAN
RDMP RU BALIKPAPAN JO
PT PERTAMINA
BALIKPAPAN, INDONESIA
DES
Abdul
PROJECT
OWNER
TITLE
VENDOR
PERTAMINA DRAWING NO.
DETAIL DRAWING OF LADDER AND PLATFORM FOR
CAUSTIC STORAGE TANK
(D-160-01)
PT. KOKOH SEMESTA
MANUFACTURES-ENGINEERS-CONTRACTORS
NTS
SCALE
26071
JOB NO.
26071-V46A-D-160-01-00012
DOCUMENT NO.
REV.
SHT NO.
2
051
Ir.Esra
Sugeng
Abdul
Ranto
Issued for approval
28 AUG 20
00B
00C 09 OCT 20 Issued for approval Ranto Abdul Sugeng Ir.Esra
Issued for approval
03 NOV 20
00D Ranto Abdul Sugeng Ir.Esra
Ir.Esra
Sugeng
Abdul
Ranto
Issued for approval
000 20 JAN 20 Issued for construction Ranto Abdul Sugeng Ir.Esra
00E 15 DES 20
050 14 JUN 21 As Built Ranto Abdul Sugeng Ir.Esra
B4T-sc
ISO 9001-2015
NO.506/Q-95/12
051 14 SEP 21 As Built Ranto Abdul Sugeng Ir.Esra
3. 1663
2
5
2
6
5
8
1
4
8
1
275 1030
1882
A
B C
B1
B1
SG19 SG17
SG20
VIEW A1-A1
2
3
8
0 1250
1350
A
A
B
B
C
C
F
F
A1
A1
TOS EL +108200
TOS EL +106300
8
3
0
5
6
1
1
4
1
9
1
3
1
9
1137
426
1250
1350
1475
E
E
D
F
D
D
G
K
L
SG18
VIEW B1-B1
2
9
0
0
3600
9
9
5
800 1450
1
2
5
5
6
5
0
5
0
0
R1858
1479
1140
PF1
PF2
PF3
PF4
PF5
PF17
PF7
PF8
PF10
PF9
PF6
2
8
8
0
3
2
9
1
0
6
1
6
5
0
9
7
5
1061 65
290
3580
R1898
R2198
1476
200
958
280
DETAIL SG24
TOS EL +106300
TOS EL +108200
R3398
R2248
1
6
2
8
1365
1200
8
0
5
805
PF11
PF12
PF13
PF14
PF15
PF16
1200
616
R
3
3
9
8
1
6
0
1
5
5
DETAIL SG25
3
5
8
H
H
DETAIL A
SG1
275 TO TANK CL
4
2
7
DETAIL B
SG2
SG22&SG23
1030 TO TANK CL
4
3
7
DETAIL C
SG3
1882 TO TANK CL
6
TYP
3
4
0
VIEW A-A
SG4
275 TO TANK CL
1
7
0
VIEW B-B
SG5
4
4
0
VIEW C-C
SG6
SG8
SG7
1300 TO TANK CL
2
0
4
3
E
VIEW E-E
SG12
3226 TO TANK CL
1
3
50
DETAIL D
SG10
SG9
SG12
6
TYP
40
4
0
3
0
DETAIL F
SG20
2- 12 Holes
FOR 3/8' UNC BOLT/NUT
120
1
0
0
2
5
10
100
VIEW D-DSG3
SG7
6
TYP
DETAIL G
SG14
SG10
SG11
6
TYP
1760
I
J
VIEW F-F
SG14
100
140
DETAIL I
SG13
SG14 PF14
SG22&SG23
3220 TO TANK CL
6
TYP
150
24
G
G
DETAIL J
SG15
PF14
SG22&SG23
DETAIL E
SG11
SG22&SG23
6
TYP
VIEW G-G
SG16
SG15
SG22&SG23
6
TYP
5
0
6
62
6
1
1
2
VIEW H-H
SG8
DETAIL K
SG17
5
TYP
65 35
DETAIL L
SG13
DESCRIPTION
10 JUL 20
00A
Rev.
Issued for approval
DATE DRWN
Sugeng
APPV
CONTRACTOR
Ir.Esra
CHKD
Ranto
RDMP RU V BALIKPAPAN
RDMP RU BALIKPAPAN JO
PT PERTAMINA
BALIKPAPAN, INDONESIA
DES
Abdul
PROJECT
OWNER
TITLE
VENDOR
PERTAMINA DRAWING NO.
DETAIL DRAWING OF LADDER AND PLATFORM FOR
CAUSTIC STORAGE TANK
(D-160-01)
PT. KOKOH SEMESTA
MANUFACTURES-ENGINEERS-CONTRACTORS
NTS
SCALE
26071
JOB NO.
26071-V46A-D-160-01-00012
DOCUMENT NO.
REV.
SHT NO.
3
051
Ir.Esra
Sugeng
Abdul
Ranto
Issued for approval
28 AUG 20
00B
00C 09 OCT 20 Issued for approval Ranto Abdul Sugeng Ir.Esra
Issued for approval
03 NOV 20
00D Ranto Abdul Sugeng Ir.Esra
Ir.Esra
Sugeng
Abdul
Ranto
Issued for approval
000 20 JAN 20 Issued for construction Ranto Abdul Sugeng Ir.Esra
00E 15 DES 20
050 Ranto Abdul Sugeng Ir.Esra
B4T-sc
ISO 9001-2015
NO.506/Q-95/12
14 JUN 21 As Built
051 14 SEP 21 As Built Ranto Abdul Sugeng Ir.Esra
4. 3600
1575 50 1774 65
4- 18 Holes
2
2
DETAIL PF1
125 50 1300 50 1200 50
2900
6- 18 Holes
2
2
DETAIL PF2
1479
125 50
2- 18 Holes
2
2
D
ETAIL PF3
3594
136 65
2- 18 Holes
2
8
DETAIL PF5
995
DETAIL PF6
983
44 895 44
DETAIL PF7
794
44 750
DETAIL PF10
1392
44 1304
DETAIL PF9
1899
1855
44
DETAIL PF8
100
46 8
2
0
0
13
1
7
5
DETAIL SG10
3
0
2
8
42 28
1
7
5
100
7
5
2- 18 Holes
DETAIL SG11
6
2
112
31
50
3
1
2- 18 Holes
DETAIL SG8
1
4
0
93
48
4
0
6
5
2- 18 Holes
DETAIL SG13
88
7
5
5
0
1
5
0
44
2- 18 Holes
DETAIL SG15
1
2
0
65
29 8
9
2
1
4
DETAIL SG16
OD 970
6
DETAIL SG17
100
O
D
2
9
2
6
DETAIL SG18
O
D
2
1
2
6
DETAIL SG19
100
100
2024
R
1
8
5
8
349 47
15
1
1
7
2- 18 Holes
DETAIL PF11 879
44
R
2
1
9
8
DETAIL PF13
44
879 44
R2
19
8
DETAIL PF12
2872
R
3
3
4
8
DETAIL PF4
1365
65 135
2
8
2- 18 Holes
FOR 5/8" UNC BOLT/NUT
1365
65 135
2
8
2- 18 Holes
65 85
1326 44
2- 18 Holes
50 50
5
0
1
0
0
2- 18 Holes
DETAIL PF15
50 50
5
0
1
0
0
2- 18 Holes
DETAIL PF14
1370
60 50
2- 18 Holes
DETAIL PF16
70
1
0
0
4
0
41
2- 12 Holes
3
0
DETAIL SG21
O
D
R
1
7
2
6
DETAIL SG20
100
895
44 44
983
65 201
2
2
2- 18 Holes
DETAIL PF17
9
3
140
35 65
4
8
2- 18 Holes
DETAIL SG26
FOR 5/8" UNC BOLT/NUT
DESCRIPTION
10 JUL 20
00A
Rev.
Issued for approval
DATE DRWN
Sugeng
APPV
CONTRACTOR
Ir.Esra
CHKD
Ranto
RDMP RU V BALIKPAPAN
RDMP RU BALIKPAPAN JO
PT PERTAMINA
BALIKPAPAN, INDONESIA
DES
Abdul
PROJECT
OWNER
TITLE
VENDOR
PERTAMINA DRAWING NO.
DETAIL DRAWING OF LADDER AND PLATFORM FOR
CAUSTIC STORAGE TANK
(D-160-01)
PT. KOKOH SEMESTA
MANUFACTURES-ENGINEERS-CONTRACTORS
NTS
SCALE
26071
JOB NO.
26071-V46A-D-160-01-00012
DOCUMENT NO.
REV.
SHT NO.
4
051
Ir.Esra
Sugeng
Abdul
Ranto
Issued for approval
28 AUG 20
00B
00C 09 OCT 20 Issued for approval Ranto Abdul Sugeng Ir.Esra
Issued for approval
03 NOV 20
00D Ranto Abdul Sugeng Ir.Esra
Ir.Esra
Sugeng
Abdul
Ranto
Issued for approval
000 20 JAN 20 Issued for construction Ranto Abdul Sugeng Ir.Esra
00E 15 DES 20
050 14 JUN 21 As Built Ranto Abdul Sugeng Ir.Esra
B4T-sc
ISO 9001-2015
NO.506/Q-95/12
051 14 SEP 21 As Built Ranto Abdul Sugeng Ir.Esra