History of Transportation Planning
• 60 years of transportation planning
• 4 County-wide Transportation Plans
– 1964, 1991
– Metropolitan Transportation Plans
• 2030 (2005), 2035 (2010), 2040 (2015)
Review of Metropolitan Plans
• Metro 2030 Transportation Plan
– Adopted, September 2005
– Amended, December 2007
• $181,685,000 in 35 projects
• 2035 Transportation Plan
– Adopted, September 2010
– Cost Update, July 2011; September 2013
• $415,212,107 in 47 projects
Why do a Review?
• Learn from where we came from
• What worked, what didn’t
• Performance Measures
– Evaluate projects, policies, programs to be sure
the assumptions were correct
• Implement new ideas and change old ones
Metro 2030 Transportation Plan
• March 2013, Report of
Accomplishments
• Evaluation of
Socioeconomic data
• Evaluation of Goals and
Objectives
Metro 2030 SE Data
• Aggressive Growth Forecasted
– 137,000 Population
– 50,000 Households, smaller persons/household
– Income fell $4K, from $32,000 median by 2010
– 82,868 forecasted; in 2010: at 47,000 – should
have been 65,000
Metro 2030 Goals
• Goal 1 – Economic Vitality
– Intersection Improvements
– Traffic Management Center
– Reduce Vehicle Miles Traveled
– New LDR and ULDC
Vehicle Miles Traveled
Metro 2013 Goals
• Goal 2: Regionalism and Tourism
– Bike and Pedestrian Master Plan
– Transit Feasibility and Implementation Plans
– Freight Movement Study and Report Series
– Access Management coordination
– Transportation Investment Act - TSPLOST
Metro 2030 Goals
• Goal 3: Accessibility and Mobility
– Transit Feasibility and Implementation Plans
– More bicycle information on safety and awareness
– Coordinated Public Transportation
• Goal 4: Funding Mechanisms
– Preservation and Maintenance First
– Project Selection Process
– Public Private Partnerships (transit, GDOT)
Metro 2030 Goals
• Goal 5: Land Use Compatibility
– Staff level coordination of proposed developments
and other programs
• Goal 6: Environmental Protection
– Public Participation Policy, Title VI Plan, LEP Plan
– Procurement and DBE Policies
– Promote Alternative Fuels and Gateways
Metro 2030 Goals
• Goal 7: Public Involvement
– Public Participation Policy, Title VI Plan, LEP Plan
– Procurement and DBE Policies
– New websites and social media
• Goal 8: System Management
– Preservation and Maintenance First
– Traffic Management Center
– Annual Crash Report
Metro 2030 Goals
• Goal 9: Traffic Safety and Emergency
Management
– Preservation and Maintenance First
– Annual Crash Report
– Promote Safety
Metro 2030 Projects
• 35 Projects
– 5 Complete
– 3 Under Construction
– 1 in Right-of-Way
– 3 in Engineering/Design
– 2 Projects Terminated
– 21 No Activity
2035 Transportation Plan
• March 2013, Report of
Activities
• Evaluation of
Socioeconomic data
• Evaluation of Goals and
Objectives
• INVEST Analysis
2035 TP SE Data
2003 Base 2006 Base 2010 Census 2030 TP 2035 TP
Population 95,024 103,796 109,233 132,150 134,697
Employment 47,300 55,664 45,440 82,868 72,051
Households 35,503 38,935 43,921 50,600 53,397
Enrollment 33,517 32,932 34,974 42,932 66,655
Income $32,132 $33,597 $38,535 $32,000 (2003$) $46,599
2035 TP Goals
• Priority 1: Develop a sustainable and safe regional
transportation system that includes all modes for
the transport of people and goods that promotes
economic development.
– Level of Service Improvements
– Job growth in Freight Sectors
– Transit Implementation Plan
– Staff coordination of land use changes/development
– Bike and Pedestrian Infrastructure Investment
– Job growth near transportation projects
• Priority 2: Encourage the MPO, SGRC and their
member communities to cooperatively consider
land use decisions by encouraging public
participation and involvement in the
transportation planning process.
– Public Participation Plan
– Annual Crash Report
– Project Selection Criteria
– Public Private Partnerships (transit, GDOT)
– Land use, development outside of Urban Service Area
– Multi-jurisdictional projects
• Priority 3: Promote an aesthetically
pleasing, sustainable, transportation system
that respects the needs of, and mitigates
and/or enhances the impacts on
disadvantaged populations and the context of
the nearby built and natural environments.
– Environmental impact mitigation
– Alternative Fuel Usage
– Gateways
2035 TP INVEST Analysis
• Infrastructure Voluntary Evaluation
Sustainability Tool
• Help transportation agencies integrate social,
economic and environmental best practices
into transportation projects, policies,
programs, etc.
• Included in 2035 TP Report of Activities
2035 TP INVEST Analysis
• Economic Development/Land Use
– Evaluate land use and transportation
development, evaluate zoning changes and sprawl
impacts on transportation system
• Natural Environment
– Engage resource and regulatory agencies in
planning process. Include evaluation of plans as
part of transportation plan update
2035 TP INVEST Analysis
• Social
– Evaluate goals/objectives and performance
measures to be inclusive of all parties
– Ensure that community vision is shared and
transportation plan is economically,
environmentally and socially resilient
– Consider performance measures in Public
Participation Plan, UPWP, TIP, other MPO
documents
2035 TP INVEST Analysis
• Accessibility and Affordability
– Physical, equitable, affordable access to
transportation resources
– Include evaluation of other plans as part of
transportation plan update
• Safety Planning
– Use resources to project crash rates and consider
other GIS tools for better crash analysis
2035 TP INVEST Analysis
• Multimodal Transportation and Public Health
– Include public health as a stakeholder/resource
agency
– Consider conducting a Health Impact Assessment
before completion of next transportation plan
– Include health impacts in goals and objectives
• Freight and Goods Movement
– Consider performance measures for freight mobility
– Review updated National Highway System
2035 TP INVEST Analysis
• Travel Demand Management
– Consider TDM strategies that are best practices in
small cities
• Air Quality
– Consider multi-modal strategies, operations
improvements, renewable resources, alternative
fuels
• Energy and Fuels
– Quantifiably consider impact of less fuel usage
2035 TP INVEST Analysis
• Financial Sustainability
– Use project specific cost estimates rather than
formula based
• Analysis Methods
– Consider developing a strategic plan for data
analysis, not just in the UPWP
• Transportation Systems Management & Ops
– Implement management and operations
performance measures
2035 TP INVEST Analysis
• Asset Management and Planning
– Consider asset management techniques and
performance measures
– Develop a benefit/cost analysis technique
• Infrastructure Resiliency
– Consider hazard mitigation plans measures
• Linking Planning and NEPA
– Consider best practices to link environmental review
to the planning level to streamline coordination and
consultation to improve project delivery
2035 TP Projects
• 47 Projects
– 4 Complete
– 3 Under Construction
– 1 in Right-of-Way
– 6 in Engineering/Design
– 33 No Activity
2040 Transportation Plan
• Timeline
– Vision/Goals/Objectives
• Common Community Vision
– Socioeconomic Data
• Performance Measures

More Related Content

What's hot

Congestion management process presentation updated
Congestion management process presentation updatedCongestion management process presentation updated
Congestion management process presentation updatedpyoungkyova
 
Regional Transportation Planning in Colorado
Regional Transportation Planning in ColoradoRegional Transportation Planning in Colorado
Regional Transportation Planning in ColoradoRPO America
 
SIVA project_Recommendation paper on infrastructure mapping (A531)
SIVA project_Recommendation paper on infrastructure mapping (A531)SIVA project_Recommendation paper on infrastructure mapping (A531)
SIVA project_Recommendation paper on infrastructure mapping (A531)Sivaul
 
Itmp25 cesa ypf - 16 oct 14
Itmp25   cesa ypf - 16 oct 14Itmp25   cesa ypf - 16 oct 14
Itmp25 cesa ypf - 16 oct 14googlingsa
 
Regional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRegional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRPO America
 
Planning & Zoning Commission 2019 Plan of Work
Planning & Zoning Commission 2019 Plan of WorkPlanning & Zoning Commission 2019 Plan of Work
Planning & Zoning Commission 2019 Plan of WorkCity of College Station
 
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...Sį Susisiekimo Paslaugos
 
Thompson Roadway Safety Data Program
Thompson Roadway Safety Data ProgramThompson Roadway Safety Data Program
Thompson Roadway Safety Data ProgramRPO America
 
Vandermerwe summit on intelligent transport systems
Vandermerwe summit on intelligent transport systemsVandermerwe summit on intelligent transport systems
Vandermerwe summit on intelligent transport systemsitssa-presentations
 
DISCOVERY DAY 2017: MAKE IT HAPPEN!
DISCOVERY DAY 2017: MAKE IT HAPPEN!DISCOVERY DAY 2017: MAKE IT HAPPEN!
DISCOVERY DAY 2017: MAKE IT HAPPEN!FAO
 
Cheshire Development Update: Robin Miller-Stott - Transport for the North
Cheshire Development Update: Robin Miller-Stott - Transport for the NorthCheshire Development Update: Robin Miller-Stott - Transport for the North
Cheshire Development Update: Robin Miller-Stott - Transport for the NorthPlace North West
 
Chap1 introductionto Land Aministration and ICT in Rwanda
Chap1 introductionto Land Aministration and ICT in RwandaChap1 introductionto Land Aministration and ICT in Rwanda
Chap1 introductionto Land Aministration and ICT in Rwandarwandageospatialmedia
 
Using FAF Data in Economic Analysis/Case Study: North Dakota
Using FAF Data in Economic Analysis/Case Study: North DakotaUsing FAF Data in Economic Analysis/Case Study: North Dakota
Using FAF Data in Economic Analysis/Case Study: North DakotaUGPTI
 
Улаанбаатар 2014 Ubupi (jfpr project) 1 english
Улаанбаатар 2014 Ubupi (jfpr project) 1 englishУлаанбаатар 2014 Ubupi (jfpr project) 1 english
Улаанбаатар 2014 Ubupi (jfpr project) 1 englishBayar Tsend
 
2016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 20162016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 2016SCVTA
 
Current trends and innovations 5310 program and mod sandbox overview
Current trends and innovations 5310 program and mod sandbox overviewCurrent trends and innovations 5310 program and mod sandbox overview
Current trends and innovations 5310 program and mod sandbox overviewCHCRPA
 
Formulation of an Action Programme for the Integrated Management of the Shar...
 Formulation of an Action Programme for the Integrated Management of the Shar... Formulation of an Action Programme for the Integrated Management of the Shar...
Formulation of an Action Programme for the Integrated Management of the Shar...Iwl Pcu
 

What's hot (20)

Congestion management process presentation updated
Congestion management process presentation updatedCongestion management process presentation updated
Congestion management process presentation updated
 
Regional Transportation Planning in Colorado
Regional Transportation Planning in ColoradoRegional Transportation Planning in Colorado
Regional Transportation Planning in Colorado
 
SIVA project_Recommendation paper on infrastructure mapping (A531)
SIVA project_Recommendation paper on infrastructure mapping (A531)SIVA project_Recommendation paper on infrastructure mapping (A531)
SIVA project_Recommendation paper on infrastructure mapping (A531)
 
Itmp25 cesa ypf - 16 oct 14
Itmp25   cesa ypf - 16 oct 14Itmp25   cesa ypf - 16 oct 14
Itmp25 cesa ypf - 16 oct 14
 
Regional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRegional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning Framework
 
Planning & Zoning Commission 2019 Plan of Work
Planning & Zoning Commission 2019 Plan of WorkPlanning & Zoning Commission 2019 Plan of Work
Planning & Zoning Commission 2019 Plan of Work
 
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
Ivo cré, novatoriškų idėjų perdavimas viešajame transporte tide projekto pati...
 
Thompson Roadway Safety Data Program
Thompson Roadway Safety Data ProgramThompson Roadway Safety Data Program
Thompson Roadway Safety Data Program
 
Comprehensive Plan Evaluation Committee
Comprehensive Plan Evaluation CommitteeComprehensive Plan Evaluation Committee
Comprehensive Plan Evaluation Committee
 
Vandermerwe summit on intelligent transport systems
Vandermerwe summit on intelligent transport systemsVandermerwe summit on intelligent transport systems
Vandermerwe summit on intelligent transport systems
 
Capital Project Needs
Capital Project NeedsCapital Project Needs
Capital Project Needs
 
DISCOVERY DAY 2017: MAKE IT HAPPEN!
DISCOVERY DAY 2017: MAKE IT HAPPEN!DISCOVERY DAY 2017: MAKE IT HAPPEN!
DISCOVERY DAY 2017: MAKE IT HAPPEN!
 
Cheshire Development Update: Robin Miller-Stott - Transport for the North
Cheshire Development Update: Robin Miller-Stott - Transport for the NorthCheshire Development Update: Robin Miller-Stott - Transport for the North
Cheshire Development Update: Robin Miller-Stott - Transport for the North
 
Chap1 introductionto Land Aministration and ICT in Rwanda
Chap1 introductionto Land Aministration and ICT in RwandaChap1 introductionto Land Aministration and ICT in Rwanda
Chap1 introductionto Land Aministration and ICT in Rwanda
 
Using FAF Data in Economic Analysis/Case Study: North Dakota
Using FAF Data in Economic Analysis/Case Study: North DakotaUsing FAF Data in Economic Analysis/Case Study: North Dakota
Using FAF Data in Economic Analysis/Case Study: North Dakota
 
Улаанбаатар 2014 Ubupi (jfpr project) 1 english
Улаанбаатар 2014 Ubupi (jfpr project) 1 englishУлаанбаатар 2014 Ubupi (jfpr project) 1 english
Улаанбаатар 2014 Ubupi (jfpr project) 1 english
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
2016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 20162016 Measure B Presentation, Dec 2016
2016 Measure B Presentation, Dec 2016
 
Current trends and innovations 5310 program and mod sandbox overview
Current trends and innovations 5310 program and mod sandbox overviewCurrent trends and innovations 5310 program and mod sandbox overview
Current trends and innovations 5310 program and mod sandbox overview
 
Formulation of an Action Programme for the Integrated Management of the Shar...
 Formulation of an Action Programme for the Integrated Management of the Shar... Formulation of an Action Programme for the Integrated Management of the Shar...
Formulation of an Action Programme for the Integrated Management of the Shar...
 

Similar to 2030 and 2035 Transportation Plans Review

Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxssuserc1ed5e
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentationRPO America
 
CHAPTER 1.pptx
CHAPTER 1.pptxCHAPTER 1.pptx
CHAPTER 1.pptxJamieZali
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planningPiter Biswas
 
Statewide Transit Plan Open House at PPACG May 14, 2014
Statewide Transit Plan Open House at PPACG May 14, 2014Statewide Transit Plan Open House at PPACG May 14, 2014
Statewide Transit Plan Open House at PPACG May 14, 2014OV Consulting
 
Regional tranport system RTP
Regional tranport system RTPRegional tranport system RTP
Regional tranport system RTPSatyam Rai
 
Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final documentDonna Lum
 
2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdf2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdfUGPTI
 
Sustainable transport planning
Sustainable transport planning Sustainable transport planning
Sustainable transport planning MOHIT PANCHAL
 
Public Transport and Sustainable Development
Public Transport and Sustainable DevelopmentPublic Transport and Sustainable Development
Public Transport and Sustainable DevelopmentAndre Dantas
 
Csp coj tod 8 oct 2013 samantha naidu
Csp coj tod 8 oct 2013 samantha naiduCsp coj tod 8 oct 2013 samantha naidu
Csp coj tod 8 oct 2013 samantha naiduReaVaya_KM
 
Adopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarking
Adopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarkingAdopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarking
Adopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarkingAshish Shah
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentationbunthy sros
 
Phases and principles of transportation planning
Phases and principles of transportation planningPhases and principles of transportation planning
Phases and principles of transportation planningMuhammadNomanAslam3
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentationdirectionsto2050
 

Similar to 2030 and 2035 Transportation Plans Review (20)

Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
 
CHAPTER 1.pptx
CHAPTER 1.pptxCHAPTER 1.pptx
CHAPTER 1.pptx
 
dr. cal
dr. caldr. cal
dr. cal
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planning
 
Statewide Transit Plan Open House at PPACG May 14, 2014
Statewide Transit Plan Open House at PPACG May 14, 2014Statewide Transit Plan Open House at PPACG May 14, 2014
Statewide Transit Plan Open House at PPACG May 14, 2014
 
Lecture 5.pptx
Lecture 5.pptxLecture 5.pptx
Lecture 5.pptx
 
Regional tranport system RTP
Regional tranport system RTPRegional tranport system RTP
Regional tranport system RTP
 
Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...
Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...
Creating a Safer System Through State Pedestrian and Bicycle Safety Campaigns...
 
Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final document
 
2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdf2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdf
 
Sustainable transport planning
Sustainable transport planning Sustainable transport planning
Sustainable transport planning
 
Public Transport and Sustainable Development
Public Transport and Sustainable DevelopmentPublic Transport and Sustainable Development
Public Transport and Sustainable Development
 
Csp coj tod 8 oct 2013 samantha naidu
Csp coj tod 8 oct 2013 samantha naiduCsp coj tod 8 oct 2013 samantha naidu
Csp coj tod 8 oct 2013 samantha naidu
 
Adopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarking
Adopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarkingAdopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarking
Adopting-smart_technology_for_enhancing_road_asset_performance_and_benchmarking
 
14 04-09 complete streets overview
14 04-09 complete streets overview14 04-09 complete streets overview
14 04-09 complete streets overview
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentation
 
Phases and principles of transportation planning
Phases and principles of transportation planningPhases and principles of transportation planning
Phases and principles of transportation planning
 
Safer People, Safer Streets, and Safer Policies at USDOT--Dan Goodman
Safer People, Safer Streets, and Safer Policies at USDOT--Dan GoodmanSafer People, Safer Streets, and Safer Policies at USDOT--Dan Goodman
Safer People, Safer Streets, and Safer Policies at USDOT--Dan Goodman
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentation
 

More from Valdosta-Lowndes Metropolitan Planning Organization

More from Valdosta-Lowndes Metropolitan Planning Organization (19)

Making the Case for Transit: Valdosta Pilot Shuttle Program
Making the Case for Transit: Valdosta Pilot Shuttle ProgramMaking the Case for Transit: Valdosta Pilot Shuttle Program
Making the Case for Transit: Valdosta Pilot Shuttle Program
 
Performance Based Public Participation
Performance Based Public ParticipationPerformance Based Public Participation
Performance Based Public Participation
 
Bicycle and Pedestrian Planing in Southern Georgia
Bicycle and Pedestrian Planing in Southern GeorgiaBicycle and Pedestrian Planing in Southern Georgia
Bicycle and Pedestrian Planing in Southern Georgia
 
2040 Transportation Vision Plan Highlights
2040 Transportation Vision Plan Highlights2040 Transportation Vision Plan Highlights
2040 Transportation Vision Plan Highlights
 
By the Number: Lowndes County in 2040
By the Number: Lowndes County in 2040By the Number: Lowndes County in 2040
By the Number: Lowndes County in 2040
 
Travel Demand Model VLMPO CAC-TAC
Travel Demand Model VLMPO CAC-TACTravel Demand Model VLMPO CAC-TAC
Travel Demand Model VLMPO CAC-TAC
 
2040 Transportation Plan Hahira Presentation
2040 Transportation Plan Hahira Presentation2040 Transportation Plan Hahira Presentation
2040 Transportation Plan Hahira Presentation
 
2040 Transportation Vision Plan
2040 Transportation Vision Plan2040 Transportation Vision Plan
2040 Transportation Vision Plan
 
Climate Change and Transportation Planning
Climate Change and Transportation PlanningClimate Change and Transportation Planning
Climate Change and Transportation Planning
 
Sociology Applied in Transportation Planning Spring 2014
Sociology Applied in Transportation Planning Spring 2014Sociology Applied in Transportation Planning Spring 2014
Sociology Applied in Transportation Planning Spring 2014
 
A Common Community Vision for Greater Lowndes County
A Common Community Vision for Greater Lowndes CountyA Common Community Vision for Greater Lowndes County
A Common Community Vision for Greater Lowndes County
 
2040 Socioeconomic Study - GLPC Presentation
2040 Socioeconomic Study - GLPC Presentation2040 Socioeconomic Study - GLPC Presentation
2040 Socioeconomic Study - GLPC Presentation
 
2040 Socioeconomic Study - VLMPO Presentation
2040 Socioeconomic Study - VLMPO Presentation2040 Socioeconomic Study - VLMPO Presentation
2040 Socioeconomic Study - VLMPO Presentation
 
Sociology Applied to Transportation Planning
Sociology Applied to Transportation PlanningSociology Applied to Transportation Planning
Sociology Applied to Transportation Planning
 
Complete Streets Best Practices
Complete Streets Best PracticesComplete Streets Best Practices
Complete Streets Best Practices
 
FY2013 Valdosta-Lowndes MPO Annual Report Summary
FY2013 Valdosta-Lowndes MPO Annual Report SummaryFY2013 Valdosta-Lowndes MPO Annual Report Summary
FY2013 Valdosta-Lowndes MPO Annual Report Summary
 
Georgia Transportation Infrastructure Bank
Georgia Transportation Infrastructure BankGeorgia Transportation Infrastructure Bank
Georgia Transportation Infrastructure Bank
 
Regional Transportation Planning an Introduction
Regional Transportation Planning an IntroductionRegional Transportation Planning an Introduction
Regional Transportation Planning an Introduction
 
Georgia's Transportation Investment Act: Lessons Learned
Georgia's Transportation Investment Act: Lessons LearnedGeorgia's Transportation Investment Act: Lessons Learned
Georgia's Transportation Investment Act: Lessons Learned
 

Recently uploaded

How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 

Recently uploaded (20)

How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 

2030 and 2035 Transportation Plans Review

  • 1. Metro 2030 Transportation Plan and 2035 Transportation Plan Review Valdosta-Lowndes Metropolitan Planning Organization August 23, 2013 Joint TAC/CAC Meeting
  • 2. History of Transportation Planning • 60 years of transportation planning • 4 County-wide Transportation Plans – 1964, 1991 – Metropolitan Transportation Plans • 2030 (2005), 2035 (2010), 2040 (2015)
  • 3. Review of Metropolitan Plans • Metro 2030 Transportation Plan – Adopted, September 2005 – Amended, December 2007 • $181,685,000 in 35 projects • 2035 Transportation Plan – Adopted, September 2010 – Cost Update, July 2011; September 2013 • $415,212,107 in 47 projects
  • 4. Why do a Review? • Learn from where we came from • What worked, what didn’t • Performance Measures – Evaluate projects, policies, programs to be sure the assumptions were correct • Implement new ideas and change old ones
  • 5. Metro 2030 Transportation Plan • March 2013, Report of Accomplishments • Evaluation of Socioeconomic data • Evaluation of Goals and Objectives
  • 6. Metro 2030 SE Data • Aggressive Growth Forecasted – 137,000 Population – 50,000 Households, smaller persons/household – Income fell $4K, from $32,000 median by 2010 – 82,868 forecasted; in 2010: at 47,000 – should have been 65,000
  • 7. Metro 2030 Goals • Goal 1 – Economic Vitality – Intersection Improvements – Traffic Management Center – Reduce Vehicle Miles Traveled – New LDR and ULDC
  • 9. Metro 2013 Goals • Goal 2: Regionalism and Tourism – Bike and Pedestrian Master Plan – Transit Feasibility and Implementation Plans – Freight Movement Study and Report Series – Access Management coordination – Transportation Investment Act - TSPLOST
  • 10. Metro 2030 Goals • Goal 3: Accessibility and Mobility – Transit Feasibility and Implementation Plans – More bicycle information on safety and awareness – Coordinated Public Transportation • Goal 4: Funding Mechanisms – Preservation and Maintenance First – Project Selection Process – Public Private Partnerships (transit, GDOT)
  • 11. Metro 2030 Goals • Goal 5: Land Use Compatibility – Staff level coordination of proposed developments and other programs • Goal 6: Environmental Protection – Public Participation Policy, Title VI Plan, LEP Plan – Procurement and DBE Policies – Promote Alternative Fuels and Gateways
  • 12. Metro 2030 Goals • Goal 7: Public Involvement – Public Participation Policy, Title VI Plan, LEP Plan – Procurement and DBE Policies – New websites and social media • Goal 8: System Management – Preservation and Maintenance First – Traffic Management Center – Annual Crash Report
  • 13. Metro 2030 Goals • Goal 9: Traffic Safety and Emergency Management – Preservation and Maintenance First – Annual Crash Report – Promote Safety
  • 14. Metro 2030 Projects • 35 Projects – 5 Complete – 3 Under Construction – 1 in Right-of-Way – 3 in Engineering/Design – 2 Projects Terminated – 21 No Activity
  • 15. 2035 Transportation Plan • March 2013, Report of Activities • Evaluation of Socioeconomic data • Evaluation of Goals and Objectives • INVEST Analysis
  • 16. 2035 TP SE Data 2003 Base 2006 Base 2010 Census 2030 TP 2035 TP Population 95,024 103,796 109,233 132,150 134,697 Employment 47,300 55,664 45,440 82,868 72,051 Households 35,503 38,935 43,921 50,600 53,397 Enrollment 33,517 32,932 34,974 42,932 66,655 Income $32,132 $33,597 $38,535 $32,000 (2003$) $46,599
  • 17. 2035 TP Goals • Priority 1: Develop a sustainable and safe regional transportation system that includes all modes for the transport of people and goods that promotes economic development. – Level of Service Improvements – Job growth in Freight Sectors – Transit Implementation Plan – Staff coordination of land use changes/development – Bike and Pedestrian Infrastructure Investment – Job growth near transportation projects
  • 18. • Priority 2: Encourage the MPO, SGRC and their member communities to cooperatively consider land use decisions by encouraging public participation and involvement in the transportation planning process. – Public Participation Plan – Annual Crash Report – Project Selection Criteria – Public Private Partnerships (transit, GDOT) – Land use, development outside of Urban Service Area – Multi-jurisdictional projects
  • 19. • Priority 3: Promote an aesthetically pleasing, sustainable, transportation system that respects the needs of, and mitigates and/or enhances the impacts on disadvantaged populations and the context of the nearby built and natural environments. – Environmental impact mitigation – Alternative Fuel Usage – Gateways
  • 20. 2035 TP INVEST Analysis • Infrastructure Voluntary Evaluation Sustainability Tool • Help transportation agencies integrate social, economic and environmental best practices into transportation projects, policies, programs, etc. • Included in 2035 TP Report of Activities
  • 21. 2035 TP INVEST Analysis • Economic Development/Land Use – Evaluate land use and transportation development, evaluate zoning changes and sprawl impacts on transportation system • Natural Environment – Engage resource and regulatory agencies in planning process. Include evaluation of plans as part of transportation plan update
  • 22. 2035 TP INVEST Analysis • Social – Evaluate goals/objectives and performance measures to be inclusive of all parties – Ensure that community vision is shared and transportation plan is economically, environmentally and socially resilient – Consider performance measures in Public Participation Plan, UPWP, TIP, other MPO documents
  • 23. 2035 TP INVEST Analysis • Accessibility and Affordability – Physical, equitable, affordable access to transportation resources – Include evaluation of other plans as part of transportation plan update • Safety Planning – Use resources to project crash rates and consider other GIS tools for better crash analysis
  • 24. 2035 TP INVEST Analysis • Multimodal Transportation and Public Health – Include public health as a stakeholder/resource agency – Consider conducting a Health Impact Assessment before completion of next transportation plan – Include health impacts in goals and objectives • Freight and Goods Movement – Consider performance measures for freight mobility – Review updated National Highway System
  • 25. 2035 TP INVEST Analysis • Travel Demand Management – Consider TDM strategies that are best practices in small cities • Air Quality – Consider multi-modal strategies, operations improvements, renewable resources, alternative fuels • Energy and Fuels – Quantifiably consider impact of less fuel usage
  • 26. 2035 TP INVEST Analysis • Financial Sustainability – Use project specific cost estimates rather than formula based • Analysis Methods – Consider developing a strategic plan for data analysis, not just in the UPWP • Transportation Systems Management & Ops – Implement management and operations performance measures
  • 27. 2035 TP INVEST Analysis • Asset Management and Planning – Consider asset management techniques and performance measures – Develop a benefit/cost analysis technique • Infrastructure Resiliency – Consider hazard mitigation plans measures • Linking Planning and NEPA – Consider best practices to link environmental review to the planning level to streamline coordination and consultation to improve project delivery
  • 28. 2035 TP Projects • 47 Projects – 4 Complete – 3 Under Construction – 1 in Right-of-Way – 6 in Engineering/Design – 33 No Activity
  • 29. 2040 Transportation Plan • Timeline – Vision/Goals/Objectives • Common Community Vision – Socioeconomic Data • Performance Measures