SlideShare a Scribd company logo
1 of 3
Download to read offline
1
For immediate release
Sino Oil and Gas Holdings Limited
CBM sales surged 80% contributing to turnaround in 2014
23 March 2015, Hong Kong ---- Oil and gas company Sino Oil and Gas Holdings Limited (“Sino
Oil and Gas Holdings”, HKEx: 702) is delighted to report a turnaround for 2014.The Group
posted a profit for the year of HK$10,420,000 (loss in 2013: HK$61,332,000).
During the year ended 31 December 2014, the Group recorded a turnover of HK$16,540,000
(2013: HK$21,598,000), while posting an 80.5% increase in trial sales of coalbed methane
(“CBM”) together with related government subsidies amounting to HK$70,198,000 (2013:
HK$38,899,000) as disclosed under the item of “other revenue”.
Through its wholly-owned subsidiary Orion Energy International Inc. (“Orion”), the Group
entered into a production sharing contract (“PSC”) with China National Petroleum Corporation
(“PetroChina”), its partner in the PRC, for exploration, exploitation and production at a CBM field
in the Sanjiao block, located in the Erdos Basin in Shanxi and Shaanxi provinces. The Group
has a 70% interest in the PSC.
The CBM operation moved rapidly into profitability as sales increased upon the completion of
complementary facilities, including the CBM processing station and sales pipelines, in phases.
The achievement of profitability was also attributable to the 13.9% increase in CBM price for
industrial users during the year subsequently the increasing CBM sales price in 2013. In the
absence of any one-off expenses (2013: HK$25,247,000) for this year, as well as a 11.9%
reduction in administrative expenses owing to enhanced internal cost controls, the Group
registered a profit for the year of HK$10,420,000 (loss in 2013: HK$61,332,000).
During the year, the Sanjiao project recorded CBM production of approximately 47.28 million
cubic meters (2013: 45.45 million cubic meters) and CBM sales of approximately 44.26 million
cubic meters (2013: 30.45 million cubic meters), resulting in a gas sale-to-production rate of
93.6% (2013: 67.0%) for the full year. In terms of the composition of gas sales during the year,
industrial piped CBM sales accounted for 89.7% of total sales, while residential piped CBM
sales contributed 10.2% and compressed natural gas (“CNG”) sales 0.1%. Total piped CBM
sales accounted for 99.9% of total gas sales during the year.
In the second half of 2014, the Group and PetroChina have jointly decided to increase the gas
selling price for industrial users of the Sanjiao CBM project. The gas selling price was increased
by RMB0.25 per cubic meter with retrospective effect from 1 September 2014. This 13.9% price
adjustment had an immediate and significant positive impact on the revenue and earnings of the
Sanjiao project.
During the year, the Ministry of Finance has released subsidies on CBM sales from Sanjiao
project in 2012 and 2013 on the basis of RMB0.2 per cubic meter in accordance with the state
policy. It is expected that government subsidies on 2014 sales will be received around the third
quarter of 2015.
Sino Oil and Gas Holdings Chairman Dr. Dai Xiaobing said: “The report on environmental effects
from Sanjiao CBM project has already been approved by Shanxi Provincial Department of
Environmental Protection. This is a core assessment report which is the most crucial and
emblematic part of the ODP. The Group has completed substantially all necessary assessment
reports and has been granted the required governmental approvals, pending the final approval
of the ODP. In line with the schedule of ODP approval by NDRC, the Group will continue to
engage in the active development of ground facilities, while the capacity of the CBM processing
2
station is being expanded to cope with increased gas sales. The Group has also employed
foreign advanced well-drilling technologies to seek to further explore the recoverable gas
reserves of the Sanjiao block.”
As at the end of 2014, the Sanjiao CBM project has completed a total of 73 wells, comprising 40
multilateral horizontal wells and 33 vertical wells. Out of the total 73 wells, 63 wells were in the
normal dewatering stage, of which 52 wells had access to the gas collection pipeline network. A
ground pipeline network of approximately 18 kilometers, inter-well pipelines of approximately 39
kilometers, and outbound pipelines of approximately 17 kilometers were completed.
Approximately 49 kilometers of 10KV power grid and 10KV branch power line were also
completed.
In December 2012, the Group acquired a 30% equity interest in a Sino-foreign joint venture.
This joint venture is in the process of setting up a liquefied natural gas (“LNG”) station with daily
processing capacity of 1.2 million cubic meters in the Sanjiao area of Shanxi Province. The
design of the first phase of the LNG station, with a daily processing capacity of 300,000 cubic
meters, was completed in early March 2015 and will be constructed in line with the schedule of
ODP approval. Tendering of related works is currently in process. Upon completion, the LNG
station will help broaden the Sanjiao project’s sales channels.
In order to increase resources reserves, the Group is actively seeking appropriate oil and gas
blocks in China, while exploring investment opportunities in overseas upstream businesses. The
Group hence entered into two non-legally-binding memorandums of understanding (“MOU”) in
June and September 2014. The acquisition target is an oilfield located in Alberta Province,
Canada. The Group is currently undertaking geological evaluation and due diligence work. Dr.
Dai added: “Oil and gas resources in North America are abundant and the local markets are
sophisticated. Despite the current drop in international oil prices, which will increase the Group’s
bargaining power in negotiations towards the acquisition of oil and gas businesses, the Group
believes that, as oil prices begin to recover from their trough, the operation of high-quality oil and
gas businesses in North America or other overseas countries will contribute to the asset base
and profitability of the Group in the long term. Such investments will also help balance the
Group’s geographical risk exposure.”
The Group’s gearing ratio and liquidity position has improved significantly, and its overall
financial position has strengthened.
Financial Highlights
Year ended December 31,
2014 2013
HK$’000 HK$’000
Turnover 16,540 21,598
Profit/(Loss) for the year 10,420 (61,332)
Operating profit/(loss) 9,959 (57,632)
Profit/(Loss) per share - Basic HK0.064 cent HK(0.467) cent
As at 31 December:
Total assets 4,699,000 4,275,000
Net assets 4,054,000 3,447,000
*Gearing ratio 10.06% 14.45%
Current ratio 1.42 0.35
*Gearing calculation based on interest-bearing liabilities over total assets.
To download this release, please click into: http://t6pr.com/index-e.html
3
About Sino Oil and Gas Holdings
Sino Oil and Gas Holdings Limited (HKEx: 702) is an energy company with a key focus on oil,
coalbed methane (CBM) and conventional natural gas. The Group is committed to building a
portfolio of oil and gas assets and operations with the aim of developing into one of the leading
independent oil and gas companies in Greater China. The Group currently operates oil and gas
fields in Shaanxi and a CBM project in Sanjiao Block in Shanxi, China. For more information,
please visit http://www.sino-oilgas.hk/.
Issued by: Sino Oil and Gas Holdings Limited
Through: Veronica Yum or Jenny Lee, t6.communications limited
tel: (852)2511 8388 / fax: (852)2511 8238 / email: sino-oilgas@t6pr.com

More Related Content

What's hot

Antero Resources 2012 Financial and Operating Results
Antero Resources 2012 Financial and Operating ResultsAntero Resources 2012 Financial and Operating Results
Antero Resources 2012 Financial and Operating ResultsMarcellus Drilling News
 
Global scenario of cgd
Global scenario of cgdGlobal scenario of cgd
Global scenario of cgdVIVEK KUMAR
 
Renewable Chemicals and Advanced Biofuels
Renewable Chemicals and Advanced BiofuelsRenewable Chemicals and Advanced Biofuels
Renewable Chemicals and Advanced Biofuelsdinomasch
 
platts petrochemical prices Coal to-olefins technology in china could soon fl...
platts petrochemical prices Coal to-olefins technology in china could soon fl...platts petrochemical prices Coal to-olefins technology in china could soon fl...
platts petrochemical prices Coal to-olefins technology in china could soon fl...Platts
 
GAS UTILIZATION, CHALLENGES, PROSPECT AND THE WAY FORWARD
GAS UTILIZATION, CHALLENGES, PROSPECT AND THE WAY FORWARDGAS UTILIZATION, CHALLENGES, PROSPECT AND THE WAY FORWARD
GAS UTILIZATION, CHALLENGES, PROSPECT AND THE WAY FORWARDISRAEL ONYIJE
 
Could coal be the answer to global plastics shortages
Could coal be the answer to global plastics shortagesCould coal be the answer to global plastics shortages
Could coal be the answer to global plastics shortagesPlatts
 
New base special 27 may 2014
New base special  27  may  2014New base special  27  may  2014
New base special 27 may 2014Khaled Al Awadi
 
Company website presentation april 2014
Company website presentation   april 2014Company website presentation   april 2014
Company website presentation april 2014AnteroResources
 
New base special 26 august 2014
New base special  26 august 2014New base special  26 august 2014
New base special 26 august 2014Khaled Al Awadi
 
New base 19 november 2021 energy news issue 1470 by khaled al awadi
New base  19 november  2021 energy news issue   1470  by khaled al awadiNew base  19 november  2021 energy news issue   1470  by khaled al awadi
New base 19 november 2021 energy news issue 1470 by khaled al awadiKhaled Al Awadi
 
LNG global congress london 14092014
LNG global congress london 14092014LNG global congress london 14092014
LNG global congress london 14092014srinivasulu vemula
 
New base 24 january 2018 energy news issue 1132 by khaled al awadi
New base 24 january 2018 energy news issue   1132  by khaled al awadiNew base 24 january 2018 energy news issue   1132  by khaled al awadi
New base 24 january 2018 energy news issue 1132 by khaled al awadiKhaled Al Awadi
 
eni's upstream model
eni's upstream model eni's upstream model
eni's upstream model Eni
 
New base special 02 january 2014 khaled al awadi
New base special  02 january 2014 khaled al awadiNew base special  02 january 2014 khaled al awadi
New base special 02 january 2014 khaled al awadiKhaled Al Awadi
 
New base special 02 january 2014
New base special  02 january 2014New base special  02 january 2014
New base special 02 january 2014Khaled Al Awadi
 
Goliat Field Trip
Goliat Field TripGoliat Field Trip
Goliat Field TripEni
 

What's hot (20)

Interim Results to 30 November 2013
Interim Results to 30 November 2013Interim Results to 30 November 2013
Interim Results to 30 November 2013
 
Antero Resources 2012 Financial and Operating Results
Antero Resources 2012 Financial and Operating ResultsAntero Resources 2012 Financial and Operating Results
Antero Resources 2012 Financial and Operating Results
 
Global scenario of cgd
Global scenario of cgdGlobal scenario of cgd
Global scenario of cgd
 
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
20.06.2013 Sharyn Gol – A New Dawn, Anarbold Odonkhuu
 
Renewable Chemicals and Advanced Biofuels
Renewable Chemicals and Advanced BiofuelsRenewable Chemicals and Advanced Biofuels
Renewable Chemicals and Advanced Biofuels
 
platts petrochemical prices Coal to-olefins technology in china could soon fl...
platts petrochemical prices Coal to-olefins technology in china could soon fl...platts petrochemical prices Coal to-olefins technology in china could soon fl...
platts petrochemical prices Coal to-olefins technology in china could soon fl...
 
Nortech trinity EPC opportunity in fertilizer plants in india
Nortech trinity   EPC opportunity in fertilizer plants in indiaNortech trinity   EPC opportunity in fertilizer plants in india
Nortech trinity EPC opportunity in fertilizer plants in india
 
GAS UTILIZATION, CHALLENGES, PROSPECT AND THE WAY FORWARD
GAS UTILIZATION, CHALLENGES, PROSPECT AND THE WAY FORWARDGAS UTILIZATION, CHALLENGES, PROSPECT AND THE WAY FORWARD
GAS UTILIZATION, CHALLENGES, PROSPECT AND THE WAY FORWARD
 
Could coal be the answer to global plastics shortages
Could coal be the answer to global plastics shortagesCould coal be the answer to global plastics shortages
Could coal be the answer to global plastics shortages
 
New base special 27 may 2014
New base special  27  may  2014New base special  27  may  2014
New base special 27 may 2014
 
Company website presentation april 2014
Company website presentation   april 2014Company website presentation   april 2014
Company website presentation april 2014
 
New base special 26 august 2014
New base special  26 august 2014New base special  26 august 2014
New base special 26 august 2014
 
New base 19 november 2021 energy news issue 1470 by khaled al awadi
New base  19 november  2021 energy news issue   1470  by khaled al awadiNew base  19 november  2021 energy news issue   1470  by khaled al awadi
New base 19 november 2021 energy news issue 1470 by khaled al awadi
 
LNG global congress london 14092014
LNG global congress london 14092014LNG global congress london 14092014
LNG global congress london 14092014
 
New base 24 january 2018 energy news issue 1132 by khaled al awadi
New base 24 january 2018 energy news issue   1132  by khaled al awadiNew base 24 january 2018 energy news issue   1132  by khaled al awadi
New base 24 january 2018 energy news issue 1132 by khaled al awadi
 
eni's upstream model
eni's upstream model eni's upstream model
eni's upstream model
 
SVCE Initiation of Coverage
SVCE Initiation of CoverageSVCE Initiation of Coverage
SVCE Initiation of Coverage
 
New base special 02 january 2014 khaled al awadi
New base special  02 january 2014 khaled al awadiNew base special  02 january 2014 khaled al awadi
New base special 02 january 2014 khaled al awadi
 
New base special 02 january 2014
New base special  02 january 2014New base special  02 january 2014
New base special 02 january 2014
 
Goliat Field Trip
Goliat Field TripGoliat Field Trip
Goliat Field Trip
 

Viewers also liked

Www laseronsale com_laserpen_500mw_p-7056
Www laseronsale com_laserpen_500mw_p-7056Www laseronsale com_laserpen_500mw_p-7056
Www laseronsale com_laserpen_500mw_p-7056qiuqiuu
 
10 questions for LAFOIP in the classroom
10 questions for LAFOIP in the classroom10 questions for LAFOIP in the classroom
10 questions for LAFOIP in the classroomkmuench
 
Tarea no. 2 (primera parte)
Tarea no. 2 (primera parte)Tarea no. 2 (primera parte)
Tarea no. 2 (primera parte)jaimearchila1969
 
Cisco tour by SDT 25 Novembre 2015
Cisco tour by SDT 25 Novembre 2015Cisco tour by SDT 25 Novembre 2015
Cisco tour by SDT 25 Novembre 2015Tahar ABID
 
Spiti sarahan safari
Spiti  sarahan safariSpiti  sarahan safari
Spiti sarahan safariholidayatati
 
Evaporation thermique
Evaporation thermiqueEvaporation thermique
Evaporation thermiqueMalak Talbi
 
Top 8 receiving clerk resume samples
Top 8 receiving clerk resume samplesTop 8 receiving clerk resume samples
Top 8 receiving clerk resume samplesRoyKeane789
 
Spsu time capsule final presentation
Spsu time capsule   final presentationSpsu time capsule   final presentation
Spsu time capsule final presentationsmadgett
 

Viewers also liked (12)

Www laseronsale com_laserpen_500mw_p-7056
Www laseronsale com_laserpen_500mw_p-7056Www laseronsale com_laserpen_500mw_p-7056
Www laseronsale com_laserpen_500mw_p-7056
 
10 questions for LAFOIP in the classroom
10 questions for LAFOIP in the classroom10 questions for LAFOIP in the classroom
10 questions for LAFOIP in the classroom
 
Tarea no. 2 (primera parte)
Tarea no. 2 (primera parte)Tarea no. 2 (primera parte)
Tarea no. 2 (primera parte)
 
Cisco tour by SDT 25 Novembre 2015
Cisco tour by SDT 25 Novembre 2015Cisco tour by SDT 25 Novembre 2015
Cisco tour by SDT 25 Novembre 2015
 
Trabajo 1
Trabajo 1Trabajo 1
Trabajo 1
 
Spiti sarahan safari
Spiti  sarahan safariSpiti  sarahan safari
Spiti sarahan safari
 
Futbol gaelico
Futbol gaelicoFutbol gaelico
Futbol gaelico
 
Evaporation thermique
Evaporation thermiqueEvaporation thermique
Evaporation thermique
 
Top 8 receiving clerk resume samples
Top 8 receiving clerk resume samplesTop 8 receiving clerk resume samples
Top 8 receiving clerk resume samples
 
RESUME OF F. C. ORTIZ JR.
RESUME OF F. C. ORTIZ JR.RESUME OF F. C. ORTIZ JR.
RESUME OF F. C. ORTIZ JR.
 
Resume_Rhonda
Resume_RhondaResume_Rhonda
Resume_Rhonda
 
Spsu time capsule final presentation
Spsu time capsule   final presentationSpsu time capsule   final presentation
Spsu time capsule final presentation
 

Similar to 2015032315173217_en

Weekly market report
Weekly market report Weekly market report
Weekly market report QNB Group
 
Oil and Natural Gas Corporation.pptx
Oil and Natural Gas Corporation.pptxOil and Natural Gas Corporation.pptx
Oil and Natural Gas Corporation.pptxKeshavJalan4
 
New base 778 special 02 februaury 2016 r2
New base 778 special 02 februaury 2016 r2New base 778 special 02 februaury 2016 r2
New base 778 special 02 februaury 2016 r2Khaled Al Awadi
 
New base 1045 special 21 june 2017 energy news
New base 1045 special 21 june 2017 energy newsNew base 1045 special 21 june 2017 energy news
New base 1045 special 21 june 2017 energy newsKhaled Al Awadi
 
Weekly Market Report
Weekly Market ReportWeekly Market Report
Weekly Market ReportQNB Group
 
QNBFS Weekly Market Report February 21, 2019
QNBFS Weekly Market Report February 21, 2019QNBFS Weekly Market Report February 21, 2019
QNBFS Weekly Market Report February 21, 2019QNB Group
 
A Critical Review of BG Group's LNG Marketing
A Critical Review of BG Group's LNG MarketingA Critical Review of BG Group's LNG Marketing
A Critical Review of BG Group's LNG MarketingOlaleye Adio (MIChemE)
 
Nov 2016 Presentation - Dorian LPG
Nov 2016 Presentation - Dorian LPGNov 2016 Presentation - Dorian LPG
Nov 2016 Presentation - Dorian LPGDorianLPG2016
 
New base special 28 august 2014
New base special  28 august 2014New base special  28 august 2014
New base special 28 august 2014Khaled Al Awadi
 
Presentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongPresentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongSantos Ltd
 
Buy Indian Oil Corporation for a target of Rs405
Buy Indian Oil Corporation for a target of Rs405Buy Indian Oil Corporation for a target of Rs405
Buy Indian Oil Corporation for a target of Rs405IndiaNotes.com
 
New base 510 special 04 january 2014
New base 510 special  04 january 2014New base 510 special  04 january 2014
New base 510 special 04 january 2014Khaled Al Awadi
 

Similar to 2015032315173217_en (20)

Weekly market report
Weekly market report Weekly market report
Weekly market report
 
Oil and Natural Gas Corporation.pptx
Oil and Natural Gas Corporation.pptxOil and Natural Gas Corporation.pptx
Oil and Natural Gas Corporation.pptx
 
New base 778 special 02 februaury 2016 r2
New base 778 special 02 februaury 2016 r2New base 778 special 02 februaury 2016 r2
New base 778 special 02 februaury 2016 r2
 
Ongc
OngcOngc
Ongc
 
Q2.pdf
Q2.pdfQ2.pdf
Q2.pdf
 
New base 1045 special 21 june 2017 energy news
New base 1045 special 21 june 2017 energy newsNew base 1045 special 21 june 2017 energy news
New base 1045 special 21 june 2017 energy news
 
ADB Loan
ADB LoanADB Loan
ADB Loan
 
ADB Loan
ADB LoanADB Loan
ADB Loan
 
Weekly Market Report
Weekly Market ReportWeekly Market Report
Weekly Market Report
 
QNBFS Weekly Market Report February 21, 2019
QNBFS Weekly Market Report February 21, 2019QNBFS Weekly Market Report February 21, 2019
QNBFS Weekly Market Report February 21, 2019
 
Interim results to 30 November 2014
Interim results to 30 November 2014Interim results to 30 November 2014
Interim results to 30 November 2014
 
BCG_BUY_05032016_Final
BCG_BUY_05032016_FinalBCG_BUY_05032016_Final
BCG_BUY_05032016_Final
 
A Critical Review of BG Group's LNG Marketing
A Critical Review of BG Group's LNG MarketingA Critical Review of BG Group's LNG Marketing
A Critical Review of BG Group's LNG Marketing
 
Nov 2016 Presentation - Dorian LPG
Nov 2016 Presentation - Dorian LPGNov 2016 Presentation - Dorian LPG
Nov 2016 Presentation - Dorian LPG
 
New base special 28 august 2014
New base special  28 august 2014New base special  28 august 2014
New base special 28 august 2014
 
Presentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongPresentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong Kong
 
Buy Indian Oil Corporation for a target of Rs405
Buy Indian Oil Corporation for a target of Rs405Buy Indian Oil Corporation for a target of Rs405
Buy Indian Oil Corporation for a target of Rs405
 
Tgi earnings call 3 q presentation
Tgi earnings call 3 q presentationTgi earnings call 3 q presentation
Tgi earnings call 3 q presentation
 
TGIi & Cálidda conference call Q3 14
TGIi & Cálidda conference call Q3 14TGIi & Cálidda conference call Q3 14
TGIi & Cálidda conference call Q3 14
 
New base 510 special 04 january 2014
New base 510 special  04 january 2014New base 510 special  04 january 2014
New base 510 special 04 january 2014
 

2015032315173217_en

  • 1. 1 For immediate release Sino Oil and Gas Holdings Limited CBM sales surged 80% contributing to turnaround in 2014 23 March 2015, Hong Kong ---- Oil and gas company Sino Oil and Gas Holdings Limited (“Sino Oil and Gas Holdings”, HKEx: 702) is delighted to report a turnaround for 2014.The Group posted a profit for the year of HK$10,420,000 (loss in 2013: HK$61,332,000). During the year ended 31 December 2014, the Group recorded a turnover of HK$16,540,000 (2013: HK$21,598,000), while posting an 80.5% increase in trial sales of coalbed methane (“CBM”) together with related government subsidies amounting to HK$70,198,000 (2013: HK$38,899,000) as disclosed under the item of “other revenue”. Through its wholly-owned subsidiary Orion Energy International Inc. (“Orion”), the Group entered into a production sharing contract (“PSC”) with China National Petroleum Corporation (“PetroChina”), its partner in the PRC, for exploration, exploitation and production at a CBM field in the Sanjiao block, located in the Erdos Basin in Shanxi and Shaanxi provinces. The Group has a 70% interest in the PSC. The CBM operation moved rapidly into profitability as sales increased upon the completion of complementary facilities, including the CBM processing station and sales pipelines, in phases. The achievement of profitability was also attributable to the 13.9% increase in CBM price for industrial users during the year subsequently the increasing CBM sales price in 2013. In the absence of any one-off expenses (2013: HK$25,247,000) for this year, as well as a 11.9% reduction in administrative expenses owing to enhanced internal cost controls, the Group registered a profit for the year of HK$10,420,000 (loss in 2013: HK$61,332,000). During the year, the Sanjiao project recorded CBM production of approximately 47.28 million cubic meters (2013: 45.45 million cubic meters) and CBM sales of approximately 44.26 million cubic meters (2013: 30.45 million cubic meters), resulting in a gas sale-to-production rate of 93.6% (2013: 67.0%) for the full year. In terms of the composition of gas sales during the year, industrial piped CBM sales accounted for 89.7% of total sales, while residential piped CBM sales contributed 10.2% and compressed natural gas (“CNG”) sales 0.1%. Total piped CBM sales accounted for 99.9% of total gas sales during the year. In the second half of 2014, the Group and PetroChina have jointly decided to increase the gas selling price for industrial users of the Sanjiao CBM project. The gas selling price was increased by RMB0.25 per cubic meter with retrospective effect from 1 September 2014. This 13.9% price adjustment had an immediate and significant positive impact on the revenue and earnings of the Sanjiao project. During the year, the Ministry of Finance has released subsidies on CBM sales from Sanjiao project in 2012 and 2013 on the basis of RMB0.2 per cubic meter in accordance with the state policy. It is expected that government subsidies on 2014 sales will be received around the third quarter of 2015. Sino Oil and Gas Holdings Chairman Dr. Dai Xiaobing said: “The report on environmental effects from Sanjiao CBM project has already been approved by Shanxi Provincial Department of Environmental Protection. This is a core assessment report which is the most crucial and emblematic part of the ODP. The Group has completed substantially all necessary assessment reports and has been granted the required governmental approvals, pending the final approval of the ODP. In line with the schedule of ODP approval by NDRC, the Group will continue to engage in the active development of ground facilities, while the capacity of the CBM processing
  • 2. 2 station is being expanded to cope with increased gas sales. The Group has also employed foreign advanced well-drilling technologies to seek to further explore the recoverable gas reserves of the Sanjiao block.” As at the end of 2014, the Sanjiao CBM project has completed a total of 73 wells, comprising 40 multilateral horizontal wells and 33 vertical wells. Out of the total 73 wells, 63 wells were in the normal dewatering stage, of which 52 wells had access to the gas collection pipeline network. A ground pipeline network of approximately 18 kilometers, inter-well pipelines of approximately 39 kilometers, and outbound pipelines of approximately 17 kilometers were completed. Approximately 49 kilometers of 10KV power grid and 10KV branch power line were also completed. In December 2012, the Group acquired a 30% equity interest in a Sino-foreign joint venture. This joint venture is in the process of setting up a liquefied natural gas (“LNG”) station with daily processing capacity of 1.2 million cubic meters in the Sanjiao area of Shanxi Province. The design of the first phase of the LNG station, with a daily processing capacity of 300,000 cubic meters, was completed in early March 2015 and will be constructed in line with the schedule of ODP approval. Tendering of related works is currently in process. Upon completion, the LNG station will help broaden the Sanjiao project’s sales channels. In order to increase resources reserves, the Group is actively seeking appropriate oil and gas blocks in China, while exploring investment opportunities in overseas upstream businesses. The Group hence entered into two non-legally-binding memorandums of understanding (“MOU”) in June and September 2014. The acquisition target is an oilfield located in Alberta Province, Canada. The Group is currently undertaking geological evaluation and due diligence work. Dr. Dai added: “Oil and gas resources in North America are abundant and the local markets are sophisticated. Despite the current drop in international oil prices, which will increase the Group’s bargaining power in negotiations towards the acquisition of oil and gas businesses, the Group believes that, as oil prices begin to recover from their trough, the operation of high-quality oil and gas businesses in North America or other overseas countries will contribute to the asset base and profitability of the Group in the long term. Such investments will also help balance the Group’s geographical risk exposure.” The Group’s gearing ratio and liquidity position has improved significantly, and its overall financial position has strengthened. Financial Highlights Year ended December 31, 2014 2013 HK$’000 HK$’000 Turnover 16,540 21,598 Profit/(Loss) for the year 10,420 (61,332) Operating profit/(loss) 9,959 (57,632) Profit/(Loss) per share - Basic HK0.064 cent HK(0.467) cent As at 31 December: Total assets 4,699,000 4,275,000 Net assets 4,054,000 3,447,000 *Gearing ratio 10.06% 14.45% Current ratio 1.42 0.35 *Gearing calculation based on interest-bearing liabilities over total assets. To download this release, please click into: http://t6pr.com/index-e.html
  • 3. 3 About Sino Oil and Gas Holdings Sino Oil and Gas Holdings Limited (HKEx: 702) is an energy company with a key focus on oil, coalbed methane (CBM) and conventional natural gas. The Group is committed to building a portfolio of oil and gas assets and operations with the aim of developing into one of the leading independent oil and gas companies in Greater China. The Group currently operates oil and gas fields in Shaanxi and a CBM project in Sanjiao Block in Shanxi, China. For more information, please visit http://www.sino-oilgas.hk/. Issued by: Sino Oil and Gas Holdings Limited Through: Veronica Yum or Jenny Lee, t6.communications limited tel: (852)2511 8388 / fax: (852)2511 8238 / email: sino-oilgas@t6pr.com