Assigned Project
Design of a 2900 DWT Oil Tanker
Route: Chittagong-Dhaka
Service Speed: 10 knots
Route Specifications:
Water ways distance---350 km
Maximum Draft-------3.96 m
Maximum Length-----76.2 m
Maximum Breadth ----15.0 m
PRESENTATION CONTENTS
1. Determination of Preliminary Principal
particulars
2. Preliminary lightweight, deadweight and
displacement
3. Preliminary General Arrangement
4. Preliminary Lines Plan
5. Preliminary Hydrostatic Calculations
Finding Preliminary Principal Particulars
As per “DOS” (Department Of Shipping)
Bangladesh and BIWTA:
For inland vessels we have following restrictions:
Loa will not exceed 76.2 m
B mld will not exceed 15 m
Draft mld will not exceed 3.96 m
Principal particulars:
 We have length, breadth and draft restrictions as we
have to move inland. For first assumption, we are have
taken these restrictions as our principal particulars.
 Deadweight=2900 tonnes
 Assumed Cd =0.8
 Displacement= 2900/0.8 =3625 tonnes
 Lightweight= (3625 ─ 2900) =725 tonnes
 Loa=76.2 m
Principal particulars
 Lbp= 96% of Loa = 73.152 m
 Bmld=15 m
 Draftmld=3.96 m
 Speed=10 knots
 Cb= 0.83
Preliminary Principal Particulars
LOA 76.2 m
LBP 73.152 m
Breadth mld 15m
Depth mld 5.94.m
Draught 3.96 m
Cb 0.83
Speed 10 knots
Displacement = deadweight / deadweight co efficient = 2900 / 0.8 =3625tonnes
Light weight = displacement – dead weight = 3625 – 2900= 725 tonnes
Preliminary Lightweight, Deadweight
and Displacement:
Category Quantity
Fuel 14.539tonnes
Weight of people 1.275 tonnes
Fresh water 12.58 tonnes
Provisions & stores 0.85 tonnes
Cargo oil = 2900– 29.668 = 2870.332
tonnes
ON DECK
Owner 01
Class-I Inland master 01
Class- II Inland master 01
Class- III Inland master 07
Certified Crew (Sukani) 02
Cook (Bhandary) 01
AT ENGINE
Class-I Inland Driver 01
Class-II Inland Driver 01
Greaser 01
Pump man 01
Total = 17
Manning of the Ship
Preliminary General
Arrangement
Drawing
Preliminary Lines
Plan Drawing
Offset table
Half breadth (mm)
Station tan WL-1 WL-2 WL-3 WL-4 Deck Poop/F.Castle Deck
Ap 0 0 0 0 1468.8 3893.81 5619.92
0.5 765.2 1680.1 2048.54 2086.06 2763.51 6260.02 6560.77
1 2696.63 5265 5805 6025 6225 6770.24 7034.83
1.5 4437 6502.5 6907.5 7054 7230 7373.42 7403.13
2 5756.63 7215 7372.5 7382 7492.5 7500 0
3 6375 7500 7500 7500 7500 7500 0
4 6375 7500 7500 7500 7500 7500 0
5 6375 7500 7500 7500 7500 7500 0
6 6375 7500 7500 7500 7500 7500 0
7 5907.66 7282.05 7432.5 7466.25 7500 7500 0
8 5441.43 7117.5 7365 7398.75 7432.5 7445.25 0
8.5 5139.77 6915 7162.5 7196.25 7230 7230.74 0
9 4087.56 6405 6652.5 6686.25 6720 6868.83 7044.23
9.5 1893.19 3923.83 4137.73 4301.44 4536.42 5844.81 6312.1
Fp 0 0 0 0 0 2770.2 4019.59
Height Above Base (mm)
Keel BTK A BTK B BTK C Deck At Side Poop/F.Castle Deck
3698.4 4522.43 6067.57 9957.71 6133.98 9957.71
0 1339.06 4616.75 5572.2 6002.92 9852.06
0 0 130 1533.01 5976.28 9875.2
0 0 0 227.94 5946.77 9852.28
0 0 0 0 5940 0
0 0 0 0 5940 0
0 0 0 0 5940 0
0 0 0 0` 0
0 0 0 0 5940 0
0 0 0 0 5940 0
0 0 0 24.7 5943.43 0
0 0 0 58.75 5953.53 0
0 0 0 193.12 5971.3 8951.21
0 0 634.74 5426.81 6025.41 9152.97
3960 5494.32 - - 6192.3 9410.4
Hydrostatic
calculation &
curves
Hydrostatic Particulars
 Displacement
 KB
 Longitudinal Position of Center of buoyancy, LCB
 Position of Center of flotation from amidship, LCF
 KML
 KMT
 BML
 BMT
 Water Plane Area
 Tonnes per cm immersion
 Moment to Change Trim 1 cm
 Area of midship section
 Block Coefficient, Cb
 Coefficient of fineness of Midship Section, Cm
 Prismatic Coefficient, Cp
 Coefficient of fineness of water plane
Summary of Hydrostatic Particulars
Draft
Displac
ement
Water-
plane
Area
TPC KB BMT BML KMT KML
MCT
1cm
LCB from
amid-
ship,
+ve =
fwd
LCF
from
amid-
ship,
+ve =
fwd
Am
Cb Cm Cp Cw
(m) (tonnes) (m2
)
tonnes
/cm
(m) M (m) (m) (m)
(tonnes
-m)
(m) (m) (m2
)
0.99 832.951 928.249 9.28 0.54 18.465 375.65519.007376.197 44.49 0.861 0.978
13.92
2 0.80 0.94 0.85 0.879
1.98 1772.775 950.031 9.5 1.03 9.122 185.431 10.151 186.46 46.73 0..878 0.879 28.96 0.85 0.98 0.87 0.90
2.97 2716.679 955.965 9.56 1.54 6.032 122.71 7.569 124.247 46.998 0.850 0.873 43.72 0.86 0.98 0.876 0.898
3.96 3675.898 987.144 9.87 2.03 4.594 99.689 6.628 101.723 49.328 0.86 0.046 58.65 0.83 0.99 0.84 0.885
Hydrostatic Curves
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 1000.000 2000.000 3000.000 4000.000
Draft(m)
Displacement (m^3)
T vs ▼
Manual Hydromax
Draft vs. Displacement Draft vs. Water plane area
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
920.000 940.000 960.000 980.000 1000.000
Draft(m) AW (m^2)
T vs WPA
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
9.000 9.500 10.000 10.500
Draft(m)
TPC(t/cm)
T vs TPC
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
42.000 44.000 46.000 48.000 50.000 52.000
Draft(m)
MCT 1(tonnes.m/cm)
T vs MCT1
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 0.500 1.000 1.500 2.000 2.500
Draft(m)
KB(m)
T vs KB
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 0.200 0.400 0.600 0.800 1.000 1.200
Draft(m)
LCB(m)
T vs LCB
Manual Hydromax
Draft vs.LCB from amidship
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 5.000 10.000 15.000 20.000
Draft(m)
BMT(m)
T vs BMT
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 100.000 200.000 300.000 400.000
Draft(m)
BML(m)
T vs BML
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 5.000 10.000 15.000 20.000
Draft(m)
KMT(m)
T vs KMT
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 100.000 200.000 300.000 400.000
Draft(m)
KML(m)
T vs KML
Manual Hydromax
Draft vs.LCF from amidship
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 0.200 0.400 0.600 0.800 1.000 1.200
Draft(m)
LCF (m)
T vs LCF
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.920 0.940 0.960 0.980 1.000
Draft(m)
Cm
T vs CM
Manual Hydromax
0.00
0.31
0.63
0.94
1.25
1.56
1.88
2.19
2.50
2.81
3.13
3.44
3.75
4.06
4.38
0.78 0.80 0.82 0.84 0.86 0.88
Draft(m)
CB
T vs CB
Manual Hydromax
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0.86 0.87 0.88 0.89 0.9 0.91
DRAFT
Cw
DRAFT VS Cw CURVE
MANUAL MAXRUF
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0.82 0.84 0.86 0.88
DRAFT
Cp
DRAFT VS Cp CURVE
MANUAL MAXRUF
1/1/2016

More Related Content

What's hot

Final pre.ppt
Final pre.pptFinal pre.ppt
Final pre.ppt
Rubayed Razib
 
Worked Examples for Timber Beam Design to AS1720.1 Webinar
Worked Examples for Timber Beam Design to AS1720.1 WebinarWorked Examples for Timber Beam Design to AS1720.1 Webinar
Worked Examples for Timber Beam Design to AS1720.1 Webinar
ClearCalcs
 
Design of rc building
Design of rc buildingDesign of rc building
Design of rc building
Nirzzhor
 
Shallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsShallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsTyler Edgington
 
Single pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
Single pile analysis & design, l=18,00m d=1,10m, by C.SachpazisSingle pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
Single pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
Dr.Costas Sachpazis
 
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
Dr.Costas Sachpazis
 
Fellenius prediction presentation
Fellenius  prediction presentationFellenius  prediction presentation
Fellenius prediction presentation
cfpbolivia
 
Presentation for Gantry crane
Presentation for Gantry cranePresentation for Gantry crane
Presentation for Gantry craneJulia Collins
 
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
azhar ahmad
 
Kollmorgen pmb motor_specsheet
Kollmorgen pmb motor_specsheetKollmorgen pmb motor_specsheet
Kollmorgen pmb motor_specsheet
Electromate
 
Sachpazis_PILE Analysis_Design to EC2
Sachpazis_PILE Analysis_Design to EC2Sachpazis_PILE Analysis_Design to EC2
Sachpazis_PILE Analysis_Design to EC2
Dr.Costas Sachpazis
 
Bearing Failure RCA
Bearing Failure RCABearing Failure RCA
Bearing Failure RCA
rahul kishore
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
Singareni Collieries Company Limited
 
Design tables 2 way slabs as per IS 456 with deflection check
Design tables 2 way slabs  as per IS 456 with deflection checkDesign tables 2 way slabs  as per IS 456 with deflection check
Design tables 2 way slabs as per IS 456 with deflection check
VVIETCIVIL
 
Volvo ec210 b lc ec210blc excavator service repair manual
Volvo ec210 b lc ec210blc excavator service repair manualVolvo ec210 b lc ec210blc excavator service repair manual
Volvo ec210 b lc ec210blc excavator service repair manual
fujsekfksmemer
 
Prop1.0 2
Prop1.0 2Prop1.0 2
Prop1.0 2
Anand Gaikwad
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
ing_eliali4748
 
Volvo EC240C LD EC240CLD Excavator Service Repair Manual
Volvo EC240C LD EC240CLD Excavator Service Repair ManualVolvo EC240C LD EC240CLD Excavator Service Repair Manual
Volvo EC240C LD EC240CLD Excavator Service Repair Manual
fujdfjjskrtekme
 

What's hot (19)

Final pre.ppt
Final pre.pptFinal pre.ppt
Final pre.ppt
 
Worked Examples for Timber Beam Design to AS1720.1 Webinar
Worked Examples for Timber Beam Design to AS1720.1 WebinarWorked Examples for Timber Beam Design to AS1720.1 Webinar
Worked Examples for Timber Beam Design to AS1720.1 Webinar
 
Design of rc building
Design of rc buildingDesign of rc building
Design of rc building
 
Shallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsShallow and Deep Founation Design Calucations
Shallow and Deep Founation Design Calucations
 
Single pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
Single pile analysis & design, l=18,00m d=1,10m, by C.SachpazisSingle pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
Single pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
 
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
 
Fellenius prediction presentation
Fellenius  prediction presentationFellenius  prediction presentation
Fellenius prediction presentation
 
gantry crane report
gantry crane reportgantry crane report
gantry crane report
 
Presentation for Gantry crane
Presentation for Gantry cranePresentation for Gantry crane
Presentation for Gantry crane
 
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
Forces2018 Presentation:The Assessment Of Pile Group Integrity Due To Pile Ec...
 
Kollmorgen pmb motor_specsheet
Kollmorgen pmb motor_specsheetKollmorgen pmb motor_specsheet
Kollmorgen pmb motor_specsheet
 
Sachpazis_PILE Analysis_Design to EC2
Sachpazis_PILE Analysis_Design to EC2Sachpazis_PILE Analysis_Design to EC2
Sachpazis_PILE Analysis_Design to EC2
 
Bearing Failure RCA
Bearing Failure RCABearing Failure RCA
Bearing Failure RCA
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
 
Design tables 2 way slabs as per IS 456 with deflection check
Design tables 2 way slabs  as per IS 456 with deflection checkDesign tables 2 way slabs  as per IS 456 with deflection check
Design tables 2 way slabs as per IS 456 with deflection check
 
Volvo ec210 b lc ec210blc excavator service repair manual
Volvo ec210 b lc ec210blc excavator service repair manualVolvo ec210 b lc ec210blc excavator service repair manual
Volvo ec210 b lc ec210blc excavator service repair manual
 
Prop1.0 2
Prop1.0 2Prop1.0 2
Prop1.0 2
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
 
Volvo EC240C LD EC240CLD Excavator Service Repair Manual
Volvo EC240C LD EC240CLD Excavator Service Repair ManualVolvo EC240C LD EC240CLD Excavator Service Repair Manual
Volvo EC240C LD EC240CLD Excavator Service Repair Manual
 

Viewers also liked

AYE 250 Brochure Turkish
AYE 250 Brochure TurkishAYE 250 Brochure Turkish
AYE 250 Brochure Turkish
Abdullah Özel
 
Winskysoft Introduction
Winskysoft IntroductionWinskysoft Introduction
Winskysoft Introduction
AlanHong
 
Wang_Yiwen - Transcript
Wang_Yiwen - TranscriptWang_Yiwen - Transcript
Wang_Yiwen - TranscriptYiwen Wang
 
Crude Oil & Natural Gas Hedging Study
Crude Oil & Natural Gas Hedging StudyCrude Oil & Natural Gas Hedging Study
Crude Oil & Natural Gas Hedging Study
Mercatus Energy Advisors
 
[MarCha 2013] Decode Marketing Challengers 2013
[MarCha 2013] Decode Marketing Challengers 2013[MarCha 2013] Decode Marketing Challengers 2013
[MarCha 2013] Decode Marketing Challengers 2013AiiM
 
Colegio america nuevo laredo
Colegio america nuevo laredoColegio america nuevo laredo
Colegio america nuevo laredopcrmz
 
MSM 2D Award 2D MLG-MiTT Jul2007-Mar2010
MSM 2D Award 2D MLG-MiTT Jul2007-Mar2010MSM 2D Award 2D MLG-MiTT Jul2007-Mar2010
MSM 2D Award 2D MLG-MiTT Jul2007-Mar2010Charles Wolfe
 
Presentation1
Presentation1Presentation1
Presentation1bakbar
 
2016_aerothermal_Lau_revB
2016_aerothermal_Lau_revB2016_aerothermal_Lau_revB
2016_aerothermal_Lau_revBKei Yun lau
 
Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...
Railways and Harbours
 
Marine Engineering : Equipment on-board 100000 dwt Tanker
Marine Engineering : Equipment on-board 100000 dwt TankerMarine Engineering : Equipment on-board 100000 dwt Tanker
Marine Engineering : Equipment on-board 100000 dwt Tanker
Vishnuraj J
 
Sustainable Building Design with Shipping Containers
Sustainable Building Design with Shipping ContainersSustainable Building Design with Shipping Containers
Sustainable Building Design with Shipping ContainersDallas College
 
General Knowledge of Maritime Logistics
General Knowledge of Maritime LogisticsGeneral Knowledge of Maritime Logistics
General Knowledge of Maritime Logistics
Youssef Serroukh
 
Spionerende apps - C'T magazine
Spionerende apps - C'T magazineSpionerende apps - C'T magazine
Spionerende apps - C'T magazine
Sanne F-Secure
 
Entrepreneur
Entrepreneur Entrepreneur
Entrepreneur
Triutaminomortilu
 

Viewers also liked (20)

AYE 250 Brochure Turkish
AYE 250 Brochure TurkishAYE 250 Brochure Turkish
AYE 250 Brochure Turkish
 
AWS Certificate
AWS CertificateAWS Certificate
AWS Certificate
 
Greek Open Data_Nikolaidou Noppie
Greek Open Data_Nikolaidou NoppieGreek Open Data_Nikolaidou Noppie
Greek Open Data_Nikolaidou Noppie
 
Page11
Page11Page11
Page11
 
Winskysoft Introduction
Winskysoft IntroductionWinskysoft Introduction
Winskysoft Introduction
 
Wang_Yiwen - Transcript
Wang_Yiwen - TranscriptWang_Yiwen - Transcript
Wang_Yiwen - Transcript
 
Crude Oil & Natural Gas Hedging Study
Crude Oil & Natural Gas Hedging StudyCrude Oil & Natural Gas Hedging Study
Crude Oil & Natural Gas Hedging Study
 
[MarCha 2013] Decode Marketing Challengers 2013
[MarCha 2013] Decode Marketing Challengers 2013[MarCha 2013] Decode Marketing Challengers 2013
[MarCha 2013] Decode Marketing Challengers 2013
 
Colegio america nuevo laredo
Colegio america nuevo laredoColegio america nuevo laredo
Colegio america nuevo laredo
 
MSM 2D Award 2D MLG-MiTT Jul2007-Mar2010
MSM 2D Award 2D MLG-MiTT Jul2007-Mar2010MSM 2D Award 2D MLG-MiTT Jul2007-Mar2010
MSM 2D Award 2D MLG-MiTT Jul2007-Mar2010
 
Apresentação1
Apresentação1Apresentação1
Apresentação1
 
Worldpress
WorldpressWorldpress
Worldpress
 
Presentation1
Presentation1Presentation1
Presentation1
 
2016_aerothermal_Lau_revB
2016_aerothermal_Lau_revB2016_aerothermal_Lau_revB
2016_aerothermal_Lau_revB
 
Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...Vessel tracking, coastal surveillance and other navigational aids, particular...
Vessel tracking, coastal surveillance and other navigational aids, particular...
 
Marine Engineering : Equipment on-board 100000 dwt Tanker
Marine Engineering : Equipment on-board 100000 dwt TankerMarine Engineering : Equipment on-board 100000 dwt Tanker
Marine Engineering : Equipment on-board 100000 dwt Tanker
 
Sustainable Building Design with Shipping Containers
Sustainable Building Design with Shipping ContainersSustainable Building Design with Shipping Containers
Sustainable Building Design with Shipping Containers
 
General Knowledge of Maritime Logistics
General Knowledge of Maritime LogisticsGeneral Knowledge of Maritime Logistics
General Knowledge of Maritime Logistics
 
Spionerende apps - C'T magazine
Spionerende apps - C'T magazineSpionerende apps - C'T magazine
Spionerende apps - C'T magazine
 
Entrepreneur
Entrepreneur Entrepreneur
Entrepreneur
 

Similar to 1st Presentation NAME 338

Presentasi kapal rancangan full countainer 7000 dwt
Presentasi kapal rancangan full countainer 7000 dwtPresentasi kapal rancangan full countainer 7000 dwt
Presentasi kapal rancangan full countainer 7000 dwt
Yogga Haw
 
2nd Presentation NAME 338
2nd Presentation NAME 3382nd Presentation NAME 338
2nd Presentation NAME 338
Kifayath Chowdhury
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama Merah
Hami Asma'i
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysis
KristoforusAnggara
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
SaketChandra4
 
Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019
Oleg Buyanov
 
Preliminary Design of Containership
Preliminary Design of ContainershipPreliminary Design of Containership
Preliminary Design of ContainershipAhmed Atef
 
Ready rackner for qs
Ready rackner for qsReady rackner for qs
Ready rackner for qs
Hiren Thakkar
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
bala506586
 
Family Boat Design Assignment
Family Boat Design AssignmentFamily Boat Design Assignment
Family Boat Design AssignmentGodfreywang
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSUMARDIONO .
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW software
Pratap Bikram Shahi
 
DESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRODESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRO
civilEngineering9966
 
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET Journal
 
Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationSteven Polowy
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptx
darmadi ir,mm
 
ShipWeight Trend Sample Report
ShipWeight Trend Sample ReportShipWeight Trend Sample Report
ShipWeight Trend Sample Report
Denis Morais
 
Preliminary ship-design
Preliminary ship-designPreliminary ship-design

Similar to 1st Presentation NAME 338 (20)

Presentasi kapal rancangan full countainer 7000 dwt
Presentasi kapal rancangan full countainer 7000 dwtPresentasi kapal rancangan full countainer 7000 dwt
Presentasi kapal rancangan full countainer 7000 dwt
 
2nd Presentation NAME 338
2nd Presentation NAME 3382nd Presentation NAME 338
2nd Presentation NAME 338
 
CBG_BSc Grad
CBG_BSc GradCBG_BSc Grad
CBG_BSc Grad
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama Merah
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysis
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
 
Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019
 
Preliminary Design of Containership
Preliminary Design of ContainershipPreliminary Design of Containership
Preliminary Design of Containership
 
Ready rackner for qs
Ready rackner for qsReady rackner for qs
Ready rackner for qs
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 
Family Boat Design Assignment
Family Boat Design AssignmentFamily Boat Design Assignment
Family Boat Design Assignment
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW software
 
DESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRODESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRO
 
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
 
Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn Presentation
 
Trawler report
Trawler reportTrawler report
Trawler report
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptx
 
ShipWeight Trend Sample Report
ShipWeight Trend Sample ReportShipWeight Trend Sample Report
ShipWeight Trend Sample Report
 
Preliminary ship-design
Preliminary ship-designPreliminary ship-design
Preliminary ship-design
 

Recently uploaded

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
ambekarshweta25
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 

Recently uploaded (20)

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 

1st Presentation NAME 338

  • 1. NAME 338 SHIP DESIGN PROJECT & PRESENTATION Presented by MD. Kifayath Chowdhury Student No. 1112023 Mahmudur Rahman Student No. 1112049No. 1112049 Under the supervision of Prof. Dr. MD. Sadiqul Baree
  • 2. Assigned Project Design of a 2900 DWT Oil Tanker Route: Chittagong-Dhaka Service Speed: 10 knots
  • 3. Route Specifications: Water ways distance---350 km Maximum Draft-------3.96 m Maximum Length-----76.2 m Maximum Breadth ----15.0 m
  • 4. PRESENTATION CONTENTS 1. Determination of Preliminary Principal particulars 2. Preliminary lightweight, deadweight and displacement 3. Preliminary General Arrangement 4. Preliminary Lines Plan 5. Preliminary Hydrostatic Calculations
  • 5. Finding Preliminary Principal Particulars As per “DOS” (Department Of Shipping) Bangladesh and BIWTA: For inland vessels we have following restrictions: Loa will not exceed 76.2 m B mld will not exceed 15 m Draft mld will not exceed 3.96 m
  • 6. Principal particulars:  We have length, breadth and draft restrictions as we have to move inland. For first assumption, we are have taken these restrictions as our principal particulars.  Deadweight=2900 tonnes  Assumed Cd =0.8  Displacement= 2900/0.8 =3625 tonnes  Lightweight= (3625 ─ 2900) =725 tonnes  Loa=76.2 m
  • 7. Principal particulars  Lbp= 96% of Loa = 73.152 m  Bmld=15 m  Draftmld=3.96 m  Speed=10 knots  Cb= 0.83
  • 8. Preliminary Principal Particulars LOA 76.2 m LBP 73.152 m Breadth mld 15m Depth mld 5.94.m Draught 3.96 m Cb 0.83 Speed 10 knots
  • 9. Displacement = deadweight / deadweight co efficient = 2900 / 0.8 =3625tonnes Light weight = displacement – dead weight = 3625 – 2900= 725 tonnes Preliminary Lightweight, Deadweight and Displacement: Category Quantity Fuel 14.539tonnes Weight of people 1.275 tonnes Fresh water 12.58 tonnes Provisions & stores 0.85 tonnes Cargo oil = 2900– 29.668 = 2870.332 tonnes
  • 10. ON DECK Owner 01 Class-I Inland master 01 Class- II Inland master 01 Class- III Inland master 07 Certified Crew (Sukani) 02 Cook (Bhandary) 01 AT ENGINE Class-I Inland Driver 01 Class-II Inland Driver 01 Greaser 01 Pump man 01 Total = 17 Manning of the Ship
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 20.
  • 21.
  • 22.
  • 23.
  • 25. Half breadth (mm) Station tan WL-1 WL-2 WL-3 WL-4 Deck Poop/F.Castle Deck Ap 0 0 0 0 1468.8 3893.81 5619.92 0.5 765.2 1680.1 2048.54 2086.06 2763.51 6260.02 6560.77 1 2696.63 5265 5805 6025 6225 6770.24 7034.83 1.5 4437 6502.5 6907.5 7054 7230 7373.42 7403.13 2 5756.63 7215 7372.5 7382 7492.5 7500 0 3 6375 7500 7500 7500 7500 7500 0 4 6375 7500 7500 7500 7500 7500 0 5 6375 7500 7500 7500 7500 7500 0 6 6375 7500 7500 7500 7500 7500 0 7 5907.66 7282.05 7432.5 7466.25 7500 7500 0 8 5441.43 7117.5 7365 7398.75 7432.5 7445.25 0 8.5 5139.77 6915 7162.5 7196.25 7230 7230.74 0 9 4087.56 6405 6652.5 6686.25 6720 6868.83 7044.23 9.5 1893.19 3923.83 4137.73 4301.44 4536.42 5844.81 6312.1 Fp 0 0 0 0 0 2770.2 4019.59
  • 26. Height Above Base (mm) Keel BTK A BTK B BTK C Deck At Side Poop/F.Castle Deck 3698.4 4522.43 6067.57 9957.71 6133.98 9957.71 0 1339.06 4616.75 5572.2 6002.92 9852.06 0 0 130 1533.01 5976.28 9875.2 0 0 0 227.94 5946.77 9852.28 0 0 0 0 5940 0 0 0 0 0 5940 0 0 0 0 0 5940 0 0 0 0 0` 0 0 0 0 0 5940 0 0 0 0 0 5940 0 0 0 0 24.7 5943.43 0 0 0 0 58.75 5953.53 0 0 0 0 193.12 5971.3 8951.21 0 0 634.74 5426.81 6025.41 9152.97 3960 5494.32 - - 6192.3 9410.4
  • 28. Hydrostatic Particulars  Displacement  KB  Longitudinal Position of Center of buoyancy, LCB  Position of Center of flotation from amidship, LCF  KML  KMT  BML  BMT  Water Plane Area  Tonnes per cm immersion  Moment to Change Trim 1 cm  Area of midship section  Block Coefficient, Cb  Coefficient of fineness of Midship Section, Cm  Prismatic Coefficient, Cp  Coefficient of fineness of water plane
  • 29. Summary of Hydrostatic Particulars Draft Displac ement Water- plane Area TPC KB BMT BML KMT KML MCT 1cm LCB from amid- ship, +ve = fwd LCF from amid- ship, +ve = fwd Am Cb Cm Cp Cw (m) (tonnes) (m2 ) tonnes /cm (m) M (m) (m) (m) (tonnes -m) (m) (m) (m2 ) 0.99 832.951 928.249 9.28 0.54 18.465 375.65519.007376.197 44.49 0.861 0.978 13.92 2 0.80 0.94 0.85 0.879 1.98 1772.775 950.031 9.5 1.03 9.122 185.431 10.151 186.46 46.73 0..878 0.879 28.96 0.85 0.98 0.87 0.90 2.97 2716.679 955.965 9.56 1.54 6.032 122.71 7.569 124.247 46.998 0.850 0.873 43.72 0.86 0.98 0.876 0.898 3.96 3675.898 987.144 9.87 2.03 4.594 99.689 6.628 101.723 49.328 0.86 0.046 58.65 0.83 0.99 0.84 0.885
  • 30. Hydrostatic Curves 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 1000.000 2000.000 3000.000 4000.000 Draft(m) Displacement (m^3) T vs ▼ Manual Hydromax Draft vs. Displacement Draft vs. Water plane area 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 920.000 940.000 960.000 980.000 1000.000 Draft(m) AW (m^2) T vs WPA Manual Hydromax
  • 31. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 9.000 9.500 10.000 10.500 Draft(m) TPC(t/cm) T vs TPC Manual Hydromax 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 42.000 44.000 46.000 48.000 50.000 52.000 Draft(m) MCT 1(tonnes.m/cm) T vs MCT1 Manual Hydromax
  • 32. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 0.500 1.000 1.500 2.000 2.500 Draft(m) KB(m) T vs KB Manual Hydromax 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 0.200 0.400 0.600 0.800 1.000 1.200 Draft(m) LCB(m) T vs LCB Manual Hydromax Draft vs.LCB from amidship
  • 33. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 5.000 10.000 15.000 20.000 Draft(m) BMT(m) T vs BMT Manual Hydromax 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 100.000 200.000 300.000 400.000 Draft(m) BML(m) T vs BML Manual Hydromax
  • 34. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 5.000 10.000 15.000 20.000 Draft(m) KMT(m) T vs KMT Manual Hydromax 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 100.000 200.000 300.000 400.000 Draft(m) KML(m) T vs KML Manual Hydromax
  • 35. Draft vs.LCF from amidship 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 0.200 0.400 0.600 0.800 1.000 1.200 Draft(m) LCF (m) T vs LCF Manual Hydromax
  • 36. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.920 0.940 0.960 0.980 1.000 Draft(m) Cm T vs CM Manual Hydromax 0.00 0.31 0.63 0.94 1.25 1.56 1.88 2.19 2.50 2.81 3.13 3.44 3.75 4.06 4.38 0.78 0.80 0.82 0.84 0.86 0.88 Draft(m) CB T vs CB Manual Hydromax
  • 37. 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0.86 0.87 0.88 0.89 0.9 0.91 DRAFT Cw DRAFT VS Cw CURVE MANUAL MAXRUF 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0.82 0.84 0.86 0.88 DRAFT Cp DRAFT VS Cp CURVE MANUAL MAXRUF