PARK LANE MEWS HOTEL PROJECT
01 WELCOME
Welcometoapublicexhibitionoftheproposalsfor
the Park Lane Mews Hotel Project, incorporating
16 Stanhope Row, 16a, 16b & 17 Market Mews,
37 Hertford Street, 36 Hertford Street and 46
Hertford Street.
Genting UK, together with architects Stiff +
Trevillion, have prepared plans to redevelop the
site for a new hotel with an ancillary casino.
Genting UK will shortly be submitting a planning
application to Westminster City Council. You
are invited to view the boards on display, which
outline our proposals for the site.
We would be grateful if you could complete a
feedback form to let us know your views on the
scheme. Members of the project team are on
hand to answer any questions you may have and
provide further information if required.
PARK LANE MEWS HOTEL (2 STANHOPE ROW)
16 & 17A MARKET MEWS
36 HERTFORD STREET
37 HERTFORD STREET
46 HERTFORD STREET
PARK LANE MEWS HOTEL (2 STANHOPE ROW)
16 & 17A MARKET MEWS
36 HERTFORD STREET
37 HERTFORD STREET
46 HERTFORD STREET
8
17a
36
STANHOPEROW
1
23
46
27
16a
24
17
7
Leconfield House
Carrington
Carrington House
House
2
24
10a
21
Bank
House
32
11
48
17c
42
15
MARKET MEWS
MARKET MEWS
MARKET
6 BRICK STREET
BRICK STREET
BRICK
50
Curzon House
Bank
10
10
55
6
11
12a12a
DOW
N
STREET
Garage
18.1m
12
HERTFORDSTREET
26
Bank
Hotel
49
21
21
Hotel
31
Shepherd
Shepherd
PH
19
17
17
MEWS
23
SHEPHERD STREET
17
3
17a
37
16
1
37 to 49
11
4 1 to 8
8
47
Vicarage
Cinema
15
22
22 to 28
DERBY
DERBYSTST
DERBYST
DERBY
DERBYST
DERBY
6b
1
25
38
Works
6a
37
Interpark HouseInterpark HouseInterpark
2
5
301 to 311
30
Chy
20.2m
2
7
2
701 to 705705
6b
26
36
10
2to5
39a
7 to 9
Hotel
Hotel
TREBECKSTREET
TREBECKSTREET
TREBECK
601 to 605605
23
2a
Market
21a
to
Christ
16
52
Club
1
38
33
22
8
Church
20
13
9
HERTFORD STREET
44
501 to 511
6
5
16.9m
14
20
21
29
15
Park
31 to 35
Curzon
17b
20
34
Fig. 1. Site Location PlanFig. 2. Park Lane Mews Hotel - as Existing
Fig. 3. Site Location Satellite Image
Fig. 4. Aerial View from South
Fig. 5. Aerial View from North
PARK LANE MEWS HOTEL PROJECT
ABOUT THE ARCHITECT
Stiff+Trevillion are an award-winning architectural
practice with over twenty-five years of experience
working in the UK and mainland Europe.
The practice is a design-led studio with a varied
workload, ranging from masterplanning and mixed-use
new buildings to high quality interior design and private
residential projects.
Current projects in Westminster include:
• Queens Apartments, W2
• Westbourne House, Westbourne Grove
• 55 Victoria Street, SW1
• Regent House, George Street, W1
• 40 Beak Street, Soho
Other major London projects include:
• 127-135 Sloane Street, Chelsea
• 15 Bishopsgate, City of London
• 10-4 Pentonville Road, Islington
• Portobello Dock, London W10
• One Valentine Place, London, SE1
ABOUT GENTING UK
Genting UK is one of the leading casino operators in the
UK with 6 casinos in London.
ThisincludesCrockfordsClubonCurzonStreetinMayfair,
which is one of the oldest and most exclusive casinos in
the world and attracts an international clientele.
The company also operates the exclusive Colony Club on
Hertford Street and Maxims Casino Club in Kensington.
Genting operates successfully in the UK in one of the
strictest gambling regimes in the world where security,
compliance and safety are of paramount importance.
PROJECT BRIEF
Having acquired the Park Lane Mews Hotel and a number
of adjoining properties, Genting intend to redevelop the
site to provide a very high quality mixed-use development
comprising a luxury boutique hotel with a small exclusive
casino, and private residential apartments.
The proposals are an evolution of the already consented
scheme for the redevelopment of the site.
Fig. 6. Crockfords, 30 Curzon Street
Fig. 7. The Colony Club, 24 Hertford Street
Queens Apartments, W2
10-4 Pentonville Road, Islington
131 Sloane Street One Valentine Place, SE1
Regent House, George Street / Edgware Road
02 PROJECT TEAM
15 Bishopsgate, City of London
PARK LANE MEWS HOTEL PROJECT
EXISTING BUILDINGS AND USES
PARK LANE MEWS HOTEL:
The existing Park Lane Mews Hotel falls short of modern day requirements
for high-quality hotel accommodation:
• Guest rooms are too small
• Floor-to-ceiling heights are too low
• Entrances are cramped, communal dining & bar facilities are inadequate
back-of-house facilities are below standard.
• The building fabric does not meet current energy efficiency levels, while the
building services have reached end-of life.
• The architectural language is not of high quality, completed in a pastiche
style in the 1980s, and formed of a haphazard composition. The existing
service bay arrangement is inefficient, and forms a blank section to the
facade where there should be active frontage.
16 & 17 A MARKET MEWS
16 & 17 A Market Mews consists of a series of parking garages at ground
level with residential accommodation above. The residential part of 16 & 17A
Market Mews is in a very poor state of repair.
As per the permitted scheme, It is proposed that this part of the site is
redeveloped, and changed from C3 Residential to C1 Hotel use. As part of
this element of the works, an off-street servicing and delivery area would be
provided at ground level, preferable to the existing arrangements on Stanhope
Row and to the rear of Shepherd Street.
The loss of residential use is proposed to be offset by the part-conversion to
residential use of 46 Hertford Street - please see details below.
36 HERTFORD STREET
36 Hertford Street as existing has C3 Residential Use. The property comprises
five storeys plus lower ground, split into 7 no. flats.
The building is Grade II Listed, but is in need of substantial renovation and
refurbishment works. As per the permitted scheme, it is proposed to undertake
these refurbishment works and to provide a number of high-quality private
apartments within.
37 HERTFORD STREET
37 Hertford Street as existing has C3 Residential use. The property comprises
four storeys plus lower ground, split into 6 no. flats.
As per the permitted scheme, it is proposed that this building is redeveloped,
in order that floor levels can be aligned with the adjacent 36 Hertford Street,
and therefore lift access can be provided to serve all levels of the residential
apartments to both addresses.
46 HERTFORD STREET
46 Hertford Street as existing is a period property in B1 Office use, converted
from residential some years ago. Comprises five storeys plus lower ground.
03 THE SITE
RENDERRENDER RENDER
RENDER
STONESTONESTONE
SLOPING SLATE ROOF
ROOF LINE DEDUCED
CHIMNEY
PIPE
BALCONY
VENT
DUCT
SIGN
HERITAGE SIGN
SIGN
VENT
VENT
VENT
VENT
VENTVENT
VENT
VENTVENT
VENT
VENT
VENT VENT
VENT
VENT VENT
VENTVENT
BRICK
BRICK
BRICK
BRICK
BRICK
VENT
ELEVATION A-A
CHANGE OF ANGLE OF ELEVATION BASE LINE
CHANGE OF ANGLE OF ELEVATION BASE LINE
BRICKBRICK
STR
BRICK
BRICK
BRICK
BRICK
STONE
BRICK
BRICK BRICK
BRICK
BRICK
BRICK
RENDER
NO VISUAL ACCESS
DETAIL DEDUCED DETAIL DEDUCED
NO VISUAL ACCESS
BRICK
BRICK
STONE
SHUTTER DOOR
VENT
CANOPY
STONE
STONE
BRICK
STONE
STANHOPE ROW
ELEVATION E-E
ELEVATION F-F
MARKET MEWS
ELEVATION J-J
HERTFORD STREET
STANHOPE ROW
DETAIL DEDUCED
NO VISUAL ACCESS
NO VISUAL ACCESS
DETAIL DEDUCED
BRICK
BRICK
BRICKBRICK
BRICKBRICK
VENT VENT
VENT
VENT
VENT
VENT
STONE
BRICK
BRICK
BRICK
BRICK
VENT
VENT
BALCONY
RAILING
PIPE
STR
STONE STONE
BALCONY
PIPE
VENT
VENT
RENDER RENDER
RENDERRENDER
NO VISUAL ACCESS
DETAIL DEDUCED
SLOPING
ROOF
STACKSTACK
RENDER
STONE
RENDER
RENDER
STONE
RENDER
RENDER
STONE
NO VISUAL ACCESS
DETAIL DEDUCED. ROOF
SLOPING
SLOPING
ROOFDETAIL DEDUCED.
NO VISUAL ACCESS
RENDER
RENDER
STONE
RENDER RENDER
RENDER
NO. 40
PANAMA HOUSE
NO. 41
NO. 39
NO. 38NO. 37NO. 36
HERTFORD STREET
ELEVATION G-G
STANHOPE ROW
ELEVATION H-H
SEE DRAWING 6409/02 FOR DETAILS.
CHANGE IN ELEVATION BASELINE ANGLE.
CHANGE IN ELEVATION BASELINE ANGLE.
SEE DRAWING 6409/02 FOR DETAILS.
Fig. 8. Park Lane Mews Hotel - Elevation as Existing – with adjoining 36 Hertford Street
Fig. 9. 36 & 37 Hertford Street - Elevation
Fig. 10. 16 & 17 A Market Mews - Elevation
Fig. 11. Existing Park Lane Mews Hotel - View from Pitts Head Mews
Fig. 12. Existing Park Lane Mews Hotel - View from Shepherd Street
Fig. 13. 16 & 17 A Market Mews View as Existing
Fig. 14. 36 & 37 Hertford Street View facing Stanhope Row
Fig. 15. 36 & 37 Hertford Street
PARK LANE MEWS HOTEL PROJECT
Consent was granted on 4 March 2010 for application [09/09841/FULL]
submitted by the previous owner, Premio Group Holdings Ltd.
This scheme proposed substantial redevelopment of the site, Including:
• Demolition of the existing buildings to: Park Lane Mews Hotel, 16 & 17 A
Market Mews, 37 Hertford Street.
• New hotel building consisting of 6-storeys plus lower ground and
basement, incorporating larger but fewer hotel rooms, dedicated
restaurant facility, etc.
• Incorporation of the rebuilt low-level Market Street block into hotel use, in
order to provide additional rooms plus an off-street servicing and delivery
bay
• Uppermost storey of the hotel block is a set-back penthouse residential
apartment, accessed from the 37 Hertford Street entrance.
• Restoration / renovation / refurbishment and internal modifications of the
Grade II listed 36 Hertford Street to provide new residential apartments,
over five storeys plus lower ground floor.
• Redevelopment of the site at 37 Hertford Street, to provide five storeys
plus lower ground floor. Re-built in order to match the floor levels of
the adjacent No. 36, in order to provide shared accessible passenger lift
and stairs to both properties. Associated Public Realm improvements to
Stanhope Row
Fig. 16. Park Lane Mews Hotel - Elevation to Stanhope Row - Permitted Scheme
Internal Arrangements As Permitted
Basement Plan – As Proposed Lower Ground Floor Plan – As Proposed Ground Floor Plan – As Proposed
First Floor Plan – As Proposed Second Floor Plan – As Proposed Third Floor Plan – As Proposed
Fourth Floor Plan – As Proposed Fifth Floor Plan – As Proposed Roof Plan – As Proposed
Residential Hotel SharedHotel Restaurant
04 EXISTING PERMISSION
Fig. 17. Park Lane Mews Hotel - Permitted Scheme - View from Pitts Head Mews
Fig. 18. Park Lane Mews Hotel - Permitted Scheme - View from Hertford Street
PARK LANE MEWS HOTEL PROJECT
PLANS AS PROPOSED
GIA 375.597 sq m:
SHARED
GIA 181.139 sq m:
C3 RESI ANCILLARY
INTAKE
AIR
BUILDING SERVICES
PLANT AREA
RESIDENTIAL BUILDING SERVICES
- WATER SERVICES
- ELECTRICAL SWITCH ROOM
- BOILERS & CALORIFIERS
GOODS LIFT 1600kg
Car: 1100 x 2000mm
Shaft: 1900 x 2400mm
Door Opg: 1100mm
GIA 562.688 sq m:
BLOCK
GEA 648.647 sq m:
BLOCK
GEA 209.002 sq m:
C3 RESI
GEA 440.344 sq m:
SHARED
20 10m4 6 8BASEMENT PLAN AS PROPOSED
Scale: 1:100
1
Basement Plan – As Proposed Lower Ground Floor Plan – As Proposed
Ground Floor Plan – As Proposed First Floor Plan – As Proposed
Second Floor Plan – As Proposed Third Floor Plan – As Proposed
Fourth Floor Plan – As Proposed Fifth Floor Plan – As Proposed
Roof Plan – As Proposed
GIA 156.088 sq m:
C1 HOTEL
RESI NSA 81.356 sq m:
[2-BED DUPLEX]
UNIT 2
RESI NSA 56.15 sq m:
[2-BED DUPLEX]
UNIT 1
WASTE&
RECYCLING
WASTE&
RECYCLING
CYCLE
STORE
CYCLE
STORE
CYCLE
STORE
CYCLE
STORE
WASTE &
RECYCLING
36HERTFORDSTREET
37HERTFORDSTREET
HOTEL STAFF
BACK-OF-HOUSE
RESIDENTIAL
SERVICE
LOBBY
GEA 167.715 sq m:
C3 RESI
GIA 141.681 sq m:
C3 RESI
GEA 174.703 sq m:
C1 HOTEL
GIA 156.088 sq m:
C1 HOTEL
GIA 322.616 sq m:
C1 HOTEL
GIA 25.484 sq m:
C1 HOTEL
GIA 208.287 sq m:
SHARED
GIA 28.515 sq m:
C1 HOTEL
SHOWERS
NOT IN DEMISE
CENTRAL
KITCHEN
WC'S
INTAKE
AIR
GIA 599.437 sq m:
BLOCK
HOTEL BREAKFAST
& DINING ROOM
PAVEMENT LIGHTS
OVERHEAD
GEA 237.969 sq m:
SHARED
VOID ABOVE
BIKE STORAGE
DISPENSEBAR
WC'S
WS
WS
GEA 642.604 sq m:
BLOCK
GEA 30.615 sq m:
C1 HOTEL
GOODS LIFT 1600kg
Car: 1100 x 2000mm
Shaft: 1900 x 2400mm
Door Opg: 1100mm
GEA 25.484 sq m:
C1 HOTEL
GEA 348.056 sq m:
C1 HOTEL RESTAURANT
SUBSTATION
PLANTACCESS
HATCHABOVE
LOWER GROUND PLAN AS PROPOSED
Scale: 1:100
1
0 2 4 6 8 10 M
STANHOPE ROW
MARKETMEWS
HERTFORDSTREET
46
11
15
10
17
37
22
44
14
NIA 80.834 sq m:
[2-BED RESI]
UNIT 4
NIA 35.81 sq m:
[2-BED DUPLEX]
UNIT 3
RESI NSA 53.09 sq m:
[2-BED DUPLEX]
UNIT 2
RESI NSA 37.877 sq m:
[2-BED DUPLEX]
UNIT 1
GEA 167.084 sq m:
C3 RESI
GIA 144.728 sq m:
C3 RESI
GIA 155.472 sq m:
C3 RESI
GEA 172.595 sq m:
C3 RESI
GIA 104.29 sq m:
SHARED
GIA 2.38901e-06 sq m:
CASINO
GIA 15.641 sq m:
CASINO
GIA 31.883 sq m:
CASINO
GIA 157.534 sq m:
C1 HOTEL
GIA 17.637 sq m:
C1 HOTEL
GIA 78.022 sq m:
HOTEL & CASINO RECEPTION
GIA 19.595 sq m:
SHARED
GIA 28.832 sq m:
SHARED
GIA 19.902 sq m:
SHARED
HOTEL & CASINO
RECEPTION
LINK ACCESS
STORE
EXISTING GARAGENOT IN DEMISE
INTAKE
AIR
GOODS LIFT 1600kg
Car: 1100 x 2000mm
Shaft: 1900 x 2400mm
Door Opg: 1100mm
SHEPHERD
MEWS
PASSAGE
CONCIERGE
HOTEL LOUNGE
DELIVERIES
1280ltrEurobin1260(L)x985(W)1280ltrEurobin1260(L)x985(W)
CASINO
LIFTLOBBY
HOTEL
LIFTLOBBY
VOID
FIRE EXIT
FEATURE STAIR
TO CASINO
RECEPTION STAFF
GEA 81.02 sq m:
HOTEL & CASINO RECEPTION
GEA 32.961 sq m:
SHARED
GEA 166.728 sq m:
C1 HOTEL
GEA 199.784 sq m:
BLOCK
GEA 325.822 sq m:
BLOCK
GEA 149.925 sq m:
SHARED USE
GEA 19.337 sq m:
C1 HOTEL
GIA 273.353 sq m:
BLOCK
GIA 186.367 sq m:
BLOCK
GEA 49.024 sq m:
CASINO
1280ltrEurobin1260(L)x985(W)
1280ltrEurobin1260(L)x985(W)
1280ltrEurobin1260(L)x985(W)
REFUSE
PLANTACCESS
HATCH
SUBSTATIONVENT
GROUND FLOOR PLAN AS PROPOSED
Scale: 1:100
1
0 2 4 6 8 10 M
SHARED GIA 27.333 sq m:
CASINO GIA 414.952 sq m:
SHARED GIA 19.152 sq m:
GIA 3.217 sq m:
C1 HOTEL
GIA 8.3 sq m:
C1 HOTEL
SHARED GIA 18.347 sq m:
SALLE
PRIVÉ
BAR
GIA 488.688 sq m:
BLOCK
STORE
GEA 8.3 sq m:
C1 HOTEL
GEA 3.217 sq m:
C1 HOTEL
GEA 452.261 sq m:
CASINO
GEA 541.81 sq m:
BLOCK
GEA 20.601 sq m:
SHARED
GOODS LIFT 1600kg
Car: 1100 x 2000mm
Shaft: 1900 x 2400mm
Door Opg: 1100mm
GEA 52.903 sq m:
SHARED
RESI NSA 52.157 sq m:
[2-BED DUPLEX]
UNIT 3
RESI NSA 46.632 sq m:
[1-BED RESI]
UNIT 6
RESI NSA 109.492 sq m:
[2-BED RESI]
UNIT 5
36HERTFORDSTREET
37HERTFORDSTREET
GEA 136.452 sq m:
C3 RESI
GIA 122.843 sq m:
C3 RESI
GIA 143.552 sq m:
C3 RESI
GEA 167.084 sq m:
C3 RESI
20 10m4 6 8FIRST FLOOR PLAN AS PROPOSED
Scale: 1:100
1
SHARED GIA 20.58 sq m:
HOTEL GIA 433.517 sq m:
CASINOGIA8.5sqm:
SHARED GIA 19.152 sq m:
SHARED GIA 10.725 sq m:
ROOM AREA: 26m2
ROOM AREA: 27m2
ROOM AREA: 38m2
ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 31m2
ROOM 2.01ROOM 2.04
ROOM 2.03
SUITE 2.10
ROOM 2.02ROOM 2.05
ROOM 2.06
ROOM 2.07
ROOM 2.08
ROOM 2.09
LIFTLOBBY
ROOM AREA: 53m2
STORE
GEA 37.695 sq m:
SHARED
GEA 8.5 sq m:
CASINO
GIA 488.808 sq m:
BLOCK
GEA 20.532 sq m:
SHARED
GEA 476.225 sq m:
C1 HOTEL
GEA 543.036 sq m:
BLOCK
GOODS LIFT 1600kg
Car: 1100 x 2000mm
Shaft: 1900 x 2400mm
Door Opg: 1100mm
RESI NSA 52.551 sq m:
[1-BED RESI]
UNIT 9
RESI NSA 46.63 sq m:
[1-BED RESI]
UNIT 8
RESI NSA 100.629 sq m:
[3-BED RESI]
UNIT 7
GEA 136.452 sq m:
C3 RESI
GIA 123.683 sq m:
C3 RESI
GIA 146.761 sq m:
C3 RESI
SECOND FLOOR PLAN AS PROPOSED
Scale: 1:100
1
0 2 4 6 8 10 M
HOTEL GIA 384.49 sq m:
CASINOGIA8.251sqm:
SHARED GIA 10.725 sq m:
SHARED GIA 20.58 sq m:
SHARED GIA 19.152 sq m:
GIA 442.619 sq m:
BLOCK
ROOM AREA: 61m2
ROOM 3.01ROOM 3.02ROOM 3.03ROOM 3.04ROOM 3.05ROOM 3.06SUITE 3.07
SUITE 3.08
ROOM AREA: 53m2
LIFTLOBBY
GEA 37.683 sq m:
SHAREDGREEN ROOF
VOID
GEA 8.25 sq m:
CASINO
GEA 20.601 sq m:
SHARED
GEA 419.901 sq m:
C1 HOTEL
GEA 486.482 sq m:
BLOCK
GOODS LIFT 1600kg
Car: 1100 x 2000mm
Shaft: 1900 x 2400mm
Door Opg: 1100mm
ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 31m2
RESI NSA 52.412 sq m:
[1-BED RESI]
UNIT 12
RESI NSA 46.587 sq m:
[1-BED RESI]
UNIT 11
RESI NSA 116.617 sq m:
[2-BED RESI]
UNIT 10
GEA 136.452 sq m:
C3 RESI
GEA 162.108 sq m:
C3 RESI
GIA 124.335 sq m:
C3 RESI
GIA 143.532 sq m:
C3 RESI
THIRD FLOOR PLAN AS PROPOSED
Scale: 1:100
1
0 2 4 6 8 10 M
CASINOGIA8.251sqm:
SHARED GIA 10.725 sq m:
SHARED GIA 20.58 sq m:
HOTEL GIA 359.328 sq m:
ROOM AREA: 24m2
GEA 37.748 sq m:
SHARED
SHARED GIA 19.152 sq m:
ROOM 4.2 ROOM 4.1
LIFTLOBBY
ROOM 4.6ROOM 4.7
SUITE 4.9
ROOM AREA: 52m2
ROOM AREA: 31m2
ROOM AREA: 29m2
GEA 8.251 sq m:
CASINO
ROOM 4.3ROOM 4.4ROOM 4.5
GEA 20.601 sq m:
SHARED
ROOM 4.8
ROOM AREA: 27m2ROOM AREA: 24m2 ROOM AREA: 24m2ROOM AREA: 24m2ROOM AREA: 24m2
GIA 417.776 sq m:
BLOCK
GEA 461.369 sq m:
BLOCK
GEA 406.407 sq m:
C1 HOTEL
GOODS LIFT 1600kg
Car: 1100 x 2000mm
Shaft: 1900 x 2400mm
Door Opg: 1100mm
NSA 145.091 sq m:
[3-BED RESI]
UNIT 13 PENTHOUSE
TERRACE
GEA 131.578 sq m:
C3 RESIDENTIAL
GEA 66.946 sq m:
C3 RESIDENTIAL
GIA 120.833 sq m:
C3 RESI
ENSUITE
BATH
LIVING/
DINING
BED 2
BED 3
BED 1
GIA 58.886 sq m:
C3 RESI
20 10m4 6 8FOURTH FLOOR PLAN AS PROPOSED
Scale: 1:100
1
HOTEL GIA 143.033 sq m:
SHARED GIA 31.199 sq m:
EXT TERRACE 69.642 sq m:
CASINO GIA 117.107 sq m:
SHARED GIA 10.843 sq m:
GIA 8.25 sq m:
C1 HOTEL
SHARED GIA 19.152 sq m:
TERRACE
GEA 356.95 sq m:
BLOCK
ROOM AREA: 45m2
ROOM AREA: 53xm2
SALLE
PRIVÉ
SUITE 5.1
SUITE 5.2
BLOCK GIA 329.031 sq m:
GEA 151.56 sq m:
HOTEL
GEA 137.506 sq m:
CASINO
SALLE
PRIVÉ
GEA 48.544 sq m:
SHARED
GEA 8.25 sq m:
C1 HOTEL
GEA 20.676 sq m:
SHARED
GREEN ROOF
GOODS LIFT 1600kg
Car: 1100 x 2000mm
Shaft: 1900 x 2400mm
Door Opg: 1100mm
GREEN
ROOF
GREEN
ROOF
RESIDENTIAL
PLANT
ROOFLIGHT
LIFT
OVERRUN
AOV/
ROOF
ACCESS
MECHANICAL
SMOKE VENT
FIFTH FLOOR PLAN AS PROPOSED
Scale: 1:100
1
0 2 4 6 8 10 M
GREEN
ROOF
GREEN
ROOF
RESIDENTIAL
PLANT
ROOFLIGHT
LIFT
OVERRUN
AOV/
ROOF
ACCESS
MECHANICAL
SMOKE VENT
AOV
AOV / ROOF ACCESS HATCH
BOILER FLUE DISCHARGES ABOVE
ROOF LEVEL VIA ROOF COWL
KITCHEN EXTRACT DUCT DISCHARGES
TO ATMOSPHERE AT ROOF LEVEL VIA
HIGH VELOCITY JET COWL
ROOF MOUNTED LOW
NOISE DRY AIR COOLER
SKY SATELLITE DISH
800MM Ø
ARABIC SATELLITE DISH
1200MM Ø
LIFT OVERRUN
PLANT
ENCLOSURE
GREEN ROOF
GREEN ROOF
GREEN ROOF
20 10m4 6 8ROOF PLAN AS PROPOSED
Scale: 1:100
1
Residential Hotel SharedHotel Restaurant Casino
PARK LANE MEWS HOTEL PROPOSALS
The scheme as now proposed is intended to match the high quality of the
permitted scheme.
The design retains the overall massing and height of the permitted scheme,
with minor amendments to suit the new internal layouts.
The scheme as now proposed will also seek to retain the philosophy of
providing fewer, but larger high-quality hotel rooms, with the inclusion of an
improved hotel restaurant, and active street frontage.
The provision of residential apartments is intended to match the unit type and
size of the permitted scheme.
The works to 36 Hertford Street retain the existing features of the listed
building, while carrying out the necessary repairs and refurbishment to
provide residential accommodation to modern standards.
AMENDMENTS FROM PERMITTED SCHEME
• Incorporation of ancillary casino use to the hotel. This includes making
associated internal arrangement alterations to suit the necessary licensing
requirements, including a separate public entrance and segregated
circulation.
• Number of hotel guest rooms is correspondingly reduced from 44 to 29.
• Reduction in the amount of basement excavation required.
• Provision of hotel use (lounge bar & external terrace) to the set-back top
storey of the hotel block, in place of the residential penthouse apartment to
the consented scheme.
• Elevational changes to Park Lane Mews Hotel building
• Provision of an enclosed external courtyard at first floor level to Market
Mews, to provide external space to the casino, while preventing any noise
breakout associated with an open terrace.
• The inclusion of residential use within 46 Hertford Street to provide the
required additional residential area to meet Westminster policy.
• Some amendments to the residential layouts and unit sizes within 36 & 37
Hertford Street. The unit numbers and mix will be augmented through the
inclusion of residential apartments to 46 Hertford Street.
05 PROPOSALS
PARK LANE MEWS HOTEL PROJECT
Park Lane Mews Hotel - Elevation to Stanhope Row - As Proposed
AS EXISTING
AS PERMITTED
1 2
34
5
6
5
7
8
MATERIALS KEY
1.
2.
3.
4.
5.
6.
7.
8.
GLAZED TERRACOTTA PLINTH
BLACK ANODISED ALUMINIUM GLAZING
PROJECTING WINDOWS TO GUEST AREAS
HAND-MADE FACING BRICKWORK
PROFILED GLAZED TERRACOTTA CLADDING
DECORATIVE SPANDREL PANEL
PPC ALUMINIUM BLACK HORIZONTAL LOUVRES
PPC ANODISED ALUMINIUM COPING
AS EXISTING
AS PERMITTED
1 2
34
5
6
5
7
8
MATERIALS KEY
1.
2.
3.
4.
5.
6.
7.
8.
GLAZED TERRACOTTA PLINTH
BLACK ANODISED ALUMINIUM GLAZING
PROJECTING WINDOWS TO GUEST AREAS
HAND-MADE FACING BRICKWORK
PROFILED GLAZED TERRACOTTA CLADDING
DECORATIVE SPANDREL PANEL
PPC ALUMINIUM BLACK HORIZONTAL LOUVRES
PPC ANODISED ALUMINIUM COPING
Park Lane Mews Hotel - Elevation to Market Mews - As Proposed
AS EXISTING
AS PERMITTED
2
2
4
4
5
6
8
9
MATERIALS KEY
1.
2.
3.
4.
5.
6.
7.
8.
9.
GLAZED TERRACOTTA PLINTH
BLACK ANODISED ALUMINIUM GLAZING
PROJECTING WINDOWS TO GUEST AREAS
HAND-MADE FACING BRICKWORK
PROFILED GLAZED TERRACOTTA CLADDING
DECORATIVE SPANDREL AN BAY WINDOWS SIDE
PANELS
PPC ALUMINIUM BLACK HORIZONTAL LOUVRES
PPC ANODISED ALUMINIUM COPING
SUBSTATION LOUVRES
Park Lane Mews Hotel - Elevation to Shepherd Mews - As Proposed
AS EXISTING
AS PERMITTED
1
2
3
4
5
7
8
MATERIALS KEY
1.
2.
3.
4.
5.
6.
7.
8.
GLAZED TERRACOTTA PLINTH
BLACK ANODISED ALUMINIUM GLAZING
PROJECTING WINDOWS TO GUEST AREAS
HAND-MADE FACING BRICKWORK
PROFILED GLAZED TERRACOTTA CLADDING
DECORATIVE SPANDREL PANEL
PPC ALUMINIUM BLACK HORIZONTAL LOUVRES
PPC ANODISED ALUMINIUM COPING
Park Lane Mews Hotel - Short Section As Proposed Park Lane Mews Hotel - Long Section As Proposed
AS EXISTING
AS PERMITTED
1 2
34
5
6
5
7
8
MATERIALS KEY
1.
2.
3.
4.
5.
6.
7.
8.
GLAZED TERRACOTTA PLINTH
BLACK ANODISED ALUMINIUM GLAZING
PROJECTING WINDOWS TO GUEST AREAS
HAND-MADE FACING BRICKWORK
PROFILED GLAZED TERRACOTTA CLADDING
DECORATIVE SPANDREL PANEL
PPC ALUMINIUM BLACK HORIZONTAL LOUVRES
PPC ANODISED ALUMINIUM COPING
AS EXISTING
AS PERMITTED
1 2
34
5
6
5
7
8
MATERIALS KEY
1.
2.
3.
4.
5.
6.
7.
8.
GLAZED TERRACOTTA PLINTH
BLACK ANODISED ALUMINIUM GLAZING
PROJECTING WINDOWS TO GUEST AREAS
HAND-MADE FACING BRICKWORK
PROFILED GLAZED TERRACOTTA CLADDING
DECORATIVE SPANDREL PANEL
PPC ALUMINIUM BLACK HORIZONTAL LOUVRES
PPC ANODISED ALUMINIUM COPING
As Existing
As Proposed
235022502500
2850
2250
2600
2350
2350
26002600
44392170
400350350
15004900
2850
400
2600
35024005002400500
600
32508004003600
1500
BASEMENT
10.000
LOWER GND
14.000
GND (STANHOPE ROW)
18.450
1ST FLOOR
21.750
2ND FLOOR
25.050
3RD FLOOR
28.050
4TH FLOOR
31.050
5TH FLOOR
34.250
PARAPET
37.500
28502600257528502600
33003300300030003200
2600
PLANT ENCL.
38.500
GND (MARKET STREET)
17.500
335044504000
950
1500
36003500425
2300700
GND (STANHOPE ROW)
18.450
GND (SHEPHERD ST)
17.660
SECOND FLOOR
GUEST ROOMS
FIRST FLOOR
CASINO
GROUND FLOOR
RECEPTION
LOWER GROUND
HOTEL RESTAURANT / LOUNGE BAR
BASEMENT
PLANT AREA
THIRD FLOOR
GUEST ROOMS
FOURTH FLOOR
GUEST ROOMS
FIFTH FLOOR
SALLES PRIVÉES
GUEST SUITES
TERRACE
ROOF PLANT
BASEMENT
10.000
LOWER GND
14.000
GND (STANHOPE ROW)
18.450
1ST FLOOR
21.750
2ND FLOOR
25.050
3RD FLOOR
28.050
4TH FLOOR
31.050
5TH FLOOR
34.250
PARAPET
37.500
28502600257528502600
33003300300030003200
2600
PLANT ENCL.
38.500
GND (MARKET STREET)
17.500
335044504000
950
1500
36003500425
2300700
18.560 - GND (36 HS)
22.260 - 1ST (36 HS)
26.000 - 2ND (36 HS)
29.150 - 3RD (36 HS)
32.100 - 4TH (36 HS)
16.000 - LOWER GND EXISTING
15.500 - LOWER GND PROPOSED
35.590 - PARAPET
36.153 - PLANT ENCLOSURE
35.265 - RIDGE
33.400 - PARAPET (36 HS)
ELECTRICAL
SUBSTATION
SHARED
PLANT ROOM
HOTEL
RESTAURANT
STAFF FACILITIES
DELIVERY
BAY
HOTEL / CASINO
RECEPTION
CASINO
PASSAGE
TO MARKET MEWS
HOTEL
ROOMS
CASINO
SALLES PRIVÉE
HOTEL
ROOMS
STORAGE
BACK-OF HOUSE
HOTEL
LOUNGE
HOTEL
ROOMS
HOTEL
ROOMS
20 10m4 6 8
SECTION AA
Scale: 1:50
HOTEL
CASINO
RESIDENTIAL
SHARED / ANCILLARY
EXISTING OUTLINE
PERMITTED OUTLINE
USE CLASSES
Residential Hotel SharedHotel Restaurant Casino
Park Lane Mews Hotel Sections As Proposed
06 DESIGN
PARK LANE MEWS HOTEL PROJECT
1
2
3
5
6
7
PARK LANE MEWS HOTEL BAY STUDY AS PROPOSED
The facade design for the project is intended to reference the surrounding
fabric of Mayfair, through the use of brickwork as the main material.
The brickwork is supplemented by the use of shaped glazed terracotta bays,
which will lend colour, luxury and interest to the facade.
The window bays are tall and generous, mimicking the proportions of the
surrounding historic Georgian fabric.
Decorativemetalworkisaddedtothewindowbaystogiveinterestandrichness.
A ground floor level plinth of glazed terracotta gives strength and robustness
at street level.
WINDOW BAY STUDY
ROOF: PRE-PATINATED ZINCFACING BRICKWORK : LIGHT-COLOURED CHARCOAL-FIRED BRICK
GLAZING FRAMING:
PATINATED METAL
INSET PANELS: PROFILED GLAZED TERRACOTTA
GLAZED TERRACOTTA:
DETAILED TEXTURE
GROUND FLOOR PLINTH:
GLAZED TERRACOTTA
FAIENCE
DECORATIVE SPANDREL
PANEL
1 2
3 4
5 6 7
1
3
7
6
6
5
PARK LANE MEWS HOTEL WINDOW BAY STUDY AS PROPOSED PLMH GUEST ROOMS: WINDOW SEAT WITH SHUTTERS
SKETCH FAÇADE DETAILS
07 FACADE DESIGN
36 Hertford Street is a listed building. The proposals include retaining and
refurbishing the existing fabric - in particular the decorated plaster of the
internal grand stair. To the facade, the existing render is to be removed, and
the brickwork to be repaired and blackened, as per some typical Mayfair
townhouses.
37 Hertford Street is not listed, and is to be rebuilt, as per the existing consent.
The new frontage is to be in-keeping with the surrounding buildings, mimicking
the door and windows. The rebuilding is necessary to enable disabled access
and building services to be provided to both buildings, and to bring the building
fabric up to modern standards.
PARK LANE MEWS HOTEL PROJECT
PARK LANE MEWS HOTEL: VIEWS FROM STANHOPE ROW
AS EXISTING AS PROPOSED
AS EXISTING AS PROPOSED
PARK LANE MEWS HOTEL: VIEWS FROM PITTS HEAD MEWS
08 PERSPECTIVE VIEWS 1
PARK LANE MEWS HOTEL PROJECT
PARK LANE MEWS HOTEL: VIEWS FROM SHEPHERD STREET
AS EXISTING AS PROPOSED
AS EXISTING AS PROPOSED
PARK LANE MEWS HOTEL: VIEW FROM MARKET MEWS
09 PERSPECTIVE VIEWS 2
PARK LANE MEWS HOTEL PROJECT
AERIAL VIEW FROM SOUTH-WEST
AERIAL VIEW FROM NORTH-WEST
AERIAL VIEW FROM NORTH-EAST
AERIAL VIEW FROM SOUTH-EAST
10 AERIAL VIEWS
PARK LANE MEWS HOTEL PROJECT
Park Lane Mews Hotel Access Routes Diagram As Proposed
DRAWING NU
SCALES:
DRAWN:
DRAWING TIT
PROJECT:
CLIENT:
REV.
Notes:
151605/A/01 .
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
Servicing Vehicle Routes
Vehicle Drop-off
Pedestrian Access
ACCESS & SERVICING
• Access for hotel residents and casino guests will by via
the main entrance on Stanhope Row – there will be no
rear entrance on Shepherd Street.
• Hotel guests arriving by vehicle will be via Pitts
Head Mews and Stanhope row, involving a drop-off
zone outside the hotel frontage, as per the existing
arrangements. The exit route is via Hertford Street,
connecting back to the inner ring road at Park Lane.
• Hotel deliveries are to be made via Market Mews. A
dedicated off-street servicing bay is to be built to replace
the garages to the existing mews building. The delivery
bay will cater for 2no. panel vans or Luton-type box
vans.
• Refuse collection for the hotel will also be made
via Market Mews. A dedicated off-street refuse and
recycling store will be incorporated into the design.
OPERATION & MANAGEMENT
• The casino operation will be governed by a stringent
Operation Management Plan.
• Genting have considerable experience of operating
casinos in residential areas, and we pay great respect to
the needs of the local residents.
• Entry to the casino will be controlled and limited to
members, their guests, hotel residents and guests of
the management. All members will receive a copy of
the management plan in their welcome packs and are
required to adhere to it.
• The anticipated volume of members and guests will be
very low as it will be an exclusive venue.
• The casino will run a complimentary valet service,
allowing cars to be parked in local car parks.
• The drivers of these vehicles are trained to deliver an
efficient and discrete service.
• A small discreet smoking area has been included in the
building design for members and guests to use when
required and will prevent anyone smoking outside of the
building.
5.885
0.72 3.7
4.6t Light Van
Overall Length 5.885m
Overall Width 2.000m
Overall Body Height 2.526m
Min Body Ground Clearance 0.299m
Track Width 1.765m
Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 6.000m
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
151605/AT/A01 .
Swept Path Analysis - Panel Van Entry
5.885
0.72 3.7
4.6t Light Van
Overall Length 5.885m
Overall Width 2.000m
Overall Body Height 2.526m
Min Body Ground Clearance 0.299m
Track Width 1.765m
Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 6.000m
151605/AT/A02 .
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
8.01
1.21 4.25
7.5t Box Van
Overall Length 8.010m
Overall Width 2.100m
Overall Body Height 3.556m
Min Body Ground Clearance 0.351m
Track Width 2.064m
Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 7.400m
151605/AT/C02 .
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
10.4
1.25 5 1.4
10.4m Large Refuse Vehicle (3 axle)
Overall Length 10.400m
Overall Width 2.500m
Overall Body Height 3.814m
Min Body Ground Clearance 0.366m
Track Width 2.500m
Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 9.350m
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
151605/AT/D01 .
10.4
1.25 5 1.4
10.4m Large Refuse Vehicle (3 axle)
Overall Length 10.400m
Overall Width 2.500m
Overall Body Height 3.814m
Min Body Ground Clearance 0.366m
Track Width 2.500m
Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 9.350m
151605/AT/D02 .
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
5.885
0.72 3.7
4.6t Light Van
Overall Length 5.885m
Overall Width 2.000m
Overall Body Height 2.526m
Min Body Ground Clearance 0.299m
Track Width 1.765m
Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 6.000m
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
151605/AT/A01 .
Swept Path Analysis - Panel Van Exit
5.885
0.72 3.7
4.6t Light Van
Overall Length 5.885m
Overall Width 2.000m
Overall Body Height 2.526m
Min Body Ground Clearance 0.299m
Track Width 1.765m
Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 6.000m
151605/AT/A02 .
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
Swept Path Analysis - Refuse Van Entry
10.4
1.25 5 1.4
10.4m Large Refuse Vehicle (3 axle)
Overall Length 10.400m
Overall Width 2.500m
Overall Body Height 3.814m
Min Body Ground Clearance 0.366m
Track Width 2.500m
Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 9.350m
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
151605/AT/D01 .
Swept Path Analysis - Refuse Van Exit
10.4
1.25 5 1.4
10.4m Large Refuse Vehicle (3 axle)
Overall Length 10.400m
Overall Width 2.500m
Overall Body Height 3.814m
Min Body Ground Clearance 0.366m
Track Width 2.500m
Lock to Lock Time 4.00s
Kerb to Kerb Turning Radius 9.350m
151605/AT/D02 .
DRAWING NUMBER:
SCALES:
DRAWN: CHECKED:
REVISION:
DATE:
DRAWING TITLE:
PROJECT:
CLIENT:
REV. DETAILS DRAWN DATECHECKED
Notes:
11 OPERATIONAL MANAGEMENT
Prepared by Vectos
PARK LANE MEWS HOTEL PROJECT
STANHOPEROW
CHESTERFIELDGARDENS
H
ALF
M
O
O
N
STR
EET
MARKET MEWS
STANHOPE GATE
WHITEHORSESTREET
Shepherd
Hire
CURZON GATE
C
LAR
G
ES
STR
EET
HAMILTON MEWS
Shepherd Market
Horse
Ride
PARK
LANE
HAMILTONPLACE
Broad
PARK
LANE
OLD
PARK
LANE
GRANTHAM
PLACE
SQUARE
QUEENSTREET
PAR
K
TREBECKSTREET
LANE
CURZON
SQUARE
Market
SOUTHAUDLEYSTREET
MARKET
HERTFORD STREET
PARKLANE
PITT'S
HEAD
BRICK STREET
SHEPHERD
HERTFORDSTREET
MEWS
DOW
N
STREET
AUDLEY
M
EW
S
ACHILLES WAY
DEANERY MEWS
CARRINGTONSTREET
TILNEY STREET
YARMOUTH PLACE
PARKLANE
CHESTERFIELDSTREET
DOW
N
STREET
CURZON STREET
Cycle
SHEPHERD STREET
DEANERYSTREET
DERBYST
Station
PICCADILLY
Cycle Hire Station
Subway
Posts
CURZON STREET
ACCESS
ROUTE
1
ACCESS
ROUTE
2
EXIT
STANHOPEROW
CHESTERFIELDGARDENS
H
ALF
M
O
O
N
STR
EET
MARKET MEWS
STANHOPE GATE
WHITEHORSESTREET
Shepherd
Hire
CURZON GATE
C
LAR
G
ES
STR
EET
HAMILTON MEWS
Shepherd Market
Horse
Ride
PARK
LANE
HAMILTONPLACE
Broad
PARK
LANE
OLD
PARK
LANE
GRANTHAM
PLACE
SQUARE
QUEENSTREET
PAR
K
TREBECKSTREET
LANE
CURZON
SQUARE
Market
SOUTHAUDLEYSTREET
MARKET
HERTFORD STREET
PARKLANE
PITT'S
HEAD
BRICK STREET
SHEPHERD
HERTFORDSTREET
MEWS
DOW
N
STREET
AUDLEY
M
EW
S
ACHILLES WAY
DEANERY MEWS
CARRINGTONSTREET
TILNEY STREET
YARMOUTH PLACE
PARKLANE
CHESTERFIELDSTREET
DOW
N
STREET
CURZON STREET
Cycle
SHEPHERD STREET
DEANERYSTREET
DERBYST
Station
PICCADILLY
Cycle Hire Station
Subway
Posts
CURZON STREET
ACCESS
ACCESS
ROUTE
2
EXIT
ROUTE1
PEROW
H
ALF
M
O
O
N
STR
EET
MARKET MEWS
WHITEHORSESTREET
Shepherd
Hire
C
LAR
G
ES
STR
EET
Shepherd Market
CE
QUEENSTREET
TREBECKSTREET
Market
MARKET
HERTFORD STREET
BRICK STREET
SHEPHERD
HERTFORDSTREET
DOW
N
STREET
M
EW
S
CARRINGTONSTREET
YARMOUTH PLACE
CHESTERFIELDSTREET
DOW
N
STREET
CURZON STREET
Cycle
SHEPHERD STREET
Station
PICCADILLY
BO
LTO
N
STREET
ACCESS
ROUTE
2
Issues & Revisions
Rev Date Details of issue / revision RevDrw
Birmingham | 0121 233 3322
Leeds | 0113 233 8000
Manchester | 0161 233 4260
London | 020 7407 3879
Nottingham | 0115 924 1100
www.bwbconsulting.com
BWB Ref: Date: Scale@A0:
Drawn: Reviewed:
Drawing Status
Project - Originator - Zone - Level - Type - Role - Number Status
P1PLMH-BWB-SGN-ZZ-DR-S-0001
PRELIMINARY
R Gokool R Lowenthal
LNS2157
ACCESS ROUTE
FOR SITE A
PARK LANE MEWS HOTEL
GENTING UK PLC
NTS06.07.15
P1 06.07.15 Preliminary Issue RLRSG
Notes
1. Do not scale this drawing. All dimensions must be checked/ verified
on site. If in doubt ask.
2. This drawing is to be read in conjunction with all relevant architects,
engineers and specialists drawings and specifications.
3. All dimensions in millimetres unless noted otherwise. All levels in
metres unless noted otherwise.
4. Any discrepancies noted on site are to be reported to the engineer
immediately.
Key Plan
Legend
SITE A - PARK LANE MEWS HOTEL
SITE B - 46 HERTFORD STREET
AdraftConstructionManagementPlanhasbeendevelopedtoaddress
the Health & Safety, Environmental and Quality Requirements for the
construction phase of the project.
The plan will be developed to consider all necessary measures
required to minimise the effect of the construction works on the
surrounding buildings, roads and to the public, to include:
• Adequate signage
• Parking restrictions
• Phasing of deliveries
• Restricting noise and dust
Planning and Environmental Officers will be consulted to discuss
and agree traffic management and logistics, and for granting of the
necessary licenses.
Programme and phasing requirements will be finalised prior to
works commencing. Newsletters will be prepared and circulated to
local residents and businesses to introduce the construction team,
and provide key contact details, and set out key work activities in
order to promote good local relationships.
OUTLINE METHODOLOGY
The key challenges of the project are:
• Safe demolition with consideration to neighbours
• Construction within tight site constraints
• Management of ground water due to high water table
• Delivery of materials, distribution & craneage
• Installation of major plant and timing of such installs
There is a double-level basement which will involve specialised
temporary works. These will be designed by specialist engineers,
and be undertaken by suitably experienced contractors.
SITE SET UP
An application will be made to create site accommodation within a
portion of the retained building.
SECURITY
Site hoardings, fencing and lockable gates will be erected in
accordance with the site logistics plan, subject to approval. Safety and
directional signage will be appropriately erected to warn pedestrians
and motorists of construction activity
PEDESTRIAN ACCESS
Site pedestrian access and egress routing will be clearly signed
and segregated from all site hazards. The footpath on the east side
of Stanhope Row will be closed off and alternative routing clearly
signed.
DELIVERIES AND TRANSPORT
Access and egress from the site will be via Pitt’s Head mews from
the A4142 (Park Lane) and via Down Street from the A4 (Piccadilly).
A primary loading area has been identified on Stanhope Row.
Construction traffic will be carefully managed and controlled in
Stanhope Row at all times by marshalling staff.
The existing circular one-way system will be utilised to ensure ease
or traffic flow and avoidance of congestion. Loading and unloading
during these stages will mainly be in Stanhope Row, whilst
maintaining through-access for other vehicles and reducing impact
to surrounding residential properties on other roads.
The refurbishment of 46 Hertford Street involves significantly less
work with smaller vehicles and far fewer deliveries. Similar access
points can be used as for the main redevelopment but will utilise an
alternative egress route via Curzon Street.
Unrestricted access and egress is to be maintained at all times for
local residents. Deliveries will be scheduled so as not to arrive during
school start and home times, nor during the peak traffic hours of
between 0800-0900 and 1700-1800.
SUBSTRUCTURE / BASEMENT CONSTRUCTION
The ground floor slab will be progressively removed and the existing
basement backfilled to provide a level platform for piling works. Piles
will be installed around the perimeter to support retained earth and
to enable the reduced level dig. Internal columns will be supported
on bored concrete piles within the basement footprint.
Following installation of waterproofing, works can commence
installingthebasementslab,columnsandbasementperimeterwalls,
which will then support the Ground Floor Slab and superstructure.
Vehiclescarryingdemolitionandexcavationmaterialsshallbesuitably
sheeted to minimise dust being released. Additional measures such
as water spraying may be deployed to reduce dust from site being
blown around. Vehicle wheel / body washing facilities will be provided
and used as required.
STRUCTURAL FRAME
The frame construction will be reinforced concrete with post-
tensioned slabs. This technique minimises the quantity of concrete
required and reduces the number of deliveries. The uppermost level
will be constructed using a structural steel frame which can be pre-
fabricated off-site to minimise installation time.
ENVELOPE AND ROOF
The installation of the external facade will be completed floor by floor
moving up the building.
The external envelope will be installed early in the programme to
provide weatherproofing and so that internal fitout works will be able
to proceed unhindered. The roof installation will be commenced as
soon as the roof slab is complete.
Prepared by BWB Consulting
Construction Vehicles Access Routes - Main Site
Construction Vehicles Access Routes - Site B
Fig. 19. Structural zones
Fig. 20. Street zones
12 CONSTRUCTION MANAGEMENT
MARKETMEWS
HERTFORDSTREET
STANHOPE ROW
No 36 HERTFORD STREET LISTED
GRADE II BUILDING TO BE
RETAINED AND REFURBISHED
EXISTING BUILDINGS TO
BE DEMOLISHED
SITE BOUNDARY
STRUCTURAL ZONES
NOT TO SCALE
MARKETMEWS
HERTFORDSTREET
STANHOPE ROW
No 36 HERTFORD STREET LISTED
GRADE II BUILDING TO BE
RETAINED AND REFURBISHED
EXISTING BUILDINGS TO
BE DEMOLISHED
SITE BOUNDARY
STANHOPE ROW
MARKETMEWS
HERTFORDSTREET
MOTORCYCLE PARKING
BAYS
VEHICLE LOADING /
UNLOADING AREA
CAR PARKING
BAYS
PAVEMENT CLOSURE /
HOARDING AREA
CAR PARKING
BAYS
Issues & Revisions
Rev Date Details of issue / revision
ww
BWB Ref: Date:
Drawn: Re
Drawing Status
Project - Originator - Zone - Level - Type - R
PLMH-BWB-SGN-ZZ-D
PRELIMINARY
R Gokool
LNS2157
ACCESS ZONES
PARK LANE ME
GENTING UK PL
06
P1 06.07.15 Preliminary Issue
Notes
1. Do not scale this drawing. All dimensio
on site. If in doubt ask.
2. This drawing is to be read in conjuncti
engineers and specialists drawings an
3. All dimensions in millimetres unless no
metres unless noted otherwise.
4. Any discrepancies noted on site are to
immediately.
Key Plan
Legend
STRUCTURAL ZONES
NOT TO SCALE
STREET ZONES
NOT TO SCALE
P2 07.07.15 Parking bay annotations rev
PARK LANE MEWS HOTEL PROJECT
GENTING ENVIRONMENTAL POLICY
Genting is committed to proactively managing and minimising its environmental impact
through the adoption of a corporate strategy. As a minimum, Genting will meet all legislative
environmental targets and will endeavour to adopt best practice wherever practicable.
We have always believed that it is the responsibility of the corporate and individual citizen to
play their part and we want and will make every effort to ensure we protect our environment
for our local communities and beyond and in doing so we can make a positive contribution to a
sustainable future both locally and nationally
The Park Lane Mews Hotel project aims to consider environmental issues and translate
them into construction with the intention to provide an efficient building with minimal energy
demand and low pollution levels. The aim is to provide facilities which support the needs of
the current population, without hindering both the natural and existing built environment, for
future populations.
CLIMATE CHANGE
The Proposed Development aims to achieve a reduction in CO2
emissions by enhancing the
thermal performance of the building and by using low or zero carbon technologies wherever
possible.
POLLUTION
Actions shall be implemented throughout construction to reduce the potential negative impacts
on water, and air, to minimise disturbance to the surrounding areas. In addition, the design of
the building shall be undertaken in a way which negates or reduces the impact of pollution
during its operation.
DESIGN
The Proposed Development shall be designed in a manner which minimises the risk of crime.
The site shall be designed securely and advice shall be sought from a Security Officer. This
seeks to ensure a safe working environment and ensure that the site is safe and accessible.
The layout of the site shall be designed to provide safe access for pedestrians and cyclists and
cycle storage facilities shall be provided that are safe and secure. Delivery vehicles shall have
dedicated access areas to avoid disruption to the local transport network.
OPERATION AND MANAGEMENT
It is inevitable that any new building, throughout both construction and occupation, will impact
upon the existing natural and built environment. The development aims to control this impact
through careful monitoring of energy and water consumption and waste production throughout
both construction and operation phases.
A management strategy shall be established at the handover of the development to ensure the
correct operation and use of the building, so that it is used in the most effective and efficient
manner. This strategy shall include training and walk-rounds, as well as the production of a
non-technical user guide, alongside the technical manuals provided in accordance with the
building regulations. The critical part of any low energy building is to see the occupier is fully
cognisant with the means of controlling energy use.
BREEAM
BREEAM is the world’s leading and most widely used environmental assessment method for
buildings. It sets the standard for best practice in sustainable design and has become the
de facto measure used to describe a building’s environmental performance. The Proposed
Development aims to use BREEAM to qualify it’s environmental and sustainable performance.
• Credits are then awarded and added together to produce a single overall score. A rating
is then achieved based on a scale of Pass, Good, Very Good, Excellent and Outstanding.
BREEAM aims are to:
• To mitigate the impacts of buildings on the environment;
• To enable buildings to be recognised according to their environmental benefits;
• To ensure best environmental practice is incorporated in buildings;
The development aims to achieve BREEAM certification and a rating of Excellent, the equivalent
to a score of 70 %.
THE LONDON PLAN
The London Plan is the overall strategic plan for London, setting out an integrated economic,
environmental, transport and social framework for the development of London over the next
20–25 years.
The London Plan establishes the framework for the development and use of land in London,
linkinginimprovementstoinfrastructure;settingoutproposalsforimplementation,coordination
and resourcing; and helping to ensure joined up policy delivery by the Greater London Authority
Group of organisations.
The London Plan promotes the principle that there should be equality of opportunity for all
people, and to:
• Reducing health inequality and promoting Londoners’ health
• Climate change and the consequences of climate change
• Achieving sustainable development in the United Kingdom
The London Plan deals only with things of strategic importance to Greater London however
Local councils are encouraged to follow the policies set out in the London Plan.
BUILDING DESIGN
The London Plan requirements utilise the strategy detailed in the Chartered Institution of
Building Services Engineers’ Design Guide A, which details the ‘Fabric First’ approach to
constructing intrinsically low energy buildings.
The fabric first approach examines both the thermal energy use and the regulated electrical
energy use, determining the optimum performance of the building fabric in combination with
the electrical energy used to light the internal space and provide power for the mechanical
systems controlling temperature and air quality within the building.
Computational Fluid Dynamic (CFD) modelling software will be used as the design tool to
determine the optimum thermal performance of the building, balancing heat losses, heat gains
and indoor air quality with the construction of the building envelope and the extent of renewable
technologies used.
RENEWABLE TECHNOLOGIES
Westminster City Council requires all major developments to maximise on-site renewable
energy generation to achieve a 20% carbon emission reduction, via its policy S40. For the
proposed development there are a number of strategies available to utilise such as:
• Solar Thermal for domestic hot water production
• Combined Heat and Power (CHP) systems
• Photovoltaic Panels for electricity production
One or more of these renewable energies shall be selected based on optimising the carbon
emission reduction of the proposed development.
Park Lane Mews Hotel - Thermal Simulation Model
Sample Energy Performance Certificate / BREEAM
13 SUSTAINABILITY
Prepared by Engineering Services Consultancy Ltd
The fabric first approach examines both the thermal energy use and the regulated electrical energy
use, determining the optimum performance of the building fabric in combination with the electrical
energy used to light the internal space and provide power for the mechanical systems controlling
temperature and air quality within the building.
Computational Fluid Dynamic (CFD) modelling software will be used as the design tool to
determine the optimum thermal performance of the building, balancing heat losses, heat gains and
indoor air quality with the construction of the building envelope and the extent of renewable
technologies used.
R E N E W A B L E T E C H N O L O G I E S
Westminster City Council requires all major developments to maximise on-site renewable energy
generation to achieve a 20% carbon emission reduction, via its policy S40. For the proposed
development there are a number of strategies available to utilise such as:
• Solar Thermal for domestic hot water production
• Combined Heat and Power (CHP) systems
• Photovoltaic Panels for electricity production
One or more of these renewable energies shall be selected based on optimising the carbon
emission reduction of the proposed development.
Baseline Building, built to exceed the requirements of Building
Regulations, maximising the building envelope performance.
Utilise systems to service the building which are highly energy efficient
and which are controlled to suit the use pattern of the building.
Consider the use of renewable energy equipment to generate some or
all of the resulting energy demand of the building	
  
Fig. 21. Indicative roof-mounted photovoltaic array Fig. 23.Indicative solar thermal collectors
Fig. 22.Indicative semi-intensive green roof
PARK LANE MEWS HOTEL PROJECT
THANK YOU
Thank you for attending this public exhibition. We hope that you have found
this information useful.
To summarise, these proposals will:
• Provide a finely designed building that responds to the architectural
character of the Mayfair.
• Re-provide a high-quality hotel suitable for the requirements of the West
End hotel trade.
• Provide a well-managed entertainment use that is respectful of the
residential nature of the area.
• Improve the infrastructure of the hotel, ensuring it meets environmentally
sustainable for years to come.
NEXT STEPS:
We will shortly be submitting a planning application to Westminster City
Council to seek permission to redevelop the site.
PROGRAMME:
The timetable below sets out the anticipated key dates for the project:
Summer 2015: Planning application submitted to Westminster City Council
Winter 2015: Anticipated date for a planning decision
Summer 2016: Construction work starts
Winter 2018: Construction period complete
Park Lane Mews Hotel & No. 36 Stanhope Row: View from Hertford Street As Proposed
14 THANK YOU
FEEDBACK
To ensure that we understand the views of the local community, we would be
grateful if you could take a few moments to fill in a feedback form to let us
know your thoughts.
The feedback form can be completed and left with staff or sent back to us
later using the FREEPOST address.
CONTACT DETAILS
If you have any further questions or would like more information, please
contact us at:
T: 020 3697 4385
E: parklanemewshotel@fourcommunications.com
Westminster City Council will also consult residents, businesses and the
local community as part of the application process. Westminster’s officers
will collate all feedback received to form part of their report to the planning
committee – any feedback given here will be passed to Westminster City
Council as part of the application.

More Related Content

What's hot

Restoring a Sag Harbor Eyesore-behance
Restoring a Sag Harbor Eyesore-behanceRestoring a Sag Harbor Eyesore-behance
Restoring a Sag Harbor Eyesore-behance
kimmendeni
 
Nutbourne Brochure
Nutbourne BrochureNutbourne Brochure
Nutbourne Brochure
James Dearsley
 
Walking Tour Brochure: Art Deco Towers Of Bay Street
Walking Tour Brochure: Art Deco Towers Of Bay StreetWalking Tour Brochure: Art Deco Towers Of Bay Street
Walking Tour Brochure: Art Deco Towers Of Bay Street
Glue Inc.
 
Equis Lake Design Guidelines Annexure A
Equis Lake Design Guidelines Annexure AEquis Lake Design Guidelines Annexure A
Equis Lake Design Guidelines Annexure A
EquisLake the Vine
 
Spotlight - UH Ultimate 2015
Spotlight - UH Ultimate 2015Spotlight - UH Ultimate 2015
Spotlight - UH Ultimate 2015
Stacey Staum
 
Audiology House Sales brochure
Audiology House Sales brochureAudiology House Sales brochure
Audiology House Sales brochure
George Marcou
 
TOP 29 - Tribeca 12:30
TOP 29 - Tribeca 12:30TOP 29 - Tribeca 12:30
TOP 29 - Tribeca 12:30
Karina Fomicheva
 
The loft at nuuanu
The loft at nuuanuThe loft at nuuanu
The loft at nuuanu
Lisa van den Heuvel
 
Aia Design Awards 2012 Reduce
Aia Design Awards 2012 ReduceAia Design Awards 2012 Reduce
Aia Design Awards 2012 Reduce
jgwinkler1
 
Ph presentation 11 7-12
Ph presentation 11 7-12Ph presentation 11 7-12
Ph presentation 11 7-12
vbcmarketing
 
2410 hamilton st, us 59 @ downtown
2410 hamilton st, us 59 @ downtown2410 hamilton st, us 59 @ downtown
2410 hamilton st, us 59 @ downtown
Fred Loden
 
General zone design guidelines
General zone design guidelinesGeneral zone design guidelines
General zone design guidelines
Ellenbrook
 
The loft at nuuanu 928 nuuanu ave suite 210
The loft at nuuanu 928 nuuanu ave suite 210The loft at nuuanu 928 nuuanu ave suite 210
The loft at nuuanu 928 nuuanu ave suite 210
Lisa van den Heuvel
 
5 Churchill Place
5 Churchill Place5 Churchill Place
5 Churchill Place
CVydra
 
Salt Lake Costume Project (1701 S 1100 E)
Salt Lake Costume Project (1701 S 1100 E)Salt Lake Costume Project (1701 S 1100 E)
Salt Lake Costume Project (1701 S 1100 E)
ELPCO East Liberty Park Comm. Organization
 
Portfolio spreads
Portfolio spreadsPortfolio spreads
Portfolio spreads
Laura Handleton
 
Portfolio Andreas Lebisch 2015_web
Portfolio Andreas Lebisch 2015_webPortfolio Andreas Lebisch 2015_web
Portfolio Andreas Lebisch 2015_web
Andreas Lebisch
 

What's hot (17)

Restoring a Sag Harbor Eyesore-behance
Restoring a Sag Harbor Eyesore-behanceRestoring a Sag Harbor Eyesore-behance
Restoring a Sag Harbor Eyesore-behance
 
Nutbourne Brochure
Nutbourne BrochureNutbourne Brochure
Nutbourne Brochure
 
Walking Tour Brochure: Art Deco Towers Of Bay Street
Walking Tour Brochure: Art Deco Towers Of Bay StreetWalking Tour Brochure: Art Deco Towers Of Bay Street
Walking Tour Brochure: Art Deco Towers Of Bay Street
 
Equis Lake Design Guidelines Annexure A
Equis Lake Design Guidelines Annexure AEquis Lake Design Guidelines Annexure A
Equis Lake Design Guidelines Annexure A
 
Spotlight - UH Ultimate 2015
Spotlight - UH Ultimate 2015Spotlight - UH Ultimate 2015
Spotlight - UH Ultimate 2015
 
Audiology House Sales brochure
Audiology House Sales brochureAudiology House Sales brochure
Audiology House Sales brochure
 
TOP 29 - Tribeca 12:30
TOP 29 - Tribeca 12:30TOP 29 - Tribeca 12:30
TOP 29 - Tribeca 12:30
 
The loft at nuuanu
The loft at nuuanuThe loft at nuuanu
The loft at nuuanu
 
Aia Design Awards 2012 Reduce
Aia Design Awards 2012 ReduceAia Design Awards 2012 Reduce
Aia Design Awards 2012 Reduce
 
Ph presentation 11 7-12
Ph presentation 11 7-12Ph presentation 11 7-12
Ph presentation 11 7-12
 
2410 hamilton st, us 59 @ downtown
2410 hamilton st, us 59 @ downtown2410 hamilton st, us 59 @ downtown
2410 hamilton st, us 59 @ downtown
 
General zone design guidelines
General zone design guidelinesGeneral zone design guidelines
General zone design guidelines
 
The loft at nuuanu 928 nuuanu ave suite 210
The loft at nuuanu 928 nuuanu ave suite 210The loft at nuuanu 928 nuuanu ave suite 210
The loft at nuuanu 928 nuuanu ave suite 210
 
5 Churchill Place
5 Churchill Place5 Churchill Place
5 Churchill Place
 
Salt Lake Costume Project (1701 S 1100 E)
Salt Lake Costume Project (1701 S 1100 E)Salt Lake Costume Project (1701 S 1100 E)
Salt Lake Costume Project (1701 S 1100 E)
 
Portfolio spreads
Portfolio spreadsPortfolio spreads
Portfolio spreads
 
Portfolio Andreas Lebisch 2015_web
Portfolio Andreas Lebisch 2015_webPortfolio Andreas Lebisch 2015_web
Portfolio Andreas Lebisch 2015_web
 

Similar to 150708 plmh-public exhib-crop

Investment Opportunity: City Wharf, London N1
Investment Opportunity: City Wharf, London N1Investment Opportunity: City Wharf, London N1
Investment Opportunity: City Wharf, London N1
Proud To Be World
 
Emma-Maddick_WEB-landscape
Emma-Maddick_WEB-landscapeEmma-Maddick_WEB-landscape
Emma-Maddick_WEB-landscape
Emma Maddick
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
Dave Arkell
 
Grosvenor gardens house presentation
Grosvenor gardens house presentationGrosvenor gardens house presentation
Grosvenor gardens house presentation
Mark Holyoake
 
The Brewery Square Portfolio
The Brewery Square PortfolioThe Brewery Square Portfolio
The Brewery Square Portfolio
George Marcou
 
DEB13 STAR AND GARTER
DEB13 STAR AND GARTERDEB13 STAR AND GARTER
DEB13 STAR AND GARTER
Stuart Langrish
 
Nj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizioNj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizio
New Jersey Future
 
8 Merchants Place
8 Merchants Place8 Merchants Place
8 Merchants Place
Crystyna Nimmo MCIAT
 
Anchorage Brochure Final 27.02.15
Anchorage Brochure Final 27.02.15Anchorage Brochure Final 27.02.15
Anchorage Brochure Final 27.02.15
Peter Flanagan
 
Mountford Pigott LLP Asset Management Portfolio 2013
Mountford Pigott LLP Asset Management Portfolio 2013Mountford Pigott LLP Asset Management Portfolio 2013
Mountford Pigott LLP Asset Management Portfolio 2013
mountfordpigott
 
Concrete, vol 47, June 2013 Tesco, Woolwich
Concrete, vol 47, June 2013 Tesco, WoolwichConcrete, vol 47, June 2013 Tesco, Woolwich
Concrete, vol 47, June 2013 Tesco, Woolwich
rgaskill
 
Vicinity Digital Bro_V21.1
Vicinity Digital Bro_V21.1Vicinity Digital Bro_V21.1
Vicinity Digital Bro_V21.1
Mark Shorrock
 
Exclusive - Sami Robertson
Exclusive - Sami RobertsonExclusive - Sami Robertson
Exclusive - Sami Robertson
Sami Robertson
 
Retail Projects
Retail ProjectsRetail Projects
Retail Projects
Gilsanz Murray Steficek
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
grahamelanders
 
Riviere
RiviereRiviere
Riviere
theriviere
 
EarlsCourt_FINAL_WEB_Amend3
EarlsCourt_FINAL_WEB_Amend3EarlsCourt_FINAL_WEB_Amend3
EarlsCourt_FINAL_WEB_Amend3
Rian Strauss
 
Cordy Commercial_Brochure_190x257_v20
Cordy Commercial_Brochure_190x257_v20Cordy Commercial_Brochure_190x257_v20
Cordy Commercial_Brochure_190x257_v20
Joseph Edwards
 
213 215 tenant space - 2017 - slide show
213 215 tenant space - 2017 - slide show213 215 tenant space - 2017 - slide show
213 215 tenant space - 2017 - slide show
Eugene Aleci
 
213 215 West King St. Tenant Space - 2017
213 215 West King St. Tenant Space - 2017213 215 West King St. Tenant Space - 2017
213 215 West King St. Tenant Space - 2017
Eugene Aleci
 

Similar to 150708 plmh-public exhib-crop (20)

Investment Opportunity: City Wharf, London N1
Investment Opportunity: City Wharf, London N1Investment Opportunity: City Wharf, London N1
Investment Opportunity: City Wharf, London N1
 
Emma-Maddick_WEB-landscape
Emma-Maddick_WEB-landscapeEmma-Maddick_WEB-landscape
Emma-Maddick_WEB-landscape
 
Dave Arkell Latest CV
Dave Arkell Latest CVDave Arkell Latest CV
Dave Arkell Latest CV
 
Grosvenor gardens house presentation
Grosvenor gardens house presentationGrosvenor gardens house presentation
Grosvenor gardens house presentation
 
The Brewery Square Portfolio
The Brewery Square PortfolioThe Brewery Square Portfolio
The Brewery Square Portfolio
 
DEB13 STAR AND GARTER
DEB13 STAR AND GARTERDEB13 STAR AND GARTER
DEB13 STAR AND GARTER
 
Nj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizioNj future redevelopment forum 2014 morristown fabrizio
Nj future redevelopment forum 2014 morristown fabrizio
 
8 Merchants Place
8 Merchants Place8 Merchants Place
8 Merchants Place
 
Anchorage Brochure Final 27.02.15
Anchorage Brochure Final 27.02.15Anchorage Brochure Final 27.02.15
Anchorage Brochure Final 27.02.15
 
Mountford Pigott LLP Asset Management Portfolio 2013
Mountford Pigott LLP Asset Management Portfolio 2013Mountford Pigott LLP Asset Management Portfolio 2013
Mountford Pigott LLP Asset Management Portfolio 2013
 
Concrete, vol 47, June 2013 Tesco, Woolwich
Concrete, vol 47, June 2013 Tesco, WoolwichConcrete, vol 47, June 2013 Tesco, Woolwich
Concrete, vol 47, June 2013 Tesco, Woolwich
 
Vicinity Digital Bro_V21.1
Vicinity Digital Bro_V21.1Vicinity Digital Bro_V21.1
Vicinity Digital Bro_V21.1
 
Exclusive - Sami Robertson
Exclusive - Sami RobertsonExclusive - Sami Robertson
Exclusive - Sami Robertson
 
Retail Projects
Retail ProjectsRetail Projects
Retail Projects
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 
Riviere
RiviereRiviere
Riviere
 
EarlsCourt_FINAL_WEB_Amend3
EarlsCourt_FINAL_WEB_Amend3EarlsCourt_FINAL_WEB_Amend3
EarlsCourt_FINAL_WEB_Amend3
 
Cordy Commercial_Brochure_190x257_v20
Cordy Commercial_Brochure_190x257_v20Cordy Commercial_Brochure_190x257_v20
Cordy Commercial_Brochure_190x257_v20
 
213 215 tenant space - 2017 - slide show
213 215 tenant space - 2017 - slide show213 215 tenant space - 2017 - slide show
213 215 tenant space - 2017 - slide show
 
213 215 West King St. Tenant Space - 2017
213 215 West King St. Tenant Space - 2017213 215 West King St. Tenant Space - 2017
213 215 West King St. Tenant Space - 2017
 

Recently uploaded

14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
PauloRodrigues104553
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 

Recently uploaded (20)

14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Series of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.pptSeries of visio cisco devices Cisco_Icons.ppt
Series of visio cisco devices Cisco_Icons.ppt
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 

150708 plmh-public exhib-crop

  • 1. PARK LANE MEWS HOTEL PROJECT 01 WELCOME Welcometoapublicexhibitionoftheproposalsfor the Park Lane Mews Hotel Project, incorporating 16 Stanhope Row, 16a, 16b & 17 Market Mews, 37 Hertford Street, 36 Hertford Street and 46 Hertford Street. Genting UK, together with architects Stiff + Trevillion, have prepared plans to redevelop the site for a new hotel with an ancillary casino. Genting UK will shortly be submitting a planning application to Westminster City Council. You are invited to view the boards on display, which outline our proposals for the site. We would be grateful if you could complete a feedback form to let us know your views on the scheme. Members of the project team are on hand to answer any questions you may have and provide further information if required. PARK LANE MEWS HOTEL (2 STANHOPE ROW) 16 & 17A MARKET MEWS 36 HERTFORD STREET 37 HERTFORD STREET 46 HERTFORD STREET PARK LANE MEWS HOTEL (2 STANHOPE ROW) 16 & 17A MARKET MEWS 36 HERTFORD STREET 37 HERTFORD STREET 46 HERTFORD STREET 8 17a 36 STANHOPEROW 1 23 46 27 16a 24 17 7 Leconfield House Carrington Carrington House House 2 24 10a 21 Bank House 32 11 48 17c 42 15 MARKET MEWS MARKET MEWS MARKET 6 BRICK STREET BRICK STREET BRICK 50 Curzon House Bank 10 10 55 6 11 12a12a DOW N STREET Garage 18.1m 12 HERTFORDSTREET 26 Bank Hotel 49 21 21 Hotel 31 Shepherd Shepherd PH 19 17 17 MEWS 23 SHEPHERD STREET 17 3 17a 37 16 1 37 to 49 11 4 1 to 8 8 47 Vicarage Cinema 15 22 22 to 28 DERBY DERBYSTST DERBYST DERBY DERBYST DERBY 6b 1 25 38 Works 6a 37 Interpark HouseInterpark HouseInterpark 2 5 301 to 311 30 Chy 20.2m 2 7 2 701 to 705705 6b 26 36 10 2to5 39a 7 to 9 Hotel Hotel TREBECKSTREET TREBECKSTREET TREBECK 601 to 605605 23 2a Market 21a to Christ 16 52 Club 1 38 33 22 8 Church 20 13 9 HERTFORD STREET 44 501 to 511 6 5 16.9m 14 20 21 29 15 Park 31 to 35 Curzon 17b 20 34 Fig. 1. Site Location PlanFig. 2. Park Lane Mews Hotel - as Existing Fig. 3. Site Location Satellite Image Fig. 4. Aerial View from South Fig. 5. Aerial View from North
  • 2. PARK LANE MEWS HOTEL PROJECT ABOUT THE ARCHITECT Stiff+Trevillion are an award-winning architectural practice with over twenty-five years of experience working in the UK and mainland Europe. The practice is a design-led studio with a varied workload, ranging from masterplanning and mixed-use new buildings to high quality interior design and private residential projects. Current projects in Westminster include: • Queens Apartments, W2 • Westbourne House, Westbourne Grove • 55 Victoria Street, SW1 • Regent House, George Street, W1 • 40 Beak Street, Soho Other major London projects include: • 127-135 Sloane Street, Chelsea • 15 Bishopsgate, City of London • 10-4 Pentonville Road, Islington • Portobello Dock, London W10 • One Valentine Place, London, SE1 ABOUT GENTING UK Genting UK is one of the leading casino operators in the UK with 6 casinos in London. ThisincludesCrockfordsClubonCurzonStreetinMayfair, which is one of the oldest and most exclusive casinos in the world and attracts an international clientele. The company also operates the exclusive Colony Club on Hertford Street and Maxims Casino Club in Kensington. Genting operates successfully in the UK in one of the strictest gambling regimes in the world where security, compliance and safety are of paramount importance. PROJECT BRIEF Having acquired the Park Lane Mews Hotel and a number of adjoining properties, Genting intend to redevelop the site to provide a very high quality mixed-use development comprising a luxury boutique hotel with a small exclusive casino, and private residential apartments. The proposals are an evolution of the already consented scheme for the redevelopment of the site. Fig. 6. Crockfords, 30 Curzon Street Fig. 7. The Colony Club, 24 Hertford Street Queens Apartments, W2 10-4 Pentonville Road, Islington 131 Sloane Street One Valentine Place, SE1 Regent House, George Street / Edgware Road 02 PROJECT TEAM 15 Bishopsgate, City of London
  • 3. PARK LANE MEWS HOTEL PROJECT EXISTING BUILDINGS AND USES PARK LANE MEWS HOTEL: The existing Park Lane Mews Hotel falls short of modern day requirements for high-quality hotel accommodation: • Guest rooms are too small • Floor-to-ceiling heights are too low • Entrances are cramped, communal dining & bar facilities are inadequate back-of-house facilities are below standard. • The building fabric does not meet current energy efficiency levels, while the building services have reached end-of life. • The architectural language is not of high quality, completed in a pastiche style in the 1980s, and formed of a haphazard composition. The existing service bay arrangement is inefficient, and forms a blank section to the facade where there should be active frontage. 16 & 17 A MARKET MEWS 16 & 17 A Market Mews consists of a series of parking garages at ground level with residential accommodation above. The residential part of 16 & 17A Market Mews is in a very poor state of repair. As per the permitted scheme, It is proposed that this part of the site is redeveloped, and changed from C3 Residential to C1 Hotel use. As part of this element of the works, an off-street servicing and delivery area would be provided at ground level, preferable to the existing arrangements on Stanhope Row and to the rear of Shepherd Street. The loss of residential use is proposed to be offset by the part-conversion to residential use of 46 Hertford Street - please see details below. 36 HERTFORD STREET 36 Hertford Street as existing has C3 Residential Use. The property comprises five storeys plus lower ground, split into 7 no. flats. The building is Grade II Listed, but is in need of substantial renovation and refurbishment works. As per the permitted scheme, it is proposed to undertake these refurbishment works and to provide a number of high-quality private apartments within. 37 HERTFORD STREET 37 Hertford Street as existing has C3 Residential use. The property comprises four storeys plus lower ground, split into 6 no. flats. As per the permitted scheme, it is proposed that this building is redeveloped, in order that floor levels can be aligned with the adjacent 36 Hertford Street, and therefore lift access can be provided to serve all levels of the residential apartments to both addresses. 46 HERTFORD STREET 46 Hertford Street as existing is a period property in B1 Office use, converted from residential some years ago. Comprises five storeys plus lower ground. 03 THE SITE RENDERRENDER RENDER RENDER STONESTONESTONE SLOPING SLATE ROOF ROOF LINE DEDUCED CHIMNEY PIPE BALCONY VENT DUCT SIGN HERITAGE SIGN SIGN VENT VENT VENT VENT VENTVENT VENT VENTVENT VENT VENT VENT VENT VENT VENT VENT VENTVENT BRICK BRICK BRICK BRICK BRICK VENT ELEVATION A-A CHANGE OF ANGLE OF ELEVATION BASE LINE CHANGE OF ANGLE OF ELEVATION BASE LINE BRICKBRICK STR BRICK BRICK BRICK BRICK STONE BRICK BRICK BRICK BRICK BRICK BRICK RENDER NO VISUAL ACCESS DETAIL DEDUCED DETAIL DEDUCED NO VISUAL ACCESS BRICK BRICK STONE SHUTTER DOOR VENT CANOPY STONE STONE BRICK STONE STANHOPE ROW ELEVATION E-E ELEVATION F-F MARKET MEWS ELEVATION J-J HERTFORD STREET STANHOPE ROW DETAIL DEDUCED NO VISUAL ACCESS NO VISUAL ACCESS DETAIL DEDUCED BRICK BRICK BRICKBRICK BRICKBRICK VENT VENT VENT VENT VENT VENT STONE BRICK BRICK BRICK BRICK VENT VENT BALCONY RAILING PIPE STR STONE STONE BALCONY PIPE VENT VENT RENDER RENDER RENDERRENDER NO VISUAL ACCESS DETAIL DEDUCED SLOPING ROOF STACKSTACK RENDER STONE RENDER RENDER STONE RENDER RENDER STONE NO VISUAL ACCESS DETAIL DEDUCED. ROOF SLOPING SLOPING ROOFDETAIL DEDUCED. NO VISUAL ACCESS RENDER RENDER STONE RENDER RENDER RENDER NO. 40 PANAMA HOUSE NO. 41 NO. 39 NO. 38NO. 37NO. 36 HERTFORD STREET ELEVATION G-G STANHOPE ROW ELEVATION H-H SEE DRAWING 6409/02 FOR DETAILS. CHANGE IN ELEVATION BASELINE ANGLE. CHANGE IN ELEVATION BASELINE ANGLE. SEE DRAWING 6409/02 FOR DETAILS. Fig. 8. Park Lane Mews Hotel - Elevation as Existing – with adjoining 36 Hertford Street Fig. 9. 36 & 37 Hertford Street - Elevation Fig. 10. 16 & 17 A Market Mews - Elevation Fig. 11. Existing Park Lane Mews Hotel - View from Pitts Head Mews Fig. 12. Existing Park Lane Mews Hotel - View from Shepherd Street Fig. 13. 16 & 17 A Market Mews View as Existing Fig. 14. 36 & 37 Hertford Street View facing Stanhope Row Fig. 15. 36 & 37 Hertford Street
  • 4. PARK LANE MEWS HOTEL PROJECT Consent was granted on 4 March 2010 for application [09/09841/FULL] submitted by the previous owner, Premio Group Holdings Ltd. This scheme proposed substantial redevelopment of the site, Including: • Demolition of the existing buildings to: Park Lane Mews Hotel, 16 & 17 A Market Mews, 37 Hertford Street. • New hotel building consisting of 6-storeys plus lower ground and basement, incorporating larger but fewer hotel rooms, dedicated restaurant facility, etc. • Incorporation of the rebuilt low-level Market Street block into hotel use, in order to provide additional rooms plus an off-street servicing and delivery bay • Uppermost storey of the hotel block is a set-back penthouse residential apartment, accessed from the 37 Hertford Street entrance. • Restoration / renovation / refurbishment and internal modifications of the Grade II listed 36 Hertford Street to provide new residential apartments, over five storeys plus lower ground floor. • Redevelopment of the site at 37 Hertford Street, to provide five storeys plus lower ground floor. Re-built in order to match the floor levels of the adjacent No. 36, in order to provide shared accessible passenger lift and stairs to both properties. Associated Public Realm improvements to Stanhope Row Fig. 16. Park Lane Mews Hotel - Elevation to Stanhope Row - Permitted Scheme Internal Arrangements As Permitted Basement Plan – As Proposed Lower Ground Floor Plan – As Proposed Ground Floor Plan – As Proposed First Floor Plan – As Proposed Second Floor Plan – As Proposed Third Floor Plan – As Proposed Fourth Floor Plan – As Proposed Fifth Floor Plan – As Proposed Roof Plan – As Proposed Residential Hotel SharedHotel Restaurant 04 EXISTING PERMISSION Fig. 17. Park Lane Mews Hotel - Permitted Scheme - View from Pitts Head Mews Fig. 18. Park Lane Mews Hotel - Permitted Scheme - View from Hertford Street
  • 5. PARK LANE MEWS HOTEL PROJECT PLANS AS PROPOSED GIA 375.597 sq m: SHARED GIA 181.139 sq m: C3 RESI ANCILLARY INTAKE AIR BUILDING SERVICES PLANT AREA RESIDENTIAL BUILDING SERVICES - WATER SERVICES - ELECTRICAL SWITCH ROOM - BOILERS & CALORIFIERS GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg: 1100mm GIA 562.688 sq m: BLOCK GEA 648.647 sq m: BLOCK GEA 209.002 sq m: C3 RESI GEA 440.344 sq m: SHARED 20 10m4 6 8BASEMENT PLAN AS PROPOSED Scale: 1:100 1 Basement Plan – As Proposed Lower Ground Floor Plan – As Proposed Ground Floor Plan – As Proposed First Floor Plan – As Proposed Second Floor Plan – As Proposed Third Floor Plan – As Proposed Fourth Floor Plan – As Proposed Fifth Floor Plan – As Proposed Roof Plan – As Proposed GIA 156.088 sq m: C1 HOTEL RESI NSA 81.356 sq m: [2-BED DUPLEX] UNIT 2 RESI NSA 56.15 sq m: [2-BED DUPLEX] UNIT 1 WASTE& RECYCLING WASTE& RECYCLING CYCLE STORE CYCLE STORE CYCLE STORE CYCLE STORE WASTE & RECYCLING 36HERTFORDSTREET 37HERTFORDSTREET HOTEL STAFF BACK-OF-HOUSE RESIDENTIAL SERVICE LOBBY GEA 167.715 sq m: C3 RESI GIA 141.681 sq m: C3 RESI GEA 174.703 sq m: C1 HOTEL GIA 156.088 sq m: C1 HOTEL GIA 322.616 sq m: C1 HOTEL GIA 25.484 sq m: C1 HOTEL GIA 208.287 sq m: SHARED GIA 28.515 sq m: C1 HOTEL SHOWERS NOT IN DEMISE CENTRAL KITCHEN WC'S INTAKE AIR GIA 599.437 sq m: BLOCK HOTEL BREAKFAST & DINING ROOM PAVEMENT LIGHTS OVERHEAD GEA 237.969 sq m: SHARED VOID ABOVE BIKE STORAGE DISPENSEBAR WC'S WS WS GEA 642.604 sq m: BLOCK GEA 30.615 sq m: C1 HOTEL GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg: 1100mm GEA 25.484 sq m: C1 HOTEL GEA 348.056 sq m: C1 HOTEL RESTAURANT SUBSTATION PLANTACCESS HATCHABOVE LOWER GROUND PLAN AS PROPOSED Scale: 1:100 1 0 2 4 6 8 10 M STANHOPE ROW MARKETMEWS HERTFORDSTREET 46 11 15 10 17 37 22 44 14 NIA 80.834 sq m: [2-BED RESI] UNIT 4 NIA 35.81 sq m: [2-BED DUPLEX] UNIT 3 RESI NSA 53.09 sq m: [2-BED DUPLEX] UNIT 2 RESI NSA 37.877 sq m: [2-BED DUPLEX] UNIT 1 GEA 167.084 sq m: C3 RESI GIA 144.728 sq m: C3 RESI GIA 155.472 sq m: C3 RESI GEA 172.595 sq m: C3 RESI GIA 104.29 sq m: SHARED GIA 2.38901e-06 sq m: CASINO GIA 15.641 sq m: CASINO GIA 31.883 sq m: CASINO GIA 157.534 sq m: C1 HOTEL GIA 17.637 sq m: C1 HOTEL GIA 78.022 sq m: HOTEL & CASINO RECEPTION GIA 19.595 sq m: SHARED GIA 28.832 sq m: SHARED GIA 19.902 sq m: SHARED HOTEL & CASINO RECEPTION LINK ACCESS STORE EXISTING GARAGENOT IN DEMISE INTAKE AIR GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg: 1100mm SHEPHERD MEWS PASSAGE CONCIERGE HOTEL LOUNGE DELIVERIES 1280ltrEurobin1260(L)x985(W)1280ltrEurobin1260(L)x985(W) CASINO LIFTLOBBY HOTEL LIFTLOBBY VOID FIRE EXIT FEATURE STAIR TO CASINO RECEPTION STAFF GEA 81.02 sq m: HOTEL & CASINO RECEPTION GEA 32.961 sq m: SHARED GEA 166.728 sq m: C1 HOTEL GEA 199.784 sq m: BLOCK GEA 325.822 sq m: BLOCK GEA 149.925 sq m: SHARED USE GEA 19.337 sq m: C1 HOTEL GIA 273.353 sq m: BLOCK GIA 186.367 sq m: BLOCK GEA 49.024 sq m: CASINO 1280ltrEurobin1260(L)x985(W) 1280ltrEurobin1260(L)x985(W) 1280ltrEurobin1260(L)x985(W) REFUSE PLANTACCESS HATCH SUBSTATIONVENT GROUND FLOOR PLAN AS PROPOSED Scale: 1:100 1 0 2 4 6 8 10 M SHARED GIA 27.333 sq m: CASINO GIA 414.952 sq m: SHARED GIA 19.152 sq m: GIA 3.217 sq m: C1 HOTEL GIA 8.3 sq m: C1 HOTEL SHARED GIA 18.347 sq m: SALLE PRIVÉ BAR GIA 488.688 sq m: BLOCK STORE GEA 8.3 sq m: C1 HOTEL GEA 3.217 sq m: C1 HOTEL GEA 452.261 sq m: CASINO GEA 541.81 sq m: BLOCK GEA 20.601 sq m: SHARED GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg: 1100mm GEA 52.903 sq m: SHARED RESI NSA 52.157 sq m: [2-BED DUPLEX] UNIT 3 RESI NSA 46.632 sq m: [1-BED RESI] UNIT 6 RESI NSA 109.492 sq m: [2-BED RESI] UNIT 5 36HERTFORDSTREET 37HERTFORDSTREET GEA 136.452 sq m: C3 RESI GIA 122.843 sq m: C3 RESI GIA 143.552 sq m: C3 RESI GEA 167.084 sq m: C3 RESI 20 10m4 6 8FIRST FLOOR PLAN AS PROPOSED Scale: 1:100 1 SHARED GIA 20.58 sq m: HOTEL GIA 433.517 sq m: CASINOGIA8.5sqm: SHARED GIA 19.152 sq m: SHARED GIA 10.725 sq m: ROOM AREA: 26m2 ROOM AREA: 27m2 ROOM AREA: 38m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 31m2 ROOM 2.01ROOM 2.04 ROOM 2.03 SUITE 2.10 ROOM 2.02ROOM 2.05 ROOM 2.06 ROOM 2.07 ROOM 2.08 ROOM 2.09 LIFTLOBBY ROOM AREA: 53m2 STORE GEA 37.695 sq m: SHARED GEA 8.5 sq m: CASINO GIA 488.808 sq m: BLOCK GEA 20.532 sq m: SHARED GEA 476.225 sq m: C1 HOTEL GEA 543.036 sq m: BLOCK GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg: 1100mm RESI NSA 52.551 sq m: [1-BED RESI] UNIT 9 RESI NSA 46.63 sq m: [1-BED RESI] UNIT 8 RESI NSA 100.629 sq m: [3-BED RESI] UNIT 7 GEA 136.452 sq m: C3 RESI GIA 123.683 sq m: C3 RESI GIA 146.761 sq m: C3 RESI SECOND FLOOR PLAN AS PROPOSED Scale: 1:100 1 0 2 4 6 8 10 M HOTEL GIA 384.49 sq m: CASINOGIA8.251sqm: SHARED GIA 10.725 sq m: SHARED GIA 20.58 sq m: SHARED GIA 19.152 sq m: GIA 442.619 sq m: BLOCK ROOM AREA: 61m2 ROOM 3.01ROOM 3.02ROOM 3.03ROOM 3.04ROOM 3.05ROOM 3.06SUITE 3.07 SUITE 3.08 ROOM AREA: 53m2 LIFTLOBBY GEA 37.683 sq m: SHAREDGREEN ROOF VOID GEA 8.25 sq m: CASINO GEA 20.601 sq m: SHARED GEA 419.901 sq m: C1 HOTEL GEA 486.482 sq m: BLOCK GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg: 1100mm ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 29m2 ROOM AREA: 31m2 RESI NSA 52.412 sq m: [1-BED RESI] UNIT 12 RESI NSA 46.587 sq m: [1-BED RESI] UNIT 11 RESI NSA 116.617 sq m: [2-BED RESI] UNIT 10 GEA 136.452 sq m: C3 RESI GEA 162.108 sq m: C3 RESI GIA 124.335 sq m: C3 RESI GIA 143.532 sq m: C3 RESI THIRD FLOOR PLAN AS PROPOSED Scale: 1:100 1 0 2 4 6 8 10 M CASINOGIA8.251sqm: SHARED GIA 10.725 sq m: SHARED GIA 20.58 sq m: HOTEL GIA 359.328 sq m: ROOM AREA: 24m2 GEA 37.748 sq m: SHARED SHARED GIA 19.152 sq m: ROOM 4.2 ROOM 4.1 LIFTLOBBY ROOM 4.6ROOM 4.7 SUITE 4.9 ROOM AREA: 52m2 ROOM AREA: 31m2 ROOM AREA: 29m2 GEA 8.251 sq m: CASINO ROOM 4.3ROOM 4.4ROOM 4.5 GEA 20.601 sq m: SHARED ROOM 4.8 ROOM AREA: 27m2ROOM AREA: 24m2 ROOM AREA: 24m2ROOM AREA: 24m2ROOM AREA: 24m2 GIA 417.776 sq m: BLOCK GEA 461.369 sq m: BLOCK GEA 406.407 sq m: C1 HOTEL GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg: 1100mm NSA 145.091 sq m: [3-BED RESI] UNIT 13 PENTHOUSE TERRACE GEA 131.578 sq m: C3 RESIDENTIAL GEA 66.946 sq m: C3 RESIDENTIAL GIA 120.833 sq m: C3 RESI ENSUITE BATH LIVING/ DINING BED 2 BED 3 BED 1 GIA 58.886 sq m: C3 RESI 20 10m4 6 8FOURTH FLOOR PLAN AS PROPOSED Scale: 1:100 1 HOTEL GIA 143.033 sq m: SHARED GIA 31.199 sq m: EXT TERRACE 69.642 sq m: CASINO GIA 117.107 sq m: SHARED GIA 10.843 sq m: GIA 8.25 sq m: C1 HOTEL SHARED GIA 19.152 sq m: TERRACE GEA 356.95 sq m: BLOCK ROOM AREA: 45m2 ROOM AREA: 53xm2 SALLE PRIVÉ SUITE 5.1 SUITE 5.2 BLOCK GIA 329.031 sq m: GEA 151.56 sq m: HOTEL GEA 137.506 sq m: CASINO SALLE PRIVÉ GEA 48.544 sq m: SHARED GEA 8.25 sq m: C1 HOTEL GEA 20.676 sq m: SHARED GREEN ROOF GOODS LIFT 1600kg Car: 1100 x 2000mm Shaft: 1900 x 2400mm Door Opg: 1100mm GREEN ROOF GREEN ROOF RESIDENTIAL PLANT ROOFLIGHT LIFT OVERRUN AOV/ ROOF ACCESS MECHANICAL SMOKE VENT FIFTH FLOOR PLAN AS PROPOSED Scale: 1:100 1 0 2 4 6 8 10 M GREEN ROOF GREEN ROOF RESIDENTIAL PLANT ROOFLIGHT LIFT OVERRUN AOV/ ROOF ACCESS MECHANICAL SMOKE VENT AOV AOV / ROOF ACCESS HATCH BOILER FLUE DISCHARGES ABOVE ROOF LEVEL VIA ROOF COWL KITCHEN EXTRACT DUCT DISCHARGES TO ATMOSPHERE AT ROOF LEVEL VIA HIGH VELOCITY JET COWL ROOF MOUNTED LOW NOISE DRY AIR COOLER SKY SATELLITE DISH 800MM Ø ARABIC SATELLITE DISH 1200MM Ø LIFT OVERRUN PLANT ENCLOSURE GREEN ROOF GREEN ROOF GREEN ROOF 20 10m4 6 8ROOF PLAN AS PROPOSED Scale: 1:100 1 Residential Hotel SharedHotel Restaurant Casino PARK LANE MEWS HOTEL PROPOSALS The scheme as now proposed is intended to match the high quality of the permitted scheme. The design retains the overall massing and height of the permitted scheme, with minor amendments to suit the new internal layouts. The scheme as now proposed will also seek to retain the philosophy of providing fewer, but larger high-quality hotel rooms, with the inclusion of an improved hotel restaurant, and active street frontage. The provision of residential apartments is intended to match the unit type and size of the permitted scheme. The works to 36 Hertford Street retain the existing features of the listed building, while carrying out the necessary repairs and refurbishment to provide residential accommodation to modern standards. AMENDMENTS FROM PERMITTED SCHEME • Incorporation of ancillary casino use to the hotel. This includes making associated internal arrangement alterations to suit the necessary licensing requirements, including a separate public entrance and segregated circulation. • Number of hotel guest rooms is correspondingly reduced from 44 to 29. • Reduction in the amount of basement excavation required. • Provision of hotel use (lounge bar & external terrace) to the set-back top storey of the hotel block, in place of the residential penthouse apartment to the consented scheme. • Elevational changes to Park Lane Mews Hotel building • Provision of an enclosed external courtyard at first floor level to Market Mews, to provide external space to the casino, while preventing any noise breakout associated with an open terrace. • The inclusion of residential use within 46 Hertford Street to provide the required additional residential area to meet Westminster policy. • Some amendments to the residential layouts and unit sizes within 36 & 37 Hertford Street. The unit numbers and mix will be augmented through the inclusion of residential apartments to 46 Hertford Street. 05 PROPOSALS
  • 6. PARK LANE MEWS HOTEL PROJECT Park Lane Mews Hotel - Elevation to Stanhope Row - As Proposed AS EXISTING AS PERMITTED 1 2 34 5 6 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8. GLAZED TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING PROJECTING WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK PROFILED GLAZED TERRACOTTA CLADDING DECORATIVE SPANDREL PANEL PPC ALUMINIUM BLACK HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING AS EXISTING AS PERMITTED 1 2 34 5 6 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8. GLAZED TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING PROJECTING WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK PROFILED GLAZED TERRACOTTA CLADDING DECORATIVE SPANDREL PANEL PPC ALUMINIUM BLACK HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING Park Lane Mews Hotel - Elevation to Market Mews - As Proposed AS EXISTING AS PERMITTED 2 2 4 4 5 6 8 9 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8. 9. GLAZED TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING PROJECTING WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK PROFILED GLAZED TERRACOTTA CLADDING DECORATIVE SPANDREL AN BAY WINDOWS SIDE PANELS PPC ALUMINIUM BLACK HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING SUBSTATION LOUVRES Park Lane Mews Hotel - Elevation to Shepherd Mews - As Proposed AS EXISTING AS PERMITTED 1 2 3 4 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8. GLAZED TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING PROJECTING WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK PROFILED GLAZED TERRACOTTA CLADDING DECORATIVE SPANDREL PANEL PPC ALUMINIUM BLACK HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING Park Lane Mews Hotel - Short Section As Proposed Park Lane Mews Hotel - Long Section As Proposed AS EXISTING AS PERMITTED 1 2 34 5 6 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8. GLAZED TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING PROJECTING WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK PROFILED GLAZED TERRACOTTA CLADDING DECORATIVE SPANDREL PANEL PPC ALUMINIUM BLACK HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING AS EXISTING AS PERMITTED 1 2 34 5 6 5 7 8 MATERIALS KEY 1. 2. 3. 4. 5. 6. 7. 8. GLAZED TERRACOTTA PLINTH BLACK ANODISED ALUMINIUM GLAZING PROJECTING WINDOWS TO GUEST AREAS HAND-MADE FACING BRICKWORK PROFILED GLAZED TERRACOTTA CLADDING DECORATIVE SPANDREL PANEL PPC ALUMINIUM BLACK HORIZONTAL LOUVRES PPC ANODISED ALUMINIUM COPING As Existing As Proposed 235022502500 2850 2250 2600 2350 2350 26002600 44392170 400350350 15004900 2850 400 2600 35024005002400500 600 32508004003600 1500 BASEMENT 10.000 LOWER GND 14.000 GND (STANHOPE ROW) 18.450 1ST FLOOR 21.750 2ND FLOOR 25.050 3RD FLOOR 28.050 4TH FLOOR 31.050 5TH FLOOR 34.250 PARAPET 37.500 28502600257528502600 33003300300030003200 2600 PLANT ENCL. 38.500 GND (MARKET STREET) 17.500 335044504000 950 1500 36003500425 2300700 GND (STANHOPE ROW) 18.450 GND (SHEPHERD ST) 17.660 SECOND FLOOR GUEST ROOMS FIRST FLOOR CASINO GROUND FLOOR RECEPTION LOWER GROUND HOTEL RESTAURANT / LOUNGE BAR BASEMENT PLANT AREA THIRD FLOOR GUEST ROOMS FOURTH FLOOR GUEST ROOMS FIFTH FLOOR SALLES PRIVÉES GUEST SUITES TERRACE ROOF PLANT BASEMENT 10.000 LOWER GND 14.000 GND (STANHOPE ROW) 18.450 1ST FLOOR 21.750 2ND FLOOR 25.050 3RD FLOOR 28.050 4TH FLOOR 31.050 5TH FLOOR 34.250 PARAPET 37.500 28502600257528502600 33003300300030003200 2600 PLANT ENCL. 38.500 GND (MARKET STREET) 17.500 335044504000 950 1500 36003500425 2300700 18.560 - GND (36 HS) 22.260 - 1ST (36 HS) 26.000 - 2ND (36 HS) 29.150 - 3RD (36 HS) 32.100 - 4TH (36 HS) 16.000 - LOWER GND EXISTING 15.500 - LOWER GND PROPOSED 35.590 - PARAPET 36.153 - PLANT ENCLOSURE 35.265 - RIDGE 33.400 - PARAPET (36 HS) ELECTRICAL SUBSTATION SHARED PLANT ROOM HOTEL RESTAURANT STAFF FACILITIES DELIVERY BAY HOTEL / CASINO RECEPTION CASINO PASSAGE TO MARKET MEWS HOTEL ROOMS CASINO SALLES PRIVÉE HOTEL ROOMS STORAGE BACK-OF HOUSE HOTEL LOUNGE HOTEL ROOMS HOTEL ROOMS 20 10m4 6 8 SECTION AA Scale: 1:50 HOTEL CASINO RESIDENTIAL SHARED / ANCILLARY EXISTING OUTLINE PERMITTED OUTLINE USE CLASSES Residential Hotel SharedHotel Restaurant Casino Park Lane Mews Hotel Sections As Proposed 06 DESIGN
  • 7. PARK LANE MEWS HOTEL PROJECT 1 2 3 5 6 7 PARK LANE MEWS HOTEL BAY STUDY AS PROPOSED The facade design for the project is intended to reference the surrounding fabric of Mayfair, through the use of brickwork as the main material. The brickwork is supplemented by the use of shaped glazed terracotta bays, which will lend colour, luxury and interest to the facade. The window bays are tall and generous, mimicking the proportions of the surrounding historic Georgian fabric. Decorativemetalworkisaddedtothewindowbaystogiveinterestandrichness. A ground floor level plinth of glazed terracotta gives strength and robustness at street level. WINDOW BAY STUDY ROOF: PRE-PATINATED ZINCFACING BRICKWORK : LIGHT-COLOURED CHARCOAL-FIRED BRICK GLAZING FRAMING: PATINATED METAL INSET PANELS: PROFILED GLAZED TERRACOTTA GLAZED TERRACOTTA: DETAILED TEXTURE GROUND FLOOR PLINTH: GLAZED TERRACOTTA FAIENCE DECORATIVE SPANDREL PANEL 1 2 3 4 5 6 7 1 3 7 6 6 5 PARK LANE MEWS HOTEL WINDOW BAY STUDY AS PROPOSED PLMH GUEST ROOMS: WINDOW SEAT WITH SHUTTERS SKETCH FAÇADE DETAILS 07 FACADE DESIGN 36 Hertford Street is a listed building. The proposals include retaining and refurbishing the existing fabric - in particular the decorated plaster of the internal grand stair. To the facade, the existing render is to be removed, and the brickwork to be repaired and blackened, as per some typical Mayfair townhouses. 37 Hertford Street is not listed, and is to be rebuilt, as per the existing consent. The new frontage is to be in-keeping with the surrounding buildings, mimicking the door and windows. The rebuilding is necessary to enable disabled access and building services to be provided to both buildings, and to bring the building fabric up to modern standards.
  • 8. PARK LANE MEWS HOTEL PROJECT PARK LANE MEWS HOTEL: VIEWS FROM STANHOPE ROW AS EXISTING AS PROPOSED AS EXISTING AS PROPOSED PARK LANE MEWS HOTEL: VIEWS FROM PITTS HEAD MEWS 08 PERSPECTIVE VIEWS 1
  • 9. PARK LANE MEWS HOTEL PROJECT PARK LANE MEWS HOTEL: VIEWS FROM SHEPHERD STREET AS EXISTING AS PROPOSED AS EXISTING AS PROPOSED PARK LANE MEWS HOTEL: VIEW FROM MARKET MEWS 09 PERSPECTIVE VIEWS 2
  • 10. PARK LANE MEWS HOTEL PROJECT AERIAL VIEW FROM SOUTH-WEST AERIAL VIEW FROM NORTH-WEST AERIAL VIEW FROM NORTH-EAST AERIAL VIEW FROM SOUTH-EAST 10 AERIAL VIEWS
  • 11. PARK LANE MEWS HOTEL PROJECT Park Lane Mews Hotel Access Routes Diagram As Proposed DRAWING NU SCALES: DRAWN: DRAWING TIT PROJECT: CLIENT: REV. Notes: 151605/A/01 . DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: Servicing Vehicle Routes Vehicle Drop-off Pedestrian Access ACCESS & SERVICING • Access for hotel residents and casino guests will by via the main entrance on Stanhope Row – there will be no rear entrance on Shepherd Street. • Hotel guests arriving by vehicle will be via Pitts Head Mews and Stanhope row, involving a drop-off zone outside the hotel frontage, as per the existing arrangements. The exit route is via Hertford Street, connecting back to the inner ring road at Park Lane. • Hotel deliveries are to be made via Market Mews. A dedicated off-street servicing bay is to be built to replace the garages to the existing mews building. The delivery bay will cater for 2no. panel vans or Luton-type box vans. • Refuse collection for the hotel will also be made via Market Mews. A dedicated off-street refuse and recycling store will be incorporated into the design. OPERATION & MANAGEMENT • The casino operation will be governed by a stringent Operation Management Plan. • Genting have considerable experience of operating casinos in residential areas, and we pay great respect to the needs of the local residents. • Entry to the casino will be controlled and limited to members, their guests, hotel residents and guests of the management. All members will receive a copy of the management plan in their welcome packs and are required to adhere to it. • The anticipated volume of members and guests will be very low as it will be an exclusive venue. • The casino will run a complimentary valet service, allowing cars to be parked in local car parks. • The drivers of these vehicles are trained to deliver an efficient and discrete service. • A small discreet smoking area has been included in the building design for members and guests to use when required and will prevent anyone smoking outside of the building. 5.885 0.72 3.7 4.6t Light Van Overall Length 5.885m Overall Width 2.000m Overall Body Height 2.526m Min Body Ground Clearance 0.299m Track Width 1.765m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius 6.000m DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 151605/AT/A01 . Swept Path Analysis - Panel Van Entry 5.885 0.72 3.7 4.6t Light Van Overall Length 5.885m Overall Width 2.000m Overall Body Height 2.526m Min Body Ground Clearance 0.299m Track Width 1.765m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius 6.000m 151605/AT/A02 . DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 8.01 1.21 4.25 7.5t Box Van Overall Length 8.010m Overall Width 2.100m Overall Body Height 3.556m Min Body Ground Clearance 0.351m Track Width 2.064m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius 7.400m 151605/AT/C02 . DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 10.4 1.25 5 1.4 10.4m Large Refuse Vehicle (3 axle) Overall Length 10.400m Overall Width 2.500m Overall Body Height 3.814m Min Body Ground Clearance 0.366m Track Width 2.500m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius 9.350m DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 151605/AT/D01 . 10.4 1.25 5 1.4 10.4m Large Refuse Vehicle (3 axle) Overall Length 10.400m Overall Width 2.500m Overall Body Height 3.814m Min Body Ground Clearance 0.366m Track Width 2.500m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius 9.350m 151605/AT/D02 . DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 5.885 0.72 3.7 4.6t Light Van Overall Length 5.885m Overall Width 2.000m Overall Body Height 2.526m Min Body Ground Clearance 0.299m Track Width 1.765m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius 6.000m DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 151605/AT/A01 . Swept Path Analysis - Panel Van Exit 5.885 0.72 3.7 4.6t Light Van Overall Length 5.885m Overall Width 2.000m Overall Body Height 2.526m Min Body Ground Clearance 0.299m Track Width 1.765m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius 6.000m 151605/AT/A02 . DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: Swept Path Analysis - Refuse Van Entry 10.4 1.25 5 1.4 10.4m Large Refuse Vehicle (3 axle) Overall Length 10.400m Overall Width 2.500m Overall Body Height 3.814m Min Body Ground Clearance 0.366m Track Width 2.500m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius 9.350m DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 151605/AT/D01 . Swept Path Analysis - Refuse Van Exit 10.4 1.25 5 1.4 10.4m Large Refuse Vehicle (3 axle) Overall Length 10.400m Overall Width 2.500m Overall Body Height 3.814m Min Body Ground Clearance 0.366m Track Width 2.500m Lock to Lock Time 4.00s Kerb to Kerb Turning Radius 9.350m 151605/AT/D02 . DRAWING NUMBER: SCALES: DRAWN: CHECKED: REVISION: DATE: DRAWING TITLE: PROJECT: CLIENT: REV. DETAILS DRAWN DATECHECKED Notes: 11 OPERATIONAL MANAGEMENT Prepared by Vectos
  • 12. PARK LANE MEWS HOTEL PROJECT STANHOPEROW CHESTERFIELDGARDENS H ALF M O O N STR EET MARKET MEWS STANHOPE GATE WHITEHORSESTREET Shepherd Hire CURZON GATE C LAR G ES STR EET HAMILTON MEWS Shepherd Market Horse Ride PARK LANE HAMILTONPLACE Broad PARK LANE OLD PARK LANE GRANTHAM PLACE SQUARE QUEENSTREET PAR K TREBECKSTREET LANE CURZON SQUARE Market SOUTHAUDLEYSTREET MARKET HERTFORD STREET PARKLANE PITT'S HEAD BRICK STREET SHEPHERD HERTFORDSTREET MEWS DOW N STREET AUDLEY M EW S ACHILLES WAY DEANERY MEWS CARRINGTONSTREET TILNEY STREET YARMOUTH PLACE PARKLANE CHESTERFIELDSTREET DOW N STREET CURZON STREET Cycle SHEPHERD STREET DEANERYSTREET DERBYST Station PICCADILLY Cycle Hire Station Subway Posts CURZON STREET ACCESS ROUTE 1 ACCESS ROUTE 2 EXIT STANHOPEROW CHESTERFIELDGARDENS H ALF M O O N STR EET MARKET MEWS STANHOPE GATE WHITEHORSESTREET Shepherd Hire CURZON GATE C LAR G ES STR EET HAMILTON MEWS Shepherd Market Horse Ride PARK LANE HAMILTONPLACE Broad PARK LANE OLD PARK LANE GRANTHAM PLACE SQUARE QUEENSTREET PAR K TREBECKSTREET LANE CURZON SQUARE Market SOUTHAUDLEYSTREET MARKET HERTFORD STREET PARKLANE PITT'S HEAD BRICK STREET SHEPHERD HERTFORDSTREET MEWS DOW N STREET AUDLEY M EW S ACHILLES WAY DEANERY MEWS CARRINGTONSTREET TILNEY STREET YARMOUTH PLACE PARKLANE CHESTERFIELDSTREET DOW N STREET CURZON STREET Cycle SHEPHERD STREET DEANERYSTREET DERBYST Station PICCADILLY Cycle Hire Station Subway Posts CURZON STREET ACCESS ACCESS ROUTE 2 EXIT ROUTE1 PEROW H ALF M O O N STR EET MARKET MEWS WHITEHORSESTREET Shepherd Hire C LAR G ES STR EET Shepherd Market CE QUEENSTREET TREBECKSTREET Market MARKET HERTFORD STREET BRICK STREET SHEPHERD HERTFORDSTREET DOW N STREET M EW S CARRINGTONSTREET YARMOUTH PLACE CHESTERFIELDSTREET DOW N STREET CURZON STREET Cycle SHEPHERD STREET Station PICCADILLY BO LTO N STREET ACCESS ROUTE 2 Issues & Revisions Rev Date Details of issue / revision RevDrw Birmingham | 0121 233 3322 Leeds | 0113 233 8000 Manchester | 0161 233 4260 London | 020 7407 3879 Nottingham | 0115 924 1100 www.bwbconsulting.com BWB Ref: Date: Scale@A0: Drawn: Reviewed: Drawing Status Project - Originator - Zone - Level - Type - Role - Number Status P1PLMH-BWB-SGN-ZZ-DR-S-0001 PRELIMINARY R Gokool R Lowenthal LNS2157 ACCESS ROUTE FOR SITE A PARK LANE MEWS HOTEL GENTING UK PLC NTS06.07.15 P1 06.07.15 Preliminary Issue RLRSG Notes 1. Do not scale this drawing. All dimensions must be checked/ verified on site. If in doubt ask. 2. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications. 3. All dimensions in millimetres unless noted otherwise. All levels in metres unless noted otherwise. 4. Any discrepancies noted on site are to be reported to the engineer immediately. Key Plan Legend SITE A - PARK LANE MEWS HOTEL SITE B - 46 HERTFORD STREET AdraftConstructionManagementPlanhasbeendevelopedtoaddress the Health & Safety, Environmental and Quality Requirements for the construction phase of the project. The plan will be developed to consider all necessary measures required to minimise the effect of the construction works on the surrounding buildings, roads and to the public, to include: • Adequate signage • Parking restrictions • Phasing of deliveries • Restricting noise and dust Planning and Environmental Officers will be consulted to discuss and agree traffic management and logistics, and for granting of the necessary licenses. Programme and phasing requirements will be finalised prior to works commencing. Newsletters will be prepared and circulated to local residents and businesses to introduce the construction team, and provide key contact details, and set out key work activities in order to promote good local relationships. OUTLINE METHODOLOGY The key challenges of the project are: • Safe demolition with consideration to neighbours • Construction within tight site constraints • Management of ground water due to high water table • Delivery of materials, distribution & craneage • Installation of major plant and timing of such installs There is a double-level basement which will involve specialised temporary works. These will be designed by specialist engineers, and be undertaken by suitably experienced contractors. SITE SET UP An application will be made to create site accommodation within a portion of the retained building. SECURITY Site hoardings, fencing and lockable gates will be erected in accordance with the site logistics plan, subject to approval. Safety and directional signage will be appropriately erected to warn pedestrians and motorists of construction activity PEDESTRIAN ACCESS Site pedestrian access and egress routing will be clearly signed and segregated from all site hazards. The footpath on the east side of Stanhope Row will be closed off and alternative routing clearly signed. DELIVERIES AND TRANSPORT Access and egress from the site will be via Pitt’s Head mews from the A4142 (Park Lane) and via Down Street from the A4 (Piccadilly). A primary loading area has been identified on Stanhope Row. Construction traffic will be carefully managed and controlled in Stanhope Row at all times by marshalling staff. The existing circular one-way system will be utilised to ensure ease or traffic flow and avoidance of congestion. Loading and unloading during these stages will mainly be in Stanhope Row, whilst maintaining through-access for other vehicles and reducing impact to surrounding residential properties on other roads. The refurbishment of 46 Hertford Street involves significantly less work with smaller vehicles and far fewer deliveries. Similar access points can be used as for the main redevelopment but will utilise an alternative egress route via Curzon Street. Unrestricted access and egress is to be maintained at all times for local residents. Deliveries will be scheduled so as not to arrive during school start and home times, nor during the peak traffic hours of between 0800-0900 and 1700-1800. SUBSTRUCTURE / BASEMENT CONSTRUCTION The ground floor slab will be progressively removed and the existing basement backfilled to provide a level platform for piling works. Piles will be installed around the perimeter to support retained earth and to enable the reduced level dig. Internal columns will be supported on bored concrete piles within the basement footprint. Following installation of waterproofing, works can commence installingthebasementslab,columnsandbasementperimeterwalls, which will then support the Ground Floor Slab and superstructure. Vehiclescarryingdemolitionandexcavationmaterialsshallbesuitably sheeted to minimise dust being released. Additional measures such as water spraying may be deployed to reduce dust from site being blown around. Vehicle wheel / body washing facilities will be provided and used as required. STRUCTURAL FRAME The frame construction will be reinforced concrete with post- tensioned slabs. This technique minimises the quantity of concrete required and reduces the number of deliveries. The uppermost level will be constructed using a structural steel frame which can be pre- fabricated off-site to minimise installation time. ENVELOPE AND ROOF The installation of the external facade will be completed floor by floor moving up the building. The external envelope will be installed early in the programme to provide weatherproofing and so that internal fitout works will be able to proceed unhindered. The roof installation will be commenced as soon as the roof slab is complete. Prepared by BWB Consulting Construction Vehicles Access Routes - Main Site Construction Vehicles Access Routes - Site B Fig. 19. Structural zones Fig. 20. Street zones 12 CONSTRUCTION MANAGEMENT MARKETMEWS HERTFORDSTREET STANHOPE ROW No 36 HERTFORD STREET LISTED GRADE II BUILDING TO BE RETAINED AND REFURBISHED EXISTING BUILDINGS TO BE DEMOLISHED SITE BOUNDARY STRUCTURAL ZONES NOT TO SCALE MARKETMEWS HERTFORDSTREET STANHOPE ROW No 36 HERTFORD STREET LISTED GRADE II BUILDING TO BE RETAINED AND REFURBISHED EXISTING BUILDINGS TO BE DEMOLISHED SITE BOUNDARY STANHOPE ROW MARKETMEWS HERTFORDSTREET MOTORCYCLE PARKING BAYS VEHICLE LOADING / UNLOADING AREA CAR PARKING BAYS PAVEMENT CLOSURE / HOARDING AREA CAR PARKING BAYS Issues & Revisions Rev Date Details of issue / revision ww BWB Ref: Date: Drawn: Re Drawing Status Project - Originator - Zone - Level - Type - R PLMH-BWB-SGN-ZZ-D PRELIMINARY R Gokool LNS2157 ACCESS ZONES PARK LANE ME GENTING UK PL 06 P1 06.07.15 Preliminary Issue Notes 1. Do not scale this drawing. All dimensio on site. If in doubt ask. 2. This drawing is to be read in conjuncti engineers and specialists drawings an 3. All dimensions in millimetres unless no metres unless noted otherwise. 4. Any discrepancies noted on site are to immediately. Key Plan Legend STRUCTURAL ZONES NOT TO SCALE STREET ZONES NOT TO SCALE P2 07.07.15 Parking bay annotations rev
  • 13. PARK LANE MEWS HOTEL PROJECT GENTING ENVIRONMENTAL POLICY Genting is committed to proactively managing and minimising its environmental impact through the adoption of a corporate strategy. As a minimum, Genting will meet all legislative environmental targets and will endeavour to adopt best practice wherever practicable. We have always believed that it is the responsibility of the corporate and individual citizen to play their part and we want and will make every effort to ensure we protect our environment for our local communities and beyond and in doing so we can make a positive contribution to a sustainable future both locally and nationally The Park Lane Mews Hotel project aims to consider environmental issues and translate them into construction with the intention to provide an efficient building with minimal energy demand and low pollution levels. The aim is to provide facilities which support the needs of the current population, without hindering both the natural and existing built environment, for future populations. CLIMATE CHANGE The Proposed Development aims to achieve a reduction in CO2 emissions by enhancing the thermal performance of the building and by using low or zero carbon technologies wherever possible. POLLUTION Actions shall be implemented throughout construction to reduce the potential negative impacts on water, and air, to minimise disturbance to the surrounding areas. In addition, the design of the building shall be undertaken in a way which negates or reduces the impact of pollution during its operation. DESIGN The Proposed Development shall be designed in a manner which minimises the risk of crime. The site shall be designed securely and advice shall be sought from a Security Officer. This seeks to ensure a safe working environment and ensure that the site is safe and accessible. The layout of the site shall be designed to provide safe access for pedestrians and cyclists and cycle storage facilities shall be provided that are safe and secure. Delivery vehicles shall have dedicated access areas to avoid disruption to the local transport network. OPERATION AND MANAGEMENT It is inevitable that any new building, throughout both construction and occupation, will impact upon the existing natural and built environment. The development aims to control this impact through careful monitoring of energy and water consumption and waste production throughout both construction and operation phases. A management strategy shall be established at the handover of the development to ensure the correct operation and use of the building, so that it is used in the most effective and efficient manner. This strategy shall include training and walk-rounds, as well as the production of a non-technical user guide, alongside the technical manuals provided in accordance with the building regulations. The critical part of any low energy building is to see the occupier is fully cognisant with the means of controlling energy use. BREEAM BREEAM is the world’s leading and most widely used environmental assessment method for buildings. It sets the standard for best practice in sustainable design and has become the de facto measure used to describe a building’s environmental performance. The Proposed Development aims to use BREEAM to qualify it’s environmental and sustainable performance. • Credits are then awarded and added together to produce a single overall score. A rating is then achieved based on a scale of Pass, Good, Very Good, Excellent and Outstanding. BREEAM aims are to: • To mitigate the impacts of buildings on the environment; • To enable buildings to be recognised according to their environmental benefits; • To ensure best environmental practice is incorporated in buildings; The development aims to achieve BREEAM certification and a rating of Excellent, the equivalent to a score of 70 %. THE LONDON PLAN The London Plan is the overall strategic plan for London, setting out an integrated economic, environmental, transport and social framework for the development of London over the next 20–25 years. The London Plan establishes the framework for the development and use of land in London, linkinginimprovementstoinfrastructure;settingoutproposalsforimplementation,coordination and resourcing; and helping to ensure joined up policy delivery by the Greater London Authority Group of organisations. The London Plan promotes the principle that there should be equality of opportunity for all people, and to: • Reducing health inequality and promoting Londoners’ health • Climate change and the consequences of climate change • Achieving sustainable development in the United Kingdom The London Plan deals only with things of strategic importance to Greater London however Local councils are encouraged to follow the policies set out in the London Plan. BUILDING DESIGN The London Plan requirements utilise the strategy detailed in the Chartered Institution of Building Services Engineers’ Design Guide A, which details the ‘Fabric First’ approach to constructing intrinsically low energy buildings. The fabric first approach examines both the thermal energy use and the regulated electrical energy use, determining the optimum performance of the building fabric in combination with the electrical energy used to light the internal space and provide power for the mechanical systems controlling temperature and air quality within the building. Computational Fluid Dynamic (CFD) modelling software will be used as the design tool to determine the optimum thermal performance of the building, balancing heat losses, heat gains and indoor air quality with the construction of the building envelope and the extent of renewable technologies used. RENEWABLE TECHNOLOGIES Westminster City Council requires all major developments to maximise on-site renewable energy generation to achieve a 20% carbon emission reduction, via its policy S40. For the proposed development there are a number of strategies available to utilise such as: • Solar Thermal for domestic hot water production • Combined Heat and Power (CHP) systems • Photovoltaic Panels for electricity production One or more of these renewable energies shall be selected based on optimising the carbon emission reduction of the proposed development. Park Lane Mews Hotel - Thermal Simulation Model Sample Energy Performance Certificate / BREEAM 13 SUSTAINABILITY Prepared by Engineering Services Consultancy Ltd The fabric first approach examines both the thermal energy use and the regulated electrical energy use, determining the optimum performance of the building fabric in combination with the electrical energy used to light the internal space and provide power for the mechanical systems controlling temperature and air quality within the building. Computational Fluid Dynamic (CFD) modelling software will be used as the design tool to determine the optimum thermal performance of the building, balancing heat losses, heat gains and indoor air quality with the construction of the building envelope and the extent of renewable technologies used. R E N E W A B L E T E C H N O L O G I E S Westminster City Council requires all major developments to maximise on-site renewable energy generation to achieve a 20% carbon emission reduction, via its policy S40. For the proposed development there are a number of strategies available to utilise such as: • Solar Thermal for domestic hot water production • Combined Heat and Power (CHP) systems • Photovoltaic Panels for electricity production One or more of these renewable energies shall be selected based on optimising the carbon emission reduction of the proposed development. Baseline Building, built to exceed the requirements of Building Regulations, maximising the building envelope performance. Utilise systems to service the building which are highly energy efficient and which are controlled to suit the use pattern of the building. Consider the use of renewable energy equipment to generate some or all of the resulting energy demand of the building   Fig. 21. Indicative roof-mounted photovoltaic array Fig. 23.Indicative solar thermal collectors Fig. 22.Indicative semi-intensive green roof
  • 14. PARK LANE MEWS HOTEL PROJECT THANK YOU Thank you for attending this public exhibition. We hope that you have found this information useful. To summarise, these proposals will: • Provide a finely designed building that responds to the architectural character of the Mayfair. • Re-provide a high-quality hotel suitable for the requirements of the West End hotel trade. • Provide a well-managed entertainment use that is respectful of the residential nature of the area. • Improve the infrastructure of the hotel, ensuring it meets environmentally sustainable for years to come. NEXT STEPS: We will shortly be submitting a planning application to Westminster City Council to seek permission to redevelop the site. PROGRAMME: The timetable below sets out the anticipated key dates for the project: Summer 2015: Planning application submitted to Westminster City Council Winter 2015: Anticipated date for a planning decision Summer 2016: Construction work starts Winter 2018: Construction period complete Park Lane Mews Hotel & No. 36 Stanhope Row: View from Hertford Street As Proposed 14 THANK YOU FEEDBACK To ensure that we understand the views of the local community, we would be grateful if you could take a few moments to fill in a feedback form to let us know your thoughts. The feedback form can be completed and left with staff or sent back to us later using the FREEPOST address. CONTACT DETAILS If you have any further questions or would like more information, please contact us at: T: 020 3697 4385 E: parklanemewshotel@fourcommunications.com Westminster City Council will also consult residents, businesses and the local community as part of the application process. Westminster’s officers will collate all feedback received to form part of their report to the planning committee – any feedback given here will be passed to Westminster City Council as part of the application.