Contents
1. Rational of Study
2. Team Formulation
3. Team’s Objectives
4. Current Operation
5. Performance Measurement
6. Data Collection and Analysis, Interpretation
7. Recommendation for improvement
1. Rational of Study
Reporting system play roles to ensure the project result
orientation.
The trend of development in Cambodia has changed as
some of these have flowed to other countries which were
poorer than Cambodia.
With the limit fund for development, plenty of development
organisations in different countries have competed for fund to
develop in their countries.
To be eligible for fund, all organisations have oriented the
work quality results through many ways including reporting
system.
1. Rational of Study (Con’t)
 The reporting system helps staff including management
  level to manage their organisation better.
 The system is delivered through two main results.
   – Firstly, the system needs to provide the essential
     functionality to enable staff to easily and effectively
     perform their duties.
   – The second is to provide access to meaningful reports to
     make better organisation decisions.
1. Rational of Study (Con’t)
 With its main contribution in improving work quality in
  particular staff performance; the reporting system is
  prioritised to study. The topic is selected as the process as
  below:
    With three-year experiences with My Village Organisation in the
     position of Programme Manager, my roles and responsibilities
     focus on development management including policies, guideline
     including reporting system guideline.
    I have discussed with MVi staff in some level to discuss some topics
     for the assignments and prioritise them. The results of the
     discussion are that the reporting system is prioritised by staff for
     study.
    The secondary documents were reviewed and reflected with the real
     practices of staff in their work.
2. Team Formulation
a. Building team
Firstly, I have identified the staff members who are more
involved with reports in particular editing report.
Then I have discussed with them the importance of study
and my interested in the topics of reporting system for them.
With their available time, they volunteered to be members
of team to study the reporting system.
We, team members, defined objective of study and the roles
and responsibilities of the team were defined as mentioned in
section 4.
The methodologies of the study were discussed as
mentioned in section 5.
2. Team Formulation (Con’t)
b. Performing
 The team members have performed their roles and responsibilities
   above.
 Their roles and responsibilities are mentioned in the section 3.
 Their roles and responsibilities were framed from preparation, data
   collection, data analysis, study report writing, reflection and reflection.
c. Reflection and Evaluation
 The gathered data was reflected and reviewed to make sure that the
   data is accurate. This was coordinated by Provincial Programme
   Coordinate and Programme Managers.
2. Team Formulation (Con’t)
 The team members are responsible for different section in
  the study. The team designated consists of four members
  to study the process including
      Mr. Por Narith, Programme Manager
      Mr. My Baing, Stung Treng Programme Coordinator
      Mr. Kung Am, Mondulkiri Programme Coordinator
      Mr. Hok Sav, Kratie Senior Programme Officer
 The four staff members above have played main roles to
  coordinate team in program units in Stung Treng,
  Mondulkiri and Kratie provinces and they were also more
  involved with reporting in particular editing report and
  writing report with result orientation.
3. Team’s Objectives
•   The objectives of the team were defined as below
•   Discuss the study objectives.
•   Discuss the roles and responsibilities of team.
•   Discuss the study methodologies.
•   Discuss and develop the schedule.
•   Develop study materials including questionnaires.
•   Test questionnaires.
•   Review questionnaires.
•   Coordinate the questionnaires for staff.
•   Collect information from staff.
•   Review the information in questionnaires to make sure that it
    accurate.
•   Entry data in Excel.
•   Review the data.
•   Analyse data.
•   Write study report.
4. Current Operation
With the study of the team designated above, we have
designed the structures for the reporting system in the
organisation as below:
 
Report System Structure
Please link to Report System Structure

Types of Reports and Responsibilities
Please link to Types of Report and Responsibilities
5. Performance Measurement

 The indicators of qualities used to identify the appropriate
  performance measure included
    Time Measurement
    Quality and Satisfaction Measurement
    Profiling
    Economic Measurement
5. Performance Measurement (Con’t)
 The questions of performance indicators are detailed below.
    The questionnaires were developed by the study team with
     consultation with some staff.
    Then the questionnaires were tested with some staff to make sure that
     all the questions were applicable.
    The questions were sent to provincial programme coordinators for
     coordinating with team to complete the questionnaires.
    After completion, the questionnaires were collected by provincial
     programme coordinators and sent back study team.
    The information provided by staff was reviewed by study team.
    Unclear information was clarified with team on the phones because
     they were far from us. The final information was entered in excel and
     imported to SPSS for analysis and interpretation as the draft report.
     The draft study finding report was verified with team through sending
     via mail. The draft report was finalised and this was distributed for
     team. The recommendation from the report finding was discussed to
     take action to improve in next time.
5. Performance Measurement (Con’t)
 The information was gathered from all level of staff
  including
    Field staff
    Project supervisors
    Technical working team
    Indigenous people advisory groups
    Management team


   The questionnaires for data collection
   Please links to questionnaires
6. Data Collection and Analysis,
           Interpretation
 Time Measurement
Please link to Time Management
 Quality and Satisfaction Measurement
Please link to Quality and Satisfaction Measurement
 Profiling
Please link to Profiling Measurement
 Economic Measurement
Please link to Economic Measurement
7. Recommendation for improvement

 To improve the process, I would provide recommendations
  as the following:
    Review the forms of reports in order that they could not
      take more time for that.
    Review existing report system through consultation with
      staff with all level.
    Conduct orientation on reviewed report format
      guideline for staff in order that they could process
      correctly and smoothly to reduce their rework and
      maximize the economic effectiveness.
Thanks for Your Attention!!!

More Related Content

Viewers also liked

120717 group assigment on cambodida agriculture strategic plan por narith
120717 group assigment on cambodida agriculture strategic plan por narith120717 group assigment on cambodida agriculture strategic plan por narith
120717 group assigment on cambodida agriculture strategic plan por narithNarith Por
 
Is indian agriculture a policy disaster?
Is indian agriculture a policy disaster?Is indian agriculture a policy disaster?
Is indian agriculture a policy disaster?Nataraj Kp
 
Student management system project report c++
Student management system project report c++Student management system project report c++
Student management system project report c++Student
 
Thesis my documentation
Thesis  my documentationThesis  my documentation
Thesis my documentationcas123
 
Proposal format
Proposal formatProposal format
Proposal formatMr SMAK
 
Algorithm Designs - Control Structures
Algorithm Designs - Control StructuresAlgorithm Designs - Control Structures
Algorithm Designs - Control Structureshatredai
 
clinic database and software management system
clinic database and software management systemclinic database and software management system
clinic database and software management systemMujahed Ahmed
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal WritingTony
 
Library Management System
Library Management SystemLibrary Management System
Library Management SystemAditya Shah
 
Library mangement system project srs documentation.doc
Library mangement system project srs documentation.docLibrary mangement system project srs documentation.doc
Library mangement system project srs documentation.docjimmykhan
 

Viewers also liked (15)

120717 group assigment on cambodida agriculture strategic plan por narith
120717 group assigment on cambodida agriculture strategic plan por narith120717 group assigment on cambodida agriculture strategic plan por narith
120717 group assigment on cambodida agriculture strategic plan por narith
 
IGIDR-IFPRI - Indian Agriculture Issues and Challenges, Prof Mahendra Dev
IGIDR-IFPRI - Indian Agriculture Issues and Challenges, Prof Mahendra DevIGIDR-IFPRI - Indian Agriculture Issues and Challenges, Prof Mahendra Dev
IGIDR-IFPRI - Indian Agriculture Issues and Challenges, Prof Mahendra Dev
 
Is indian agriculture a policy disaster?
Is indian agriculture a policy disaster?Is indian agriculture a policy disaster?
Is indian agriculture a policy disaster?
 
Students report card for C++ project..
Students report card for C++ project..Students report card for C++ project..
Students report card for C++ project..
 
Student management system project report c++
Student management system project report c++Student management system project report c++
Student management system project report c++
 
Skill india
Skill indiaSkill india
Skill india
 
Algorithms
AlgorithmsAlgorithms
Algorithms
 
Labour in Indian Agriculture: A Growing Challenge
Labour in Indian Agriculture: A Growing ChallengeLabour in Indian Agriculture: A Growing Challenge
Labour in Indian Agriculture: A Growing Challenge
 
Thesis my documentation
Thesis  my documentationThesis  my documentation
Thesis my documentation
 
Proposal format
Proposal formatProposal format
Proposal format
 
Algorithm Designs - Control Structures
Algorithm Designs - Control StructuresAlgorithm Designs - Control Structures
Algorithm Designs - Control Structures
 
clinic database and software management system
clinic database and software management systemclinic database and software management system
clinic database and software management system
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 
Library Management System
Library Management SystemLibrary Management System
Library Management System
 
Library mangement system project srs documentation.doc
Library mangement system project srs documentation.docLibrary mangement system project srs documentation.doc
Library mangement system project srs documentation.doc
 

Similar to 120901 individial assigment on reporting system por narith

CIPD - Management Report Proposal (Final)
CIPD - Management Report Proposal (Final)CIPD - Management Report Proposal (Final)
CIPD - Management Report Proposal (Final)Niki Taylor
 
Training for Trainers course free sample
Training for Trainers course free sampleTraining for Trainers course free sample
Training for Trainers course free sampleReady to Train
 
2008 Pioneering The Employment Services Audit In The Ontario College Sector
2008 Pioneering The Employment Services Audit In The Ontario College Sector2008 Pioneering The Employment Services Audit In The Ontario College Sector
2008 Pioneering The Employment Services Audit In The Ontario College SectorNikhat Rasheed
 
Week 6 Class Assessment Implementation Plan for an HRD Learning Int.pdf
Week 6 Class Assessment Implementation Plan for an HRD Learning Int.pdfWeek 6 Class Assessment Implementation Plan for an HRD Learning Int.pdf
Week 6 Class Assessment Implementation Plan for an HRD Learning Int.pdfsales223546
 
Learning tool M4T4: Assesment and improving the program
Learning tool M4T4: Assesment and improving the programLearning tool M4T4: Assesment and improving the program
Learning tool M4T4: Assesment and improving the programTOTVET
 
uning ppt.pptx
uning ppt.pptxuning ppt.pptx
uning ppt.pptxMTKho
 
Organizational development
Organizational developmentOrganizational development
Organizational developmentRadhaDeosthalee
 
Presentation Strategy Team
Presentation   Strategy TeamPresentation   Strategy Team
Presentation Strategy TeamLoriann123
 
Presentation Strategy Team
Presentation   Strategy TeamPresentation   Strategy Team
Presentation Strategy TeamLoriann123
 
Please provide responses for the following questionsWeek 5 Conten.pdf
Please provide responses for the following questionsWeek 5 Conten.pdfPlease provide responses for the following questionsWeek 5 Conten.pdf
Please provide responses for the following questionsWeek 5 Conten.pdfrmwaterlife
 
Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises Moutasm Tamimi
 
Instructions and RubricBased upon class discussions, assigned
Instructions and RubricBased upon class discussions, assigned Instructions and RubricBased upon class discussions, assigned
Instructions and RubricBased upon class discussions, assigned LaticiaGrissomzz
 
Instructions and RubricBased upon class discussions, assigned
Instructions and RubricBased upon class discussions, assigned Instructions and RubricBased upon class discussions, assigned
Instructions and RubricBased upon class discussions, assigned TatianaMajor22
 
Human Resource Planning & Development (HRDP)
Human Resource Planning & Development (HRDP)Human Resource Planning & Development (HRDP)
Human Resource Planning & Development (HRDP)Manu Alias
 
Training Need Identification_A seminar
Training Need Identification_A seminarTraining Need Identification_A seminar
Training Need Identification_A seminarRakesh Kumar Sahoo
 
trainingneedassessment-140410234023-phpapp01.pptx
trainingneedassessment-140410234023-phpapp01.pptxtrainingneedassessment-140410234023-phpapp01.pptx
trainingneedassessment-140410234023-phpapp01.pptxsanthosh77
 

Similar to 120901 individial assigment on reporting system por narith (20)

CIPD - Management Report Proposal (Final)
CIPD - Management Report Proposal (Final)CIPD - Management Report Proposal (Final)
CIPD - Management Report Proposal (Final)
 
Training for Trainers course free sample
Training for Trainers course free sampleTraining for Trainers course free sample
Training for Trainers course free sample
 
2008 Pioneering The Employment Services Audit In The Ontario College Sector
2008 Pioneering The Employment Services Audit In The Ontario College Sector2008 Pioneering The Employment Services Audit In The Ontario College Sector
2008 Pioneering The Employment Services Audit In The Ontario College Sector
 
Week 6 Class Assessment Implementation Plan for an HRD Learning Int.pdf
Week 6 Class Assessment Implementation Plan for an HRD Learning Int.pdfWeek 6 Class Assessment Implementation Plan for an HRD Learning Int.pdf
Week 6 Class Assessment Implementation Plan for an HRD Learning Int.pdf
 
Learning tool M4T4: Assesment and improving the program
Learning tool M4T4: Assesment and improving the programLearning tool M4T4: Assesment and improving the program
Learning tool M4T4: Assesment and improving the program
 
uning ppt.pptx
uning ppt.pptxuning ppt.pptx
uning ppt.pptx
 
Organizational development
Organizational developmentOrganizational development
Organizational development
 
Presentation Strategy Team
Presentation   Strategy TeamPresentation   Strategy Team
Presentation Strategy Team
 
Presentation Strategy Team
Presentation   Strategy TeamPresentation   Strategy Team
Presentation Strategy Team
 
Class notes hrd
Class notes hrdClass notes hrd
Class notes hrd
 
Please provide responses for the following questionsWeek 5 Conten.pdf
Please provide responses for the following questionsWeek 5 Conten.pdfPlease provide responses for the following questionsWeek 5 Conten.pdf
Please provide responses for the following questionsWeek 5 Conten.pdf
 
Sip report
Sip reportSip report
Sip report
 
Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises Critical Success Factors along ERP life-cycle in Small medium enterprises
Critical Success Factors along ERP life-cycle in Small medium enterprises
 
Resume
ResumeResume
Resume
 
Instructions and RubricBased upon class discussions, assigned
Instructions and RubricBased upon class discussions, assigned Instructions and RubricBased upon class discussions, assigned
Instructions and RubricBased upon class discussions, assigned
 
Instructions and RubricBased upon class discussions, assigned
Instructions and RubricBased upon class discussions, assigned Instructions and RubricBased upon class discussions, assigned
Instructions and RubricBased upon class discussions, assigned
 
Human Resource Planning & Development (HRDP)
Human Resource Planning & Development (HRDP)Human Resource Planning & Development (HRDP)
Human Resource Planning & Development (HRDP)
 
Training Need Identification_A seminar
Training Need Identification_A seminarTraining Need Identification_A seminar
Training Need Identification_A seminar
 
Management by Objective MBO
Management by Objective MBOManagement by Objective MBO
Management by Objective MBO
 
trainingneedassessment-140410234023-phpapp01.pptx
trainingneedassessment-140410234023-phpapp01.pptxtrainingneedassessment-140410234023-phpapp01.pptx
trainingneedassessment-140410234023-phpapp01.pptx
 

More from Narith Por

Impact of communities' livelihood resulting from ls2 dam resettlement project
Impact of communities' livelihood resulting from ls2 dam resettlement projectImpact of communities' livelihood resulting from ls2 dam resettlement project
Impact of communities' livelihood resulting from ls2 dam resettlement projectNarith Por
 
Analysis of institutional capacity of national social protection policy frame...
Analysis of institutional capacity of national social protection policy frame...Analysis of institutional capacity of national social protection policy frame...
Analysis of institutional capacity of national social protection policy frame...Narith Por
 
Impacts of economic recession on cambodia garment industries
Impacts of economic recession on cambodia garment industriesImpacts of economic recession on cambodia garment industries
Impacts of economic recession on cambodia garment industriesNarith Por
 
Group assigment statistic group3
Group assigment statistic group3Group assigment statistic group3
Group assigment statistic group3Narith Por
 
Group 1 hkd case analysis
Group 1 hkd case analysisGroup 1 hkd case analysis
Group 1 hkd case analysisNarith Por
 
120417 group assigment on child labor and traficking updated
120417 group assigment on child labor and traficking updated120417 group assigment on child labor and traficking updated
120417 group assigment on child labor and traficking updatedNarith Por
 
Narith individual assignment on agriculture production
Narith individual assignment on agriculture productionNarith individual assignment on agriculture production
Narith individual assignment on agriculture productionNarith Por
 
Group i the world around us
Group i the world around usGroup i the world around us
Group i the world around usNarith Por
 

More from Narith Por (8)

Impact of communities' livelihood resulting from ls2 dam resettlement project
Impact of communities' livelihood resulting from ls2 dam resettlement projectImpact of communities' livelihood resulting from ls2 dam resettlement project
Impact of communities' livelihood resulting from ls2 dam resettlement project
 
Analysis of institutional capacity of national social protection policy frame...
Analysis of institutional capacity of national social protection policy frame...Analysis of institutional capacity of national social protection policy frame...
Analysis of institutional capacity of national social protection policy frame...
 
Impacts of economic recession on cambodia garment industries
Impacts of economic recession on cambodia garment industriesImpacts of economic recession on cambodia garment industries
Impacts of economic recession on cambodia garment industries
 
Group assigment statistic group3
Group assigment statistic group3Group assigment statistic group3
Group assigment statistic group3
 
Group 1 hkd case analysis
Group 1 hkd case analysisGroup 1 hkd case analysis
Group 1 hkd case analysis
 
120417 group assigment on child labor and traficking updated
120417 group assigment on child labor and traficking updated120417 group assigment on child labor and traficking updated
120417 group assigment on child labor and traficking updated
 
Narith individual assignment on agriculture production
Narith individual assignment on agriculture productionNarith individual assignment on agriculture production
Narith individual assignment on agriculture production
 
Group i the world around us
Group i the world around usGroup i the world around us
Group i the world around us
 

120901 individial assigment on reporting system por narith

  • 1. BUILD BRIGHT UNIVERSITY Stung Treng Campus, Cambodia MBA Program, Promotion I MVi Reporting System January to July 2012 Lectured by Pro Siv Vutthy Prepared by Por Narith, Student, STG BBU MBA
  • 2. Contents 1. Rational of Study 2. Team Formulation 3. Team’s Objectives 4. Current Operation 5. Performance Measurement 6. Data Collection and Analysis, Interpretation 7. Recommendation for improvement
  • 3. 1. Rational of Study Reporting system play roles to ensure the project result orientation. The trend of development in Cambodia has changed as some of these have flowed to other countries which were poorer than Cambodia. With the limit fund for development, plenty of development organisations in different countries have competed for fund to develop in their countries. To be eligible for fund, all organisations have oriented the work quality results through many ways including reporting system.
  • 4. 1. Rational of Study (Con’t)  The reporting system helps staff including management level to manage their organisation better.  The system is delivered through two main results. – Firstly, the system needs to provide the essential functionality to enable staff to easily and effectively perform their duties. – The second is to provide access to meaningful reports to make better organisation decisions.
  • 5. 1. Rational of Study (Con’t)  With its main contribution in improving work quality in particular staff performance; the reporting system is prioritised to study. The topic is selected as the process as below:  With three-year experiences with My Village Organisation in the position of Programme Manager, my roles and responsibilities focus on development management including policies, guideline including reporting system guideline.  I have discussed with MVi staff in some level to discuss some topics for the assignments and prioritise them. The results of the discussion are that the reporting system is prioritised by staff for study.  The secondary documents were reviewed and reflected with the real practices of staff in their work.
  • 6. 2. Team Formulation a. Building team Firstly, I have identified the staff members who are more involved with reports in particular editing report. Then I have discussed with them the importance of study and my interested in the topics of reporting system for them. With their available time, they volunteered to be members of team to study the reporting system. We, team members, defined objective of study and the roles and responsibilities of the team were defined as mentioned in section 4. The methodologies of the study were discussed as mentioned in section 5.
  • 7. 2. Team Formulation (Con’t) b. Performing  The team members have performed their roles and responsibilities above.  Their roles and responsibilities are mentioned in the section 3.  Their roles and responsibilities were framed from preparation, data collection, data analysis, study report writing, reflection and reflection. c. Reflection and Evaluation  The gathered data was reflected and reviewed to make sure that the data is accurate. This was coordinated by Provincial Programme Coordinate and Programme Managers.
  • 8. 2. Team Formulation (Con’t)  The team members are responsible for different section in the study. The team designated consists of four members to study the process including  Mr. Por Narith, Programme Manager  Mr. My Baing, Stung Treng Programme Coordinator  Mr. Kung Am, Mondulkiri Programme Coordinator  Mr. Hok Sav, Kratie Senior Programme Officer  The four staff members above have played main roles to coordinate team in program units in Stung Treng, Mondulkiri and Kratie provinces and they were also more involved with reporting in particular editing report and writing report with result orientation.
  • 9. 3. Team’s Objectives • The objectives of the team were defined as below • Discuss the study objectives. • Discuss the roles and responsibilities of team. • Discuss the study methodologies. • Discuss and develop the schedule. • Develop study materials including questionnaires. • Test questionnaires. • Review questionnaires. • Coordinate the questionnaires for staff. • Collect information from staff. • Review the information in questionnaires to make sure that it accurate. • Entry data in Excel. • Review the data. • Analyse data. • Write study report.
  • 10. 4. Current Operation With the study of the team designated above, we have designed the structures for the reporting system in the organisation as below:   Report System Structure Please link to Report System Structure Types of Reports and Responsibilities Please link to Types of Report and Responsibilities
  • 11. 5. Performance Measurement  The indicators of qualities used to identify the appropriate performance measure included  Time Measurement  Quality and Satisfaction Measurement  Profiling  Economic Measurement
  • 12. 5. Performance Measurement (Con’t)  The questions of performance indicators are detailed below.  The questionnaires were developed by the study team with consultation with some staff.  Then the questionnaires were tested with some staff to make sure that all the questions were applicable.  The questions were sent to provincial programme coordinators for coordinating with team to complete the questionnaires.  After completion, the questionnaires were collected by provincial programme coordinators and sent back study team.  The information provided by staff was reviewed by study team.  Unclear information was clarified with team on the phones because they were far from us. The final information was entered in excel and imported to SPSS for analysis and interpretation as the draft report. The draft study finding report was verified with team through sending via mail. The draft report was finalised and this was distributed for team. The recommendation from the report finding was discussed to take action to improve in next time.
  • 13. 5. Performance Measurement (Con’t)  The information was gathered from all level of staff including  Field staff  Project supervisors  Technical working team  Indigenous people advisory groups  Management team The questionnaires for data collection Please links to questionnaires
  • 14. 6. Data Collection and Analysis, Interpretation  Time Measurement Please link to Time Management  Quality and Satisfaction Measurement Please link to Quality and Satisfaction Measurement  Profiling Please link to Profiling Measurement  Economic Measurement Please link to Economic Measurement
  • 15. 7. Recommendation for improvement  To improve the process, I would provide recommendations as the following:  Review the forms of reports in order that they could not take more time for that.  Review existing report system through consultation with staff with all level.  Conduct orientation on reviewed report format guideline for staff in order that they could process correctly and smoothly to reduce their rework and maximize the economic effectiveness.
  • 16. Thanks for Your Attention!!!