In his 10-point Socioeconomic Agenda, President Rodrigo Duterte envisioned the reduction of poverty from 21.6% in 2015 to 13%-15% by 2022.
Among the reforms that will drive this Agenda is the acceleration of infrastructure and the development of industries that will yield robust growth across the archipelago, create jobs and uplift the lives of Filipinos.
Infrastructure is among the top priorities of this Administration with public spending on infrastructure projects targeted to reach 8-9 trillion pesos from 2017-2022.
4. The need for infrastructure
is one of the great Global
challenges of our time…
Failure to invest means
failure to grow and develop
our social and economic
fabric.
- KPMG
“
One of the biggest accounting
firms in the world.
5. For every
USD $1 Billion
spent on
infrastructure
200,000 direct jobs
are created.
International Labour Organization
Estimate for developing countries
6. A sustained increase in
public infrastructure
spending to 5% of GDP
would add a total of 5-6% to
GDP after 15 years.
International Monetary Fund
“
7. The Philippines has been lagging its Asian peers
in investment due to poor infrastructure, which
has been traced to government underspending on such projects.
“At 21.8 percent of GDP [gross domestic product]
in 2014, the investment rate in the Philippines is
well below regional peers, as reflected in its low capital stock and
infrastructure quality,” the IMF said in the report.
The Manila Times
SEPTEMBER 6, 2015
8. 3.2
2.2
2.2
2.2
1.9
2.9
5.4
0 1.5 3 4.5 6
INFRASTRUCTURE SPENDING
(% TO GDP)
AQUINO (6 Years)
DUTERTE YEAR 1
(2017 Budget)
Source: Philippine Institute for Development Studies
2017 National Expediture Program
ARROYO (9 Years)
ESTRADA (2 Years)
RAMOS (6 Years)
AQUINO (6 Years)
MARCOS (21 Years)
13. SANTA MONICA - LAWTON - BGC
LINK BRIDGE
Pwede nang dumiretso ng
BGC papuntang Ortigas.
Mababawasan ng 100,000
sasakyan sa EDSA
PHOTOS ARE FOR REFERENCE ONLY
14. UP - MIRIAM - ATENEO VIADUCT
80% decrease
in travel time
sa Katipunan at CP Garcia
PHOTOS ARE FOR REFERENCE ONLY
16. DAVAO CITY BYPASS
CONSTRUCTION PROJECT
Biyahe Mula sa Digos, Davao Del Sur
papuntang Panabo, Davao Del Norte na
dating 2 oras, ngayon, 45 mins na lang,
PHOTOS ARE FOR REFERENCE ONLY
17. NLEX-SLEX CONNECTOR ROAD
30 minutes na lang ang biyahe
papuntang Alabang hanggang
Balintawak
PHOTOS ARE FOR REFERENCE ONLY
20. METRO MANILA BUS RAPID TRAIN SYSTEM
Mabilis at siguradong
schedule ng bus sa EDSA at
mga malalaking kalye sa
Metro Manila.
21. MINDANAO RAILWAY
2 oras na lang mula Davao
hanggang Surigao at CDO. Mas
mura at di na mabubulok ang
pagkain at produkto.
PHOTOS ARE FOR REFERENCE ONLY
25. CLARK INTERNATIONAL AIRPORT
NEW TERMINAL BUILDING
Magkakaroon na ng ka-una unahang
world-class airport ang Pilipinas,
Mababawasan ang traffic at
congestion sa NAIA.
26. CLARK GREEN CITY
The first of many new cities.
Ang long-term na solusyon sa
kasikipan at traffic sa
Metro Manila ay narito na.
27. BGC to NAIA BUS RAPID TRANSIT (BRT) SYSTEM
Makakarating na sa NAIA sa
loob ng 15 mins galing
Fort Bonifacio—walang traffic,
walang delay.
28. SUBIC-CLARK CARGO RAILWAY PROJECT
Connection ng Subic port and
Clark Airport para mabawasan and
mga truck sa MM at mas mapamura
ang ibat ibang mga bilihin.
PHOTOS ARE FOR REFERENCE ONLY
29. STEP 1 6 months FEASIBILITY STUDY MOU
No cost to government no exclusivity. Philippines not bound to accept.
Under terms of the MOU:
• Study at no cost to Philippine Government.
• The Philippine Government is not bound to accept the Studies.
• Non-exclusivity of Parties to enter into other agreements for
development of similar projects.
STEP 2 1 month FINANCIAL DISCUSSION/NEGOTIATION Explore possible options on different financing schemes.
STEP 3 10-12 months DETAILED ENGINEERING DESIGN
STEP 4 1-2 months
CRAFTING OF TERMS OF REFERENCE
(TOR)
Crafting and approval of TOR.
STEP 5 1 month COMPETITIVE PUBLIC BIDDING
Based on Philippine procurement laws, rules, and regulations
(banned or blacklisted companies will not be qualified to participate.)
STEP 6 2 years
GROUND BREAKING AND
CONSTRUCTION
30. If we all work
together all of these
can happen in
3-5 Years
31.
32. 3% 5%
3%
52%
18%
19%
Sea Ports Airports
BRT & Other Transport Rail, Roads & Bridges
Others New Cities
120,000195,000
97,500
2,000,0
00
675,000
730,000
Sea Ports Airports
BRT & Other Transport Rail, Roads & Bridges
Others New Cities