SOIL MECHANICS AND
FOUNDATION ENGINEERING-II
(CE 311)
SAMPLERS AND SAMPLING
TECHNIQUES
 Generally Samples are collected from bore holes at depth
intervals of 1.5m and whenever there is change of soil type
observed.
 The SAMPLES obtained are varying in the degree of
DISTURBANCE they suffer in the process of sampling.
TYPES OF SOIL SAMPLES
 UNDISTURBED SAMPLES:
 In which care is taken to cause minimal disturbance to the
density, structure and water content of the soil.
 Obtained by carefully designed SAMPLERS.
 Can be tested in the LAB to determine both the physical and
engineering properties.
 DISTURBED SAMPLES:
 In which care is taken to ensure that at least the composition of
the soil remains unaltered.
 Obtained by more rugged but relatively crude.
 Can be used to determine mineralogy, grain size distribution and
Liquid Limit and Plastic Limits.
TYPES OF SOIL SAMPLES
(Contd.)
 DISTURBED NON-REPRESENTATIVE SAMPLES:
 These are not obtained by samplers but are recovered during
drilling operation.
 They give broad idea of the soil type but can not be used for
laboratory testing.
TYPE OF SOIL SAMPLERS
 PISTON SAMPLERS
 FOIL SAMPLERS
 OPEN DRIVE SAMPLERS
PISTON SAMPLERS
 thin-walled metal tubes which contain a piston at the tip
 pushed into the bottom of a borehole, with the piston
remaining at the surface of the soil while the tube slides past it
 Used for undisturbed samples from soft soils, but are difficult
to advance in sands and stiff clays, and can be damaged if
gravel is encountered
 Livingstone corer is a commonly used piston sampler
FOIL SAMPLERS
 Primarily used for sampling of
cohesive soils
 Uniquely adapted for sampling of
thinly stratified soil and for very soft
and semi-liquids soils which
frequently occur at harbour bottom
OPEN DRIVE SAMPLERS
 Called open drive because at the leading end, it is open and
soil enters through it.
 Cutting edge at leading end
 Pushing sampler into the ground displaces the soil of equal
volume of the metal of the sampler.
 Thicker the volume of metal, greater shall be the disturbance.
 Area Ratio (Ar) represents the ratio of soil volume that has to
be displaced to the sampled volume.
 The displacement of soil either in the sample or outside
 OUTSIDE DISTURBANCE is always better
Types of OPEN DRIVE Samplers
 THIN WALL SAMPLERS
 THICK WALL SAMPLERS
 COMPOSITE SAMPLERS
 SAMPLER WITH CORE CATCHER
THIN WALL SAMPLERS
 Made up of SEAMLES steel tube and cutting edge is and
integral part.
 Used when least disturbance needed i.e. undisturbed
samples are obtained
 Area ratio is 10%
 After sampling, the barrel is separated from the head
 Then both ends are dipped in molten wax
 Placed along length in the laboratory
 Cut along its length to give minimum disturbance
THICK WALL SAMPLERS
 Most Common type of samplers known as SPLIT SPOON
SAMPLER
 It splits into two halves longitudinally
 The soil sample obtained is DISTURBED but Representative
COMPOSIT SAMPLERS
 It is also thick wall sampler
 Its barrel is so shaped that a number of liners fit in it.
 After the sampling operation, the liners are pushed out of the
barrel; the soil remains in the barrel
 Samples obtained are DISTURBED Representative
IN-SITU FIELD TESTING
 PENETRATION TESTS
 Standard Penetration Test
 Static Cone Penetration Test
 GROUND WATER OBSERVATIONS
 PERMEABILITY TESTS
STANDARD PENETRATION TEST
(SPT)
 Split spoon sampler is driven by the impact of a hammer
under standardized test conditions
 We measure number of blows required to achieve a standard
amount of penetration.
 Sample obtained is UNDISTURBED
 Constant energy imparted by each blow is that of 650 N
weight falling freely from a height of 750 mm.
 The blow count (N) noted down
 Where N is number of blows required to push the split spoon
sampler from a penetration depth of 150 mm – 450 mm.
Factors affecting SPT N Values
 Efficiency of Mechanism
 Diameter of borehole
 The size of the rod to which split spoon sampler is attached
 Location of the water table
 etc.
 BUT the CODES OF PRACTICE do not give correction due
to above factors
Correction to the N-value
 As per the practice, the CODES give following TWO factors
for which correction in the N-values should be made.
 These are influence of DILATENCY and of OVERBURDEN
 OVERBURDEN CORRECTION:
 A soil have same c & f will exhibit
more strength if it is located deep
in the ground.
N´=CN Nobs
Correction to the N-value
 DILATENCY CORRECTION:
 In saturated condition, the impact load gives undrained
conditions and develops pore water pressure.
 In loose soil, N´ value < 15, positive pore pressure develops
thus effective stress decreases: NO CORRECTION IS
APPLIED
 In dense soil, N´ value >15, negative pore pressure develops
thus effective stress increases: CORRECTION IS APPLIED
𝑁´´ = 15 +
(𝑁´−15)
2
Problems
1. An SPT was conducted at a depth of 2m in a sand deposit
with a unit weight of 20kN/m3. The water table at this site
was 1m below ground level. The N value was observed to
be 5. What would be corrected N value?
2. At the site in Problem 1, the SPT conducted at 15m below
ground surface gives N observed as 21. What would be
the corrected N-value.
3. At a site the soil has a unit weight of 18 kN/m3 and the
water table is at a depth of 6m. The observed N-values at
the site were as follows:
Depth (m) 3 6 9 12 15
Nobs 9 8 17 19 25
Determine the magnitude and corrected N-values i.e. N“.
STATIC CONE PENETRATION
TEST (SCPT)
 MECHANICAL CONE
 ELECTRICAL CONE
Electrical Static Cone Penetration
Test (ESCPT)
 The consists of pushing a standard sized cone having
diameter of 35.6 mm with a taper angle 60° into the soil at a
rate of 10 to 20 mm/sec
 As cone penetrates into the ground, the cone tip resistance,
qC and the friction one the sleeve, fC is vey useful for the
design of foundations especially piles
Comparison of the SPT and ESCPT
PARAMETER SPT ESCPT
Nature of load Impact Static
Resistance Measured Dynamic Static
Frequency of measurement At intervals Continuous
Conducted in the Bore Hole Yes No
Affected by disturbance caused Yes No
Skill required to conduct test Low High
Utility of Data More for Shallow
Foundation
More for Deep
Foundation
Presenting Results of
Site Investigations
 FOUR PARTS:
1. The Project: Nature of Civil Engineering Work
2. Results of Site Investigation: Nature of the site, the soil
profile and the properties of the soil.
3. Possible Solution and Analysis: which describes
alternative solutions that you have considered and the
analysis you conducted to characterize merits of each
alternative.
4. Recommendations: which presents the solution you
propose with details of required design parameters.

More Related Content

Similar to 10570216.ppt

Geotechnical testign methods ii as
Geotechnical testign methods ii asGeotechnical testign methods ii as
Geotechnical testign methods ii as
ieqa zainol
 
GEOTECHNICAL-ENGINEERING-2 module 1 module 2 module 3
GEOTECHNICAL-ENGINEERING-2  module 1 module 2 module 3GEOTECHNICAL-ENGINEERING-2  module 1 module 2 module 3
GEOTECHNICAL-ENGINEERING-2 module 1 module 2 module 3
Akshayshinde504303
 
Presentation on type of sample and sampler in geotechnical engineering
Presentation on type of sample and sampler in geotechnical engineeringPresentation on type of sample and sampler in geotechnical engineering
Presentation on type of sample and sampler in geotechnical engineering
INDRANIL BANERJEE
 
Cpt by h.a.akbar
Cpt by h.a.akbarCpt by h.a.akbar
Cpt by h.a.akbar
RASULUET
 
TL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.pptTL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.ppt
AshokKumar561399
 
Ay 2020 2021 fe supply key
Ay 2020 2021 fe supply keyAy 2020 2021 fe supply key
Ay 2020 2021 fe supply key
PRASANTHI PETLURU
 
م.36-مبادرة#تواصل_تطوير-أ.د.محمد حسنين ربيع - إستكشاف التربة بالطرق المتقدمة
م.36-مبادرة#تواصل_تطوير-أ.د.محمد حسنين ربيع - إستكشاف التربة بالطرق المتقدمةم.36-مبادرة#تواصل_تطوير-أ.د.محمد حسنين ربيع - إستكشاف التربة بالطرق المتقدمة
م.36-مبادرة#تواصل_تطوير-أ.د.محمد حسنين ربيع - إستكشاف التربة بالطرق المتقدمة
Egyptian Engineers Association
 
Gte ii-readytoprint
Gte ii-readytoprintGte ii-readytoprint
Gte ii-readytoprint
jagadish108
 
GI MOD 3.pptx
GI MOD 3.pptxGI MOD 3.pptx
GI MOD 3.pptx
amruthas70
 
Standard Penetration Test
Standard Penetration TestStandard Penetration Test
Standard Penetration Test
INDRANIL BANERJEE
 
soilsampling-191108151522.pdf
soilsampling-191108151522.pdfsoilsampling-191108151522.pdf
soilsampling-191108151522.pdf
LyricCorner
 
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILDETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
Japtyesh Singh
 
Soil sampling
Soil samplingSoil sampling
Soil sampling
Deepankar Garg
 
Soil investigation jda_13_194
Soil investigation jda_13_194Soil investigation jda_13_194
Soil investigation jda_13_194
Ahmed Abbas
 
DETERMINATION OF SOIL RESISTANCES:
DETERMINATION OF SOIL RESISTANCES:DETERMINATION OF SOIL RESISTANCES:
DETERMINATION OF SOIL RESISTANCES:
MdAbdullahAlAslam
 
REAL==ENG15B00342Y_CVE308_END-OF -SEM-NEWTON WOLERU.docx
REAL==ENG15B00342Y_CVE308_END-OF -SEM-NEWTON WOLERU.docxREAL==ENG15B00342Y_CVE308_END-OF -SEM-NEWTON WOLERU.docx
REAL==ENG15B00342Y_CVE308_END-OF -SEM-NEWTON WOLERU.docx
nelziwalz
 
foundation engg group activity.pptx
foundation engg group activity.pptxfoundation engg group activity.pptx
foundation engg group activity.pptx
jeevikakp
 
ملزمة
ملزمةملزمة
ملزمة
Abdo Hussien Imam
 
==ENG15B00342Y_CVE309_END-OF -SEM-NEWTON WOLERU.pdf
==ENG15B00342Y_CVE309_END-OF -SEM-NEWTON WOLERU.pdf==ENG15B00342Y_CVE309_END-OF -SEM-NEWTON WOLERU.pdf
==ENG15B00342Y_CVE309_END-OF -SEM-NEWTON WOLERU.pdf
nelziwalz
 
Standard penetration test(spt)
Standard penetration test(spt)Standard penetration test(spt)
Standard penetration test(spt)
KHK karimi
 

Similar to 10570216.ppt (20)

Geotechnical testign methods ii as
Geotechnical testign methods ii asGeotechnical testign methods ii as
Geotechnical testign methods ii as
 
GEOTECHNICAL-ENGINEERING-2 module 1 module 2 module 3
GEOTECHNICAL-ENGINEERING-2  module 1 module 2 module 3GEOTECHNICAL-ENGINEERING-2  module 1 module 2 module 3
GEOTECHNICAL-ENGINEERING-2 module 1 module 2 module 3
 
Presentation on type of sample and sampler in geotechnical engineering
Presentation on type of sample and sampler in geotechnical engineeringPresentation on type of sample and sampler in geotechnical engineering
Presentation on type of sample and sampler in geotechnical engineering
 
Cpt by h.a.akbar
Cpt by h.a.akbarCpt by h.a.akbar
Cpt by h.a.akbar
 
TL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.pptTL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.ppt
 
Ay 2020 2021 fe supply key
Ay 2020 2021 fe supply keyAy 2020 2021 fe supply key
Ay 2020 2021 fe supply key
 
م.36-مبادرة#تواصل_تطوير-أ.د.محمد حسنين ربيع - إستكشاف التربة بالطرق المتقدمة
م.36-مبادرة#تواصل_تطوير-أ.د.محمد حسنين ربيع - إستكشاف التربة بالطرق المتقدمةم.36-مبادرة#تواصل_تطوير-أ.د.محمد حسنين ربيع - إستكشاف التربة بالطرق المتقدمة
م.36-مبادرة#تواصل_تطوير-أ.د.محمد حسنين ربيع - إستكشاف التربة بالطرق المتقدمة
 
Gte ii-readytoprint
Gte ii-readytoprintGte ii-readytoprint
Gte ii-readytoprint
 
GI MOD 3.pptx
GI MOD 3.pptxGI MOD 3.pptx
GI MOD 3.pptx
 
Standard Penetration Test
Standard Penetration TestStandard Penetration Test
Standard Penetration Test
 
soilsampling-191108151522.pdf
soilsampling-191108151522.pdfsoilsampling-191108151522.pdf
soilsampling-191108151522.pdf
 
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILDETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
 
Soil sampling
Soil samplingSoil sampling
Soil sampling
 
Soil investigation jda_13_194
Soil investigation jda_13_194Soil investigation jda_13_194
Soil investigation jda_13_194
 
DETERMINATION OF SOIL RESISTANCES:
DETERMINATION OF SOIL RESISTANCES:DETERMINATION OF SOIL RESISTANCES:
DETERMINATION OF SOIL RESISTANCES:
 
REAL==ENG15B00342Y_CVE308_END-OF -SEM-NEWTON WOLERU.docx
REAL==ENG15B00342Y_CVE308_END-OF -SEM-NEWTON WOLERU.docxREAL==ENG15B00342Y_CVE308_END-OF -SEM-NEWTON WOLERU.docx
REAL==ENG15B00342Y_CVE308_END-OF -SEM-NEWTON WOLERU.docx
 
foundation engg group activity.pptx
foundation engg group activity.pptxfoundation engg group activity.pptx
foundation engg group activity.pptx
 
ملزمة
ملزمةملزمة
ملزمة
 
==ENG15B00342Y_CVE309_END-OF -SEM-NEWTON WOLERU.pdf
==ENG15B00342Y_CVE309_END-OF -SEM-NEWTON WOLERU.pdf==ENG15B00342Y_CVE309_END-OF -SEM-NEWTON WOLERU.pdf
==ENG15B00342Y_CVE309_END-OF -SEM-NEWTON WOLERU.pdf
 
Standard penetration test(spt)
Standard penetration test(spt)Standard penetration test(spt)
Standard penetration test(spt)
 

More from pisal3

Ghhhhhhhhhhhhhhgghjjhjjjjhhhjjhhhhhhjjjhh
GhhhhhhhhhhhhhhgghjjhjjjjhhhjjhhhhhhjjjhhGhhhhhhhhhhhhhhgghjjhjjjjhhhjjhhhhhhjjjhh
Ghhhhhhhhhhhhhhgghjjhjjjjhhhjjhhhhhhjjjhh
pisal3
 
5sdfdgfdgfdgdrfdgrreteteersfsfsfsdfs8.pdf
5sdfdgfdgfdgdrfdgrreteteersfsfsfsdfs8.pdf5sdfdgfdgfdgdrfdgrreteteersfsfsfsdfs8.pdf
5sdfdgfdgfdgdrfdgrreteteersfsfsfsdfs8.pdf
pisal3
 
Assessment for Project Management.pdf
Assessment for Project Management.pdfAssessment for Project Management.pdf
Assessment for Project Management.pdf
pisal3
 
15017542.ppt
15017542.ppt15017542.ppt
15017542.ppt
pisal3
 
6232942.ppt
6232942.ppt6232942.ppt
6232942.ppt
pisal3
 
781314.ppt
781314.ppt781314.ppt
781314.ppt
pisal3
 
Essential Lean Construction Tools1.pptx
Essential Lean Construction Tools1.pptxEssential Lean Construction Tools1.pptx
Essential Lean Construction Tools1.pptx
pisal3
 
ceilingppt-230529084904-79af4fca.pdf
ceilingppt-230529084904-79af4fca.pdfceilingppt-230529084904-79af4fca.pdf
ceilingppt-230529084904-79af4fca.pdf
pisal3
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
pisal3
 
5829416.ppt
5829416.ppt5829416.ppt
5829416.ppt
pisal3
 
6165090.ppt
6165090.ppt6165090.ppt
6165090.ppt
pisal3
 
conman14.ppt
conman14.pptconman14.ppt
conman14.ppt
pisal3
 
Process_Management_in_Design_and_Constru.pdf
Process_Management_in_Design_and_Constru.pdfProcess_Management_in_Design_and_Constru.pdf
Process_Management_in_Design_and_Constru.pdf
pisal3
 
sdf.ppt
sdf.pptsdf.ppt
sdf.ppt
pisal3
 
dsds.ppt
dsds.pptdsds.ppt
dsds.ppt
pisal3
 
kh_science_formative_assessment_final_opt_customized.pdf
kh_science_formative_assessment_final_opt_customized.pdfkh_science_formative_assessment_final_opt_customized.pdf
kh_science_formative_assessment_final_opt_customized.pdf
pisal3
 
Leadership Skills
Leadership SkillsLeadership Skills
Leadership Skills
pisal3
 
dfgd
dfgddfgd
dfgd
pisal3
 
sdfsd.pdf
sdfsd.pdfsdfsd.pdf
sdfsd.pdf
pisal3
 
Cambodia transport-assessment-strategy-road-map
Cambodia transport-assessment-strategy-road-mapCambodia transport-assessment-strategy-road-map
Cambodia transport-assessment-strategy-road-map
pisal3
 

More from pisal3 (20)

Ghhhhhhhhhhhhhhgghjjhjjjjhhhjjhhhhhhjjjhh
GhhhhhhhhhhhhhhgghjjhjjjjhhhjjhhhhhhjjjhhGhhhhhhhhhhhhhhgghjjhjjjjhhhjjhhhhhhjjjhh
Ghhhhhhhhhhhhhhgghjjhjjjjhhhjjhhhhhhjjjhh
 
5sdfdgfdgfdgdrfdgrreteteersfsfsfsdfs8.pdf
5sdfdgfdgfdgdrfdgrreteteersfsfsfsdfs8.pdf5sdfdgfdgfdgdrfdgrreteteersfsfsfsdfs8.pdf
5sdfdgfdgfdgdrfdgrreteteersfsfsfsdfs8.pdf
 
Assessment for Project Management.pdf
Assessment for Project Management.pdfAssessment for Project Management.pdf
Assessment for Project Management.pdf
 
15017542.ppt
15017542.ppt15017542.ppt
15017542.ppt
 
6232942.ppt
6232942.ppt6232942.ppt
6232942.ppt
 
781314.ppt
781314.ppt781314.ppt
781314.ppt
 
Essential Lean Construction Tools1.pptx
Essential Lean Construction Tools1.pptxEssential Lean Construction Tools1.pptx
Essential Lean Construction Tools1.pptx
 
ceilingppt-230529084904-79af4fca.pdf
ceilingppt-230529084904-79af4fca.pdfceilingppt-230529084904-79af4fca.pdf
ceilingppt-230529084904-79af4fca.pdf
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
5829416.ppt
5829416.ppt5829416.ppt
5829416.ppt
 
6165090.ppt
6165090.ppt6165090.ppt
6165090.ppt
 
conman14.ppt
conman14.pptconman14.ppt
conman14.ppt
 
Process_Management_in_Design_and_Constru.pdf
Process_Management_in_Design_and_Constru.pdfProcess_Management_in_Design_and_Constru.pdf
Process_Management_in_Design_and_Constru.pdf
 
sdf.ppt
sdf.pptsdf.ppt
sdf.ppt
 
dsds.ppt
dsds.pptdsds.ppt
dsds.ppt
 
kh_science_formative_assessment_final_opt_customized.pdf
kh_science_formative_assessment_final_opt_customized.pdfkh_science_formative_assessment_final_opt_customized.pdf
kh_science_formative_assessment_final_opt_customized.pdf
 
Leadership Skills
Leadership SkillsLeadership Skills
Leadership Skills
 
dfgd
dfgddfgd
dfgd
 
sdfsd.pdf
sdfsd.pdfsdfsd.pdf
sdfsd.pdf
 
Cambodia transport-assessment-strategy-road-map
Cambodia transport-assessment-strategy-road-mapCambodia transport-assessment-strategy-road-map
Cambodia transport-assessment-strategy-road-map
 

Recently uploaded

The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
heathfieldcps1
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
MysoreMuleSoftMeetup
 
Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
danielkiash986
 
Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
Iris Thiele Isip-Tan
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
haiqairshad
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
RamseyBerglund
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
Nguyen Thanh Tu Collection
 
Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)
nitinpv4ai
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
PsychoTech Services
 
MDP on air pollution of class 8 year 2024-2025
MDP on air pollution of class 8 year 2024-2025MDP on air pollution of class 8 year 2024-2025
MDP on air pollution of class 8 year 2024-2025
khuleseema60
 
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
ImMuslim
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
deepaannamalai16
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
Skimbleshanks-The-Railway-Cat by T S Eliot
Skimbleshanks-The-Railway-Cat by T S EliotSkimbleshanks-The-Railway-Cat by T S Eliot
Skimbleshanks-The-Railway-Cat by T S Eliot
nitinpv4ai
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
nitinpv4ai
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
zuzanka
 
skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)
Mohammad Al-Dhahabi
 

Recently uploaded (20)

The basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptxThe basics of sentences session 7pptx.pptx
The basics of sentences session 7pptx.pptx
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47Mule event processing models | MuleSoft Mysore Meetup #47
Mule event processing models | MuleSoft Mysore Meetup #47
 
Pharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brubPharmaceutics Pharmaceuticals best of brub
Pharmaceutics Pharmaceuticals best of brub
 
Educational Technology in the Health Sciences
Educational Technology in the Health SciencesEducational Technology in the Health Sciences
Educational Technology in the Health Sciences
 
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skillsspot a liar (Haiqa 146).pptx Technical writhing and presentation skills
spot a liar (Haiqa 146).pptx Technical writhing and presentation skills
 
Electric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger HuntElectric Fetus - Record Store Scavenger Hunt
Electric Fetus - Record Store Scavenger Hunt
 
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
BÀI TẬP DẠY THÊM TIẾNG ANH LỚP 7 CẢ NĂM FRIENDS PLUS SÁCH CHÂN TRỜI SÁNG TẠO ...
 
Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)Oliver Asks for More by Charles Dickens (9)
Oliver Asks for More by Charles Dickens (9)
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
 
MDP on air pollution of class 8 year 2024-2025
MDP on air pollution of class 8 year 2024-2025MDP on air pollution of class 8 year 2024-2025
MDP on air pollution of class 8 year 2024-2025
 
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
Geography as a Discipline Chapter 1 __ Class 11 Geography NCERT _ Class Notes...
 
HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.HYPERTENSION - SLIDE SHARE PRESENTATION.
HYPERTENSION - SLIDE SHARE PRESENTATION.
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
Skimbleshanks-The-Railway-Cat by T S Eliot
Skimbleshanks-The-Railway-Cat by T S EliotSkimbleshanks-The-Railway-Cat by T S Eliot
Skimbleshanks-The-Railway-Cat by T S Eliot
 
Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10Haunted Houses by H W Longfellow for class 10
Haunted Houses by H W Longfellow for class 10
 
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptxRESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
RESULTS OF THE EVALUATION QUESTIONNAIRE.pptx
 
skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)skeleton System.pdf (skeleton system wow)
skeleton System.pdf (skeleton system wow)
 

10570216.ppt

  • 1. SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
  • 2. SAMPLERS AND SAMPLING TECHNIQUES  Generally Samples are collected from bore holes at depth intervals of 1.5m and whenever there is change of soil type observed.  The SAMPLES obtained are varying in the degree of DISTURBANCE they suffer in the process of sampling.
  • 3. TYPES OF SOIL SAMPLES  UNDISTURBED SAMPLES:  In which care is taken to cause minimal disturbance to the density, structure and water content of the soil.  Obtained by carefully designed SAMPLERS.  Can be tested in the LAB to determine both the physical and engineering properties.  DISTURBED SAMPLES:  In which care is taken to ensure that at least the composition of the soil remains unaltered.  Obtained by more rugged but relatively crude.  Can be used to determine mineralogy, grain size distribution and Liquid Limit and Plastic Limits.
  • 4. TYPES OF SOIL SAMPLES (Contd.)  DISTURBED NON-REPRESENTATIVE SAMPLES:  These are not obtained by samplers but are recovered during drilling operation.  They give broad idea of the soil type but can not be used for laboratory testing.
  • 5. TYPE OF SOIL SAMPLERS  PISTON SAMPLERS  FOIL SAMPLERS  OPEN DRIVE SAMPLERS
  • 6. PISTON SAMPLERS  thin-walled metal tubes which contain a piston at the tip  pushed into the bottom of a borehole, with the piston remaining at the surface of the soil while the tube slides past it  Used for undisturbed samples from soft soils, but are difficult to advance in sands and stiff clays, and can be damaged if gravel is encountered  Livingstone corer is a commonly used piston sampler
  • 7. FOIL SAMPLERS  Primarily used for sampling of cohesive soils  Uniquely adapted for sampling of thinly stratified soil and for very soft and semi-liquids soils which frequently occur at harbour bottom
  • 8. OPEN DRIVE SAMPLERS  Called open drive because at the leading end, it is open and soil enters through it.  Cutting edge at leading end  Pushing sampler into the ground displaces the soil of equal volume of the metal of the sampler.  Thicker the volume of metal, greater shall be the disturbance.  Area Ratio (Ar) represents the ratio of soil volume that has to be displaced to the sampled volume.  The displacement of soil either in the sample or outside  OUTSIDE DISTURBANCE is always better
  • 9. Types of OPEN DRIVE Samplers  THIN WALL SAMPLERS  THICK WALL SAMPLERS  COMPOSITE SAMPLERS  SAMPLER WITH CORE CATCHER
  • 10. THIN WALL SAMPLERS  Made up of SEAMLES steel tube and cutting edge is and integral part.  Used when least disturbance needed i.e. undisturbed samples are obtained  Area ratio is 10%  After sampling, the barrel is separated from the head  Then both ends are dipped in molten wax  Placed along length in the laboratory  Cut along its length to give minimum disturbance
  • 11. THICK WALL SAMPLERS  Most Common type of samplers known as SPLIT SPOON SAMPLER  It splits into two halves longitudinally  The soil sample obtained is DISTURBED but Representative
  • 12. COMPOSIT SAMPLERS  It is also thick wall sampler  Its barrel is so shaped that a number of liners fit in it.  After the sampling operation, the liners are pushed out of the barrel; the soil remains in the barrel  Samples obtained are DISTURBED Representative
  • 13. IN-SITU FIELD TESTING  PENETRATION TESTS  Standard Penetration Test  Static Cone Penetration Test  GROUND WATER OBSERVATIONS  PERMEABILITY TESTS
  • 14. STANDARD PENETRATION TEST (SPT)  Split spoon sampler is driven by the impact of a hammer under standardized test conditions  We measure number of blows required to achieve a standard amount of penetration.  Sample obtained is UNDISTURBED  Constant energy imparted by each blow is that of 650 N weight falling freely from a height of 750 mm.  The blow count (N) noted down  Where N is number of blows required to push the split spoon sampler from a penetration depth of 150 mm – 450 mm.
  • 15. Factors affecting SPT N Values  Efficiency of Mechanism  Diameter of borehole  The size of the rod to which split spoon sampler is attached  Location of the water table  etc.  BUT the CODES OF PRACTICE do not give correction due to above factors
  • 16. Correction to the N-value  As per the practice, the CODES give following TWO factors for which correction in the N-values should be made.  These are influence of DILATENCY and of OVERBURDEN  OVERBURDEN CORRECTION:  A soil have same c & f will exhibit more strength if it is located deep in the ground. N´=CN Nobs
  • 17. Correction to the N-value  DILATENCY CORRECTION:  In saturated condition, the impact load gives undrained conditions and develops pore water pressure.  In loose soil, N´ value < 15, positive pore pressure develops thus effective stress decreases: NO CORRECTION IS APPLIED  In dense soil, N´ value >15, negative pore pressure develops thus effective stress increases: CORRECTION IS APPLIED 𝑁´´ = 15 + (𝑁´−15) 2
  • 18. Problems 1. An SPT was conducted at a depth of 2m in a sand deposit with a unit weight of 20kN/m3. The water table at this site was 1m below ground level. The N value was observed to be 5. What would be corrected N value? 2. At the site in Problem 1, the SPT conducted at 15m below ground surface gives N observed as 21. What would be the corrected N-value. 3. At a site the soil has a unit weight of 18 kN/m3 and the water table is at a depth of 6m. The observed N-values at the site were as follows: Depth (m) 3 6 9 12 15 Nobs 9 8 17 19 25 Determine the magnitude and corrected N-values i.e. N“.
  • 19. STATIC CONE PENETRATION TEST (SCPT)  MECHANICAL CONE  ELECTRICAL CONE
  • 20. Electrical Static Cone Penetration Test (ESCPT)  The consists of pushing a standard sized cone having diameter of 35.6 mm with a taper angle 60° into the soil at a rate of 10 to 20 mm/sec  As cone penetrates into the ground, the cone tip resistance, qC and the friction one the sleeve, fC is vey useful for the design of foundations especially piles
  • 21. Comparison of the SPT and ESCPT PARAMETER SPT ESCPT Nature of load Impact Static Resistance Measured Dynamic Static Frequency of measurement At intervals Continuous Conducted in the Bore Hole Yes No Affected by disturbance caused Yes No Skill required to conduct test Low High Utility of Data More for Shallow Foundation More for Deep Foundation
  • 22. Presenting Results of Site Investigations  FOUR PARTS: 1. The Project: Nature of Civil Engineering Work 2. Results of Site Investigation: Nature of the site, the soil profile and the properties of the soil. 3. Possible Solution and Analysis: which describes alternative solutions that you have considered and the analysis you conducted to characterize merits of each alternative. 4. Recommendations: which presents the solution you propose with details of required design parameters.