Functions (Scope) of HRM
1.Staffing
•Personnel Planning
•Job Analysis
•Recruitment
•Selection
Functions
Functions
of HRM
of HRM
5.Employee
& Labor
Relations
4.Safety &
Health
3.Compensation
& Benefits
2.Human
Resource
Development
3
1. Staffing
 Process through which an organization ensures that it
always has the proper number of employees with the
appropriate skills in the right jobs at the right time to
achieve the organization’s objectives.
 It includes
• Personnel planning
• Job Analysis
• Recruitment
• Selection
4
1996 Croatia USAF CT-43 crash
 On April 3, 1996, a United
States Air Force CT-43 crashed
in Croatia while on an official
trade mission. The aircraft was
carrying United States
Secretary of Commerce Ron
Brown and 35 other people
(including 16 corporate
executives).
5
The September 11 attacks
 Often referred to as September 11th or
9/11were a series of coordinated suicide
attacks on the United States on
September 11, 2001. On that morning,
19 terrorists hijacked four commercial
passenger jet airliners.
 The death toll of the attacks was 2,996,
including the 19 hijackers with more
then 6000 injuries.
 The hijackers intentionally crashed two
of the airliners into the Twin Towers of
the World Trade Center in New York
City, killing everyone on board and
many others working in the buildings.
6
Succession Planning
 The process for identifying and developing people
with the potential to fill key positions in the
company once the position is vacant. Succession
planning increases the availability of experienced
and capable employees that are prepared to assume
these roles as they become available.
7
Difference Between "Job" And "Position"
 Job - Consists of a group of tasks that must be
performed for an organization to achieve its goals
 Position - Collection of tasks and responsibilities
performed by one person; there is a position for
every individual in an organization.
(As per Mondy
Noe)
Job – A job is a pattern of tasks, duties and
responsibilities that can be done by a person
(Keith Devis)
8
 Strategic Planning- is the process by which top
management determines overall organizational
purposes and objectives and how they are to be
achieved.
 HR Planning- The process of systematically
reviewing HR requirements to determine & ensure
that required number of employees, with the
required skills, are available when they are needed.
 Succession Planning- Ensuring that a qualified
person is available to assume a managerial position
once the position is vacant usually with the help of
replacement chart.
9
Human Resource Planning Process
External Environment
Internal Environment
Strategic Planning
Human Resource Planning
Forecasting
Human
Resource
Requirements
Comparing
Requirements
and Availability
Forecasting
Human Resource
Availability
Surplus of
Workers
Demand =
No Action Restricted Hiring,
Reduced Hours,
Early Retirement,
Layoff, Downsizing
Shortage of
Workers
Recruitment
Selection
10

Statistical approaches
1. Ratio analysis
2. Regression analysis

Judgmental methods
Demand Forecasting
11
Patients: Doctors = 4:1
Number of Patients = 100
Number of Doctors = 25
Ratio analysis
If there are 400 patients, how many Doctors
are needed?
12
# Employees
# Customers
50 100 150
75
50
25
0
Regression analysis
13
The Relationship of Sales Volume to Number of
Employees
Number of
Employees
500
400
300
200
100
0 10 20 30 40 50 60
Sales (thousands)
14
Job Analysis
 Job Analysis – Job analysis is a systematic
process of determining the skills, duties and
human characteristics required for performing
specific job in organization. In job analysis
information about jobs are systematically
collected, evaluated & organized.
 Job description – document providing information
regarding tasks, duties, and responsibilities of job
 Job specification – minimum qualifications to
perform a particular job
15
Job Analysis: A Basic Human Resource
Management Tool
Tasks Responsibilities Duties
Job
Analysis
Job
Descriptions
Job
Specifications
Knowledge Skills Abilities
Human Resource
Planning
Recruitment
Selection
Training and
Development
Performance
Appraisal
Compensation and
Benefits
Safety and Health
Employee and Labor
Relations
Legal Considerations
16
Job Description- a written statement that
explains tasks, duties, working conditions,
responsibilities & other aspects of a specified
job
 Job Title
 Location
 Duties
 Machines, Tools,
Equipments, Materials
used.
 Supervision given or
received
 Job Grade / Pay Scale
 Employment Status
 Hazard
 Date
 Job Summary
17
Sample Job
Description
18
19
Job Descriptions Contents
Job
Identification
Job
Summary
Responsibilities
and Duties
Authority
Standards of
Performance
Working
Conditions
Job
Specifications
Sections of a
Typical Job
Description
20
The Job Description Sections
 Job identification
Job title: name of job
Grade/ status
Preparation date: when the description was written
Prepared by: who wrote the description
 Job summary
Describes the general nature of the job
Lists the major functions or activities
21
 Relationships (chain of command)
Reports to: employee’s immediate supervisor
Supervises: employees that the job incumbent directly
supervises
Works with: others with whom the job holder will be
expected to work and come into contact with internally.
Outside the company: others with whom the job holder is
expected to work and come into contact with externally.
22
 Responsibilities and duties
A listing of the job’s major responsibilities and duties (essential functions)
Defines limits of jobholder’s decision-making authority, direct
supervision, and budgetary limitations.
 Standards of performance and working conditions
Lists the standards the employee is expected to achieve under each of the
job description’s main duties and responsibilities.
 Job Specification
 Authority
23
Job Specification- a written statement that
explains human characteristics needed to
perform the job.
 Education
 Experience
 Training
 Physical & Mental Status
 Communication Skills
 Languages
 Physical Skills
 Personality Traits
24
Sample
Job Specification-
25
Purposes of Job Analysis
 What physical and mental tasks does the worker
accomplish?
 When does the job have to be completed?
 Where is the job to be accomplished?
 How does the worker do the job?
 Why is the job done?
 What qualifications are needed to perform the job?
26
Reasons For Conducting Job Analysis
 Staffing- lacking up-to-date job analysis, a firm would have
to select employees for the job without having clear
guidelines.
 Training & Development- Incompatibility between job
requirement & employee can b met by T&D.
 Compensation and Benefits- The relative value of a
particular job to the company must be known before a
monetary value can be placed on it.
 Safety and Health- Information derived from job analysis is
also valuable in identifying safety and health considerations.
 Employee and Labor Relations- Job analysis provides a
standard for promotion, transfer, demotion.
 Legal Considerations- Job analysis data is used to defend
matters involving legal obligations.
27
Occasions For Job Analysis
 When the organization is founded
 When new jobs are created
 When jobs are changed significantly as a result
of new technologies, methods, procedures, or
systems
 Job Morphing- Readjusting skills to match the job requirements or
changing of a present job to a new one. like if your working in a
construction site as a an electrician, then you'll do the plumbing just to
make the work faster . any work you're capable of doing which is not
you're usual routine.
28
Job Analysis Methods
 Questionnaires
 Observation
 Interviews
 Employee recording
 Analyzing jobs of rival organizations
 Combination of methods
29
Methods of Collecting Job Analysis
Information: The Interview
 Information Sources
 Individual employees
 Groups of employees
 Supervisors with knowledge of the
job
 Advantages
 Quick, direct way to find
overlooked information
 Disadvantages
 Distorted information
 Interview Formats
 Structured (Checklist)
 Unstructured
30
Questionnaires
 Information Source
 Employees fill out
questionnaires to
describe their job-related
duties and responsibilities
 Questionnaire Formats
 Structured checklists
 Open-ended questions
 Advantages
 Quick and efficient way to
gather information from
large numbers of
employees
 Disadvantages
 Expense and time
consumed in preparing and
testing the questionnaire
31
Observation
 Information Source
 Observing and noting
the physical activities
of employees as they
go about their jobs
 Advantages
 Provides first-hand information
 Reduces distortion of information
 Disadvantages
 Time consuming
 Difficulty in capturing entire job
cycle
 Of little use if job involves a high
level of mental activity
32
Participant Diary/Logs
 Information Source
 Workers keep a
chronological diary/
log of what they do
and the time spent on
each activity
 Advantages
 Produces a more complete
picture of the job
 Employee participation
 Disadvantages
 Distortion of information
 Depends upon employees to
accurately recall their
activities
33
People Who Participate in Job
Analysis Should Include
(at a minimum)
 Employee
 Employee’s immediate supervisor
 Job analyst
 Consultants
34
JOB DESIGN- Process of determining the
specific tasks to be performed, the
methods used in performing these tasks,
and how the job relates to other work in
the organization in order to increase
productivity & employees satisfaction.
Or else
 Lower productivity
 Employees Turnover
 Absenteeism
 Resignations
 Employees dissatisfaction
 Sabotage
 Unionization
 Complaint
35
 Job Design is Work arrangement (or rearrangement)
aimed at reducing or overcoming job dissatisfaction
and employee alienation arising from repetitive
tasks. Through job design, organizations try to raise
productivity levels by offering non-monetary
rewards such as greater satisfaction from a sense of
personal achievement in meeting the increased
challenge and responsibility of one's work. Job
enlargement, job enrichment, job rotation are the
various techniques used in a job design exercise.
36
 There are two basics ways in which work is organized. The first is related to the flow
of authority and is known as organization structure. The second relates to flow of
work itself from one operation to another and is known as procedure.
 The job design is about designing or re-designing a new job profile and setting the
correct organizational structure.
 The job design is about using several theoretical approaches to bring the balance
between creative and routine part of the job.
 The job design is done as the organization needs to keep the number of employees at
the affordable costs.
 The correct job design can bring the elimination of many process steps and it can help
the organization to react quicker to the requests of the customers.
 The job analysis is about the analysis of the current jobs and it is can be used as the
input to the job design.
Difference between Job Analysis and Job Design
37
Elements of Job Design
1. Organizational Elements (Efficiency)
 Mechanistic Approach- Involves
identifying every task of a job so that task
can be arranged & grouped into a job.
Results Specialization & shortens Job
Cycle.
 Work flow- Sequence & balance between
jobs.
 Work Practices- Set ways of performing
work.
 Ergonomics- Study of how human beings
physically interface with equipments.
38
2. Environmental Elements
 Employee abilities & Availability
 Social & Cultural Expectations
3. Behavioral Elements.
 Autonomy
 Variety
 Task Identity- Extent to which a job involves doing a complete
from beginning to end and identifiable piece of work with a visible
outcome, as opposed to doing only a portion of the job. Task
identity is an important component of job satisfaction.
 Task Significance- Extent to which an identifiable piece of work
affects, or is important to, others within or outside the organization.
An employee's knowledge of other people's dependence on the
work he or she is doing is an important factor in his or her job
satisfaction.
 Feedback
39
Organizational
Elements
Environmental
Elements
Behavioral
Elements
Job
Design
Productivity &
Satisfying
Jobs
Feedback
Input
Transformation
Process
Desired
Outputs
The Job design Input-output Framework
40
Job Analysis in a “Jobless” World
From Specialized to Enlarged Jobs
Techniques of Job Redesign /Dejobbing
 Job enlargement “adds more things to do”
Assigning workers additional same level
activities, thus increasing the number of activities
they perform. (Horizontal loading)
 Job enrichment “adds more responsibility”
Redesigning jobs in a way that increases the
opportunities for the worker to experience
feelings of responsibility, achievement, growth,
and recognition. (Vertical loading)
41
 Job rotation
Moving an employee from department to department to
broaden his or her experience and identify strong and
weak points to prepare the person for an enhanced role
with the company
Systematically moving workers from one job to another
to enhance work team performance.
42
Why Managers Are Dejobbing /Redesigning
 Dejobbing
Broadening the responsibilities of
the company’s jobs by
encouraging employees not to limit
themselves up to job description.
 Internal factors leading to
dejobbing
 Flatter organizations
 Work teams
 Reengineering
 External factors leading
to dejobbing.
 Rapid product and
technological change
 Global competition
 Deregulation,
 Political instability,
 Demographic changes
 Rise of a service
economy.
43

02. Human Resources and Planning & Job Analysis.ppt

  • 1.
    1 Job Analysis & PersonnelPlanning Chapter 2 Resource Person: Muhammad Faisal Reference Books: Human Resource Management (Keith Devis) Human Resource Management (Mondy) Internet
  • 2.
    2 Functions (Scope) ofHRM 1.Staffing •Personnel Planning •Job Analysis •Recruitment •Selection Functions Functions of HRM of HRM 5.Employee & Labor Relations 4.Safety & Health 3.Compensation & Benefits 2.Human Resource Development
  • 3.
    3 1. Staffing  Processthrough which an organization ensures that it always has the proper number of employees with the appropriate skills in the right jobs at the right time to achieve the organization’s objectives.  It includes • Personnel planning • Job Analysis • Recruitment • Selection
  • 4.
    4 1996 Croatia USAFCT-43 crash  On April 3, 1996, a United States Air Force CT-43 crashed in Croatia while on an official trade mission. The aircraft was carrying United States Secretary of Commerce Ron Brown and 35 other people (including 16 corporate executives).
  • 5.
    5 The September 11attacks  Often referred to as September 11th or 9/11were a series of coordinated suicide attacks on the United States on September 11, 2001. On that morning, 19 terrorists hijacked four commercial passenger jet airliners.  The death toll of the attacks was 2,996, including the 19 hijackers with more then 6000 injuries.  The hijackers intentionally crashed two of the airliners into the Twin Towers of the World Trade Center in New York City, killing everyone on board and many others working in the buildings.
  • 6.
    6 Succession Planning  Theprocess for identifying and developing people with the potential to fill key positions in the company once the position is vacant. Succession planning increases the availability of experienced and capable employees that are prepared to assume these roles as they become available.
  • 7.
    7 Difference Between "Job"And "Position"  Job - Consists of a group of tasks that must be performed for an organization to achieve its goals  Position - Collection of tasks and responsibilities performed by one person; there is a position for every individual in an organization. (As per Mondy Noe) Job – A job is a pattern of tasks, duties and responsibilities that can be done by a person (Keith Devis)
  • 8.
    8  Strategic Planning-is the process by which top management determines overall organizational purposes and objectives and how they are to be achieved.  HR Planning- The process of systematically reviewing HR requirements to determine & ensure that required number of employees, with the required skills, are available when they are needed.  Succession Planning- Ensuring that a qualified person is available to assume a managerial position once the position is vacant usually with the help of replacement chart.
  • 9.
    9 Human Resource PlanningProcess External Environment Internal Environment Strategic Planning Human Resource Planning Forecasting Human Resource Requirements Comparing Requirements and Availability Forecasting Human Resource Availability Surplus of Workers Demand = No Action Restricted Hiring, Reduced Hours, Early Retirement, Layoff, Downsizing Shortage of Workers Recruitment Selection
  • 10.
    10  Statistical approaches 1. Ratioanalysis 2. Regression analysis  Judgmental methods Demand Forecasting
  • 11.
    11 Patients: Doctors =4:1 Number of Patients = 100 Number of Doctors = 25 Ratio analysis If there are 400 patients, how many Doctors are needed?
  • 12.
    12 # Employees # Customers 50100 150 75 50 25 0 Regression analysis
  • 13.
    13 The Relationship ofSales Volume to Number of Employees Number of Employees 500 400 300 200 100 0 10 20 30 40 50 60 Sales (thousands)
  • 14.
    14 Job Analysis  JobAnalysis – Job analysis is a systematic process of determining the skills, duties and human characteristics required for performing specific job in organization. In job analysis information about jobs are systematically collected, evaluated & organized.  Job description – document providing information regarding tasks, duties, and responsibilities of job  Job specification – minimum qualifications to perform a particular job
  • 15.
    15 Job Analysis: ABasic Human Resource Management Tool Tasks Responsibilities Duties Job Analysis Job Descriptions Job Specifications Knowledge Skills Abilities Human Resource Planning Recruitment Selection Training and Development Performance Appraisal Compensation and Benefits Safety and Health Employee and Labor Relations Legal Considerations
  • 16.
    16 Job Description- awritten statement that explains tasks, duties, working conditions, responsibilities & other aspects of a specified job  Job Title  Location  Duties  Machines, Tools, Equipments, Materials used.  Supervision given or received  Job Grade / Pay Scale  Employment Status  Hazard  Date  Job Summary
  • 17.
  • 18.
  • 19.
    19 Job Descriptions Contents Job Identification Job Summary Responsibilities andDuties Authority Standards of Performance Working Conditions Job Specifications Sections of a Typical Job Description
  • 20.
    20 The Job DescriptionSections  Job identification Job title: name of job Grade/ status Preparation date: when the description was written Prepared by: who wrote the description  Job summary Describes the general nature of the job Lists the major functions or activities
  • 21.
    21  Relationships (chainof command) Reports to: employee’s immediate supervisor Supervises: employees that the job incumbent directly supervises Works with: others with whom the job holder will be expected to work and come into contact with internally. Outside the company: others with whom the job holder is expected to work and come into contact with externally.
  • 22.
    22  Responsibilities andduties A listing of the job’s major responsibilities and duties (essential functions) Defines limits of jobholder’s decision-making authority, direct supervision, and budgetary limitations.  Standards of performance and working conditions Lists the standards the employee is expected to achieve under each of the job description’s main duties and responsibilities.  Job Specification  Authority
  • 23.
    23 Job Specification- awritten statement that explains human characteristics needed to perform the job.  Education  Experience  Training  Physical & Mental Status  Communication Skills  Languages  Physical Skills  Personality Traits
  • 24.
  • 25.
    25 Purposes of JobAnalysis  What physical and mental tasks does the worker accomplish?  When does the job have to be completed?  Where is the job to be accomplished?  How does the worker do the job?  Why is the job done?  What qualifications are needed to perform the job?
  • 26.
    26 Reasons For ConductingJob Analysis  Staffing- lacking up-to-date job analysis, a firm would have to select employees for the job without having clear guidelines.  Training & Development- Incompatibility between job requirement & employee can b met by T&D.  Compensation and Benefits- The relative value of a particular job to the company must be known before a monetary value can be placed on it.  Safety and Health- Information derived from job analysis is also valuable in identifying safety and health considerations.  Employee and Labor Relations- Job analysis provides a standard for promotion, transfer, demotion.  Legal Considerations- Job analysis data is used to defend matters involving legal obligations.
  • 27.
    27 Occasions For JobAnalysis  When the organization is founded  When new jobs are created  When jobs are changed significantly as a result of new technologies, methods, procedures, or systems  Job Morphing- Readjusting skills to match the job requirements or changing of a present job to a new one. like if your working in a construction site as a an electrician, then you'll do the plumbing just to make the work faster . any work you're capable of doing which is not you're usual routine.
  • 28.
    28 Job Analysis Methods Questionnaires  Observation  Interviews  Employee recording  Analyzing jobs of rival organizations  Combination of methods
  • 29.
    29 Methods of CollectingJob Analysis Information: The Interview  Information Sources  Individual employees  Groups of employees  Supervisors with knowledge of the job  Advantages  Quick, direct way to find overlooked information  Disadvantages  Distorted information  Interview Formats  Structured (Checklist)  Unstructured
  • 30.
    30 Questionnaires  Information Source Employees fill out questionnaires to describe their job-related duties and responsibilities  Questionnaire Formats  Structured checklists  Open-ended questions  Advantages  Quick and efficient way to gather information from large numbers of employees  Disadvantages  Expense and time consumed in preparing and testing the questionnaire
  • 31.
    31 Observation  Information Source Observing and noting the physical activities of employees as they go about their jobs  Advantages  Provides first-hand information  Reduces distortion of information  Disadvantages  Time consuming  Difficulty in capturing entire job cycle  Of little use if job involves a high level of mental activity
  • 32.
    32 Participant Diary/Logs  InformationSource  Workers keep a chronological diary/ log of what they do and the time spent on each activity  Advantages  Produces a more complete picture of the job  Employee participation  Disadvantages  Distortion of information  Depends upon employees to accurately recall their activities
  • 33.
    33 People Who Participatein Job Analysis Should Include (at a minimum)  Employee  Employee’s immediate supervisor  Job analyst  Consultants
  • 34.
    34 JOB DESIGN- Processof determining the specific tasks to be performed, the methods used in performing these tasks, and how the job relates to other work in the organization in order to increase productivity & employees satisfaction. Or else  Lower productivity  Employees Turnover  Absenteeism  Resignations  Employees dissatisfaction  Sabotage  Unionization  Complaint
  • 35.
    35  Job Designis Work arrangement (or rearrangement) aimed at reducing or overcoming job dissatisfaction and employee alienation arising from repetitive tasks. Through job design, organizations try to raise productivity levels by offering non-monetary rewards such as greater satisfaction from a sense of personal achievement in meeting the increased challenge and responsibility of one's work. Job enlargement, job enrichment, job rotation are the various techniques used in a job design exercise.
  • 36.
    36  There aretwo basics ways in which work is organized. The first is related to the flow of authority and is known as organization structure. The second relates to flow of work itself from one operation to another and is known as procedure.  The job design is about designing or re-designing a new job profile and setting the correct organizational structure.  The job design is about using several theoretical approaches to bring the balance between creative and routine part of the job.  The job design is done as the organization needs to keep the number of employees at the affordable costs.  The correct job design can bring the elimination of many process steps and it can help the organization to react quicker to the requests of the customers.  The job analysis is about the analysis of the current jobs and it is can be used as the input to the job design. Difference between Job Analysis and Job Design
  • 37.
    37 Elements of JobDesign 1. Organizational Elements (Efficiency)  Mechanistic Approach- Involves identifying every task of a job so that task can be arranged & grouped into a job. Results Specialization & shortens Job Cycle.  Work flow- Sequence & balance between jobs.  Work Practices- Set ways of performing work.  Ergonomics- Study of how human beings physically interface with equipments.
  • 38.
    38 2. Environmental Elements Employee abilities & Availability  Social & Cultural Expectations 3. Behavioral Elements.  Autonomy  Variety  Task Identity- Extent to which a job involves doing a complete from beginning to end and identifiable piece of work with a visible outcome, as opposed to doing only a portion of the job. Task identity is an important component of job satisfaction.  Task Significance- Extent to which an identifiable piece of work affects, or is important to, others within or outside the organization. An employee's knowledge of other people's dependence on the work he or she is doing is an important factor in his or her job satisfaction.  Feedback
  • 39.
  • 40.
    40 Job Analysis ina “Jobless” World From Specialized to Enlarged Jobs Techniques of Job Redesign /Dejobbing  Job enlargement “adds more things to do” Assigning workers additional same level activities, thus increasing the number of activities they perform. (Horizontal loading)  Job enrichment “adds more responsibility” Redesigning jobs in a way that increases the opportunities for the worker to experience feelings of responsibility, achievement, growth, and recognition. (Vertical loading)
  • 41.
    41  Job rotation Movingan employee from department to department to broaden his or her experience and identify strong and weak points to prepare the person for an enhanced role with the company Systematically moving workers from one job to another to enhance work team performance.
  • 42.
    42 Why Managers AreDejobbing /Redesigning  Dejobbing Broadening the responsibilities of the company’s jobs by encouraging employees not to limit themselves up to job description.  Internal factors leading to dejobbing  Flatter organizations  Work teams  Reengineering  External factors leading to dejobbing.  Rapid product and technological change  Global competition  Deregulation,  Political instability,  Demographic changes  Rise of a service economy.
  • 43.

Editor's Notes

  • #9 Layoff is the temporary suspension or permanent termination of employment of an employee or (more commonly) a group of employees for business reasons Downsizing is a commonly used euphemism which refers to reducing the overall size and operating costs of a company, most directly through a reduction in the total number of employees.