This document provides a list of materials, labor, and equipment needed to construct a multi-purpose local in the annex of Otoro, Peru. It includes over 100 line items with descriptions of materials like cement, rebar, lumber, electrical components, plumbing fixtures, and more. The quantities, units, and total costs are specified for materials to be used in months 1, 2, and 3 of the construction project.
CASE 860 BACKHOE LOADER Service Repair Manualjksmmd usekjdkm
This is the Highly Detailed factory service repair manual for theCASE 860 BACKHOE LOADER, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.CASE 860 BACKHOE LOADER Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
General
Engine
Fuel System
Electrical
Steering
Power Train
Brake
Hydraulics
Mounted
Equipment
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveCASE 860 BACKHOE LOADER Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
The document discusses drum manufacturing for steam boilers. It provides details on:
1) The functions of a boiler drum including steam-water separation, housing equipment for steam purification, and maintaining water level.
2) Standard drum specifications for different MW capacities including plate thickness, length, and weight.
3) Raw material suppliers and plate specifications.
4) Configurations for different MW drums including number of shells and dimensions.
5) The hot forming process including plate heating temperatures and times.
6) Quality checks and non-destructive testing of welds.
7) Other manufacturing steps like circumferential seam welding and hydrotesting.
Pdf accidentes de trafico_2010_isabel [comprimido]Isabel
This document discusses basic communication techniques for assisting victims of road traffic accidents. It begins by establishing effective communication as the goal, using simple, direct statements. Primary exploration involves determining if the patient is conscious and assessing their airway, breathing, and circulation. Further exploration examines the patient's head, neck, chest, abdomen, and limbs for injuries or pain. The document provides example language for procedures like examinations, injections, and transporting the patient for additional care.
This document provides a list of items for sale including product codes, descriptions, brands, units, prices, and stock quantities. There are over 90 different items listed ranging from electrical tapes, tools, lighting equipment, cables, switches, and other accessories. The total stock value at current prices is calculated to be over $3,500.
This document provides a list of items for sale including product codes, descriptions, brands, units, prices, and stock quantities. There are over 90 different items listed ranging from electrical tapes, tools, lighting products, cables, switches and more from brands like 3M, Bosch, Bticino, Alpha and others. The total stock value at current prices is calculated to be over $3,500.
Valorización adicionales 28 01-2015 eddsonEdd Leo G
This document contains a budget with line items for materials, labor, and costs associated with construction projects. It includes concrete work, steel reinforcement, formwork, masonry, finishes, and mechanical works for columns, beams, slabs, walls, floors, and more. The total budget amount is over $168,000. There are also additional budget sections for modifications to the kitchen, auditorium, and addition of a presidential suite totaling around $57,000.
This document provides a list of materials, labor costs, and schedule for a school improvement and expansion project. It includes line items for various construction materials, labor costs for officials, operators, laborers, and a foreman, as well as a schedule indicating which materials will be acquired in each of 4 months. The total cost for labor is $119,614.38 and the total cost for materials is $168,384.79. A Gantt chart at the bottom schedules material acquisition across the 4 month period.
The document outlines 8 steps for designing the structure of a building: 1) selecting a building plan, 2) drawing the plan in AutoCAD, 3) calculating loads, 4) creating a STAAD model, 5) sizing columns and beams, 6) entering loads, 7) selecting materials, and 8) designing structural elements. It then provides details on load calculations, beam sizes and reinforcement, and column sizes for a sample college building design.
CASE 860 BACKHOE LOADER Service Repair Manualjksmmd usekjdkm
This is the Highly Detailed factory service repair manual for theCASE 860 BACKHOE LOADER, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.CASE 860 BACKHOE LOADER Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
General
Engine
Fuel System
Electrical
Steering
Power Train
Brake
Hydraulics
Mounted
Equipment
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveCASE 860 BACKHOE LOADER Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
The document discusses drum manufacturing for steam boilers. It provides details on:
1) The functions of a boiler drum including steam-water separation, housing equipment for steam purification, and maintaining water level.
2) Standard drum specifications for different MW capacities including plate thickness, length, and weight.
3) Raw material suppliers and plate specifications.
4) Configurations for different MW drums including number of shells and dimensions.
5) The hot forming process including plate heating temperatures and times.
6) Quality checks and non-destructive testing of welds.
7) Other manufacturing steps like circumferential seam welding and hydrotesting.
Pdf accidentes de trafico_2010_isabel [comprimido]Isabel
This document discusses basic communication techniques for assisting victims of road traffic accidents. It begins by establishing effective communication as the goal, using simple, direct statements. Primary exploration involves determining if the patient is conscious and assessing their airway, breathing, and circulation. Further exploration examines the patient's head, neck, chest, abdomen, and limbs for injuries or pain. The document provides example language for procedures like examinations, injections, and transporting the patient for additional care.
This document provides a list of items for sale including product codes, descriptions, brands, units, prices, and stock quantities. There are over 90 different items listed ranging from electrical tapes, tools, lighting equipment, cables, switches, and other accessories. The total stock value at current prices is calculated to be over $3,500.
This document provides a list of items for sale including product codes, descriptions, brands, units, prices, and stock quantities. There are over 90 different items listed ranging from electrical tapes, tools, lighting products, cables, switches and more from brands like 3M, Bosch, Bticino, Alpha and others. The total stock value at current prices is calculated to be over $3,500.
Valorización adicionales 28 01-2015 eddsonEdd Leo G
This document contains a budget with line items for materials, labor, and costs associated with construction projects. It includes concrete work, steel reinforcement, formwork, masonry, finishes, and mechanical works for columns, beams, slabs, walls, floors, and more. The total budget amount is over $168,000. There are also additional budget sections for modifications to the kitchen, auditorium, and addition of a presidential suite totaling around $57,000.
This document provides a list of materials, labor costs, and schedule for a school improvement and expansion project. It includes line items for various construction materials, labor costs for officials, operators, laborers, and a foreman, as well as a schedule indicating which materials will be acquired in each of 4 months. The total cost for labor is $119,614.38 and the total cost for materials is $168,384.79. A Gantt chart at the bottom schedules material acquisition across the 4 month period.
The document outlines 8 steps for designing the structure of a building: 1) selecting a building plan, 2) drawing the plan in AutoCAD, 3) calculating loads, 4) creating a STAAD model, 5) sizing columns and beams, 6) entering loads, 7) selecting materials, and 8) designing structural elements. It then provides details on load calculations, beam sizes and reinforcement, and column sizes for a sample college building design.
This document provides technical specifications for roofing materials and purlins. It includes the wind load, yield stresses for different sheet materials, slope recommendations, sheet and purlin sizes for different spans, and the mass of purlin profiles. Purlin depths and thicknesses are specified. Connection details are shown for lap joints, simple connections and double flange braces.
This document is a price list for Schneider electric equipment in Vietnam for June 2014. It lists Schneider equipment part numbers, descriptions and prices in Vietnamese Dong. The prices are inclusive of VAT. It contains pricing for over 200 different electrical equipment parts including circuit breakers, contactors, relays, switches, sockets and accessories.
The document provides specifications for copper tube crimping lugs for connecting copper conductors. It includes a table with specifications for various lugs, including the diameter and length of the stud and barrel, recommended crimping tools, and packaging quantities. The lugs are made of annealed electrolytic copper tube to provide efficient conductivity while resisting vibration and pull-out. They have an inspection hole and barrel length designed for accurate crimping. Lugs are tin-plated to prevent oxidation and suitable for power-carrying applications.
This document provides contact information for Ferrostaal Piping Supply B.V. and Ferrostaal Piping Supply GmbH, including addresses, phone numbers, fax numbers, and email addresses for locations in the Netherlands and Germany. It also lists various pipe dimensions, schedules, and material grades according to ASME standards for austenitic steel pipes.
This document provides contact information for Ferrostaal Piping Supply B.V. and Ferrostaal Piping Supply GmbH, including addresses, phone numbers, fax numbers, and email addresses for locations in the Netherlands and Germany. It also lists pipe dimension standards for various pipe schedules according to ASME B36.10 and B36.19, including nominal pipe size, outer diameter, volume per meter, and wall thickness. Material specifications are provided for seamless stainless steel tubes according to DIN, EN, ASTM, and ASME standards.
This document provides contact information for Ferrostaal Piping Supply B.V. and Ferrostaal Piping Supply GmbH, including addresses, phone numbers, fax numbers, and email addresses for locations in the Netherlands and Germany. It also lists pipe dimension standards for various ASME steel pipe schedules, including nominal pipe sizes, outside diameters, wall thicknesses, and weights.
This document provides a list of materials, labor, and other resources required for the project "Improvement of Primary Education Service at Educational Institution No. 72188 of the Peasant Community of Quety, Ituata District - Carabaya - Puno". It includes over 200 line items with quantities, unit prices, and totals. The resources include materials like cement, wood, electrical equipment, as well as labor costs for tasks like masonry, carpentry, and more. The total cost of materials is over 252,000 Soles and the total cost of all resources is over 500,000 Soles.
This document contains architectural plans and technical specifications for the expansion of a home. It includes floor plans for the first and second floors showing new construction works. It also includes details of sanitary installations, electrical installations, structure works, and specifications. The plans show new bedrooms, bathrooms, and other living areas being added to an existing home through this expansion project.
Pabrik kabel terbesar di Indonesia PT. Eleq Cable Indonesia Wa: 0813-8552-1314 sebagai produsen yang menjual berbagai jenis kabel listrik di Glodok Jakarta eleqcable.com untuk semua keperluan baik industri kelistrikan juga telekomunikasi.
Ada beberapa model yang di produksi pada pabrik kabel kami demi untuk memenuhi permintaan pasar yang semakin hari semakin tinggi kebutuhannya. Perkembangan teknologi telekomunikasi membuat permintaan pabrik kabel optik eleqcable harus siap memenuhi kebutuhan tersebut. Demikian menjadi keharusan untuk merebut persaingan pasar kedepan sebagai produsen kabel kami selalu mengutamakan mutu dan kualitas terbaik yang diminta.
Pada kesempatan ini kami sebagai Pabrik kabel di Tangerang yang beralamat Kawasan Industri Manis, Jalan Manis V No. 11, kelurahan Manis Jaya Kecamatan Jatiuwung, Tangerang Banten 15136. Memberikan penawaran dari model yang ada dan produksi PT. Eleq Cable Indonesia dengan produk yang berkualitas serta memenuhi standar mutu (SNI).
This document provides information about spring applied brakes from Inertia Dynamics. It describes SAB brakes as being engaged and disengaged in a static condition at zero RPM, making them suitable for use as parking brakes. It lists available models of the SAB brake along with their torque ratings, armature weights, and electrical specifications. Tables provide dimensional information and an ordering code for selecting the proper brake model, voltage, bore size, and other options.
Standard stock-materials-for-11k v-systemRamesh Meti
This document contains a schedule of rates for standard stock materials commonly used in 11kV power distribution systems. It lists 99 items, including poles, cross arms, insulators, conductors, clamps and other hardware. For each item it provides the name, material code, unit of measurement, and Ford rates from 2016-17 and 2018-19 inclusive of taxes, freight and insurance. The rates are provided in Indian Rupees (Rs).
This document provides specifications for the construction of gas pipeline stations. It includes typical dimensions and details for sectioning and interconnection stations with diameters ranging from 4 to 36 inches. Notes provide additional information on materials, dimensions, and construction details.
BHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLEKuberBhusal1
This document provides information about the manufacturing process for steel tubes at Bhushan Power and Steel Ltd. It begins with an overview of the company and its products. It then describes the tube manufacturing process which involves forming steel strips into tubular shapes and welding the edges. Various quality tests are conducted including hydraulic testing. Tubes may also be galvanized and threaded. Standards that the company's tubes conform to from various countries are listed. Details on specific tube types including dimensions, tolerances and material properties are provided.
This document provides information on calculating pressure ratings for stainless steel pipe and tube. It includes equations for determining the required wall thickness given an internal design pressure or for calculating the maximum allowable internal pressure given the wall thickness. Tables with material properties like stress values and quality factors are also included to aid in the calculations. Worked examples demonstrate how to use the equations and tables to size pipe or determine pressure ratings.
This document is an accounting ledger listing transactions from January 1, 2004 to December 31, 2004. It includes over 100 line item entries of debits and credits with details of transaction numbers, codes, parties, and descriptions primarily in Italian. The document provides accounting information on a variety of income and expense transactions over the course of the year.
Fantastic tutorial, shared with us by Dario Ilardi, of Grafica2d3d.com, I recommend to see.
The website is in Italian, but it is full of excellent tutorials, understandable in any language.
This great tutorial, explain, step by step, how to obtain, by using vray 2.0 for sketchup, a render, clear and clean as what we see in the picture below.
Dario say : " I'm experimenting with the use of brute force as a substitute of irradiance map and I must say that in terms of speed and quality impressed me positively "
Thanks so much Dario for this one, the result is really good !
The document provides information about flange mounted brakes of type FB, including specifications, dimensions, torque and current draw for different models, ordering information, and notes for customers. It lists technical details like mounting dimensions, air gap settings, and inertia for various brake models from FB08 to FB42 that can be used to stop or hold a load coupled to an armature hub.
Ultra high purity tubing & fittings dimensional specificationNeha Gupta
Cardinal continues to supply the finest in ultra high purity fittings and piping components to manufacturers and industries requiring critically pure production systems. We also supply a wide range of tubing and specialty services for other markets including medical, food processing, biotechnology, pharmaceutical, semiconductor, and telecommunication. To know more visit: https://www.cardinaluhp.com/fittings
Sandvik pipe – tube – bar – hollow bar stock program in stainless
Sandvik offers a wide range of stainless steel tubing, pipe, bar, and hollow bar from stock. This includes hydraulic tubing, instrumentation tubing, pipe to ANSI/ASME standards, metric sized tube, high temperature tubing and pipe, composite tubes, heat exchanger tubes, titanium and zirconium tubing, stainless hollow bar, stainless bar steel, and welding consumables. Sandvik can supply both standard and custom sizes to meet customer needs.
Cembre 2 hole copper tube crimp lugs feature extended palm with two fixing holes at 44.5mm centres. Cembre two hole cable lugs suit stranded copper conductors 25sqmm, 35sqmm, 50sqmm, 70sqmm, 95sqmm, 120sqmm, 150sqmm, 185sqmm, 240sqmm, 300sqmm, 400sqmm, 500sqmm and 630sqmm cables.
Cembre 2 Hole Copper Tube Terminal Lugs are designed for both low and high voltage cable termination up to 33kV. Manufactured from high purity copper tube, annealed and tin-plated - the extended Cembre cable lug barrel enhances electrical and mechanical performance while the absence of an inspection hole prevents moisture entry into the crimped joint or termination. Featuring an extended palm with two fixing holes at 44.5mm centres.
বাংলাদেশের অর্থনৈতিক সমীক্ষা ২০২৪ [Bangladesh Economic Review 2024 Bangla.pdf] কম্পিউটার , ট্যাব ও স্মার্ট ফোন ভার্সন সহ সম্পূর্ণ বাংলা ই-বুক বা pdf বই " সুচিপত্র ...বুকমার্ক মেনু 🔖 ও হাইপার লিংক মেনু 📝👆 যুক্ত ..
আমাদের সবার জন্য খুব খুব গুরুত্বপূর্ণ একটি বই ..বিসিএস, ব্যাংক, ইউনিভার্সিটি ভর্তি ও যে কোন প্রতিযোগিতা মূলক পরীক্ষার জন্য এর খুব ইম্পরট্যান্ট একটি বিষয় ...তাছাড়া বাংলাদেশের সাম্প্রতিক যে কোন ডাটা বা তথ্য এই বইতে পাবেন ...
তাই একজন নাগরিক হিসাবে এই তথ্য গুলো আপনার জানা প্রয়োজন ...।
বিসিএস ও ব্যাংক এর লিখিত পরীক্ষা ...+এছাড়া মাধ্যমিক ও উচ্চমাধ্যমিকের স্টুডেন্টদের জন্য অনেক কাজে আসবে ...
This document provides technical specifications for roofing materials and purlins. It includes the wind load, yield stresses for different sheet materials, slope recommendations, sheet and purlin sizes for different spans, and the mass of purlin profiles. Purlin depths and thicknesses are specified. Connection details are shown for lap joints, simple connections and double flange braces.
This document is a price list for Schneider electric equipment in Vietnam for June 2014. It lists Schneider equipment part numbers, descriptions and prices in Vietnamese Dong. The prices are inclusive of VAT. It contains pricing for over 200 different electrical equipment parts including circuit breakers, contactors, relays, switches, sockets and accessories.
The document provides specifications for copper tube crimping lugs for connecting copper conductors. It includes a table with specifications for various lugs, including the diameter and length of the stud and barrel, recommended crimping tools, and packaging quantities. The lugs are made of annealed electrolytic copper tube to provide efficient conductivity while resisting vibration and pull-out. They have an inspection hole and barrel length designed for accurate crimping. Lugs are tin-plated to prevent oxidation and suitable for power-carrying applications.
This document provides contact information for Ferrostaal Piping Supply B.V. and Ferrostaal Piping Supply GmbH, including addresses, phone numbers, fax numbers, and email addresses for locations in the Netherlands and Germany. It also lists various pipe dimensions, schedules, and material grades according to ASME standards for austenitic steel pipes.
This document provides contact information for Ferrostaal Piping Supply B.V. and Ferrostaal Piping Supply GmbH, including addresses, phone numbers, fax numbers, and email addresses for locations in the Netherlands and Germany. It also lists pipe dimension standards for various pipe schedules according to ASME B36.10 and B36.19, including nominal pipe size, outer diameter, volume per meter, and wall thickness. Material specifications are provided for seamless stainless steel tubes according to DIN, EN, ASTM, and ASME standards.
This document provides contact information for Ferrostaal Piping Supply B.V. and Ferrostaal Piping Supply GmbH, including addresses, phone numbers, fax numbers, and email addresses for locations in the Netherlands and Germany. It also lists pipe dimension standards for various ASME steel pipe schedules, including nominal pipe sizes, outside diameters, wall thicknesses, and weights.
This document provides a list of materials, labor, and other resources required for the project "Improvement of Primary Education Service at Educational Institution No. 72188 of the Peasant Community of Quety, Ituata District - Carabaya - Puno". It includes over 200 line items with quantities, unit prices, and totals. The resources include materials like cement, wood, electrical equipment, as well as labor costs for tasks like masonry, carpentry, and more. The total cost of materials is over 252,000 Soles and the total cost of all resources is over 500,000 Soles.
This document contains architectural plans and technical specifications for the expansion of a home. It includes floor plans for the first and second floors showing new construction works. It also includes details of sanitary installations, electrical installations, structure works, and specifications. The plans show new bedrooms, bathrooms, and other living areas being added to an existing home through this expansion project.
Pabrik kabel terbesar di Indonesia PT. Eleq Cable Indonesia Wa: 0813-8552-1314 sebagai produsen yang menjual berbagai jenis kabel listrik di Glodok Jakarta eleqcable.com untuk semua keperluan baik industri kelistrikan juga telekomunikasi.
Ada beberapa model yang di produksi pada pabrik kabel kami demi untuk memenuhi permintaan pasar yang semakin hari semakin tinggi kebutuhannya. Perkembangan teknologi telekomunikasi membuat permintaan pabrik kabel optik eleqcable harus siap memenuhi kebutuhan tersebut. Demikian menjadi keharusan untuk merebut persaingan pasar kedepan sebagai produsen kabel kami selalu mengutamakan mutu dan kualitas terbaik yang diminta.
Pada kesempatan ini kami sebagai Pabrik kabel di Tangerang yang beralamat Kawasan Industri Manis, Jalan Manis V No. 11, kelurahan Manis Jaya Kecamatan Jatiuwung, Tangerang Banten 15136. Memberikan penawaran dari model yang ada dan produksi PT. Eleq Cable Indonesia dengan produk yang berkualitas serta memenuhi standar mutu (SNI).
This document provides information about spring applied brakes from Inertia Dynamics. It describes SAB brakes as being engaged and disengaged in a static condition at zero RPM, making them suitable for use as parking brakes. It lists available models of the SAB brake along with their torque ratings, armature weights, and electrical specifications. Tables provide dimensional information and an ordering code for selecting the proper brake model, voltage, bore size, and other options.
Standard stock-materials-for-11k v-systemRamesh Meti
This document contains a schedule of rates for standard stock materials commonly used in 11kV power distribution systems. It lists 99 items, including poles, cross arms, insulators, conductors, clamps and other hardware. For each item it provides the name, material code, unit of measurement, and Ford rates from 2016-17 and 2018-19 inclusive of taxes, freight and insurance. The rates are provided in Indian Rupees (Rs).
This document provides specifications for the construction of gas pipeline stations. It includes typical dimensions and details for sectioning and interconnection stations with diameters ranging from 4 to 36 inches. Notes provide additional information on materials, dimensions, and construction details.
BHUSHAN STEEL.pdf BROCHURE FOR STEEL TABLEKuberBhusal1
This document provides information about the manufacturing process for steel tubes at Bhushan Power and Steel Ltd. It begins with an overview of the company and its products. It then describes the tube manufacturing process which involves forming steel strips into tubular shapes and welding the edges. Various quality tests are conducted including hydraulic testing. Tubes may also be galvanized and threaded. Standards that the company's tubes conform to from various countries are listed. Details on specific tube types including dimensions, tolerances and material properties are provided.
This document provides information on calculating pressure ratings for stainless steel pipe and tube. It includes equations for determining the required wall thickness given an internal design pressure or for calculating the maximum allowable internal pressure given the wall thickness. Tables with material properties like stress values and quality factors are also included to aid in the calculations. Worked examples demonstrate how to use the equations and tables to size pipe or determine pressure ratings.
This document is an accounting ledger listing transactions from January 1, 2004 to December 31, 2004. It includes over 100 line item entries of debits and credits with details of transaction numbers, codes, parties, and descriptions primarily in Italian. The document provides accounting information on a variety of income and expense transactions over the course of the year.
Fantastic tutorial, shared with us by Dario Ilardi, of Grafica2d3d.com, I recommend to see.
The website is in Italian, but it is full of excellent tutorials, understandable in any language.
This great tutorial, explain, step by step, how to obtain, by using vray 2.0 for sketchup, a render, clear and clean as what we see in the picture below.
Dario say : " I'm experimenting with the use of brute force as a substitute of irradiance map and I must say that in terms of speed and quality impressed me positively "
Thanks so much Dario for this one, the result is really good !
The document provides information about flange mounted brakes of type FB, including specifications, dimensions, torque and current draw for different models, ordering information, and notes for customers. It lists technical details like mounting dimensions, air gap settings, and inertia for various brake models from FB08 to FB42 that can be used to stop or hold a load coupled to an armature hub.
Ultra high purity tubing & fittings dimensional specificationNeha Gupta
Cardinal continues to supply the finest in ultra high purity fittings and piping components to manufacturers and industries requiring critically pure production systems. We also supply a wide range of tubing and specialty services for other markets including medical, food processing, biotechnology, pharmaceutical, semiconductor, and telecommunication. To know more visit: https://www.cardinaluhp.com/fittings
Sandvik pipe – tube – bar – hollow bar stock program in stainless
Sandvik offers a wide range of stainless steel tubing, pipe, bar, and hollow bar from stock. This includes hydraulic tubing, instrumentation tubing, pipe to ANSI/ASME standards, metric sized tube, high temperature tubing and pipe, composite tubes, heat exchanger tubes, titanium and zirconium tubing, stainless hollow bar, stainless bar steel, and welding consumables. Sandvik can supply both standard and custom sizes to meet customer needs.
Cembre 2 hole copper tube crimp lugs feature extended palm with two fixing holes at 44.5mm centres. Cembre two hole cable lugs suit stranded copper conductors 25sqmm, 35sqmm, 50sqmm, 70sqmm, 95sqmm, 120sqmm, 150sqmm, 185sqmm, 240sqmm, 300sqmm, 400sqmm, 500sqmm and 630sqmm cables.
Cembre 2 Hole Copper Tube Terminal Lugs are designed for both low and high voltage cable termination up to 33kV. Manufactured from high purity copper tube, annealed and tin-plated - the extended Cembre cable lug barrel enhances electrical and mechanical performance while the absence of an inspection hole prevents moisture entry into the crimped joint or termination. Featuring an extended palm with two fixing holes at 44.5mm centres.
বাংলাদেশের অর্থনৈতিক সমীক্ষা ২০২৪ [Bangladesh Economic Review 2024 Bangla.pdf] কম্পিউটার , ট্যাব ও স্মার্ট ফোন ভার্সন সহ সম্পূর্ণ বাংলা ই-বুক বা pdf বই " সুচিপত্র ...বুকমার্ক মেনু 🔖 ও হাইপার লিংক মেনু 📝👆 যুক্ত ..
আমাদের সবার জন্য খুব খুব গুরুত্বপূর্ণ একটি বই ..বিসিএস, ব্যাংক, ইউনিভার্সিটি ভর্তি ও যে কোন প্রতিযোগিতা মূলক পরীক্ষার জন্য এর খুব ইম্পরট্যান্ট একটি বিষয় ...তাছাড়া বাংলাদেশের সাম্প্রতিক যে কোন ডাটা বা তথ্য এই বইতে পাবেন ...
তাই একজন নাগরিক হিসাবে এই তথ্য গুলো আপনার জানা প্রয়োজন ...।
বিসিএস ও ব্যাংক এর লিখিত পরীক্ষা ...+এছাড়া মাধ্যমিক ও উচ্চমাধ্যমিকের স্টুডেন্টদের জন্য অনেক কাজে আসবে ...
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumMJDuyan
(𝐓𝐋𝐄 𝟏𝟎𝟎) (𝐋𝐞𝐬𝐬𝐨𝐧 𝟏)-𝐏𝐫𝐞𝐥𝐢𝐦𝐬
𝐃𝐢𝐬𝐜𝐮𝐬𝐬 𝐭𝐡𝐞 𝐄𝐏𝐏 𝐂𝐮𝐫𝐫𝐢𝐜𝐮𝐥𝐮𝐦 𝐢𝐧 𝐭𝐡𝐞 𝐏𝐡𝐢𝐥𝐢𝐩𝐩𝐢𝐧𝐞𝐬:
- Understand the goals and objectives of the Edukasyong Pantahanan at Pangkabuhayan (EPP) curriculum, recognizing its importance in fostering practical life skills and values among students. Students will also be able to identify the key components and subjects covered, such as agriculture, home economics, industrial arts, and information and communication technology.
𝐄𝐱𝐩𝐥𝐚𝐢𝐧 𝐭𝐡𝐞 𝐍𝐚𝐭𝐮𝐫𝐞 𝐚𝐧𝐝 𝐒𝐜𝐨𝐩𝐞 𝐨𝐟 𝐚𝐧 𝐄𝐧𝐭𝐫𝐞𝐩𝐫𝐞𝐧𝐞𝐮𝐫:
-Define entrepreneurship, distinguishing it from general business activities by emphasizing its focus on innovation, risk-taking, and value creation. Students will describe the characteristics and traits of successful entrepreneurs, including their roles and responsibilities, and discuss the broader economic and social impacts of entrepreneurial activities on both local and global scales.
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPRAHUL
This Dissertation explores the particular circumstances of Mirzapur, a region located in the
core of India. Mirzapur, with its varied terrains and abundant biodiversity, offers an optimal
environment for investigating the changes in vegetation cover dynamics. Our study utilizes
advanced technologies such as GIS (Geographic Information Systems) and Remote sensing to
analyze the transformations that have taken place over the course of a decade.
The complex relationship between human activities and the environment has been the focus
of extensive research and worry. As the global community grapples with swift urbanization,
population expansion, and economic progress, the effects on natural ecosystems are becoming
more evident. A crucial element of this impact is the alteration of vegetation cover, which plays a
significant role in maintaining the ecological equilibrium of our planet.Land serves as the foundation for all human activities and provides the necessary materials for
these activities. As the most crucial natural resource, its utilization by humans results in different
'Land uses,' which are determined by both human activities and the physical characteristics of the
land.
The utilization of land is impacted by human needs and environmental factors. In countries
like India, rapid population growth and the emphasis on extensive resource exploitation can lead
to significant land degradation, adversely affecting the region's land cover.
Therefore, human intervention has significantly influenced land use patterns over many
centuries, evolving its structure over time and space. In the present era, these changes have
accelerated due to factors such as agriculture and urbanization. Information regarding land use and
cover is essential for various planning and management tasks related to the Earth's surface,
providing crucial environmental data for scientific, resource management, policy purposes, and
diverse human activities.
Accurate understanding of land use and cover is imperative for the development planning
of any area. Consequently, a wide range of professionals, including earth system scientists, land
and water managers, and urban planners, are interested in obtaining data on land use and cover
changes, conversion trends, and other related patterns. The spatial dimensions of land use and
cover support policymakers and scientists in making well-informed decisions, as alterations in
these patterns indicate shifts in economic and social conditions. Monitoring such changes with the
help of Advanced technologies like Remote Sensing and Geographic Information Systems is
crucial for coordinated efforts across different administrative levels. Advanced technologies like
Remote Sensing and Geographic Information Systems
9
Changes in vegetation cover refer to variations in the distribution, composition, and overall
structure of plant communities across different temporal and spatial scales. These changes can
occur natural.
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...PECB
Denis is a dynamic and results-driven Chief Information Officer (CIO) with a distinguished career spanning information systems analysis and technical project management. With a proven track record of spearheading the design and delivery of cutting-edge Information Management solutions, he has consistently elevated business operations, streamlined reporting functions, and maximized process efficiency.
Certified as an ISO/IEC 27001: Information Security Management Systems (ISMS) Lead Implementer, Data Protection Officer, and Cyber Risks Analyst, Denis brings a heightened focus on data security, privacy, and cyber resilience to every endeavor.
His expertise extends across a diverse spectrum of reporting, database, and web development applications, underpinned by an exceptional grasp of data storage and virtualization technologies. His proficiency in application testing, database administration, and data cleansing ensures seamless execution of complex projects.
What sets Denis apart is his comprehensive understanding of Business and Systems Analysis technologies, honed through involvement in all phases of the Software Development Lifecycle (SDLC). From meticulous requirements gathering to precise analysis, innovative design, rigorous development, thorough testing, and successful implementation, he has consistently delivered exceptional results.
Throughout his career, he has taken on multifaceted roles, from leading technical project management teams to owning solutions that drive operational excellence. His conscientious and proactive approach is unwavering, whether he is working independently or collaboratively within a team. His ability to connect with colleagues on a personal level underscores his commitment to fostering a harmonious and productive workplace environment.
Date: May 29, 2024
Tags: Information Security, ISO/IEC 27001, ISO/IEC 42001, Artificial Intelligence, GDPR
-------------------------------------------------------------------------------
Find out more about ISO training and certification services
Training: ISO/IEC 27001 Information Security Management System - EN | PECB
ISO/IEC 42001 Artificial Intelligence Management System - EN | PECB
General Data Protection Regulation (GDPR) - Training Courses - EN | PECB
Webinars: https://pecb.com/webinars
Article: https://pecb.com/article
-------------------------------------------------------------------------------
For more information about PECB:
Website: https://pecb.com/
LinkedIn: https://www.linkedin.com/company/pecb/
Facebook: https://www.facebook.com/PECBInternational/
Slideshare: http://www.slideshare.net/PECBCERTIFICATION
Main Java[All of the Base Concepts}.docxadhitya5119
This is part 1 of my Java Learning Journey. This Contains Custom methods, classes, constructors, packages, multithreading , try- catch block, finally block and more.
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxEduSkills OECD
Iván Bornacelly, Policy Analyst at the OECD Centre for Skills, OECD, presents at the webinar 'Tackling job market gaps with a skills-first approach' on 12 June 2024
Chapter wise All Notes of First year Basic Civil Engineering.pptxDenish Jangid
Chapter wise All Notes of First year Basic Civil Engineering
Syllabus
Chapter-1
Introduction to objective, scope and outcome the subject
Chapter 2
Introduction: Scope and Specialization of Civil Engineering, Role of civil Engineer in Society, Impact of infrastructural development on economy of country.
Chapter 3
Surveying: Object Principles & Types of Surveying; Site Plans, Plans & Maps; Scales & Unit of different Measurements.
Linear Measurements: Instruments used. Linear Measurement by Tape, Ranging out Survey Lines and overcoming Obstructions; Measurements on sloping ground; Tape corrections, conventional symbols. Angular Measurements: Instruments used; Introduction to Compass Surveying, Bearings and Longitude & Latitude of a Line, Introduction to total station.
Levelling: Instrument used Object of levelling, Methods of levelling in brief, and Contour maps.
Chapter 4
Buildings: Selection of site for Buildings, Layout of Building Plan, Types of buildings, Plinth area, carpet area, floor space index, Introduction to building byelaws, concept of sun light & ventilation. Components of Buildings & their functions, Basic concept of R.C.C., Introduction to types of foundation
Chapter 5
Transportation: Introduction to Transportation Engineering; Traffic and Road Safety: Types and Characteristics of Various Modes of Transportation; Various Road Traffic Signs, Causes of Accidents and Road Safety Measures.
Chapter 6
Environmental Engineering: Environmental Pollution, Environmental Acts and Regulations, Functional Concepts of Ecology, Basics of Species, Biodiversity, Ecosystem, Hydrological Cycle; Chemical Cycles: Carbon, Nitrogen & Phosphorus; Energy Flow in Ecosystems.
Water Pollution: Water Quality standards, Introduction to Treatment & Disposal of Waste Water. Reuse and Saving of Water, Rain Water Harvesting. Solid Waste Management: Classification of Solid Waste, Collection, Transportation and Disposal of Solid. Recycling of Solid Waste: Energy Recovery, Sanitary Landfill, On-Site Sanitation. Air & Noise Pollution: Primary and Secondary air pollutants, Harmful effects of Air Pollution, Control of Air Pollution. . Noise Pollution Harmful Effects of noise pollution, control of noise pollution, Global warming & Climate Change, Ozone depletion, Greenhouse effect
Text Books:
1. Palancharmy, Basic Civil Engineering, McGraw Hill publishers.
2. Satheesh Gopi, Basic Civil Engineering, Pearson Publishers.
3. Ketki Rangwala Dalal, Essentials of Civil Engineering, Charotar Publishing House.
4. BCP, Surveying volume 1
Bed Making ( Introduction, Purpose, Types, Articles, Scientific principles, N...
01 requerimirnto
1. PROYECTO : CONSTRUCCIÓN DEL LOCAL DE USOS MÚLTIPLES EN EL ANEXO DE OTORA
INT. EJEC. : MUNICIPALIDAD DISTRITAL DE TORATA
REGIÓN : MOQUEGUA
PROVINCIA : MARISCAL NIETO
DISTRITO : TORATA
C. P. : OTORA
Nº DESCRIPCIÓN UND M1 cantidad M2 cantidad M3 cantidad TOTAL
01 MANO DE OBRA 134,931.13
Topografo. hh S/. 3,206.07 1 S/. 3,206.07 1 S/. 3,206.07 1 9,618.21
Capataz hh S/. 4,788.00 1 S/. 4,788.00 1 S/. 4,788.00 1 14,364.00
Operario. hh S/. 10,902.41 3 S/. 21,804.82 5 S/. 10,902.41 3 43,609.63
Oficial. hh S/. 4,039.23 1 S/. 8,078.47 2 S/. 4,039.23 1 16,156.93
Peón. hh S/. 12,795.59 4 S/. 25,591.18 8 S/. 12,795.59 4 51,182.35
02 MATERIALES 258,328.57
Alambre Negro N°16. kg S/. 497.3 S/. 95.64 S/. 726.8 S/. 161.5 S/. 358.3 1,582.38
Alambre Negro N°8. kg S/. 293.8 S/. 56.50 S/. 231.1 S/. 181.6 706.42
Clavos Para Madera C/C 1". kg S/. 2.6 S/. 0.47 S/. 5.2 S/. 0.0 7.80
Clavos Para Madera C/C 2 1/2" kg S/. 0.0 S/. 0.0 S/. 117.7 S/. 0.0 117.65
Clavos Para Madera C/C 3" kg S/. 218.5 S/. 39.73 S/. 141.8 S/. 549.4 909.75
Clavos Para Madera C/C 2" kg S/. 147.5 S/. 26.83 S/. 20.0 S/. 0.0 167.51
Perno 1/2"x12". und S/. 0.0 S/. 0.0 S/. 167.2 S/. 0.0 167.19
Espárrajo de 3/16" y accesorios completo und S/. 0.0 S/. 0.0 S/. 325.2 S/. 0.0 325.19
Perno 3/8"x4" con tuerca+volandas a presion. und S/. 0.0 S/. 0.0 S/. 1,435.2 S/. 0.0 1,435.19
Perno 3/8"x5" con tuerca+volandas a presion. und S/. 0.0 S/. 0.0 S/. 946.4 S/. 0.0 946.39
Acero liso de 1/2" m S/. 0.0 S/. 0.0 S/. 0.0 S/. 861.5 861.46
Pernos Hexagonales De 3/4" X 3 1/2" pza S/. 207.2 S/. 31.88 S/. 0.0 S/. 0.0 207.19
Acero de refuerzo Fy=4200 Grado 60. kg S/. 9,976.4 S/. 2,850.4 S/. 8,357.8 S/. 0.0 18,334.17
Acero currugado Ø 1/2" m S/. 0.0 S/. 0.0 S/. 0.0 S/. 128.0 127.99
Arena Fina. m3 S/. 0.0 S/. 0.0 S/. 759.7 S/. 1,755.6 2,515.35
Abono m3 S/. 0.0 S/. 0.0 S/. 0.0 S/. 175.8 175.82
Urea al 46% kg S/. 0.0 S/. 0.0 S/. 0.0 S/. 114.3 114.33
Semilla de grass. kg S/. 0.0 S/. 0.0 S/. 0.0 S/. 386.4 386.43
Tierra negra sarandeada m3 S/. 0.0 S/. 0.0 S/. 0.0 S/. 824.4 824.37
Piedra chancada de 1/2 - 3/4". m3 S/. 1,485.5 S/. 14.85 S/. 5,167.4 S/. 5,249.1 11,902.02
Piedra Mediana. m3 S/. 42.3 S/. 0.65 S/. 536.8 S/. 62.8 641.91
Piedra grande. m3 S/. 363.2 S/. 5.6 S/. 189.6 S/. 991.4 1,544.24
Arena Gruesa m3 S/. 1,232.5 S/. 273.9 S/. 4,509.7 S/. 3,698.4 9,440.61
Material de relleno m3 S/. 0.0 S/. 0.0 S/. 6,064.0 S/. 706.6 6,770.57
Cable de 2.5mm2 TW m S/. 0.0 S/. 0.0 S/. 0.0 S/. 254.7 254.66
Cable de 2.5mm2 THW m S/. 0.0 S/. 0.0 S/. 0.0 S/. 485.7 485.71
Cable de 10mm2 Cu desnudo blando m S/. 0.0 S/. 0.0 S/. 0.0 S/. 145.7 145.67
Cable de 4mm2 THW m S/. 0.0 S/. 0.0 S/. 0.0 S/. 434.5 434.47
Cable de 10mm2 THW m S/. 0.0 S/. 0.0 S/. 0.0 S/. 230.6 230.63
Cable de 6mm2 THW m S/. 0.0 S/. 0.0 S/. 0.0 S/. 266.2 266.19
Inodoro Tque. Bajo Normal Blanco C/A. und S/. 0.0 S/. 0.0 S/. 983.2 S/. 0.0 983.19
Urinario blanco inc/accesorios und S/. 0.0 S/. 0.0 S/. 198.2 S/. 0.0 198.19
Registro Cromado De 4". und S/. 0.0 S/. 0.0 S/. 0.0 S/. 129.2 129.19
Luminaria circular al modelo FWG200 2xPL-C/2P 18W/Philipsund S/. 0.0 S/. 0.0 S/. 0.0 S/. 403.2 403.19
Luminaria p/interiores similar al modelo TCS160 2xTL-D36W HFS C3/Philips, 202x900mmund S/. 0.0 S/. 0.0 S/. 0.0 S/. 1,048.2 1,048.19
Luminaria fluorecente de 1x32W/Fhilips o similar und S/. 0.0 S/. 0.0 S/. 0.0 S/. 467.2 467.19
Luminaria tipo braquete und S/. 0.0 S/. 0.0 S/. 0.0 S/. 253.2 253.19
Tablero monofasico 220 de barras con bornera a tierra 10 polosund S/. 0.0 S/. 0.0 S/. 0.0 S/. 273.2 273.19
Tomacorriente doble con puesta a tierra und S/. 0.0 S/. 0.0 S/. 0.0 S/. 436.0 435.99
Interruptor termomagnetico 2x15A de engrampe und S/. 0.0 S/. 0.0 S/. 0.0 S/. 123.2 123.19
Interruptor termomagnetico 2x20A de engrampe und S/. 0.0 S/. 0.0 S/. 0.0 S/. 253.2 253.19
Interruptor termomagnetico 2x40A de engrampe und S/. 0.0 S/. 0.0 S/. 0.0 S/. 148.2 148.19
Interruptor termomagnetico 2x50A de engrampe und S/. 0.0 S/. 0.0 S/. 0.0 S/. 161.2 161.19
Interruptor termomagnetico 2x30A de engrampe und S/. 0.0 S/. 0.0 S/. 0.0 S/. 173.2 173.19
Caja cuadrada de paso FºGº 100x100x55mm. und S/. 0.0 S/. 0.0 S/. 0.0 S/. 133.2 133.19
Caja metalica portamedidor tipo L und S/. 0.0 S/. 0.0 S/. 0.0 S/. 133.2 133.19
Caja rectangular und S/. 0.0 S/. 0.0 S/. 0.0 S/. 183.1 183.09
Equipo de luz de emergencia de 2x20W inc/accesoriosund S/. 0.0 S/. 0.0 S/. 0.0 S/. 358.2 358.19
Salida para Tv-Cable pto S/. 0.0 S/. 0.0 S/. 0.0 S/. 114.2 114.19
Ladrillo K.K. De Arcilla 10X14X24 Cm. und S/. 0.0 S/. 0.0 S/. 3,540.0 S/. 9,516.1 13,056.09
Ladrillo kk caravista 9x12X24 und S/. 0.0 S/. 0.0 S/. 202.4 S/. 0.0 202.44
Ladrillo hueco de 12x30x30cm und S/. 0.0 S/. 0.0 S/. 1,410.7 S/. 0.0 1,410.69
Cable concentrico 2x10mm2 SET m S/. 0.0 S/. 0.0 S/. 0.0 S/. 324.2 324.19
Cemento Portland Tipo I (42.5KG). bls S/. 8,900.6 S/. 383.65 S/. 22,832.9 S/. 17,288.6 49,022.04
Plancha de baldosa 5/8"(1.22mx0.61m) pl S/. 0.0 S/. 0.0 S/. 0.0 S/. 2,807.4 2,807.40
Caja De C° Simple P/Medidor Agua T/Esal. pza S/. 0.0 S/. 0.0 S/. 0.0 S/. 135.2 135.19
Ceramica revestimiento de 20x33 cm m2 S/. 0.0 S/. 0.0 S/. 0.0 S/. 2,558.7 2,558.68
Picaporte de bronce 6" und S/. 0.0 S/. 0.0 S/. 0.0 S/. 151.2 151.19
Cerradura Exterior De Dos Golpes. und S/. 0.0 S/. 0.0 S/. 0.0 S/. 283.2 283.19
Cerradura exterior de tres golpes. und S/. 0.0 S/. 0.0 S/. 0.0 S/. 343.2 343.19
Bisagra Bronceada Capuchina #333 3"X3". par S/. 0.0 S/. 0.0 S/. 0.0 S/. 477.2 477.19
Bisagra de acero und S/. 0.0 S/. 0.0 S/. 0.0 S/. 144.2 144.23
Bisagra tipo slide o similar p/muebles und S/. 0.0 S/. 0.0 S/. 0.0 S/. 163.2 163.19
Cerradura p/muebles und S/. 0.0 S/. 0.0 S/. 0.0 S/. 135.7 135.69
Cerradura Tipo Perilla Con Boton Para Ss Hh. und S/. 0.0 S/. 0.0 S/. 0.0 S/. 208.2 208.19
Cinta Aislante 3M und S/. 0.0 S/. 0.0 S/. 0.0 S/. 108.9 108.89
Cinta Teflon. rll S/. 0.0 S/. 0.0 S/. 0.0 S/. 113.0 112.99
Yeso De 28 Kg. bls S/. 345.4 S/. 13.82 S/. 44.4 S/. 95.0 484.86
Ocre de color kg S/. 0.0 S/. 0.0 S/. 111.8 S/. 0.0 111.77
Thiner. gal S/. 0.0 S/. 0.0 S/. 0.0 S/. 183.5 183.53
Arbol I und S/. 0.0 S/. 0.0 S/. 0.0 S/. 127.2 127.19
Arbustos I und S/. 0.0 S/. 0.0 S/. 0.0 S/. 132.0 131.99
Arbustos II und S/. 0.0 S/. 0.0 S/. 0.0 S/. 128.2 128.19
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES
2. PROYECTO : CONSTRUCCIÓN DEL LOCAL DE USOS MÚLTIPLES EN EL ANEXO DE OTORA
INT. EJEC. : MUNICIPALIDAD DISTRITAL DE TORATA
REGIÓN : MOQUEGUA
PROVINCIA : MARISCAL NIETO
DISTRITO : TORATA
C. P. : OTORA
Nº DESCRIPCIÓN UND M1 cantidad M2 cantidad M3 cantidad TOTAL
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES
Flores tipo I und S/. 0.0 S/. 0.0 S/. 0.0 S/. 218.7 218.69
Soldadura para estructucturas kg S/. 60.0 S/. 3.33 S/. 0.0 S/. 862.2 922.22
Porcelana. kg S/. 0.0 S/. 0.0 S/. 312.2 S/. 493.9 806.16
Sellador. gal S/. 0.0 S/. 0.0 S/. 463.2 S/. 448.3 911.50
Interruptor Unipolar Simple Magic Ticino O Similar. und S/. 0.0 S/. 0.0 S/. 34.1 S/. 169.9 203.99
Interruptor Unipolar Doble Magic Ticino O Similar. und S/. 0.0 S/. 0.0 S/. 35.0 S/. 118.1 153.19
Lavatorio 23"X17" P/Grif.4" Blanco C/A. und S/. 0.0 S/. 0.0 S/. 0.0 S/. 583.2 583.19
Lavadero acero inoxidable 21"X38" 2 pozas inc. acce.und S/. 0.0 S/. 0.0 S/. 0.0 S/. 293.2 293.19
Silicona. und S/. 0.0 S/. 0.0 S/. 427.0 S/. 300.7 727.65
Pegamento Para Tuberia Pvc. gal S/. 0.0 S/. 0.0 S/. 172.7 S/. 13.1 185.79
Sellador Elastomerico. cja S/. 434.9 S/. 14.50 S/. 518.4 S/. 652.6 1,605.89
Medidor de energia eléctrica monofasico und S/. 0.0 S/. 0.0 S/. 0.0 S/. 253.2 253.19
Medidas de seguridad glb S/. 603.2 S/. 134.0 S/. 0.0 S/. 0.0 603.19
Rotura de testigos de concreto und S/. 352.3 S/. 78.3 S/. 335.3 S/. 195.6 883.19
Diseño de mezclas und S/. 485.2 S/. 2.21 S/. 472.8 S/. 465.2 1,423.19
Ensayo de suelos und S/. 1,494.8 S/. 1.03 S/. 1,483.0 S/. 1,475.4 4,453.19
Ensayos de densidad de campo (proctor) glb S/. 0.0 S/. 0.0 S/. 814.1 S/. 225.1 1,039.19
Caja De Registro De 12"X24" De C-S P/Desague. pza S/. 0.0 S/. 0.0 S/. 109.9 S/. 63.3 173.19
Caja de registro de concreto und S/. 0.0 S/. 0.0 S/. 0.0 S/. 128.2 128.19
Movilizacion Y Desmovilizacion De Equipo. glb S/. 2,903.2 S/. 645.2 S/. 0.0 S/. 0.0 2,903.19
Lija para metal. hja S/. 0.0 S/. 0.0 S/. 72.7 S/. 124.6 197.28
Lija para Madera. und S/. 0.0 S/. 0.0 S/. 58.5 S/. 93.1 151.62
Lija para concreto. hja S/. 0.0 S/. 0.0 S/. 250.6 S/. 120.3 370.94
Paja de fibra fina. kg S/. 0.0 S/. 0.0 S/. 181.6 S/. 0.0 181.63
Teknopor De 1" X 4' X 8'. pl S/. 0.0 S/. 0.0 S/. 207.7 S/. 0.0 207.68
Agua. m3 S/. 339.1 S/. 33.91 S/. 384.6 S/. 288.8 1,012.53
Dosis de sales rehidratantes und S/. 0.0 S/. 0.0 S/. 0.0 S/. 147.2 147.19
Instalacion de accesorios pozo percolador. glb S/. 0.0 S/. 0.0 S/. 0.0 S/. 263.2 263.19
Instalacion de biodigestores inc. mat y equipos. pza S/. 0.0 S/. 0.0 S/. 353.2 S/. 0.0 353.19
Instalacion de biodigestores asesoria y control glb S/. 0.0 S/. 0.0 S/. 603.2 S/. 0.0 603.19
Transporte de Materiales. glb S/. 14,065.5 S/. 1.01 S/. 0.0 S/. 0.0 14,065.49
Tapa metalica inspeccion 0.60m*0.60m. und S/. 0.0 S/. 0.0 S/. 0.0 S/. 142.8 142.79
Ceramica 7.5X30cm Celima Serie Rustica. m S/. 0.0 S/. 0.0 S/. 682.0 S/. 1,231.8 1,913.79
Ceramica Antideslizante 30x30 Cm. Serie Rustico Celima.m2 S/. 0.0 S/. 0.0 S/. 2,310.2 S/. 1,427.4 3,737.68
Madera Tornillo. p2 S/. 1,115.3 S/. 199.16 S/. 2,405.3 S/. 3,005.8 6,526.39
Puerta Tablero Rebajado Con Marco Cedro/Incl. Instalacion.m2 S/. 0.0 S/. 0.0 S/. 784.1 S/. 5,591.1 6,375.19
Puerta Tablero Rebajado doble hoja Con Marco Cedro/Incl. Instalacion.m2 S/. 0.0 S/. 0.0 S/. 1,221.4 S/. 1,139.3 2,360.69
Marco de madera con bisel m S/. 0.0 S/. 0.0 S/. 2,364.7 S/. 1,390.0 3,754.79
Madera nacional p/encof. y carpinteria. p2 S/. 5,843.4 S/. 1,062.43 S/. 4,443.4 S/. 5,945.9 16,232.67
Madera eucalipto rollizo. p2 S/. 0.0 S/. 0.0 S/. 0.0 S/. 1,314.6 1,314.57
Plancha melamina de 4'x8'x19mm pl S/. 0.0 S/. 0.0 S/. 488.5 S/. 0.0 488.53
Triplay de 4'X8'X 4 mm. pl S/. 1,901.4 S/. 51.39 S/. 0.0 S/. 0.0 1,901.39
Malla galvanizada Nº 10 m2 S/. 0.0 S/. 0.0 S/. 0.0 S/. 920.7 920.69
Tapa C/Marco Fºfº De Desague 12" X 24". pza S/. 0.0 S/. 0.0 S/. 103.3 S/. 51.9 155.19
Tapa Y Marco F° Gal. P/Med. Agua. pza S/. 0.0 S/. 0.0 S/. 0.0 S/. 123.2 123.19
Acero estructural T 1 1/4" x 1 1/4"x1/8" (largueros) m S/. 0.0 S/. 0.0 S/. 764.9 S/. 0.0 764.94
Acero estructural L 3/4"x3/4"x1/8" (perimetral) m S/. 0.0 S/. 0.0 S/. 635.5 S/. 0.0 635.45
Acero estructural L 3/4"x3/4"x2.5mm" m S/. 0.0 S/. 0.0 S/. 274.1 S/. 0.0 274.08
Platina de fierro/ml 2"x3/16". m S/. 0.0 S/. 0.0 S/. 139.2 S/. 0.0 139.19
Platina 2" X 1/8" m S/. 0.0 S/. 0.0 S/. 116.4 S/. 0.0 116.39
Platina 1" X 1/8" m S/. 0.0 S/. 0.0 S/. 1,026.7 S/. 0.0 1,026.71
Tubo de acero cuadrado 2"x2"x1/8" m S/. 0.0 S/. 0.0 S/. 0.0 S/. 1,170.3 1,170.26
Petroleo. gal S/. 314.4 S/. 25.15 S/. 82.0 S/. 0.0 396.35
Combustible gal S/. 159.9 S/. 12.79 S/. 631.8 S/. 308.2 1,099.84
Pintura esmalte sintetico gal S/. 0.0 S/. 0.0 S/. 293.5 S/. 407.2 700.74
Base Imprimante kg S/. 0.0 S/. 0.0 S/. 304.6 S/. 283.6 588.18
Pintura Esmalte Sintetico. gal S/. 0.0 S/. 0.0 S/. 0.0 S/. 169.0 168.95
Pintura Latex Tipo Supermate. gal S/. 0.0 S/. 0.0 S/. 0.0 S/. 1,796.8 1,796.77
Pintura Anticorrosiva. gal S/. 0.0 S/. 0.0 S/. 0.0 S/. 821.2 821.20
Pintura esmalte gal S/. 187.6 S/. 3.75 S/. 18.9 S/. 35.7 242.18
Barniz Marino. gal S/. 0.0 S/. 0.0 S/. 115.3 S/. 0.0 115.29
Plancha de acero e:3/16" p/platinas m2 S/. 0.0 S/. 0.0 S/. 633.6 S/. 0.0 633.59
Calamina Galvanizada De 0.25X830X1800. pl S/. 1,167.2 S/. 41.69 S/. 0.0 S/. 0.0 1,167.19
Canaleta circular F°G° de 1/8x6". m S/. 0.0 S/. 0.0 S/. 522.8 S/. 0.0 522.77
Tubo negro 2". m S/. 1,118.2 S/. 37.27 S/. 1,425.8 S/. 0.0 2,543.99
Tubo negro 2 1/2". m S/. 872.8 S/. 26.45 S/. 1,328.8 S/. 0.0 2,201.59
Tubo negro 1 1/2" m S/. 0.0 S/. 0.0 S/. 1,315.7 S/. 0.0 1,315.69
Union Universal De Fo. Galv. De 1/2". und S/. 0.0 S/. 0.0 S/. 263.2 S/. 0.0 263.19
Niple De Fo Go De 1/2" X 1 1/2". und S/. 0.0 S/. 0.0 S/. 151.2 S/. 0.0 151.19
Tirafones de 3/16"x5" pza S/. 0.0 S/. 0.0 S/. 436.2 S/. 0.0 436.19
Alambre galvanizado Nº 14 kg S/. 0.0 S/. 0.0 S/. 232.0 S/. 0.0 231.96
Tejaforte granada opaca de 1.15m x 0.76m x 0.09mund S/. 0.0 S/. 0.0 S/. 4,931.7 S/. 0.0 4,931.69
Cumbrera superior tejaforte und S/. 0.0 S/. 0.0 S/. 345.6 S/. 0.0 345.59
Varilla de cobre 5/8"x2.40m 99.9% pureza und S/. 0.0 S/. 0.0 S/. 283.2 S/. 0.0 283.19
Sumidero De Bronce De 2". pza S/. 0.0 S/. 0.0 S/. 124.4 S/. 0.0 124.39
Tubo Pvc Sal 2" X 3m. pza S/. 0.0 S/. 0.0 S/. 148.0 S/. 0.0 147.99
Union Pvc Sap Roscado 1/2". pza S/. 0.0 S/. 0.0 S/. 134.4 S/. 0.0 134.39
Union Pvc Sap Roscado 3/4". pza S/. 0.0 S/. 0.0 S/. 106.2 S/. 0.0 106.19
Tee Sanitaria Simple Pvc Sal De 4". und S/. 0.0 S/. 0.0 S/. 116.4 S/. 0.0 116.39
Tuberia y accesorios. glb S/. 0.0 S/. 0.0 S/. 353.2 S/. 0.0 353.19
Tee Pvc Sap 1/2" C/R P/Agua. und S/. 0.0 S/. 0.0 S/. 125.2 S/. 0.0 125.19
3. PROYECTO : CONSTRUCCIÓN DEL LOCAL DE USOS MÚLTIPLES EN EL ANEXO DE OTORA
INT. EJEC. : MUNICIPALIDAD DISTRITAL DE TORATA
REGIÓN : MOQUEGUA
PROVINCIA : MARISCAL NIETO
DISTRITO : TORATA
C. P. : OTORA
Nº DESCRIPCIÓN UND M1 cantidad M2 cantidad M3 cantidad TOTAL
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES
Tub. Pvc Sap Presion P/Agua C-10 Ec 1/2". m S/. 0.0 S/. 0.0 S/. 460.6 S/. 0.0 460.55
Tub. Pvc Sap Presion P/Agua C-10 Ec 3/4". m S/. 0.0 S/. 0.0 S/. 194.6 S/. 0.0 194.57
Tuberia pvc sal 4" m S/. 0.0 S/. 0.0 S/. 194.6 S/. 0.0 194.55
Tuberia Pvc Sal 3". m S/. 0.0 S/. 0.0 S/. 363.5 S/. 0.0 363.45
Tuberia cribada m S/. 0.0 S/. 0.0 S/. 343.2 S/. 0.0 343.19
Biodigestor de 1300 lt. pza S/. 0.0 S/. 0.0 S/. 2,003.2 S/. 0.0 2,003.19
Codo De 90 Pvc Sal De 2. und S/. 0.0 S/. 0.0 S/. 127.2 S/. 0.0 127.19
Codo De 90 Pvc Sal De 4". und S/. 0.0 S/. 0.0 S/. 133.2 S/. 0.0 133.19
Codo Pvc Sap 1/2" C/Rosca 90º. und S/. 0.0 S/. 0.0 S/. 203.2 S/. 0.0 203.19
Codos Pvc Sal 4" X 90°. pza S/. 0.0 S/. 0.0 S/. 160.9 S/. 0.0 160.94
Codo de 90° C/R PVC sap P/agua de 3/4". und S/. 0.0 S/. 0.0 S/. 146.4 S/. 0.0 146.39
Terminal de PVC und S/. 0.0 S/. 0.0 S/. 167.7 S/. 0.0 167.69
Arandela plástica 3/16" y accesorios completo und S/. 0.0 S/. 0.0 S/. 269.7 S/. 0.0 269.69
Codo de 45º Pvc Sal de 4". und S/. 0.0 S/. 0.0 S/. 108.7 S/. 0.0 108.69
Codo de 90° C/R PVC sap P/agua de 1/2". und S/. 0.0 S/. 0.0 S/. 124.8 S/. 0.0 124.79
Tee Pvc Sal 4" X 4". und S/. 0.0 S/. 0.0 S/. 143.2 S/. 0.0 143.19
Tee Pvc Sal 4" X 2". und S/. 0.0 S/. 0.0 S/. 127.2 S/. 0.0 127.19
Yee Pvc Sal De 4" X 4". pza S/. 0.0 S/. 0.0 S/. 129.2 S/. 0.0 129.19
Caja octagonal und S/. 0.0 S/. 0.0 S/. 149.1 S/. 0.0 149.09
Tubo PVC SEL 3/4" m S/. 0.0 S/. 0.0 S/. 273.8 S/. 350.6 624.37
Tubo PVC SEL 1" m S/. 0.0 S/. 0.0 S/. 209.0 S/. 104.2 313.19
Banner de 3.80 x 2.40m. und S/. 498.2 S/. 1.26 S/. 0.0 S/. 0.0 498.19
Curva 90º PVC 20mm pza S/. 0.0 S/. 0.0 S/. 139.9 S/. 29.3 169.19
Conector Anderson. und S/. 0.0 S/. 0.0 S/. 0.0 S/. 107.7 107.69
Valvula Compuerta De Bronce De 1/2". und S/. 0.0 S/. 0.0 S/. 0.0 S/. 423.2 423.19
Vidrio Transparente Incoloro Crudo Mediodoble. m2 S/. 0.0 S/. 0.0 S/. 216.5 S/. 1,447.8 1,664.33
03 EQUIPOS - 9,311.14
Herramienta manuales. %mo S/. 893.28 S/. 1,586.71 S/. 893.28 3,373.28
Jalon. he S/. 19.89 17 S/. 10.05 S/. 0.00 46.52
Camion cisterna de 3000 gl. hm S/. 64.76 0 S/. 65.01 S/. 0.00 130.12
Motobomba 3.5 HP 2" hm S/. 0.00 - S/. 90.00 S/. 0.00 90.00
Equipo De Soldar. hm S/. 0.00 - S/. 184.58 S/. 184.58 369.15
Andamio metalico. hm S/. 0.00 - S/. 270.19 S/. 190.20 460.39
Winche Con Balde. hm S/. 0.00 - S/. 59.04 S/. 43.44 102.48
Cortador de cesped. hm S/. 0.00 - S/. 0.00 S/. 30.00 30.00
Compactador Vibr. Tipo Plancha 4 Hp. hm S/. 48.48 3 S/. 532.49 S/. 77.63 661.84
Compactador vibr. tipo plancha 7 HP hm S/. 0.00 - S/. 125.25 S/. 118.78 244.03
Vibrador De Concreto 4 Hp 1.35". hm S/. 102.28 7 S/. 263.35 S/. 0.00 372.45
Motosoldadora de 250 A hm S/. 93.99 6 S/. 88.11 S/. 36.84 225.21
Tractor D7 hm S/. 257.89 1 S/. 0.00 S/. 0.00 258.92
Mezcladora Concreto Tambor 18HP 11p3. hm S/. 513.96 26 S/. 1,118.12 S/. 990.95 2,648.73
Nivel Topografico. he S/. 82.90 6 S/. 13.11 S/. 27.25 128.79
Teodolito/Estación total he S/. 110.53 6 S/. 17.48 S/. 35.71 169.25
04 MOBILIARIO Y EQUIPAMIENTO 18,478.94
Refrigeradora und S/. 1,499.00 1,499.00
Micrófono und S/. 45.00 45.00
Dvd und S/. 180.00 180.00
Equipo de Sonido tipo (Mini Componente FWM-997)und S/. 1,350.00 1,350.00
Licuadora und S/. 200.00 200.00
Televisor de 21" LCD und S/. 1,100.00 1,100.00
Cocina industrial 4 hornillas und S/. 1,243.44 1,243.44
Balón de gas und S/. 250.00 250.00
Guantes p/cocina par S/. 36.00 36.00
Asta de bandera und S/. 40.00 40.00
Sillas madera forrada con tela und S/. 4,875.00 4,875.00
Pizarra acrilica und S/. 210.00 210.00
Mesa de madera 1.0mx2.4m und S/. 1,300.00 1,300.00
Cubiertos jgo S/. 337.50 337.50
Vajillas jgo S/. 450.00 450.00
Vasos de vidrio und S/. 135.00 135.00
Tachos de basura und S/. 192.00 192.00
Pocillos und S/. 60.00 60.00
Cucharon und S/. 100.00 100.00
Espumadera und S/. 60.00 60.00
Prensa papas und S/. 75.00 75.00
Condimenteros und S/. 64.00 64.00
Tabla de picar und S/. 84.00 84.00
Ralladores und S/. 72.00 72.00
Cuchillos und S/. 176.00 176.00
Asadera de 20"x30" und S/. 84.00 84.00
Ollas und S/. 2,400.00 2,400.00
Bandera nacional und S/. 80.00 80.00
Cortinas und S/. 350.00 350.00
Andamio und S/. 360.00 360.00
4. PROYECTO : CONSTRUCCIÓN DEL LOCAL DE USOS MÚLTIPLES EN EL ANEXO DE OTORA
INT. EJEC. : MUNICIPALIDAD DISTRITAL DE TORATA
REGIÓN : MOQUEGUA
PROVINCIA : MARISCAL NIETO
DISTRITO : TORATA
C. P. : OTORA
Nº DESCRIPCIÓN UND M1 cantidad M2 cantidad M3 cantidad TOTAL
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES
Espejos 50 X 60 cm und S/. 75.00 75.00
Expendedor de papel und S/. 480.00 480.00
Dispensador de jabón liquido und S/. 160.00 160.00
Stiker de señalización und S/. 60.00 60.00
Porta cubiertos und S/. 48.00 48.00
Porta platos und S/. 168.00 168.00
Sartén und S/. 80.00 80.00
S/.95548.64 S/.172779.24 S/.152650.88 S/.421049.78
25.95% GASTOS GENERALES S/.24794.87 S/.44836.21 S/.39612.90 S/.109262.42
SUB TOTAL S/.120343.51 S/.217615.45 S/.192263.78 S/.530312.20
8.85% GASTOS DE SUPERVISIÓN S/.8456.05 S/.15290.96 S/.13509.60 S/.37262.91
2.35% GASTOS DE GESTIÓN DE PROYEC. Y ADMINISTRATIVOS S/.2245.39 S/.4060.31 S/.3587.30 S/.9894.67
5.0% ELEBORACIÓN DE EXPEDIENTE TÉCNICO S/.4777.43 S/.8638.96 S/.7632.54 S/.21052.49
S/.15478.88 S/.27990.24 S/.24729.44 S/.598522.27
TOTAL DE COSTO DIRECTO
TOTAL PRESUPUESTO DE OBRA