SlideShare a Scribd company logo
PRESUPUESTO GENERAL
Proyecto : CONST. PRESA MANQUIRI - ACHUMIRI (POTOSÍ)
Cliente : F.P.S. - GAM POTOSÍ
Lugar : MANQUIRI - ACHUMIRI
Item DESCRIPCIÓN UNID. CANT. P UNIT PARCIAL
Nº (Bs.) (Bs.)
1 INSTALACIONES GENERALES
1.1 INSTALACION DE FAENAS Y MOVILIZACION (GLOBAL) GLB 1.00 22,361.66 22,361.66
1.2 INSTALACION DE FAENAS C/ALQUILER DE AMBIENTES GLB 1.00 6,200.65 6,200.65
1.3 LETRERO DE OBRAS FPS (SEGUN DISEÑO) PZA 1.00 412.12 412.12
1.4 LETRERO DE OBRAS MURO DE LADRILLO (SEGUN DISEÑO) PZA 1.00 2,433.08 2,433.08
1.5 PLACA ENTREGA DE OBRAS FPS (SEGUN DISEÑO PZA 2.00 817.27 1,634.54
SUBTOTAL Bs. 33,042.05
2 PREPARACION
2.1 LIMPIEZA MECANICA DE SUPERFICIES HA 2.76 2,431.51 6,710.97
2.2 DESVIO Y CONTROL DE AGUAS GLB 1.00 4,940.10 4,940.10
SUBTOTAL Bs. 11,651.07
3 INYECCIONES DE CEMENTO
3.1 ESTUDIO GEOSISMICO GLB 1.00 8,510.28 8,510.28
3.2 PERFORACIONES NQ ML 775.00 1,276.54 989,318.50
3.3 CASING ML 57.00 521.55 29,728.35
3.4 ENSAYOS LUGEON CON 5 ETAPAS PTO 16.00 389.04 6,224.64
3.5 INYECCIONES DE CEMENTO TON 19.00 4,863.02 92,397.38
3.6 ARENA BENTONITA Y OTROS GLB 1.00 12,157.54 12,157.54
SUBTOTAL Bs. 1,138,336.69
4 CUERPO REPRESA GRAVEDAD
4.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 399.98 18.08 7,231.64
4.2 EXCAVACION ESTRUCTURAS A MAQUINA SUELO SEMIDURO M3 89.18 32.26 2,876.95
4.3 EXCAVACION ESTRUCTURAS A MAQUINA ROCA M3 1,694.51 92.94 157,487.76
4.4 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO M3 628.25 48.84 30,683.73
4.5 HºCº - FUNDACIONES (1:2:3-50% PD-H21) M3 1,556.35 879.29 1,368,482.99
4.6 HºCº - ELEVACIONES (1:2:3-50% PD-H21) M3 1,300.70 1,136.61 1,478,388.63
4.7 HºSº (1:2:3 - H21)-RECUBRIMIENTO M3 66.51 993.43 66,073.03
4.8 HºAº (1:2:3-H21) - LOSAS (ESTRUCTURAS CORRIENTES) M3 35.16 4,083.71 143,583.24
4.9 JUNTAS DE DILATACION CON CINTA WATER STOP 0-32 ML 45.08 262.52 11,834.40
4.10 BARANDADO METALICO M2 86.40 497.12 42,951.17
4.11 PIEZOMETRO PZA 2.00 1,812.61 3,625.22
4.12 LIMNIMETRO PZA 1.00 132.95 132.95
SUBTOTAL Bs. 3,313,351.71
5 DISIPADOR DE ENERGIA
5.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 74.80 18.08 1,352.38
5.2 EXCAVACION ESTRUCTURAS A MAQUINA SUELO SEMIDURO M3 13.15 32.26 424.22
5.3 EXCAVACION ESTRUCTURAS A MAQUINA ROCA M3 249.90 92.94 23,225.71
5.4 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO M3 35.19 48.84 1,718.68
5.5 HºCº - FUNDACIONES (1:2:3-50% PD-H21) M3 93.11 879.29 81,870.69
5.6 HºAº (1:2:3-H21) - ESTRUCTURAS CORRIENTES M3 28.22 4,083.71 115,242.30
SUBTOTAL Bs. 223,833.98
6 OBRA DE TOMA REPRESA
6.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 23.08 18.08 417.29
6.2 EXCAVACION ESTRUCTURAS 0-2M - SUELO DURO M3 24.73 130.16 3,218.86
6.3 PROVISION Y TENDIDO TUBERIA F.G. 12" ML 12.00 755.74 9,068.88
6.4 VALVULA DE CIERRE 12 PLG PN 20 INCL/ ACC. PZA 19.30 24,054.40 464,249.92
6.5 REJILLA DE ACERO INOXID. M2 2.00 677.61 1,355.22
6.6 ESCALERA METALICA INTERIOR (ANCHO 0.50M) ML 23.54 289.46 6,813.89
6.7 TAPA METALICA VISITA (0.70*0.70*3/16) INCL./ ACC. PZA 2.00 1,660.92 3,321.84
6.8 H°C° - CAMARAS (1:2:3-50% PD-H21) M3 21.54 1,016.01 21,884.86
6.9 HºAº (1:2:3-H21) - ESTRUCTURAS CORRIENTES M3 0.87 4,083.71 3,552.83
SUBTOTAL Bs. 513,883.57
7 DESAGUE DE AZOLVES
7.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 32.89 18.08 594.65
7.2 HºAº (1:2:3-H21) - ESTRUCTURAS CORRIENTES M3 15.39 4,083.71 62,848.30
7.3 COMPUERTA METALICA PARA PRESAS HP=20M PZA 1.00 230,174.67 230,174.67
7.4 TUBERIA LLENADO DE CONDUCTO DN 10" ML 4.60 669.40 3,079.24
7.5 VALVULA DE CIERRE LLENADO DE CONDUCTO DN250 PZA 1.00 11,780.15 11,780.15
7.6 ZAMPEADO DE PIEDRA M2 6.30 162.08 1,021.10
SUBTOTAL Bs. 309,498.11
8 CONDUCCION POR TUBERIA
8.1 REPLANTEO Y CONTROL DE LINEAS DE TUBERIA ML 4,153.99 1.47 6,106.37
8.2 EXCAVACION DE ZANJAS-ROCA M3 232.26 173.24 40,236.72
8.3 EXCAVACION DE ZANJAS 0-2M - SUELO DURO M3 3,117.62 151.85 473,410.60
8.4 RELLENO MANUAL C/TIERRA CERNIDA (NO I/MA M3 623.52 93.75 58,455.00
8.5 PROV.Y TEND.TUBERIA PVC 12" SDR-64 (U-A) ML 723.98 218.85 158,443.02
8.6 PROV.Y TEND.TUBERIA PVC 10" SDR-64 (U-A) ML 1,269.86 178.45 226,606.52
8.7 PROV.Y TEND.TUBERIA PVC 6" SDR-64 (U-A) ML 1,114.74 68.50 76,359.69
8.8 PROV.Y TEND.TUBERIA PVC 4" SDR-64 (U-A) ML 356.11 39.46 14,052.10
8.9 PROV.Y TEND.TUBERIA PVC 4" SDR-41 (U-A) ML 147.01 40.71 5,984.78
8.10 PROV.Y TEND.TUBERIA PVC 4" SDR-26 (U-A) ML 66.43 59.50 3,952.59
8.11 PROVISION Y TENDIDO TUBERIA F.G. 12" ML 268.11 755.74 202,621.45
8.12 PROVISION Y TENDIDO TUBERIA F.G. 10" ML 38.10 611.19 23,286.34
8.13 PROVISION Y TENDIDO TUBERIA F.G. 6" ML 49.37 349.71 17,265.18
8.14 PROVISION Y TENDIDO TUBERIA F.G. 4" ML 120.29 163.75 19,697.49
8.15 ANCLAJE DE TUBERIA DE F.G. - HASTA Ø=20" ML 238.21 91.01 21,679.49
8.16 RELLENO COMUN ZANJA (COMPACT.S/PROV.MATE M3 1,995.28 38.50 76,818.28
8.17 ENCAMISADO DE HºSº (1:2:3 - H21) M3 2.84 1,097.51 3,116.93
8.18 PURGA TRAMO 6"-TIPO PZA 1.00 20,020.95 20,020.95
8.19 PURGA TRAMO 4"-TIPO PZA 1.00 12,726.42 12,726.42
8.20 VENTOSA TRAMO 6"-TIPO PZA 1.00 20,020.95 20,020.95
8.21 CAMARA DISTRIBUCION HºCº H21 18"-16"-14"-12" A 6" PZA 3.00 5,450.60 16,351.80
8.22 CAMARA DISTRIBUCION HºCº H21 DE 10"-8"-6" A 4" PZA 10.00 3,553.91 35,539.10
8.23 CAMARA DISTRIBUCION H21 DE 4"-3"-2 1/2" A 2" PZA 2.00 2,174.03 4,348.06
8.24 CAMARA FINAL DE HºCº H21 DE 4" PZA 1.00 3,591.11 3,591.11
8.25 ACCESORIOS ADUCCION Ø 12"-10"-6"-4" GLB 1.00 20,047.54 20,047.54
8.26 DESINFECCION DE TUBERIAS DE 4" A 20" ML 4,153.99 0.07 290.78
8.27 PRUEBA HIDRAULICA (TUBERIAS 4" A 20") ML 4,153.99 1.72 7,144.86
SUBTOTAL Bs. 1,568,174.11
9 PASOS DE QUEBRADA TUBERIA
9.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 132.59 18.08 2,397.23
9.2 EXCAVACION ESTRUCTURAS 0-2M - SUELO DURO M3 186.82 130.16 24,316.49
9.3 PUENTE COLGANTE ACUEDUCTO (L=70±3M) TUBERIA D=4" PZA 1.00 47,479.52 47,479.52
9.4 PUENTE COLGANTE ACUEDUCTO (L=50±3M) TUBERIA D=4" PZA 1.00 32,166.44 32,166.44
9.5 PUENTE COLGANTE ACUEDUCTO (L=25±2M) TUBERIA D=6" PZA 1.00 7,519.20 7,519.20
9.6 PUENTE COLGANTE ACUEDUCTO (L=20±2M) TUBERIA D=6" PZA 1.00 7,667.30 7,667.30
9.7 PUENTE COLGANTE ACUEDUCTO (L=20±2M) TUBERIA D=10" PZA 2.00 11,413.51 22,827.02
9.8 PUENTE COLGANTE ACUEDUCTO (L=15±2M) TUBERIA D=12" PZA 1.00 8,868.35 8,868.35
9.9 PUENTE COLGANTE ACUEDUCTO (L=10±2M) TUBERIA D=12" PZA 2.00 5,181.55 10,363.10
9.10 PASO DE QUEBRADA L=5±2M PZA 1.00 3,656.72 3,656.72
9.11 HºCº H21 - MACIZO DE ANCLAJE (1:2:4 - 50% PD) M3 169.83 1,213.18 206,034.36
SUBTOTAL Bs. 373,295.73
10 MEDIDAS DE MITIGACION AMBIENTAL
10.1 SEÑALIZACION VERTICAL PREVENTIVA E INFORMATIVA PZA 4.00 1,667.06 6,668.24
10.2 PROVISIÓN Y COLOCADO SEÑALIZACIÓN AMBIENTAL PZA 5.00 145.89 729.45
10.3 PROVISIÓN DE CONTENEDORES PLASTICOS PZA 5.00 121.58 607.90
10.4 REVEGETACION CON PLANTINES HA 3.00 80,637.77 241,913.31
10.5 LIMPIEZA Y RETIRO DE ESCOMBROS M3 60.00 149.99 8,999.40
SUBTOTAL Bs. 258,918.30
COSTO TOTAL DEL PROYECTO (Bs.) 7,743,985.32
Son : Siete millones setecientos cuarenta y tres mil novecientos ochenta y cinco con 32/100 Bolivianos

More Related Content

What's hot

Bobcat 864 f series compact track loader parts catalogue manual sn 5169 11001...
Bobcat 864 f series compact track loader parts catalogue manual sn 5169 11001...Bobcat 864 f series compact track loader parts catalogue manual sn 5169 11001...
Bobcat 864 f series compact track loader parts catalogue manual sn 5169 11001...
jfjskekdhnejd
 
Cembre C Tap Crimp Connectors
Cembre C Tap Crimp ConnectorsCembre C Tap Crimp Connectors
Cembre C Tap Crimp Connectors
Thorne & Derrick International
 
Bobcat S175 S185 Skid Steer Loader Parts Catalogue Manual S/N 5253 11001 & Above
Bobcat S175 S185 Skid Steer Loader Parts Catalogue Manual S/N 5253 11001 & AboveBobcat S175 S185 Skid Steer Loader Parts Catalogue Manual S/N 5253 11001 & Above
Bobcat S175 S185 Skid Steer Loader Parts Catalogue Manual S/N 5253 11001 & Above
hskekdmmm
 
Bobcat 873 f series skid steer loader parts catalogue manual (sn 5142 11001 ...
Bobcat 873 f series skid steer loader parts catalogue manual (sn 5142 11001  ...Bobcat 873 f series skid steer loader parts catalogue manual (sn 5142 11001  ...
Bobcat 873 f series skid steer loader parts catalogue manual (sn 5142 11001 ...
fjjkskekfsmem
 
Bobcat 463 Skid Steer Loader Parts Catalogue Manual S/N 522111001 and Above
Bobcat 463 Skid Steer Loader Parts Catalogue Manual S/N 522111001 and AboveBobcat 463 Skid Steer Loader Parts Catalogue Manual S/N 522111001 and Above
Bobcat 463 Skid Steer Loader Parts Catalogue Manual S/N 522111001 and Above
jksmemmme
 
Cembre Cable Lugs, Crimps & Connectors - HV up to 33kV
Cembre Cable Lugs, Crimps & Connectors - HV up to 33kVCembre Cable Lugs, Crimps & Connectors - HV up to 33kV
Cembre Cable Lugs, Crimps & Connectors - HV up to 33kV
Thorne & Derrick International
 
BICC Bicon BW20S LSF Cable Gland Kit (Prysmian 420LSF-52)
BICC Bicon BW20S LSF Cable Gland Kit (Prysmian 420LSF-52)BICC Bicon BW20S LSF Cable Gland Kit (Prysmian 420LSF-52)
BICC Bicon BW20S LSF Cable Gland Kit (Prysmian 420LSF-52)
Thorne & Derrick International
 
BW LSF Brass Cable Glands - BICC, BICON, Prysmian
BW LSF Brass Cable Glands - BICC, BICON, PrysmianBW LSF Brass Cable Glands - BICC, BICON, Prysmian
BW LSF Brass Cable Glands - BICC, BICON, Prysmian
Thorne & Derrick International
 
Bobcat 923 s sideshift backhoes service repair manual
Bobcat 923 s sideshift backhoes service repair manualBobcat 923 s sideshift backhoes service repair manual
Bobcat 923 s sideshift backhoes service repair manual
fjjskejdmdn
 
Bobcat 937 s sideshift backhoes service repair manual
Bobcat 937 s sideshift backhoes service repair manualBobcat 937 s sideshift backhoes service repair manual
Bobcat 937 s sideshift backhoes service repair manual
wedsrffcdgdv
 
Cembre Narrow Palm Cable Lugs
Cembre Narrow Palm Cable LugsCembre Narrow Palm Cable Lugs
Cembre Narrow Palm Cable Lugs
Thorne & Derrick International
 

What's hot (11)

Bobcat 864 f series compact track loader parts catalogue manual sn 5169 11001...
Bobcat 864 f series compact track loader parts catalogue manual sn 5169 11001...Bobcat 864 f series compact track loader parts catalogue manual sn 5169 11001...
Bobcat 864 f series compact track loader parts catalogue manual sn 5169 11001...
 
Cembre C Tap Crimp Connectors
Cembre C Tap Crimp ConnectorsCembre C Tap Crimp Connectors
Cembre C Tap Crimp Connectors
 
Bobcat S175 S185 Skid Steer Loader Parts Catalogue Manual S/N 5253 11001 & Above
Bobcat S175 S185 Skid Steer Loader Parts Catalogue Manual S/N 5253 11001 & AboveBobcat S175 S185 Skid Steer Loader Parts Catalogue Manual S/N 5253 11001 & Above
Bobcat S175 S185 Skid Steer Loader Parts Catalogue Manual S/N 5253 11001 & Above
 
Bobcat 873 f series skid steer loader parts catalogue manual (sn 5142 11001 ...
Bobcat 873 f series skid steer loader parts catalogue manual (sn 5142 11001  ...Bobcat 873 f series skid steer loader parts catalogue manual (sn 5142 11001  ...
Bobcat 873 f series skid steer loader parts catalogue manual (sn 5142 11001 ...
 
Bobcat 463 Skid Steer Loader Parts Catalogue Manual S/N 522111001 and Above
Bobcat 463 Skid Steer Loader Parts Catalogue Manual S/N 522111001 and AboveBobcat 463 Skid Steer Loader Parts Catalogue Manual S/N 522111001 and Above
Bobcat 463 Skid Steer Loader Parts Catalogue Manual S/N 522111001 and Above
 
Cembre Cable Lugs, Crimps & Connectors - HV up to 33kV
Cembre Cable Lugs, Crimps & Connectors - HV up to 33kVCembre Cable Lugs, Crimps & Connectors - HV up to 33kV
Cembre Cable Lugs, Crimps & Connectors - HV up to 33kV
 
BICC Bicon BW20S LSF Cable Gland Kit (Prysmian 420LSF-52)
BICC Bicon BW20S LSF Cable Gland Kit (Prysmian 420LSF-52)BICC Bicon BW20S LSF Cable Gland Kit (Prysmian 420LSF-52)
BICC Bicon BW20S LSF Cable Gland Kit (Prysmian 420LSF-52)
 
BW LSF Brass Cable Glands - BICC, BICON, Prysmian
BW LSF Brass Cable Glands - BICC, BICON, PrysmianBW LSF Brass Cable Glands - BICC, BICON, Prysmian
BW LSF Brass Cable Glands - BICC, BICON, Prysmian
 
Bobcat 923 s sideshift backhoes service repair manual
Bobcat 923 s sideshift backhoes service repair manualBobcat 923 s sideshift backhoes service repair manual
Bobcat 923 s sideshift backhoes service repair manual
 
Bobcat 937 s sideshift backhoes service repair manual
Bobcat 937 s sideshift backhoes service repair manualBobcat 937 s sideshift backhoes service repair manual
Bobcat 937 s sideshift backhoes service repair manual
 
Cembre Narrow Palm Cable Lugs
Cembre Narrow Palm Cable LugsCembre Narrow Palm Cable Lugs
Cembre Narrow Palm Cable Lugs
 

Similar to Por módulos manquiri

Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawingsbibimisael
 
Tema 12 diapositivas
Tema 12 diapositivasTema 12 diapositivas
Tema 12 diapositivas
NiltonCondorRojas
 
0. presupuesto
0. presupuesto0. presupuesto
0. presupuesto
henrylionelchvezpalp
 
Hagie sts10 parts manual 2010
Hagie sts10 parts manual 2010Hagie sts10 parts manual 2010
Hagie sts10 parts manual 2010
PartCatalogs Net
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examplesLoren Davis
 
Sample for small_shed_of_steel_structur
Sample for small_shed_of_steel_structurSample for small_shed_of_steel_structur
Sample for small_shed_of_steel_structur
AymanBadr16
 
F60C 07.PDF
F60C 07.PDFF60C 07.PDF
F60C 07.PDF
jorgealonso321164
 
Lista de precios iccu 2016
Lista de precios iccu 2016 Lista de precios iccu 2016
Lista de precios iccu 2016
Freddy Zamudio Alvarez
 
Bobcat flair mower, 3 point hitches, scaprifier, tracks, hand tool control, f...
Bobcat flair mower, 3 point hitches, scaprifier, tracks, hand tool control, f...Bobcat flair mower, 3 point hitches, scaprifier, tracks, hand tool control, f...
Bobcat flair mower, 3 point hitches, scaprifier, tracks, hand tool control, f...
fjjsefkksemm
 
Catalogo adubadeira komander_36_hp
Catalogo adubadeira komander_36_hpCatalogo adubadeira komander_36_hp
Catalogo adubadeira komander_36_hp
Catalogo Fácil Agro Mecânica Tatuí
 
pdfcoffee.com_lt-cable-sizing-pdf-free.pdf
pdfcoffee.com_lt-cable-sizing-pdf-free.pdfpdfcoffee.com_lt-cable-sizing-pdf-free.pdf
pdfcoffee.com_lt-cable-sizing-pdf-free.pdf
SAID MASHATE
 
Rx king part katalog catalog Indonesia
Rx king part katalog catalog IndonesiaRx king part katalog catalog Indonesia
Rx king part katalog catalog Indonesia
Pead Motor
 
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
dujfjjksekmmd
 
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
udfjjdjkskkem
 

Similar to Por módulos manquiri (16)

Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
 
Tema 12 diapositivas
Tema 12 diapositivasTema 12 diapositivas
Tema 12 diapositivas
 
PROPOSED
PROPOSEDPROPOSED
PROPOSED
 
Final-report
Final-reportFinal-report
Final-report
 
0. presupuesto
0. presupuesto0. presupuesto
0. presupuesto
 
Hagie sts10 parts manual 2010
Hagie sts10 parts manual 2010Hagie sts10 parts manual 2010
Hagie sts10 parts manual 2010
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
 
Sample for small_shed_of_steel_structur
Sample for small_shed_of_steel_structurSample for small_shed_of_steel_structur
Sample for small_shed_of_steel_structur
 
F60C 07.PDF
F60C 07.PDFF60C 07.PDF
F60C 07.PDF
 
Lista de precios iccu 2016
Lista de precios iccu 2016 Lista de precios iccu 2016
Lista de precios iccu 2016
 
Bobcat flair mower, 3 point hitches, scaprifier, tracks, hand tool control, f...
Bobcat flair mower, 3 point hitches, scaprifier, tracks, hand tool control, f...Bobcat flair mower, 3 point hitches, scaprifier, tracks, hand tool control, f...
Bobcat flair mower, 3 point hitches, scaprifier, tracks, hand tool control, f...
 
Catalogo adubadeira komander_36_hp
Catalogo adubadeira komander_36_hpCatalogo adubadeira komander_36_hp
Catalogo adubadeira komander_36_hp
 
pdfcoffee.com_lt-cable-sizing-pdf-free.pdf
pdfcoffee.com_lt-cable-sizing-pdf-free.pdfpdfcoffee.com_lt-cable-sizing-pdf-free.pdf
pdfcoffee.com_lt-cable-sizing-pdf-free.pdf
 
Rx king part katalog catalog Indonesia
Rx king part katalog catalog IndonesiaRx king part katalog catalog Indonesia
Rx king part katalog catalog Indonesia
 
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
 
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
Claas xerion 5000 4000 tractor parts catalogue manual (sn 78400111-78499999)
 

Recently uploaded

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 

Por módulos manquiri

  • 1. PRESUPUESTO GENERAL Proyecto : CONST. PRESA MANQUIRI - ACHUMIRI (POTOSÍ) Cliente : F.P.S. - GAM POTOSÍ Lugar : MANQUIRI - ACHUMIRI Item DESCRIPCIÓN UNID. CANT. P UNIT PARCIAL Nº (Bs.) (Bs.) 1 INSTALACIONES GENERALES 1.1 INSTALACION DE FAENAS Y MOVILIZACION (GLOBAL) GLB 1.00 22,361.66 22,361.66 1.2 INSTALACION DE FAENAS C/ALQUILER DE AMBIENTES GLB 1.00 6,200.65 6,200.65 1.3 LETRERO DE OBRAS FPS (SEGUN DISEÑO) PZA 1.00 412.12 412.12 1.4 LETRERO DE OBRAS MURO DE LADRILLO (SEGUN DISEÑO) PZA 1.00 2,433.08 2,433.08 1.5 PLACA ENTREGA DE OBRAS FPS (SEGUN DISEÑO PZA 2.00 817.27 1,634.54 SUBTOTAL Bs. 33,042.05 2 PREPARACION 2.1 LIMPIEZA MECANICA DE SUPERFICIES HA 2.76 2,431.51 6,710.97 2.2 DESVIO Y CONTROL DE AGUAS GLB 1.00 4,940.10 4,940.10 SUBTOTAL Bs. 11,651.07 3 INYECCIONES DE CEMENTO 3.1 ESTUDIO GEOSISMICO GLB 1.00 8,510.28 8,510.28 3.2 PERFORACIONES NQ ML 775.00 1,276.54 989,318.50 3.3 CASING ML 57.00 521.55 29,728.35 3.4 ENSAYOS LUGEON CON 5 ETAPAS PTO 16.00 389.04 6,224.64 3.5 INYECCIONES DE CEMENTO TON 19.00 4,863.02 92,397.38 3.6 ARENA BENTONITA Y OTROS GLB 1.00 12,157.54 12,157.54 SUBTOTAL Bs. 1,138,336.69 4 CUERPO REPRESA GRAVEDAD 4.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 399.98 18.08 7,231.64 4.2 EXCAVACION ESTRUCTURAS A MAQUINA SUELO SEMIDURO M3 89.18 32.26 2,876.95 4.3 EXCAVACION ESTRUCTURAS A MAQUINA ROCA M3 1,694.51 92.94 157,487.76 4.4 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO M3 628.25 48.84 30,683.73 4.5 HºCº - FUNDACIONES (1:2:3-50% PD-H21) M3 1,556.35 879.29 1,368,482.99 4.6 HºCº - ELEVACIONES (1:2:3-50% PD-H21) M3 1,300.70 1,136.61 1,478,388.63 4.7 HºSº (1:2:3 - H21)-RECUBRIMIENTO M3 66.51 993.43 66,073.03 4.8 HºAº (1:2:3-H21) - LOSAS (ESTRUCTURAS CORRIENTES) M3 35.16 4,083.71 143,583.24 4.9 JUNTAS DE DILATACION CON CINTA WATER STOP 0-32 ML 45.08 262.52 11,834.40 4.10 BARANDADO METALICO M2 86.40 497.12 42,951.17 4.11 PIEZOMETRO PZA 2.00 1,812.61 3,625.22 4.12 LIMNIMETRO PZA 1.00 132.95 132.95 SUBTOTAL Bs. 3,313,351.71 5 DISIPADOR DE ENERGIA 5.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 74.80 18.08 1,352.38 5.2 EXCAVACION ESTRUCTURAS A MAQUINA SUELO SEMIDURO M3 13.15 32.26 424.22 5.3 EXCAVACION ESTRUCTURAS A MAQUINA ROCA M3 249.90 92.94 23,225.71 5.4 RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO M3 35.19 48.84 1,718.68 5.5 HºCº - FUNDACIONES (1:2:3-50% PD-H21) M3 93.11 879.29 81,870.69
  • 2. 5.6 HºAº (1:2:3-H21) - ESTRUCTURAS CORRIENTES M3 28.22 4,083.71 115,242.30 SUBTOTAL Bs. 223,833.98 6 OBRA DE TOMA REPRESA 6.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 23.08 18.08 417.29 6.2 EXCAVACION ESTRUCTURAS 0-2M - SUELO DURO M3 24.73 130.16 3,218.86 6.3 PROVISION Y TENDIDO TUBERIA F.G. 12" ML 12.00 755.74 9,068.88 6.4 VALVULA DE CIERRE 12 PLG PN 20 INCL/ ACC. PZA 19.30 24,054.40 464,249.92 6.5 REJILLA DE ACERO INOXID. M2 2.00 677.61 1,355.22 6.6 ESCALERA METALICA INTERIOR (ANCHO 0.50M) ML 23.54 289.46 6,813.89 6.7 TAPA METALICA VISITA (0.70*0.70*3/16) INCL./ ACC. PZA 2.00 1,660.92 3,321.84 6.8 H°C° - CAMARAS (1:2:3-50% PD-H21) M3 21.54 1,016.01 21,884.86 6.9 HºAº (1:2:3-H21) - ESTRUCTURAS CORRIENTES M3 0.87 4,083.71 3,552.83 SUBTOTAL Bs. 513,883.57 7 DESAGUE DE AZOLVES 7.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 32.89 18.08 594.65 7.2 HºAº (1:2:3-H21) - ESTRUCTURAS CORRIENTES M3 15.39 4,083.71 62,848.30 7.3 COMPUERTA METALICA PARA PRESAS HP=20M PZA 1.00 230,174.67 230,174.67 7.4 TUBERIA LLENADO DE CONDUCTO DN 10" ML 4.60 669.40 3,079.24 7.5 VALVULA DE CIERRE LLENADO DE CONDUCTO DN250 PZA 1.00 11,780.15 11,780.15 7.6 ZAMPEADO DE PIEDRA M2 6.30 162.08 1,021.10 SUBTOTAL Bs. 309,498.11 8 CONDUCCION POR TUBERIA 8.1 REPLANTEO Y CONTROL DE LINEAS DE TUBERIA ML 4,153.99 1.47 6,106.37 8.2 EXCAVACION DE ZANJAS-ROCA M3 232.26 173.24 40,236.72 8.3 EXCAVACION DE ZANJAS 0-2M - SUELO DURO M3 3,117.62 151.85 473,410.60 8.4 RELLENO MANUAL C/TIERRA CERNIDA (NO I/MA M3 623.52 93.75 58,455.00 8.5 PROV.Y TEND.TUBERIA PVC 12" SDR-64 (U-A) ML 723.98 218.85 158,443.02 8.6 PROV.Y TEND.TUBERIA PVC 10" SDR-64 (U-A) ML 1,269.86 178.45 226,606.52 8.7 PROV.Y TEND.TUBERIA PVC 6" SDR-64 (U-A) ML 1,114.74 68.50 76,359.69 8.8 PROV.Y TEND.TUBERIA PVC 4" SDR-64 (U-A) ML 356.11 39.46 14,052.10 8.9 PROV.Y TEND.TUBERIA PVC 4" SDR-41 (U-A) ML 147.01 40.71 5,984.78 8.10 PROV.Y TEND.TUBERIA PVC 4" SDR-26 (U-A) ML 66.43 59.50 3,952.59 8.11 PROVISION Y TENDIDO TUBERIA F.G. 12" ML 268.11 755.74 202,621.45 8.12 PROVISION Y TENDIDO TUBERIA F.G. 10" ML 38.10 611.19 23,286.34 8.13 PROVISION Y TENDIDO TUBERIA F.G. 6" ML 49.37 349.71 17,265.18 8.14 PROVISION Y TENDIDO TUBERIA F.G. 4" ML 120.29 163.75 19,697.49 8.15 ANCLAJE DE TUBERIA DE F.G. - HASTA Ø=20" ML 238.21 91.01 21,679.49 8.16 RELLENO COMUN ZANJA (COMPACT.S/PROV.MATE M3 1,995.28 38.50 76,818.28 8.17 ENCAMISADO DE HºSº (1:2:3 - H21) M3 2.84 1,097.51 3,116.93 8.18 PURGA TRAMO 6"-TIPO PZA 1.00 20,020.95 20,020.95 8.19 PURGA TRAMO 4"-TIPO PZA 1.00 12,726.42 12,726.42 8.20 VENTOSA TRAMO 6"-TIPO PZA 1.00 20,020.95 20,020.95 8.21 CAMARA DISTRIBUCION HºCº H21 18"-16"-14"-12" A 6" PZA 3.00 5,450.60 16,351.80 8.22 CAMARA DISTRIBUCION HºCº H21 DE 10"-8"-6" A 4" PZA 10.00 3,553.91 35,539.10 8.23 CAMARA DISTRIBUCION H21 DE 4"-3"-2 1/2" A 2" PZA 2.00 2,174.03 4,348.06
  • 3. 8.24 CAMARA FINAL DE HºCº H21 DE 4" PZA 1.00 3,591.11 3,591.11 8.25 ACCESORIOS ADUCCION Ø 12"-10"-6"-4" GLB 1.00 20,047.54 20,047.54 8.26 DESINFECCION DE TUBERIAS DE 4" A 20" ML 4,153.99 0.07 290.78 8.27 PRUEBA HIDRAULICA (TUBERIAS 4" A 20") ML 4,153.99 1.72 7,144.86 SUBTOTAL Bs. 1,568,174.11 9 PASOS DE QUEBRADA TUBERIA 9.1 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 132.59 18.08 2,397.23 9.2 EXCAVACION ESTRUCTURAS 0-2M - SUELO DURO M3 186.82 130.16 24,316.49 9.3 PUENTE COLGANTE ACUEDUCTO (L=70±3M) TUBERIA D=4" PZA 1.00 47,479.52 47,479.52 9.4 PUENTE COLGANTE ACUEDUCTO (L=50±3M) TUBERIA D=4" PZA 1.00 32,166.44 32,166.44 9.5 PUENTE COLGANTE ACUEDUCTO (L=25±2M) TUBERIA D=6" PZA 1.00 7,519.20 7,519.20 9.6 PUENTE COLGANTE ACUEDUCTO (L=20±2M) TUBERIA D=6" PZA 1.00 7,667.30 7,667.30 9.7 PUENTE COLGANTE ACUEDUCTO (L=20±2M) TUBERIA D=10" PZA 2.00 11,413.51 22,827.02 9.8 PUENTE COLGANTE ACUEDUCTO (L=15±2M) TUBERIA D=12" PZA 1.00 8,868.35 8,868.35 9.9 PUENTE COLGANTE ACUEDUCTO (L=10±2M) TUBERIA D=12" PZA 2.00 5,181.55 10,363.10 9.10 PASO DE QUEBRADA L=5±2M PZA 1.00 3,656.72 3,656.72 9.11 HºCº H21 - MACIZO DE ANCLAJE (1:2:4 - 50% PD) M3 169.83 1,213.18 206,034.36 SUBTOTAL Bs. 373,295.73 10 MEDIDAS DE MITIGACION AMBIENTAL 10.1 SEÑALIZACION VERTICAL PREVENTIVA E INFORMATIVA PZA 4.00 1,667.06 6,668.24 10.2 PROVISIÓN Y COLOCADO SEÑALIZACIÓN AMBIENTAL PZA 5.00 145.89 729.45 10.3 PROVISIÓN DE CONTENEDORES PLASTICOS PZA 5.00 121.58 607.90 10.4 REVEGETACION CON PLANTINES HA 3.00 80,637.77 241,913.31 10.5 LIMPIEZA Y RETIRO DE ESCOMBROS M3 60.00 149.99 8,999.40 SUBTOTAL Bs. 258,918.30 COSTO TOTAL DEL PROYECTO (Bs.) 7,743,985.32 Son : Siete millones setecientos cuarenta y tres mil novecientos ochenta y cinco con 32/100 Bolivianos