SlideShare a Scribd company logo
A head of Reservoir Engineering
Executive summary
Master in Petroleum Engineering ( Produced Water Management) from the University
of Khartoum/ Sudan and 9+ years oil industry experience. First 6 years as a reservoir
engineer for Petrodar Operating Company involved in planning, well testing, reservoir
management, numerical simulation, forecasting, economics etc., Now with StarOil
Petroleum Operating Company as a head of reservoir engineering section involving &
responsible for company reservoir engineering aspects and activities. My native
language is Arabic and Fluent in English.
Skills
 Pressure Transient Analysis.
 Reservoir Simulation.
 Field Development.
 Reservoir Surveillance and Management.
 Reservoir Surveillance and Management.
 Workover Planning and Revival of problematic Wells.
 Production Performance analysis and Production forecasting.
 Reserve Estimation and reporting.
 Substantial experience in produced water management techniques including
water source diagnosis, mitigation plan and remedial actions as well water
production control techniques.
 Familiar with preparing the contract strategy and ITB
 Coaching and supervisor junior staff.
Employment History:
 November -20013 up to date StarOil Operating Company
Address: Khartoum, Sudan
Job Title: A head of Reservoir Eng
 December - December, 2012 StarOil Operating Company
Muaz Hassan Ali Ahmed
Mobile: +249912157439
Email: muaz910@gmail.com
................... .mhassan@staroilsd.com
Address: Khartoum, Sudan
Job Title: Sr. Reservoir Eng
 April- 2006 – November, 2012 Petrodar Operating Company (PDOC)
Address: Khartoum, Sudan
Job Title Reservoir Engineer
Basic Functions & Scope for above tow positions:
As part of the team, for the Petrodar Operating/StarOil Companies reservoirs with a
STOIIP in excess of 6 billion barrels. My duties include:
 Provides inputs for well test proposal which includes well test objectives,
procedures, selection of testing type sand selection of test intervals with the
agreement and coordination between Geological Section, Exploration and
Production Departments. Review and analyze acquired data integrity and interpret
well test data using appropriate software.
 Recommends acquisitions of representative fluid sample and coring intervals for
laboratory measurement techniques used in laboratory for fluid and rock data
and provide analysis to determine the validity of the laboratory measurement
using PVTi module simulation and other techniques and equations to predict
representative fluid and rock behavior.
 Carry out reservoir management activities such as:
I. Carry out reservoir and well performance evaluation and monitoring which
necessitate the application of decline curve , material balance studies
,reservoir simulation updates, pressure transient analysis & Production
optimization initiatives (well work-over, pump optimization) to increase
production and field/well recoverable reserves.
II. Use analytical methods such as WOR & WOR’ and integrate dynamic
and static data or run Production Logging Test (PLT) to identify the water
production source and set mitigation plans (Mechanical, Chemical or
Change completion strategy) to shut-off or control water production.
III. Design surveillance programs including pressure transient surveys, tracer
surveys, interference testing and cased hole logging programs. Monitor
flood front movement and identify the depletion zones and see the
possibilities of add new perforation.
IV. Follow up water injection implantation and the impact of water injection for
nearby producer’s performance as well as injector wells proposal
preparation.
V. Carry out pattern balancing calculation and ensure uniform production and
injection process in order to select the optimum VRR.
VI. Identify opportunities for improving well performance, workover jobs, well
stimulation and production enhancement. Follow up on drilling,
completions activities.
VII. Carry out well test interpretation using Saphir Software.
VIII. Carry out Pressure and Temperature Survey (static and buildup) in order
to determine formation latest data and characteristics (P, T, skin, k,
Productivity, Injectivity etc)
 Work as focal point of Company for hydrocarbon resources reporting using SPE
guidelines which requires the establishment and maintenance of good well
production data, field data and reserves figures, and this achieved via performing of
Annual Review of Petroleum Resource (ARPR) including: reserve estimation utilizing
Simulation, volumetric method, decline curve analysis and material balance
methods. Also Annual reserve reporting as Ultimate Recovery (UR), Potential
Recovery (PR), Speculative Resources (SR), and applied both of reserve definition
(1P, 2P, 3P & EV) and (P1, P2, P3 &EV)
 Work as Team Leader focal point of running the Production Logging Test (PLT) in
Company and I had completed more than 10 PLTs jobs including
I. Candidates selection
II. Proposal preparation
III. Follow up the job implementation in the both Field & office
IV. PLT result and interpretation
V. Remedial action base on PLT result.
VI. Assess and evaluate the remedial action after implementation.
 Work as team leader of chemical water shut-off projects in Company , which are
running by bellow vendors:
1. Schlumberger using Oregano-Seal Technology
2. DDPI company using polymer Technology
3. Oil Resource Company using NMN-300 Technology
 Participates in the definition of contracted special field testing related to reservoir
engineering. Includes defining scope of special tests for Reservoir Engineering,
preparing specifications and evaluating bids. Monitor contractor compliance with
contract terms and schedules and details progress and performance in regular
activity reports.
 Establish the near term, short term and long term well and field/project production
forecast.
 Carry out Full Field Review studies with an integrated Team to assess
well/reservoir/field performance, identify further development opportunities (acid
stimulation, infill drilling, sand cleaning, and water shut- off) and activities necessary
to be undertaking to enhance oil production rate and recovery.
 Work with team to provide reservoir engineering evaluation including establishment
of fluid contacts, pressure transient analysis, reservoir simulation work and
analysis ,reserves estimation ,drainage plans ,production forecasting,
establishment of reservoir management plan and recommend the optimum
development option and Cost-effective technology applications to create maximum
value from the hydrocarbon reserves.
 Cary out the Development Technical Review presentation (DTR) & Field
Performance workshop of the main field in Company, normally half Annually.
 Conduct static model upscale using Petrel software and dynamic simulation on
base case of static model of each prospect using ECLIPSE software based on 3D
static geological model with the following objectives:
I. Detailed preparation on simulation input data such as formation pressure and
temperature, test results, relative permeability and rock properties, fluid and
reservoir properties and also dynamic data.
II. Detailed simulation model (using Eclipse Black oil ) model construction,
initialization.
III. To use Local Grid Refinement model for wells with suspected coning, poor
history matching and for future horizontal wells.
IV. To provide a full study and enhancement plans such as water injection,
including WHIP (Well Head Injection Pressure) and amount of injection water
for all injectors in its reservoir simulation study, or any other secondary
recovery methods.
V. To provide production rate sensitivity simulation.
VI. To provide horizontal well planning study.
VII. Examine the ways to maximize recovery in terms of well pattern/spacing, off
take rate, completion strategy, and depletion strategy etc.
VIII. Generate field production forecast of every development scenario.
IX. Determine the optimum development scenario.
X. Review the development of combination vertical and horizontal wells to
improve recovery and project economics.
XI. Determine recovery factor and recoverable reserves.
 Coach and Monitor less experienced staff
 January- 2005 – March, 2006 University of Khartoum
Address: Khartoum, Sudan
Job Title : Petroleum & Gas Section/ Teaching Assistant
Qualifications:
1999-2004 B.Sc. (Honour) (Second Upper Class) in Petroleum Engineering,
Sudan University Of Science & Technology (SUST)
Khartoum, Sudan
July 2011-Dec-2014 MSC in Petroleum engineering (Produced Water Management)
University of Khartoum
Projects & Assignments:
1. Work as Team Leader for the South Annajma Field Development Study by
Schlumberger: April 2013- Abu Dhabi-UEA
The main tasks were:
a- To follow up the study progress and cross check and validate the data analysis
and consentience.
b- Arrange the meetings and facilitate the communication between Schlumberger in
Abu Dhabi team and Staroil head office in Khartoum
c- As well as to work with team in track to meet the Study target
d- Beside above mentioned tasks is to QC and validate the conventional reservoir
analysis data preparation and these including not limited: RCA, SCAL, PVT,
Pressure transient analysis, production data analysis using PVTi module and
other techniques and equations.
e- Model initialization and QC. Dynamic model build up using Eclipse or Petr-RE,
and this including: rock properties, fluid properties, history matching, run
sensitivity for different cases.etc…
f- Reserve Classification and reporting
g- FDP working file, this including: No. of new wells to be drilled, new wells location,
expected flow rate, accumulative produced oil and wells reserves developed.
2. Work Assignment With FDP Study Team (Gumry Field)
(22-Nov-08 to 20-May-09) In China Beijing - APEX
Including:
A- Reservoir Engineering:-
I- Reservoir Analysis (RCA, SCAL, PVT and pressure analysis)
II- Integrating Static & dynamic data
III- Reserve Estimation (integrating volumetric & numerical reserve estimation.
IV- Oil production history matching using ECLIPSE software
V- Oil field development plans design including EOR study trough reservoir simulation
VI- Performed pressure transient analysis (PTA) in blocks 3/7 PDOC.
B- Software Training Package:-
I- Reservoir Simulation (Eclipse 100 black oil simulator), especially to Flo Grid
model, Schedule model & office model
II-Well Test interpretation Package: Saphir 3.20
III-Continuum Software (DCA, Reserve Calculation Economic)
3. Work Assignment With Remodeling Study Team
(03-Sep-11 to 01- Dec -11) In China Beijing - APEX
Including:
A- Reservoir Engineering:-
I- Reservoir Analysis (RCA, SCAL, PVT and pressure analysis)
II- Integrating Static & dynamic data
III- Reserve Estimation (integrating volumetric & numerical reserve estimation.
IV- Oil production history matching using ECLIPSE software
V- Oil field development plans design including EOR study trough reservoir
simulation
VI- Performed pressure transient analysis (PTA) in blocks 3/7 PDOC
Training Courses and Workshops:
1. Training in OFM fundamental & advanced topics
(June,1-5,2008), Schlumberger
2. Training in Special Core Analysis (SCAL)
(May, 7-16, 2008), Centre of Petroleum Laboratory –Khartoum
3. Training in Production Logging Test (PLT)
(October, 23-27, 2008), Schlumberger-Cairo
4. Training in reservoir characterization and simulation
(March, 9-13, 2008), Resmodtec- Abu Dhabi
5. Applied Reservoir Engineering & Management: Analysis, Characterization,
Simulation, Integration, and Statistic & Naturally Fractured
(October, 27-31, 2010), Howard Technology Middle East-Dubai
6. Production analysis and optimization using Nodal Analysis with Pipesim software
(March, 6-17, 2011), Petrotech-Khartoum
7. Pressure Transient Analysis (DDAI) (Using Saphir software)
(April,24-28,2011), KAPPA software and Engineering Constant-Abu Dhabi
8. Training in risk analysis and reserve estimation
(July, 7-11, 2007), Resmodtec-Cairo
9. Applied Reservoir Management
(October, 18-22, 2009), Hot Engineering-Dubai
10.Training in basic petrophysics
(February, 18-22, 2007), Schlumberger-Khartoum
11.Training in production technology
(September, 9-13, 2007), Schlumberger-Khartoum
12.IOR Techniques to maximize Sudanese Oil Fields Production
(October, 18-19, 2010), SPE, Sudan, Khartoum
13.Training in Petro-View-Plus Software
(February, 25-27, 2007), Schlumberger- Khartoum
14.Training in Basic Cardio Pulmonary Resuscitation
(July, 5, 2007), University of Khartoum
15.Training in Basic Awareness, Basic Emergency Response, Basic Process Safety
(July, 5, 2007), University of Khartoum
16.Integrated Field Development Workshop
(January, 11-14, 2010), Resmodtec- Abu Dhabi
17.Training in Action Learning Coaching Skills
(April, 5-11, 2009), Business School Netherlands-Khartoum
18.Training in both reservoir simulation software Eclipse (Black Oil-E100) & (Petrel
RE)
(June, 9-13, 2009), Schlumberger-Cairo
19.Training in Report Writing Skills
((April, 27-May, 22, 2008), Etisalat Academy Khartoum
20.2nd Annual Enhanced Oil Recovery and Heavy Oil Conference
March 27-28, 2013, Abu Dhabi, UAE
Skills:
Good in Arabic & English
Has ability to negotiate & make effective decisions.
Has ability to work under pressure
Has ability to work independently and as part of a team.
Has ability to work in multinational environment.
Software:
Good knowledge of main reservoir engineering software (classical or 3D
modeling):
 Petrel RE, Eclipse E100
 PVTi module
 Schedule module
 Saphir, Kappa (well test interpretation).
 OFM (Reservoir & Well Surveillance)
 Proficient in Word, Excel, PowerPoint
Personal data:
Full Name: Muaz Hassan Ali Ahmed
Date of birth: Jan, 01, 1981
Place of birth: Gazera, Sudan
Nationality: Sudanese.
Marital status: Married.
Personal E-mail: muaz910@gmail.com & mhassan@staroilsd.com
Mobile No: +971528737669/+249912429403/+249912157439
Has Sudanese Driving license.
Associations:
Member of the Society of Petroleum Engineers (Sudan Section)
Member of the Society of Sudanese Engineers
References:
1. Mohd Nazlee Rasol, PETRONAS, Resource Enhancement, PRD,PMU
Tel No: +603 2331 5570, Hp No: +6019 260 6446
E-mail: nazleer@petronas.com.my / nazleer.pdoc@gmail.com
2. Mr. Mutwakil Amin–UAE – Abu Dhabi- Abu Dhabi Operating Company Limited
(ADCO),Mobile: (+971-506913777) - E-mail: malamin@adco.ae
3. Dr Mohamed Salah Abou Sayed –UAE – Gulf Reservoir Modeling Technology,
President and CEO – Tel. Off. :( +971)2-6674666, Mobile: (+971)50-4463329 –
fax: (+971)2-6674999
4. Dr. Hassan Nimir – Sudan – University of Khartoum – Faculty of Engineering-
Section Head of Petroleum Engineering & Natural Gas Section Mobile:
(+249)912390154 – E-mail: hassannimir@yahoo.com

More Related Content

What's hot

Snr. Planning Engineer -WP- Kemya Sabic
Snr. Planning Engineer -WP- Kemya SabicSnr. Planning Engineer -WP- Kemya Sabic
Snr. Planning Engineer -WP- Kemya SabicSajid Arfi
 
maintenance equipment manager
maintenance equipment managermaintenance equipment manager
maintenance equipment managerabdulaziz mohamed
 
Cv
CvCv
Ahmed Khalil Engineering role
Ahmed Khalil Engineering roleAhmed Khalil Engineering role
Ahmed Khalil Engineering roleAhmed Khalil
 
Air Logistics Training Center
Air Logistics Training CenterAir Logistics Training Center
Air Logistics Training Centerkingstonmj
 
Green Ship Research Dr Carol Hargreaves
Green Ship Research Dr Carol HargreavesGreen Ship Research Dr Carol Hargreaves
Green Ship Research Dr Carol Hargreaves
Carol Hargreaves
 
Executive Transport Detatchment Sigonella
Executive Transport Detatchment SigonellaExecutive Transport Detatchment Sigonella
Executive Transport Detatchment Sigonellakingstonmj
 
Flex Maint Plan C 40 A
Flex Maint Plan C 40 AFlex Maint Plan C 40 A
Flex Maint Plan C 40 Akingstonmj
 
David Scott CV 2016
David Scott CV 2016David Scott CV 2016
David Scott CV 2016David Scott
 
Richard Blankenship 2016
Richard Blankenship 2016Richard Blankenship 2016
Richard Blankenship 2016
Richard Blankenship
 
Nasser Rabie Resume
Nasser Rabie ResumeNasser Rabie Resume
Nasser Rabie ResumeNasser Rabie
 
Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015BobSpeirs
 
Manufacturing Manager k resume iv
Manufacturing Manager k resume ivManufacturing Manager k resume iv
Manufacturing Manager k resume iv
Ethan Williams
 
Coop Presentation - NewPage
Coop Presentation - NewPageCoop Presentation - NewPage
Coop Presentation - NewPage
msvandyke
 

What's hot (20)

resumenew_Atul Bhalla
resumenew_Atul Bhallaresumenew_Atul Bhalla
resumenew_Atul Bhalla
 
Snr. Planning Engineer -WP- Kemya Sabic
Snr. Planning Engineer -WP- Kemya SabicSnr. Planning Engineer -WP- Kemya Sabic
Snr. Planning Engineer -WP- Kemya Sabic
 
maintenance equipment manager
maintenance equipment managermaintenance equipment manager
maintenance equipment manager
 
Cv
CvCv
Cv
 
Ahmed Khalil Engineering role
Ahmed Khalil Engineering roleAhmed Khalil Engineering role
Ahmed Khalil Engineering role
 
Air Logistics Training Center
Air Logistics Training CenterAir Logistics Training Center
Air Logistics Training Center
 
Green Ship Research Dr Carol Hargreaves
Green Ship Research Dr Carol HargreavesGreen Ship Research Dr Carol Hargreaves
Green Ship Research Dr Carol Hargreaves
 
Executive Transport Detatchment Sigonella
Executive Transport Detatchment SigonellaExecutive Transport Detatchment Sigonella
Executive Transport Detatchment Sigonella
 
Flex Maint Plan C 40 A
Flex Maint Plan C 40 AFlex Maint Plan C 40 A
Flex Maint Plan C 40 A
 
David Scott CV 2016
David Scott CV 2016David Scott CV 2016
David Scott CV 2016
 
Borrego, David
Borrego, DavidBorrego, David
Borrego, David
 
Richard Blankenship 2016
Richard Blankenship 2016Richard Blankenship 2016
Richard Blankenship 2016
 
Nasser Rabie Resume
Nasser Rabie ResumeNasser Rabie Resume
Nasser Rabie Resume
 
Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015
 
CFD_salesmaterial_261215
CFD_salesmaterial_261215CFD_salesmaterial_261215
CFD_salesmaterial_261215
 
Manufacturing Manager k resume iv
Manufacturing Manager k resume ivManufacturing Manager k resume iv
Manufacturing Manager k resume iv
 
ABDULAZEE1
ABDULAZEE1ABDULAZEE1
ABDULAZEE1
 
Coop Presentation - NewPage
Coop Presentation - NewPageCoop Presentation - NewPage
Coop Presentation - NewPage
 
Oana Barabancea-CV
Oana Barabancea-CVOana Barabancea-CV
Oana Barabancea-CV
 
RESUME
RESUMERESUME
RESUME
 

Viewers also liked

Oil & gas companies sudan
Oil & gas companies sudanOil & gas companies sudan
Oil & gas companies sudanDidier Touati
 
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
Uploadworld
 
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTDHEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTDADENIYI AIYESA
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
ICHLC Corporate Health Trends Report
ICHLC Corporate Health Trends ReportICHLC Corporate Health Trends Report
ICHLC Corporate Health Trends ReportErin Giordano, MBA
 
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORTUNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORTStanley Cayari
 
2015 - Images of MAY - May 01 - May 08
2015 - Images of MAY - May 01 - May 082015 - Images of MAY - May 01 - May 08
2015 - Images of MAY - May 01 - May 08
vinhbinh2010
 
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebMario Rey Rguieb_68
 
201104 food manufacturing and automation show
201104   food manufacturing and automation show201104   food manufacturing and automation show
201104 food manufacturing and automation show
tnessen
 
Amacom.administrative.assistants.secretarys.handbook
Amacom.administrative.assistants.secretarys.handbookAmacom.administrative.assistants.secretarys.handbook
Amacom.administrative.assistants.secretarys.handbook
Daisy Galzote
 
tebodin-world-april-2011
tebodin-world-april-2011tebodin-world-april-2011
tebodin-world-april-2011Dennis Brand
 
Elbarbary Group - Company Profile.txt
Elbarbary Group - Company Profile.txtElbarbary Group - Company Profile.txt
Elbarbary Group - Company Profile.txtElbarbary Group
 
World bank final project
World bank final projectWorld bank final project
World bank final project
s-mb
 
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
Ibrahim Al-Hudhaif
 
Pepsi hajipur
Pepsi hajipurPepsi hajipur
Pepsi hajipur
Sonu Kumar
 
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usaLCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
John Romano
 
Posidonia 2012: A forum for the Global Shipping Community
Posidonia 2012: A forum for the Global Shipping CommunityPosidonia 2012: A forum for the Global Shipping Community
Posidonia 2012: A forum for the Global Shipping Community
ACE Rent a Car Greece
 

Viewers also liked (20)

CV Dr El_fadil.2015
CV Dr El_fadil.2015CV Dr El_fadil.2015
CV Dr El_fadil.2015
 
Oil & gas companies sudan
Oil & gas companies sudanOil & gas companies sudan
Oil & gas companies sudan
 
kamal final cv
kamal final cvkamal final cv
kamal final cv
 
CV of JN SHARMA
CV of JN SHARMACV of JN SHARMA
CV of JN SHARMA
 
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
Nanoencapsulation of essential oils with enhanced antimicrobial activity: A n...
 
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTDHEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
HEAVENS FLOODGATES EASYWELL SHOPPINGS LTD
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
ICHLC Corporate Health Trends Report
ICHLC Corporate Health Trends ReportICHLC Corporate Health Trends Report
ICHLC Corporate Health Trends Report
 
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORTUNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
UNITED FOOD INDUSTRIES CORPOTATION LTD. COMPANY EXPORT
 
2015 - Images of MAY - May 01 - May 08
2015 - Images of MAY - May 01 - May 082015 - Images of MAY - May 01 - May 08
2015 - Images of MAY - May 01 - May 08
 
Curriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey GuiebCurriculum Vitae of Mario Rey Guieb
Curriculum Vitae of Mario Rey Guieb
 
201104 food manufacturing and automation show
201104   food manufacturing and automation show201104   food manufacturing and automation show
201104 food manufacturing and automation show
 
Amacom.administrative.assistants.secretarys.handbook
Amacom.administrative.assistants.secretarys.handbookAmacom.administrative.assistants.secretarys.handbook
Amacom.administrative.assistants.secretarys.handbook
 
tebodin-world-april-2011
tebodin-world-april-2011tebodin-world-april-2011
tebodin-world-april-2011
 
Elbarbary Group - Company Profile.txt
Elbarbary Group - Company Profile.txtElbarbary Group - Company Profile.txt
Elbarbary Group - Company Profile.txt
 
World bank final project
World bank final projectWorld bank final project
World bank final project
 
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
AL ARRAB CONTRACTING COMPANY PROFILE 2015 Arabic
 
Pepsi hajipur
Pepsi hajipurPepsi hajipur
Pepsi hajipur
 
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usaLCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
LCR Hallcrest Handbook of Liquid Crystal Technology RT006 rev01 usa
 
Posidonia 2012: A forum for the Global Shipping Community
Posidonia 2012: A forum for the Global Shipping CommunityPosidonia 2012: A forum for the Global Shipping Community
Posidonia 2012: A forum for the Global Shipping Community
 

Similar to 0.1 Muaz Hassan Resume

Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.walaa ahmed ahmed attiia
 
CURRICULUM VITAE Ayman1
CURRICULUM VITAE Ayman1CURRICULUM VITAE Ayman1
CURRICULUM VITAE Ayman1Ayman Farghaly
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015gufron gufron
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain
Shray Jain
 
ATEF CV Updated in June 2015
ATEF CV Updated in June 2015ATEF CV Updated in June 2015
ATEF CV Updated in June 2015Atef Farouk
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Budi Prihartono
 
Production technology & optimization engineer achievements
Production technology & optimization engineer achievementsProduction technology & optimization engineer achievements
Production technology & optimization engineer achievements
Joseph Bracic
 
Mesbah_Elazrig_Sr Drilling Eng
Mesbah_Elazrig_Sr Drilling EngMesbah_Elazrig_Sr Drilling Eng
Mesbah_Elazrig_Sr Drilling EngMesbah Elazrig
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process EngineerJuber Loharia
 
Ajay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Sharma
 
Resume - Imane Mansouri
Resume - Imane MansouriResume - Imane Mansouri
Resume - Imane Mansouriimy2010x
 

Similar to 0.1 Muaz Hassan Resume (20)

Circulem viate
Circulem viateCirculem viate
Circulem viate
 
Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) Updated
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
CURRICULUM VITAE Ayman1
CURRICULUM VITAE Ayman1CURRICULUM VITAE Ayman1
CURRICULUM VITAE Ayman1
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain
 
RESERVOIR ENGR CV(1)
RESERVOIR ENGR CV(1)RESERVOIR ENGR CV(1)
RESERVOIR ENGR CV(1)
 
ATEF CV Updated in June 2015
ATEF CV Updated in June 2015ATEF CV Updated in June 2015
ATEF CV Updated in June 2015
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)
 
Production technology & optimization engineer achievements
Production technology & optimization engineer achievementsProduction technology & optimization engineer achievements
Production technology & optimization engineer achievements
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
Mesbah_Elazrig_Sr Drilling Eng
Mesbah_Elazrig_Sr Drilling EngMesbah_Elazrig_Sr Drilling Eng
Mesbah_Elazrig_Sr Drilling Eng
 
Hemant Sharma Resume 2015
Hemant Sharma Resume 2015Hemant Sharma Resume 2015
Hemant Sharma Resume 2015
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
Resume Leyla Clothier
Resume Leyla ClothierResume Leyla Clothier
Resume Leyla Clothier
 
Ajay Kumar Sharma_Resume
Ajay Kumar Sharma_ResumeAjay Kumar Sharma_Resume
Ajay Kumar Sharma_Resume
 
Resume - Imane Mansouri
Resume - Imane MansouriResume - Imane Mansouri
Resume - Imane Mansouri
 
Mohamed Fahim 2015
Mohamed Fahim 2015Mohamed Fahim 2015
Mohamed Fahim 2015
 

0.1 Muaz Hassan Resume

  • 1. A head of Reservoir Engineering Executive summary Master in Petroleum Engineering ( Produced Water Management) from the University of Khartoum/ Sudan and 9+ years oil industry experience. First 6 years as a reservoir engineer for Petrodar Operating Company involved in planning, well testing, reservoir management, numerical simulation, forecasting, economics etc., Now with StarOil Petroleum Operating Company as a head of reservoir engineering section involving & responsible for company reservoir engineering aspects and activities. My native language is Arabic and Fluent in English. Skills  Pressure Transient Analysis.  Reservoir Simulation.  Field Development.  Reservoir Surveillance and Management.  Reservoir Surveillance and Management.  Workover Planning and Revival of problematic Wells.  Production Performance analysis and Production forecasting.  Reserve Estimation and reporting.  Substantial experience in produced water management techniques including water source diagnosis, mitigation plan and remedial actions as well water production control techniques.  Familiar with preparing the contract strategy and ITB  Coaching and supervisor junior staff. Employment History:  November -20013 up to date StarOil Operating Company Address: Khartoum, Sudan Job Title: A head of Reservoir Eng  December - December, 2012 StarOil Operating Company Muaz Hassan Ali Ahmed Mobile: +249912157439 Email: muaz910@gmail.com ................... .mhassan@staroilsd.com
  • 2. Address: Khartoum, Sudan Job Title: Sr. Reservoir Eng  April- 2006 – November, 2012 Petrodar Operating Company (PDOC) Address: Khartoum, Sudan Job Title Reservoir Engineer Basic Functions & Scope for above tow positions: As part of the team, for the Petrodar Operating/StarOil Companies reservoirs with a STOIIP in excess of 6 billion barrels. My duties include:  Provides inputs for well test proposal which includes well test objectives, procedures, selection of testing type sand selection of test intervals with the agreement and coordination between Geological Section, Exploration and Production Departments. Review and analyze acquired data integrity and interpret well test data using appropriate software.  Recommends acquisitions of representative fluid sample and coring intervals for laboratory measurement techniques used in laboratory for fluid and rock data and provide analysis to determine the validity of the laboratory measurement using PVTi module simulation and other techniques and equations to predict representative fluid and rock behavior.  Carry out reservoir management activities such as: I. Carry out reservoir and well performance evaluation and monitoring which necessitate the application of decline curve , material balance studies ,reservoir simulation updates, pressure transient analysis & Production optimization initiatives (well work-over, pump optimization) to increase production and field/well recoverable reserves. II. Use analytical methods such as WOR & WOR’ and integrate dynamic and static data or run Production Logging Test (PLT) to identify the water production source and set mitigation plans (Mechanical, Chemical or Change completion strategy) to shut-off or control water production. III. Design surveillance programs including pressure transient surveys, tracer surveys, interference testing and cased hole logging programs. Monitor flood front movement and identify the depletion zones and see the possibilities of add new perforation. IV. Follow up water injection implantation and the impact of water injection for nearby producer’s performance as well as injector wells proposal preparation. V. Carry out pattern balancing calculation and ensure uniform production and injection process in order to select the optimum VRR. VI. Identify opportunities for improving well performance, workover jobs, well stimulation and production enhancement. Follow up on drilling, completions activities.
  • 3. VII. Carry out well test interpretation using Saphir Software. VIII. Carry out Pressure and Temperature Survey (static and buildup) in order to determine formation latest data and characteristics (P, T, skin, k, Productivity, Injectivity etc)  Work as focal point of Company for hydrocarbon resources reporting using SPE guidelines which requires the establishment and maintenance of good well production data, field data and reserves figures, and this achieved via performing of Annual Review of Petroleum Resource (ARPR) including: reserve estimation utilizing Simulation, volumetric method, decline curve analysis and material balance methods. Also Annual reserve reporting as Ultimate Recovery (UR), Potential Recovery (PR), Speculative Resources (SR), and applied both of reserve definition (1P, 2P, 3P & EV) and (P1, P2, P3 &EV)  Work as Team Leader focal point of running the Production Logging Test (PLT) in Company and I had completed more than 10 PLTs jobs including I. Candidates selection II. Proposal preparation III. Follow up the job implementation in the both Field & office IV. PLT result and interpretation V. Remedial action base on PLT result. VI. Assess and evaluate the remedial action after implementation.  Work as team leader of chemical water shut-off projects in Company , which are running by bellow vendors: 1. Schlumberger using Oregano-Seal Technology 2. DDPI company using polymer Technology 3. Oil Resource Company using NMN-300 Technology  Participates in the definition of contracted special field testing related to reservoir engineering. Includes defining scope of special tests for Reservoir Engineering, preparing specifications and evaluating bids. Monitor contractor compliance with contract terms and schedules and details progress and performance in regular activity reports.  Establish the near term, short term and long term well and field/project production forecast.  Carry out Full Field Review studies with an integrated Team to assess well/reservoir/field performance, identify further development opportunities (acid stimulation, infill drilling, sand cleaning, and water shut- off) and activities necessary to be undertaking to enhance oil production rate and recovery.  Work with team to provide reservoir engineering evaluation including establishment of fluid contacts, pressure transient analysis, reservoir simulation work and analysis ,reserves estimation ,drainage plans ,production forecasting, establishment of reservoir management plan and recommend the optimum
  • 4. development option and Cost-effective technology applications to create maximum value from the hydrocarbon reserves.  Cary out the Development Technical Review presentation (DTR) & Field Performance workshop of the main field in Company, normally half Annually.  Conduct static model upscale using Petrel software and dynamic simulation on base case of static model of each prospect using ECLIPSE software based on 3D static geological model with the following objectives: I. Detailed preparation on simulation input data such as formation pressure and temperature, test results, relative permeability and rock properties, fluid and reservoir properties and also dynamic data. II. Detailed simulation model (using Eclipse Black oil ) model construction, initialization. III. To use Local Grid Refinement model for wells with suspected coning, poor history matching and for future horizontal wells. IV. To provide a full study and enhancement plans such as water injection, including WHIP (Well Head Injection Pressure) and amount of injection water for all injectors in its reservoir simulation study, or any other secondary recovery methods. V. To provide production rate sensitivity simulation. VI. To provide horizontal well planning study. VII. Examine the ways to maximize recovery in terms of well pattern/spacing, off take rate, completion strategy, and depletion strategy etc. VIII. Generate field production forecast of every development scenario. IX. Determine the optimum development scenario. X. Review the development of combination vertical and horizontal wells to improve recovery and project economics. XI. Determine recovery factor and recoverable reserves.  Coach and Monitor less experienced staff  January- 2005 – March, 2006 University of Khartoum Address: Khartoum, Sudan Job Title : Petroleum & Gas Section/ Teaching Assistant Qualifications:
  • 5. 1999-2004 B.Sc. (Honour) (Second Upper Class) in Petroleum Engineering, Sudan University Of Science & Technology (SUST) Khartoum, Sudan July 2011-Dec-2014 MSC in Petroleum engineering (Produced Water Management) University of Khartoum Projects & Assignments: 1. Work as Team Leader for the South Annajma Field Development Study by Schlumberger: April 2013- Abu Dhabi-UEA The main tasks were: a- To follow up the study progress and cross check and validate the data analysis and consentience. b- Arrange the meetings and facilitate the communication between Schlumberger in Abu Dhabi team and Staroil head office in Khartoum c- As well as to work with team in track to meet the Study target d- Beside above mentioned tasks is to QC and validate the conventional reservoir analysis data preparation and these including not limited: RCA, SCAL, PVT, Pressure transient analysis, production data analysis using PVTi module and other techniques and equations. e- Model initialization and QC. Dynamic model build up using Eclipse or Petr-RE, and this including: rock properties, fluid properties, history matching, run sensitivity for different cases.etc… f- Reserve Classification and reporting g- FDP working file, this including: No. of new wells to be drilled, new wells location, expected flow rate, accumulative produced oil and wells reserves developed. 2. Work Assignment With FDP Study Team (Gumry Field) (22-Nov-08 to 20-May-09) In China Beijing - APEX Including: A- Reservoir Engineering:- I- Reservoir Analysis (RCA, SCAL, PVT and pressure analysis) II- Integrating Static & dynamic data III- Reserve Estimation (integrating volumetric & numerical reserve estimation. IV- Oil production history matching using ECLIPSE software V- Oil field development plans design including EOR study trough reservoir simulation VI- Performed pressure transient analysis (PTA) in blocks 3/7 PDOC. B- Software Training Package:-
  • 6. I- Reservoir Simulation (Eclipse 100 black oil simulator), especially to Flo Grid model, Schedule model & office model II-Well Test interpretation Package: Saphir 3.20 III-Continuum Software (DCA, Reserve Calculation Economic) 3. Work Assignment With Remodeling Study Team (03-Sep-11 to 01- Dec -11) In China Beijing - APEX Including: A- Reservoir Engineering:- I- Reservoir Analysis (RCA, SCAL, PVT and pressure analysis) II- Integrating Static & dynamic data III- Reserve Estimation (integrating volumetric & numerical reserve estimation. IV- Oil production history matching using ECLIPSE software V- Oil field development plans design including EOR study trough reservoir simulation VI- Performed pressure transient analysis (PTA) in blocks 3/7 PDOC Training Courses and Workshops: 1. Training in OFM fundamental & advanced topics (June,1-5,2008), Schlumberger 2. Training in Special Core Analysis (SCAL) (May, 7-16, 2008), Centre of Petroleum Laboratory –Khartoum 3. Training in Production Logging Test (PLT) (October, 23-27, 2008), Schlumberger-Cairo 4. Training in reservoir characterization and simulation (March, 9-13, 2008), Resmodtec- Abu Dhabi 5. Applied Reservoir Engineering & Management: Analysis, Characterization, Simulation, Integration, and Statistic & Naturally Fractured (October, 27-31, 2010), Howard Technology Middle East-Dubai 6. Production analysis and optimization using Nodal Analysis with Pipesim software (March, 6-17, 2011), Petrotech-Khartoum 7. Pressure Transient Analysis (DDAI) (Using Saphir software) (April,24-28,2011), KAPPA software and Engineering Constant-Abu Dhabi 8. Training in risk analysis and reserve estimation (July, 7-11, 2007), Resmodtec-Cairo 9. Applied Reservoir Management (October, 18-22, 2009), Hot Engineering-Dubai 10.Training in basic petrophysics (February, 18-22, 2007), Schlumberger-Khartoum 11.Training in production technology
  • 7. (September, 9-13, 2007), Schlumberger-Khartoum 12.IOR Techniques to maximize Sudanese Oil Fields Production (October, 18-19, 2010), SPE, Sudan, Khartoum 13.Training in Petro-View-Plus Software (February, 25-27, 2007), Schlumberger- Khartoum 14.Training in Basic Cardio Pulmonary Resuscitation (July, 5, 2007), University of Khartoum 15.Training in Basic Awareness, Basic Emergency Response, Basic Process Safety (July, 5, 2007), University of Khartoum 16.Integrated Field Development Workshop (January, 11-14, 2010), Resmodtec- Abu Dhabi 17.Training in Action Learning Coaching Skills (April, 5-11, 2009), Business School Netherlands-Khartoum 18.Training in both reservoir simulation software Eclipse (Black Oil-E100) & (Petrel RE) (June, 9-13, 2009), Schlumberger-Cairo 19.Training in Report Writing Skills ((April, 27-May, 22, 2008), Etisalat Academy Khartoum 20.2nd Annual Enhanced Oil Recovery and Heavy Oil Conference March 27-28, 2013, Abu Dhabi, UAE Skills: Good in Arabic & English Has ability to negotiate & make effective decisions. Has ability to work under pressure Has ability to work independently and as part of a team. Has ability to work in multinational environment. Software: Good knowledge of main reservoir engineering software (classical or 3D modeling):  Petrel RE, Eclipse E100  PVTi module  Schedule module  Saphir, Kappa (well test interpretation).  OFM (Reservoir & Well Surveillance)  Proficient in Word, Excel, PowerPoint Personal data: Full Name: Muaz Hassan Ali Ahmed Date of birth: Jan, 01, 1981
  • 8. Place of birth: Gazera, Sudan Nationality: Sudanese. Marital status: Married. Personal E-mail: muaz910@gmail.com & mhassan@staroilsd.com Mobile No: +971528737669/+249912429403/+249912157439 Has Sudanese Driving license. Associations: Member of the Society of Petroleum Engineers (Sudan Section) Member of the Society of Sudanese Engineers References: 1. Mohd Nazlee Rasol, PETRONAS, Resource Enhancement, PRD,PMU Tel No: +603 2331 5570, Hp No: +6019 260 6446 E-mail: nazleer@petronas.com.my / nazleer.pdoc@gmail.com 2. Mr. Mutwakil Amin–UAE – Abu Dhabi- Abu Dhabi Operating Company Limited (ADCO),Mobile: (+971-506913777) - E-mail: malamin@adco.ae 3. Dr Mohamed Salah Abou Sayed –UAE – Gulf Reservoir Modeling Technology, President and CEO – Tel. Off. :( +971)2-6674666, Mobile: (+971)50-4463329 – fax: (+971)2-6674999 4. Dr. Hassan Nimir – Sudan – University of Khartoum – Faculty of Engineering- Section Head of Petroleum Engineering & Natural Gas Section Mobile: (+249)912390154 – E-mail: hassannimir@yahoo.com