52 a risk-management_approach_to_a_successful_infrastructure_projectEng. Mohamed Muhumed
Currently they seem to be no high level, hi-tech poultry farms in this country like the ones we used to see in USA, Europe and Asia. Any investor who have enough nerve and needed capital to venture into it will have reasons to smile within a short period of investment. Up till now, Nigeria still import chicken from other countries because the ones the local farmers produces are not enough to meet the demand of the over 150 Million citizens.
This briefing provides an engineering perspective on the major issues currently facing the UK and highlights five
policy priorities for government to address.
Efficient transport sector is the paramount component of the economic development. The key strategic task of the transport policy shall become the forming of the transport system of Uzbekistan to the effect that it would be possible to ensure the relative decrease of the costs for transportation services, increase of operational efficiency, reliability and availability of transportation services for the economic entities, diversity of transport routes and become the connecting link in transcontinental and regional logistics schemes.
Эффективный транспортный сектор является важнейшей составляющей экономического развития. Ключевой стратегической задачей транспортной политики Узбекистана должно стать выстраивание транспортной системы так, чтобы обеспечить относительное снижение цен на транспортные услуги, оперативность, надежность и доступность услуг транспорта для хозяйствующих субъектов, диверсифицировать транспортные маршруты и стать связующим звеном в трансконтинентальных и региональных логистических схемах.
52 a risk-management_approach_to_a_successful_infrastructure_projectEng. Mohamed Muhumed
Currently they seem to be no high level, hi-tech poultry farms in this country like the ones we used to see in USA, Europe and Asia. Any investor who have enough nerve and needed capital to venture into it will have reasons to smile within a short period of investment. Up till now, Nigeria still import chicken from other countries because the ones the local farmers produces are not enough to meet the demand of the over 150 Million citizens.
This briefing provides an engineering perspective on the major issues currently facing the UK and highlights five
policy priorities for government to address.
Efficient transport sector is the paramount component of the economic development. The key strategic task of the transport policy shall become the forming of the transport system of Uzbekistan to the effect that it would be possible to ensure the relative decrease of the costs for transportation services, increase of operational efficiency, reliability and availability of transportation services for the economic entities, diversity of transport routes and become the connecting link in transcontinental and regional logistics schemes.
Эффективный транспортный сектор является важнейшей составляющей экономического развития. Ключевой стратегической задачей транспортной политики Узбекистана должно стать выстраивание транспортной системы так, чтобы обеспечить относительное снижение цен на транспортные услуги, оперативность, надежность и доступность услуг транспорта для хозяйствующих субъектов, диверсифицировать транспортные маршруты и стать связующим звеном в трансконтинентальных и региональных логистических схемах.
Metabolismo energético: respiração celular e fermentaçãoFelipe Haeberlin
Apresentação abordando conceitos gerais de energia, diferenças entre moléculas energéticas e as que aceleram o metabolismo. Processos respiração celular e fermentação e respectivo rendimento em ATP de ambos os processos.
Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...Adeoye Charles
This term paper sheds light on the risks involved in the construction of highways and also the ways it can be prevented/eradicated so as to deliver optimum performance.
Effective Project Preparation Process: A Key Factor to a Successful PPP Infra...inventionjournals
Management of PPP project preparation process according to WEF (2013) is quite complex because it involves large team and multiple stakeholders such as ministries, regulatory organs and regulations, engineering firms, banks as well as multiple interfaces between different project functional feasibility studies. It is therefore very important at this stage to put together capable and experienced cross-functional project team supported by committed political and project leadership in order to achieve a sustainable PPP project preparation process. The main feature of a PPP project preparation process includes; project planning, project coordination and project monitoring. This process according to Adamuet al. (2015) can be cost intensive, therefore the public sector needs to ensure sufficient upfront funding of the entire process.This study is aimed at assessing the effectiveness of road project preparation process in the development of road infrastructure under PPP concession. In order to achieve this aim, the study examined the concept of PPP models for infrastructure development and project preparation process in a PPP framework. Data collection was through administration of well-structured questionnaire on the target population. Data collected were analysed using both descriptive and inferential statistic analytical techniques.The study revealed that there is urgent need to review the current Nigeria National Policy on PPP, institutional structure and individual capacity building in the area of PPP project preparation in order to encourage more private sector participation in the drive for provision and development of road infrastructure facility.
Assessment of risk on road projects in nigeria construction industryResearchWap
The aim of this research is to examine the impact of risk on road projects in Nigerian construction industry. The specific objectives are to;
i. Identify and assess the various risk factors associated with road project in Nigerian construction industry.
ii. Determine the effect of risk factors on cost of road project in the study area.
iii. Determine the effect of risk factors on completion time of road project in the study area.
PPP Bankable Feasibility Study: A Case of Road Infrastructure Development in ...inventionjournals
Adequate and reliable bankable project feasibility study according to Adamuet al. (2015) determines the private sectors investment interest in a PPP transaction which centers around project demand forecast taking into account the willingness to pay, inter and intra-model competition, ramp-up effects, and long-term macro-economic effect and population growth rate. In order to achieve this, WEF (2013) noted that public sector needs to determine the project technical specifications, and also carry out a detail cost benefit analysis so as to determine the project’s commercial viability to be followed by proactive and professionalized stakeholder engagement. Efforts must also be made to mitigate the social and environmental impact of the proposed infrastructure. This is very essential in determining the bankability of any infrastructure development. This study is aimed at assessing the effectiveness of bankable feasibility study and factors affecting bankability of road infrastructure development under PPP concession. In order to achieve this aim, the study examined the concept of PPP models for infrastructure development and bankable feasibility process in a PPP framework. Data collection was through administration of well-structured questionnaire on the target population. Data collected were analysed using both descriptive and inferential statistic analytical techniques. The study revealed that there is urgent need to review the current Nigeria National Policy on PPP, institutional structure and individual capacity building in the area of PPP project preparation in order to encourage more private sector participation in the drive for provision and development of road infrastructure facility.
Metabolismo energético: respiração celular e fermentaçãoFelipe Haeberlin
Apresentação abordando conceitos gerais de energia, diferenças entre moléculas energéticas e as que aceleram o metabolismo. Processos respiração celular e fermentação e respectivo rendimento em ATP de ambos os processos.
Adeoye Preye charles qsv/12/0227 term paper on Risk involved in highway const...Adeoye Charles
This term paper sheds light on the risks involved in the construction of highways and also the ways it can be prevented/eradicated so as to deliver optimum performance.
Effective Project Preparation Process: A Key Factor to a Successful PPP Infra...inventionjournals
Management of PPP project preparation process according to WEF (2013) is quite complex because it involves large team and multiple stakeholders such as ministries, regulatory organs and regulations, engineering firms, banks as well as multiple interfaces between different project functional feasibility studies. It is therefore very important at this stage to put together capable and experienced cross-functional project team supported by committed political and project leadership in order to achieve a sustainable PPP project preparation process. The main feature of a PPP project preparation process includes; project planning, project coordination and project monitoring. This process according to Adamuet al. (2015) can be cost intensive, therefore the public sector needs to ensure sufficient upfront funding of the entire process.This study is aimed at assessing the effectiveness of road project preparation process in the development of road infrastructure under PPP concession. In order to achieve this aim, the study examined the concept of PPP models for infrastructure development and project preparation process in a PPP framework. Data collection was through administration of well-structured questionnaire on the target population. Data collected were analysed using both descriptive and inferential statistic analytical techniques.The study revealed that there is urgent need to review the current Nigeria National Policy on PPP, institutional structure and individual capacity building in the area of PPP project preparation in order to encourage more private sector participation in the drive for provision and development of road infrastructure facility.
Assessment of risk on road projects in nigeria construction industryResearchWap
The aim of this research is to examine the impact of risk on road projects in Nigerian construction industry. The specific objectives are to;
i. Identify and assess the various risk factors associated with road project in Nigerian construction industry.
ii. Determine the effect of risk factors on cost of road project in the study area.
iii. Determine the effect of risk factors on completion time of road project in the study area.
PPP Bankable Feasibility Study: A Case of Road Infrastructure Development in ...inventionjournals
Adequate and reliable bankable project feasibility study according to Adamuet al. (2015) determines the private sectors investment interest in a PPP transaction which centers around project demand forecast taking into account the willingness to pay, inter and intra-model competition, ramp-up effects, and long-term macro-economic effect and population growth rate. In order to achieve this, WEF (2013) noted that public sector needs to determine the project technical specifications, and also carry out a detail cost benefit analysis so as to determine the project’s commercial viability to be followed by proactive and professionalized stakeholder engagement. Efforts must also be made to mitigate the social and environmental impact of the proposed infrastructure. This is very essential in determining the bankability of any infrastructure development. This study is aimed at assessing the effectiveness of bankable feasibility study and factors affecting bankability of road infrastructure development under PPP concession. In order to achieve this aim, the study examined the concept of PPP models for infrastructure development and bankable feasibility process in a PPP framework. Data collection was through administration of well-structured questionnaire on the target population. Data collected were analysed using both descriptive and inferential statistic analytical techniques. The study revealed that there is urgent need to review the current Nigeria National Policy on PPP, institutional structure and individual capacity building in the area of PPP project preparation in order to encourage more private sector participation in the drive for provision and development of road infrastructure facility.
Problematic Infrastructure Factors Affecting Development in the 21st Century ...Premier Publishers
Good infrastructure is linked to economic growth and development, without deny. The study explores five problematic infrastructure factors affecting development in Zimbabwe. The Zimbabwean nation has been struggling to recover from economic crisis, which has bedeviled the economy for quite a long time. The study identified and discussed five problematic infrastructure factors that hinders development. Addressing of the factors will place the country on a better position for recovery using a better recovery pace. The study utilized the Network Theory to support its argument. The identified factors are power cuts and shortages, poor road infrastructure, inefficient rail network within the country, water shortages and poor transport infrastructure for access to ports. The study employed the Relative Importance Index to enable the ranking of identified factors. Policies that target improvement of the identified problems will aid both short term and long-term development of the economy.
Construction industry before and after pandemicvivatechijri
: Since the World Health Organization (WHO) announced the coronavirus2019 (COVID-19) outbreak
as a pandemic, many countries have declared a complete national lockdown after a remarkable spike in COVID
19 cases. These decisions have restricted the movement of people and resulted in a complete shutdown of many
businesses across many sectors. The construction industry, as a significant growth driver of the economy with no
exception, has also been completely shut down. All the developments and projects were postponed until further
notice. It is, therefore, a prudent to address the impact of the pandemic at the outset and end of the crisis to
prepare for any future possibility and gain lessons for plans. This study aims to investigate the effect of COVID 19
on the construction industry’s survival. The impacts and fallout have been determined and evaluated through the
recruitment of construction experts and practitioners. The impacts have been classified into different groups
which include economic, human resources. The study implied two methods include exploratory interviews and
questionnaire surveys. The study found the most prominent impacts of COVID 19 are the suspension of projects,
labour impact and job loss, time overrun, cost overrun, and financial implications. The findings of this study shed
light on the consequences of the sudden occurrence of pandemic and raise awareness of the most critical impacts
which can’t be overlooked. The findings also help project stakeholders to realise the sequences of the sudden
epidemic and prepare for the worst-case scenario during the planning stage of the construction projects. The
problem for the construction and engineering sector in India is aggravated and difficult to address as there is no
standard form or format for contracts followed by the industry.To say that the companies engaged in the
construction and engineering sector, would be affected due to the current unprecedented situation would be an
understatement. The various restrictions put in place by the Governments to control the effects of the virus may
trigger shortage of raw material and manpower, disrupted supply chain, further creating handicaps in performing
contractual obligations. Contraction in consumption demand should be the least of the worries for the sector.
Some elements in construction and engineering are imported from countries, which may be more badly affected,
creating a domino effect on the entire sector
Infrastructure is the back bone of economic development of any Nation. Road infrastructure plays key role for trade and commerce, connecting the production and consumption centers. Road and transportation infrastructure construction is highly capital intensive, wherein the government alone cannot meet its ends and initiated Public Private Partnership (PPP) for its execution right from planning and designing to its maintenance through various PPP models. Over the last few years many of the awarded roadprojects through PPP modelare stalled citing various reasons. This technical paper analyses the risk factors associated with PPP –toll operated road projects through case studies and suggested corrective measures like shadow tolling and hybrid models for restoration of PPP.
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
Effect of construction delays on project time overruneSAT Journals
Abstract The time and cost for performance of a project are usually important to the employer and contractor. About 57% of Indian construction projects are experiencing time overrun. These time overruns always contributed as expensive to all parties. This paper highlights the types of construction delays due to which project suffer time and cost overrun. Construction delay is considered to be one of the recurring problems in the construction industry and it has an adverse effect on project success in terms of time, cost and quality. The construction industry is the tool through which a society achieves its goal of urban and rural development. It is one of the sectors that provides important ingredient for the development of an economy. This paper studies external and internal factors that influence the construction process and outlines the effect of delay in large construction projects. Various media reports shows incidents of extended delays and extensive cost overruns in infrastructure projects. These delayed projects are further can conclude additional delays and this affects an ongoing projects and also new projects which could not be started due to pending projects whose completion date already elongated. Realizing the density of matter this paper studies the performance of previous year 2012 ongoing and also completed projects. These projects are from around 17 various central sectors costing Rs. 1000 crore and above (Mega Projects). Keywords: Delays, Time overrun, Cost overrun, Megaprojects etc
Critically analyze the business operating environment of a project you are fa...Kudzai Chibarinya
Critically analyze the business operating environment of a project you are familiar with and what are the prospects of its success, What are the area of improvements of any would you recommend to the project sponsors for it to be successfully.
Changes to OH&E legislation in Victoria Australia in 2020, now means if a fatality occurs on a construction site or elsewhere "C" level executives could be liable for up to a 20-year jail sentence and the company a $16.5 million fine as it is now Criminal Manslaughter to kill and employee.
Similar to 0 geoffrey vaughn challenges facing guyana construction sector (20)
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
As a business owner in Delaware, staying on top of your tax obligations is paramount, especially with the annual deadline for Delaware Franchise Tax looming on March 1. One such obligation is the annual Delaware Franchise Tax, which serves as a crucial requirement for maintaining your company’s legal standing within the state. While the prospect of handling tax matters may seem daunting, rest assured that the process can be straightforward with the right guidance. In this comprehensive guide, we’ll walk you through the steps of filing your Delaware Franchise Tax and provide insights to help you navigate the process effectively.
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxmy Pandit
Explore the world of the Taurus zodiac sign. Learn about their stability, determination, and appreciation for beauty. Discover how Taureans' grounded nature and hardworking mindset define their unique personality.
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
2. The construction sector as define by “Standard
Industrial Classification”, are companies or sub-sectors
that are engaged in the construction of buildings
(residential and commercial), structures (bridges, dams,
sluices etc). Included are those sub-sectors that engage
in demolition works, blasting, soil investigation, drilling,
landfill, and those engaged in infrastructure works
(roads, drains, ports, airport etc).
13/02/2014Ministry of Public Works 2
3. There are special characteristics which relates to exceptional
relationship between the construction sector and the level of
economic development such as
The level of adaptation of technology by contractors in Guyana.
The level of development of our human resource mainly in
science and technology, construction etc.
The development and level of our infrastructure system in
Guyana.
Contribution of National Funds (Budget allocation) to
infrastructure development.
13/02/2014Ministry of Public WorksMinistry of Public WorksMinistry of Public WorksMinistry of Public Works 3
4. Guyana continue to experience economic growth the latest
estimates shows that 2013 saw a economic growth of
approximately 5%. This is excellent but how do we sustain
this with all the challenges we are faced with in our critical
construction sector.
13/02/2014Ministry of Public Works 4
5. Challenges that would be addressed in this presentation are:
Education and Training
Contractors Capacity
Utility Services
Material Shortages and Cost Increases
Quality in Construction
13/02/2014Ministry of Public Works 5
6. Guyana continues to have a shortfall in this most important asset
our human resource. This asset is needed to meet the demand of
the technological revolution of the twentieth century.
There is an ominous shortage of professionals, sub professionals,
technicians and skilled tradesmen. The weakness is most
noticeable at the level of sub-professionals and supervisory staff
such as chargehands, technicians and foreman. Most times
chargehands and foremen are procured from the ranks of the
skilled (senior) tradesmen (Suite 2001).
13/02/2014Ministry of Public Works 6
7. An overview of the 2012 2013 CSEC results shows
that much students are not passing the science
base subjects such as Mathematic (30.35%),
Chemistry (52.39), Physics (54.34%) and English
(45.69). This is where the core of our Construction
challenges begin.
13/02/2014Ministry of Public Works 7
8. In reviewing reports from the University of Guyana
Faculty of Technology for the period 2009 to 2013
shows that two thousand nine hundred students
(2,900) enrolled for the Engineering programme
from a total enrollment of thirty one thousand and
ninety (31,090).
This represents 9.3% for the five year period of the
total University population.
13/02/2014Ministry of Public Works 8
9. YEARS ENROLLMENT AMOUNT
2013201320132013 ---- 2014201420142014 677677677677
2012201220122012 ---- 2013201320132013 613613613613
2010201020102010 ---- 2011201120112011 640640640640
2011201120112011 ---- 2012201220122012 748748748748
2009200920092009 –––– 2010201020102010 222222222222
TOTALTOTALTOTALTOTAL 2,9002,9002,9002,900
13/02/2014Ministry of Public Works 9
10. Even our technical Institute saw a decline in its pass
rate for 2012 (76%) and 2013 (58%) a decline of
18%. It must be known that 15% of the student
population drop-out for various reasons.
13/02/2014Ministry of Public Works 10
11. The issues raised in training gives us an
understanding to the reasons for;
Time overrun
Basic understanding of Bill of Quantity while
tendering
Lack of understanding of the procurement rules
Cost overrun
13/02/2014Ministry of Public Works 11
12. Assessing the contracts awarded for the last five
years, projects where loans or grants are received
via funding agencies (IDB, EU, World Bank) shows
that only a few National contractors have the
capacity to execute projects funded by these
agencies.
13/02/2014Ministry of Public Works 12
14. Poor quality in construction results in rework. Poor
quality elements not only do not perform in the
manner for which the structures were designed and
built i.e. they possess reduced capacity, but they
last only a fraction of their design life; this issue
have become one of our major concern in the
construction of our roads bridges and also
buildings.
13/02/2014Ministry of Public Works 14
15. Frequently we excuse or attempt to justify poor
quality by saying we are working to meet schedules
or deadlines or we are cutting cost of construction.
We have seen instances where poor quality has led
to contract being terminated as per contract
condition. Poor quality construction is all around
us, our roads, buildings, as well as our other
infrastructures and utilities.
13/02/2014Ministry of Public Works 15
16. In 2013 several projects saw materials being rejects
for not meeting specification. We have had several
contracts within the Ministry terminated for poor
quality works.
13/02/2014Ministry of Public Works 16
17. The issue of quality is closely related to training and
development, they are shortages of clerk of works
and technicians whom on most projects has the
responsibility of ensuring quality and standards as
per contract specifications.
Poor quality of construction means that there will be
a high percentage of rework which we have seen
over the last five years.
13/02/2014Ministry of Public Works 17
18. The shortage of construction materials continues to
be a major concern to the construction sector. The
sector has seen a significant growth with increase
construction in the housing, roads, sea defences,
bridges and other infrastructure. This increase has
caused a increase demand for certain construction
materials such as:
13/02/2014Ministry of Public Works 18
19. Stone
Cement
Steel sheet piles
These are three materials which are constantly
needed by contractors for the execution of works.
There were several projects delayed due to the
shortage of these materials.
13/02/2014Ministry of Public Works 19
20. Projects within the sea defence unit and the National
Drainage and Irrigation Authority required sheet
piles which was difficult to access due to the
reduction in production by the Chinese company
because of Environmental Issues. Both entity saw
delays in the projects works for almost 1year.
In some cases alternative material was considered
but with some amount of reluctant.
13/02/2014Ministry of Public Works 20
21. 2011 to 2013 saw a shortage of aggregate for the
construction sector. Ministry of Public Works CPTU
was tasked with the assignment to determine the
effects of aggregate shortage in the sector. Below
is a table of the findings;
13/02/2014Ministry of Public Works 21
22. We must not forget the challenges that we faced in
2005 – 2007 during our preparation for World
Cup cricket. During this period steel prices went
up, there was a shortage of cement and even a
shortage of our critical human resources.
These challenges are not new therefore we have to
find ways to deal with it and the time is now.
13/02/2014Ministry of Public Works 22
23. DetailsDetailsDetailsDetails Amounts/TonsAmounts/TonsAmounts/TonsAmounts/Tons
BaracaraBaracaraBaracaraBaracara QuarriesQuarriesQuarriesQuarries 114,457114,457114,457114,457
ToolsieToolsieToolsieToolsie PersaudPersaudPersaudPersaud LtdLtdLtdLtd 84,96584,96584,96584,965
BK Quarries Inc.BK Quarries Inc.BK Quarries Inc.BK Quarries Inc. 464,043464,043464,043464,043
Metallica CC QuarriesMetallica CC QuarriesMetallica CC QuarriesMetallica CC Quarries 7,4427,4427,4427,442
Durban QuarriesDurban QuarriesDurban QuarriesDurban Quarries 9,2909,2909,2909,290
TotalTotalTotalTotal 680,197680,197680,197680,197
13/02/2014Ministry of Public Works 23
25. In this presentation of these critical issues one
does not claim that the list is all inclusive. It seeks
to briefly address the more critical
issues/challenges.
These issues/challenges explained are our
expectations for a collective discussion that will
serve to achieve a higher level of efficiency within
the sector.
13/02/2014Ministry of Public Works 25
26. The Government and the Private Sector need
to work together so as reduce these
challenges. There is need for more Public
Private Partner projects which will reduce the
impact faced in the sector.
13/02/2014Ministry of Public Works 26
27. Sinnott, Lewis and Pineda (December, 2005, p17) stated
“every“every“every“every oneoneoneone dollardollardollardollar spentspentspentspent onononon constructionconstructionconstructionconstruction generallygenerallygenerallygenerally
generatesgeneratesgeneratesgenerates upupupup totototo fivefivefivefive ((((5555)))) extraextraextraextra dollarsdollarsdollarsdollars ofofofof GDP”GDP”GDP”GDP”....
The capital spending on construction services may
stimulate the economy by creating employment and
boost the GDP but one of the major factor other than
the those mentioned, is that it provides built
infrastructure which is essential for the service and
manufacturing sector.
13/02/2014Ministry of Public Works 27