SlideShare a Scribd company logo
1 of 9
ASSESSMENT OF RISK ON ROAD PROJECTS IN NIGERIA
CONSTRUCTION INDUSTRY (A CASE STUDY OF LAGOS
METROPOLIS)
Consequences of uncertainty and its exposure in a project, is risk. In a
project context, risk is the chance of something happening that will have an
impact upon objectives. It includes the possibility of loss or gain, or variation
from a desired or planned outcome, as a consequence of the uncertainty
associated with following a particular course of action. (Deviprasadh, 2007). Risk
thus has two elements: the likelihood or probability of something happening,
and the consequences or impacts if it does. Managing risk is an integral part of
good management; it is fundamental to achieving good business and project
outcomes and the effective procurement of goods and services Risk
management provides a structured way of assessing and dealing with future
uncertainly. Project risk management includes the processes concerned with
identifying, analyzing, and responding to project risk. It includes maximizing the
results of positive events and minimizing the consequences of adverse events."
(Deviprasadh, 2007).
Project Management Institute (2004) defines project risk as an uncertain
event or condition that, if it occurs, has a positive or a negative effect on at least
one project objective, such as time, cost, scope, or quality. A risk may have one
or more causes and, if it occurs, one or more impacts Construction projects
vary in type and nature and a large number of people with professional skills.
The variations are endless, but what all projects have in common is their
exposure to risk (Flanagan and Norman, 1999).
Civil engineering is the branch of engineering that deals with the
creation, improvement, and protection of the communal environment, providing
facilities for living, industry and transportation, including large buildings, roads,
bridges, canals, and other engineered constructions (Stark, 2008). It is
characterized by its high magnitude, uncertainties and the level of risk involved
(Seeley and Murray, 2001). Civil engineering is a professional engineering
discipline that deals with the design, construction, and maintenance of the
physical and naturally built environment, it is traditionally broken into several
sub-disciplines including environmental engineering, geotechnical engineering,
structural engineering, transportation engineering, municipal or urban
engineering, water resources engineering, materials engineering. Coastal
engineering, surveying, and construction engineering. (Oakes 2001).
Civil engineering takes place on all levels: in the public sector and in the
private sector from individual homeowners through to international companies
(ICE, 2007), Civil engineering was first introduced as a profession in 1828 and the
Royal charter of the Institute of Civil Engineers (2007) defined civil engineering as
the art of directing the great sources of power in nature for the use and
convenience of man, as applied in the construction of roads, bridges,
aqueducts, canals, river navigation and docks, and in the construction of ports,
harbours, moles, breakwaters and lighthouses, and in the art of navigation by
artificial power for the purposes of commerce, and in the construction and
application of machinery, and in the drainage of cities and towns (ICE, 2007).
Construction engineering is a civil engineering sub discipline that involves
planning and execution of the designs from transportation (Wikipedia, 2011).
The modes of transportation as identified by Lam (1999) are roadways, railways,
waterways, and airways. A road is a route on land between two places
which typically has been paved or other wise improved to allow travel by some
conveyance (Wikipedia, 2011).
Cost overruns and delays are not unusual in civil engineering works. This
pattern of risk is' largely influenced by the financial structure of the projects
(Lam, 1999).
During limes of foreign exchange and interest role fluctuations, most
conventional projects funded by direct capital injection from the governments
may be affected by cost increases in their imported elements. The use of project
finance in privatized projects also means that lenders rely solely on the
prospective income stream for repayment of their loans. Late completion will
erode the financial plan and extra interest costs on the part of the sponsors.
There are also uncertainties as to the level and stability of income which
depends on the market condition of the product in question. In road project,
land acquisition can be a slow and expensive process especially when a long
road has to go through different municipalities or different provinces having non-
standardized land resumption procedures. Right of way disputes sometimes
creep in, as is the likelihood of treading on archeological mines and former
industrial site with contaminated grounds (Lam, 1999).
There are many examples of non-achievement of time, cost and quality of
projects due to the absence of risk management techniques in project
management. Therefore, the success parameters of a construction project,
namely, the timely completion, staying within the specified budget, and
achieving requisite performance would depend upon the capability of each
party in risk management. (Perera, 2009).
1.2 STATEMENT OF THE PROBLEM
As construction and engineering projects increases in complexity, the
magnitude of risk involved for all the parties involved increases, from the clients,
to contractors, architects, quantity surveyors, engineers, investors, and financial
institutions (Seeley & Murray, 2001). Risk has been studied by different
researchers (Farinloye 2009: Onukbwe 2009; Dada and Jagboro, 2007; Baker
1999; Perera et al, 2009) in the light of the influence it has made in decision
making in the construction industry and the techniques that could be used by the
design and construction team in the management of risk on construction
projects.
Farinloye et al., (2009) assessed the construction professional's
perception of risk impact on cost of building projects and concluded that
completion delay is the risk variable that has the highest probability of
occurrence and this risk has the second highest impact on construction cost.
Onukwube et al., (2009) also assessed risk in the light of the impact it has on
contractors' pricing in building projects and concluded that inadequate cash
flow had a significant impact on contractors pricing of building projects. These
studies were limited to building projects in Nigeria and no attempt was made to
cover road projects.
Dada and Jagboro (2007) carried out an evaluation of the impact of
risk on project cost overrun; they identified the risk factors inherent in different
building procurement methods and assessed their impact on project cost.
However, this study was limited to risk factors in relation to building
procurement methods and the impact on cost. Baker et al., (1999) examined
the risk response techniques employed for major projects and they concluded
that the construction industry concentrates almost exclusively on reduction of
financial risk. Perera et al., (2009) also assessed risk in civil engineering
construction, they identified the risk responsibilities of contractual parties’ in
order to improve their risk handling strategies but the study was limited to road
construction in Sri Lanka.
Therefore, this study becomes vital to fill the gaps identified above as the
research works identified did not cover the impact of risk on road projects in
Nigerian Construction industry. In the light of this, the following research
questions are raised:
1.3 RESEARCH QUESTIONS
i. What are the risk factors inherent in road project?
ii. What are the effects of risk on the duration of road?
iii. How do these factors affect the total construction cost of road project?
1.4 AIM AND OBJECTIVES
The aim of this research is to examine the impact of risk on road projects in
Nigerian construction industry. The specific objectives are to;
i. Identify and assess the various risk factors associated with road project
in Nigerian construction industry.
ii. Determine the effect of risk factors on cost of road project in the study
area.
iii. Determine the effect of risk factors on completion time of road project in
the study area.
1.5 JUSTIFICATION OF THE STUDY
Civil engineering works encompass a wide range of different projects
which are of great magnitude. Vast cuttings and embankments, mass and
reinforced concrete structures, large structural steel construction, reservoirs,
sewage schemes, piling for heavy foundations, harbor works, dry docks, roads,
canal and railways, all form subject matter of civil engineering contracts.
These works require considerable skill and technical knowledge in both
their design and construction. Continual changes in nature and methods of
construction in these projects, and the increasing size and complexity of these
works increases the risk involved (Seeley & Murray, 2001). Road projects
however often confront many uncertainties, due to factors such as resource
availability, the physical, economic and political environments, statutory
regulations, etc.(Perera et al., 2009). According to Wang and Chou (2003), such
risks have a significant effect on the outcome of a road construction process.
Assessing risk offsets negative impact it may have and pursue positive
impact (PM1, 2004). The study therefore becomes necessary to identify the
impact of risk on road projects with a view to providing information to
construction professionals in reducing to the barest minimum the risk associated
with road projects in Nigeria.
1.6 SCOPE AND LIMITATIONS OF THE STUDY
This study focused on the assessment of the impact of risk on road projects
in Nigeria. The study was restricted to federal and state roads in Lagos state.
1.7 RESEARCH METHODOLOGY
The approaches that were adopted to achieve the stated objectives
include the following: primary and secondary data source.
The primary source of data was generated through questionnaire survey
administered to construction professionals in civil engineering construction and
consulting companies, and professionals that coordinate road project in the
federal and state ministries in the study area. The survey was carried out in
order to assess the risk-factors inherent in road projects in terms of their degree
of severity and assess their impact on total cost and duration of the project.
The secondary source of data included reports such as published
textbooks, refereed conference proceedings; dissertation or theses and
government publications which focus on the theme of the research.
EDITOR SOURCE: AssessmentOf Risk On Road Projects In NigeriaConstructionIndustry

More Related Content

Similar to Assessing Risk Impacts on Nigerian Road Projects

Establishing risk management factors for construction projects in iraq
Establishing risk management factors for construction projects in iraqEstablishing risk management factors for construction projects in iraq
Establishing risk management factors for construction projects in iraqIAEME Publication
 
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ IAEME Publication
 
B0363010015
B0363010015B0363010015
B0363010015theijes
 
Literature Review - Final
Literature Review - FinalLiterature Review - Final
Literature Review - FinalRifan Fhazi
 
The Impact of Project Environment Study on Sustainable Change Control: A Case...
The Impact of Project Environment Study on Sustainable Change Control: A Case...The Impact of Project Environment Study on Sustainable Change Control: A Case...
The Impact of Project Environment Study on Sustainable Change Control: A Case...IRJET Journal
 
A fuzzy ahp model in risk ranking
A fuzzy ahp model in risk rankingA fuzzy ahp model in risk ranking
A fuzzy ahp model in risk rankingAlexander Decker
 
A fuzzy ahp model in risk ranking
A fuzzy ahp model in risk rankingA fuzzy ahp model in risk ranking
A fuzzy ahp model in risk rankingAlexander Decker
 
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...IRJET Journal
 
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...IJERA Editor
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Alexander Decker
 
IRJET- Risk Management in the Construction Project: Review
IRJET-  	  Risk Management in the Construction Project: ReviewIRJET-  	  Risk Management in the Construction Project: Review
IRJET- Risk Management in the Construction Project: ReviewIRJET Journal
 
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...civejjour
 
Theoretical risk identification within
Theoretical risk identification withinTheoretical risk identification within
Theoretical risk identification withincivej
 
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...Khalid Yafai
 
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSFACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSIAEME Publication
 
Risk Management in High Rise Construction Projects: A Review
Risk Management in High Rise Construction Projects: A ReviewRisk Management in High Rise Construction Projects: A Review
Risk Management in High Rise Construction Projects: A ReviewA Makwana
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghanaAlexander Decker
 
IRJET- Impacts of Significant Risk Factors on Forecasted Construction Cash Fl...
IRJET- Impacts of Significant Risk Factors on Forecasted Construction Cash Fl...IRJET- Impacts of Significant Risk Factors on Forecasted Construction Cash Fl...
IRJET- Impacts of Significant Risk Factors on Forecasted Construction Cash Fl...IRJET Journal
 

Similar to Assessing Risk Impacts on Nigerian Road Projects (20)

Establishing risk management factors for construction projects in iraq
Establishing risk management factors for construction projects in iraqEstablishing risk management factors for construction projects in iraq
Establishing risk management factors for construction projects in iraq
 
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
ESTABLISHING RISK MANAGEMENT FACTORS FOR CONSTRUCTION PROJECTS IN IRAQ
 
B0363010015
B0363010015B0363010015
B0363010015
 
Literature Review - Final
Literature Review - FinalLiterature Review - Final
Literature Review - Final
 
The Impact of Project Environment Study on Sustainable Change Control: A Case...
The Impact of Project Environment Study on Sustainable Change Control: A Case...The Impact of Project Environment Study on Sustainable Change Control: A Case...
The Impact of Project Environment Study on Sustainable Change Control: A Case...
 
A fuzzy ahp model in risk ranking
A fuzzy ahp model in risk rankingA fuzzy ahp model in risk ranking
A fuzzy ahp model in risk ranking
 
A fuzzy ahp model in risk ranking
A fuzzy ahp model in risk rankingA fuzzy ahp model in risk ranking
A fuzzy ahp model in risk ranking
 
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
IRJET-Factors influencing Time and Cost Overruns in Road Construction Project...
 
Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...Causes of delays on Construction Projects in Kuwait according to opinion of e...
Causes of delays on Construction Projects in Kuwait according to opinion of e...
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
 
IRJET- Risk Management in the Construction Project: Review
IRJET-  	  Risk Management in the Construction Project: ReviewIRJET-  	  Risk Management in the Construction Project: Review
IRJET- Risk Management in the Construction Project: Review
 
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
Theoretical Risk Identification within the Nigeria East- West Coastal Highway...
 
Theoretical risk identification within
Theoretical risk identification withinTheoretical risk identification within
Theoretical risk identification within
 
33 article text-127-1-10-20181005
33 article text-127-1-10-2018100533 article text-127-1-10-20181005
33 article text-127-1-10-20181005
 
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
مهم جدا جدا An empirical approach for identifying critical time ovrerun risk ...
 
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTSFACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
FACTORS AFFECTING DELAYS ON PRIVATE CONSTRUCTION PROJECTS
 
C1303032126
C1303032126C1303032126
C1303032126
 
Risk Management in High Rise Construction Projects: A Review
Risk Management in High Rise Construction Projects: A ReviewRisk Management in High Rise Construction Projects: A Review
Risk Management in High Rise Construction Projects: A Review
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghana
 
IRJET- Impacts of Significant Risk Factors on Forecasted Construction Cash Fl...
IRJET- Impacts of Significant Risk Factors on Forecasted Construction Cash Fl...IRJET- Impacts of Significant Risk Factors on Forecasted Construction Cash Fl...
IRJET- Impacts of Significant Risk Factors on Forecasted Construction Cash Fl...
 

More from ResearchWap

The Secrets Of Credit Management In Banking Industry.docx
The Secrets Of Credit Management In Banking Industry.docxThe Secrets Of Credit Management In Banking Industry.docx
The Secrets Of Credit Management In Banking Industry.docxResearchWap
 
Unlock Your Employees' Potential.docx
Unlock Your Employees' Potential.docxUnlock Your Employees' Potential.docx
Unlock Your Employees' Potential.docxResearchWap
 
The Relationship Between Class Size And Secondary School Students Academic Pe...
The Relationship Between Class Size And Secondary School Students Academic Pe...The Relationship Between Class Size And Secondary School Students Academic Pe...
The Relationship Between Class Size And Secondary School Students Academic Pe...ResearchWap
 
A Survey Of Causes And Management Of Teacher’s Behaviour Problems Among Headt...
A Survey Of Causes And Management Of Teacher’s Behaviour Problems Among Headt...A Survey Of Causes And Management Of Teacher’s Behaviour Problems Among Headt...
A Survey Of Causes And Management Of Teacher’s Behaviour Problems Among Headt...ResearchWap
 
Emotional Intelligence And Locus Of Control As Predictors Of Teachers’ Instru...
Emotional Intelligence And Locus Of Control As Predictors Of Teachers’ Instru...Emotional Intelligence And Locus Of Control As Predictors Of Teachers’ Instru...
Emotional Intelligence And Locus Of Control As Predictors Of Teachers’ Instru...ResearchWap
 
Consequences Of Deforestation On Rural Household Income.docx
Consequences Of Deforestation On Rural Household Income.docxConsequences Of Deforestation On Rural Household Income.docx
Consequences Of Deforestation On Rural Household Income.docxResearchWap
 
The Effect Of Agbarho Slaughterhouse Effluent On The Agbarho River Water.docx
The Effect Of Agbarho Slaughterhouse Effluent On The Agbarho River Water.docxThe Effect Of Agbarho Slaughterhouse Effluent On The Agbarho River Water.docx
The Effect Of Agbarho Slaughterhouse Effluent On The Agbarho River Water.docxResearchWap
 
Labour Market Core Skills Requirements And University Graduate Soft Skills Co...
Labour Market Core Skills Requirements And University Graduate Soft Skills Co...Labour Market Core Skills Requirements And University Graduate Soft Skills Co...
Labour Market Core Skills Requirements And University Graduate Soft Skills Co...ResearchWap
 
Environmental Assessment Of Potentially Oil Impacted Areas In Duburu, Khana L...
Environmental Assessment Of Potentially Oil Impacted Areas In Duburu, Khana L...Environmental Assessment Of Potentially Oil Impacted Areas In Duburu, Khana L...
Environmental Assessment Of Potentially Oil Impacted Areas In Duburu, Khana L...ResearchWap
 
Design And Production Of Ceiling Board Using Plaster Of Paris (Pop) Gypsum Ma...
Design And Production Of Ceiling Board Using Plaster Of Paris (Pop) Gypsum Ma...Design And Production Of Ceiling Board Using Plaster Of Paris (Pop) Gypsum Ma...
Design And Production Of Ceiling Board Using Plaster Of Paris (Pop) Gypsum Ma...ResearchWap
 
Assessment Of Heavy Metal In Sediment Of Orogodo River, Agbor, Delta State.docx
Assessment Of Heavy Metal In Sediment Of Orogodo River, Agbor, Delta State.docxAssessment Of Heavy Metal In Sediment Of Orogodo River, Agbor, Delta State.docx
Assessment Of Heavy Metal In Sediment Of Orogodo River, Agbor, Delta State.docxResearchWap
 
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...ResearchWap
 
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...ResearchWap
 
THE DETERMINANTS OF JOB SATISFACTION AMONG SECONDARY SCHOOL TEACHERS.docx
THE DETERMINANTS OF JOB SATISFACTION AMONG SECONDARY SCHOOL TEACHERS.docxTHE DETERMINANTS OF JOB SATISFACTION AMONG SECONDARY SCHOOL TEACHERS.docx
THE DETERMINANTS OF JOB SATISFACTION AMONG SECONDARY SCHOOL TEACHERS.docxResearchWap
 
STRATEGIES FOR IMPROVING LOW ACADEMIC PERFORMANCE IN ENGLISH LANGUAGE IN SECO...
STRATEGIES FOR IMPROVING LOW ACADEMIC PERFORMANCE IN ENGLISH LANGUAGE IN SECO...STRATEGIES FOR IMPROVING LOW ACADEMIC PERFORMANCE IN ENGLISH LANGUAGE IN SECO...
STRATEGIES FOR IMPROVING LOW ACADEMIC PERFORMANCE IN ENGLISH LANGUAGE IN SECO...ResearchWap
 
PREDOMINANT DEVICES USED BY NGUGI WA THIONG’O IN HIS NOVEL WIZARD OF THE CROW...
PREDOMINANT DEVICES USED BY NGUGI WA THIONG’O IN HIS NOVEL WIZARD OF THE CROW...PREDOMINANT DEVICES USED BY NGUGI WA THIONG’O IN HIS NOVEL WIZARD OF THE CROW...
PREDOMINANT DEVICES USED BY NGUGI WA THIONG’O IN HIS NOVEL WIZARD OF THE CROW...ResearchWap
 
THE PRINCIPAL HUMAN RELATION STRATEGIES AND TEACHERS JOB PERFORMANCES OF SECO...
THE PRINCIPAL HUMAN RELATION STRATEGIES AND TEACHERS JOB PERFORMANCES OF SECO...THE PRINCIPAL HUMAN RELATION STRATEGIES AND TEACHERS JOB PERFORMANCES OF SECO...
THE PRINCIPAL HUMAN RELATION STRATEGIES AND TEACHERS JOB PERFORMANCES OF SECO...ResearchWap
 
PROPAGANDA IN POLITICS - THE USE OF LANGUAGE FOR EFFECT IN ELECTIONEERING CAM...
PROPAGANDA IN POLITICS - THE USE OF LANGUAGE FOR EFFECT IN ELECTIONEERING CAM...PROPAGANDA IN POLITICS - THE USE OF LANGUAGE FOR EFFECT IN ELECTIONEERING CAM...
PROPAGANDA IN POLITICS - THE USE OF LANGUAGE FOR EFFECT IN ELECTIONEERING CAM...ResearchWap
 
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docxPRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docxResearchWap
 
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docxPRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docxResearchWap
 

More from ResearchWap (20)

The Secrets Of Credit Management In Banking Industry.docx
The Secrets Of Credit Management In Banking Industry.docxThe Secrets Of Credit Management In Banking Industry.docx
The Secrets Of Credit Management In Banking Industry.docx
 
Unlock Your Employees' Potential.docx
Unlock Your Employees' Potential.docxUnlock Your Employees' Potential.docx
Unlock Your Employees' Potential.docx
 
The Relationship Between Class Size And Secondary School Students Academic Pe...
The Relationship Between Class Size And Secondary School Students Academic Pe...The Relationship Between Class Size And Secondary School Students Academic Pe...
The Relationship Between Class Size And Secondary School Students Academic Pe...
 
A Survey Of Causes And Management Of Teacher’s Behaviour Problems Among Headt...
A Survey Of Causes And Management Of Teacher’s Behaviour Problems Among Headt...A Survey Of Causes And Management Of Teacher’s Behaviour Problems Among Headt...
A Survey Of Causes And Management Of Teacher’s Behaviour Problems Among Headt...
 
Emotional Intelligence And Locus Of Control As Predictors Of Teachers’ Instru...
Emotional Intelligence And Locus Of Control As Predictors Of Teachers’ Instru...Emotional Intelligence And Locus Of Control As Predictors Of Teachers’ Instru...
Emotional Intelligence And Locus Of Control As Predictors Of Teachers’ Instru...
 
Consequences Of Deforestation On Rural Household Income.docx
Consequences Of Deforestation On Rural Household Income.docxConsequences Of Deforestation On Rural Household Income.docx
Consequences Of Deforestation On Rural Household Income.docx
 
The Effect Of Agbarho Slaughterhouse Effluent On The Agbarho River Water.docx
The Effect Of Agbarho Slaughterhouse Effluent On The Agbarho River Water.docxThe Effect Of Agbarho Slaughterhouse Effluent On The Agbarho River Water.docx
The Effect Of Agbarho Slaughterhouse Effluent On The Agbarho River Water.docx
 
Labour Market Core Skills Requirements And University Graduate Soft Skills Co...
Labour Market Core Skills Requirements And University Graduate Soft Skills Co...Labour Market Core Skills Requirements And University Graduate Soft Skills Co...
Labour Market Core Skills Requirements And University Graduate Soft Skills Co...
 
Environmental Assessment Of Potentially Oil Impacted Areas In Duburu, Khana L...
Environmental Assessment Of Potentially Oil Impacted Areas In Duburu, Khana L...Environmental Assessment Of Potentially Oil Impacted Areas In Duburu, Khana L...
Environmental Assessment Of Potentially Oil Impacted Areas In Duburu, Khana L...
 
Design And Production Of Ceiling Board Using Plaster Of Paris (Pop) Gypsum Ma...
Design And Production Of Ceiling Board Using Plaster Of Paris (Pop) Gypsum Ma...Design And Production Of Ceiling Board Using Plaster Of Paris (Pop) Gypsum Ma...
Design And Production Of Ceiling Board Using Plaster Of Paris (Pop) Gypsum Ma...
 
Assessment Of Heavy Metal In Sediment Of Orogodo River, Agbor, Delta State.docx
Assessment Of Heavy Metal In Sediment Of Orogodo River, Agbor, Delta State.docxAssessment Of Heavy Metal In Sediment Of Orogodo River, Agbor, Delta State.docx
Assessment Of Heavy Metal In Sediment Of Orogodo River, Agbor, Delta State.docx
 
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
 
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
THE ELEMENT OF PARA GOTHICISM CHARLOTTE BRONTE'S JANE EYRE AND EMILY BRONTE'S...
 
THE DETERMINANTS OF JOB SATISFACTION AMONG SECONDARY SCHOOL TEACHERS.docx
THE DETERMINANTS OF JOB SATISFACTION AMONG SECONDARY SCHOOL TEACHERS.docxTHE DETERMINANTS OF JOB SATISFACTION AMONG SECONDARY SCHOOL TEACHERS.docx
THE DETERMINANTS OF JOB SATISFACTION AMONG SECONDARY SCHOOL TEACHERS.docx
 
STRATEGIES FOR IMPROVING LOW ACADEMIC PERFORMANCE IN ENGLISH LANGUAGE IN SECO...
STRATEGIES FOR IMPROVING LOW ACADEMIC PERFORMANCE IN ENGLISH LANGUAGE IN SECO...STRATEGIES FOR IMPROVING LOW ACADEMIC PERFORMANCE IN ENGLISH LANGUAGE IN SECO...
STRATEGIES FOR IMPROVING LOW ACADEMIC PERFORMANCE IN ENGLISH LANGUAGE IN SECO...
 
PREDOMINANT DEVICES USED BY NGUGI WA THIONG’O IN HIS NOVEL WIZARD OF THE CROW...
PREDOMINANT DEVICES USED BY NGUGI WA THIONG’O IN HIS NOVEL WIZARD OF THE CROW...PREDOMINANT DEVICES USED BY NGUGI WA THIONG’O IN HIS NOVEL WIZARD OF THE CROW...
PREDOMINANT DEVICES USED BY NGUGI WA THIONG’O IN HIS NOVEL WIZARD OF THE CROW...
 
THE PRINCIPAL HUMAN RELATION STRATEGIES AND TEACHERS JOB PERFORMANCES OF SECO...
THE PRINCIPAL HUMAN RELATION STRATEGIES AND TEACHERS JOB PERFORMANCES OF SECO...THE PRINCIPAL HUMAN RELATION STRATEGIES AND TEACHERS JOB PERFORMANCES OF SECO...
THE PRINCIPAL HUMAN RELATION STRATEGIES AND TEACHERS JOB PERFORMANCES OF SECO...
 
PROPAGANDA IN POLITICS - THE USE OF LANGUAGE FOR EFFECT IN ELECTIONEERING CAM...
PROPAGANDA IN POLITICS - THE USE OF LANGUAGE FOR EFFECT IN ELECTIONEERING CAM...PROPAGANDA IN POLITICS - THE USE OF LANGUAGE FOR EFFECT IN ELECTIONEERING CAM...
PROPAGANDA IN POLITICS - THE USE OF LANGUAGE FOR EFFECT IN ELECTIONEERING CAM...
 
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docxPRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
 
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docxPRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
PRAGMATIC ANALYSIS OF WHATSAPP CHATS.docx
 

Recently uploaded

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 

Recently uploaded (20)

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 

Assessing Risk Impacts on Nigerian Road Projects

  • 1. ASSESSMENT OF RISK ON ROAD PROJECTS IN NIGERIA CONSTRUCTION INDUSTRY (A CASE STUDY OF LAGOS METROPOLIS) Consequences of uncertainty and its exposure in a project, is risk. In a project context, risk is the chance of something happening that will have an impact upon objectives. It includes the possibility of loss or gain, or variation from a desired or planned outcome, as a consequence of the uncertainty associated with following a particular course of action. (Deviprasadh, 2007). Risk thus has two elements: the likelihood or probability of something happening, and the consequences or impacts if it does. Managing risk is an integral part of good management; it is fundamental to achieving good business and project outcomes and the effective procurement of goods and services Risk management provides a structured way of assessing and dealing with future uncertainly. Project risk management includes the processes concerned with identifying, analyzing, and responding to project risk. It includes maximizing the results of positive events and minimizing the consequences of adverse events." (Deviprasadh, 2007).
  • 2. Project Management Institute (2004) defines project risk as an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality. A risk may have one or more causes and, if it occurs, one or more impacts Construction projects vary in type and nature and a large number of people with professional skills. The variations are endless, but what all projects have in common is their exposure to risk (Flanagan and Norman, 1999). Civil engineering is the branch of engineering that deals with the creation, improvement, and protection of the communal environment, providing facilities for living, industry and transportation, including large buildings, roads, bridges, canals, and other engineered constructions (Stark, 2008). It is characterized by its high magnitude, uncertainties and the level of risk involved (Seeley and Murray, 2001). Civil engineering is a professional engineering discipline that deals with the design, construction, and maintenance of the physical and naturally built environment, it is traditionally broken into several sub-disciplines including environmental engineering, geotechnical engineering, structural engineering, transportation engineering, municipal or urban engineering, water resources engineering, materials engineering. Coastal engineering, surveying, and construction engineering. (Oakes 2001).
  • 3. Civil engineering takes place on all levels: in the public sector and in the private sector from individual homeowners through to international companies (ICE, 2007), Civil engineering was first introduced as a profession in 1828 and the Royal charter of the Institute of Civil Engineers (2007) defined civil engineering as the art of directing the great sources of power in nature for the use and convenience of man, as applied in the construction of roads, bridges, aqueducts, canals, river navigation and docks, and in the construction of ports, harbours, moles, breakwaters and lighthouses, and in the art of navigation by artificial power for the purposes of commerce, and in the construction and application of machinery, and in the drainage of cities and towns (ICE, 2007). Construction engineering is a civil engineering sub discipline that involves planning and execution of the designs from transportation (Wikipedia, 2011). The modes of transportation as identified by Lam (1999) are roadways, railways, waterways, and airways. A road is a route on land between two places which typically has been paved or other wise improved to allow travel by some conveyance (Wikipedia, 2011). Cost overruns and delays are not unusual in civil engineering works. This pattern of risk is' largely influenced by the financial structure of the projects (Lam, 1999).
  • 4. During limes of foreign exchange and interest role fluctuations, most conventional projects funded by direct capital injection from the governments may be affected by cost increases in their imported elements. The use of project finance in privatized projects also means that lenders rely solely on the prospective income stream for repayment of their loans. Late completion will erode the financial plan and extra interest costs on the part of the sponsors. There are also uncertainties as to the level and stability of income which depends on the market condition of the product in question. In road project, land acquisition can be a slow and expensive process especially when a long road has to go through different municipalities or different provinces having non- standardized land resumption procedures. Right of way disputes sometimes creep in, as is the likelihood of treading on archeological mines and former industrial site with contaminated grounds (Lam, 1999). There are many examples of non-achievement of time, cost and quality of projects due to the absence of risk management techniques in project management. Therefore, the success parameters of a construction project, namely, the timely completion, staying within the specified budget, and achieving requisite performance would depend upon the capability of each party in risk management. (Perera, 2009).
  • 5. 1.2 STATEMENT OF THE PROBLEM As construction and engineering projects increases in complexity, the magnitude of risk involved for all the parties involved increases, from the clients, to contractors, architects, quantity surveyors, engineers, investors, and financial institutions (Seeley & Murray, 2001). Risk has been studied by different researchers (Farinloye 2009: Onukbwe 2009; Dada and Jagboro, 2007; Baker 1999; Perera et al, 2009) in the light of the influence it has made in decision making in the construction industry and the techniques that could be used by the design and construction team in the management of risk on construction projects. Farinloye et al., (2009) assessed the construction professional's perception of risk impact on cost of building projects and concluded that completion delay is the risk variable that has the highest probability of occurrence and this risk has the second highest impact on construction cost. Onukwube et al., (2009) also assessed risk in the light of the impact it has on contractors' pricing in building projects and concluded that inadequate cash flow had a significant impact on contractors pricing of building projects. These
  • 6. studies were limited to building projects in Nigeria and no attempt was made to cover road projects. Dada and Jagboro (2007) carried out an evaluation of the impact of risk on project cost overrun; they identified the risk factors inherent in different building procurement methods and assessed their impact on project cost. However, this study was limited to risk factors in relation to building procurement methods and the impact on cost. Baker et al., (1999) examined the risk response techniques employed for major projects and they concluded that the construction industry concentrates almost exclusively on reduction of financial risk. Perera et al., (2009) also assessed risk in civil engineering construction, they identified the risk responsibilities of contractual parties’ in order to improve their risk handling strategies but the study was limited to road construction in Sri Lanka. Therefore, this study becomes vital to fill the gaps identified above as the research works identified did not cover the impact of risk on road projects in Nigerian Construction industry. In the light of this, the following research questions are raised: 1.3 RESEARCH QUESTIONS
  • 7. i. What are the risk factors inherent in road project? ii. What are the effects of risk on the duration of road? iii. How do these factors affect the total construction cost of road project? 1.4 AIM AND OBJECTIVES The aim of this research is to examine the impact of risk on road projects in Nigerian construction industry. The specific objectives are to; i. Identify and assess the various risk factors associated with road project in Nigerian construction industry. ii. Determine the effect of risk factors on cost of road project in the study area. iii. Determine the effect of risk factors on completion time of road project in the study area. 1.5 JUSTIFICATION OF THE STUDY Civil engineering works encompass a wide range of different projects which are of great magnitude. Vast cuttings and embankments, mass and reinforced concrete structures, large structural steel construction, reservoirs,
  • 8. sewage schemes, piling for heavy foundations, harbor works, dry docks, roads, canal and railways, all form subject matter of civil engineering contracts. These works require considerable skill and technical knowledge in both their design and construction. Continual changes in nature and methods of construction in these projects, and the increasing size and complexity of these works increases the risk involved (Seeley & Murray, 2001). Road projects however often confront many uncertainties, due to factors such as resource availability, the physical, economic and political environments, statutory regulations, etc.(Perera et al., 2009). According to Wang and Chou (2003), such risks have a significant effect on the outcome of a road construction process. Assessing risk offsets negative impact it may have and pursue positive impact (PM1, 2004). The study therefore becomes necessary to identify the impact of risk on road projects with a view to providing information to construction professionals in reducing to the barest minimum the risk associated with road projects in Nigeria. 1.6 SCOPE AND LIMITATIONS OF THE STUDY This study focused on the assessment of the impact of risk on road projects in Nigeria. The study was restricted to federal and state roads in Lagos state.
  • 9. 1.7 RESEARCH METHODOLOGY The approaches that were adopted to achieve the stated objectives include the following: primary and secondary data source. The primary source of data was generated through questionnaire survey administered to construction professionals in civil engineering construction and consulting companies, and professionals that coordinate road project in the federal and state ministries in the study area. The survey was carried out in order to assess the risk-factors inherent in road projects in terms of their degree of severity and assess their impact on total cost and duration of the project. The secondary source of data included reports such as published textbooks, refereed conference proceedings; dissertation or theses and government publications which focus on the theme of the research. EDITOR SOURCE: AssessmentOf Risk On Road Projects In NigeriaConstructionIndustry