CHENNAI METRO RAIL PROJECT ECV-02 /03<br />WORK METHOD STATEMENT<br />PROCEDURE FOR SURVEY-WMS-1A<br />DISCIPLINECivilMechanicalElectricalGeneral<br />ContactDocument controlNAME:  S.BalajiTopographical SurveyQMS/D/CMP/WMS- 1ATel:09600091870Action RequiredEmail:sbj@lntecc.comFor informationFor Approval<br />Preparation & IssueNamePositionSignatureDatePrepared byS.KavinkumarPlanning Manager02-03-2010Reviewed byK.NarasimhanConstruction Manager02-03-2010Approved byS.BalajiProject Manager03-03-2010This submission is considered ready for review and complies with contract other than stated herewith.Approved by(GCC)<br />This document consists of 5 pages including this page<br />CONTENTS<br />Sl No.ContentPage no.01Preamble302Manpower, Machineries & Equipment303Work Methodology404Environment, Health & Safety505Formats / Reports5<br />SURVEY METHODOLOGY<br />FOR CHENNAI METRO PROJECT-VIADUCT SURVEY CHENNAI<br />INTRODUCTION:<br /> The following mentioned methodology shall be adopted by M/s National Survey and Engineers for carrying out topographical survey for the projects ECV02 & ECV03 of CMRL phase I for the sector Ashok Nagar to St. Thomas mount and from Saidapet to OTA.<br />1. PREAMBLE.<br />The object of this Method Statement is to lay down a procedure for survey works of the Project such as setting out the horizontal and vertical control points, setting out the project highway alignment and taking Original Ground Levels of the project highway etc,. <br />   <br /> 2. MANPOWER, MACHINERY & EQUIPMENT: <br /> 2.1       MANPOWER:<br />Sl.NoDescriptionRequirementRemarks1Survey Engineer12Surveyors23Helper4<br />2.2     MACHINERY & EQUIPMENT: <br />Sl.NoDescriptionRequirementRemarks1Total Station with Sighting Prism22Auto level23Leveling Staff44Measuring Tape45Other ToolsAs per the site Requirement<br />Apparatus:  The following survey instruments shall be deployed for the survey job:<br />Leica GX1230 Differential GPS with L1 and L2 frequency   - 1 Base and 1 Rover.<br />  Electronic Total Station instruments   - 2 to 3 No.<br />Digital Level DN10.<br />3. WORK METHODOLOGY:<br />Pillars Fixing<br />DGPS Network survey for the proposed area.<br />Leveling to connect all network stations<br />Detailed topo Survey.<br /> 3.1 PILLAR FIXING: <br />RCC Pillars of both GPS and secondary pillars as prescribed size shall be fixed at the locations along the stretch as decided by the site Engineer-in-charge.<br /> 3.2 DGPS network Survey:<br />After making reconnaissance survey of the area, DGPS network station is selected to fix          Primary Control Points for the interval of every 5km.<br />Data Collection:<br />Keeping the DGPS Receiver at 0 km chainage and another DGPS Receiver at 5th km control station point, the data shall be collected using satellites for maximum duration of 1 hour simultaneously.   In the similar manner, the data is collected for all other Primary control points.<br />Processing:  <br />The collected DGPS data is downloaded from the Receivers to the Computer and the data is processed using the Leica Geo Office software until the ambiguity is resolved. <br />Processing Parameters: <br />Ellipsoid:                 WGS-84 <br />Semi Major Axis (a):          6378137.00<br />Flattening (1/f):                298.257223563<br />Projection:              UTM <br />Zone width:   6  wide<br />False Easting:        500000 at CM <br />           Scale Factor at CM:  0.9996<br />          False Northing:      0.000 at Equator<br />After processing the data, we get Slope/Grid distance and Azimuth between the stations as well as co-ordinates in WGS-84 system. <br />Chainage marking:<br /> Chainage shall be marked from starting point to end point at every 20 m interval to facilitate to take cross section details<br />Horizontal Traverse Survey:<br />  Horizontal traverse stations at 200-250 m interval shall be established all along the route of survey. Using the Electronic Total Station instrument horizontal traverse shall be carried from one DGPS station to another station taking angles and distance in both faces left and face right values.  In addition to this, we establish Traverse stations at various intervals to facilitate detailed topographical survey. The horizontal traverse accuracy shall be 1 in 20000.<br />3.3 Leveling:<br />     The entire Primary, secondary and all Traverse stations are connected by using Digital level from the known or identified BM to get the elevation or height. The leveling accuracy shall be 12√k.<br />3.4 Detailed Topographical Survey:<br /> From the established primary, secondary and Traverse stations as per specifications all the existing features, shall be captured by using Electronic Total Station.<br />Drawing:<br /> The field data collected with DGPS and Electronic Total Station instruments would be downloaded into computer and as per code drawing will be prepared using Auto CAD. Drawing print out copy shall be taken to field to cross check with ground features.  If there is any omission that shall be rectified.  Final drawing shall be submitted with all field data in soft copy and report in hard copy.<br />4. Environment Health & Safety:<br /> All the staff and work men shall be provided with necessary personal protective equipment.(Safety jackets, safety helmets and safety shoes) always at site.<br />All the works shall be carried out in order to maintain clean environment and no damage will occur to any property or public amenities.<br />5. Reports<br />The field data collected with DGPS and electronic Total station instruments shall be downloaded into computer and as per code drawing shall be prepared in AutoCAD. Drawing printout copy shall be taken to field and physically cross checked. If there is any omissions or commission shall be rectified. Final drawing shall be submitted with all field data in soft copy and reports in hard copy.<br />
Cmp wms -1 a-survey-rev.1- 03-03-10
Cmp wms -1 a-survey-rev.1- 03-03-10
Cmp wms -1 a-survey-rev.1- 03-03-10
Cmp wms -1 a-survey-rev.1- 03-03-10

More Related Content

More from Siddhartha Bhamidipati (19)

Gen. ref. book
Gen. ref. bookGen. ref. book
Gen. ref. book
 
Ch 4-water
Ch 4-waterCh 4-water
Ch 4-water
 
ISO 9001 -2008
ISO  9001 -2008ISO  9001 -2008
ISO 9001 -2008
 
Rev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationRev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigation
 
4648
46484648
4648
 
432 1
432 1432 1
432 1
 
1200 5
1200 51200 5
1200 5
 
1200 5
1200 51200 5
1200 5
 
1200 4
1200 41200 4
1200 4
 
1200 3
1200 31200 3
1200 3
 
1200 2
1200 21200 2
1200 2
 
1200 1
1200 11200 1
1200 1
 
1199
11991199
1199
 
784
784784
784
 
783
783783
783
 
Ac02 nit
Ac02 nitAc02 nit
Ac02 nit
 
Ac02 itt
Ac02 ittAc02 itt
Ac02 itt
 
Axial%20 load%20test%20procedures%20for%20pile%20foundations
Axial%20 load%20test%20procedures%20for%20pile%20foundationsAxial%20 load%20test%20procedures%20for%20pile%20foundations
Axial%20 load%20test%20procedures%20for%20pile%20foundations
 
construction safety
construction safetyconstruction safety
construction safety
 

Recently uploaded

State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!Memoori
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimaginedpanagenda
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Patrick Viafore
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024Stephen Perrenod
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentationyogeshlabana357357
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPTiSEO AI
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxFIDO Alliance
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe中 央社
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...FIDO Alliance
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsLeah Henrickson
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch TuesdayIvanti
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Skynet Technologies
 
Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Hiroshi SHIBATA
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...FIDO Alliance
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...panagenda
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FIDO Alliance
 
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The InsideCollecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The InsideStefan Dietze
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGDSC PJATK
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?Paolo Missier
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...marcuskenyatta275
 

Recently uploaded (20)

State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch Tuesday
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
FDO for Camera, Sensor and Networking Device – Commercial Solutions from VinC...
 
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The InsideCollecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
Collecting & Temporal Analysis of Behavioral Web Data - Tales From The Inside
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
 

Cmp wms -1 a-survey-rev.1- 03-03-10

  • 1. CHENNAI METRO RAIL PROJECT ECV-02 /03<br />WORK METHOD STATEMENT<br />PROCEDURE FOR SURVEY-WMS-1A<br />DISCIPLINECivilMechanicalElectricalGeneral<br />ContactDocument controlNAME: S.BalajiTopographical SurveyQMS/D/CMP/WMS- 1ATel:09600091870Action RequiredEmail:sbj@lntecc.comFor informationFor Approval<br />Preparation & IssueNamePositionSignatureDatePrepared byS.KavinkumarPlanning Manager02-03-2010Reviewed byK.NarasimhanConstruction Manager02-03-2010Approved byS.BalajiProject Manager03-03-2010This submission is considered ready for review and complies with contract other than stated herewith.Approved by(GCC)<br />This document consists of 5 pages including this page<br />CONTENTS<br />Sl No.ContentPage no.01Preamble302Manpower, Machineries & Equipment303Work Methodology404Environment, Health & Safety505Formats / Reports5<br />SURVEY METHODOLOGY<br />FOR CHENNAI METRO PROJECT-VIADUCT SURVEY CHENNAI<br />INTRODUCTION:<br /> The following mentioned methodology shall be adopted by M/s National Survey and Engineers for carrying out topographical survey for the projects ECV02 & ECV03 of CMRL phase I for the sector Ashok Nagar to St. Thomas mount and from Saidapet to OTA.<br />1. PREAMBLE.<br />The object of this Method Statement is to lay down a procedure for survey works of the Project such as setting out the horizontal and vertical control points, setting out the project highway alignment and taking Original Ground Levels of the project highway etc,. <br /> <br /> 2. MANPOWER, MACHINERY & EQUIPMENT: <br /> 2.1 MANPOWER:<br />Sl.NoDescriptionRequirementRemarks1Survey Engineer12Surveyors23Helper4<br />2.2 MACHINERY & EQUIPMENT: <br />Sl.NoDescriptionRequirementRemarks1Total Station with Sighting Prism22Auto level23Leveling Staff44Measuring Tape45Other ToolsAs per the site Requirement<br />Apparatus: The following survey instruments shall be deployed for the survey job:<br />Leica GX1230 Differential GPS with L1 and L2 frequency - 1 Base and 1 Rover.<br /> Electronic Total Station instruments - 2 to 3 No.<br />Digital Level DN10.<br />3. WORK METHODOLOGY:<br />Pillars Fixing<br />DGPS Network survey for the proposed area.<br />Leveling to connect all network stations<br />Detailed topo Survey.<br /> 3.1 PILLAR FIXING: <br />RCC Pillars of both GPS and secondary pillars as prescribed size shall be fixed at the locations along the stretch as decided by the site Engineer-in-charge.<br /> 3.2 DGPS network Survey:<br />After making reconnaissance survey of the area, DGPS network station is selected to fix Primary Control Points for the interval of every 5km.<br />Data Collection:<br />Keeping the DGPS Receiver at 0 km chainage and another DGPS Receiver at 5th km control station point, the data shall be collected using satellites for maximum duration of 1 hour simultaneously. In the similar manner, the data is collected for all other Primary control points.<br />Processing: <br />The collected DGPS data is downloaded from the Receivers to the Computer and the data is processed using the Leica Geo Office software until the ambiguity is resolved. <br />Processing Parameters: <br />Ellipsoid: WGS-84 <br />Semi Major Axis (a): 6378137.00<br />Flattening (1/f): 298.257223563<br />Projection: UTM <br />Zone width: 6 wide<br />False Easting: 500000 at CM <br /> Scale Factor at CM: 0.9996<br /> False Northing: 0.000 at Equator<br />After processing the data, we get Slope/Grid distance and Azimuth between the stations as well as co-ordinates in WGS-84 system. <br />Chainage marking:<br /> Chainage shall be marked from starting point to end point at every 20 m interval to facilitate to take cross section details<br />Horizontal Traverse Survey:<br /> Horizontal traverse stations at 200-250 m interval shall be established all along the route of survey. Using the Electronic Total Station instrument horizontal traverse shall be carried from one DGPS station to another station taking angles and distance in both faces left and face right values. In addition to this, we establish Traverse stations at various intervals to facilitate detailed topographical survey. The horizontal traverse accuracy shall be 1 in 20000.<br />3.3 Leveling:<br /> The entire Primary, secondary and all Traverse stations are connected by using Digital level from the known or identified BM to get the elevation or height. The leveling accuracy shall be 12√k.<br />3.4 Detailed Topographical Survey:<br /> From the established primary, secondary and Traverse stations as per specifications all the existing features, shall be captured by using Electronic Total Station.<br />Drawing:<br /> The field data collected with DGPS and Electronic Total Station instruments would be downloaded into computer and as per code drawing will be prepared using Auto CAD. Drawing print out copy shall be taken to field to cross check with ground features. If there is any omission that shall be rectified. Final drawing shall be submitted with all field data in soft copy and report in hard copy.<br />4. Environment Health & Safety:<br /> All the staff and work men shall be provided with necessary personal protective equipment.(Safety jackets, safety helmets and safety shoes) always at site.<br />All the works shall be carried out in order to maintain clean environment and no damage will occur to any property or public amenities.<br />5. Reports<br />The field data collected with DGPS and electronic Total station instruments shall be downloaded into computer and as per code drawing shall be prepared in AutoCAD. Drawing printout copy shall be taken to field and physically cross checked. If there is any omissions or commission shall be rectified. Final drawing shall be submitted with all field data in soft copy and reports in hard copy.<br />