Deloitte Consulting chose a modified Scrum method over a traditional waterfall method for its projects due to Scrum's iterative approach and ability to adapt to changing requirements. DC performed project planning by prioritizing features into sprints and analyzing effectiveness through daily stand-ups and retrospectives. Challenges in each project phase, like integrating third party components, were overcome through Agile concepts like self-organizing teams and frequent stakeholder feedback. DC monitored progress through burn-down charts and velocity tracking, enabling project success. It did not use offshore resources due to cultural and communication challenges.
Python Notes for mca i year students osmania university.docx
CIS 443 Entire Course NEW
1. STAYER CIS 443 Week 4 Case Study 1 Agile in Practice – An
Agile Success Story (870 Words) NEW
Check this A+ tutorial guideline at
http://www.uopassignments.com/cis-443-strayer/cis-
443-week-4-case-study-1-agile-in-practice-an-agile-
success-story-recent
For more classes visit
http://www.uopassignments.com
Case Study 1: Agile in Practice – An Agile Success Story
Due Week 4 and worth 100 points
Read the article titled “Agile in Practice – An Agile Success
Story” and complete this case study assignment. Note: The
article in PDF format can be found in the online course shell.
Write a four to five (4-5) page paper in which you:
Determine the key reasons why Deloitte Consulting (DC) chose
a modified SCRUM method instead of a traditional waterfall
method.
Explain how DC performed project planning and analyze its
effectiveness for later execution and product release.
Identify the challenges that DC encountered in each project
phase and explain how they overcame those challenges. Give an
opinion on whether the Agile concepts played an important
role in this process.
Determine the techniques that DC used to monitor the project
progress and evaluate how it enabled the project success.
Explain why DC did not use offshore resources and evaluate
whether the Agile method will work in a project with diverse
workforce geographically and culturally. .
Speculate on the leadership roles needed if you were part of the
DC team.
Use at least three (3) quality resources in this assignment.Note:
2. Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
The specific course learning outcomes associated with this
assignment are:
Compare and contrast Agile methods with traditional project
management techniques.
Explain the challenges and opportunities of an Agile project
leader.
Summarize the iterative qualities for Agile project success.
Describe Agile project management methods and phases.
Use technology and information resources to research issues in
Agile project management.
Write clearly and concisely about Agile project management
topics using proper writing mechanics and technical style
conventions.
3. STAYER CIS 443 Week 6 Assignment 2: Agile Delivery
Framework NEW
Check this A+ tutorial guideline at
http://www.uopassignments.com/cis-443-strayer/cis-
443-week-6-assignment-2-agile-delivery-framework-
recent
For more classes visit
http://www.uopassignments.com
Assignment 2: Agile Delivery Framework
Due Week 6 and worth 100 points
Imagine that your company, a home improvement store chain,
needs to build an e-Commerce Website for your customers and
prospects. The key features of your e-Commerce Website
include product description, product pricing and discount rate,
home improvement tutorial videos, order and pickup
scheduling, store location and store hours, and other similar
features. You have decided to use the Agile Delivery
Framework for this project.
Write a four to five (4-5) pages paper in which you:
Develop a project schedule that includes at least two (2) phases
and twelve (12) tasks under the Agile delivery framework
through the use of MS Project or Excel. Note: Submit a
screenshot or image file that shows your work. The graphically
depicted solution is not included in the required page length.
Determine the product vision and provide strategies for how to
conduct the envisioning practice.
Determine the main roles of the Agile project team and explain
whether the product manager should be from the IT field or
4. non-IT related field.
Explain how iteration works in this project. Support your
rationale.
Take a position on whether stories are important in the Agile
delivery framework and explain why or why not. Include at
least two feature-story examples to support your explanation.
Use at least three (3) quality resources in this assignment.Note:
Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
The specific course learning outcomes associated with this
assignment are:
Explain the role of teams in Agile settings.
Analyze the phases of the Agile Delivery Framework.
Use technology and information resources to research issues in
Agile project management.
Write clearly and concisely about Agile project management
topics using proper writing mechanics and technical style
conventions.
5. STAYER CIS 443 Week 7 Assignment 3: Release Planning NEW
Check this A+ tutorial guideline at
http://www.uopassignments.com/cis-443-strayer/cis-
443-week-7-assignment-3-release-planning-recent
For more classes visit
http://www.uopassignments.com
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
Include charts or diagrams created in Visio or Dia. The
completed diagrams / charts must be imported into the Word
document before the paper is submitted.
The specific course learning outcomes associated with this
assignment are:
Discuss release planning attributes in Agile environments.
Analyze the phases of the Agile Delivery Framework.
Use technology and information resources to research issues in
Agile project management.
Write clearly and concisely about Agile project management
topics using proper writing mechanics and technical style
conventions.
6. STAYER CIS 443 Week 8 Assignment 4: How to Become a Leader
in Agile Projects NEW
Check this A+ tutorial guideline at
http://www.uopassignments.com/cis-443-strayer/cis-
443-week-8-assignment-4-how-to-become-a-leader-in-
agile-projects-recent
For more classes visit
http://www.uopassignments.com
Assignment 3: Release Planning
Due Week 7 and worth 100 points
With the Agile project framework in place for your home
improvement store’s e-Commerce Website you started in
assignment two (2), now you must consider long-term planning
as well as short-term planning for your project. In addition, the
company has realized the importance of mobile devices, such as
smart-phones and tablets, and decided to extend the e-
Commerce effort to include mobile devices.
Note: You may create and / or assume all necessary
assumptions needed for the completion of this assignment.
Write a four to five (4-5) page paper in which you:
Draw a diagram to highlight the product road map and product
life cycle through the use of graphical tools in Visio, or an open
source alternative such as Dia. Note: The graphically depicted
solution is not included in the required page length.
Provide at least two (2) iterations and twelve (12) tasks related
to development on mobile devices through the use of MS
Project. Note: Submit a screenshot or image file that shows your
work. The graphically depicted solution is not included in the
required page length.
7. Suggest strategies on calculating relative value points and
monetary value points. Note: Please refer to Chapter 8 of the
textbook for detailed information on calculating relative value
points and monetary value points.
Speculate on the associated risks regarding the development
on mobile devices and provide strategies to mitigate those
risks.
Provide at least one (1) example of maintenance stories based
on the context of the project.
Provide at least one (1) example of performance cards based on
the context of the project.
Use at least three (3) quality resources in this assignment.Note:
Wikipedia and similar Websites do not qualify as quality
resources.
Assignment 4: How to Become a Leader in Agile Projects
Due Week 8 and worth 100 points
The following resources may be helpful when completing this
assignment:
Adaptive Leadership
(http://www.thoughtworks.com/sites/www.thoughtworks.co
m/files/files/adaptive-leadership-accelerating-enterprise-
agility-jim-highsmith-thoughtworks.pdf)
Agile Leadership and Coaching (Development Manager’s Need
to grow up!)
(http://lostechies.com/joeocampo/2007/05/15/agile-
leadership-and-coaching-development-manager-s-need-to-
grow-up/)
Agile Project Management
(http://www.ccpace.com/resources/documents/agileprojectm
anagement.pdf)
Situational Leadership for Agile Software Development.
(http://www.luca.minudel.it/freestaff/situationalleadership.p
df)
Team Empowerment (http://www.agile-
8. process.org/team.html)
The Agile Leader: Adaptability
(http://www.mindtools.com/pages/article/newLDR_49.htm)
Imagine that you are now the test lead for the home
improvement store chain in the scenario for Assignments 2 and
3. Your company still needs an e-Commerce Website for your
customers and prospects; however, your team members are
now offshored in India. In this assignment, you must explore
how to become a leader in Agile projects in the context of
developing the e-Commerce Website and mobile applications
for your specialized company.
Write a four to five (4-5) page paper in which you:
Explain how to handle the documentation needs in this project
using the Agile concepts.
Determine the necessary success factors one would need to
become an Agile leader in this project which contains a
complex scope and extended timeline.
Recommend the approach to manage offshore resources in this
project, and determine the associated challenges and
mitigation strategies to ensure the success of the project.
Suggest strategies on measuring the performance and quality of
the products and services of this organization and provide the
approach to accelerate the testing process.
Use at least three (3) quality resources in this assignment.Note:
Wikipedia and similar Websites do not qualify as quality
resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the
9. student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
The specific course learning outcomes associated with this
assignment are:
Explain the challenges and opportunities of an Agile project
leader.
Discuss methods of measuring the performance and quality of
Agile projects.
Use technology and information resources to research issues in
Agile project management.
Write clearly and concisely about Agile project management
topics using proper writing mechanics and technical style
conventions.
10. STAYER CIS 443 Week 9 Case Study 2: Getty Image and Agile
Portfolio Management NEW
Check this A+ tutorial guideline at
http://www.uopassignments.com/cis-443-strayer/cis-
443-week-9-case-study-2-getty-image-and-agile-portfolio-
management-recent
For more classes visit
http://www.uopassignments.com
Case Study 2: Getty Image and Agile Portfolio Management
Due Week 9 and worth 100 points
Watch the video presentation titled, “Getty Images Customer
Story – Agile Portfolio Management”
Video Source: RallySoftware. (2011, December 14). Getty
Images Customer Story – Agile Portfolio Management [Video
file]. Retrieved from
http://www.youtube.com/watch?v=VQHw1mKTFoo.
This video can be viewed from within your online course shell.
Write a four to five (4-5) page paper in which you:
Explain the relationship among Agile project management,
Agile portfolio management, and corporate culture.
Analyze why Getty Image embraced Agile methodologies.
Speculate on the result if Agile methodologies were not
embraced in this situation.
11. Explain how the Project Management Office (PMO) in Getty
Image changed its methods in planning and prioritization.
Determine the Agile methodologies being adopted and Getty’s
new way of doing business.
Evaluate the value of leadership and toolset that Getty Image
produced.
Speculate on the additional data points that Getty Image needs
to improve its portfolio management and reporting. Provide a
rationale to support the answer.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
The specific course learning outcomes associated with this
assignment are:
Analyze the phases of the Agile Delivery Framework.
Describe Agile governance methods for organizational use.
Use technology and information resources to research issues in
Agile project management.
Write clearly and concisely about Agile project management
topics using proper writing mechanics and technical style
conventions.
12. STAYER CIS 443 Week 10 Term Paper: Using Agile Project
Management to Implement a Complex Marketing Campaign
System NEW
Check this A+ tutorial guideline at
http://www.uopassignments.com/cis-443-strayer/cis-
443-week-10-term-paper-using-agile-project-
management-to-implement-a-complex-marketing-
campaign-system-recent
For more classes visit
http://www.uopassignments.com
Term Paper: Using Agile Project Management to Implement a
Complex Marketing Campaign System
Due Week 10 and worth 200 points
This assignment consists of two (2) sections: a written project
plan, and a project plan that is created through the use of MS
Project.You must submit the two (2) sections as separate files
for the completion of this assignment. Label each file name
according to the section of the assignment it is written for.
Additionally, you may create and / or assume all necessary
assumptions needed for the completion of this assignment.
Imagine you are the project manager for a critical project for an
organization. The organization wants to implement a state of
the art real-time marketing campaign system. This system has
many components.
First, it has to get data from its front-end systems via the
middle-ware component.
Second, it has its own database system that stores the shopping
history, credit information, billing address and shipping
address, and so on.
13. Third, it has a marketing rules engine that needs to be
customized for various campaigns.
Finally, it has an analytical platform that leverages data
warehouse and analytics tools, such as SAS to test marketing
strategies and assess campaign effectiveness.
In addition, your company already has some stand-alone
applications supporting marketing campaigns and analytics.
Due to this project, your executives want IT to retire the legacy
applications as part of the project. Although your executives
plan to have this new system in production in twelve (12) to
fourteen (14) months, they want to see the results as soon as
possible, so they can enable more business capabilities, such as
real-time decisions for up-selling and cross-selling. The
executives also want to save costs by using offshore resources
even though your organization does not currently have
experience with this. Other troubles with the organization
include problems controlling the scope of projects and
inexperience to initiatives of this size. To further complicate
the situation, you are aware that some of the business
executives have had bad experiences with IT delivery in the
past and you heard numerous complains about IT projects
being late without meeting project expectations.
Section 1: Written Project Plan
Write a ten to fifteen (10-15) page paper in which you:
Suggest an Agile project management framework to the
sponsors and justify why the framework you suggested is best
suited for this project.
Develop a release plan through the use of graphical tools in
Microsoft Word or Visio, or an open source alternative such as
Dia. Note: The graphically depicted solution is not included in
the required page length.
Explain how to use Agile methods to scale the release plan you
developed for retiring the legacy applications.
14. Explain how to use Agile methods to establish the scope for the
project and determine the methods to control the scope to
ensure the business values will be delivered.
Choose at least two (2) Agile techniques to monitor this project
and explain the reasons why you chose those two (2)
techniques.
Suggest Agile strategies to develop product vision and product
architecture.
Create a diagram to show the overall systems architecture
through the use of graphical tools in Microsoft Word or Visio, or
an open source alternative such as Dia. Note: The graphically
depicted solution is not included in the required page length.
Determine the roles of the Agile project team in this project and
determine the coaching methods to build a high-performance
team.
Determine the Agile techniques to manage conflicts and
facilitate collaboration throughout the project. Provide
examples to support your response.
Explain how to set the right expectation with the business.
Take a position on whether or not offshore resources should be
used in this project and explain why or why not.
Speculate on the ethical challenges in this project and explain
how to resolve them.
Identify the key differences and speculate on the consequences
if managing / governing the same project with a traditional
waterfall project management approach instead of using Agile
strategies.
Suggest the Agile methods to control the quality of work among
the project team.
Explain how to encourage more innovative ways to accomplish
this project.
Explain how to use Agile methods to handle the documentation
in this project that would satisfy both short-term project needs
and long-term maintenance needs.
15. Use at least five (5) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality
resources.
Section 1 of your assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and
references must follow APA or school-specific format. Check
with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
Include charts or diagrams created in Visio or Dia. The
completed diagrams / charts must be imported into the Word
document before the paper is submitted.
Section 2: Project Plan
Use Microsoft project to:
Develop the project plan. The project plan should:
Record all tasks, subtasks, resources, and time related to the
project.
Outline the planning, analysis, design, and implementation
phases.
The specific course learning outcomes associated with this
assignment are:
Describe Agile project management methods and phases.
Describe Agile governance methods for organizational use.
Explain the leadership values in Agile environments.
Compare and contrast Agile methods with traditional project
management techniques.
Summarize the iterative qualities for Agile project success.
16. Explain the challenges and opportunities of an Agile project
leader.
Explain the role of teams in Agile settings.
Analyze the phases of the Agile Delivery Framework.
Discuss release planning attributes in Agile environments.
Discuss methods of measuring the performance and quality of
Agile projects.
Develop an Agile deployment plan that addresses and solves a
proposed business problem.
Evaluate the ethical concerns inherent in Agile project
management techniques.
Use technology and information resources to research issues in
Agile project management.
Write clearly and concisely about Agile project management
topics using proper writing mechanics and technical style
conventions.