SlideShare a Scribd company logo
1 of 4
SHERAZ AHMED
Allama Iqbal Town Basti Mian
Sahib Manthar Road, Sadiq Abad
Distt: Rahim Yar khan
Cell # :+923067613511
:+923417086927
Email: sheraz_ahmed0571@yahoo.com
Email: sheraz.ahmed571@gmail.com
Professional Career Objective:
• A highly motivated Operation professional with skill in strategic emergency handling and
problem deification is looking for a post of Utilities Operator.
Personal Profile:
Father’s Name MUHAMMAD AMIN
Date of birth 23-11-1989
CNIC No. 31304-7857643-1
Nationality Pakistani
Religion Islam
Marital Status Marriad
Permanent Address Allama Iqbal Town Basti Mian Sahib Manthar Road
Sadiq Abad. Dist. Rahim Yar Khan.
Academic Qualification:
Degree Division Passing Year
Matriculation 1st
Div 2005
F.Sc (Non Medical) 1st
Div 2007
Technical Qualification
Two years apprenticeship as utility operator from Fauji Fertilizer Company Ltd. at Base Unit
Goth Machhi Sadiq Abad, Currently I am working on Utility Plant in Fauji Fertilizer Company
Ltd Goth Machhi, Pakistan facilitated with DCS (CS-3000) (Certified ISO-9001:2008, OHSAS-
18001:2007 & ISO-14001:2004) Since 31 Oct. 2008 to present.
Professional Experience Detail
• GAS TURBINE
• VERY HIGH BOILER
• BOILER FEED WATER NETWORK
• DEAERATOR
• COOLING TOWER
• CHILLERS
• LET DOWN STATIONS
• CONDENSATE POLISHING (DEMIN)
• N2 GENERATION PLANT (CRYOGENIC PROCESS)
GAS TURBINES (Two gas turbines of General Electric) MS-5001
Cycle Combined
Generator Rating 31375 KVA of Each
Gas Turbine Power 34000 HP of Each (Useful Power)
Control Mark-V and Mark-2 (Droop AND ISO for each Turbine)
Fuel Natural Gas and Diesel
Emergency Shut Down ELMS and Snamprogetty Shut Down
Chemical Used(Water Treatment) Nalcool-2000
2. Very High Pressure Steam Boiler of Combustion Engineering
Type D. Type Water Tube
Pressure 105 Kg/Cm²
Temperature 510 ºC
Capacity 77 Ton/Hr
Firing Tangential
Water Circulation Thermosyphoning
Draft Forced
Fuel Natural Gas, Syn Gas and Purge Gas
No. Of Drums Two (Upper Steam Drum) & (Lower Mud Drum)
No. Of Burners Four
Super Heaters Two Primary & Secondary
De-Superheater Inner Lined
Igniters Four Electrically Ignited With Step Up Transformer (10000 V)
Control Auto & Manual
Combustion air is supplied by a forced draft fan driven either by Steam Turbine or Motor.
Normally Steam Turbine is in service and motor on Standby.
3. Boiler Feed Water System
No Of Systems Two (High Pressure) & (Medium Pressure)
No. Of Pumps 06 (Three for High Pressure & Three for Medium Pressure)
Pressure Of HP-BFW 160 Kg/Cm² with Temperature 117 ºC
Pressure Of MP-BFW 60 Kg/Cm² with Temperature 117 ºC
Water Deminerallized Water
Usage Of Total Feed
Water
490 ~ 510 M³/Hr
Stages Of Each Pump 08
Type Centrifugal
Driven One (High Pressure Pump) with steam Turbine & the other two with
Motors. Normally steam Turbine driven remains in Operation and Motor
driven are on Auto Standby. For Medium Pressure One is driven with
Steam Turbine and the other two with Motors. Normally in Medium
Pressure One Steam Turbine driven & one Motor driven remains in
Operation and third one on Auto Standby.
De-Aerator Pressurized (Spray & Tray Type) With Chemical and Mechanical De-
Aeration
De-Aeration Mechanical and Chemical
4. Steam Let Down Stations
No. of Stations 03 With The Capacity of 13/86/32 Ton/Hr Respectively
Purpose Two for let down of Very High Pressure Steam (105 Kg/Cm² & 510
ºC) into High pressure Steam (39 Kg/Cm² & 375 ºC) and One for from
High Pressure Steam (39 Kg/Cm²& 375 ºC) into Low Pressure Steam
(2.5 kg/Cm² & 180 ºC).
• A condensate recovery system is also provided.
5. Cooling Tower
Vendor Lilly Hoffman
Type Cross Flow Induced Draft with 09 Cells
No. Of Cooling Water
Circulating Pumps
05.( Four driven by Motors and One with Steam Turbine) Absorbed
Power 1000 KW each
Motor Rating Two of 1.3 MW and Other Two of 1.1 MW
Steam Turbine Rating 1500 HP
Steam Rating 39 Kg/Cm² and 375 ºC
Cooling Water Circulation
Rate
32000 M³/Hr and 8000 M3/Hr Flow Of each Disch Press. 4.5 Kg/cm2
No. Of Cooling Water
Filters
04 (Automatic Valve less Gravity Sand Filters)
pH control of Cooling
Water
Through Ejector Acid Dosing and PD. Diaphragm Pumps
Cooling Water Treatment Buckman Laboratories (Pvt Ltd) BULAB Chemicals and Sulfuric
Acid
Corrosion, Scaling and
Fouling Control
Phosphate System and Cathodic Protection
6. CHILLERS
I have worked on compression and absorption chillers using freon-12/22 and Li-bromide as
refrigerant respectively
Total chillers 08
Total Compression Chillers (PD compression)= 03
Total Absorption chillers = 04
7. N2 GENERATION PLANT (CRYOGENIC PROCESS)
Design Capacity 1340 NMC/Hr
Design pressure 8.5 Kg/Cm²
Design Temp. 40 ºC
Skill Improvement Courses
Following Skill Improvement Courses attended while working with Fauji Fertilizer Company
Limited Goth Machhi.
 Centrifugal Pumps
 Centrifugal Compressors
 Positive displacement Pumps
 Positive displacement Compressors
 Cooling Water Treatment
 Safety in Chemical Process Industry
 Fire Fighting (Wet Drill)
 Work Permit Procedure

More Related Content

Viewers also liked

Enbe.project one july 2016
Enbe.project one july 2016Enbe.project one july 2016
Enbe.project one july 2016
brianjys96
 
ستة امتحانات بإجاباتها لغة إنجليزية 3ث
ستة امتحانات بإجاباتها لغة إنجليزية 3ثستة امتحانات بإجاباتها لغة إنجليزية 3ث
ستة امتحانات بإجاباتها لغة إنجليزية 3ث
Motafawkeen
 
NGUYEN THI THANH TRA - 11052016
NGUYEN THI THANH TRA - 11052016NGUYEN THI THANH TRA - 11052016
NGUYEN THI THANH TRA - 11052016
NGUYEN TRA
 

Viewers also liked (16)

waing
waingwaing
waing
 
RESUME Howard3
RESUME Howard3RESUME Howard3
RESUME Howard3
 
New Doc
New DocNew Doc
New Doc
 
CV_NguyenHoaiNam_201510
CV_NguyenHoaiNam_201510CV_NguyenHoaiNam_201510
CV_NguyenHoaiNam_201510
 
STAFF ACM-ICPC
STAFF  ACM-ICPCSTAFF  ACM-ICPC
STAFF ACM-ICPC
 
Enbe.project one july 2016
Enbe.project one july 2016Enbe.project one july 2016
Enbe.project one july 2016
 
Electronic forms of communication
Electronic forms of communicationElectronic forms of communication
Electronic forms of communication
 
Pham Phuong Dung
Pham Phuong DungPham Phuong Dung
Pham Phuong Dung
 
Inhaladores
InhaladoresInhaladores
Inhaladores
 
ستة امتحانات بإجاباتها لغة إنجليزية 3ث
ستة امتحانات بإجاباتها لغة إنجليزية 3ثستة امتحانات بإجاباتها لغة إنجليزية 3ث
ستة امتحانات بإجاباتها لغة إنجليزية 3ث
 
Hypertensive retinopathy
Hypertensive retinopathyHypertensive retinopathy
Hypertensive retinopathy
 
قصة سجين زندا لغة انجليزية للثانوية العامة
قصة سجين زندا لغة انجليزية للثانوية العامةقصة سجين زندا لغة انجليزية للثانوية العامة
قصة سجين زندا لغة انجليزية للثانوية العامة
 
كيف تكتب مقدمة تعبير احترافية
كيف تكتب مقدمة تعبير احترافيةكيف تكتب مقدمة تعبير احترافية
كيف تكتب مقدمة تعبير احترافية
 
أدب لغة عربية للصف الثالث الثانوي منهج-جديد-2016
أدب لغة عربية للصف الثالث الثانوي منهج-جديد-2016أدب لغة عربية للصف الثالث الثانوي منهج-جديد-2016
أدب لغة عربية للصف الثالث الثانوي منهج-جديد-2016
 
PeterHoangNguyen
PeterHoangNguyenPeterHoangNguyen
PeterHoangNguyen
 
NGUYEN THI THANH TRA - 11052016
NGUYEN THI THANH TRA - 11052016NGUYEN THI THANH TRA - 11052016
NGUYEN THI THANH TRA - 11052016
 

Similar to Sheraz CV2

Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
R G Sanjay Prakash
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
PRAN-RFL Group
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
applesam8
 
Process plant operator Shabeer Ahmad
Process plant operator Shabeer AhmadProcess plant operator Shabeer Ahmad
Process plant operator Shabeer Ahmad
shabeer ahmad
 

Similar to Sheraz CV2 (20)

ammoniautility operator
ammoniautility operatorammoniautility operator
ammoniautility operator
 
ammonia&utility operator
ammonia&utility operatorammonia&utility operator
ammonia&utility operator
 
National fetilizers limited captive power plant
National fetilizers limited  captive power plantNational fetilizers limited  captive power plant
National fetilizers limited captive power plant
 
Rama-Resume
Rama-ResumeRama-Resume
Rama-Resume
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
 
Microsoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual FillingMicrosoft PowerPoint - DEV of Dual Filling
Microsoft PowerPoint - DEV of Dual Filling
 
EMERSON Power plant applications
EMERSON Power plant applicationsEMERSON Power plant applications
EMERSON Power plant applications
 
Emerson Power plant applications
Emerson Power plant applicationsEmerson Power plant applications
Emerson Power plant applications
 
Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
Ntpc report
Ntpc  report Ntpc  report
Ntpc report
 
KTPS
KTPSKTPS
KTPS
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...
We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...
We, the fourth-year students of the Dept. of Mechanical Engineering, SUST, vi...
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial training
 
Process plant operator Shabeer Ahmad
Process plant operator Shabeer AhmadProcess plant operator Shabeer Ahmad
Process plant operator Shabeer Ahmad
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 

Sheraz CV2

  • 1. SHERAZ AHMED Allama Iqbal Town Basti Mian Sahib Manthar Road, Sadiq Abad Distt: Rahim Yar khan Cell # :+923067613511 :+923417086927 Email: sheraz_ahmed0571@yahoo.com Email: sheraz.ahmed571@gmail.com Professional Career Objective: • A highly motivated Operation professional with skill in strategic emergency handling and problem deification is looking for a post of Utilities Operator. Personal Profile: Father’s Name MUHAMMAD AMIN Date of birth 23-11-1989 CNIC No. 31304-7857643-1 Nationality Pakistani Religion Islam Marital Status Marriad Permanent Address Allama Iqbal Town Basti Mian Sahib Manthar Road Sadiq Abad. Dist. Rahim Yar Khan. Academic Qualification: Degree Division Passing Year Matriculation 1st Div 2005 F.Sc (Non Medical) 1st Div 2007 Technical Qualification Two years apprenticeship as utility operator from Fauji Fertilizer Company Ltd. at Base Unit Goth Machhi Sadiq Abad, Currently I am working on Utility Plant in Fauji Fertilizer Company Ltd Goth Machhi, Pakistan facilitated with DCS (CS-3000) (Certified ISO-9001:2008, OHSAS- 18001:2007 & ISO-14001:2004) Since 31 Oct. 2008 to present. Professional Experience Detail • GAS TURBINE • VERY HIGH BOILER • BOILER FEED WATER NETWORK • DEAERATOR • COOLING TOWER • CHILLERS • LET DOWN STATIONS • CONDENSATE POLISHING (DEMIN) • N2 GENERATION PLANT (CRYOGENIC PROCESS)
  • 2. GAS TURBINES (Two gas turbines of General Electric) MS-5001 Cycle Combined Generator Rating 31375 KVA of Each Gas Turbine Power 34000 HP of Each (Useful Power) Control Mark-V and Mark-2 (Droop AND ISO for each Turbine) Fuel Natural Gas and Diesel Emergency Shut Down ELMS and Snamprogetty Shut Down Chemical Used(Water Treatment) Nalcool-2000 2. Very High Pressure Steam Boiler of Combustion Engineering Type D. Type Water Tube Pressure 105 Kg/Cm² Temperature 510 ºC Capacity 77 Ton/Hr Firing Tangential Water Circulation Thermosyphoning Draft Forced Fuel Natural Gas, Syn Gas and Purge Gas No. Of Drums Two (Upper Steam Drum) & (Lower Mud Drum) No. Of Burners Four Super Heaters Two Primary & Secondary De-Superheater Inner Lined Igniters Four Electrically Ignited With Step Up Transformer (10000 V) Control Auto & Manual Combustion air is supplied by a forced draft fan driven either by Steam Turbine or Motor. Normally Steam Turbine is in service and motor on Standby. 3. Boiler Feed Water System No Of Systems Two (High Pressure) & (Medium Pressure) No. Of Pumps 06 (Three for High Pressure & Three for Medium Pressure) Pressure Of HP-BFW 160 Kg/Cm² with Temperature 117 ºC Pressure Of MP-BFW 60 Kg/Cm² with Temperature 117 ºC Water Deminerallized Water Usage Of Total Feed Water 490 ~ 510 M³/Hr Stages Of Each Pump 08 Type Centrifugal Driven One (High Pressure Pump) with steam Turbine & the other two with Motors. Normally steam Turbine driven remains in Operation and Motor driven are on Auto Standby. For Medium Pressure One is driven with Steam Turbine and the other two with Motors. Normally in Medium Pressure One Steam Turbine driven & one Motor driven remains in Operation and third one on Auto Standby. De-Aerator Pressurized (Spray & Tray Type) With Chemical and Mechanical De- Aeration De-Aeration Mechanical and Chemical
  • 3. 4. Steam Let Down Stations No. of Stations 03 With The Capacity of 13/86/32 Ton/Hr Respectively Purpose Two for let down of Very High Pressure Steam (105 Kg/Cm² & 510 ºC) into High pressure Steam (39 Kg/Cm² & 375 ºC) and One for from High Pressure Steam (39 Kg/Cm²& 375 ºC) into Low Pressure Steam (2.5 kg/Cm² & 180 ºC). • A condensate recovery system is also provided. 5. Cooling Tower Vendor Lilly Hoffman Type Cross Flow Induced Draft with 09 Cells No. Of Cooling Water Circulating Pumps 05.( Four driven by Motors and One with Steam Turbine) Absorbed Power 1000 KW each Motor Rating Two of 1.3 MW and Other Two of 1.1 MW Steam Turbine Rating 1500 HP Steam Rating 39 Kg/Cm² and 375 ºC Cooling Water Circulation Rate 32000 M³/Hr and 8000 M3/Hr Flow Of each Disch Press. 4.5 Kg/cm2 No. Of Cooling Water Filters 04 (Automatic Valve less Gravity Sand Filters) pH control of Cooling Water Through Ejector Acid Dosing and PD. Diaphragm Pumps Cooling Water Treatment Buckman Laboratories (Pvt Ltd) BULAB Chemicals and Sulfuric Acid Corrosion, Scaling and Fouling Control Phosphate System and Cathodic Protection 6. CHILLERS I have worked on compression and absorption chillers using freon-12/22 and Li-bromide as refrigerant respectively Total chillers 08 Total Compression Chillers (PD compression)= 03 Total Absorption chillers = 04 7. N2 GENERATION PLANT (CRYOGENIC PROCESS) Design Capacity 1340 NMC/Hr Design pressure 8.5 Kg/Cm² Design Temp. 40 ºC Skill Improvement Courses Following Skill Improvement Courses attended while working with Fauji Fertilizer Company Limited Goth Machhi.  Centrifugal Pumps  Centrifugal Compressors
  • 4.  Positive displacement Pumps  Positive displacement Compressors  Cooling Water Treatment  Safety in Chemical Process Industry  Fire Fighting (Wet Drill)  Work Permit Procedure