INTRODUCTION
-Established on 27 June 1970
-PTL started with annual capacity of 5000 tractors
and with a capital of 3.7 cores
-IN 2007 M&M(the leaders in domestic tractor
industry) acquired majority stake in PTL
-IN 2012 it changed to MAHINDRA AND
MAHINDRA SWARAJ LTD and it became second
tractor company to win ā€˜THE DEMING PRIZEā€™
IN 2013 swaraj division plant 1and plant 2 won TPM
Excellence award from JIPM
Location:- The factory is located at Sahibzada Ajit
Singh Nagar, an important industrial town in
Punjab, 5 km from Chandigarh
PTL consist of three divisions:
ā€¢ Swaraj Tractor Division (STD), Mohali.
ā€¢ Swaraj Foundry Division (SFD) ,Mazri.
ā€¢ Swaraj Combine Division (SCD),
Chapparcheri.CHAPPAR
VARIOUS DEPARTMENT IN SWARAJ TRACTOR
DIVISION
LIGHT MACHINE SHOP (L.M.S)
L M S is the largest section of the factory. All
transmission components like shafts and gears used
in tractors are manufactured here. L.M.S comprises
of 117 machines.
ā€¢ FUNCTION OF THE DEPARTMENT
ā€¢ Gear manufacture and grinding.
ā€¢ Machining of bull gears.
ā€¢ Bevel gear cutting of all rounds on power hacksaws.
ā€¢ Facing and centering.
ā€¢ All type of grinding inner and outer gears.
ā€¢ Hobbing and broaching machine.
ā€¢.
Gear shaving gear deburring machine.
ā€¢ Drilling of all gears reporting system.
ā€¢ Number of workmen shifts operations
Machines used in LMS:-
1.Planer machine
2.Hand Lathe
3.Universal Milling Machine
4.Grinding Machine
5.Hydraulic Press
HEAVY MACHINE SHOP (H.M.S)
ā€¢ All heavy casting of tractors is machined in this
shop with the help of variety of special machine.
ā€¢ Facilities of this shop include general-purpose
turning, drilling and milling machines
COMPONENTS MACHINED IN THE HMS
GEAR BOX HOUSING
DIFFERENTIAL HOUSING
REAR COVER
TRUMPET HOUSING
BRAKE HOUSING
HEAT TREATMENT SHOP
ā€¢ In automobile industry all the gear and shafts need to be
heat treated to impart desired strength and increase life of the
component.
ā€¢ The H.T shop at PTL is equipped with several gas
carbonizing furnaces, quenching tanks, induction hardening
machines and shot blasting furnaces.
WHY
Improve mach inability.
ā€¢ Relieve internal stresses.
ā€¢ Improve mechanical properties such as ductility,
strength ,hardness, toughness etc.
ā€¢ Change in grain size.
ā€¢ Increase resistance to heat and corrosion
ASSEMBLY SHOP (ASSEMBLY OF
SWARAJ TRACTOR)
ā€¢ ASSEMBLY:
The process of joining various constituents to form
a final product.
Assembly of the tractor is divided into five sections:
a) Differential Sub assy.
b) Engine Sub assy.
c) Hydraulic rear cover Sub Assy.
d) Gearbox Sub Assy.
e) Main line Assy.
DIFFERENTIAL SUB ASSEMBLY
ā€¢ FUNCTION:
When the vehicle takes turns , a device is necessary
which make the wheels move at different speed and
equal speed on straight path
To accomplished this purpose a system of gear
called ā€œDifferential System ā€œ is provided.
CAGE
ASSEMBLY
CAGE , BULL
GEAR &BRAKES
FIITTED
PTO SHIFTER &
SUCTION AND
STRAINER ASSY
BRAKE PEDAL
,TAIL PINION
SHAFT FITTED
GEAR BOX
COUPLING
LAY OUT OF DIFF.
SUB ASSY
LAY OUT OF ENGINE SUB ASSY
HYD PUMP
ASSEMBLY
CLUTCH PLATE
&
PRESSURE
PLATE
FITMENT
ALTERNATOR
,STARTING
MOTOR
FITMENT
FRONT AXLE
BEAM
ASSEMBLY
KING PIN
STUB AXLE
ASSEMBLY
FRONT AXLE
BEAM
FITMENT
PAINT SHOP
ā€¢ Paint shop is the place where the different sheet metal
components are painted.
ā€¢ They are made to pass through various chemicals before
they are actually painted.
ā€¢ The painting methods operated is that of Spray painting.
NEED FOR
PAINTING:-
ā€¢ Long Life.
ā€¢ Rust Resistance.
ā€¢ Better Look
The various operation performed in paint shop
are
ā€¢ Surface Preparation (Pre Treatment Cell) ā€“ carried out
for sheets and rims.
ā€¢ Painting JOSH 1(dash board, rear frame ,front shield
,top bonnet),JOSH 2(fenders, side panel), CHASSIS
BOOTH (washing, primer,washing zones), FINAL TOUCH
UP.
ā€¢ Inspection.
ā€¢ Rejection (Reprocessing) for sheets and rims
ā€¢ NEED FOR SURFACE PREPERATION
For removing Organic compounds (oil, grease)
ā€¢ Inorganic compounds (oxides, peroxides)
ā€¢ Better paint adhesion.
ā€¢ Elimination chances of reoccurring of dust.
MY PROJECTS
INSTALLATION OF NEW
MACHINCE
INSTALLATION OF NEW MACHINCE
IS IT EVEN A PROJECT
ANY WORK THAT IS
DONE IN INDUSTRY
IS A SORT OF
PROJECT BCOZ IT
HAS TO BE
CARRIED WITH
ATMOST
SAFETY,PLANED
METHOD AND
CALCULATION
MACHINCE IS A
COMBINATION
OF LINKS JOINED
BY NO. OF
JOINTS.SO TO
RUN AMACHINCE
ALL THE LINKS
MUST BE
INSTALLED
PROPERLYSO
THAT IT CAN
WORK PROPERLY
INTRODUCTION
STARRAG IWK 7000
IT IS A GERMAN TECHNOLOGY MACHINCE BUILT WITH
THE INCORPATION WITH INDIAN ENGINEERS,THE I
STANDS FOR INDAIN
INTRODUCTION AND CHARACTERSTICS
THE IWK 7000 MACHINCES ARE HIGH PERFORMANCE 4 AXIS
HORIZONTAL MACHINING CENTRES DESIGNED FOR INTRICATE AND
COMPLEX MACHINCING OF FERROUS AS WELL AS NON FERROUS
COMPONENTS PROVIDING HIGH FLEXIBILITY,PERFORMANCE AND
CONSISTENT PERFORMANCE
CHARACTERSTICS
NUMBER OF AXES 4
SPINDLE ORIENTATION HORIZONTAL
X TRAVEL 910 MM
Y TRAVEL 800 MM
Z TRAVEL 1000 MM
ACCURACY 10 MICRONS
ROTATIONAL SPEED
MIN 20RPM
MAX 6000 RPM
WHY IT WAS BROUGHT
1. VARIOUS OPERTIONS LIKE DRILLING,BORING,TAPPING ,
MILLING,FACING
2. INCREASED THE PRODUCTION
3. REDUCED HUMAN EFFORT AS IT IS FULLY AUTOMATIC
4. IT PROMISED LONG TERM ACCURACY,LONG TEM
RELIABILITY AND LONG TERM PRODUCTIVITY
KEY BENEFITS AND TECHANICAL DATA
1) RIGID STRUCTURE
2) HIGH TORQUE GEARED SPINDLE HSKA100
3) HEAVY DUTY TOOL HANDLING SYSTEM
4) RUGGED ROLLER GUIDEEWAYS
5) ACCURATE CLAMPING
6) PALLET-FIXTURE INTERFACE LOCATION
TECHANICAL DATA
1. CLAMPING SURFACE 630X630 MM
2. W/P INTERFACE AREA DIA. 1100 MM
3. MAX. FEED 50 M/MIN
4. SPINDLE TAPER HSKA100
5. TORQUE TORQUE 733 NM
6. POWER 22 KW
7. MAX. TOOL WEIGHT 25KG
MAX.TOOL SLOTS 120
INSTALLATION PROCESS
1.TRANSPORATION PROCESS
ļƒ˜ STARRAG IWK 7000 IS VERY BULKY MACHINCE .IT
REQUIRES VERY PRECISE HANDLING METHOD.
ļƒ˜THE MACHINCE WAS FIRST TRANSPORTED FROM
BANGALORE TO MOHALI VIA ROAD I.E BY TRUCKS.IT WAS
PACKED IN VERY LARGE CARTON
ļƒ˜JCB CRANES WERE USED TO LIFT WOODEN CARTON
FROM THE TRUCK AND BE PLACED ON THE GROUND
DEASSEMBLING AND MAINTENANCE
PHASE
AFTER BEING TRANSPORTED,THE MACHINCE WAS
DISASSEMBLED SO THAT EACH PART CAN BE CHECKED
THROUGHLY FOR ANY DAMAGE,
PROBLEM
ENCOUNTERED
1) EYE BOLT OF ONE OF THE PART WAS DAMAGED .SO THERE WAS
A NEED TO DESIGN A M30 EYE BOLT.SO THIS TASK WAS GIVEN
TO ME.SO I DESIGNED IT AND GAVE DRAWING TO ASSEMBLY
SHOP AND THEY MADE IT
ELECTRICAL PHASE
Main tasks carried out:
1.Visual inspection of the main cable terminals
2Checking of the cooling and lubricating systems
3Electrical measurement and check of all the machineĀ“s wiring
4Testing and calibrating setup parameters like Automatic
Voltage Regulation (AVR) setting, Checking the idle running,
load running and connecting the generator phases to the grid
Checking the operating parameters ā€“ load sharing, checking
operating temperatures and vibrations
SETTING OF STABILIZER
This system stabilizes the input voltage to be stable and
generates a reliable output voltage
TECHANICAL PARAMETERS
1. POWER RANGE 100KVA
2. INPUT RANGE 360V
3. OUTPUT RANGE 415V
4. COOLING AIR/OIL
5. EFFICIENCY >95%
6. WORKING FREQUENCY 50-60 HZ
BASIC PARTS
Cabinet; English, LCD display screen
Terminals: 3 phase 4 wires (With Neutral Ground/Earth);
Main Switch, AC contactor, Servo Motor, Carbon
Brush, Cables/Busbar, PCB main board, Manual/Automatic Switch,
Adjusting transformer (contact type voltage regulator),
LEXOS 100
KVA
STABILIZER
MECHANICAL PHASE
MECHANICAL PHASE START WITH THE ASSEMBLY OF ALL PARTS
LIKE MAGAZINE,STABILIZER,HYDRAULIC POWER
PACK,PALLETS,TOOL SPINDLE
THE MOST IMPORTANT PART OF THIS PHASE IS TO INSTALL
HYDRAULIC POWER PACK.THE FUNCTION OF THIS PUMP IS
CONVERT ELECRTICAL ENERGY TO MECHANICAL ENERGY.
GENERATING A DRIVING TORQUE,HYDRAULIC POWER UNITS
FUNCTION AS A POWER SOURCE.IT WILL BE CONNECTED TO
PALLET.IT IS ALSO USED FOR CLAMPING AND UNCLAMPING OF
TOOL SPINDLE
COMPLETELY INSTALLED STARRAG IWK 7000
FINAL PHASE:TESTING PHASE
1. AFTER THE MACHINCE IS INSTALLED THE FOREMOST STEP
IS TO CHECK PALLET POSITION WITH RESPECT TO THE
TOOL SPINDLE . THEY SHOULD BE IN STRAIGHT LINE,IT IS
DONE BY USING AN INSTRUMENT CALLED ā€˜LEVELSā€™ā€™
2. THEN TESTING OF DRILLS IS DONE FROM THE MAGAZINE WHICH
HOLDS NUMEROUS TOOLS,DRILLS ARE WASHED WITH COOLANT
3.THE LAST STEP INCLUDES TEST RUN WITH A DUMMY
GEARBOX AND PRODUCES VARIOUS FUNCTIONS
:DRILLING,BORING,MILLING,SURFACE FINISHING AND
GIVING HIGH ACCURACY
6 MONTHS TRAINING REPORT AT MAHINDRA AND MAHINDRA

More Related Content

What's hot

Projet report swaraj 2013
Projet report swaraj 2013Projet report swaraj 2013
Projet report swaraj 2013Rishabh Kaushik
Ā 
indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016 indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016 Kishan Bharti
Ā 
Mercedes benz service centre training report
Mercedes benz service centre training reportMercedes benz service centre training report
Mercedes benz service centre training reportPanchal Anand
Ā 
summer internship report
summer internship reportsummer internship report
summer internship reportSaransh Gupta
Ā 
DLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSIDLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSIShivam Prajapati
Ā 
Training report
Training reportTraining report
Training reportSumit Kumar
Ā 
LOCO TRAINING REPORT
LOCO TRAINING REPORTLOCO TRAINING REPORT
LOCO TRAINING REPORTShivam Prajapati
Ā 
Automobile training report(GALLOPS MOTORS0
Automobile training report(GALLOPS MOTORS0Automobile training report(GALLOPS MOTORS0
Automobile training report(GALLOPS MOTORS0Vijay Dubey
Ā 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsKashifRaza113
Ā 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training reportPrashantSharma897
Ā 
Winter Training Report@Escorts Agri Machinery.pdf
Winter Training Report@Escorts Agri Machinery.pdfWinter Training Report@Escorts Agri Machinery.pdf
Winter Training Report@Escorts Agri Machinery.pdfAnant938795
Ā 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwayChirag Jain
Ā 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshopShivam Prajapati
Ā 
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)amal babu
Ā 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSHAILESH SHUKLA
Ā 
swaraj tractor division
swaraj tractor divisionswaraj tractor division
swaraj tractor divisionpradeep rana
Ā 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship reportrahul waghmare
Ā 
Dlw training
Dlw trainingDlw training
Dlw trainingDeepak Singh
Ā 

What's hot (20)

Projet report swaraj 2013
Projet report swaraj 2013Projet report swaraj 2013
Projet report swaraj 2013
Ā 
indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016 indian railway gorakhpur training report for mechanical engineering 2016
indian railway gorakhpur training report for mechanical engineering 2016
Ā 
BLW SUMMER TRAINING REPORT
BLW SUMMER TRAINING REPORTBLW SUMMER TRAINING REPORT
BLW SUMMER TRAINING REPORT
Ā 
Mercedes benz service centre training report
Mercedes benz service centre training reportMercedes benz service centre training report
Mercedes benz service centre training report
Ā 
summer internship report
summer internship reportsummer internship report
summer internship report
Ā 
DLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSIDLW WORKSHOP , VARANSI
DLW WORKSHOP , VARANSI
Ā 
Training report
Training reportTraining report
Training report
Ā 
LOCO TRAINING REPORT
LOCO TRAINING REPORTLOCO TRAINING REPORT
LOCO TRAINING REPORT
Ā 
Automobile training report(GALLOPS MOTORS0
Automobile training report(GALLOPS MOTORS0Automobile training report(GALLOPS MOTORS0
Automobile training report(GALLOPS MOTORS0
Ā 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) Students
Ā 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
Ā 
Winter Training Report@Escorts Agri Machinery.pdf
Winter Training Report@Escorts Agri Machinery.pdfWinter Training Report@Escorts Agri Machinery.pdf
Winter Training Report@Escorts Agri Machinery.pdf
Ā 
Summer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian RailwaySummer Internship/Training report at Indian Railway
Summer Internship/Training report at Indian Railway
Ā 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
Ā 
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
Ā 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
Ā 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
Ā 
swaraj tractor division
swaraj tractor divisionswaraj tractor division
swaraj tractor division
Ā 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
Ā 
Dlw training
Dlw trainingDlw training
Dlw training
Ā 

Similar to 6 MONTHS TRAINING REPORT AT MAHINDRA AND MAHINDRA

bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path methodSaurav Kumar
Ā 
BWEL Project Report
BWEL Project ReportBWEL Project Report
BWEL Project ReportASHISH KUMAR
Ā 
Sunil gaur bhel ppt
Sunil gaur bhel pptSunil gaur bhel ppt
Sunil gaur bhel pptsunil gaur
Ā 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway stationdurgesh pathak
Ā 
Summer Internship final reports
Summer Internship final reportsSummer Internship final reports
Summer Internship final reportsvivek srivastava
Ā 
AXTEL SCREW FEEDER REPORT
AXTEL SCREW FEEDER REPORTAXTEL SCREW FEEDER REPORT
AXTEL SCREW FEEDER REPORTsudhir gohil
Ā 
REPORT (1)
REPORT (1)REPORT (1)
REPORT (1)Raj290394
Ā 
Hydraulic cone crusher
Hydraulic cone crusherHydraulic cone crusher
Hydraulic cone crusherEvita Lee
Ā 
Tata steel limited,kalinganagar(orissa),three months in project training
Tata steel limited,kalinganagar(orissa),three months in project trainingTata steel limited,kalinganagar(orissa),three months in project training
Tata steel limited,kalinganagar(orissa),three months in project trainingBABUL RAJAN
Ā 
The general tyre and rubber company
The general tyre and rubber companyThe general tyre and rubber company
The general tyre and rubber companyRaza Jahangir
Ā 
Developing a new generation of energy efficiency products for reciprocating e...
Developing a new generation of energy efficiency products for reciprocating e...Developing a new generation of energy efficiency products for reciprocating e...
Developing a new generation of energy efficiency products for reciprocating e...Bowman Power
Ā 
Lhp training report
Lhp training reportLhp training report
Lhp training reportumesh chikhale
Ā 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profileJanakbhatt
Ā 
Power Point Presentation on training in bhushan steel private ltd
Power Point Presentation on training in bhushan steel private ltdPower Point Presentation on training in bhushan steel private ltd
Power Point Presentation on training in bhushan steel private ltdAnkit Gupta
Ā 
SENIOR MECHANICAL TECHNICIAN
SENIOR MECHANICAL TECHNICIANSENIOR MECHANICAL TECHNICIAN
SENIOR MECHANICAL TECHNICIANABDULSATTAR KARACHI
Ā 
Naman BHEL seminar
Naman BHEL seminarNaman BHEL seminar
Naman BHEL seminarNaman Jain
Ā 

Similar to 6 MONTHS TRAINING REPORT AT MAHINDRA AND MAHINDRA (20)

bottle neck operation through critical path method
bottle neck operation through critical path methodbottle neck operation through critical path method
bottle neck operation through critical path method
Ā 
BWEL Project Report
BWEL Project ReportBWEL Project Report
BWEL Project Report
Ā 
Sunil gaur bhel ppt
Sunil gaur bhel pptSunil gaur bhel ppt
Sunil gaur bhel ppt
Ā 
Ppt on Gorakhpur railway station
Ppt on Gorakhpur railway stationPpt on Gorakhpur railway station
Ppt on Gorakhpur railway station
Ā 
Sei ppt
Sei pptSei ppt
Sei ppt
Ā 
Sei ppt
Sei pptSei ppt
Sei ppt
Ā 
Summer Internship final reports
Summer Internship final reportsSummer Internship final reports
Summer Internship final reports
Ā 
AXTEL SCREW FEEDER REPORT
AXTEL SCREW FEEDER REPORTAXTEL SCREW FEEDER REPORT
AXTEL SCREW FEEDER REPORT
Ā 
REPORT (1)
REPORT (1)REPORT (1)
REPORT (1)
Ā 
final report
final reportfinal report
final report
Ā 
Hydraulic cone crusher
Hydraulic cone crusherHydraulic cone crusher
Hydraulic cone crusher
Ā 
Tata steel limited,kalinganagar(orissa),three months in project training
Tata steel limited,kalinganagar(orissa),three months in project trainingTata steel limited,kalinganagar(orissa),three months in project training
Tata steel limited,kalinganagar(orissa),three months in project training
Ā 
The general tyre and rubber company
The general tyre and rubber companyThe general tyre and rubber company
The general tyre and rubber company
Ā 
Developing a new generation of energy efficiency products for reciprocating e...
Developing a new generation of energy efficiency products for reciprocating e...Developing a new generation of energy efficiency products for reciprocating e...
Developing a new generation of energy efficiency products for reciprocating e...
Ā 
Lhp training report
Lhp training reportLhp training report
Lhp training report
Ā 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profile
Ā 
Power Point Presentation on training in bhushan steel private ltd
Power Point Presentation on training in bhushan steel private ltdPower Point Presentation on training in bhushan steel private ltd
Power Point Presentation on training in bhushan steel private ltd
Ā 
SENIOR MECHANICAL TECHNICIAN
SENIOR MECHANICAL TECHNICIANSENIOR MECHANICAL TECHNICIAN
SENIOR MECHANICAL TECHNICIAN
Ā 
training report
training report training report
training report
Ā 
Naman BHEL seminar
Naman BHEL seminarNaman BHEL seminar
Naman BHEL seminar
Ā 

Recently uploaded

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
Ā 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
Ā 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
Ā 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
Ā 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
Ā 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
Ā 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
Ā 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
Ā 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
Ā 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
Ā 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
Ā 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoĆ£o Esperancinha
Ā 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
Ā 
Call Us ā‰½ 8377877756 ā‰¼ Call Girls In Shastri Nagar (Delhi)
Call Us ā‰½ 8377877756 ā‰¼ Call Girls In Shastri Nagar (Delhi)Call Us ā‰½ 8377877756 ā‰¼ Call Girls In Shastri Nagar (Delhi)
Call Us ā‰½ 8377877756 ā‰¼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
Ā 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
Ā 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
Ā 
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort serviceGurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort servicejennyeacort
Ā 

Recently uploaded (20)

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
Ā 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
Ā 
young call girls in Rajiv ChowkšŸ” 9953056974 šŸ” Delhi escort Service
young call girls in Rajiv ChowkšŸ” 9953056974 šŸ” Delhi escort Serviceyoung call girls in Rajiv ChowkšŸ” 9953056974 šŸ” Delhi escort Service
young call girls in Rajiv ChowkšŸ” 9953056974 šŸ” Delhi escort Service
Ā 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Ā 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
Ā 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
Ā 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
Ā 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
Ā 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
Ā 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
Ā 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
Ā 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
Ā 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
Ā 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Ā 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
Ā 
ā˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
ā˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCRā˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
ā˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Ā 
Call Us ā‰½ 8377877756 ā‰¼ Call Girls In Shastri Nagar (Delhi)
Call Us ā‰½ 8377877756 ā‰¼ Call Girls In Shastri Nagar (Delhi)Call Us ā‰½ 8377877756 ā‰¼ Call Girls In Shastri Nagar (Delhi)
Call Us ā‰½ 8377877756 ā‰¼ Call Girls In Shastri Nagar (Delhi)
Ā 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
Ā 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
Ā 
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort serviceGurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Ā 

6 MONTHS TRAINING REPORT AT MAHINDRA AND MAHINDRA

  • 1. 6 MONTHS INDUSTRIAL TRAINING REPORT AT MAHINDRA AND MAHINDRA SWARAJ,MOHALI SUBMITTED BY SHASHI BHUSHAN UE149077 SUMITTED TO MR.TUKESH SONI
  • 2. INTRODUCTION -Established on 27 June 1970 -PTL started with annual capacity of 5000 tractors and with a capital of 3.7 cores -IN 2007 M&M(the leaders in domestic tractor industry) acquired majority stake in PTL -IN 2012 it changed to MAHINDRA AND MAHINDRA SWARAJ LTD and it became second tractor company to win ā€˜THE DEMING PRIZEā€™
  • 3. IN 2013 swaraj division plant 1and plant 2 won TPM Excellence award from JIPM Location:- The factory is located at Sahibzada Ajit Singh Nagar, an important industrial town in Punjab, 5 km from Chandigarh PTL consist of three divisions: ā€¢ Swaraj Tractor Division (STD), Mohali. ā€¢ Swaraj Foundry Division (SFD) ,Mazri. ā€¢ Swaraj Combine Division (SCD), Chapparcheri.CHAPPAR
  • 4.
  • 5. VARIOUS DEPARTMENT IN SWARAJ TRACTOR DIVISION
  • 6. LIGHT MACHINE SHOP (L.M.S) L M S is the largest section of the factory. All transmission components like shafts and gears used in tractors are manufactured here. L.M.S comprises of 117 machines. ā€¢ FUNCTION OF THE DEPARTMENT ā€¢ Gear manufacture and grinding. ā€¢ Machining of bull gears. ā€¢ Bevel gear cutting of all rounds on power hacksaws. ā€¢ Facing and centering. ā€¢ All type of grinding inner and outer gears. ā€¢ Hobbing and broaching machine. ā€¢.
  • 7. Gear shaving gear deburring machine. ā€¢ Drilling of all gears reporting system. ā€¢ Number of workmen shifts operations Machines used in LMS:- 1.Planer machine 2.Hand Lathe 3.Universal Milling Machine 4.Grinding Machine 5.Hydraulic Press
  • 8.
  • 9. HEAVY MACHINE SHOP (H.M.S) ā€¢ All heavy casting of tractors is machined in this shop with the help of variety of special machine. ā€¢ Facilities of this shop include general-purpose turning, drilling and milling machines COMPONENTS MACHINED IN THE HMS GEAR BOX HOUSING DIFFERENTIAL HOUSING
  • 11. HEAT TREATMENT SHOP ā€¢ In automobile industry all the gear and shafts need to be heat treated to impart desired strength and increase life of the component. ā€¢ The H.T shop at PTL is equipped with several gas carbonizing furnaces, quenching tanks, induction hardening machines and shot blasting furnaces. WHY Improve mach inability. ā€¢ Relieve internal stresses. ā€¢ Improve mechanical properties such as ductility, strength ,hardness, toughness etc. ā€¢ Change in grain size. ā€¢ Increase resistance to heat and corrosion
  • 12. ASSEMBLY SHOP (ASSEMBLY OF SWARAJ TRACTOR)
  • 13. ā€¢ ASSEMBLY: The process of joining various constituents to form a final product. Assembly of the tractor is divided into five sections: a) Differential Sub assy. b) Engine Sub assy. c) Hydraulic rear cover Sub Assy. d) Gearbox Sub Assy. e) Main line Assy.
  • 14. DIFFERENTIAL SUB ASSEMBLY ā€¢ FUNCTION: When the vehicle takes turns , a device is necessary which make the wheels move at different speed and equal speed on straight path To accomplished this purpose a system of gear called ā€œDifferential System ā€œ is provided.
  • 15. CAGE ASSEMBLY CAGE , BULL GEAR &BRAKES FIITTED PTO SHIFTER & SUCTION AND STRAINER ASSY BRAKE PEDAL ,TAIL PINION SHAFT FITTED GEAR BOX COUPLING LAY OUT OF DIFF. SUB ASSY
  • 16. LAY OUT OF ENGINE SUB ASSY HYD PUMP ASSEMBLY CLUTCH PLATE & PRESSURE PLATE FITMENT ALTERNATOR ,STARTING MOTOR FITMENT FRONT AXLE BEAM ASSEMBLY KING PIN STUB AXLE ASSEMBLY FRONT AXLE BEAM FITMENT
  • 17. PAINT SHOP ā€¢ Paint shop is the place where the different sheet metal components are painted. ā€¢ They are made to pass through various chemicals before they are actually painted. ā€¢ The painting methods operated is that of Spray painting. NEED FOR PAINTING:- ā€¢ Long Life. ā€¢ Rust Resistance. ā€¢ Better Look
  • 18. The various operation performed in paint shop are ā€¢ Surface Preparation (Pre Treatment Cell) ā€“ carried out for sheets and rims. ā€¢ Painting JOSH 1(dash board, rear frame ,front shield ,top bonnet),JOSH 2(fenders, side panel), CHASSIS BOOTH (washing, primer,washing zones), FINAL TOUCH UP. ā€¢ Inspection. ā€¢ Rejection (Reprocessing) for sheets and rims ā€¢ NEED FOR SURFACE PREPERATION For removing Organic compounds (oil, grease) ā€¢ Inorganic compounds (oxides, peroxides) ā€¢ Better paint adhesion. ā€¢ Elimination chances of reoccurring of dust.
  • 20. INSTALLATION OF NEW MACHINCE IS IT EVEN A PROJECT ANY WORK THAT IS DONE IN INDUSTRY IS A SORT OF PROJECT BCOZ IT HAS TO BE CARRIED WITH ATMOST SAFETY,PLANED METHOD AND CALCULATION MACHINCE IS A COMBINATION OF LINKS JOINED BY NO. OF JOINTS.SO TO RUN AMACHINCE ALL THE LINKS MUST BE INSTALLED PROPERLYSO THAT IT CAN WORK PROPERLY
  • 21. INTRODUCTION STARRAG IWK 7000 IT IS A GERMAN TECHNOLOGY MACHINCE BUILT WITH THE INCORPATION WITH INDIAN ENGINEERS,THE I STANDS FOR INDAIN
  • 22. INTRODUCTION AND CHARACTERSTICS THE IWK 7000 MACHINCES ARE HIGH PERFORMANCE 4 AXIS HORIZONTAL MACHINING CENTRES DESIGNED FOR INTRICATE AND COMPLEX MACHINCING OF FERROUS AS WELL AS NON FERROUS COMPONENTS PROVIDING HIGH FLEXIBILITY,PERFORMANCE AND CONSISTENT PERFORMANCE CHARACTERSTICS NUMBER OF AXES 4 SPINDLE ORIENTATION HORIZONTAL X TRAVEL 910 MM Y TRAVEL 800 MM Z TRAVEL 1000 MM ACCURACY 10 MICRONS
  • 23.
  • 25.
  • 26. WHY IT WAS BROUGHT 1. VARIOUS OPERTIONS LIKE DRILLING,BORING,TAPPING , MILLING,FACING 2. INCREASED THE PRODUCTION 3. REDUCED HUMAN EFFORT AS IT IS FULLY AUTOMATIC 4. IT PROMISED LONG TERM ACCURACY,LONG TEM RELIABILITY AND LONG TERM PRODUCTIVITY
  • 27. KEY BENEFITS AND TECHANICAL DATA 1) RIGID STRUCTURE 2) HIGH TORQUE GEARED SPINDLE HSKA100 3) HEAVY DUTY TOOL HANDLING SYSTEM 4) RUGGED ROLLER GUIDEEWAYS 5) ACCURATE CLAMPING 6) PALLET-FIXTURE INTERFACE LOCATION TECHANICAL DATA 1. CLAMPING SURFACE 630X630 MM 2. W/P INTERFACE AREA DIA. 1100 MM 3. MAX. FEED 50 M/MIN 4. SPINDLE TAPER HSKA100 5. TORQUE TORQUE 733 NM 6. POWER 22 KW 7. MAX. TOOL WEIGHT 25KG
  • 29. INSTALLATION PROCESS 1.TRANSPORATION PROCESS ļƒ˜ STARRAG IWK 7000 IS VERY BULKY MACHINCE .IT REQUIRES VERY PRECISE HANDLING METHOD. ļƒ˜THE MACHINCE WAS FIRST TRANSPORTED FROM BANGALORE TO MOHALI VIA ROAD I.E BY TRUCKS.IT WAS PACKED IN VERY LARGE CARTON ļƒ˜JCB CRANES WERE USED TO LIFT WOODEN CARTON FROM THE TRUCK AND BE PLACED ON THE GROUND
  • 30.
  • 32.
  • 33.
  • 34. AFTER BEING TRANSPORTED,THE MACHINCE WAS DISASSEMBLED SO THAT EACH PART CAN BE CHECKED THROUGHLY FOR ANY DAMAGE, PROBLEM ENCOUNTERED 1) EYE BOLT OF ONE OF THE PART WAS DAMAGED .SO THERE WAS A NEED TO DESIGN A M30 EYE BOLT.SO THIS TASK WAS GIVEN TO ME.SO I DESIGNED IT AND GAVE DRAWING TO ASSEMBLY SHOP AND THEY MADE IT
  • 35.
  • 36. ELECTRICAL PHASE Main tasks carried out: 1.Visual inspection of the main cable terminals 2Checking of the cooling and lubricating systems 3Electrical measurement and check of all the machineĀ“s wiring 4Testing and calibrating setup parameters like Automatic Voltage Regulation (AVR) setting, Checking the idle running, load running and connecting the generator phases to the grid Checking the operating parameters ā€“ load sharing, checking operating temperatures and vibrations
  • 37. SETTING OF STABILIZER This system stabilizes the input voltage to be stable and generates a reliable output voltage TECHANICAL PARAMETERS 1. POWER RANGE 100KVA 2. INPUT RANGE 360V 3. OUTPUT RANGE 415V 4. COOLING AIR/OIL 5. EFFICIENCY >95% 6. WORKING FREQUENCY 50-60 HZ BASIC PARTS Cabinet; English, LCD display screen Terminals: 3 phase 4 wires (With Neutral Ground/Earth); Main Switch, AC contactor, Servo Motor, Carbon Brush, Cables/Busbar, PCB main board, Manual/Automatic Switch, Adjusting transformer (contact type voltage regulator),
  • 39. MECHANICAL PHASE MECHANICAL PHASE START WITH THE ASSEMBLY OF ALL PARTS LIKE MAGAZINE,STABILIZER,HYDRAULIC POWER PACK,PALLETS,TOOL SPINDLE THE MOST IMPORTANT PART OF THIS PHASE IS TO INSTALL HYDRAULIC POWER PACK.THE FUNCTION OF THIS PUMP IS CONVERT ELECRTICAL ENERGY TO MECHANICAL ENERGY. GENERATING A DRIVING TORQUE,HYDRAULIC POWER UNITS FUNCTION AS A POWER SOURCE.IT WILL BE CONNECTED TO PALLET.IT IS ALSO USED FOR CLAMPING AND UNCLAMPING OF TOOL SPINDLE
  • 40.
  • 41.
  • 43. FINAL PHASE:TESTING PHASE 1. AFTER THE MACHINCE IS INSTALLED THE FOREMOST STEP IS TO CHECK PALLET POSITION WITH RESPECT TO THE TOOL SPINDLE . THEY SHOULD BE IN STRAIGHT LINE,IT IS DONE BY USING AN INSTRUMENT CALLED ā€˜LEVELSā€™ā€™
  • 44. 2. THEN TESTING OF DRILLS IS DONE FROM THE MAGAZINE WHICH HOLDS NUMEROUS TOOLS,DRILLS ARE WASHED WITH COOLANT
  • 45. 3.THE LAST STEP INCLUDES TEST RUN WITH A DUMMY GEARBOX AND PRODUCES VARIOUS FUNCTIONS :DRILLING,BORING,MILLING,SURFACE FINISHING AND GIVING HIGH ACCURACY