                         Oracle Primavera Solutions
Prepared by: Shahin Ghajar
E-Mail : shahinghajar@yahoo.com
The Oracle Primavera product suite provides industry-specific project, portfolio and
resource management software to more than 75,000 customers around the
world. Recognizing that no two organizations are alike, these solutions
are assembled to fit the roles of the project stakeholders with modules specific
to their industries.
• Select the right strategic mix of projects
• Assure project, IT and corporate governance
• Enhance processes and methods
• Improve project team collaboration
• Measure progress toward objectives
• Complete more projects successfully and with the intended payback
• If you're looking for the most effective project solutions for managing people and
   their work with the power to support global enterprises, you've come to the right
   place.
Dashboards
                                        Portfolios
             Projects                             Risks/Issues
                              PRIMAVERA
Resources                                                        Collaboration
                                  P6




Executives     Portfolio        PMO       Project     Resource      Team Members
Oracle Solutions
 Primavera Portfolio
    Management         An enterprise portfolio ‘investment’ management software
                              solution. From data entry forms for business
                       case/investment, idea through tracking benefit realization

Primavera P6 EPPM
                       An integrated enterprise solution for prioritizing, planning,
                           managing and executing projects, programs and
                                               portfolios.

 Primavera Contract
    Management
                          A change management, job cost and project controls
                          solution for managing subcontractor performance for
                                  engineering and construction projects.
   Primavera Risk
      Analysis          A full lifecycle risk analytics solution integrating cost and
                         schedule risk management. It determines confidence
                       levels for project success, contingency and risk response
                                                     plans
About Oracle Primavera P6 Enterprise Project
                  Portfolio Management
• Oracle Primavera P6 Enterprise Project Portfolio Management (P6 EPPM) is a
  robust and easy-to-use integrated solution for globally prioritizing, planning,
  managing, and executing projects, programs, and portfolios. It optimizes role-
  specific functionality to satisfy each team member's needs, responsibilities, and
  skills. It provides a single solution for managing projects of any size, adapts to
  various levels of complexities within a project, and intelligently scales to meet the
  needs of various roles, functions, or skill levels in your organization and on your
  project team.
• Thousands of companies rely on P6 EPPM to:
• Plan, schedule, and manage the right strategic mix of projects
• Make informed project, cost, and resource management decisions
• Enhance team collaboration and workflow productivity
• Maximize each project contributor's skills and responsibilities
• Track progress and optimize capacity for maximum profitability
• Deliver programs and projects on time and within budget
• Share data with human capital, financial management, and enterprise resource
  planning systems
Product Description

Oracle's Primavera P6 Enterprise Project Portfolio Management is the most powerful, robust,
and easy-to-use solution for globally prioritizing, planning, managing, and executing projects,
programs, and portfolios. Primavera P6 Enterprise Project Portfolio Management is an
integrated project portfolio management (PPM) solution comprising role-specific functionality
to satisfy each team member's needs, responsibilities, and skills. It provides a single solution
for managing projects of any size, adapts to various levels of complexities within a project,
and intelligently scales to meet the needs of various roles, functions, or skill levels in your
organization and on your project team
Features

• Project Management Power Client

• Methodology Management

• Web Access Client

• Portfolio Analysis

• Capacity Planning

• Reporting Database

• Time Sheets

• Web Services and Integration APIs
Benefits

• Select the right strategic mix of portfolios

• Plan, schedule and control all projects, including large-scale programs and individual
  projects

• Allocate best resources and track progress based on skills and availability

• Track project progress and monitor project performance vs. plan

• Integrate with financial management and other enterprise software applications

• Balance resource capacity

• Foster team collaboration
Oracle Primavera P6 Enterprise Project Portfolio Management

Dashboards and
                              Portfolios              Projects            Resources
 Workspaces
Screenshots
             &
        Descriptions

About Dashboards, Workspaces,
       and Workgroups
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                  Portfolios              Projects            Resources
         Workspaces



About Dashboards, Workspaces, and Workgroups
P6 provides three types of user-customizable pages you can use to monitor and share concise
snapshots of data in a single place without having to navigate to other sections of the application.
They are:
 Dashboards
 Project Workspaces
 Workgroups (a workspace within the project workspace)


You can customize the content and layout of each dashboard, workspace, and workgroup to
display related data inside smaller windows called portlets. Portlets provide the means for adding,
editing, and viewing up-to-date information about portfolio, project, resource, workflow,
document, and personal data. They provide a single location for collaborating with other users.
You can have multiple dashboards and workgroups; however, each project has just one project
workspace.
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


Budget by PM
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                  Portfolios              Projects            Resources
        Workspaces


Budget by Location
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


Capital Costs by Type
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


Cost by Product
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                 Portfolios              Projects            Resources
         Workspaces


Count by Strategic Objective
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


Earned Value Performance
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                 Portfolios              Projects            Resources
         Workspaces


Effort Pipeline by Work Type
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                  Portfolios              Projects            Resources
        Workspaces


Incoming Proposals
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


My Issues
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


Performance Scorecard
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                  Portfolios              Projects            Resources
         Workspaces


Project Gantt Chart
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                 Portfolios              Projects            Resources
         Workspaces


Project Health
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                 Portfolios              Projects            Resources
         Workspaces


Project Statistics
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                 Portfolios              Projects            Resources
         Workspaces


Prioritization
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


Resource Analysis Chart
Oracle Primavera P6 Enterprise Project Portfolio Management

      Dashboards and                 Portfolios              Projects            Resources
       Workspaces


Resource Team Summary
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


Schedule Performance
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


Spend by Project
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                 Portfolios              Projects            Resources
         Workspaces


Traffic Lighting
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                 Portfolios              Projects            Resources
         Workspaces


Valuation Metrics
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and                 Portfolios              Projects            Resources
         Workspaces


Variance Analysis by Project
Oracle Primavera P6 Enterprise Project Portfolio Management

       Dashboards and                 Portfolios              Projects            Resources
        Workspaces


Weighted Scoring
Screenshots
      &
 Descriptions

About Portfolios
Oracle Primavera P6 Enterprise Project Portfolio Management

               Dashboards and              Portfolios                   Projects              Resources
                Workspaces




About Portfolios
A portfolio is a collection of projects. Group projects into portfolios so you can easily view data from more than
one project at a time. For example, you might filter a dashboard by a portfolio to view a wide range of
information for multiple related projects at one time.
In a more strategic sense, you should group projects and programs together to facilitate the effective new
product development and management of those projects to optimize your organization's success at meeting
business objectives.
Using portfolios, you can review summary data and status information for the group as a whole or for individual
projects in a portfolio.
You can create portfolios for your own use or for sharing with other users. You can also create global portfolios,
which are available to all users.
Portfolio views, such as pie charts, enable you to visually compare portfolios. For example, compare costs for all
projects in region A (one portfolio) vs. region B (another portfolio).
Historical snapshots of grouped project data, called scenarios, aid in your analysis of project groups on the
Portfolio Analysis and Capacity Planning pages.
Oracle Primavera P6 Enterprise Project Portfolio Management

          Dashboards and                    Portfolios               Projects            Resources
           Workspaces




Portfolios Analysis
Oracle Primavera P6 Enterprise Project Portfolio Management

         Dashboards and                    Portfolios               Projects            Resources
          Workspaces




Capacity Planning
Oracle Primavera P6 Enterprise Project Portfolio Management

         Dashboards and                    Portfolios               Projects            Resources
          Workspaces




Performance Status
Oracle Primavera P6 Enterprise Project Portfolio Management

         Dashboards and                    Portfolios               Projects            Resources
          Workspaces




Gantt Chart
Oracle Primavera P6 Enterprise Project Portfolio Management

      Dashboards and                    Portfolios               Projects            Resources
       Workspaces




ROI
Oracle Primavera P6 Enterprise Project Portfolio Management

          Dashboards and                    Portfolios               Projects            Resources
           Workspaces




Details
Screenshots
      &
 Descriptions

About Projects
Oracle Primavera P6 Enterprise Project Portfolio Management

              Dashboards and               Portfolios                Projects               Resources
               Workspaces




About Projects
A project is any temporary series of activities performed in some coordinated arrangement in order to create a
product, service, or measurable business result. Projects have a definite beginning and end. A project is
concluded when its objectives have been reached or when the project is terminated.
Oracle Primavera P6 Enterprise Project Portfolio Management

      Dashboards and
                                     Portfolios             Projects             Resources
       Workspaces




EPS
Oracle Primavera P6 Enterprise Project Portfolio Management

            Dashboards and
                                           Portfolios             Projects             Resources
             Workspaces




Workspace
Oracle Primavera P6 Enterprise Project Portfolio Management

             Dashboards and
                                            Portfolios             Projects             Resources
              Workspaces




Activities
Oracle Primavera P6 Enterprise Project Portfolio Management

         Dashboards and
                                        Portfolios             Projects             Resources
          Workspaces




Team Usage
Oracle Primavera P6 Enterprise Project Portfolio Management

         Dashboards and
                                        Portfolios             Projects             Resources
          Workspaces




Issues
Oracle Primavera P6 Enterprise Project Portfolio Management

        Dashboards and
                                       Portfolios             Projects             Resources
         Workspaces




Risks
Oracle Primavera P6 Enterprise Project Portfolio Management

            Dashboards and
                                           Portfolios             Projects             Resources
             Workspaces




Documents
Screenshots
      &
 Descriptions

About Resources
Oracle Primavera P6 Enterprise Project Portfolio Management

               Dashboards and                 Portfolios                  Projects             Resources
                Workspaces




About Resources
A resource is any quantifiable item in limited supply and of sufficient value to justify tracking and assigning to
specific activities for a project. Resources include general or specialized labor, non-labor items such as
equipment, and material items such as bricks.
Resources perform roles, if defined. Resources are indirectly assigned to activities by first planning the role
required. It is also possible to directly assign resources to activities. For example, Chris, a level 2 contractor with
the confirmed skills and status, is directly assigned to activity 01. However, a technician level 4 role is assigned
to activity 02. The project will proceed while management determines the best available resource to fulfill
Oracle Primavera P6 Enterprise Project Portfolio Management

          Dashboards and               Portfolios               Projects            Resources
           Workspaces




Assignments
Oracle Primavera P6 Enterprise Project Portfolio Management

           Dashboards and               Portfolios               Projects            Resources
            Workspaces




Planning
Oracle Primavera P6 Enterprise Project Portfolio Management

           Dashboards and               Portfolios               Projects            Resources
            Workspaces




Analysis
Oracle Primavera P6 Enterprise Project Portfolio Management

           Dashboards and               Portfolios               Projects            Resources
            Workspaces




Administration
About oracle primavera solutions eppm

More Related Content

What's hot

Primavera.PLAN_AND _EXCUTE EASILY_ 070808
Primavera.PLAN_AND _EXCUTE EASILY_ 070808Primavera.PLAN_AND _EXCUTE EASILY_ 070808
Primavera.PLAN_AND _EXCUTE EASILY_ 070808Alla Buzynarska
 
Oracle primavera p6 and ebs projects where do they meet ppt
Oracle primavera p6 and ebs projects   where do they meet pptOracle primavera p6 and ebs projects   where do they meet ppt
Oracle primavera p6 and ebs projects where do they meet pptp6academy
 
Primavera EPPM in Asset-Intensive Organizations
Primavera EPPM in Asset-Intensive OrganizationsPrimavera EPPM in Asset-Intensive Organizations
Primavera EPPM in Asset-Intensive Organizationsp6academy
 
Primavera gateway SAP provider - Oracle Primavera P6 Collaborate 14
Primavera gateway SAP provider - Oracle Primavera P6 Collaborate 14Primavera gateway SAP provider - Oracle Primavera P6 Collaborate 14
Primavera gateway SAP provider - Oracle Primavera P6 Collaborate 14p6academy
 
Primavera vision & roadmap collaborate13 april 2013
Primavera vision & roadmap collaborate13 april 2013Primavera vision & roadmap collaborate13 april 2013
Primavera vision & roadmap collaborate13 april 2013p6academy
 
Demystifying P6 EPPM Dashboards
Demystifying P6 EPPM DashboardsDemystifying P6 EPPM Dashboards
Demystifying P6 EPPM Dashboardsp6academy
 
Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1Mark Kromer
 
Use of unifier with primavera
Use of unifier with primaveraUse of unifier with primavera
Use of unifier with primaveragjmstleonards
 
Business intelligence with primavera p6 analytics ppt
Business intelligence with primavera p6 analytics pptBusiness intelligence with primavera p6 analytics ppt
Business intelligence with primavera p6 analytics pptp6academy
 
Oracle Primavera P6 R16.1
Oracle Primavera P6 R16.1Oracle Primavera P6 R16.1
Oracle Primavera P6 R16.1Eduard Enache
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1p6academy
 
Primavera P6 Enterprise Project Portfolio Management 8 Essentials (1Z0-567) ...
Primavera P6 Enterprise Project Portfolio Management 8  Essentials (1Z0-567) ...Primavera P6 Enterprise Project Portfolio Management 8  Essentials (1Z0-567) ...
Primavera P6 Enterprise Project Portfolio Management 8 Essentials (1Z0-567) ...p6academy
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1p6academy
 
Primavera P6 Team Member - For Primavera Users on the Go
Primavera P6 Team Member - For Primavera Users on the GoPrimavera P6 Team Member - For Primavera Users on the Go
Primavera P6 Team Member - For Primavera Users on the Gop6academy
 
Oracle Primavera Gateway 15.2 Webcast
Oracle Primavera Gateway 15.2 WebcastOracle Primavera Gateway 15.2 Webcast
Oracle Primavera Gateway 15.2 Webcastp6academy
 
Primavera P6 R7 vs R15.1 Functionality Matrix
Primavera P6 R7 vs R15.1 Functionality MatrixPrimavera P6 R7 vs R15.1 Functionality Matrix
Primavera P6 R7 vs R15.1 Functionality Matrixp6academy
 
Data flow between p6 and cm white paper
Data flow between p6 and cm white paperData flow between p6 and cm white paper
Data flow between p6 and cm white paperp6academy
 

What's hot (19)

Primavera.PLAN_AND _EXCUTE EASILY_ 070808
Primavera.PLAN_AND _EXCUTE EASILY_ 070808Primavera.PLAN_AND _EXCUTE EASILY_ 070808
Primavera.PLAN_AND _EXCUTE EASILY_ 070808
 
Oracle primavera p6 and ebs projects where do they meet ppt
Oracle primavera p6 and ebs projects   where do they meet pptOracle primavera p6 and ebs projects   where do they meet ppt
Oracle primavera p6 and ebs projects where do they meet ppt
 
Primavera EPPM in Asset-Intensive Organizations
Primavera EPPM in Asset-Intensive OrganizationsPrimavera EPPM in Asset-Intensive Organizations
Primavera EPPM in Asset-Intensive Organizations
 
Primavera gateway SAP provider - Oracle Primavera P6 Collaborate 14
Primavera gateway SAP provider - Oracle Primavera P6 Collaborate 14Primavera gateway SAP provider - Oracle Primavera P6 Collaborate 14
Primavera gateway SAP provider - Oracle Primavera P6 Collaborate 14
 
Primavera vision & roadmap collaborate13 april 2013
Primavera vision & roadmap collaborate13 april 2013Primavera vision & roadmap collaborate13 april 2013
Primavera vision & roadmap collaborate13 april 2013
 
Demystifying P6 EPPM Dashboards
Demystifying P6 EPPM DashboardsDemystifying P6 EPPM Dashboards
Demystifying P6 EPPM Dashboards
 
Erp presentation
Erp presentationErp presentation
Erp presentation
 
Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1
 
Use of unifier with primavera
Use of unifier with primaveraUse of unifier with primavera
Use of unifier with primavera
 
Business intelligence with primavera p6 analytics ppt
Business intelligence with primavera p6 analytics pptBusiness intelligence with primavera p6 analytics ppt
Business intelligence with primavera p6 analytics ppt
 
Oracle Primavera P6 R16.1
Oracle Primavera P6 R16.1Oracle Primavera P6 R16.1
Oracle Primavera P6 R16.1
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
 
Primavera P6 Enterprise Project Portfolio Management 8 Essentials (1Z0-567) ...
Primavera P6 Enterprise Project Portfolio Management 8  Essentials (1Z0-567) ...Primavera P6 Enterprise Project Portfolio Management 8  Essentials (1Z0-567) ...
Primavera P6 Enterprise Project Portfolio Management 8 Essentials (1Z0-567) ...
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
Primavera P6 Team Member - For Primavera Users on the Go
Primavera P6 Team Member - For Primavera Users on the GoPrimavera P6 Team Member - For Primavera Users on the Go
Primavera P6 Team Member - For Primavera Users on the Go
 
Oracle Primavera Gateway 15.2 Webcast
Oracle Primavera Gateway 15.2 WebcastOracle Primavera Gateway 15.2 Webcast
Oracle Primavera Gateway 15.2 Webcast
 
SAP PPM 6.0 powered by HANA
SAP PPM 6.0 powered by HANASAP PPM 6.0 powered by HANA
SAP PPM 6.0 powered by HANA
 
Primavera P6 R7 vs R15.1 Functionality Matrix
Primavera P6 R7 vs R15.1 Functionality MatrixPrimavera P6 R7 vs R15.1 Functionality Matrix
Primavera P6 R7 vs R15.1 Functionality Matrix
 
Data flow between p6 and cm white paper
Data flow between p6 and cm white paperData flow between p6 and cm white paper
Data flow between p6 and cm white paper
 

Viewers also liked

Primavera Gateway overview - Oracle Primavera P6 Collaborate 14
Primavera Gateway overview - Oracle Primavera P6 Collaborate 14Primavera Gateway overview - Oracle Primavera P6 Collaborate 14
Primavera Gateway overview - Oracle Primavera P6 Collaborate 14p6academy
 
Primavera integration possibilities technical overview ppt
Primavera integration possibilities   technical overview pptPrimavera integration possibilities   technical overview ppt
Primavera integration possibilities technical overview pptp6academy
 
Primavera integration possibilities Technical overview - Oracle Primavera Col...
Primavera integration possibilities Technical overview - Oracle Primavera Col...Primavera integration possibilities Technical overview - Oracle Primavera Col...
Primavera integration possibilities Technical overview - Oracle Primavera Col...p6academy
 
Primavera vs Microsoft project
Primavera vs Microsoft projectPrimavera vs Microsoft project
Primavera vs Microsoft projectWigene Tabamo
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildingsKarthik Suresh
 

Viewers also liked (6)

Primavera Gateway overview - Oracle Primavera P6 Collaborate 14
Primavera Gateway overview - Oracle Primavera P6 Collaborate 14Primavera Gateway overview - Oracle Primavera P6 Collaborate 14
Primavera Gateway overview - Oracle Primavera P6 Collaborate 14
 
Primavera integration possibilities technical overview ppt
Primavera integration possibilities   technical overview pptPrimavera integration possibilities   technical overview ppt
Primavera integration possibilities technical overview ppt
 
Primavera integration possibilities Technical overview - Oracle Primavera Col...
Primavera integration possibilities Technical overview - Oracle Primavera Col...Primavera integration possibilities Technical overview - Oracle Primavera Col...
Primavera integration possibilities Technical overview - Oracle Primavera Col...
 
Primavera vs Microsoft project
Primavera vs Microsoft projectPrimavera vs Microsoft project
Primavera vs Microsoft project
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 

Similar to About oracle primavera solutions eppm

Implementing primavera enterprise project management in discrete manufacturin...
Implementing primavera enterprise project management in discrete manufacturin...Implementing primavera enterprise project management in discrete manufacturin...
Implementing primavera enterprise project management in discrete manufacturin...p6academy
 
Oracle primavera ppm
Oracle primavera ppmOracle primavera ppm
Oracle primavera ppmGaurav Rana
 
Primavera Training Course.pptx
Primavera Training Course.pptxPrimavera Training Course.pptx
Primavera Training Course.pptxIrfanAkram38
 
Lesson 1_2_3 Primavera 2.pptxProject Planning with Primavera
Lesson 1_2_3 Primavera 2.pptxProject Planning with PrimaveraLesson 1_2_3 Primavera 2.pptxProject Planning with Primavera
Lesson 1_2_3 Primavera 2.pptxProject Planning with PrimaveraEngrMuhammadJavidNaw
 
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...OnePlan Solutions
 
Redefining Enterprise Work Management - All new Microsoft Planner and OnePlan
Redefining Enterprise Work Management - All new Microsoft Planner and OnePlanRedefining Enterprise Work Management - All new Microsoft Planner and OnePlan
Redefining Enterprise Work Management - All new Microsoft Planner and OnePlanOnePlan Solutions
 
Primavera p6 eppm r8 enhancements you don't want to miss apr8
Primavera p6 eppm r8 enhancements you don't want to miss apr8Primavera p6 eppm r8 enhancements you don't want to miss apr8
Primavera p6 eppm r8 enhancements you don't want to miss apr8p6academy
 
Realizing the Business Value of PPM - What to Expect When Implementing PPM
Realizing the Business Value of PPM - What to Expect When Implementing PPMRealizing the Business Value of PPM - What to Expect When Implementing PPM
Realizing the Business Value of PPM - What to Expect When Implementing PPMEPM Live
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordablyp6academy
 
Peter Ferdinand Jensen “Project management and Microsoft Project online” Kyiv...
Peter Ferdinand Jensen “Project management and Microsoft Project online” Kyiv...Peter Ferdinand Jensen “Project management and Microsoft Project online” Kyiv...
Peter Ferdinand Jensen “Project management and Microsoft Project online” Kyiv...Lviv Startup Club
 
Primavera Project Management
Primavera Project ManagementPrimavera Project Management
Primavera Project ManagementKashiff Naveed
 
Integrating primavera p6 with oracle erp which technology path is right for...
Integrating primavera p6 with oracle erp   which technology path is right for...Integrating primavera p6 with oracle erp   which technology path is right for...
Integrating primavera p6 with oracle erp which technology path is right for...p6academy
 
Primavera P6 Training.pdf
Primavera P6 Training.pdfPrimavera P6 Training.pdf
Primavera P6 Training.pdfirfanakram32
 
Comparison and Analysis of Project Management software
Comparison and Analysis of Project Management softwareComparison and Analysis of Project Management software
Comparison and Analysis of Project Management softwareKonstantin Prokhorov, MBA, MSc
 
Implementation demystification 10 keys to a successful p6 implementation wh...
Implementation demystification   10 keys to a successful p6 implementation wh...Implementation demystification   10 keys to a successful p6 implementation wh...
Implementation demystification 10 keys to a successful p6 implementation wh...p6academy
 
Online primavera p6 advanced topics training
Online primavera p6 advanced topics trainingOnline primavera p6 advanced topics training
Online primavera p6 advanced topics trainingTen Six Consulting
 

Similar to About oracle primavera solutions eppm (20)

Implementing primavera enterprise project management in discrete manufacturin...
Implementing primavera enterprise project management in discrete manufacturin...Implementing primavera enterprise project management in discrete manufacturin...
Implementing primavera enterprise project management in discrete manufacturin...
 
Oracle primavera ppm
Oracle primavera ppmOracle primavera ppm
Oracle primavera ppm
 
Primavera P6 Online Training
Primavera  P6 Online TrainingPrimavera  P6 Online Training
Primavera P6 Online Training
 
Sizings primavera
Sizings primaveraSizings primavera
Sizings primavera
 
Primavera Training Course.pptx
Primavera Training Course.pptxPrimavera Training Course.pptx
Primavera Training Course.pptx
 
Lesson 1_2_3 Primavera 2.pptxProject Planning with Primavera
Lesson 1_2_3 Primavera 2.pptxProject Planning with PrimaveraLesson 1_2_3 Primavera 2.pptxProject Planning with Primavera
Lesson 1_2_3 Primavera 2.pptxProject Planning with Primavera
 
Primavera P6 Training
Primavera P6 TrainingPrimavera P6 Training
Primavera P6 Training
 
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
 
Redefining Enterprise Work Management - All new Microsoft Planner and OnePlan
Redefining Enterprise Work Management - All new Microsoft Planner and OnePlanRedefining Enterprise Work Management - All new Microsoft Planner and OnePlan
Redefining Enterprise Work Management - All new Microsoft Planner and OnePlan
 
Primavera p6 eppm r8 enhancements you don't want to miss apr8
Primavera p6 eppm r8 enhancements you don't want to miss apr8Primavera p6 eppm r8 enhancements you don't want to miss apr8
Primavera p6 eppm r8 enhancements you don't want to miss apr8
 
Realizing the Business Value of PPM - What to Expect When Implementing PPM
Realizing the Business Value of PPM - What to Expect When Implementing PPMRealizing the Business Value of PPM - What to Expect When Implementing PPM
Realizing the Business Value of PPM - What to Expect When Implementing PPM
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
Peter Ferdinand Jensen “Project management and Microsoft Project online” Kyiv...
Peter Ferdinand Jensen “Project management and Microsoft Project online” Kyiv...Peter Ferdinand Jensen “Project management and Microsoft Project online” Kyiv...
Peter Ferdinand Jensen “Project management and Microsoft Project online” Kyiv...
 
Primavera Project Management
Primavera Project ManagementPrimavera Project Management
Primavera Project Management
 
Integrating primavera p6 with oracle erp which technology path is right for...
Integrating primavera p6 with oracle erp   which technology path is right for...Integrating primavera p6 with oracle erp   which technology path is right for...
Integrating primavera p6 with oracle erp which technology path is right for...
 
Primavera P6 Training.pdf
Primavera P6 Training.pdfPrimavera P6 Training.pdf
Primavera P6 Training.pdf
 
Comparison and Analysis of Project Management software
Comparison and Analysis of Project Management softwareComparison and Analysis of Project Management software
Comparison and Analysis of Project Management software
 
Implementation demystification 10 keys to a successful p6 implementation wh...
Implementation demystification   10 keys to a successful p6 implementation wh...Implementation demystification   10 keys to a successful p6 implementation wh...
Implementation demystification 10 keys to a successful p6 implementation wh...
 
P6 analytics
P6 analyticsP6 analytics
P6 analytics
 
Online primavera p6 advanced topics training
Online primavera p6 advanced topics trainingOnline primavera p6 advanced topics training
Online primavera p6 advanced topics training
 

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...pujan9679
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 

Recently uploaded (20)

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 

About oracle primavera solutions eppm

  • 1. <Insert Picture Here> Oracle Primavera Solutions Prepared by: Shahin Ghajar E-Mail : shahinghajar@yahoo.com
  • 2. The Oracle Primavera product suite provides industry-specific project, portfolio and resource management software to more than 75,000 customers around the world. Recognizing that no two organizations are alike, these solutions are assembled to fit the roles of the project stakeholders with modules specific to their industries. • Select the right strategic mix of projects • Assure project, IT and corporate governance • Enhance processes and methods • Improve project team collaboration • Measure progress toward objectives • Complete more projects successfully and with the intended payback • If you're looking for the most effective project solutions for managing people and their work with the power to support global enterprises, you've come to the right place.
  • 3. Dashboards Portfolios Projects Risks/Issues PRIMAVERA Resources Collaboration P6 Executives Portfolio PMO Project Resource Team Members
  • 4. Oracle Solutions Primavera Portfolio Management An enterprise portfolio ‘investment’ management software solution. From data entry forms for business case/investment, idea through tracking benefit realization Primavera P6 EPPM An integrated enterprise solution for prioritizing, planning, managing and executing projects, programs and portfolios. Primavera Contract Management A change management, job cost and project controls solution for managing subcontractor performance for engineering and construction projects. Primavera Risk Analysis A full lifecycle risk analytics solution integrating cost and schedule risk management. It determines confidence levels for project success, contingency and risk response plans
  • 5. About Oracle Primavera P6 Enterprise Project Portfolio Management • Oracle Primavera P6 Enterprise Project Portfolio Management (P6 EPPM) is a robust and easy-to-use integrated solution for globally prioritizing, planning, managing, and executing projects, programs, and portfolios. It optimizes role- specific functionality to satisfy each team member's needs, responsibilities, and skills. It provides a single solution for managing projects of any size, adapts to various levels of complexities within a project, and intelligently scales to meet the needs of various roles, functions, or skill levels in your organization and on your project team. • Thousands of companies rely on P6 EPPM to: • Plan, schedule, and manage the right strategic mix of projects • Make informed project, cost, and resource management decisions • Enhance team collaboration and workflow productivity • Maximize each project contributor's skills and responsibilities • Track progress and optimize capacity for maximum profitability • Deliver programs and projects on time and within budget • Share data with human capital, financial management, and enterprise resource planning systems
  • 6. Product Description Oracle's Primavera P6 Enterprise Project Portfolio Management is the most powerful, robust, and easy-to-use solution for globally prioritizing, planning, managing, and executing projects, programs, and portfolios. Primavera P6 Enterprise Project Portfolio Management is an integrated project portfolio management (PPM) solution comprising role-specific functionality to satisfy each team member's needs, responsibilities, and skills. It provides a single solution for managing projects of any size, adapts to various levels of complexities within a project, and intelligently scales to meet the needs of various roles, functions, or skill levels in your organization and on your project team
  • 7. Features • Project Management Power Client • Methodology Management • Web Access Client • Portfolio Analysis • Capacity Planning • Reporting Database • Time Sheets • Web Services and Integration APIs
  • 8. Benefits • Select the right strategic mix of portfolios • Plan, schedule and control all projects, including large-scale programs and individual projects • Allocate best resources and track progress based on skills and availability • Track project progress and monitor project performance vs. plan • Integrate with financial management and other enterprise software applications • Balance resource capacity • Foster team collaboration
  • 9. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces
  • 10. Screenshots & Descriptions About Dashboards, Workspaces, and Workgroups
  • 11. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces About Dashboards, Workspaces, and Workgroups P6 provides three types of user-customizable pages you can use to monitor and share concise snapshots of data in a single place without having to navigate to other sections of the application. They are:  Dashboards  Project Workspaces  Workgroups (a workspace within the project workspace) You can customize the content and layout of each dashboard, workspace, and workgroup to display related data inside smaller windows called portlets. Portlets provide the means for adding, editing, and viewing up-to-date information about portfolio, project, resource, workflow, document, and personal data. They provide a single location for collaborating with other users. You can have multiple dashboards and workgroups; however, each project has just one project workspace.
  • 12. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Budget by PM
  • 13. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Budget by Location
  • 14. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Capital Costs by Type
  • 15. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Cost by Product
  • 16. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Count by Strategic Objective
  • 17. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Earned Value Performance
  • 18. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Effort Pipeline by Work Type
  • 19. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Incoming Proposals
  • 20. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces My Issues
  • 21. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Performance Scorecard
  • 22. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Project Gantt Chart
  • 23. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Project Health
  • 24. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Project Statistics
  • 25. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Prioritization
  • 26. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Resource Analysis Chart
  • 27. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Resource Team Summary
  • 28. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Schedule Performance
  • 29. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Spend by Project
  • 30. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Traffic Lighting
  • 31. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Valuation Metrics
  • 32. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Variance Analysis by Project
  • 33. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Weighted Scoring
  • 34. Screenshots & Descriptions About Portfolios
  • 35. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces About Portfolios A portfolio is a collection of projects. Group projects into portfolios so you can easily view data from more than one project at a time. For example, you might filter a dashboard by a portfolio to view a wide range of information for multiple related projects at one time. In a more strategic sense, you should group projects and programs together to facilitate the effective new product development and management of those projects to optimize your organization's success at meeting business objectives. Using portfolios, you can review summary data and status information for the group as a whole or for individual projects in a portfolio. You can create portfolios for your own use or for sharing with other users. You can also create global portfolios, which are available to all users. Portfolio views, such as pie charts, enable you to visually compare portfolios. For example, compare costs for all projects in region A (one portfolio) vs. region B (another portfolio). Historical snapshots of grouped project data, called scenarios, aid in your analysis of project groups on the Portfolio Analysis and Capacity Planning pages.
  • 36. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Portfolios Analysis
  • 37. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Capacity Planning
  • 38. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Performance Status
  • 39. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Gantt Chart
  • 40. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces ROI
  • 41. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Details
  • 42. Screenshots & Descriptions About Projects
  • 43. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces About Projects A project is any temporary series of activities performed in some coordinated arrangement in order to create a product, service, or measurable business result. Projects have a definite beginning and end. A project is concluded when its objectives have been reached or when the project is terminated.
  • 44. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces EPS
  • 45. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Workspace
  • 46. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Activities
  • 47. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Team Usage
  • 48. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Issues
  • 49. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Risks
  • 50. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Documents
  • 51. Screenshots & Descriptions About Resources
  • 52. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces About Resources A resource is any quantifiable item in limited supply and of sufficient value to justify tracking and assigning to specific activities for a project. Resources include general or specialized labor, non-labor items such as equipment, and material items such as bricks. Resources perform roles, if defined. Resources are indirectly assigned to activities by first planning the role required. It is also possible to directly assign resources to activities. For example, Chris, a level 2 contractor with the confirmed skills and status, is directly assigned to activity 01. However, a technician level 4 role is assigned to activity 02. The project will proceed while management determines the best available resource to fulfill
  • 53. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Assignments
  • 54. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Planning
  • 55. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Analysis
  • 56. Oracle Primavera P6 Enterprise Project Portfolio Management Dashboards and Portfolios Projects Resources Workspaces Administration

Editor's Notes

  1. Portfolio ManagementInvestment Management tool that supports business decision making around what should we do, where will we get best value or return and how is it performing across the lifecycle. EPPM which is our core offering is a fully loaded Project Portfolio solution. Its is not a P3 replacement for simply scheduling. We hope we can demonstrate that todayContract Manager is a Change and cost management solution for managing all types of contract like NEC3. It is becoming a major part of our project controls solution for large Capital ProjectsRisk analysis – is designed to give great confidence in you plan and forecast at all stages of the Project from Contingency planning to prediction and validation of delivery capability