Electricity in Pakistan
Electricity in Pakistan is generated, transmitted, distributed, and retail supplied by
two vertically integrated public sector utilities: Water and Power Development
Authority (WAPDA) for all of Pakistan (except Karachi), and the Karachi Electric (K-
Electric) for the city of Karachi and its surrounding areas. There are around 42
independent power producers (IPPs) that contribute significantly in electricity
generation in Pakistan.
Current Capacity
Total installed capacity: 23,928 MW (2015)
Electricity – Sources (2014)
fossil fuel – 14,635 MW – 64.2% of total(oil-35.2% + gas-29%)
hydro – 6,611 MW – 29% of total
nuclear – 1,322 MW – 5.8% of total
The average demand is17,000 MW whereas, shortfall between 5,000
MW and 6,000 MW.
There are four major power producers in country: WAPDA, K-Electric,
IPPs and Pakistan Atomic Energy Commission (PAEC).
Major Power Plants of Pakistan
WAPDA, PAEC, K-Electric and some Independent Power Producers IPPs are as
followed.
Power Plants
Company Location Capacity
WAPDA (HYDEL)
Tarbela Dam 3478 MW
Mangla Dam 1000 MW
Ghazi-Barotha Hydropower Project 1450 MW
WAPDA (THERMAL)
Guddu Thermal Power Plant 1655 MW
Muzaffargarh Thermal Power Plant 1350 MW
Jamshoro Thermal Power Plant 850 MW
Jump to slide 11
Power Plants
Company Location Capacity
K-Electric
Thermal Power Station, Bin Qasim I 1260 MW
CCPP, Bin Qasim II 560 MW
Thermal Power Station, Korangi 316 MW
PAEC
KANUPP 137 MW
CHASNUPP-1 325 MW
CHASNUPP-2 325 MW
CHASNUPP-3 340 MW
CHASNUPP-4 340 MW
PEPCO Nandipur Power Project 425 MW
Solar Park Quaid-e-Azam Solar Park, Bahawalpur 400 MW
Jump to slide 12
Power Plants
Company Location Capacity
IPPs
AES Lalpir Limited, Mehmood Kot 362 MW
AES Pak Gen, Mehmood Kot 365 MW
HUBCO Hub Power Plant, Hub 1292 MW
Kot Addu Power Company Limited 1638 MW
Lucky Electric Power Company Limited 660 MW
Uch (Uch-I and Uch-II) Power Limited, Dera
Murad Jamali
990 MW
Engro Powergen Qadirpur Limited, Ghotki 226.5 MW
Express Tribune Report:
As on June 30, 2015, the total installed capacity of the country was 24,823
MW; of which the share of thermal power plants was 16,814 MW (67.74%)
followed by hydel power plants 7,116 MW (28.67%), nuclear power plants
787 MW (3.17%) and wind power plant 106 MW (0.43%).
1
2
3
4
5
6
7
8
9
10
11
1955-1960
168 MW
101%
1960-1965
550 MW
82%
78%
53%
73%
50%
46%
86%
6%
1965-1970
815 MW
1970-1975
1,743 MW
1978-1983
3,280 MW
1983-1988
4,809 MW
1988-1993
6,716 MW
1993-1998
9,786 MW
1998-2003
15,421 MW
2005-2010
20,289 MW
2010-2015
20,782 MW
ENERGY PRODUCTION PLAN
1955-2010
Production Plan
Success Rate
CPEC and it’s Impact on Power Sector
Electricity generation has increased by 3.18% in 2015 as a result of Government
of Pakistan (GoP) efforts and China–Pakistan Economic Corridor (CPEC). The
country has begun diversifying its energy producing capacity by investing in coal,
nuclear energy, solar energy and wind energy to help offset the energy shortage
while larger projects greater than 1000 MW such as the Diamer-Bhasha Dam,
Kohala Hydropower Project, Pakistan Port Qasim Power Project, Sahiwal Coal
Power Project, Thar Engro Coal Power Project, Hub Coal Power Project and new
nuclear plants are now under construction or planned.
CPEC Projects – Due 2020
Power Stations Capacity
Pakistan Port Qasim Power Project. 1320 (2x660MW)
Sahiwal Coal Power Project 1320 (2x660MW)
Rahimyar Khan coal power project 1320 (2x660MW)
Thar SSRL coal power project and mine 1320 (2x660MW)
Quaid-e-Azam Solar Park 1000MW
Suki Kinari Hydropower Project 870MW
Karot Hydropower Project 720MW
HUBCO coal power project 660MW
Thar Engro Coal Power Project 660 (2x330MW)
Gwadar coal power project 300MW
UEP Windfarm 100MW
Others* 50x3MW
Classification Of Power Plants
Hydel Power Plants
It is said that Pakistan could produce upto 40,000MW through
Hydel Energy yet it consumes less than 20% of its resource.
The Hydel Contribution to power sector is only 7,116MW.
Pakistan’s major Hydro Electric Power Plants are enlisted here
WAPDA Hydro Electric Stations
Nuclear Power Stations
As of 2017 the net addition to grid through Nuclear Power Station
is 1,467MW. With Chasnupp and Kanupp extension underway and
due till 2020. Net +4200MW addition to the grid is expected by
2020. For detailed specifications visit here.
Thermal Power Stations
They are further classified as
• Oil Fired – 35.2%
• Gas Fired – 29%
• Coal Fired – 1.2%
Oil Fired
The major share of Oil fired plants raise a
startling concern as it contributes to loss of
foreign exchange and with hiking oil prices
per unit cost Rs./KWh has also increased. Oil
Fired Plants add +8000MW to the grid as of
2013 survey.
Gas Fired
Having world’s largest gas reserves
quickly deplating. Gas Fired Plants add
+6900MW to the grid. Being cheaper
compared to HSD and HFO, it’s the best
alternative to produce cheaper electricity.
Coal Fired
Pakistan have large coal reserves. Its estimated
that 40000MW could be recovered for next
100 years. Yet due to environmental policies
and coal quality the projects are limited.
+300MW has been added to grid as of 2013
Dawn News Report:
The coal power plant will have two units each with a combined capacity of
1320MW. One unit (holding 660MW capacity) is expected to be completed
by the end of 2017 and the other by March 2018.
The project adopts the world’s leading super-critical thermal technology
and will also follow environment-friendly operations, including seawater
desalination and flue gas de-sulfurization.
Inefficiencies of Thermal Power Stations
Maintaining a Power Plant is as important as operating the system. Guddu and BQPS I – KE
are nearing their life cycle with inefficiencies having its toll. Guddu being a Thermal Power
Station at its optimum has 35% net efficiency which has downgraded to only 30% similarly
BQPS-I is not running on full load due to technology upgrade and maintenance issues.
Era Of Gas Engines and Combine Cycle Power Plants
Gas engines are popular as power developing propulsion engines and have contributed millions of
MegaWatts worldwide. A simple cycle Gas Turbine engine can yield coupe up 45% Net efficiency. And when
coupled with a Steam Turbine engine the CCPP can yield upto 55-65% Net efficiency, depending upon the
technology it’s equipped with.
Currently +6700MW have been added to the Grid through CCPP. The highly efficient Power Plants yield best
economy. Per unit cost Rs./KWh is cheaper compared to other technologies.
Conclusion
Pakistan’s Power Sector is fast evolving. The production has gone 2.5x in last 10
year plan. Through China Pakistan Economic Corridor – CPEC upto 10,000MW
would be added to the Grid by 2020. Suppressing the Shortfall and featuring job
opportunities. Furthermore more efficient Super Critical Plants are being
established with 42% Net Efficiency and other Combined Cycle Power Stations
are part of the “Early Harvest – Energy Project”.
Click here to view CPEC Projects

More Related Content

What's hot

Energy Crises of Pakistan
Energy Crises of PakistanEnergy Crises of Pakistan
Energy Crises of PakistanSaad Ahmed
 
Power Generation In Pakistan
Power Generation In PakistanPower Generation In Pakistan
Power Generation In PakistanImad Baig
 
Energy crises in pakistan
Energy crises in pakistanEnergy crises in pakistan
Energy crises in pakistanGulfam Hussain
 
Power sector of pakistan
Power sector of pakistanPower sector of pakistan
Power sector of pakistanUSMAN TARIQ
 
Pakistan's energy problems and solutions
Pakistan's energy problems and solutionsPakistan's energy problems and solutions
Pakistan's energy problems and solutionsAyaz ahmed khan
 
Energy crisis in pakistan and effect on economy
Energy crisis in pakistan and effect on economyEnergy crisis in pakistan and effect on economy
Energy crisis in pakistan and effect on economySami Swati
 
Circular Debt in Energy Sector of Pakistan
Circular Debt in Energy Sector of PakistanCircular Debt in Energy Sector of Pakistan
Circular Debt in Energy Sector of PakistanAshar Ahmed
 
Iron & Steel Industry Of Pakistan
Iron & Steel Industry Of PakistanIron & Steel Industry Of Pakistan
Iron & Steel Industry Of PakistanSajid Ali
 
Energy crisis & its effects on pakistan’s economy
Energy crisis & its effects on pakistan’s economyEnergy crisis & its effects on pakistan’s economy
Energy crisis & its effects on pakistan’s economyGulfam Hussain
 
Energy crisis in pakistan
Energy crisis in pakistanEnergy crisis in pakistan
Energy crisis in pakistanAsif Kazi
 
Presentation energy crises
Presentation energy crisesPresentation energy crises
Presentation energy crisesFaizan Shabbir
 
energy crisis and its effect on pakistan's economy
energy crisis and its effect on pakistan's economyenergy crisis and its effect on pakistan's economy
energy crisis and its effect on pakistan's economyAsma Khan
 
Energy Crisis of Pakistan
Energy Crisis of PakistanEnergy Crisis of Pakistan
Energy Crisis of Pakistansaadbinasghar
 
Circular Debt in Pakistan
Circular Debt in PakistanCircular Debt in Pakistan
Circular Debt in PakistanAli Asad Sahu
 
Energy distribution in Pakistan
Energy distribution in PakistanEnergy distribution in Pakistan
Energy distribution in PakistanUzma Fatima Ch.
 

What's hot (20)

Energy Crises of Pakistan
Energy Crises of PakistanEnergy Crises of Pakistan
Energy Crises of Pakistan
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
Power Generation In Pakistan
Power Generation In PakistanPower Generation In Pakistan
Power Generation In Pakistan
 
Energy crises in pakistan
Energy crises in pakistanEnergy crises in pakistan
Energy crises in pakistan
 
Power sector of pakistan
Power sector of pakistanPower sector of pakistan
Power sector of pakistan
 
Pakistan's energy problems and solutions
Pakistan's energy problems and solutionsPakistan's energy problems and solutions
Pakistan's energy problems and solutions
 
Energy crisis in pakistan and effect on economy
Energy crisis in pakistan and effect on economyEnergy crisis in pakistan and effect on economy
Energy crisis in pakistan and effect on economy
 
Energy crisis in pakistan
Energy crisis in pakistanEnergy crisis in pakistan
Energy crisis in pakistan
 
Energy sector in pakistan
Energy sector in pakistanEnergy sector in pakistan
Energy sector in pakistan
 
Circular Debt in Energy Sector of Pakistan
Circular Debt in Energy Sector of PakistanCircular Debt in Energy Sector of Pakistan
Circular Debt in Energy Sector of Pakistan
 
Iron & Steel Industry Of Pakistan
Iron & Steel Industry Of PakistanIron & Steel Industry Of Pakistan
Iron & Steel Industry Of Pakistan
 
Energy crisis & its effects on pakistan’s economy
Energy crisis & its effects on pakistan’s economyEnergy crisis & its effects on pakistan’s economy
Energy crisis & its effects on pakistan’s economy
 
Energy crisis in pakistan
Energy crisis in pakistanEnergy crisis in pakistan
Energy crisis in pakistan
 
Energy Crisis Of Pakistan
Energy Crisis Of PakistanEnergy Crisis Of Pakistan
Energy Crisis Of Pakistan
 
Presentation energy crises
Presentation energy crisesPresentation energy crises
Presentation energy crises
 
energy crisis and its effect on pakistan's economy
energy crisis and its effect on pakistan's economyenergy crisis and its effect on pakistan's economy
energy crisis and its effect on pakistan's economy
 
Energy Crisis of Pakistan
Energy Crisis of PakistanEnergy Crisis of Pakistan
Energy Crisis of Pakistan
 
Circular Debt in Pakistan
Circular Debt in PakistanCircular Debt in Pakistan
Circular Debt in Pakistan
 
Presentation of energy crisis in pakistan
Presentation of energy crisis in pakistanPresentation of energy crisis in pakistan
Presentation of energy crisis in pakistan
 
Energy distribution in Pakistan
Energy distribution in PakistanEnergy distribution in Pakistan
Energy distribution in Pakistan
 

Similar to Pakistan's Electricity Generation and Power Plants

Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistanOwais Hassan
 
Introduction to power plants
Introduction to power plantsIntroduction to power plants
Introduction to power plantsravi8929
 
Production of Electricity in PAKISTAN 2017-18
Production  of Electricity  in PAKISTAN 2017-18Production  of Electricity  in PAKISTAN 2017-18
Production of Electricity in PAKISTAN 2017-18MuhammadUsman829
 
Internship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdfInternship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdfKhalidAyaz3
 
Energy conservation
Energy conservationEnergy conservation
Energy conservationNTPC
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptsomnathmahapatra6
 
Power energy generation report
Power energy generation reportPower energy generation report
Power energy generation reportprianca07
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALMilind Punj
 
training report , NTPC , FOR MANIT STUDENTS
training report , NTPC , FOR MANIT STUDENTStraining report , NTPC , FOR MANIT STUDENTS
training report , NTPC , FOR MANIT STUDENTSViJay ChouDhary
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanIBRAR AHMAD
 
Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...SINGHZEE
 
Power sector of pakistan –M saleem Nagri
Power sector of pakistan –M saleem NagriPower sector of pakistan –M saleem Nagri
Power sector of pakistan –M saleem NagriMuhammad Saleem Nagri
 
Adani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportAdani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportNemish Kanwar
 
Energy Crisis Of Pakistan (by Muhammad Nadeem Zulfqar)
Energy Crisis Of Pakistan (by Muhammad Nadeem Zulfqar)Energy Crisis Of Pakistan (by Muhammad Nadeem Zulfqar)
Energy Crisis Of Pakistan (by Muhammad Nadeem Zulfqar)Muhammad Nadeem SCM - MBA
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyAbhishek Ashok
 
Pakistan electricity scenario
Pakistan electricity scenarioPakistan electricity scenario
Pakistan electricity scenarioMansoor Magsi
 
Thesis power theft detection ch 2
Thesis power theft detection ch 2Thesis power theft detection ch 2
Thesis power theft detection ch 2Faraz Ahmed
 

Similar to Pakistan's Electricity Generation and Power Plants (20)

Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistan
 
Energy
EnergyEnergy
Energy
 
Introduction to power plants
Introduction to power plantsIntroduction to power plants
Introduction to power plants
 
Production of Electricity in PAKISTAN 2017-18
Production  of Electricity  in PAKISTAN 2017-18Production  of Electricity  in PAKISTAN 2017-18
Production of Electricity in PAKISTAN 2017-18
 
Internship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdfInternship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdf
 
Energy conservation
Energy conservationEnergy conservation
Energy conservation
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
 
Power energy generation report
Power energy generation reportPower energy generation report
Power energy generation report
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
training report , NTPC , FOR MANIT STUDENTS
training report , NTPC , FOR MANIT STUDENTStraining report , NTPC , FOR MANIT STUDENTS
training report , NTPC , FOR MANIT STUDENTS
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...
 
A n srivastava
A n srivastavaA n srivastava
A n srivastava
 
Power sector of pakistan –M saleem Nagri
Power sector of pakistan –M saleem NagriPower sector of pakistan –M saleem Nagri
Power sector of pakistan –M saleem Nagri
 
Adani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportAdani Power, Tirora- Project Report
Adani Power, Tirora- Project Report
 
Energy Crisis
Energy CrisisEnergy Crisis
Energy Crisis
 
Energy Crisis Of Pakistan (by Muhammad Nadeem Zulfqar)
Energy Crisis Of Pakistan (by Muhammad Nadeem Zulfqar)Energy Crisis Of Pakistan (by Muhammad Nadeem Zulfqar)
Energy Crisis Of Pakistan (by Muhammad Nadeem Zulfqar)
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar Energy
 
Pakistan electricity scenario
Pakistan electricity scenarioPakistan electricity scenario
Pakistan electricity scenario
 
Thesis power theft detection ch 2
Thesis power theft detection ch 2Thesis power theft detection ch 2
Thesis power theft detection ch 2
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 

Pakistan's Electricity Generation and Power Plants

  • 1. Syed Salman Haider Naqvi Department of Mechanical NED University of Engineering and Technology
  • 2. Electricity in Pakistan Electricity in Pakistan is generated, transmitted, distributed, and retail supplied by two vertically integrated public sector utilities: Water and Power Development Authority (WAPDA) for all of Pakistan (except Karachi), and the Karachi Electric (K- Electric) for the city of Karachi and its surrounding areas. There are around 42 independent power producers (IPPs) that contribute significantly in electricity generation in Pakistan.
  • 3. Current Capacity Total installed capacity: 23,928 MW (2015) Electricity – Sources (2014) fossil fuel – 14,635 MW – 64.2% of total(oil-35.2% + gas-29%) hydro – 6,611 MW – 29% of total nuclear – 1,322 MW – 5.8% of total The average demand is17,000 MW whereas, shortfall between 5,000 MW and 6,000 MW. There are four major power producers in country: WAPDA, K-Electric, IPPs and Pakistan Atomic Energy Commission (PAEC).
  • 4. Major Power Plants of Pakistan WAPDA, PAEC, K-Electric and some Independent Power Producers IPPs are as followed. Power Plants Company Location Capacity WAPDA (HYDEL) Tarbela Dam 3478 MW Mangla Dam 1000 MW Ghazi-Barotha Hydropower Project 1450 MW WAPDA (THERMAL) Guddu Thermal Power Plant 1655 MW Muzaffargarh Thermal Power Plant 1350 MW Jamshoro Thermal Power Plant 850 MW Jump to slide 11
  • 5. Power Plants Company Location Capacity K-Electric Thermal Power Station, Bin Qasim I 1260 MW CCPP, Bin Qasim II 560 MW Thermal Power Station, Korangi 316 MW PAEC KANUPP 137 MW CHASNUPP-1 325 MW CHASNUPP-2 325 MW CHASNUPP-3 340 MW CHASNUPP-4 340 MW PEPCO Nandipur Power Project 425 MW Solar Park Quaid-e-Azam Solar Park, Bahawalpur 400 MW Jump to slide 12
  • 6. Power Plants Company Location Capacity IPPs AES Lalpir Limited, Mehmood Kot 362 MW AES Pak Gen, Mehmood Kot 365 MW HUBCO Hub Power Plant, Hub 1292 MW Kot Addu Power Company Limited 1638 MW Lucky Electric Power Company Limited 660 MW Uch (Uch-I and Uch-II) Power Limited, Dera Murad Jamali 990 MW Engro Powergen Qadirpur Limited, Ghotki 226.5 MW
  • 7. Express Tribune Report: As on June 30, 2015, the total installed capacity of the country was 24,823 MW; of which the share of thermal power plants was 16,814 MW (67.74%) followed by hydel power plants 7,116 MW (28.67%), nuclear power plants 787 MW (3.17%) and wind power plant 106 MW (0.43%).
  • 8. 1 2 3 4 5 6 7 8 9 10 11 1955-1960 168 MW 101% 1960-1965 550 MW 82% 78% 53% 73% 50% 46% 86% 6% 1965-1970 815 MW 1970-1975 1,743 MW 1978-1983 3,280 MW 1983-1988 4,809 MW 1988-1993 6,716 MW 1993-1998 9,786 MW 1998-2003 15,421 MW 2005-2010 20,289 MW 2010-2015 20,782 MW ENERGY PRODUCTION PLAN 1955-2010 Production Plan Success Rate
  • 9. CPEC and it’s Impact on Power Sector Electricity generation has increased by 3.18% in 2015 as a result of Government of Pakistan (GoP) efforts and China–Pakistan Economic Corridor (CPEC). The country has begun diversifying its energy producing capacity by investing in coal, nuclear energy, solar energy and wind energy to help offset the energy shortage while larger projects greater than 1000 MW such as the Diamer-Bhasha Dam, Kohala Hydropower Project, Pakistan Port Qasim Power Project, Sahiwal Coal Power Project, Thar Engro Coal Power Project, Hub Coal Power Project and new nuclear plants are now under construction or planned.
  • 10. CPEC Projects – Due 2020 Power Stations Capacity Pakistan Port Qasim Power Project. 1320 (2x660MW) Sahiwal Coal Power Project 1320 (2x660MW) Rahimyar Khan coal power project 1320 (2x660MW) Thar SSRL coal power project and mine 1320 (2x660MW) Quaid-e-Azam Solar Park 1000MW Suki Kinari Hydropower Project 870MW Karot Hydropower Project 720MW HUBCO coal power project 660MW Thar Engro Coal Power Project 660 (2x330MW) Gwadar coal power project 300MW UEP Windfarm 100MW Others* 50x3MW
  • 12. Hydel Power Plants It is said that Pakistan could produce upto 40,000MW through Hydel Energy yet it consumes less than 20% of its resource. The Hydel Contribution to power sector is only 7,116MW. Pakistan’s major Hydro Electric Power Plants are enlisted here WAPDA Hydro Electric Stations
  • 13. Nuclear Power Stations As of 2017 the net addition to grid through Nuclear Power Station is 1,467MW. With Chasnupp and Kanupp extension underway and due till 2020. Net +4200MW addition to the grid is expected by 2020. For detailed specifications visit here.
  • 14. Thermal Power Stations They are further classified as • Oil Fired – 35.2% • Gas Fired – 29% • Coal Fired – 1.2% Oil Fired The major share of Oil fired plants raise a startling concern as it contributes to loss of foreign exchange and with hiking oil prices per unit cost Rs./KWh has also increased. Oil Fired Plants add +8000MW to the grid as of 2013 survey. Gas Fired Having world’s largest gas reserves quickly deplating. Gas Fired Plants add +6900MW to the grid. Being cheaper compared to HSD and HFO, it’s the best alternative to produce cheaper electricity. Coal Fired Pakistan have large coal reserves. Its estimated that 40000MW could be recovered for next 100 years. Yet due to environmental policies and coal quality the projects are limited. +300MW has been added to grid as of 2013
  • 15. Dawn News Report: The coal power plant will have two units each with a combined capacity of 1320MW. One unit (holding 660MW capacity) is expected to be completed by the end of 2017 and the other by March 2018. The project adopts the world’s leading super-critical thermal technology and will also follow environment-friendly operations, including seawater desalination and flue gas de-sulfurization.
  • 16. Inefficiencies of Thermal Power Stations Maintaining a Power Plant is as important as operating the system. Guddu and BQPS I – KE are nearing their life cycle with inefficiencies having its toll. Guddu being a Thermal Power Station at its optimum has 35% net efficiency which has downgraded to only 30% similarly BQPS-I is not running on full load due to technology upgrade and maintenance issues.
  • 17. Era Of Gas Engines and Combine Cycle Power Plants Gas engines are popular as power developing propulsion engines and have contributed millions of MegaWatts worldwide. A simple cycle Gas Turbine engine can yield coupe up 45% Net efficiency. And when coupled with a Steam Turbine engine the CCPP can yield upto 55-65% Net efficiency, depending upon the technology it’s equipped with. Currently +6700MW have been added to the Grid through CCPP. The highly efficient Power Plants yield best economy. Per unit cost Rs./KWh is cheaper compared to other technologies.
  • 18. Conclusion Pakistan’s Power Sector is fast evolving. The production has gone 2.5x in last 10 year plan. Through China Pakistan Economic Corridor – CPEC upto 10,000MW would be added to the Grid by 2020. Suppressing the Shortfall and featuring job opportunities. Furthermore more efficient Super Critical Plants are being established with 42% Net Efficiency and other Combined Cycle Power Stations are part of the “Early Harvest – Energy Project”. Click here to view CPEC Projects