PROJECT FEASIBILITY
Feasibility Study
• A feasibility study is an analysis of the viability of an
idea through a disciplined and documented way of
thinking through the idea from its logical beginning to
its logical end.
• Feasibility study is carried out in order to assess the
viability of a new project.
India Infrastructure: A story of bad planning, poor
execution
GIFT City: A white elephant in the making
• The latest in the list of poor planning and project coordination, is
the Gujarat International Finance Tec (GIFT) City that is coming up on
886 acres of land near the Ahmedabad airport. This was to be
Narendra Modi’s showpiece project launched in 2007, when he was
the Chief Minister of Gujarat. GIFT is a 50:50 joint venture between
International Leasing and Financial Services (ILFS) and a state
government firm.
GIFT
• The vision was to develop a world class integrated financial services
centre, IT hub and a multi-specialty special economic zone (SEZ) on
the lines of those seen in London, Paris, Shanghai and Tokyo, with all
amenities of a modern city that would include residential,
commercial, institutional, hospitality and retail. The project is
expected to create a million direct and indirect jobs.
• The plan was to develop GIFT as a superior alternative to Mumbai and
draw investors both from Mumbai and the international business
community to relocate to GIFT making it a thriving and vibrant
business city. The development of the first phase is well underway
with many superstructures nearing completion.
GIFT
• The 78,000 crore project is now caught in red tape! Lack of clearances has
resulted in several buildings being left incomplete with power supply yet to
be made available. What is worse, is the fact that most buildings envisaged
to come up in the project are high rises and do not have the requisite
clearances from the Airports Authority of India (AAI). Now the AAI has
given permission for buildings to have a maximum height ceiling of 191
metres above sea level.
• GIFT City has envisaged 110 high rise buildings with Diamond Tower, the
tallest building in the project planned to rise up to 410 metres. Two other
buildings in the project are expected to have a height over 350 metres.
GIFT City has requested the AAI for permission to build buildings up to 476
metres.
• In addition to this delay, the National Highways Authority of India (NHAI)
has not cleared permission to lay the underground power cables to the city.
GIFT
• And to top it all, the entire project which hinges on financial services,
has not been able to attract a single client to set up operations,
mainly due to lack of norms of operating procedures. Both the
Finance and Commerce ministries at the centre have been slow to
announce clear regulatory guidelines, without which financial services
cannot be launched from the City.
• This brings to question as to why and how is a project of this stature
and vision allowed to be publicly announced and construction
undertaken without all the above mentioned clearances. This is a
78,000 crore project where India’s capability and prestige is involved,
so who is responsible for this mess? This is a clear example where the
project gets announced first and clearances applied for later.
Google Glass is Google's wearable computer that a person wears like a regular pair of
prescription glasses. Google Glass is best described as an evolution of the smartphone — a
way to freely access data without needing to look at a handheld device. A "heads-up
display" suspended slightly above your eye places data right in your field of vision, without
completely obstructing your view.
In 2013, the device became available for beta testing to lucky applicants who were selected
based on their proposal for how to use the device and were willing to purchase it for
$1,500. Google Glass is slated for commercial release in 2014, and continues to undergo
hardware and interface changes.
In addition to the aforementioned features, the device can download and run a variety of apps,
just as a smartphone can. These apps provide a glimpse at the device's current capabilities and its
potential future applications. For example, thanks to the device's built-in camera, you can use
Google Glass in tandem with Google Hangouts to video chat with friends and show what you're
seeing. Google Maps allows you to navigate without looking down.
One popular function of the device is voice recognition. You can use verbal commands to take
pictures, browse the Internet and even send text messages. But not everything can be done with a
voice command, so Google Glass also has a touchpad, with additional controls, alongside one of
the arms. Users can swipe through displays showing recent phone calls and photos, as well as read
news, weather, sports scores, stock prices and more.
Industry Analysis
Technical Feasibility
• Is the proposed technology or solution practical?
• Do we currently possess the necessary technology?
• Do we possess the necessary technical expertise
• …and is the schedule reasonable for this team?
• Is relevant technology mature enough to be easily applied to our problem?
• What kinds of technology will we need?
• Some organizations like to use state-of-the-art technology
• …but most prefer to use mature and proven technology.
• A mature technology has a larger customer base for obtaining advice concerning problems
and improvements.
• Is the required technology available “in house”?
• If the technology is available:
• …does it have the capacity to handle the solution?
• If the technology is not available:
• …can it be acquired?
Economic Feasibility
• Can the bottom line be quantified yet?
• Very early in the project…
• a judgement of whether solving the problem is worthwhile.
• Once specific requirements and solutions have been identified…
• …the costs and benefits of each alternative can be calculated
• Cost-benefit analysis
• Purpose - answer questions such as:
• Is the project justified (I.e. will benefits outweigh costs)?
• What is the minimal cost to attain a certain system?
• How soon will the benefits accrue?
• Which alternative offers the best return on investment?
• Examples of things to consider:
• Hardware/software selection
• Selection among alternative financing arrangements (rent/lease/purchase)
• Difficulties
• benefits and costs can both be intangible, hidden and/or hard to estimate
• ranking multi-criteria alternatives
Schedule Feasibility
• How long will it take to get the technical expertise?
• We may have the technology, but that doesn't mean we have the skills required to properly
apply that technology.
• May need to hire new people
• Or re-train existing systems staff
• Whether hiring or training, it will impact the schedule.
• Assess the schedule risk:
• Given our technical expertise, are the project deadlines reasonable?
• If there are specific deadlines, are they mandatory or desirable?
• If the deadlines are not mandatory, the analyst can propose several alternative schedules.
• What are the real constraints on project deadlines?
• If the project overruns, what are the consequences?
• Deliver a properly functioning information system two months late…
• …or deliver an error-prone, useless information system on time?
• Missed schedules are bad, but inadequate systems are worse!
Operational Feasibility
• How do end-users and managers feel about…
• …the problem you identified?
• …the alternative solutions you are exploring?
• You must evaluate:
• Not just whether a system can work…
• … but also whether a system will work.
• Any solution might meet with resistance:
• Does management support the project?
• How do the end users feel about their role in the new system?
• Which users or managers may resist (or not use) the system?
• People tend to resist change.
• Can this problem be overcome? If so, how?
• How will the working environment of the end users change?
• Can or will end users and management adapt to the change?
Feasibility Study Contents
1. Purpose & scope of the study
• Objectives (of the study)
• who commissioned it & who did it,
• sources of information,
• process used for the study,
• how long did it take,…
2. Description of present situation
• organizational setting, current system(s).
• Related factors and constraints.
3. Problems and requirements
• What’s wrong with the present situation?
• What changes are needed?
4. Objectives of the new system.
• Goals and relationships between them
5. Possible alternatives
• …including ‘do nothing’.
6. Criteria for comparison
• definition of the criteria
7. Analysis of alternatives
• description of each alternative
• evaluation with respect to criteria
• cost/benefit analysis and special implications.
8. Recommendations
• what is recommended and implications
• what to do next;
• E.g. may recommend an interim solution and a permanent
solution
9. Appendices
• to include any supporting material.

More Related Content

What's hot

Motius exhibiting at Munich Tech Job Fair Spring 2019
Motius exhibiting at Munich Tech Job Fair Spring 2019Motius exhibiting at Munich Tech Job Fair Spring 2019
Motius exhibiting at Munich Tech Job Fair Spring 2019TechMeetups
 
Developing Future Capabilities in Singapore's Built Environment
Developing Future Capabilities in Singapore's Built EnvironmentDeveloping Future Capabilities in Singapore's Built Environment
Developing Future Capabilities in Singapore's Built EnvironmentEden Strategy Institute LLP
 
Your Data Science Journey - Setting Up Analytics Units From Scratch
Your Data Science Journey - Setting Up Analytics Units From ScratchYour Data Science Journey - Setting Up Analytics Units From Scratch
Your Data Science Journey - Setting Up Analytics Units From ScratchNUS-ISS
 
Israel IT trends and positioning in infrastructure and development (delivery...
Israel IT  trends and positioning in infrastructure and development (delivery...Israel IT  trends and positioning in infrastructure and development (delivery...
Israel IT trends and positioning in infrastructure and development (delivery...Dr. Jimmy Schwarzkopf
 
Ds.ai applied ai-workshop-
Ds.ai applied ai-workshop-Ds.ai applied ai-workshop-
Ds.ai applied ai-workshop-Jothi Periasamy
 
Funding for Innovation in Manufacturing, Materials & Engineering
Funding for Innovation in Manufacturing, Materials & EngineeringFunding for Innovation in Manufacturing, Materials & Engineering
Funding for Innovation in Manufacturing, Materials & EngineeringInvest Northern Ireland
 

What's hot (7)

Motius exhibiting at Munich Tech Job Fair Spring 2019
Motius exhibiting at Munich Tech Job Fair Spring 2019Motius exhibiting at Munich Tech Job Fair Spring 2019
Motius exhibiting at Munich Tech Job Fair Spring 2019
 
Developing Future Capabilities in Singapore's Built Environment
Developing Future Capabilities in Singapore's Built EnvironmentDeveloping Future Capabilities in Singapore's Built Environment
Developing Future Capabilities in Singapore's Built Environment
 
Your Data Science Journey - Setting Up Analytics Units From Scratch
Your Data Science Journey - Setting Up Analytics Units From ScratchYour Data Science Journey - Setting Up Analytics Units From Scratch
Your Data Science Journey - Setting Up Analytics Units From Scratch
 
Israel IT trends and positioning in infrastructure and development (delivery...
Israel IT  trends and positioning in infrastructure and development (delivery...Israel IT  trends and positioning in infrastructure and development (delivery...
Israel IT trends and positioning in infrastructure and development (delivery...
 
Mighty Guides- Data Disruption
Mighty Guides- Data DisruptionMighty Guides- Data Disruption
Mighty Guides- Data Disruption
 
Ds.ai applied ai-workshop-
Ds.ai applied ai-workshop-Ds.ai applied ai-workshop-
Ds.ai applied ai-workshop-
 
Funding for Innovation in Manufacturing, Materials & Engineering
Funding for Innovation in Manufacturing, Materials & EngineeringFunding for Innovation in Manufacturing, Materials & Engineering
Funding for Innovation in Manufacturing, Materials & Engineering
 

Similar to Project feasibility

2Technology Acquisition and Technology Forecasting
2Technology Acquisition and Technology Forecasting2Technology Acquisition and Technology Forecasting
2Technology Acquisition and Technology ForecastingSelvaKumar679440
 
20120905 C4ISR Strategic Investment Team Workshop
20120905 C4ISR Strategic Investment Team Workshop20120905 C4ISR Strategic Investment Team Workshop
20120905 C4ISR Strategic Investment Team Workshopdan.p.taylor
 
169960087 j2 ee-project-report
169960087 j2 ee-project-report169960087 j2 ee-project-report
169960087 j2 ee-project-reporthomeworkping8
 
GHD iConnect - our intranet for the future
GHD iConnect - our intranet for the futureGHD iConnect - our intranet for the future
GHD iConnect - our intranet for the futureMaree Courts
 
Proposed Title Fear and Loathing in Agility: Long Live the Accounting Departm...
Proposed Title Fear and Loathing in Agility: Long Live the Accounting Departm...Proposed Title Fear and Loathing in Agility: Long Live the Accounting Departm...
Proposed Title Fear and Loathing in Agility: Long Live the Accounting Departm...Laszlo Szalvay
 
Project feasibility study report
Project feasibility study report Project feasibility study report
Project feasibility study report Harish Satya
 
July webinar slides industry 4.0 view from the front lines
July webinar slides industry 4.0  view  from the front linesJuly webinar slides industry 4.0  view  from the front lines
July webinar slides industry 4.0 view from the front linesInductive Automation
 
The Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and CapitalizationThe Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and CapitalizationCprime
 
Agile project, myths & selection criteria
Agile project, myths & selection criteriaAgile project, myths & selection criteria
Agile project, myths & selection criteriaWilliam Hill Australia
 
Role of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & managementRole of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & managementKundan Sanap
 
Near east university
Near east universityNear east university
Near east universityDerrickDusabe
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Phil Comelio
 
025218911.pdf
025218911.pdf025218911.pdf
025218911.pdfEidTahir
 
How To Achieve Single Pane of Glass Performance Management: A Road Map to Uni...
How To Achieve Single Pane of Glass Performance Management: A Road Map to Uni...How To Achieve Single Pane of Glass Performance Management: A Road Map to Uni...
How To Achieve Single Pane of Glass Performance Management: A Road Map to Uni...eG Innovations
 
Project charter v2
Project charter v2Project charter v2
Project charter v2Stefan Csosz
 

Similar to Project feasibility (20)

2Technology Acquisition and Technology Forecasting
2Technology Acquisition and Technology Forecasting2Technology Acquisition and Technology Forecasting
2Technology Acquisition and Technology Forecasting
 
20120905 C4ISR Strategic Investment Team Workshop
20120905 C4ISR Strategic Investment Team Workshop20120905 C4ISR Strategic Investment Team Workshop
20120905 C4ISR Strategic Investment Team Workshop
 
Build an Application Integration Strategy
Build an Application Integration StrategyBuild an Application Integration Strategy
Build an Application Integration Strategy
 
Feasibility Study.pptx
Feasibility Study.pptxFeasibility Study.pptx
Feasibility Study.pptx
 
169960087 j2 ee-project-report
169960087 j2 ee-project-report169960087 j2 ee-project-report
169960087 j2 ee-project-report
 
GHD iConnect - our intranet for the future
GHD iConnect - our intranet for the futureGHD iConnect - our intranet for the future
GHD iConnect - our intranet for the future
 
Proposed Title Fear and Loathing in Agility: Long Live the Accounting Departm...
Proposed Title Fear and Loathing in Agility: Long Live the Accounting Departm...Proposed Title Fear and Loathing in Agility: Long Live the Accounting Departm...
Proposed Title Fear and Loathing in Agility: Long Live the Accounting Departm...
 
English digital business 2.1.pptx
English digital business 2.1.pptxEnglish digital business 2.1.pptx
English digital business 2.1.pptx
 
REport Fle.pdf
REport Fle.pdfREport Fle.pdf
REport Fle.pdf
 
Project feasibility study report
Project feasibility study report Project feasibility study report
Project feasibility study report
 
July webinar slides industry 4.0 view from the front lines
July webinar slides industry 4.0  view  from the front linesJuly webinar slides industry 4.0  view  from the front lines
July webinar slides industry 4.0 view from the front lines
 
The Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and CapitalizationThe Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and Capitalization
 
Agile project, myths & selection criteria
Agile project, myths & selection criteriaAgile project, myths & selection criteria
Agile project, myths & selection criteria
 
Role of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & managementRole of artificial intellligence in construction engg & management
Role of artificial intellligence in construction engg & management
 
Near east university
Near east universityNear east university
Near east university
 
Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?Why Do So Many Software Projects Fail?
Why Do So Many Software Projects Fail?
 
chapter-01.pptx
chapter-01.pptxchapter-01.pptx
chapter-01.pptx
 
025218911.pdf
025218911.pdf025218911.pdf
025218911.pdf
 
How To Achieve Single Pane of Glass Performance Management: A Road Map to Uni...
How To Achieve Single Pane of Glass Performance Management: A Road Map to Uni...How To Achieve Single Pane of Glass Performance Management: A Road Map to Uni...
How To Achieve Single Pane of Glass Performance Management: A Road Map to Uni...
 
Project charter v2
Project charter v2Project charter v2
Project charter v2
 

More from sachin kumar sharma

More from sachin kumar sharma (20)

strategic managment coca cola
 strategic managment coca cola strategic managment coca cola
strategic managment coca cola
 
redcarpet credit card
 redcarpet credit card  redcarpet credit card
redcarpet credit card
 
Credit rating risk 4 semester muj
Credit rating risk 4 semester mujCredit rating risk 4 semester muj
Credit rating risk 4 semester muj
 
Risk all notes muj 4semester
Risk all notes muj 4semesterRisk all notes muj 4semester
Risk all notes muj 4semester
 
Insurance risk 2 muj 4 semester
Insurance  risk 2 muj 4 semesterInsurance  risk 2 muj 4 semester
Insurance risk 2 muj 4 semester
 
Lifeinsurance 4 semester muj
Lifeinsurance 4 semester mujLifeinsurance 4 semester muj
Lifeinsurance 4 semester muj
 
hindustan petroleum 2018 report
hindustan petroleum 2018 reporthindustan petroleum 2018 report
hindustan petroleum 2018 report
 
Entrepreneurship 4 semester muj notes
Entrepreneurship 4 semester muj notesEntrepreneurship 4 semester muj notes
Entrepreneurship 4 semester muj notes
 
entrepreneurship management rashmi bansal assignment
entrepreneurship management rashmi bansal assignmententrepreneurship management rashmi bansal assignment
entrepreneurship management rashmi bansal assignment
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 
Project organisation structure
Project organisation structureProject organisation structure
Project organisation structure
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project identification & screening
Project identification & screeningProject identification & screening
Project identification & screening
 
Project financing
Project financingProject financing
Project financing
 
Development finance institutions
Development finance institutionsDevelopment finance institutions
Development finance institutions
 
Transfer of goods
Transfer of goodsTransfer of goods
Transfer of goods
 
Sales act
Sales actSales act
Sales act
 
Quasi contract
Quasi contractQuasi contract
Quasi contract
 
Offer and acceptance 1
Offer and acceptance 1Offer and acceptance 1
Offer and acceptance 1
 
Offer and acceptance
Offer and acceptanceOffer and acceptance
Offer and acceptance
 

Recently uploaded

Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 

Recently uploaded (20)

Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"Rapple "Scholarly Communications and the Sustainable Development Goals"
Rapple "Scholarly Communications and the Sustainable Development Goals"
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 

Project feasibility

  • 2. Feasibility Study • A feasibility study is an analysis of the viability of an idea through a disciplined and documented way of thinking through the idea from its logical beginning to its logical end. • Feasibility study is carried out in order to assess the viability of a new project.
  • 3.
  • 4. India Infrastructure: A story of bad planning, poor execution GIFT City: A white elephant in the making • The latest in the list of poor planning and project coordination, is the Gujarat International Finance Tec (GIFT) City that is coming up on 886 acres of land near the Ahmedabad airport. This was to be Narendra Modi’s showpiece project launched in 2007, when he was the Chief Minister of Gujarat. GIFT is a 50:50 joint venture between International Leasing and Financial Services (ILFS) and a state government firm.
  • 5. GIFT • The vision was to develop a world class integrated financial services centre, IT hub and a multi-specialty special economic zone (SEZ) on the lines of those seen in London, Paris, Shanghai and Tokyo, with all amenities of a modern city that would include residential, commercial, institutional, hospitality and retail. The project is expected to create a million direct and indirect jobs. • The plan was to develop GIFT as a superior alternative to Mumbai and draw investors both from Mumbai and the international business community to relocate to GIFT making it a thriving and vibrant business city. The development of the first phase is well underway with many superstructures nearing completion.
  • 6. GIFT • The 78,000 crore project is now caught in red tape! Lack of clearances has resulted in several buildings being left incomplete with power supply yet to be made available. What is worse, is the fact that most buildings envisaged to come up in the project are high rises and do not have the requisite clearances from the Airports Authority of India (AAI). Now the AAI has given permission for buildings to have a maximum height ceiling of 191 metres above sea level. • GIFT City has envisaged 110 high rise buildings with Diamond Tower, the tallest building in the project planned to rise up to 410 metres. Two other buildings in the project are expected to have a height over 350 metres. GIFT City has requested the AAI for permission to build buildings up to 476 metres. • In addition to this delay, the National Highways Authority of India (NHAI) has not cleared permission to lay the underground power cables to the city.
  • 7. GIFT • And to top it all, the entire project which hinges on financial services, has not been able to attract a single client to set up operations, mainly due to lack of norms of operating procedures. Both the Finance and Commerce ministries at the centre have been slow to announce clear regulatory guidelines, without which financial services cannot be launched from the City. • This brings to question as to why and how is a project of this stature and vision allowed to be publicly announced and construction undertaken without all the above mentioned clearances. This is a 78,000 crore project where India’s capability and prestige is involved, so who is responsible for this mess? This is a clear example where the project gets announced first and clearances applied for later.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15. Google Glass is Google's wearable computer that a person wears like a regular pair of prescription glasses. Google Glass is best described as an evolution of the smartphone — a way to freely access data without needing to look at a handheld device. A "heads-up display" suspended slightly above your eye places data right in your field of vision, without completely obstructing your view. In 2013, the device became available for beta testing to lucky applicants who were selected based on their proposal for how to use the device and were willing to purchase it for $1,500. Google Glass is slated for commercial release in 2014, and continues to undergo hardware and interface changes. In addition to the aforementioned features, the device can download and run a variety of apps, just as a smartphone can. These apps provide a glimpse at the device's current capabilities and its potential future applications. For example, thanks to the device's built-in camera, you can use Google Glass in tandem with Google Hangouts to video chat with friends and show what you're seeing. Google Maps allows you to navigate without looking down. One popular function of the device is voice recognition. You can use verbal commands to take pictures, browse the Internet and even send text messages. But not everything can be done with a voice command, so Google Glass also has a touchpad, with additional controls, alongside one of the arms. Users can swipe through displays showing recent phone calls and photos, as well as read news, weather, sports scores, stock prices and more.
  • 16.
  • 17.
  • 18.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32. Technical Feasibility • Is the proposed technology or solution practical? • Do we currently possess the necessary technology? • Do we possess the necessary technical expertise • …and is the schedule reasonable for this team? • Is relevant technology mature enough to be easily applied to our problem? • What kinds of technology will we need? • Some organizations like to use state-of-the-art technology • …but most prefer to use mature and proven technology. • A mature technology has a larger customer base for obtaining advice concerning problems and improvements. • Is the required technology available “in house”? • If the technology is available: • …does it have the capacity to handle the solution? • If the technology is not available: • …can it be acquired?
  • 33. Economic Feasibility • Can the bottom line be quantified yet? • Very early in the project… • a judgement of whether solving the problem is worthwhile. • Once specific requirements and solutions have been identified… • …the costs and benefits of each alternative can be calculated • Cost-benefit analysis • Purpose - answer questions such as: • Is the project justified (I.e. will benefits outweigh costs)? • What is the minimal cost to attain a certain system? • How soon will the benefits accrue? • Which alternative offers the best return on investment? • Examples of things to consider: • Hardware/software selection • Selection among alternative financing arrangements (rent/lease/purchase) • Difficulties • benefits and costs can both be intangible, hidden and/or hard to estimate • ranking multi-criteria alternatives
  • 34. Schedule Feasibility • How long will it take to get the technical expertise? • We may have the technology, but that doesn't mean we have the skills required to properly apply that technology. • May need to hire new people • Or re-train existing systems staff • Whether hiring or training, it will impact the schedule. • Assess the schedule risk: • Given our technical expertise, are the project deadlines reasonable? • If there are specific deadlines, are they mandatory or desirable? • If the deadlines are not mandatory, the analyst can propose several alternative schedules. • What are the real constraints on project deadlines? • If the project overruns, what are the consequences? • Deliver a properly functioning information system two months late… • …or deliver an error-prone, useless information system on time? • Missed schedules are bad, but inadequate systems are worse!
  • 35. Operational Feasibility • How do end-users and managers feel about… • …the problem you identified? • …the alternative solutions you are exploring? • You must evaluate: • Not just whether a system can work… • … but also whether a system will work. • Any solution might meet with resistance: • Does management support the project? • How do the end users feel about their role in the new system? • Which users or managers may resist (or not use) the system? • People tend to resist change. • Can this problem be overcome? If so, how? • How will the working environment of the end users change? • Can or will end users and management adapt to the change?
  • 36. Feasibility Study Contents 1. Purpose & scope of the study • Objectives (of the study) • who commissioned it & who did it, • sources of information, • process used for the study, • how long did it take,… 2. Description of present situation • organizational setting, current system(s). • Related factors and constraints. 3. Problems and requirements • What’s wrong with the present situation? • What changes are needed? 4. Objectives of the new system. • Goals and relationships between them 5. Possible alternatives • …including ‘do nothing’. 6. Criteria for comparison • definition of the criteria 7. Analysis of alternatives • description of each alternative • evaluation with respect to criteria • cost/benefit analysis and special implications. 8. Recommendations • what is recommended and implications • what to do next; • E.g. may recommend an interim solution and a permanent solution 9. Appendices • to include any supporting material.