PER UNIT SYSTEM
The per-unit value of any quantity is defined as the ratio of actual
value in any unit to the base or reference value in the same unit. Any
quantity is converted into per unit quantity by dividing the numeral
value by the chosen base value of the same dimension. The per-unit
value is dimensionless.
2
PER UNIT SYSTEM
Any value can be taken as the Base Value. However, it is chosen to
make computation easy. It is usually taken equal to the rating of a
machine/transformer in the power circuit. Power equipment
impedance ratings are usually given in p.u. (expressed in %) based on
their rated voltage and VA.
3
BASIC UNITS
The 4 basic electrical quantities are:
• Voltage V (volt)
• Current I (amp)
• Impedance Z (ohm)
• Power S (VA)
For single-phase circuits,
• V(volt) = Z(ohm) × I(amp);
• S (VA) = V(volt) × I(amp)*
4
PER UNIT NOTATION
In per unit notation, the physical quantity is expressed as a fraction of the reference
value, i.e.
per unit value = actual value/base value in the same unit.
e.g. V(in per unit) = V(in kV)/V base (in kV)
where the base value is a reference value for magnitude.
5
BASE QUANTITIES
In per unit notation we would like to keep
the basic relations: Vpu = Zpu Ipu; Spu = Vpu Ipu*
Hence the base quantities should be chosen such that
Base voltage (VB) =
base impedance (ZB) × base current (IB)
Base power (SB) =
base voltage (VB) × base current(IB)
6
BASE QUANTITIES
Thus only two of the base quantities can be arbitrarily chosen,
the other two will follow directly.
It is common practice to specify
base power (SB) and base voltage (VB)
Then it follows
base current IB = SB/VB
base impedance ZB = VB/IB =V𝐵2/SB 7
PERCENTAGE VALUES
An equivalent way to express the per unit value is the percentage value where
Percentage value = per unit value × 100%
However, percentage values are not so convenient to use since
Vpercent ≠ Zpercent × Ipercent
8
BASE VALUE FOR 3-PHASE SYSTEMS
For 3-phase systems it is common practice to describe system
operation with:
total 3-phase power S = 𝑆3−ɸ
line voltage V = Vline
line current I = Iline
equivalent impedance/phase Z = Zph
with (in magnitude)
V = √3ZI; S = √3VI. 9
BASE VALUE FOR 3-PHASE SYSTEMS
Hence if base values are chosen for:
total 3-phase power SB
line voltage VB
Then
base line current
IB = SB/ √3VB
base impedance
ZB = VB/ √3IB = V𝐵2/SB
10
Equivalent circuit for transformer
In the per unit representation, the equivalent circuit of a transformer is a simple
winding impedance Zpu (with excitation branch ignored)
11
ADVANTAGES OF PER UNIT SYSTEM
• Normally we are dealing with numerics near unity rather than over a wide range.
• Provides a more meaningful comparison of parameters of machines with
different ratings.
• As the per unit values of parameters of a machine of a given design normally falls
within a certain range, a typical value can be used if such parameters are not
provided.
12
REFERENCE
• https://www.mathworks.com/help/sps/ug/per-unit-system-of-
units.html#:~:text=The%20per%2Dunit%20system%20is,impedance%2C%20torque%2C%20etc
• https://instrumentationtools.com/advantages-disadvantages-per-unit-system/#
• https://www.quora.com/Why-is-the-per-unit-system-important-in-power-system-protection-and-
control
13

More Related Content

Similar to perunit-200301054221.pptx

Ee423 fault analysis_notes
Ee423  fault analysis_notesEe423  fault analysis_notes
Ee423 fault analysis_notes
Acot Benard
 

Similar to perunit-200301054221.pptx (20)

Shubham kumar(k12139) btech 5th sem
Shubham kumar(k12139) btech 5th semShubham kumar(k12139) btech 5th sem
Shubham kumar(k12139) btech 5th sem
 
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
Short Circuit Calculation Symmetrical & Asymmetrical Fault Currents ?
 
P.u systems.pptx
P.u systems.pptxP.u systems.pptx
P.u systems.pptx
 
Ee423 fault analysis_notes
Ee423  fault analysis_notesEe423  fault analysis_notes
Ee423 fault analysis_notes
 
Per unit representation
Per unit representationPer unit representation
Per unit representation
 
Power system calculations
Power system calculationsPower system calculations
Power system calculations
 
Per unit system
Per unit systemPer unit system
Per unit system
 
Symmetrical component
Symmetrical componentSymmetrical component
Symmetrical component
 
Per unit (pu) quantities|vivasolve.blogspot.com
Per unit (pu) quantities|vivasolve.blogspot.comPer unit (pu) quantities|vivasolve.blogspot.com
Per unit (pu) quantities|vivasolve.blogspot.com
 
Fundamentals of power system
Fundamentals of power systemFundamentals of power system
Fundamentals of power system
 
Per unit calculation
Per unit calculationPer unit calculation
Per unit calculation
 
Ee 1351 power system analysis
Ee 1351 power system analysisEe 1351 power system analysis
Ee 1351 power system analysis
 
Power System Analysis and Design
Power System Analysis and DesignPower System Analysis and Design
Power System Analysis and Design
 
1_Intro + Per Unit.pdf
1_Intro + Per Unit.pdf1_Intro + Per Unit.pdf
1_Intro + Per Unit.pdf
 
Lecture 3
Lecture 3Lecture 3
Lecture 3
 
Electrical power system
Electrical power system Electrical power system
Electrical power system
 
Power-System-Slide-1.pptx
Power-System-Slide-1.pptxPower-System-Slide-1.pptx
Power-System-Slide-1.pptx
 
L26 3 ph-ac
L26 3 ph-acL26 3 ph-ac
L26 3 ph-ac
 
EEE 233_Lecture-15.pptx
EEE 233_Lecture-15.pptxEEE 233_Lecture-15.pptx
EEE 233_Lecture-15.pptx
 
CHAPTER 3 - Three Phase Network.ppt
CHAPTER 3 - Three Phase Network.pptCHAPTER 3 - Three Phase Network.ppt
CHAPTER 3 - Three Phase Network.ppt
 

More from rupasharma39 (7)

National Hydro Power Plant collage PPT 1.pptx
National  Hydro Power Plant  collage PPT  1.pptxNational  Hydro Power Plant  collage PPT  1.pptx
National Hydro Power Plant collage PPT 1.pptx
 
IOT LADEN GHISING.pptx
IOT LADEN GHISING.pptxIOT LADEN GHISING.pptx
IOT LADEN GHISING.pptx
 
sscje.pdf
sscje.pdfsscje.pdf
sscje.pdf
 
multiquadrant-210207143216.pptx
multiquadrant-210207143216.pptxmultiquadrant-210207143216.pptx
multiquadrant-210207143216.pptx
 
unit1-200424112829 (1).pdf
unit1-200424112829 (1).pdfunit1-200424112829 (1).pdf
unit1-200424112829 (1).pdf
 
ev.ppt
ev.pptev.ppt
ev.ppt
 
Rupa Sharma11901612026.docx
Rupa Sharma11901612026.docxRupa Sharma11901612026.docx
Rupa Sharma11901612026.docx
 

Recently uploaded

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Recently uploaded (20)

TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 

perunit-200301054221.pptx

  • 1. POWER SYSTEM II Name : Ranjan Ghosh Roll : 11901621021 Department : Electrical Engineering 1
  • 2. PER UNIT SYSTEM The per-unit value of any quantity is defined as the ratio of actual value in any unit to the base or reference value in the same unit. Any quantity is converted into per unit quantity by dividing the numeral value by the chosen base value of the same dimension. The per-unit value is dimensionless. 2
  • 3. PER UNIT SYSTEM Any value can be taken as the Base Value. However, it is chosen to make computation easy. It is usually taken equal to the rating of a machine/transformer in the power circuit. Power equipment impedance ratings are usually given in p.u. (expressed in %) based on their rated voltage and VA. 3
  • 4. BASIC UNITS The 4 basic electrical quantities are: • Voltage V (volt) • Current I (amp) • Impedance Z (ohm) • Power S (VA) For single-phase circuits, • V(volt) = Z(ohm) × I(amp); • S (VA) = V(volt) × I(amp)* 4
  • 5. PER UNIT NOTATION In per unit notation, the physical quantity is expressed as a fraction of the reference value, i.e. per unit value = actual value/base value in the same unit. e.g. V(in per unit) = V(in kV)/V base (in kV) where the base value is a reference value for magnitude. 5
  • 6. BASE QUANTITIES In per unit notation we would like to keep the basic relations: Vpu = Zpu Ipu; Spu = Vpu Ipu* Hence the base quantities should be chosen such that Base voltage (VB) = base impedance (ZB) × base current (IB) Base power (SB) = base voltage (VB) × base current(IB) 6
  • 7. BASE QUANTITIES Thus only two of the base quantities can be arbitrarily chosen, the other two will follow directly. It is common practice to specify base power (SB) and base voltage (VB) Then it follows base current IB = SB/VB base impedance ZB = VB/IB =V𝐵2/SB 7
  • 8. PERCENTAGE VALUES An equivalent way to express the per unit value is the percentage value where Percentage value = per unit value × 100% However, percentage values are not so convenient to use since Vpercent ≠ Zpercent × Ipercent 8
  • 9. BASE VALUE FOR 3-PHASE SYSTEMS For 3-phase systems it is common practice to describe system operation with: total 3-phase power S = 𝑆3−ɸ line voltage V = Vline line current I = Iline equivalent impedance/phase Z = Zph with (in magnitude) V = √3ZI; S = √3VI. 9
  • 10. BASE VALUE FOR 3-PHASE SYSTEMS Hence if base values are chosen for: total 3-phase power SB line voltage VB Then base line current IB = SB/ √3VB base impedance ZB = VB/ √3IB = V𝐵2/SB 10
  • 11. Equivalent circuit for transformer In the per unit representation, the equivalent circuit of a transformer is a simple winding impedance Zpu (with excitation branch ignored) 11
  • 12. ADVANTAGES OF PER UNIT SYSTEM • Normally we are dealing with numerics near unity rather than over a wide range. • Provides a more meaningful comparison of parameters of machines with different ratings. • As the per unit values of parameters of a machine of a given design normally falls within a certain range, a typical value can be used if such parameters are not provided. 12