Technical Innovation on
       Eastlink
      Eastlink- Dandenong Team
Summary

   Dandenong Section- kms & Plans
   Complexity
   Delivery
   Approach
   Team
   Technical Innovation
        CaddPro- refine and develop, customise for project
        MStn V8- Levels 1-63 replaced and by levels introduced, nested files
        Integrated 3D Seamless Environment- InRoads, MicroStation,
         Autoturn & Storm and Sanitary
        Bridges in 3D
        InRoads “smarts”
            Feature Editing of .dtms

            Intelligent feature Modelling- non triangulable data

            Horizontal & Vertical Controls

            Horizontal Component Placement

            Extensive use of Decision Tables

            Profile and Cross Section Updater

            CaddPro Resheet
DANDENONG TEAM MAKEUP- 15 TOTAL MAX




                                      MANAGEMENT



                                      COORDINATORS



                                        DESIGNERS



                                          DRAFTING



                                  DRAINAGE DESIGN &
                                  DRAFTING
DANDENONG SECTION

•   ROAD
     – Main Carriageway 6kms 3-4 lanes, Median, Design Speed 100kmh
     – Ramps 10kms
     – Monash Widening 5kms
     – Local Roads 3kms
     – Total 24kms
     – Police Road Interchange- Grade Separated half diamond (Main Under)
     – Monash Interchange- Freeway to Freeway, 3 Levels, 1st in Victoria (Main Under)
     – Halton Road Overbridge (Main Under)
     – Oakwood Avenue Overbridge (Main Under)
     – Princes Hwy Interchange- Grade separated diamond (Main Over) with Heatherton
       Road Bridge Over Main- 3 levels
     – Railway Parade Crossing (Main Over)
     – Mile Creek Crossing (Main Over)
     – Jacksons Road Interchange- Exit and Loop Ramp Entry
DANDENONG SECTION

•   STRUCTURES
     – Road Bridges 22
     – SUP Bridges 4
     – SUP Box culvert Underpasses 2
     – Main Type Precast Concrete 1200 – 1800 Super T’s
     – Loop Bridge on Monash- 2m Steel Box,250m long, 170m Rad with Sight
       Line Widening
     – Princes Highway- 2.2m Steel Box
     – Heatherton- 2m Steel Box,220m long over the Main over the Princes Hwy- 3
       levels
DANDENONG SECTION

•   SHARED USE PATH
    –   Total 5kms DDA compliant and to AustRoads
    –   Challenge – restrictive grades and ROW constraints
    –   Shared Off Road Path 2kms (SORP)
•   RE EARTH WALLS
    –   No of 20, 2.7kms, 1 Ha approx
    –   Located in
         •   Earth Fills for ROW Clearance
         •   Bridge Abutments in Fill
•   SOIL NAIL WALLS
    –   No of
    –   Total Length
    –   Approximate Area
•   WATER QUALITY TREATMENT
    –   BioSwales
    –   Swales
    –   Wetlands
         •   Oakwood Park
         •   Monash Interchange
TECHNICAL INNOVATION- Eastlink DANDENONG TEAM


•   CaddPro- (Drafting Productivity)
•   MStn V8 (Standardise CAD Platform)
•   Integrated Seamless Environment
•   3D Environment
•   Bridges in 3D
•   InRoads Smarts
•   Storm and Sanitary
•   MX “I feel like they are going to take my nail gun away
    and replace it with a hammer ”
CaddPro Drafting Productivity Gains

•   Drafting
     – Manages
          •   Scales for Text, dimensions, title sheets
          •   Cell libraries for disciplines- eg structural Steel Profiles
          •   Patterning
          •   Creation of CAD documents
          •   Title Sheet Placement and provides tagged data linkage to Excel
          •   Plotting
     –   Automates
          •   PDF Issue and .csv file creation
          •   Pram Crossing Drafting & Type
          •   Batter Tic Placement
          •   Curve Setting Out Data Extraction
          •   3D Bridge Modelling
          •   Resheeting of Roads
Adoption of Standard CAD Platform

•   Agreed at Outset to adopt MStnV8
•   Why?
     –   Standard exchange of files with VicRoads
     –   Provides a standardised and controlled environment
     –   Delivers a user friendly 3D environment
     –   Provides Superior Referencing and Mapping Power
     –   Draws from major pool of local drafting resources
     –   Technical exchange & share of best practice information
     –   Increased Customisation provides improved drafting power & efficiencies
     –   Mixed platforms historically proved not to work well
           •   Conversions are imperfect
           •   Breaks down the sharing of live data
           •   Controlled data
           •   Consumes valuable time due to handling
     –   Client directed
     –   It does have the ability to read/ write to ACAD if required but not vice versa
     –   Proven track record
InRoads Smarts & Strengths


                   MStn
                   Civil




        InRoads              Storm &
                             Sanitary




                  MStn 3D
InRoads Smarts

•   Provides a seamless 3D CAD design environment
•   Advanced Feature Modelling
•   Controlled Use of Feature Names
•   Horizontal and Vertical Controls for Main for interior
    Backbone
•   Decision Tables for Exterior Backbone
     –   By feature xyz
     –   By Feature xy
     –   By grade
     –   By Vertical Alignment
     –   By Horizontal Alignment
•   Feature Editing
•   Graphical Based Modelling
•   Cross Section and Profile Updating
What did not work well
• Project Basis- No Total Document Management System
• Uncoordinated planning packages- Separating The Bridge team
  from the Road Design Team
• Non integrated environments- Giving work out to be undertaken in
  other packages and then bringing it back
• Giving out bridges to be done in 2D and ACAD
• Lack of ownership and degradation of the survey
• Overuse of Nested Reference Files
• Conversions of Files
What worked Well
•   Setting up of Project Drafting Standards
•   Customization and Configuration of MStn
•   Seamless Design Environment- MStn, InRoads and Storm & Sanitary
•   3D Modelling Environment- Road, Walls, Services, Bridges
•   Training of ACAD users to MStn
•   Issue of 3D Electronic Data for Construction
•   Careful selection of qualified staff from outset of the project
Bridges in 3D
•   Exchange of 3D MStn Files
•   Road Surface Defined
•   3D Beams assisted by CaddPro
•   Abutment Sills Wingwalls in 3D
•   3D Data Checked back in InRoads
    DTMS
•   Piles & Abutment Outlines Produced
    as non-triangulable features in
    InRoads
•   Clearance Diagrams Produced
•   Isopach Checks Confirmation

More Related Content

Similar to Technical Innovation On Eastlink

Trishul presentation 2012
Trishul presentation 2012Trishul presentation 2012
Trishul presentation 2012yogeshtrishul
 
Crossrail - Big Maps for a Big Project - Smart Infrastructure - Esri UK Annua...
Crossrail - Big Maps for a Big Project - Smart Infrastructure - Esri UK Annua...Crossrail - Big Maps for a Big Project - Smart Infrastructure - Esri UK Annua...
Crossrail - Big Maps for a Big Project - Smart Infrastructure - Esri UK Annua...Esri UK
 
Technology and Big Data - Transforming Infrastructure Planning & Design - Pau...
Technology and Big Data - Transforming Infrastructure Planning & Design - Pau...Technology and Big Data - Transforming Infrastructure Planning & Design - Pau...
Technology and Big Data - Transforming Infrastructure Planning & Design - Pau...WRI Ross Center for Sustainable Cities
 
5 c 1-hec-georas_part1
5 c 1-hec-georas_part15 c 1-hec-georas_part1
5 c 1-hec-georas_part1Taoufik Byou
 
Photogrammetry Inspection System by Six D Marketing Solutions (P) Ltd Noida
Photogrammetry Inspection System by Six D Marketing Solutions (P) Ltd NoidaPhotogrammetry Inspection System by Six D Marketing Solutions (P) Ltd Noida
Photogrammetry Inspection System by Six D Marketing Solutions (P) Ltd NoidaIndiaMART InterMESH Limited
 
Converting and Transforming Technical Graphics
Converting and Transforming Technical GraphicsConverting and Transforming Technical Graphics
Converting and Transforming Technical Graphicsdclsocialmedia
 
You Haven't Seen This 3D Engineering's Overview List on Buzzfeed
You Haven't Seen This 3D Engineering's Overview List on BuzzfeedYou Haven't Seen This 3D Engineering's Overview List on Buzzfeed
You Haven't Seen This 3D Engineering's Overview List on BuzzfeedNick Stojanovic
 
High speed-pcb-board-design-and-analysiscadence-130218085524-phpapp01
High speed-pcb-board-design-and-analysiscadence-130218085524-phpapp01High speed-pcb-board-design-and-analysiscadence-130218085524-phpapp01
High speed-pcb-board-design-and-analysiscadence-130218085524-phpapp01khalid noman husainy
 
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadFiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadCCT International
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani PortfolioRONIEE Sparks
 
Trishul Presentation 2012
Trishul Presentation 2012Trishul Presentation 2012
Trishul Presentation 2012yogeshtrishul
 
Vizup 3D Optimization for Reality Capture (company presentation and recent us...
Vizup 3D Optimization for Reality Capture (company presentation and recent us...Vizup 3D Optimization for Reality Capture (company presentation and recent us...
Vizup 3D Optimization for Reality Capture (company presentation and recent us...vizup
 

Similar to Technical Innovation On Eastlink (20)

Newcastle cdt day 3 as delivered
Newcastle cdt day 3 as deliveredNewcastle cdt day 3 as delivered
Newcastle cdt day 3 as delivered
 
Epc projects and cad tools
Epc projects and cad toolsEpc projects and cad tools
Epc projects and cad tools
 
Byron CV 2016v5
Byron CV 2016v5Byron CV 2016v5
Byron CV 2016v5
 
Trishul presentation 2012
Trishul presentation 2012Trishul presentation 2012
Trishul presentation 2012
 
Crossrail - Big Maps for a Big Project - Smart Infrastructure - Esri UK Annua...
Crossrail - Big Maps for a Big Project - Smart Infrastructure - Esri UK Annua...Crossrail - Big Maps for a Big Project - Smart Infrastructure - Esri UK Annua...
Crossrail - Big Maps for a Big Project - Smart Infrastructure - Esri UK Annua...
 
Technology and Big Data - Transforming Infrastructure Planning & Design - Pau...
Technology and Big Data - Transforming Infrastructure Planning & Design - Pau...Technology and Big Data - Transforming Infrastructure Planning & Design - Pau...
Technology and Big Data - Transforming Infrastructure Planning & Design - Pau...
 
5 c 1-hec-georas_part1
5 c 1-hec-georas_part15 c 1-hec-georas_part1
5 c 1-hec-georas_part1
 
Photogrammetry Inspection System by Six D Marketing Solutions (P) Ltd Noida
Photogrammetry Inspection System by Six D Marketing Solutions (P) Ltd NoidaPhotogrammetry Inspection System by Six D Marketing Solutions (P) Ltd Noida
Photogrammetry Inspection System by Six D Marketing Solutions (P) Ltd Noida
 
RolandGildea_CV
RolandGildea_CVRolandGildea_CV
RolandGildea_CV
 
Converting and Transforming Technical Graphics
Converting and Transforming Technical GraphicsConverting and Transforming Technical Graphics
Converting and Transforming Technical Graphics
 
Site BIM
Site BIMSite BIM
Site BIM
 
You Haven't Seen This 3D Engineering's Overview List on Buzzfeed
You Haven't Seen This 3D Engineering's Overview List on BuzzfeedYou Haven't Seen This 3D Engineering's Overview List on Buzzfeed
You Haven't Seen This 3D Engineering's Overview List on Buzzfeed
 
High speed-pcb-board-design-and-analysiscadence-130218085524-phpapp01
High speed-pcb-board-design-and-analysiscadence-130218085524-phpapp01High speed-pcb-board-design-and-analysiscadence-130218085524-phpapp01
High speed-pcb-board-design-and-analysiscadence-130218085524-phpapp01
 
Soumyadip_Chandra
Soumyadip_ChandraSoumyadip_Chandra
Soumyadip_Chandra
 
Cad standards
Cad standardsCad standards
Cad standards
 
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadFiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
 
Vias services and capabilities
Vias services and capabilitiesVias services and capabilities
Vias services and capabilities
 
Thandapani Portfolio
Thandapani PortfolioThandapani Portfolio
Thandapani Portfolio
 
Trishul Presentation 2012
Trishul Presentation 2012Trishul Presentation 2012
Trishul Presentation 2012
 
Vizup 3D Optimization for Reality Capture (company presentation and recent us...
Vizup 3D Optimization for Reality Capture (company presentation and recent us...Vizup 3D Optimization for Reality Capture (company presentation and recent us...
Vizup 3D Optimization for Reality Capture (company presentation and recent us...
 

Technical Innovation On Eastlink

  • 1. Technical Innovation on Eastlink Eastlink- Dandenong Team
  • 2. Summary  Dandenong Section- kms & Plans  Complexity  Delivery  Approach  Team  Technical Innovation  CaddPro- refine and develop, customise for project  MStn V8- Levels 1-63 replaced and by levels introduced, nested files  Integrated 3D Seamless Environment- InRoads, MicroStation, Autoturn & Storm and Sanitary  Bridges in 3D  InRoads “smarts”  Feature Editing of .dtms  Intelligent feature Modelling- non triangulable data  Horizontal & Vertical Controls  Horizontal Component Placement  Extensive use of Decision Tables  Profile and Cross Section Updater  CaddPro Resheet
  • 3. DANDENONG TEAM MAKEUP- 15 TOTAL MAX MANAGEMENT COORDINATORS DESIGNERS DRAFTING DRAINAGE DESIGN & DRAFTING
  • 4. DANDENONG SECTION • ROAD – Main Carriageway 6kms 3-4 lanes, Median, Design Speed 100kmh – Ramps 10kms – Monash Widening 5kms – Local Roads 3kms – Total 24kms – Police Road Interchange- Grade Separated half diamond (Main Under) – Monash Interchange- Freeway to Freeway, 3 Levels, 1st in Victoria (Main Under) – Halton Road Overbridge (Main Under) – Oakwood Avenue Overbridge (Main Under) – Princes Hwy Interchange- Grade separated diamond (Main Over) with Heatherton Road Bridge Over Main- 3 levels – Railway Parade Crossing (Main Over) – Mile Creek Crossing (Main Over) – Jacksons Road Interchange- Exit and Loop Ramp Entry
  • 5. DANDENONG SECTION • STRUCTURES – Road Bridges 22 – SUP Bridges 4 – SUP Box culvert Underpasses 2 – Main Type Precast Concrete 1200 – 1800 Super T’s – Loop Bridge on Monash- 2m Steel Box,250m long, 170m Rad with Sight Line Widening – Princes Highway- 2.2m Steel Box – Heatherton- 2m Steel Box,220m long over the Main over the Princes Hwy- 3 levels
  • 6. DANDENONG SECTION • SHARED USE PATH – Total 5kms DDA compliant and to AustRoads – Challenge – restrictive grades and ROW constraints – Shared Off Road Path 2kms (SORP) • RE EARTH WALLS – No of 20, 2.7kms, 1 Ha approx – Located in • Earth Fills for ROW Clearance • Bridge Abutments in Fill • SOIL NAIL WALLS – No of – Total Length – Approximate Area • WATER QUALITY TREATMENT – BioSwales – Swales – Wetlands • Oakwood Park • Monash Interchange
  • 7. TECHNICAL INNOVATION- Eastlink DANDENONG TEAM • CaddPro- (Drafting Productivity) • MStn V8 (Standardise CAD Platform) • Integrated Seamless Environment • 3D Environment • Bridges in 3D • InRoads Smarts • Storm and Sanitary • MX “I feel like they are going to take my nail gun away and replace it with a hammer ”
  • 8. CaddPro Drafting Productivity Gains • Drafting – Manages • Scales for Text, dimensions, title sheets • Cell libraries for disciplines- eg structural Steel Profiles • Patterning • Creation of CAD documents • Title Sheet Placement and provides tagged data linkage to Excel • Plotting – Automates • PDF Issue and .csv file creation • Pram Crossing Drafting & Type • Batter Tic Placement • Curve Setting Out Data Extraction • 3D Bridge Modelling • Resheeting of Roads
  • 9. Adoption of Standard CAD Platform • Agreed at Outset to adopt MStnV8 • Why? – Standard exchange of files with VicRoads – Provides a standardised and controlled environment – Delivers a user friendly 3D environment – Provides Superior Referencing and Mapping Power – Draws from major pool of local drafting resources – Technical exchange & share of best practice information – Increased Customisation provides improved drafting power & efficiencies – Mixed platforms historically proved not to work well • Conversions are imperfect • Breaks down the sharing of live data • Controlled data • Consumes valuable time due to handling – Client directed – It does have the ability to read/ write to ACAD if required but not vice versa – Proven track record
  • 10. InRoads Smarts & Strengths MStn Civil InRoads Storm & Sanitary MStn 3D
  • 11. InRoads Smarts • Provides a seamless 3D CAD design environment • Advanced Feature Modelling • Controlled Use of Feature Names • Horizontal and Vertical Controls for Main for interior Backbone • Decision Tables for Exterior Backbone – By feature xyz – By Feature xy – By grade – By Vertical Alignment – By Horizontal Alignment • Feature Editing • Graphical Based Modelling • Cross Section and Profile Updating
  • 12. What did not work well • Project Basis- No Total Document Management System • Uncoordinated planning packages- Separating The Bridge team from the Road Design Team • Non integrated environments- Giving work out to be undertaken in other packages and then bringing it back • Giving out bridges to be done in 2D and ACAD • Lack of ownership and degradation of the survey • Overuse of Nested Reference Files • Conversions of Files
  • 13. What worked Well • Setting up of Project Drafting Standards • Customization and Configuration of MStn • Seamless Design Environment- MStn, InRoads and Storm & Sanitary • 3D Modelling Environment- Road, Walls, Services, Bridges • Training of ACAD users to MStn • Issue of 3D Electronic Data for Construction • Careful selection of qualified staff from outset of the project
  • 14. Bridges in 3D • Exchange of 3D MStn Files • Road Surface Defined • 3D Beams assisted by CaddPro • Abutment Sills Wingwalls in 3D • 3D Data Checked back in InRoads DTMS • Piles & Abutment Outlines Produced as non-triangulable features in InRoads • Clearance Diagrams Produced • Isopach Checks Confirmation