Substation Engineering                                                          &                                         ...
Substation Engineering                                           Transmission & Distribution Substations                  ...
Substation Engineering                                           Transmission & Distribution Substations                  ...
Transmission Line Engineering                                           Transmission Line Engineering                     ...
Transmission Line Engineering                                         Rating Analysis for Line Upgrades                   ...
Engineering for Wind Energy                                           Pre-Certification Engineering                       ...
Field Services                                        Commissioning, Testing, Maintenance,                                ...
Field Services                                        Commissioning, Testing, Maintenance,                                ...
Bass Creek SubstationBass Creek Substation, Janesville, WIReplacement of an existing 69kV SubstationProject Scope:Replace ...
Comerford SubstationComerford Substation, Monroe, NH230kV Switchyard RevitalizationProject Scope:This project included (2)...
Staff SubstationStaff Substation, Cambria, WINew Greenfield 138kV Switching StationProject Scope:Realtime Engineers’ invol...
500kV - 502 Junction Substation502 Junction Substation, Mount Morris, PANew Greenfield 500kV SubstationProject Scope:Realt...
500/138kV - Meadowbrook SubstationMeadowbrook Substation, Winchester, VAUpgrade and Expansion of an Existing 500/138kV Sub...
138kV – New Line Route DeterminationNorth LaSalle – Fox River; Ottawa – Fox River138kV – Transmission Line Route Evaluatio...
138kV- Rated – Transmission Line Relocation                                 Wausau, WisconsinU.S. Highway 51 & South 29 Li...
69kV – Manitowoc Public Utilities       Transmission Line Relocation69kV – Line Relocation for Power Plant ExpansionRealti...
Representative Client List
ReferencesFirstEnergy/Allegheny PowerRon Dombrosky, PESenior Consulting Engineer(724) 838-6481rdombro@alleghenyenergy.comM...
Upcoming SlideShare
Loading in …5
×

Realtime Utility Engineers - SOQ

717 views

Published on

Statement of Qualifications for Realtime Utility Engineers

  • Be the first to comment

  • Be the first to like this

Realtime Utility Engineers - SOQ

  1. 1. Substation Engineering & Transmission Line Engineering Engineering Tomorrow’s Power - Today8417 Excelsior Dr., Madison, WI 53717 • Ph: 800-297-1478 • 608-664-2008 • Fax 608-664-2009 • www.rue-inc.com
  2. 2. Substation Engineering Transmission & Distribution Substations New Substations Substation Expansions • Substation Engineering Electrical / Physical Design • Protection & Control Engineering • SCADA & Automation Engineering Substation Design Engineering Realtime’s experienced substation engineers provide complete electrical and physical pre-design scoping services. To meet the client’s requirements, we prepare an engineering scope-of-work in complete conformance of the highest effective standards. We then follow-up by providing an original design, or adapting one of many proven past designs. Realtime has expertise in upgrading/expanding existing substations of all shapes and sizes. Project types include high voltage transmission substations; distribution substations; switching stations; industrial substations. Extensive experience enables us to work with both complex upgrades/retrofits and standard Greenfield projects.8417 Excelsior Dr., Madison, WI 53717 • Ph: 800-297-1478 • 608-664-2008 • Fax 608-664-2009 • www.rue-inc.com
  3. 3. Substation Engineering Transmission & Distribution Substations (continued) Pre-Design Planning • Project Scope Development • Create Specifications and Schedules • Relay Recommendations • Environmental Assessments and Real Estate Support Design • Civil Design “Realtime always have a • Station Layout and Site Designquick/correct answer to the • Electrical / Physical Design field questions and • Grounding Systems • Conduit and Cable Systemsconcerns… definitely made • Control Building Layouts our jobs easier. Thanks!” • AC and DC Distribution Systems American Transmission • Relay and Control Panels Company (ATC) • Metering and Instrumentation • SCADA / RTU • Equipment Specifications and Procurement • As-Built Drawings and Documents8417 Excelsior Dr., Madison, WI 53717 • Ph: 800-297-1478 • 608-664-2008 • Fax 608-664-2009 • www.rue-inc.com
  4. 4. Transmission Line Engineering Transmission Line Engineering • Rating Analysis for Line Upgrades • Structural Analysis • Transmission Line Design Realtime’s experienced transmission line engineers provide overhead transmission line design to electric utilities nationwide. Our transmission line engineering staff is comprised of civil and structural engineers, designers, and GIS technicians as well as PLS-CADD experts and a registered land surveyor. Realtime provides utilities with the data and analysis needed to assess existing transmission lines. Realtime has worked on over 10,000 miles of transmission level voltage line projects. From providing rapid survey data “We are pleased with collection, to completing final construction drawings, Realtime’s engineersRealtime’s performance on will take a transmission line engineering project from inception toour projects. They delivered completion. on time and were Structural Analysisresponsive to requests and • Lattice Towersflexible in meeting changing • Existing Steel Poles project requirements” - • Wood Frame Structures NSTAR • Existing Foundations • New Foundation Design 8417 Excelsior Dr., Madison, WI 53717 • Ph: 800-297-1478 • 608-664-2008 • Fax 608-664-2009 • www.rue-inc.com
  5. 5. Transmission Line Engineering Rating Analysis for Line Upgrades • Field Surveys & LiDAR Rapid Data Collection • Rating Studies • Existing Line Conditions • Maximum Operating Capacity of the Line • Clearance Violation Reports • Design Alternatives • Structural and Foundation Analysis • Opinion of Probable Cost • Project Schedule • Design Criteria Development Transmission Line Design • Reconductor • Rebuild • New Line Design • Line Optimization • Construction Specifications • Structure Drawings • Material Lists and Procurement Assistance • Plan and Profile Drawings • Field Surveys & LiDAR Rapid Data Collection Design Software Expertise • Complete PLS Design Software Suite • MFAD Foundation Design • Microstation • AutoCAD8417 Excelsior Dr., Madison, WI 53717 • Ph: 800-297-1478 • 608-664-2008 • Fax 608-664-2009 • www.rue-inc.com
  6. 6. Engineering for Wind Energy Pre-Certification Engineering • Facility and Impact Studies • Generation Requests • Power Flow Analysis Pre-Design Consulting Services • Detailed Project-Cost Estimating • Design Engineering Criteria • Detailed Project Schedule Implementation Engineering • Substation Design • Collector Systems Design • Transmission Line Design8417 Excelsior Dr., Madison, WI 53717 • Ph: 800-297-1478 • 608-664-2008 • Fax 608-664-2009 • www.rue-inc.com
  7. 7. Field Services Commissioning, Testing, Maintenance, and Construction Management Realtime’s team of experienced Protection Engineers, Senior SCADA Technicians, Senior Relay Technicians, and Relay Technicians provide extensive commissioning, testing and maintenance services for distribution and transmission substations and switchyards. Realtime installs, troubleshoots, and checks out substation SCADA, annunciation, recording, telecommunication and protective relay systems. Realtime provides: • Line Protective Relay Testing • Substation Protective Relay Testing • Current Transformer Testing • Capacitive Coupled Transformer Testing • CT and PT Circuit Checkout • Control Circuit Checkout • Power Line Carrier Tuning • Wave Trap Testing • Satellite Synchronized End-to-End Testing • Relay Simulation to test relays under actual conditions • SCADA / RTU Checkout and Verification • Double Power Factor Testing • SF6 and Oil Circuit Breaker Testing • Upon request, Realtime can also provide: Ground Grid and Earth Resistivity Testing, Battery and UPS Testing, Transformer Oil Sampling, and Infrared Inspection8417 Excelsior Dr., Madison, WI 53717 • Ph: 800-297-1478 • 608-664-2008 • Fax 608-664-2009 • www.rue-inc.com
  8. 8. Field Services Commissioning, Testing, Maintenance, & Construction Management (continued) Construction Management Realtime provides experienced construction management for substation and transmission line upgrades and Greenfield designs. Our expertise includes estimating, budgeting, specifying equipment, creating and implementing master schedules, selecting and coordinating contractors, adhering to all national and local codes, and overseeing all construction. Realtime manages complex, multiple construction projects simultaneously at different locations. Commissioning Equipment: • Doble 6150 Test Set • ProTest Software • Doble M4100 Insulation Test set and TDR9000 Breaker TIMER • Westinghouse Phase Angle Meter • Fluke Scopemeter and Multimeter • SignalCrafter Model 60, Attenuator, Model 70, Model 110 • Simpson VOM • 100kV DC Hipot • AVO Micro-Ohmeter • Biddlel TTR, 5kV Megger • GE Oil Dielectric Tester, ABB Test Plugs, 240 Volt Variac • 4-20 mA Transducer Calibrator/Tester • SEL 5010, SEL 5601, SEL 5020 Software8417 Excelsior Dr., Madison, WI 53717 • Ph: 800-297-1478 • 608-664-2008 • Fax 608-664-2009 • www.rue-inc.com
  9. 9. Bass Creek SubstationBass Creek Substation, Janesville, WIReplacement of an existing 69kV SubstationProject Scope:Replace an existing (2) line 69kV substation with a 69/138kV substation consisting of (2) 69kV lines, (2) 138kVlines, (1) 100 MVA 69/138kV transformer with oil containment, and a new 24’ X 36’ control building.The existing equipment was removed and the site was re-graded and enlarged. Special environmentalconsideration was given to an adjacent wetland area and creek. The substation equipment footprint had to becompressed as much as possible and a retention pond installed to capture storm water runoff. Major savings tothe client were realized by utilizing spare equipment from various other client substations. This required extraresearch and confirmation that the used equipment met the requirements of the new substation and in the caseof the reused steel structures, was properly modified to fit the new use. Realtime provided all engineering for thesubstation including; grading, grounding grid, raceways, foundations, steel structures, bus, equipmentspecification including a 24’ X 36’ control building, and protection and control.Design Completion Date: September 2010Client: American Transmission Company
  10. 10. Comerford SubstationComerford Substation, Monroe, NH230kV Switchyard RevitalizationProject Scope:This project included (2) separate project scopes: • 230kV Switchyard Revitalization • 230kV Disconnect Switch Replacement at TransCanada’s Request.The Comerford Generation Station is a (4) turbine, 160 MW hydroelectric station, located along the ConnecticutRiver. There are four, two-winding generator step-up transformers which step up the 13.8kV generator output,to supply the 230kV switchyard. Each pair of GSUs are connected to the 230kV bus, via motor operateddisconnect switches, to a common breaker position in a breaker and a half arrangement.Engineering, Design, and Construction Support Services Includes: • Replace all (11) Mineral Oil Dielectric Fluid (MODF) filled and live tank circuit breakers with SF6 breakers. • Install a new SF6 breaker. • Replace (28) motor-operated disconnect switches. • Install line traps for (5) lines. • Replace dead-end insulators supporting main and cross buses. • Install CCVTs on (3) lines. • Replace CCVT’s on (3) lines. • Design of a new control house incorporating:  Control, relay, and communication equipment required to operate the outdoor switchyard, including provision for Bulk Power Conversion.  Station AC and DC auxiliary services, and standby generator.  HVAC.  Heat detection system.  Primary and emergency lighting system.  Operator’s desk. • Switchyard Grounding: Analyze and modify the existing ground grid design to meet present National Grid standards. Extend the existing ground grid design to connect to the new equipment, control house, and the expanded fence. • Redesign the fenced area around the control building and new line positions. • Provide material lists and revise cable schedules. • Provide structural and electrical calculations and design.Design Completion Date: November 2011Client: National Grid
  11. 11. Staff SubstationStaff Substation, Cambria, WINew Greenfield 138kV Switching StationProject Scope:Realtime Engineers’ involvement began with finalizing the transmission company’s Facilities Study and Exhibitswithin the pending generation interconnection agreement. The substation was a greenfield site, ultimatelyconsisting of a ring bus arrangement. It is initially to be operated with (3) 138kV lines, with future expansion to(6) 138kV lines. The station will serve as a system tie between a wind farm and the local utility’s transmissiongrid. After about two years of planning and design, the new 138kV switchyard is into construction with an inservice date of May 2011.Our original scope was to design a three termination straight bus, looping an existing transmission line throughthe bus and providing a tap to an adjacent wind farm collector station. Around the time of this design’scompletion, our scope changed to designing a ring bus arrangement. Realtime expanded the design andcompleted the design package within schedule to meet the original in service date. Changing gears andincorporating the ring bus design into the construction issue saved the client about $460,000 in overall projectcost. Realtime provided all engineering for the switchyard including; grading, grounding grid, raceways,foundations, steel structures, bus, equipment specification including a 24’ X 36’ control building, and protectionand control.Realtime also provided the line loop-through scoping, design engineering, procurement support, andconstruction support for two new 90’ steel corner poles within existing ROW. We closed our work by providingnew records for creation of a newly designated line.Some interesting challenges included: Coordinating efforts with the generation owner for a single, common andjointly beneficial ground grid system of the switch station and the collector substation. Also, designing anintegrated SCADA communications system that satisfied the requirements of multiple Utility stakeholders.Design Completion Date: March 2011Client: American Transmission CompanyClient Commentary: “… this job was done with very little confusion, minor rework,and overall a design job well done. You (Realtime) always have a quick/correctanswer to the field questions and concerns… definitely made my job easier thannormal. Thanks!”
  12. 12. 500kV - 502 Junction Substation502 Junction Substation, Mount Morris, PANew Greenfield 500kV SubstationProject Scope:Realtime engineered this 500kV greenfield substation, consisting of (4) 500kV lines, designed withfuture expansion to (6) 500kV lines and future transformation to 138kV. This design required themovement of over 2 million cubic yards of materials, as well as removal of over 80 feet of mountaintop, for the ultimate substation layout.Realtime was responsible for the engineering of the (4) line terminal 500kV switchyard, whichconsisted of (8) 500kV breakers installed in a double breaker-double bus configuration. Space wasincluded for installation of a fifth and sixth 500kV line terminal, also with a double breaker-double busconfiguration. The substation was also graded for the future 500/138kV step-down transformation and138kV facilities. An approximate 40’ x 120’ metal control building was installed to house thesubstation electrical controls, metering, and communications equipment. The building also houses the125VDC storage battery and charger, and is climate controlled, complete with well and septic facilities.A 52’ x 32’ maintenance building was designed and installed, as well as a separate 16’ x 24’emergency generator building. Realtime also engineered a new SCADA system which has beeninstalled.Additional scope included the design of a new family of 500kV steel structures, for use by the client,as standards for future projects.This project invested over three years of planning and design, and the new 500kV switchyard stepdown Substation for Trans-Allegheny Interstate Line Company (TrAILCo) at 502 Junction is in-service.All substation engineering, except site and grading, were performed by Realtime for 502 Junction.Completion Date: December 2010Client: Kenny Construction Co. on behalf of TrAILCo and Allegheny Energy
  13. 13. 500/138kV - Meadowbrook SubstationMeadowbrook Substation, Winchester, VAUpgrade and Expansion of an Existing 500/138kV SubstationProject Scope:Realtime was responsible for engineering design work to accommodate the 500kV substationexpansion, (1) 500kV shunt capacitor addition, and the addition of a fourth 500/138kV 392 MVAautotransformer with LTC.Realtime engineered the protection and control design associated with the addition of a fourth500/138kV 392 MVA autotransformer with LTC. To accommodate the transformer addition, new138kV breakers were added to the breaker-and-a-half bus arrangement, and (2) 138kV lines weremoved to new bus positions. The design included (3) new relay racks, plus extensive modifications toexisting relay panels. Wiring diagrams were prepared for the new transformer and breakers. Existingannunciator, DFR, and LTC paralleling schemes were modified to accommodate the additions.Engineering design work to accommodate the 500kV substation expansion included extending (2)500kV buses, adding (4) 500kV breakers, moving (1) existing 500kV line termination, and terminating(2) new 500kV lines. Realtime’s responsibility included site design, layout, bus design, foundations,steel structures, ground grid, and equipment connections. Protection and control design included newline protection schemes, as well as incorporating the new lines into the existing bus protection andsynchronizing schemes. Replacement SCADA and annunciator systems were required for theexisting station to accommodate the line and equipment additions. Line OPGW fiber terminations andfiber interconnection panels were also part of Realtime’s responsibilities.Realtime also provided the engineering for (1) 500kV shunt capacitor addition, consisting of a 500kVbus extension, installation of a 500kV motor-operated disconnect switch, and (1) 500kV circuit breaker(with synchronous closing), additional 500kV CVT’s, 500kV reactors, 500kV arresters, and (3) singlepole manually-operated grounding switches, (1) 200/F288 MVAR shunt capacitor bank with phase andneutral imbalance detection equipment, yard lighting, and shielding. New control panels wereinstalled in the existing control building, within an area formerly used for material storage.Modifications to the building partition wall were required.Completion Date: December 2010Client: Kenny Construction Co. on behalf of TrAILCo and Allegheny Energy
  14. 14. 138kV – New Line Route DeterminationNorth LaSalle – Fox River; Ottawa – Fox River138kV – Transmission Line Route EvaluationRealtime evaluated 180 miles of potential Right of Way to define three alternativeroutes for new 138kV transmission lines for a major mid-western utility.Project Scope:Realtime performed the following tasks to establish routes for two new transmission lines: • Provided LiDAR Aerial Surveys and video imagery of potential routes • Evaluated data to create route selection criteria • Facilitated the route selection process with the client’s Real Estate and Transmission Line Engineering groups • Provided on-site field verification of areas of concern for the identified routes • Assisted in the development of design standards for the new line, including equipment and material specifications • Created property-owner database for Real Estate support and notification of affected owners • Developed graphics and participated in informational workshops for property owners and the communities at large • Assisted in providing formal documentation for the filing with the Illinois Commerce CommissionDesign Challenges & Solutions:The 38 miles of new line complete a proposed transmission loop in northern Illinois. Thecomplexity of the project included designing multiple corridors through both rural andurban areas.Realtime’s application of evaluation criteria led to the selection of a preferred route.Additionally, Realtime coordinated all of the required environmental analysis and utilizedthat data for site selection. Realtime also coordinated design standards unique to theowner.Client: AmerenIP
  15. 15. 138kV- Rated – Transmission Line Relocation Wausau, WisconsinU.S. Highway 51 & South 29 Line RelocationA Wisconsin Public Service Corporation 34.5KV distribution line needed to be relocatedas a result of a Wisconsin Department of Transportation highway interchange project.Incorporating a future upgrade to 138kV, Realtime engineered five new steel-pole structuresto accommodate the newly constructed overpasses.Project Scope:Realtime performed the following tasks: • Preliminary and final design of the line alignment, structures and foundations • Coordination with the Wisconsin Department of Transportation and Wisconsin Public Service Corporation • Steel-pole structure design and specifications • Soils investigation specifications and subcontractor coordination • Drilled-pier foundation design and construction specifications • Line construction specification • Construction documentation including PLSCADD files • Field support to construction contractors • Final project close-outDesign Challenges & Solutions:Long transmission line spans and clearance requirements over new highway overpasseslead to custom poles ranging in heights up to 115 feet.Poor soil conditions resulted in deep, large-diameter drilled-pier foundations.Total Constructed Cost Approximately: $2 millionClient: Wisconsin Public Service Corporation
  16. 16. 69kV – Manitowoc Public Utilities Transmission Line Relocation69kV – Line Relocation for Power Plant ExpansionRealtime engineering the relocation of a 69kV transmission line at municipal power plantunder extremely adverse space constraints.Project Scope:Realtime engineered the following: • Five new steel poles on foundations • Provided structural analysis • Provided soil borings and surveying • 69kV line was designed to 138kV standards • Realtime provided specifications for all of the new equipment and poles, as well as, construction specifications for the new lineDesign Challenges & Solutions:This relocation project involved an already highly congested utility area, which included acomplete coal-fired power plant and storm water-sewage treatment plant, bordering LakeMichigan’s shoreline.The design area was squeezed on a prohibitively narrow strip of land, adjoining these twofacilities and the lakeshore. Adverse space constraints included maintaining accessrequirements for semi-truck traffic and railroad traffic in and out of the coal-fired plant on anarrow, tight-fitting strip of land.Design requirements included accommodating for multi-ton loads of coal and material to bedriven on soil directly adjacent to the transmission line poles’ foundations. Due to thelakeshore, soil borings and geotechnical requirements were significantly more challenging.As a result of the complexities of the plant expansion, systems coordination betweencontractors working on the plant build-out, substation re-design, and the additional linerequirements necessitated stringent communications among all stakeholders. Thecombination of designing in a physically congested, high-trafficked area, while meetingaggressive timeframes and budget constraints, allowed Realtime the opportunity to providevaluable design solutions to our client.Total Constructed Cost Approximately: $650,000Client: Manitowoc Public Utilities
  17. 17. Representative Client List
  18. 18. ReferencesFirstEnergy/Allegheny PowerRon Dombrosky, PESenior Consulting Engineer(724) 838-6481rdombro@alleghenyenergy.comMidAmerican EnergyTom Albertson, PEManager-High Voltage Engineering(563) 333-8155ktalbertson@midamerican.comNortheast Utilities-PSNHWalter BilynskiProject Manager(603) 634-2878bilynwd@nu.comWE EnergiesJim ProtheroManager-Substation Engineering(414) 221-5071Jim.prothero@we-energies.comNew York Power Authority (NYPA)Gerry Caccavale - Project Manager123 Main StreetWhite Plains, NY 10601941-287-3033gennaro.caccavale@nypa.govAmeren ServicesJerry Murbarger – Transmission Design Specialist370 S. Main St. MC C-25Decatur, IL 62523217-424-8794jmurbarger@ameren.com

×