Site BIM

950 views

Published on

Site BIM and Masterplan Development:
The What, How, and Why of Civil 3D and BIM for Site Design

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
950
On SlideShare
0
From Embeds
0
Number of Embeds
6
Actions
Shares
0
Downloads
20
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Site BIM

  1. 1. Site BIM and Masterplan Development 3D Modeling for an Intelligent Design12/15/2010
  2. 2. Site BIM and Masterplan DevelopmentIndustry Trends History and Heritage 3D Surveying 3D Site Design Site BIM ManagementMasterplan Development Vision Multi-Project and Multi-Phase Coordination Master Project Location MapsFuture Trends
  3. 3. Industry TrendsHistory &Heritage The “New” Master Builder Partnering The Adversarial Period The AEC Split The Master Builder
  4. 4. Industry Trends 3DSurveying 3D Laser Scanning 3D Site Survey 3D Existing Utility Modeling
  5. 5. Industry Trends 3D • Capture high-resolution • Usable inSurveying existing conditions data conventional CADD 3D Laser environments and Scanning • Ideal for Areas of BIM modeling Complex Constraints – Rooftops • Accuracies within – Interior Renovations 5 millimeters – Building Expansions – Facility Upgrades
  6. 6. Industry Trends 3D Surveying 3D Laser Scanning Miramar Interim 3D Site Survey Library• Real-Life Site Feature 3D Processing• Accurate Surface Model Ready for BIM• Multiple Topo Files Combined for One Model• Detailed Site Culture to Meet Needs
  7. 7. Industry Trends 3D Surveying 3D Laser Scanning Miramar Interim 3D Site Survey Library• Real-Life Site Feature 3D Processing• Accurate Surface Model Ready for BIM• Multiple Topo Files Combined for One Model• Detailed Site Culture to Meet Needs
  8. 8. Industry Trends 3D Surveying 3D Laser Scanning Miramar Interim 3D Site Survey Library• Real-Life Site Feature 3D Processing• Accurate Surface Model Ready for BIM• Multiple Topo Files Combined for One Model• Detailed Site Culture to Meet Needs
  9. 9. Industry Trends 3D Surveying 3D Laser Scanning 3D Site Survey• Real-Life Site Feature 3D Processing• Accurate Surface Model Ready for BIM• Multiple Topo Files Combined for One Model• Detailed Site Culture to Meet Needs Miramar Interim Library
  10. 10. 3DSurveying 3D AutoCAD NavisworksLaser Scanning 3D Site Survey One File - Multiple Softwares/Uses
  11. 11. Industry Trends 3DSurveying 3D Laser Scanning 3D Site Survey 3D ExistingUtility Modeling−Various Reference Sources−Ready for BIM−Embedded System Information
  12. 12. Industry Trends 3D Surveying 3D Site Design• Site Utility and Surface Design −Visual Design −Dynamic 3D Environment −Increased Quality −Fewer Field Revisions
  13. 13. Industry Trends 3D Surveying 3D Site Design• Site Utility and Surface Design −Visual Design −Dynamic 3D Environment −Increased Quality −Fewer Field Revisions Miramar Student Union
  14. 14. Industry Trends 3D Surveying 3D Site Design• Site Utility and Surface Design −Visual Design Alpine Boulevard −Dynamic 3D Environment −Increased Quality −Fewer Field Revisions CSUSM Ballfields
  15. 15. Industry Trends 3D Surveying 3D Site Design• Site Utility and Surface Design −Visual Design Miramar Student Union −Dynamic 3D Environment −Increased Quality −Fewer Field Revisions Miramar Student Union
  16. 16. Industry Trends 3D Surveying 3D Site Design• Site Utility and Surface Design −Visual Design −Dynamic 3D Environment −Increased Quality −Fewer Field Revisions Miramar Student Union
  17. 17. Industry Trends 3D Surveying 3D Site Design Site BIMManagement Miramar Student Union• Building BIM vs. Site BIM• Engineer Responsible for Site Control• Clash Detection• Team Coordination
  18. 18. Industry Trends 3D Surveying 3D Site Design Site BIMManagement• Building BIM vs. Web-hosted BIM Site BIM Coordination Meeting• Engineer Responsible for Site Control• Clash Detection• Team Coordination
  19. 19. Industry Trends 3D Surveying 3D Site Design Site BIMManagement• Building BIM vs. Site BIM• Engineer Camp Responsible for Site Control Pendleton• Clash Detection BEQ• Team Coordination
  20. 20. Site BIM and Masterplan DevelopmentIndustry TrendsMasterplan Development Vision Multi-Project and Multi-Phase Coordination Master Project Location Maps The “What” The “Why” The “How”
  21. 21. Masterplan DevelopmentThe “What”• The Vision – Master Utility & Topo Base Files (2D, 3D) – Master Navisworks Model – Project Tracking – Comprehensive As-Built Record
  22. 22. Masterplan DevelopmentThe “Why”• The Benefits – Central File and Knowledge Resource – Consistency in Files and Project Information – Affected Project Areas Easily Identifiable – Comprehensive As-Builts – Visualization
  23. 23. Masterplan DevelopmentRendered buildings by NTD Architecture and GKK WorksUnderground Electrical by Gould ElectricUnderground Wet Utilities and Surface Rendering by RBF Consulting Master Navisworks Model
  24. 24. Masterplan Development 5. Heavy Duty 9. AT&T/Diesel Aviation Technology Building The “How” Master Project Affected Area Map Project Info and 6. Status Spreadsheet Student Union Project Plan Reference Binder Electronic Project File Database Master Project Affected Area Map
  25. 25. Masterplan DevelopmentCAD & NAVIS Files Design Line Work XREF Project C Design Design Line Work Line Work Project B Project A
  26. 26. Future Trends• GIS Integration• Facilities Management Software• Google Earth/Sketchup• Integrated Surface Rendering• Bringing Other Consultants into BIM
  27. 27. Site BIM and Masterplan DevelopmentIndustry Trends History and Heritage 3D Surveying 3D Site Design Site BIM ManagementMasterplan Development Vision Multi-Project and Multi-Phase Coordination Master Project Location MapsFuture Trends GIS Integration Bringing other Consultants into BIM
  28. 28. Masterplan Development with BIM

×