Am overview of the City of Pittsburgh's first ADU Zoning Overlay (Accessory Dwellling Unit). It allows single family homes to be built or renovated with an accessory dwelling. The Home must be owner occupied and has additional limitations outlined in this presentation to the Pittsburgh Community Reinvesment Group (PCRG) 2018 Summit. The Presentation includes the design for the first three houses to be developed by Bloomfield Garfield Corporation, Designed by Pfaffmann + Associates and built by Ecocraft Modular Homes.
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
How ADUs Can Increase Affordable Home Options
1. How Accessory Dwelling Units Can Make Homeownership More Affordable
Hillcrest ADU Houses
PFAFFMANN + ASSOCIATES
Rick Swartz, Executive Director, Bloomfield Garfield Corporation
Corey Layman, AICP, Zoning Administrator, City Of Pittsburgh
Rob Pfaffmann, FAIA, AICP Project Architect
Eliot Fabri, EcoCraft Homes
8. The BGC has been working on the designs for a single-family home that
can be built in Garfield, and feature an accessory dwelling unit as an
integral part of the structure.
To build these type of homes in a residential district that has been long
been zoned for single-family development requires the creation of an
overlay district.
Bloomfield Garfield Association
PFAFFMANN + ASSOCIATES
Community Review • October 26, 2017
The next generation of affordable
small houses designed for change
Hillcrest ADU Houses
20. Bloomfield Garfield Association
PFAFFMANN + ASSOCIATES
Community Review • October 26, 2017
The next generation of affordable
small houses designed for change
Hillcrest ADU Houses
Design Process
25. • Prototype; model for future projects
• Deep narrow lots on sloped sites
• Permanent Affordability; ADU “baked-in”
• ADU Income reduces cost of ownership
• New Zoning Provisions for ADU
• Provide Flexible unit Programs (Size, features)
• Starter homes, DINKS, Boomers w/with kids
(Intergenerational)
Hillcrest House Goals & Features
36. Hillcrest House Features
MODULAR STRUCTURE: INTERIOR
The following options describe the basic components of the interior
finish package of the typical pre-fab modular structure supplied by
EcoCraft.
• Flooring: Luxury vinyl tile laminate floor in living & dining areas
• Porcelain floor tile planks in bathroom
• Carpet in bedrooms
• Walls & Ceilings : Painted 1/2” gypboard in all rooms
• Glazed ceramic wall tile provided in bathroom as an upgrade
• Trim: Painted square-edged wood base, jambs, stools, & casing
• Casework: Wolf wood-veneered cabinets with all plywood substrates
• Wire shelving
MODULAR STRUCTURE: BUILDING SYSTEMS
The following options describe the basic system concept included in
the typical pre-fab modular structure supplied by EcoCraft.
• HVAC: Ductless minisplit in front wall of living area serving bedroom
via door grill
• Ceiling fan in bedroom
• Energy recovery ventilator in bathroom
• Plumbing 40 gallon domestic hot water heater
• Electrical & Lighting: 200 amp service; All LED lighting
MODULAR STRUCTURE: SHELL
The following options describe the basic components of the shell
of the typical pre-fab modular structure supplied by EcoCraft.
15’-7” maximum shipping width of modular unit.
Floor assembly comprised of 2x10 Wood construction with
subfloor constructed of OSB with plywood top layer
Exterior Wall Assembly
•Structure comprised of 2x6 Wood construction with perimeter
band board;
•R21 unfaced batt insulation in stud cavity; Fire-rated exterior
gypboard sheathing;
•1” graphite impregnated foam exterior continuous insulation over
sheathing; with potential upgrade to 3” for additional insulative
value
•Hardiboard prefinished concrete or prefinished metal siding
•Ceiling assembly comprised of 2x6 Wood construction with 1/2”
gypboard
•Roof assembly comprised of hinged 2x8 Wood construction with
5/8” plywood deck; Titaneum synthetic roof underlayment;
Ice&water shield at roof edge; 40-year Dimensional asphalt
shingle; with potential upgrade to standing seam metal roof (See
drawings)…
•Windows & Doors: Pella Fibrex Fiberglass windows or equivalent
ThermaTru insulated exterior doors with insulated glazing
37.
38. Next Steps: Challenges Opportunities
• ADU Overlay Status (Council, Conditions, Last Community Mtg)
• Refining Cost Models (Market vs Subsidized)
• Existing Buildings (Code Accessibility Challenges)
• Implementation of Overlays (Post two years)
• Combination with other Affordability Tools (CLT, Deed Restrictions)
• Owner Occupancy
• v2.0 Design Review
• Unintended Consequences? AirBnB
• How do we know when we are successful (Community Metrics)