Optimization of Heavy Oil Stripper
CH E 465 – Chemical Engineering Design II
Team 25 – A++Engineering
April 9th, 2015
Ammar Al-Qabbas
Fairuz Mustafa
Josh Idowu
Ryan Dinn
Siti Nasir
Fairuz Mustafa
Executive Summary
Shell Canada provided A++
Engineering with an opportunity to contribute to the optimization of
the heavy oil stripper unit within the Scotford Upgrader located in Fort Saskatchewan, Alberta. The
primary driver of this project is economic because the heavy oil stripper is fully operational and Shell
Canada is simply looking for improvements to the process. The business objective is to implement an
optimization to the unit that does not require a drastic amount of capital investment.
Three main categories of project solutions were explored for the project. The first was to follow
Shell Canada’s recommendation to target a reduction in pressure drop of the overhead system in order
to lower the operating pressure of the heavy oil stripper. The second was to consider an optimization of
the current operating conditions of the heavy oil stripper. The third and final subset of solutions
considered was physical modifications to the tower that could potentially increase the quality of
production of the unit. A total of eleven cases were considered in the development of the solution.
Ultimately, A++
Engineering has suggested that Shell Canada implement a modification to the
current heat exchanger network and overhead system piping. The project required a capital investment
of approximately $2,000,000 with an internal rate of return of 78% considered over a project life of ten
years. The solution will be implemented during the heavy oil stripper’s scheduled turnaround in the year
2019. A project execution strategy has been designed such that all construction and commissioning will
occur during the turnaround. A++
Engineering has produced a design basis memoranda level report that
can be used to take this project to the next stage of development.
1
Table of Contents
List of Tables and Figures..............................................................................................................................3
1.0 Introduction and Statement of Objectives .............................................................................................3
2.0 Background .............................................................................................................................................4
3.0 Optimization Cases Considered ..............................................................................................................5
3.1 Reduce Pressure Drop in Overhead System to Lower Tower Operating Pressure.............................6
3.1.1 Case 1: Modifications to Existing Heat Exchangers .....................................................................6
3.1.2 Case 2: Modifications to Surge and Knockout Drums..................................................................6
3.1.3 Case 3: Modifications to Overheads Heat Exchanger Network...................................................7
3.1.4 Case 4: Re-Routing Overheads Piping to Shorten Distance and Pressure Drop ..........................7
3.1.5 Case 5: Increasing Diameter of Overheads Piping.......................................................................8
3.2 Optimization of Tower Operating Conditions.....................................................................................8
3.2.1 Case 6: Optimization of HOS Pumparounds ................................................................................8
3.2.1 Case 7: Optimization of Steam Flowrate .....................................................................................9
3.2.2 Case 8: Optimization of Feed Conditions.....................................................................................9
3.3 Physical Modifications to the Stripping Tower.................................................................................10
3.3.1 Case 9: Complete Tower Re-Design...........................................................................................10
3.3.2 Case 10: Add Additional/More Efficient Packed Beds ...............................................................10
3.3.3 Case 11: Install Overheads Compressor.....................................................................................11
3.4 Do Nothing Case................................................................................................................................11
3.4.1 Case 12: Maintain Current Operating Conditions......................................................................11
4.0 Proposed Solution.................................................................................................................................11
5.0 Justification...........................................................................................................................................12
6.0 Process Description...............................................................................................................................13
6.1 Process Description...........................................................................................................................13
6.2 Stripping Tower Simulation & Validation..........................................................................................13
6.3 Main Process Flowsheet (PFD) for Base Case Simulation & Proposed Solution...............................15
6.4 Summary of Material & Energy Balances .........................................................................................15
6.5 Equipment List & Summary of Design Specifications and Optimization ..........................................18
6.5.1 Heat Exchanger (E-210A) ...........................................................................................................18
6.5.2 Design of Heat Exchanger (E-230)..............................................................................................21
6.5.3 Line Diameter Sensitivity Analysis .............................................................................................22
2
6.6 Utility Requirements.........................................................................................................................25
6.7 HAZOP and P&ID...............................................................................................................................25
6.8 DOW FEI & CEI...................................................................................................................................28
6.9 Pressure Relief Valve (PRV)...............................................................................................................28
6.10 Process Control ...............................................................................................................................29
6.11 Plot Plan..........................................................................................................................................31
6.12 Effect on Upstream and Downstream units ...................................................................................31
6.12.1 Atmospheric Distillation Tower ...............................................................................................31
6.12.2 Hydrotreater ............................................................................................................................31
6.13 Environmental/Legislative Considerations .....................................................................................32
6.14 Assumptions, Limitations, and Constraints.....................................................................................32
6.15 Project Execution Strategy..............................................................................................................32
6.15.1 Engineering Plan ......................................................................................................................33
6.15.2 Procurement Plan ....................................................................................................................33
6.15.3 Construction Plan.....................................................................................................................34
6.15.4 Project Schedule ......................................................................................................................34
6.16 HOS Start-Up/Shut-Down Procedure..............................................................................................34
7.0 Economic Analysis.................................................................................................................................35
7.1 Total Module Cost Estimation...........................................................................................................35
7.1.1 Initial Unit Capital Costs.............................................................................................................35
7.1.2 Location Effects..........................................................................................................................36
7.1.3 Field vs. Shop Fabrication ..........................................................................................................36
7.1.4 Work Included and Excluded .....................................................................................................36
7.1.5 Other Capital Cost Factors .........................................................................................................37
7.2 Working Capital Estimation ..............................................................................................................37
7.3 Operating Costs.................................................................................................................................37
7.4 Project Management Schedule.........................................................................................................38
7.5 Plan for Financing..............................................................................................................................38
7.6 Cash Flow Analysis ............................................................................................................................38
7.7 Sensitivity Analysis............................................................................................................................39
7.8 Discussion of Economics ...................................................................................................................39
8.0 Recommendations and Conclusions.....................................................................................................40
9.0 References ............................................................................................................................................40

More Related Content

What's hot

SANJAY KUMAR RESUME
SANJAY KUMAR RESUMESANJAY KUMAR RESUME
SANJAY KUMAR RESUME
Sanjay Kumar
 
Summer Internship Report (National Engineering Services Pakistan)-2014
Summer Internship Report (National Engineering Services Pakistan)-2014Summer Internship Report (National Engineering Services Pakistan)-2014
Summer Internship Report (National Engineering Services Pakistan)-2014
Danial Sohail
 
Shiaz Vivek A Quick Look
Shiaz Vivek A Quick LookShiaz Vivek A Quick Look
Shiaz Vivek A Quick Look
shiazv
 
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
Michael Siswaraharja
 
LNG By Tanker SIP by Mohit
LNG By Tanker SIP by MohitLNG By Tanker SIP by Mohit
LNG By Tanker SIP by Mohit
Mohit Patel
 

What's hot (20)

OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019OCS Training API 510 pressure vessel preparation course 2019
OCS Training API 510 pressure vessel preparation course 2019
 
PetroSync - Water Injection for Production System
PetroSync - Water Injection for Production SystemPetroSync - Water Injection for Production System
PetroSync - Water Injection for Production System
 
ROSHAN-1 (1)
ROSHAN-1 (1)ROSHAN-1 (1)
ROSHAN-1 (1)
 
SANJAY KUMAR RESUME
SANJAY KUMAR RESUMESANJAY KUMAR RESUME
SANJAY KUMAR RESUME
 
dynaCERT Pit Group Test Results
dynaCERT Pit Group Test ResultsdynaCERT Pit Group Test Results
dynaCERT Pit Group Test Results
 
Our Capabilities
Our CapabilitiesOur Capabilities
Our Capabilities
 
Proposal for Salt Iodization
Proposal for Salt IodizationProposal for Salt Iodization
Proposal for Salt Iodization
 
Pr 1047 well integrity maintenance
Pr 1047 well integrity maintenancePr 1047 well integrity maintenance
Pr 1047 well integrity maintenance
 
Summer Internship Report (National Engineering Services Pakistan)-2014
Summer Internship Report (National Engineering Services Pakistan)-2014Summer Internship Report (National Engineering Services Pakistan)-2014
Summer Internship Report (National Engineering Services Pakistan)-2014
 
Basics of quality and seven qc tools
Basics of quality and seven qc toolsBasics of quality and seven qc tools
Basics of quality and seven qc tools
 
Shiaz Vivek A Quick Look
Shiaz Vivek A Quick LookShiaz Vivek A Quick Look
Shiaz Vivek A Quick Look
 
Company Brochures
Company BrochuresCompany Brochures
Company Brochures
 
Dash profile 2012
Dash profile 2012Dash profile 2012
Dash profile 2012
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
Aberdeen Drilling International Capability Profile (ADI_Malaysia) - Incl FC F...
 
Bulk Carrier Tank Cleaning Proposal
Bulk Carrier Tank Cleaning ProposalBulk Carrier Tank Cleaning Proposal
Bulk Carrier Tank Cleaning Proposal
 
Internal cleaning of fuel tanks
Internal cleaning of fuel tanksInternal cleaning of fuel tanks
Internal cleaning of fuel tanks
 
VTU Internship Report.[Peekay Steel Castings]
VTU Internship Report.[Peekay Steel Castings]VTU Internship Report.[Peekay Steel Castings]
VTU Internship Report.[Peekay Steel Castings]
 
LNG By Tanker SIP by Mohit
LNG By Tanker SIP by MohitLNG By Tanker SIP by Mohit
LNG By Tanker SIP by Mohit
 
CHAYAN BHALLA
CHAYAN BHALLACHAYAN BHALLA
CHAYAN BHALLA
 

Viewers also liked

Smart Process Operations in Fuels Industries: Applications and Opportunities ...
Smart Process Operations in Fuels Industries: Applications and Opportunities ...Smart Process Operations in Fuels Industries: Applications and Opportunities ...
Smart Process Operations in Fuels Industries: Applications and Opportunities ...
Brenno Menezes
 
Biogas technology - A renewable source of energy
Biogas technology - A renewable source of energyBiogas technology - A renewable source of energy
Biogas technology - A renewable source of energy
Janak Shah
 
Detailed Design Report
Detailed Design ReportDetailed Design Report
Detailed Design Report
Tomos Hughes
 
31 liquid-liquid extraction
31   liquid-liquid extraction31   liquid-liquid extraction
31 liquid-liquid extraction
Incopin
 

Viewers also liked (20)

BE Chemical Engineering Design Project Production Of Propylene Oxide
BE Chemical Engineering Design Project   Production Of Propylene OxideBE Chemical Engineering Design Project   Production Of Propylene Oxide
BE Chemical Engineering Design Project Production Of Propylene Oxide
 
Ammonia stripper
Ammonia stripperAmmonia stripper
Ammonia stripper
 
2008 IFAC World Congress: Oil and gas production optimization - lost potentia...
2008 IFAC World Congress: Oil and gas production optimization - lost potentia...2008 IFAC World Congress: Oil and gas production optimization - lost potentia...
2008 IFAC World Congress: Oil and gas production optimization - lost potentia...
 
Process Optimization & Slop Oil Reduction( Fahad Khan)
Process Optimization & Slop Oil Reduction( Fahad Khan)Process Optimization & Slop Oil Reduction( Fahad Khan)
Process Optimization & Slop Oil Reduction( Fahad Khan)
 
Principle source of optimazation
Principle source of optimazationPrinciple source of optimazation
Principle source of optimazation
 
Smart Process Operations in Fuels Industries: Applications and Opportunities ...
Smart Process Operations in Fuels Industries: Applications and Opportunities ...Smart Process Operations in Fuels Industries: Applications and Opportunities ...
Smart Process Operations in Fuels Industries: Applications and Opportunities ...
 
Modelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining ProcessesModelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining Processes
 
Production of phthalic anhydride from xylene
Production of phthalic anhydride from xyleneProduction of phthalic anhydride from xylene
Production of phthalic anhydride from xylene
 
Supply chain
Supply chainSupply chain
Supply chain
 
Modeling and Optimization of In-Situ Oil Production
Modeling and Optimization of In-Situ Oil ProductionModeling and Optimization of In-Situ Oil Production
Modeling and Optimization of In-Situ Oil Production
 
Biogas technology - A renewable source of energy
Biogas technology - A renewable source of energyBiogas technology - A renewable source of energy
Biogas technology - A renewable source of energy
 
Crude-Oil Scheduling Technology: moving from simulation to optimization
Crude-Oil Scheduling Technology: moving from simulation to optimizationCrude-Oil Scheduling Technology: moving from simulation to optimization
Crude-Oil Scheduling Technology: moving from simulation to optimization
 
INTEGRATED COW FARM-BIOGAS-ORGANIC FERTILIZER
INTEGRATED COW FARM-BIOGAS-ORGANIC FERTILIZERINTEGRATED COW FARM-BIOGAS-ORGANIC FERTILIZER
INTEGRATED COW FARM-BIOGAS-ORGANIC FERTILIZER
 
Biogas technology
Biogas technologyBiogas technology
Biogas technology
 
Detailed Design Report
Detailed Design ReportDetailed Design Report
Detailed Design Report
 
31 liquid-liquid extraction
31   liquid-liquid extraction31   liquid-liquid extraction
31 liquid-liquid extraction
 
Oil & gas
Oil & gasOil & gas
Oil & gas
 
A Study Of Production Optimization Of An Oil Copy
A Study Of Production Optimization Of An Oil   CopyA Study Of Production Optimization Of An Oil   Copy
A Study Of Production Optimization Of An Oil Copy
 
Ethylene Glycol plant design
Ethylene Glycol plant designEthylene Glycol plant design
Ethylene Glycol plant design
 
Types and design of the towers trays
Types and design of the towers traysTypes and design of the towers trays
Types and design of the towers trays
 

Similar to Chemical Engineering Design II Final Project - Optimization of Heavy Oil Stripper [SAMPLE]

Kortick Senior Design Project
Kortick Senior Design ProjectKortick Senior Design Project
Kortick Senior Design Project
Asmar Farooq
 
Final_Report_Humpback_Hydro
Final_Report_Humpback_HydroFinal_Report_Humpback_Hydro
Final_Report_Humpback_Hydro
Mark Legacy
 
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningCost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Donnie Miller
 
EVALUATION OF EQUIPMENT RELIABILITY, AVAILABILITY AND MAINTAINABILITY IN AN O...
EVALUATION OF EQUIPMENT RELIABILITY, AVAILABILITY AND MAINTAINABILITY IN AN O...EVALUATION OF EQUIPMENT RELIABILITY, AVAILABILITY AND MAINTAINABILITY IN AN O...
EVALUATION OF EQUIPMENT RELIABILITY, AVAILABILITY AND MAINTAINABILITY IN AN O...
Jun Rong Du
 
Guidelines cdbus
Guidelines cdbusGuidelines cdbus
Guidelines cdbus
Meg Cereno
 
Cpuc changes to adv energy storage incentives sep 2011
Cpuc changes to adv energy storage incentives sep 2011Cpuc changes to adv energy storage incentives sep 2011
Cpuc changes to adv energy storage incentives sep 2011
UCSD-Strategic-Energy
 
Ryan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final ReportRyan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final Report
rrbierl
 
Saheb_Kapoor_Thesis
Saheb_Kapoor_ThesisSaheb_Kapoor_Thesis
Saheb_Kapoor_Thesis
Saheb Kapoor
 
Extract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyExtract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance Study
TACook Consultants
 
Extract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyExtract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance Study
Mateus Siwek
 

Similar to Chemical Engineering Design II Final Project - Optimization of Heavy Oil Stripper [SAMPLE] (20)

Business Case for 203CL Barrier
Business Case for 203CL BarrierBusiness Case for 203CL Barrier
Business Case for 203CL Barrier
 
Kortick Senior Design Project
Kortick Senior Design ProjectKortick Senior Design Project
Kortick Senior Design Project
 
Final_Report_Humpback_Hydro
Final_Report_Humpback_HydroFinal_Report_Humpback_Hydro
Final_Report_Humpback_Hydro
 
thesis
thesisthesis
thesis
 
ETCA_6
ETCA_6ETCA_6
ETCA_6
 
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningCost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
 
S E I Passive House
S E I Passive HouseS E I Passive House
S E I Passive House
 
EVALUATION OF EQUIPMENT RELIABILITY, AVAILABILITY AND MAINTAINABILITY IN AN O...
EVALUATION OF EQUIPMENT RELIABILITY, AVAILABILITY AND MAINTAINABILITY IN AN O...EVALUATION OF EQUIPMENT RELIABILITY, AVAILABILITY AND MAINTAINABILITY IN AN O...
EVALUATION OF EQUIPMENT RELIABILITY, AVAILABILITY AND MAINTAINABILITY IN AN O...
 
Guidelines cdbus
Guidelines cdbusGuidelines cdbus
Guidelines cdbus
 
FINAL REPORT (4)
FINAL REPORT (4)FINAL REPORT (4)
FINAL REPORT (4)
 
TLP_ProjectReport
TLP_ProjectReportTLP_ProjectReport
TLP_ProjectReport
 
Cpuc changes to adv energy storage incentives sep 2011
Cpuc changes to adv energy storage incentives sep 2011Cpuc changes to adv energy storage incentives sep 2011
Cpuc changes to adv energy storage incentives sep 2011
 
Ryan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final ReportRyan Bierl Mae377 Project08 Final Report
Ryan Bierl Mae377 Project08 Final Report
 
Saheb_Kapoor_Thesis
Saheb_Kapoor_ThesisSaheb_Kapoor_Thesis
Saheb_Kapoor_Thesis
 
GAS TO LIQUIDS (GTL) FROM METHANE FUELED SYNTHESIS GAS.pdf
GAS TO LIQUIDS (GTL) FROM METHANE FUELED SYNTHESIS GAS.pdfGAS TO LIQUIDS (GTL) FROM METHANE FUELED SYNTHESIS GAS.pdf
GAS TO LIQUIDS (GTL) FROM METHANE FUELED SYNTHESIS GAS.pdf
 
Aerospace Trends and New Technology Developments
Aerospace Trends and New Technology DevelopmentsAerospace Trends and New Technology Developments
Aerospace Trends and New Technology Developments
 
Extract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyExtract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance Study
 
Extract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance StudyExtract | T.A. Cook Offshore Wind Maintenance Study
Extract | T.A. Cook Offshore Wind Maintenance Study
 
Power plants characteristics_costs
Power plants characteristics_costsPower plants characteristics_costs
Power plants characteristics_costs
 
FinalReport-1
FinalReport-1FinalReport-1
FinalReport-1
 

Recently uploaded

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Recently uploaded (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

Chemical Engineering Design II Final Project - Optimization of Heavy Oil Stripper [SAMPLE]

  • 1. Optimization of Heavy Oil Stripper CH E 465 – Chemical Engineering Design II Team 25 – A++Engineering April 9th, 2015 Ammar Al-Qabbas Fairuz Mustafa Josh Idowu Ryan Dinn Siti Nasir Fairuz Mustafa
  • 2. Executive Summary Shell Canada provided A++ Engineering with an opportunity to contribute to the optimization of the heavy oil stripper unit within the Scotford Upgrader located in Fort Saskatchewan, Alberta. The primary driver of this project is economic because the heavy oil stripper is fully operational and Shell Canada is simply looking for improvements to the process. The business objective is to implement an optimization to the unit that does not require a drastic amount of capital investment. Three main categories of project solutions were explored for the project. The first was to follow Shell Canada’s recommendation to target a reduction in pressure drop of the overhead system in order to lower the operating pressure of the heavy oil stripper. The second was to consider an optimization of the current operating conditions of the heavy oil stripper. The third and final subset of solutions considered was physical modifications to the tower that could potentially increase the quality of production of the unit. A total of eleven cases were considered in the development of the solution. Ultimately, A++ Engineering has suggested that Shell Canada implement a modification to the current heat exchanger network and overhead system piping. The project required a capital investment of approximately $2,000,000 with an internal rate of return of 78% considered over a project life of ten years. The solution will be implemented during the heavy oil stripper’s scheduled turnaround in the year 2019. A project execution strategy has been designed such that all construction and commissioning will occur during the turnaround. A++ Engineering has produced a design basis memoranda level report that can be used to take this project to the next stage of development.
  • 3. 1 Table of Contents List of Tables and Figures..............................................................................................................................3 1.0 Introduction and Statement of Objectives .............................................................................................3 2.0 Background .............................................................................................................................................4 3.0 Optimization Cases Considered ..............................................................................................................5 3.1 Reduce Pressure Drop in Overhead System to Lower Tower Operating Pressure.............................6 3.1.1 Case 1: Modifications to Existing Heat Exchangers .....................................................................6 3.1.2 Case 2: Modifications to Surge and Knockout Drums..................................................................6 3.1.3 Case 3: Modifications to Overheads Heat Exchanger Network...................................................7 3.1.4 Case 4: Re-Routing Overheads Piping to Shorten Distance and Pressure Drop ..........................7 3.1.5 Case 5: Increasing Diameter of Overheads Piping.......................................................................8 3.2 Optimization of Tower Operating Conditions.....................................................................................8 3.2.1 Case 6: Optimization of HOS Pumparounds ................................................................................8 3.2.1 Case 7: Optimization of Steam Flowrate .....................................................................................9 3.2.2 Case 8: Optimization of Feed Conditions.....................................................................................9 3.3 Physical Modifications to the Stripping Tower.................................................................................10 3.3.1 Case 9: Complete Tower Re-Design...........................................................................................10 3.3.2 Case 10: Add Additional/More Efficient Packed Beds ...............................................................10 3.3.3 Case 11: Install Overheads Compressor.....................................................................................11 3.4 Do Nothing Case................................................................................................................................11 3.4.1 Case 12: Maintain Current Operating Conditions......................................................................11 4.0 Proposed Solution.................................................................................................................................11 5.0 Justification...........................................................................................................................................12 6.0 Process Description...............................................................................................................................13 6.1 Process Description...........................................................................................................................13 6.2 Stripping Tower Simulation & Validation..........................................................................................13 6.3 Main Process Flowsheet (PFD) for Base Case Simulation & Proposed Solution...............................15 6.4 Summary of Material & Energy Balances .........................................................................................15 6.5 Equipment List & Summary of Design Specifications and Optimization ..........................................18 6.5.1 Heat Exchanger (E-210A) ...........................................................................................................18 6.5.2 Design of Heat Exchanger (E-230)..............................................................................................21 6.5.3 Line Diameter Sensitivity Analysis .............................................................................................22
  • 4. 2 6.6 Utility Requirements.........................................................................................................................25 6.7 HAZOP and P&ID...............................................................................................................................25 6.8 DOW FEI & CEI...................................................................................................................................28 6.9 Pressure Relief Valve (PRV)...............................................................................................................28 6.10 Process Control ...............................................................................................................................29 6.11 Plot Plan..........................................................................................................................................31 6.12 Effect on Upstream and Downstream units ...................................................................................31 6.12.1 Atmospheric Distillation Tower ...............................................................................................31 6.12.2 Hydrotreater ............................................................................................................................31 6.13 Environmental/Legislative Considerations .....................................................................................32 6.14 Assumptions, Limitations, and Constraints.....................................................................................32 6.15 Project Execution Strategy..............................................................................................................32 6.15.1 Engineering Plan ......................................................................................................................33 6.15.2 Procurement Plan ....................................................................................................................33 6.15.3 Construction Plan.....................................................................................................................34 6.15.4 Project Schedule ......................................................................................................................34 6.16 HOS Start-Up/Shut-Down Procedure..............................................................................................34 7.0 Economic Analysis.................................................................................................................................35 7.1 Total Module Cost Estimation...........................................................................................................35 7.1.1 Initial Unit Capital Costs.............................................................................................................35 7.1.2 Location Effects..........................................................................................................................36 7.1.3 Field vs. Shop Fabrication ..........................................................................................................36 7.1.4 Work Included and Excluded .....................................................................................................36 7.1.5 Other Capital Cost Factors .........................................................................................................37 7.2 Working Capital Estimation ..............................................................................................................37 7.3 Operating Costs.................................................................................................................................37 7.4 Project Management Schedule.........................................................................................................38 7.5 Plan for Financing..............................................................................................................................38 7.6 Cash Flow Analysis ............................................................................................................................38 7.7 Sensitivity Analysis............................................................................................................................39 7.8 Discussion of Economics ...................................................................................................................39 8.0 Recommendations and Conclusions.....................................................................................................40 9.0 References ............................................................................................................................................40