EQUIPMENT / MACHINERY CHECKLIST 
Equipment Asset Code
Department Inspected By Date
Equipment Operator’s Daily Check
Name: For week starting (Monday):
 Circle days worked.
 Check deficiencies.
Work Inspection Monday Tuesday Wednesday Thursday Friday Saturday Sunday Comments and Corrective Action Date Completed
Oil level            
Oil pressure            
Water level            
No Oil Trapping/Air Leakage            
Noise Level/Vibration(Acceptable)            
Temperature (Acceptable)            
Nuts & Bolts are tight            
No Wear and tear            
No Sudden Shutdown            
Proper Cleaning            
Power cord and plug            
First Aid kit            
Operator Supervisor Maintenance Engr.
------------------- ------------------ ------------------

Equipment operators daily checklist

  • 1.
    EQUIPMENT / MACHINERYCHECKLIST  Equipment Asset Code Department Inspected By Date Equipment Operator’s Daily Check Name: For week starting (Monday):  Circle days worked.  Check deficiencies. Work Inspection Monday Tuesday Wednesday Thursday Friday Saturday Sunday Comments and Corrective Action Date Completed Oil level             Oil pressure             Water level             No Oil Trapping/Air Leakage             Noise Level/Vibration(Acceptable)             Temperature (Acceptable)             Nuts & Bolts are tight             No Wear and tear             No Sudden Shutdown             Proper Cleaning             Power cord and plug             First Aid kit             Operator Supervisor Maintenance Engr. ------------------- ------------------ ------------------