PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTS
working process of engineering function how it works, steps involved and final set up
1. EDC Working process – BIM Process
Input
CAD Drawing
3D Laser Scan
Kick-off
Meeting /
Initial
Design
Review
Task Confirmation/
Clarification
BIM
Model
Setup
Modelling
& Clash
Detection
Final
Review &
Quality
Check
Final
Delivery
No
Yes Customer
Review &
Approval
No
Finish
Yes
Task List & Priority
Time Reporting per project
Clash Report
Generation
2. EDC Working process – BIM Model Setup
Arch/Str.
Revit Model
Grid, Levels &
Coordinated
Revit Model
Point Cloud /
CAD model
MEP Revit
Model
• Clash Reports
• 3D Models
• 3D CAD
Models
• Drawings
• Reports
3. EDC Working process – BIM Information Exchange
1.1 It is important to be able to distinguish each item from another item. To do this
we implement the following systems:
a) Adapted BSAB 96 system classification
b) The BSAB 96 is the basis along which systems are splits into different
classifications like heating and cooling. Within these classifications there
can be additional splits like return and supply. Each system will have a
colour scheme which distinguishes them from other systems.
1.2 The level of development is a measure of the information level of an object.
This project uses two LOD levels namely:
a) 200 the object consists of generalized systems or assemblies with
approximate size, shape, location and orientation.
b) 300 the object consists of generalized systems or assemblies with exact
size, shape, location and orientation.