Cash Payment 9602870969 Escort Service in Udaipur Call Girls
JIT Logistics Management
1. JIT (Just-In-Time)
on Logistic
Management
Presented by:
Mahendra Wirawan
PT. Integra Solusi Dinamika
Manufacturing Excellence Consultants
People – Process – Profit
Phone: 031-21006164
marketing@isd.co.id
www.isd.co.id
www.pelatihan-online.com
2. What is JIT ?
- Integrated of activities designed to achieve
deliveries target using minimal inventories of
raw materials, WIP, and FGI.
- Supplies and components are pull system
to achieve the numbers needed, what they
are needed and when they are needed.
PT. Integra Solusi
Dinamika
www.isd.co.id
2
3. Requirements
- Runs with small inventory quantity
- High quality
- High resources
- Management system of continuous and
forced problem solving
- Elimination of waste
PT. Integra Solusi
Dinamika
www.isd.co.id
3
4. Waste dalam Logistik:
-
Late delivery
Wrong delivery
Damage vehicle
Moving over long distances
Storing over inventory
Over delivery
Delay delivery
Damage
PT. Integra Solusi
Dinamika
www.isd.co.id
4
5. Management System
Push system: delivery system are
pushed. Generally, push systems are
the result of poor demand forecasting
Pull system: delivery system are pulled
based on it is needed
PT. Integra Solusi
Dinamika
www.isd.co.id
5
6. Small Delivery Numbers
- Requires less space & capital investment
- Movement flexibility
- Makes quality problems easier to detect
- Reduce waste
PT. Integra Solusi
Dinamika
www.isd.co.id
6
7. Over Inventory Hides Problems
Wrong
Design
Problem of
Setups
Problem of
Quality
Machine
PT. yout Solusi
Unreliable
a Integra
L
Dinamika
oblem Breakdown
Supplier
pr
www.isd.co.id
7
8. Small Inventory Expose Problems
Wrong
Design
Problem of
Problem of
Setups
Quality
PT. Integra Solusi
t
Machine
Unreliable
ayou
L
Dinamika
oblem Breakdown 8 Supplier
www.isd.co.id
pr
9. Keuntungan JIT:
a.
b.
c.
d.
Reduced inventory
Improved quality
Lower costs
Reduced space
requirements
e. Shorter lead time
f.
g.
h.
On time delivery
Simplified scheduling
and control activities
Better use of human
resources
PT. Integra Solusi
Dinamika
www.isd.co.id
9
10. JIT Manage Inventory
- Traditional: inventory exists in case problems
arise
- JIT objective: eliminate inventory by eliminating
problems before happened
- JIT requires:
1. Small numbers
2. Short lead time
3. Reliable delivery plan
- JIT inventory Goal: Only have the minimum
PT. Integra Solusi
inventory needed to keep delivery running
Dinamika
www.isd.co.id
10
11. JIT Inventory Tactics
- Use a pull system to move inventory
- Reduce lot size
- Reduce lead time
- Develop Just-in-Time delivery
systems with suppliers
- Deliver directly to point of use no
storage
- Reliable schedule
PT. Integra Solusi
- Use continues improvement
Dinamika
www.isd.co.id
11
12. JIT Manage Scheduling
- Stresses the timing of delivery
- JIT requires
Communicating schedules to suppliers
2. Level schedules
3. Small lots
4. Updated latest schedule
1.
PT. Integra Solusi
Dinamika
www.isd.co.id
12
13. JIT vs Conventional
for Logistic Management
JIT System
1
1
2
2
2
3
1
1
2
2
2
3
2
2
2
3
3
Time
Conventional System
1
1
1
1
2
2
2
PT. Integra Solusi
Time
Dinamika
www.isd.co.id
13
14. Ingin belajar dan mendapatkan
sertifikat dalam manajemen
logistik?
Kunjungi :
www.pelatihan-online.com
PT. Integra Solusi
Dinamika
www.isd.co.id
14