SlideShare a Scribd company logo
1 of 16
Download to read offline
02
Pipeco GRP Sectional Water Tank
PIPECO TANKS (KOREA) is a company that specializes in the development and production
of GRP Water tanks. Located in Gimhae, Korea our large-scale plant and research center are
dedicatedtoongoingdevelopmentandproductiontoleadtheindustry.
We are specialized in manufacturing and installing GRP tanks and other GRP Products. Our
advanced technology has received ISO, WARAS (UK), PSB (SINGAPORE) quality certificates. we
have expanded our presence in more than 35 countries and 1 Tank getting completely installed
every24hours
In addition, with a corporate ideology rooted in placing our customers first, we base our
Management and Product Development upon this the foundation of trust, contributing to
technologicalinnovation,qualityimprovement,andaddedenhancement.
To carry out such customer-oriented management, we constantly keep in mind the priorities of
stringent quality management and environmental protection. In the following, we adopted ISO
product quality and environmental management standards from the very beginning, and our
efforts to Growth as an environmentally friendly company along with our customers are never-
ending.
We ask for your continuing interest and support kindly share your requirements via email at
sales@pipecogroup.com
G R O U P
G R O U P
THERMAL CONDUCTIVITY, EXPANSION AND CONTRACTION
Non-insulated panels
have 240 times less
thermal conductivity than
metal, ensuring stable
temperature. Modular panels
with low thermal coefficient
and flexible food grade sealant
ensure a leak-free design
PROTECTION AGAINST UV RAYS
Excellent ultraviolet (UV) resistant
characteristics and performance ensures
high mechanical properties and weather
resistance even after 35 years of use
Thermal Properties
50mm
Insulated
25mm
Insulated
Normal Steel
1/K(W/M.K)
03
G R O U P
STANDARD:
BS EN 13280:2001 and British
Standard BS 7491 Part 3:1994 MATERIALS:
Sheet Moulding Compound (SMC) consists
of below specification Resin - PU Form
Conforming to BS 3532 specification
Fiber Glass - Low alkali fiberglass
conforming to JIS R3411 to R3417 or
BS 3396, BS 3496, and BS 3749
specifications.
01
02
03
TESTING METHOD:
BS2782
MANUFACTURING PROCESS:
Hot pressed SMC compression
moulding
04
05
TANK STRUCTURAL SUPPORT:
External
Internal
Roof Support
SEALANT:
Non-toxic PVC Foam
BOLT, NUTS, WASHERS:
Hot Dipped Galvanised Steel
SS316
GRP Pipes
:
:
:
06
07
08
LADDER :
External Standard : Hot Dipped Galvanised
Steel, 300mm width
Internal : Standard GRP
Optional : SS 304 and 316,
300mm width
09
WATER LEVEL INDICATOR :
Standard : Direct Reading Clear Tube Type
Optional : Reversed Reading Mechanical
Ball Float Type (Cat & Mouse)
10
NOZZLE PANEL :
Flat Panels will be provided on request
11
EXTERNAL BRACED SYSTEM :
External : Hot Dipped Galvanized
Steel Internal None
(metal free inside, non
-partitioned tank only)
Roof Support : GRP Poles
04
General Specifications
External Standard : SS316 / SS304/HDG
Internal Standard : SS316
(In-contact with water)
Roof : Standard : SS316 / SS304
G R O U P
GRP Panel Type and Size
05
0.5Mx0.5M
0.5Mx1M
1Mx1M
Roof Panel
1Mx2M
Base Panel
Drain Panel
0.5Mx0.5M
0.5Mx1M
1Mx1M
1Mx1M
PIPECO
1Mx2M 0.5Mx2M
PIPECO
1Mx1.5M 0.5Mx1.5M
Wall Panel
1Mx1M 1Mx1M 0.5Mx1M 0.5Mx1M 0.3Mx1M
ManwayPanel
1Mx1M
0.5Mx0.5M
GRP Panel Composition by Height
PIPECO
PIPECO
PIPECO
PIPECO
PIPECO
PIPECO
PIPECO
PIPECO
PIPECO
PIPECO
Current A grade
Height of water tank
1x1 E 1x1.5 1x2 D 1x1.5
1x1
1x2
1x1
1x1.5
1x1
1x1
1x2
1x1
1x1
D
C
D
B
D
C
SA
D
B
SA
D 1x1.5
1x1
1x1
1x1
D
C
SA
IIA
1x2
1x1
1x1
1x1
D
B
SA
IIA
1x1.5
1x1
1x1
1x1
1x1
D
C
SA
IIA
IIIA
1x2
1x1
1x1
1x1
1x1
D
B
SA
IIA
IIIA
Unify to SA grade Current IA grade Unify to IIA grade
6.0m.H
5.5m.H
5.0m.H
4.5m.H
4.0m.H
3.5m.H
3.0m.H
2.5m.H
2.0m.H
1.5m.H
1.0m.H
0.5m.H
0m.H
Grade of base panel
Grade of drain panel
Grade of
wall-base panel
Flat,0.5X1
Flat,1X1
E
C
D
D
D
C
B
B
D
C
B
B
C
B
B
SA
B
SA
B
SA
SA
SA
SA
IIA
SA
IIA
SA
IIA
IIA
IIA
IIA
IIIA
IIA
IIA
IIA
IIIA
IIIA
IIIA
IIIA
IIIA
IIIA
IIIA
IIIA
IIIA
Roof support pipe
11
Manway panel
1 2
External ladder
3
Internal ladder
Internal bracket
Internal Tie-Rod
4
5
External bracket
7
6
Flangebar, Flat bar
Name plate
16
10
Corner frame
14
Sealing tape
13
Bolts and Nuts
12
Skid base frame
9
Wall-Bottom bracket
15
Water level gauge
8
Corner bracket
It is possible that various capacity design and flexible space
should be used by GRP panel standardized Excellent water
tightness, hygienic conditions and non-leakage
applied internally reinforced stay (Stainless)
G R O U P
06
Internally Reinforced System
07
4
11
5
2
1
11
10
13
12
9 8 16
6
7
3
15
GRP
SS400(HDG)
GRP (Pultrusion)
STS 316
STS 316
SS400(HDG)
Roof support pipe
Skid base frame
Bolts and Nuts
Sealing tape
Water level gauge
Name plate
GRP (Pultrusion)
SS400(HDG)
Internal : STS 316
Roof : STS 316
External : STS 316 / 304 / HDG
Skid Base : HDG
PVC Sealant+Butyl
Aluminum Case+PC Clear Tube+Socket
Aluminum (Water tank safery
management instructions)
Material
Name
No. No. Name Material
Manway panel
External ladder
Internal ladder
Internal bracket
Internal Tie-Rod
Flangebar, Flat bar
External bracket
Corner bracket
Wall-Bottom bracket
Corner frame
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
G R O U P
Internally Reinforced System
08
G R O U P
G R O U P
08
External ladder
3
Internal ladder
Internal bracket
4
7
External bracket
14
Name plate
12
Sealing tape
10
Base frame
Bolt and Nuts
11
Corner frame
8
13
Water level gauge
External main bar
6
Roof support pipe : GRP (Pultrusion)
9
5
Roof bar
1
Manway panel
2
Externally Reinforced System
G R O U P
09
12
11
10
2
SS400(HDG)
10 Base frame
Bolts and Nuts
11
Sealing tape
12
13 Water level gauge
14 Name plate
SS400(HDG)
Internal : STS 316
Roof : STS 316
External : STS 316
Skid Base : HDG
PVC Sealant+Butyl
Aluminum Case+PC Clear Tube+Socket
Aluminum(Water tank safety
management instructions)
Name Material
No.
1 Manway panel
External ladder
Internal ladder
Internal bracket
Roof bar
External main bar
External bracket
Corner bracket
GRP
SS400(HDG)
GRP (Pultrusion)
STS 316
SS400(HDG)
3
4
5
6
7
8
9
Roof support pipe :
GRP (Pultrusion)
No. Name Material
8 7
4
9
6
13
14
3
5
2
1
Externally Reinforced System
10
Excellent insulation of GRP Material itself with Eco-friendly Polyurethane heat insulating material
prevents freeze & water condensation.
There is non-woven fabric with excellent adhesion inside GRP insulated panel, ensuring shape stability
of panel throughout longer time periods.
GRP insulated panel with 4 layer structure ensure excellent insulating effect
Thickness of insulated panel : 40 - 50 mm
Stress Analysis of GRP Panel
Excellent Heat Insulation
Drawing of the panel Joint Part / Corner Part
Composition of Insulation Panel
G R O U P
Panel physical Properties
GRP Water Tank panel is designed with special shape for maximizing safety against stress and deformation,
so it has better structural strength than normal circle designed panel As GRP Water panel is manufactured by
oil-hydraulic press under high temperature and high pressure, it maintains top water pressure strength and there
isnodimensionaldeviationbytemperaturechange.
TEST ITEM UNIT SAMPLE
Specific Gravity (23°C/23°C)
Water Absorption
Tensile Strength
Tensile Elastic Modulus
Flexural Strength
Flexurual Elastic Modulus
Shear Strength
Izod Impact Strength
Compressive Strength
Thermal Conductivity
[Mean Temperature 20°C
Thermal Conductivity
[Mean Temperature 20°C
Barcol Hardness
Glass content
-
%
MPa
GPa
MPa
GPa
MPa
J/m
MPa
W/(m.k)
W/(m.k)
-
%
-
-
-
-
-
-
-
-
-
-
-
-
-
1,806
0.02
115
17.5
213
15.9
114
923
234
0.115
0.024
53
over 42.9%
RESULT
ASTM D792-13(Test Method A)
ASTM D570-98(2010)e1 (24 h Immersion)
«
ASTM D638-14( )
«
ASTM D638-14( )
ASTM D790-17(Procedure A)
ASTM D790-17(Procedure A)
ASTM D732-17
ASTM D256-10e1(Test Method A)
ASTM D695-15(**)
KS L 9016 : 2010
(By means of the Heat Flow Meter Apparatus)
KS L 9016 : 2010
(By means of the Heat Flow Meter Apparatus)
ASTM D2583-13a
ASTM D2584-11
TEST METHOD
11
G R O U P
Hydrostatic Pressure Water pressure reinforcement 6 times standard
Transformation rate in filled with water : Less than 1% from water tank height
Wind Force 60 m / sec
Earthquake Force Stable and safe till magnitude 5.0 (Over magnitude 5.0, it need additional
reinforcement)
Snow Load 60 Kg/m2, snow fall less than 30cm
Illumination Rate Less than 0.1%
Out-fit-Force No leakage under condition of vertical 100kg after install of 100A fitting
with 70mm span support
Water Temperature Usable temperature : Less than 30° / Limited temperature : Max 70°
Water Quality Tap Water, Well Water : Chlorine below 50mg/L
Seawater : application Externally Reinforced water tank (max 3m height)
Man Load 120 KGF
Section Design Standard
Feature GRP CONCRETE PLASTIC STEEL
Hygiene & Water Quality
Flexibility
Relocation
Water Tightness
Strength & Durability
Easy & Fast Assembly
Easy to Transportation
Thermal Conductivity
Drainage
Value of Parameter Excellent Good Average Poor
Comparison with Other Types of Tanks
Strength & Durability
Standard of Base Concrete PAD
Installation and Space
For maintenance of GRP tank, it need extra space at least
600mm - 100mm from wall and 1000mm from ceiling
G R O U P
(Partition Type)
(Non Partition Type)
Installation Space
Partition Installation
12
13
Height of water tank 2.5mH
Height of water tank4m
GRP Sectional Panel, Putting water to 85% of water tank height, Earthquake-Proof Strength 5.0
O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K
0.15 < 0.25(Allowable value)
0.17 < 0.33(Allowable value)
0.21 < 0.25(Allowable value)
0.25 < 0.33(Allowable value)
0.06 < 0.25(Allowable value)
0.27 < 0.33(Allowable value)
0.15 < 0.25(Allowable value)
0.17 < 0.33(Allowable value)
O.K
O.K
O.K
O.K
O.K
O.K
O.K
O.K
1170< 1600(Allowable value)
1340< 2400(Allowable value)
1590< 1600(Allowable value)
1830< 2400(Allowable value)
790< 1600(Allowable value)
900< 2400(Allowable value)
1540< 1600(Allowable value)
1750< 2400(Allowable value)
Long term
Short term
Long term
Short term
Long term
Short term
Long term
Short term
Base frame
Base cross
Base frame
Base cross
2.5mH
4mH
Height Contents Result
Deflection(cm)
Result
2
Bending Stress(kg/cm )
Result of skid base strength review (Safety Factor 2.0)
Earthquake-Proof Skid Base System
G R O U P
G R O U P
1) Thewaterlevelshouldbeovertierodpositionallthetime.(Over85%oftankheight)
2) Checktheflatnessofconcreteplinth.(Tolerance:2mm)
3) Checkwatertankpanel'scrack.
4) Checkdeflectionof wallpanel.(maximumupto1%ofwatertankheight)
5) Checkgenerallyforleaksordrips.
6) The interior of the tank should be cleaned two or more times a year: after cleaning, you need to
check whetherthewaterqualityinthetankisproperornot.
7) Organic solvent including thinner, acetone and chlorine bleach cannot be used to clean the
exterioror interiorofthetank.
8) When cleaning once compartment the inside of the tank, keep the water level less than 50%
atthe othercompartment.
9) Thetankcannotstoreanythingexceptnormaltemperaturedrinkingwater.
10) All internal supports should be checked for corrosion, if corrosion is found it should be rectified
immediately.
11) Checkthatalltierodshouldbetightened.
12) Checkthatallpipeworkconnectedtotanksuitablybraced.
13) Checkthatthestructuralsupportsunderthetankareingoodcondition.
14) Checkthatoverflowsarefitted.
15) WhenCleaningtheinsideoftank,donotinterfacewiththejointseals.
16) If there are ladders fitted to the tanks, ensure that they have not been damaged and are securely
fastened tothetank.
17) Ifoverflowand/orairinletscreensarefitted,checkthattheyhavenotbecomeblocked.
18) Pipeco Korea will not bear the responsibility for the problems caused by your failure to fallow the
above mentioned recommendations, inadequate strength or uneven of concrete plinths or
naturaldisasters.
Installation and Caution
1) Caution the damage to the water tank from outside shock
2) Do not use the GRP water tank for other unapproved purpose. (For example chemical storage tank)
3) Do not dismantle internal components or change it to other components without official approval.
4) Prohibit to install unapproved components or non-consent equipment.
5) Keep standard water level at all times. (Uppermost tie rod is soaked in water)
User Regulation Maintenance Items
Maintenance Control
14
Certificates of GRP Water Tanks
GRP Water Tanks Certificates and Test Reports
15
G R O U P
Getting all international certificates and Test reports for GRP Water tank
Realization of customer satisfaction through quality management system
GRP Water tank of best quality with competitive price
5HJLVWHUHG$FFUHGLWDWLRQ2IILFH
.HPS+RXVHLW5RDG/RQGRQ8QLWHG.LQJGRP
4XDOLW0DQDJHPHQW6VWHP
$%
KDVEHHQDVVHVVHGDQGUHJLVWHUHGE9HULWDV$VVXUDQFH,QWHUQDWLRQDO
DVFRQIRUPLQJWRWKHUHTXLUHPHQWVRI
7KLVFHUWLILFDWHUHPDLQVWKHSURSHUWRI9HULWDV$VVXUDQFH,QWHUQDWLRQDODQGPXVWEHUHWXUQHGRQUHTXHVW,QWKHLVVXDQFHRIWKLVFHUWLILFDWH9HULWDV$VVXUDQFH
,QWHUQDWLRQDODVVXPHVQROLDELOLWWRDQSDUWRWKHUWKDQWRWKHFOLHQWDQGWKHQRQOLQDFFRUGDQFHZLWKWKHDJUHHGXSRQFHUWLILFDWLRQDJUHHPHQW9DOLGLWRIWKLV
FHUWLILFDWHPDEHFRQILUPHGDWZZZYHULWDVDVVXUDQFHFRPGLUHFWOWKURXJK45FRGHEXVLQJDQGHYLFHZLWKFRUUHFWLQIRUPDWLRQRU
HPDLOWRDGPLQ#YHULWDVDVVXUDQFHFRP
7KLVFHUWLILFDWHUHPDLQVYDOLGZKLOHWKHKROGHUPDLQWDLQVWKHPDQDJHPHQWVVWHPLQDFFRUGDQFHZLWKWKHVWDQGDUG V DERYHZKLFKZLOOEHSHULRGLFDOODXGLWHGE
9HULWDV$VVXUDQFH,QWHUQDWLRQDO
9(5,7$6
0,;
)6 
Š
)6
ZZZIVFRUJ
)URPUHVSRQVLEOH
VRXUFHV
,62
*RPRUR-LOOH0HRQ*LPKDH6L*HRQJ6DQJQDP.RUHD
0DQXIDFWXUHDQG6HUYLFHRI*53:DWHU7DQN6WHHO5HLQIRUFHG0DWHULDOV
6DOHVRI:DWHU7DQN3DQHODQG6WHHO5HLQIRUFHG0DWHULDOV
3LSHFR.RUHD
HUWLILFDWH1R
VW QG
 6XUYHLOODQFHGXHEHIRUH  6XUYHLOODQFHGXHEHIRUH
_
HUWLILFDWHLVVXHGDWH HUWLILFDWHH[SLUGDWH
_
9HULWDV$VVXUDQFH,QWHUQDWLRQDOLV$FFUHGLWHGE$6,%
$FFUHG6HUYLFHV,QWHUQDWLRQDO%RDUG (XURSH /LPLWHG 
7KH4XDOLW0DQDJHPHQW6VWHPLVDSSOLFDEOHWR
7KLVFHUWLILFDWHLVYDOLGDWHGWKURXJKDQQXDOVXUYHLOODQFHDXGLW
7KLVLVWRFHUWLIWKDWWKH0DQDJHPHQW6VWHPRI
$XWKRULVHG6LJQDWRU
9HULWDV$VVXUDQFH,QWHUQDWLRQDO
5HJLVWHUHG$FFUHGLWDWLRQ2IILFH
.HPS+RXVHLW5RDG/RQGRQ8QLWHG.LQJGRP
(QYLURQPHQWDO0DQDJHPHQW6VWHP
$%
KDVEHHQDVVHVVHGDQGUHJLVWHUHGE9HULWDV$VVXUDQFH,QWHUQDWLRQDO
DVFRQIRUPLQJWRWKHUHTXLUHPHQWVRI
7KLVFHUWLILFDWHUHPDLQVWKHSURSHUWRI9HULWDV$VVXUDQFH,QWHUQDWLRQDODQGPXVWEHUHWXUQHGRQUHTXHVW,QWKHLVVXDQFHRIWKLVFHUWLILFDWH9HULWDV$VVXUDQFH
,QWHUQDWLRQDODVVXPHVQROLDELOLWWRDQSDUWRWKHUWKDQWRWKHFOLHQWDQGWKHQRQOLQDFFRUGDQFHZLWKWKHDJUHHGXSRQFHUWLILFDWLRQDJUHHPHQW9DOLGLWRIWKLV
FHUWLILFDWHPDEHFRQILUPHGDWZZZYHULWDVDVVXUDQFHFRPGLUHFWOWKURXJK45FRGHEXVLQJDQGHYLFHZLWKFRUUHFWLQIRUPDWLRQRU
HPDLOWRDGPLQ#YHULWDVDVVXUDQFHFRP
7KLVFHUWLILFDWHUHPDLQVYDOLGZKLOHWKHKROGHUPDLQWDLQVWKHPDQDJHPHQWVVWHPLQDFFRUGDQFHZLWKWKHVWDQGDUG V DERYHZKLFKZLOOEHSHULRGLFDOODXGLWHGE
9HULWDV$VVXUDQFH,QWHUQDWLRQDO
9(5,7$6
0,;
)6 
Š
)6
ZZZIVFRUJ
)URPUHVSRQVLEOH
VRXUFHV
,62
HUWLILFDWH1R
9HULWDV$VVXUDQFH,QWHUQDWLRQDOLV$FFUHGLWHGE$6,%
$FFUHG6HUYLFHV,QWHUQDWLRQDO%RDUG (XURSH /LPLWHG 
7KH(QYLURQPHQWDO0DQDJHPHQW6VWHPLVDSSOLFDEOHWR
7KLVFHUWLILFDWHLVYDOLGDWHGWKURXJKDQQXDOVXUYHLOODQFHDXGLW
7KLVLVWRFHUWLIWKDWWKH0DQDJHPHQW6VWHPRI
*RPRUR-LOOH0HRQ*LPKDH6L*HRQJ6DQJQDP.RUHD
0DQXIDFWXUHDQG6HUYLFHRI*53:DWHU7DQN6WHHO5HLQIRUFHG0DWHULDOV
6DOHVRI:DWHU7DQN3DQHODQG6WHHO5HLQIRUFHG0DWHULDOV
3LSHFR.RUHD
$XWKRULVHG6LJQDWRU
9HULWDV$VVXUDQFH,QWHUQDWLRQDO
VW QG
 6XUYHLOODQFHGXHEHIRUH  6XUYHLOODQFHGXHEHIRUH
_
HUWLILFDWHLVVXHGDWH HUWLILFDWHH[SLUGDWH
_
5HJLVWHUHG$FFUHGLWDWLRQ2IILFH
.HPS+RXVHLW5RDG/RQGRQ8QLWHG.LQJGRP
2FFXSDWLRQDO+HDOWKDQG6DIHW0DQDJHPHQW6VWHP
$%
KDVEHHQDVVHVVHGDQGUHJLVWHUHGE9HULWDV$VVXUDQFH,QWHUQDWLRQDO
DVFRQIRUPLQJWRWKHUHTXLUHPHQWVRI
7KLVFHUWLILFDWHUHPDLQVWKHSURSHUWRI9HULWDV$VVXUDQFH,QWHUQDWLRQDODQGPXVWEHUHWXUQHGRQUHTXHVW,QWKHLVVXDQFHRIWKLVFHUWLILFDWH9HULWDV$VVXUDQFH
,QWHUQDWLRQDODVVXPHVQROLDELOLWWRDQSDUWRWKHUWKDQWRWKHFOLHQWDQGWKHQRQOLQDFFRUGDQFHZLWKWKHDJUHHGXSRQFHUWLILFDWLRQDJUHHPHQW9DOLGLWRIWKLV
FHUWLILFDWHPDEHFRQILUPHGDWZZZYHULWDVDVVXUDQFHFRPGLUHFWOWKURXJK45FRGHEXVLQJDQGHYLFHZLWKFRUUHFWLQIRUPDWLRQRU
HPDLOWRDGPLQ#YHULWDVDVVXUDQFHFRP
7KLVFHUWLILFDWHUHPDLQVYDOLGZKLOHWKHKROGHUPDLQWDLQVWKHPDQDJHPHQWVVWHPLQDFFRUGDQFHZLWKWKHVWDQGDUG V DERYHZKLFKZLOOEHSHULRGLFDOODXGLWHGE
9HULWDV$VVXUDQFH,QWHUQDWLRQDO
9(5,7$6
0,;
)6 
Š
)6
ZZZIVFRUJ
)URPUHVSRQVLEOH
VRXUFHV
,62
HUWLILFDWH1R
9HULWDV$VVXUDQFH,QWHUQDWLRQDOLV$FFUHGLWHGE$6,%
$FFUHG6HUYLFHV,QWHUQDWLRQDO%RDUG (XURSH /LPLWHG 
7KH2FFXSDWLRQDO+HDOWK 6DIHW0DQDJHPHQW6VWHPLVDSSOLFDEOHWR
7KLVFHUWLILFDWHLVYDOLGDWHGWKURXJKDQQXDOVXUYHLOODQFHDXGLW
7KLVLVWRFHUWLIWKDWWKH0DQDJHPHQW6VWHPRI
*RPRUR-LOOH0HRQ*LPKDH6L*HRQJ6DQJQDP.RUHD
0DQXIDFWXUHDQG6HUYLFHRI*53:DWHU7DQN6WHHO5HLQIRUFHG0DWHULDOV
6DOHVRI:DWHU7DQN3DQHODQG6WHHO5HLQIRUFHG0DWHULDOV
3LSHFR.RUHD
$XWKRULVHG6LJQDWRU
9HULWDV$VVXUDQFH,QWHUQDWLRQDO
VW QG
 6XUYHLOODQFHGXHEHIRUH  6XUYHLOODQFHGXHEHIRUH
_
HUWLILFDWHLVVXHGDWH HUWLILFDWHH[SLUGDWH
_
    
 
  
   !    
#  
$ 
%$
  % '()*+)
, -./))01)2./))111
0. ()((
  3 
$ / )' / 
4 / 
$ / 
$   / 
3  '  5
       
   
,  5      ' 5     5      
6   57+1()/-())) 8 ()9 '  5 /   5       5  
      55 6   59
,5      55 6   5            5
   5        5   
             
9  3 , :  9   $       *);#
     
      ! 
,     
  ()*+)  '  ()(  ()(+
  '     '        /   =   
5  555 6  ?
,  '5 -    :8  /  8
@   5 
#$%'(
 ))*+,-(#%'*
,         % )(A  55 -+  :# 4B $  : 30*
, -CD)E1*(+++ F-CD)E1*(+++ - 5 G    :' -    :
/)* ()  51
PIPECO AJMAN Tel : +971 67459878
United Arab Emirates Fax : +971 67459877
www.pipecogroup.com
sales@pipecogroup.com
PIPECO DUBAI Tel : +971 43951771
United Arab Emirates Fax : +971 42438360
www.pipecogroup.com
sales@pipecogroup.com
PIPECO GROUP Tel : +971 65617225
United Arab Emirates Fax : +971 67459877
www.pipecogroup.com
sales@pipecogroup.com
PIPECO DOHA Tel : +974 77214844
Qatar Tel : +974 77475888
Fax : +974 77214844
www.pipecogroup.com
salesqatar@pipecogroup.com
PIPECO RIYADH Tel : +966 557198474
Saudi Arabia www.pipecogroup.com
sales@pipecotanks.com
PIPECO BAHRAIN W.L.L Tel : +973 17300426
Kingdom of Bahrain Fax : +973 17742568
www.pipecogroup.com
salesbahrain@pipecogroup.com
PIPECO INDUSTRY LLC Tel : +968 90115888
PIPECO MUSCAT LLC Tel : +968 92277629
Oman www.pipecogroup.com
salesoman@pipecogroup.com
PIPECO INDUSTRIES PVT. LTD. Tel : +91 9845333446
India Tel : +91 9700264008
www.pipecogroup.com
sales@pipecogroup.com
PIPECO KOREA www.pipecogroup.com
Korea sales@pipecogroup.com
PIPECO TANKS UK www.pipecogroup.com
United Kingdom sales@pipecogroup.com
PIPECO AFRICA Tel : +263 8644301781
Zimbabwe Tel : +263 778930545
www.pipecoafrica.com
zimbabwe@pipecoafrica.com
PIPECO JOHANNESBURG Tel : +27 837428224
South Africa Fax : +27 671355251
www.pipecoafrica.com
sales@pipecoafrica.com
PIPECO EGYPT Tel : +20 1112130408
Egypt Tel : +20 1000630106
www.pipecogroup.com
salesegypt@pipecogroup.com
PIPECO JORDAN www.pipecogroup.com
Jordan sales@pipecogroup.com
PIPECO WEST AFRICA Tel : +233 244141303
Ghana Tel : +233 273998141
www.pipecogroup.com
sales@pipecogroup.com
PIPECOEAWATERENGINEERINGLTD. www.pipecogroup.com
Nairobi, Kenya sales@pipecogroup.com

More Related Content

Similar to GRP Sectional Water Tank - Pipeco Industry

catalogue of pipe
catalogue of pipecatalogue of pipe
catalogue of pipe
Zhou Xin
 
Elite Flow Control PPT katalog valve pipa
Elite Flow Control PPT katalog valve pipaElite Flow Control PPT katalog valve pipa
Elite Flow Control PPT katalog valve pipa
wmpkelanis
 
English Version of E-catalogue
English Version of E-catalogueEnglish Version of E-catalogue
English Version of E-catalogue
Dang Zou
 

Similar to GRP Sectional Water Tank - Pipeco Industry (20)

catalogue of pipe
catalogue of pipecatalogue of pipe
catalogue of pipe
 
ABS Coated Pipe - by Technovision Engineers Pvt. Ltd. Pune
ABS Coated Pipe - by Technovision Engineers Pvt. Ltd. PuneABS Coated Pipe - by Technovision Engineers Pvt. Ltd. Pune
ABS Coated Pipe - by Technovision Engineers Pvt. Ltd. Pune
 
Technovision pipe & joints catalogue
Technovision pipe & joints catalogueTechnovision pipe & joints catalogue
Technovision pipe & joints catalogue
 
Elite Flow Control PPT katalog valve pipa
Elite Flow Control PPT katalog valve pipaElite Flow Control PPT katalog valve pipa
Elite Flow Control PPT katalog valve pipa
 
English Version of E-catalogue
English Version of E-catalogueEnglish Version of E-catalogue
English Version of E-catalogue
 
Isuzu 3 ton water tank fire fighting truck
Isuzu 3 ton water tank fire fighting truckIsuzu 3 ton water tank fire fighting truck
Isuzu 3 ton water tank fire fighting truck
 
Valvula
ValvulaValvula
Valvula
 
Valvula
ValvulaValvula
Valvula
 
product_testing.ppt
product_testing.pptproduct_testing.ppt
product_testing.ppt
 
2376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure52376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure5
 
Slide Plates V.2 Webinar
Slide Plates V.2 WebinarSlide Plates V.2 Webinar
Slide Plates V.2 Webinar
 
Innovated CGS Once-shaping Modular Tank Panel
Innovated CGS Once-shaping Modular Tank PanelInnovated CGS Once-shaping Modular Tank Panel
Innovated CGS Once-shaping Modular Tank Panel
 
Pre-Insulated Supports - September
Pre-Insulated Supports - SeptemberPre-Insulated Supports - September
Pre-Insulated Supports - September
 
Metalerstatning med PP, PA6 og PA66 armeret med lange fibre v. Johnny Bjarnho...
Metalerstatning med PP, PA6 og PA66 armeret med lange fibre v. Johnny Bjarnho...Metalerstatning med PP, PA6 og PA66 armeret med lange fibre v. Johnny Bjarnho...
Metalerstatning med PP, PA6 og PA66 armeret med lange fibre v. Johnny Bjarnho...
 
Pre-Insulated Pipe Supports for Both Cryogenic and High Temperature Applications
Pre-Insulated Pipe Supports for Both Cryogenic and High Temperature ApplicationsPre-Insulated Pipe Supports for Both Cryogenic and High Temperature Applications
Pre-Insulated Pipe Supports for Both Cryogenic and High Temperature Applications
 
HDOT one of the topmost Manufacturing Units in India
HDOT one of the topmost Manufacturing Units in IndiaHDOT one of the topmost Manufacturing Units in India
HDOT one of the topmost Manufacturing Units in India
 
Pimtas HDPE Fittings Supplier Sharjah.pptx
Pimtas HDPE Fittings Supplier Sharjah.pptxPimtas HDPE Fittings Supplier Sharjah.pptx
Pimtas HDPE Fittings Supplier Sharjah.pptx
 
[HIFLUX] High Pressure Special Valve Catalog
[HIFLUX] High Pressure Special Valve Catalog[HIFLUX] High Pressure Special Valve Catalog
[HIFLUX] High Pressure Special Valve Catalog
 
IBM-Ginde pipes english
IBM-Ginde pipes englishIBM-Ginde pipes english
IBM-Ginde pipes english
 
[HIFLUX] High Pressure Fitting Catalog - English Version
[HIFLUX] High Pressure Fitting Catalog - English Version[HIFLUX] High Pressure Fitting Catalog - English Version
[HIFLUX] High Pressure Fitting Catalog - English Version
 

Recently uploaded

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

GRP Sectional Water Tank - Pipeco Industry

  • 1.
  • 2. 02 Pipeco GRP Sectional Water Tank PIPECO TANKS (KOREA) is a company that specializes in the development and production of GRP Water tanks. Located in Gimhae, Korea our large-scale plant and research center are dedicatedtoongoingdevelopmentandproductiontoleadtheindustry. We are specialized in manufacturing and installing GRP tanks and other GRP Products. Our advanced technology has received ISO, WARAS (UK), PSB (SINGAPORE) quality certificates. we have expanded our presence in more than 35 countries and 1 Tank getting completely installed every24hours In addition, with a corporate ideology rooted in placing our customers first, we base our Management and Product Development upon this the foundation of trust, contributing to technologicalinnovation,qualityimprovement,andaddedenhancement. To carry out such customer-oriented management, we constantly keep in mind the priorities of stringent quality management and environmental protection. In the following, we adopted ISO product quality and environmental management standards from the very beginning, and our efforts to Growth as an environmentally friendly company along with our customers are never- ending. We ask for your continuing interest and support kindly share your requirements via email at sales@pipecogroup.com G R O U P
  • 3. G R O U P THERMAL CONDUCTIVITY, EXPANSION AND CONTRACTION Non-insulated panels have 240 times less thermal conductivity than metal, ensuring stable temperature. Modular panels with low thermal coefficient and flexible food grade sealant ensure a leak-free design PROTECTION AGAINST UV RAYS Excellent ultraviolet (UV) resistant characteristics and performance ensures high mechanical properties and weather resistance even after 35 years of use Thermal Properties 50mm Insulated 25mm Insulated Normal Steel 1/K(W/M.K) 03
  • 4. G R O U P STANDARD: BS EN 13280:2001 and British Standard BS 7491 Part 3:1994 MATERIALS: Sheet Moulding Compound (SMC) consists of below specification Resin - PU Form Conforming to BS 3532 specification Fiber Glass - Low alkali fiberglass conforming to JIS R3411 to R3417 or BS 3396, BS 3496, and BS 3749 specifications. 01 02 03 TESTING METHOD: BS2782 MANUFACTURING PROCESS: Hot pressed SMC compression moulding 04 05 TANK STRUCTURAL SUPPORT: External Internal Roof Support SEALANT: Non-toxic PVC Foam BOLT, NUTS, WASHERS: Hot Dipped Galvanised Steel SS316 GRP Pipes : : : 06 07 08 LADDER : External Standard : Hot Dipped Galvanised Steel, 300mm width Internal : Standard GRP Optional : SS 304 and 316, 300mm width 09 WATER LEVEL INDICATOR : Standard : Direct Reading Clear Tube Type Optional : Reversed Reading Mechanical Ball Float Type (Cat & Mouse) 10 NOZZLE PANEL : Flat Panels will be provided on request 11 EXTERNAL BRACED SYSTEM : External : Hot Dipped Galvanized Steel Internal None (metal free inside, non -partitioned tank only) Roof Support : GRP Poles 04 General Specifications External Standard : SS316 / SS304/HDG Internal Standard : SS316 (In-contact with water) Roof : Standard : SS316 / SS304
  • 5. G R O U P GRP Panel Type and Size 05 0.5Mx0.5M 0.5Mx1M 1Mx1M Roof Panel 1Mx2M Base Panel Drain Panel 0.5Mx0.5M 0.5Mx1M 1Mx1M 1Mx1M PIPECO 1Mx2M 0.5Mx2M PIPECO 1Mx1.5M 0.5Mx1.5M Wall Panel 1Mx1M 1Mx1M 0.5Mx1M 0.5Mx1M 0.3Mx1M ManwayPanel 1Mx1M 0.5Mx0.5M GRP Panel Composition by Height PIPECO PIPECO PIPECO PIPECO PIPECO PIPECO PIPECO PIPECO PIPECO PIPECO Current A grade Height of water tank 1x1 E 1x1.5 1x2 D 1x1.5 1x1 1x2 1x1 1x1.5 1x1 1x1 1x2 1x1 1x1 D C D B D C SA D B SA D 1x1.5 1x1 1x1 1x1 D C SA IIA 1x2 1x1 1x1 1x1 D B SA IIA 1x1.5 1x1 1x1 1x1 1x1 D C SA IIA IIIA 1x2 1x1 1x1 1x1 1x1 D B SA IIA IIIA Unify to SA grade Current IA grade Unify to IIA grade 6.0m.H 5.5m.H 5.0m.H 4.5m.H 4.0m.H 3.5m.H 3.0m.H 2.5m.H 2.0m.H 1.5m.H 1.0m.H 0.5m.H 0m.H Grade of base panel Grade of drain panel Grade of wall-base panel Flat,0.5X1 Flat,1X1 E C D D D C B B D C B B C B B SA B SA B SA SA SA SA IIA SA IIA SA IIA IIA IIA IIA IIIA IIA IIA IIA IIIA IIIA IIIA IIIA IIIA IIIA IIIA IIIA IIIA
  • 6. Roof support pipe 11 Manway panel 1 2 External ladder 3 Internal ladder Internal bracket Internal Tie-Rod 4 5 External bracket 7 6 Flangebar, Flat bar Name plate 16 10 Corner frame 14 Sealing tape 13 Bolts and Nuts 12 Skid base frame 9 Wall-Bottom bracket 15 Water level gauge 8 Corner bracket It is possible that various capacity design and flexible space should be used by GRP panel standardized Excellent water tightness, hygienic conditions and non-leakage applied internally reinforced stay (Stainless) G R O U P 06 Internally Reinforced System
  • 7. 07 4 11 5 2 1 11 10 13 12 9 8 16 6 7 3 15 GRP SS400(HDG) GRP (Pultrusion) STS 316 STS 316 SS400(HDG) Roof support pipe Skid base frame Bolts and Nuts Sealing tape Water level gauge Name plate GRP (Pultrusion) SS400(HDG) Internal : STS 316 Roof : STS 316 External : STS 316 / 304 / HDG Skid Base : HDG PVC Sealant+Butyl Aluminum Case+PC Clear Tube+Socket Aluminum (Water tank safery management instructions) Material Name No. No. Name Material Manway panel External ladder Internal ladder Internal bracket Internal Tie-Rod Flangebar, Flat bar External bracket Corner bracket Wall-Bottom bracket Corner frame 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 G R O U P Internally Reinforced System
  • 8. 08 G R O U P G R O U P 08 External ladder 3 Internal ladder Internal bracket 4 7 External bracket 14 Name plate 12 Sealing tape 10 Base frame Bolt and Nuts 11 Corner frame 8 13 Water level gauge External main bar 6 Roof support pipe : GRP (Pultrusion) 9 5 Roof bar 1 Manway panel 2 Externally Reinforced System
  • 9. G R O U P 09 12 11 10 2 SS400(HDG) 10 Base frame Bolts and Nuts 11 Sealing tape 12 13 Water level gauge 14 Name plate SS400(HDG) Internal : STS 316 Roof : STS 316 External : STS 316 Skid Base : HDG PVC Sealant+Butyl Aluminum Case+PC Clear Tube+Socket Aluminum(Water tank safety management instructions) Name Material No. 1 Manway panel External ladder Internal ladder Internal bracket Roof bar External main bar External bracket Corner bracket GRP SS400(HDG) GRP (Pultrusion) STS 316 SS400(HDG) 3 4 5 6 7 8 9 Roof support pipe : GRP (Pultrusion) No. Name Material 8 7 4 9 6 13 14 3 5 2 1 Externally Reinforced System
  • 10. 10 Excellent insulation of GRP Material itself with Eco-friendly Polyurethane heat insulating material prevents freeze & water condensation. There is non-woven fabric with excellent adhesion inside GRP insulated panel, ensuring shape stability of panel throughout longer time periods. GRP insulated panel with 4 layer structure ensure excellent insulating effect Thickness of insulated panel : 40 - 50 mm Stress Analysis of GRP Panel Excellent Heat Insulation Drawing of the panel Joint Part / Corner Part Composition of Insulation Panel G R O U P Panel physical Properties GRP Water Tank panel is designed with special shape for maximizing safety against stress and deformation, so it has better structural strength than normal circle designed panel As GRP Water panel is manufactured by oil-hydraulic press under high temperature and high pressure, it maintains top water pressure strength and there isnodimensionaldeviationbytemperaturechange. TEST ITEM UNIT SAMPLE Specific Gravity (23°C/23°C) Water Absorption Tensile Strength Tensile Elastic Modulus Flexural Strength Flexurual Elastic Modulus Shear Strength Izod Impact Strength Compressive Strength Thermal Conductivity [Mean Temperature 20°C Thermal Conductivity [Mean Temperature 20°C Barcol Hardness Glass content - % MPa GPa MPa GPa MPa J/m MPa W/(m.k) W/(m.k) - % - - - - - - - - - - - - - 1,806 0.02 115 17.5 213 15.9 114 923 234 0.115 0.024 53 over 42.9% RESULT ASTM D792-13(Test Method A) ASTM D570-98(2010)e1 (24 h Immersion) « ASTM D638-14( ) « ASTM D638-14( ) ASTM D790-17(Procedure A) ASTM D790-17(Procedure A) ASTM D732-17 ASTM D256-10e1(Test Method A) ASTM D695-15(**) KS L 9016 : 2010 (By means of the Heat Flow Meter Apparatus) KS L 9016 : 2010 (By means of the Heat Flow Meter Apparatus) ASTM D2583-13a ASTM D2584-11 TEST METHOD
  • 11. 11 G R O U P Hydrostatic Pressure Water pressure reinforcement 6 times standard Transformation rate in filled with water : Less than 1% from water tank height Wind Force 60 m / sec Earthquake Force Stable and safe till magnitude 5.0 (Over magnitude 5.0, it need additional reinforcement) Snow Load 60 Kg/m2, snow fall less than 30cm Illumination Rate Less than 0.1% Out-fit-Force No leakage under condition of vertical 100kg after install of 100A fitting with 70mm span support Water Temperature Usable temperature : Less than 30° / Limited temperature : Max 70° Water Quality Tap Water, Well Water : Chlorine below 50mg/L Seawater : application Externally Reinforced water tank (max 3m height) Man Load 120 KGF Section Design Standard Feature GRP CONCRETE PLASTIC STEEL Hygiene & Water Quality Flexibility Relocation Water Tightness Strength & Durability Easy & Fast Assembly Easy to Transportation Thermal Conductivity Drainage Value of Parameter Excellent Good Average Poor Comparison with Other Types of Tanks Strength & Durability
  • 12. Standard of Base Concrete PAD Installation and Space For maintenance of GRP tank, it need extra space at least 600mm - 100mm from wall and 1000mm from ceiling G R O U P (Partition Type) (Non Partition Type) Installation Space Partition Installation 12
  • 13. 13 Height of water tank 2.5mH Height of water tank4m GRP Sectional Panel, Putting water to 85% of water tank height, Earthquake-Proof Strength 5.0 O.K O.K O.K O.K O.K O.K O.K O.K 0.15 < 0.25(Allowable value) 0.17 < 0.33(Allowable value) 0.21 < 0.25(Allowable value) 0.25 < 0.33(Allowable value) 0.06 < 0.25(Allowable value) 0.27 < 0.33(Allowable value) 0.15 < 0.25(Allowable value) 0.17 < 0.33(Allowable value) O.K O.K O.K O.K O.K O.K O.K O.K 1170< 1600(Allowable value) 1340< 2400(Allowable value) 1590< 1600(Allowable value) 1830< 2400(Allowable value) 790< 1600(Allowable value) 900< 2400(Allowable value) 1540< 1600(Allowable value) 1750< 2400(Allowable value) Long term Short term Long term Short term Long term Short term Long term Short term Base frame Base cross Base frame Base cross 2.5mH 4mH Height Contents Result Deflection(cm) Result 2 Bending Stress(kg/cm ) Result of skid base strength review (Safety Factor 2.0) Earthquake-Proof Skid Base System G R O U P
  • 14. G R O U P 1) Thewaterlevelshouldbeovertierodpositionallthetime.(Over85%oftankheight) 2) Checktheflatnessofconcreteplinth.(Tolerance:2mm) 3) Checkwatertankpanel'scrack. 4) Checkdeflectionof wallpanel.(maximumupto1%ofwatertankheight) 5) Checkgenerallyforleaksordrips. 6) The interior of the tank should be cleaned two or more times a year: after cleaning, you need to check whetherthewaterqualityinthetankisproperornot. 7) Organic solvent including thinner, acetone and chlorine bleach cannot be used to clean the exterioror interiorofthetank. 8) When cleaning once compartment the inside of the tank, keep the water level less than 50% atthe othercompartment. 9) Thetankcannotstoreanythingexceptnormaltemperaturedrinkingwater. 10) All internal supports should be checked for corrosion, if corrosion is found it should be rectified immediately. 11) Checkthatalltierodshouldbetightened. 12) Checkthatallpipeworkconnectedtotanksuitablybraced. 13) Checkthatthestructuralsupportsunderthetankareingoodcondition. 14) Checkthatoverflowsarefitted. 15) WhenCleaningtheinsideoftank,donotinterfacewiththejointseals. 16) If there are ladders fitted to the tanks, ensure that they have not been damaged and are securely fastened tothetank. 17) Ifoverflowand/orairinletscreensarefitted,checkthattheyhavenotbecomeblocked. 18) Pipeco Korea will not bear the responsibility for the problems caused by your failure to fallow the above mentioned recommendations, inadequate strength or uneven of concrete plinths or naturaldisasters. Installation and Caution 1) Caution the damage to the water tank from outside shock 2) Do not use the GRP water tank for other unapproved purpose. (For example chemical storage tank) 3) Do not dismantle internal components or change it to other components without official approval. 4) Prohibit to install unapproved components or non-consent equipment. 5) Keep standard water level at all times. (Uppermost tie rod is soaked in water) User Regulation Maintenance Items Maintenance Control 14
  • 15. Certificates of GRP Water Tanks GRP Water Tanks Certificates and Test Reports 15 G R O U P Getting all international certificates and Test reports for GRP Water tank Realization of customer satisfaction through quality management system GRP Water tank of best quality with competitive price 5HJLVWHUHG$FFUHGLWDWLRQ2IILFH .HPS+RXVHLW5RDG/RQGRQ8QLWHG.LQJGRP 4XDOLW0DQDJHPHQW6VWHP $% KDVEHHQDVVHVVHGDQGUHJLVWHUHGE9HULWDV$VVXUDQFH,QWHUQDWLRQDO DVFRQIRUPLQJWRWKHUHTXLUHPHQWVRI 7KLVFHUWLILFDWHUHPDLQVWKHSURSHUWRI9HULWDV$VVXUDQFH,QWHUQDWLRQDODQGPXVWEHUHWXUQHGRQUHTXHVW,QWKHLVVXDQFHRIWKLVFHUWLILFDWH9HULWDV$VVXUDQFH ,QWHUQDWLRQDODVVXPHVQROLDELOLWWRDQSDUWRWKHUWKDQWRWKHFOLHQWDQGWKHQRQOLQDFFRUGDQFHZLWKWKHDJUHHGXSRQFHUWLILFDWLRQDJUHHPHQW9DOLGLWRIWKLV FHUWLILFDWHPDEHFRQILUPHGDWZZZYHULWDVDVVXUDQFHFRPGLUHFWOWKURXJK45FRGHEXVLQJDQGHYLFHZLWKFRUUHFWLQIRUPDWLRQRU HPDLOWRDGPLQ#YHULWDVDVVXUDQFHFRP 7KLVFHUWLILFDWHUHPDLQVYDOLGZKLOHWKHKROGHUPDLQWDLQVWKHPDQDJHPHQWVVWHPLQDFFRUGDQFHZLWKWKHVWDQGDUG V DERYHZKLFKZLOOEHSHULRGLFDOODXGLWHGE 9HULWDV$VVXUDQFH,QWHUQDWLRQDO 9(5,7$6 0,; )6 Š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Š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Š )6 ZZZIVFRUJ )URPUHVSRQVLEOH VRXUFHV ,62 HUWLILFDWH1R 9HULWDV$VVXUDQFH,QWHUQDWLRQDOLV$FFUHGLWHGE$6,% $FFUHG6HUYLFHV,QWHUQDWLRQDO%RDUG (XURSH /LPLWHG 7KH2FFXSDWLRQDO+HDOWK 6DIHW0DQDJHPHQW6VWHPLVDSSOLFDEOHWR 7KLVFHUWLILFDWHLVYDOLGDWHGWKURXJKDQQXDOVXUYHLOODQFHDXGLW 7KLVLVWRFHUWLIWKDWWKH0DQDJHPHQW6VWHPRI *RPRUR-LOOH0HRQ*LPKDH6L*HRQJ6DQJQDP.RUHD 0DQXIDFWXUHDQG6HUYLFHRI*53:DWHU7DQN6WHHO5HLQIRUFHG0DWHULDOV 6DOHVRI:DWHU7DQN3DQHODQG6WHHO5HLQIRUFHG0DWHULDOV 3LSHFR.RUHD $XWKRULVHG6LJQDWRU 9HULWDV$VVXUDQFH,QWHUQDWLRQDO VW QG 6XUYHLOODQFHGXHEHIRUH 6XUYHLOODQFHGXHEHIRUH _ HUWLILFDWHLVVXHGDWH HUWLILFDWHH[SLUGDWH _ ! # $ %$ % '()*+) , -./))01)2./))111 0. ()(( 3 $ / )' / 4 / $ / $ / 3 ' 5 , 5 ' 5 5 6 57+1()/-())) 8 ()9 ' 5 / 5 5 55 6 59 ,5 55 6 5 5 5 5 9 3 , : 9 $ *);# ! , ()*+) ' ()( ()(+ ' ' / = 5 555 6 ? , '5 - :8 / 8 @ 5 #$%'( ))*+,-(#%'* , % )(A 55 -+ :# 4B $ : 30* , -CD)E1*(+++ F-CD)E1*(+++ - 5 G :' - : /)* () 51
  • 16. PIPECO AJMAN Tel : +971 67459878 United Arab Emirates Fax : +971 67459877 www.pipecogroup.com sales@pipecogroup.com PIPECO DUBAI Tel : +971 43951771 United Arab Emirates Fax : +971 42438360 www.pipecogroup.com sales@pipecogroup.com PIPECO GROUP Tel : +971 65617225 United Arab Emirates Fax : +971 67459877 www.pipecogroup.com sales@pipecogroup.com PIPECO DOHA Tel : +974 77214844 Qatar Tel : +974 77475888 Fax : +974 77214844 www.pipecogroup.com salesqatar@pipecogroup.com PIPECO RIYADH Tel : +966 557198474 Saudi Arabia www.pipecogroup.com sales@pipecotanks.com PIPECO BAHRAIN W.L.L Tel : +973 17300426 Kingdom of Bahrain Fax : +973 17742568 www.pipecogroup.com salesbahrain@pipecogroup.com PIPECO INDUSTRY LLC Tel : +968 90115888 PIPECO MUSCAT LLC Tel : +968 92277629 Oman www.pipecogroup.com salesoman@pipecogroup.com PIPECO INDUSTRIES PVT. LTD. Tel : +91 9845333446 India Tel : +91 9700264008 www.pipecogroup.com sales@pipecogroup.com PIPECO KOREA www.pipecogroup.com Korea sales@pipecogroup.com PIPECO TANKS UK www.pipecogroup.com United Kingdom sales@pipecogroup.com PIPECO AFRICA Tel : +263 8644301781 Zimbabwe Tel : +263 778930545 www.pipecoafrica.com zimbabwe@pipecoafrica.com PIPECO JOHANNESBURG Tel : +27 837428224 South Africa Fax : +27 671355251 www.pipecoafrica.com sales@pipecoafrica.com PIPECO EGYPT Tel : +20 1112130408 Egypt Tel : +20 1000630106 www.pipecogroup.com salesegypt@pipecogroup.com PIPECO JORDAN www.pipecogroup.com Jordan sales@pipecogroup.com PIPECO WEST AFRICA Tel : +233 244141303 Ghana Tel : +233 273998141 www.pipecogroup.com sales@pipecogroup.com PIPECOEAWATERENGINEERINGLTD. www.pipecogroup.com Nairobi, Kenya sales@pipecogroup.com